back to the basics : well compliance forms and procedures

30
RAILROAD COMMISSION OF TEXAS BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES 1

Upload: hagop

Post on 22-Jan-2016

38 views

Category:

Documents


0 download

DESCRIPTION

BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES. CLASS OVERVIEW. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

1

RAILROAD COMMISSION OF TEXAS

BACK TO THE BASICS :WELL COMPLIANCE

FORMS AND PROCEDURES

Page 2: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

2

CLASS OVERVIEW

This class will focus on the forms that make up both Gas and Oil completion packets. It is

important that the information provided by the operator is accurate in order to facilitate the timely processing of the completion packet.

Page 3: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

3

FORM G-1 – GAS WELL COMPLETION REPORT

Required by Statewide Rules 28 and 31

All completions and associated forms should be filed on-line or mailed directly to the Austin Office within 30 days of completion (Statewide Rule 16)

Page 4: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

4

GAS ALLOWABLE EFFECTIVE DATE

Allowable is set based on the date of receipt of all required forms

Will be backdated 15 days from when the last form needed for an allowable was received in Austin.

Completion date (packet data on G-1) is the date the well is capable of producing by the opening of a valve or flipping of a switch.

Page 5: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

5

FORM G-1, Packet Data

Field must be on drill permit

Date well capable of being produced

Page 6: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

6

FORM G-1, PG 1

Last day of test

Entire line must be completed

Page 7: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

7

FORM G-1, PG 1 (CONTINUED)

These two sections need to be completed

Page 8: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

8

FORM G-1, PG 2

Must provide True Vertical Depth and Measured Depth if applicable

Date drill/workover rig moves off lease

Page 9: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

9

FORM G-1, PG 5

Must be reported in Measured Depth

You must report what occurred at specific depths. This includes how producing intervals were

opened.

Formations reported for that area will prepopulate from a database . Each formation must be

addressed appropriately.

Page 10: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

10

FORM G-5 – GAS WELL CLASSIFICATION REPORT

If less than 100,000 CF gas/1 bbls oil

Page 11: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

11

FORM G-10 – GAS WELL STATUS REPORT

These 4 boxes must be filled out for a gas test

Page 12: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

12

FORM P-15 – STATEMENT OF PRODUCTIVITY OF ACREAGE AND PRORATION PLAT

Page 13: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

13

FORM W-2 – OIL WELL POTENTIAL TEST

Required by Statewide Rules 16 & 51 Effective February 2011, Completion forms for All

Districts in Texas should be filed on-line or mailed directly to the Austin Office within 30 days of completion (Statewide Rule 16)

Include Lease number, if the well will be added to an existing lease

File potential test information within 10 days of the test date (Statewide Rule 51)

Wells needing an allowable must include a test Non-producing wells and service wells, no test required

Page 14: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

14

OIL ALLOWABLE EFFECTIVE DATE

Allowable set based on date of receipt of all required forms

Allowable effective date may be backdated to the completion date if the forms are received within 10 days of the test date (test information needs to include a 24 hour test)

Packet Data - Completion date is the date the well was capable of producing by the opening of a valve or flipping of a switch

Page 15: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

15

FORM W-2, PACKET DATA

Date well capable of being produced

Field must be on drill permit

Page 16: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

16

FORM W-2, PG 1

Must be at least 1 day later than completion date

Page 17: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

17

FORM W-2, PG 2

Must Provide both True Vertical Depth and Measured Depths for Horizontal/ Directional wells

Date drill/workover rig moves off lease

Page 18: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

18

FORM W-2, PG 5

Must be reported in Measured Depth

You must report what occurred at specific depths. This includes how producing intervals were

opened.

Formations reported for that area will prepopulate from a database . Each formation must be

addressed appropriately.

Page 19: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

19

PRORATION PLAT

Proration plats are required in fields that have special field rules

Plats need to outline the proration unit, show the lease line distances, and the distances to the nearest well

Plats are to be certified and to scale Please identify the plat with a district and

lease number, if lease already exists

Page 20: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

20

FORM W-10 - OIL WELL STATUS REPORT

Not required with Initial Potential. Will use test from W-2.

Report to nearest 1/10 of a barrel. Whole numbers on rest of form

Page 21: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

21

FORMS FOR BOTH GAS AND OIL

• W-12 Inclination Report• W-15 Cementing Report• L-1 Electric Log Status Report• P-4 Producer’s Transportation

Authority and Certificate of Compliance• P-8 Request for Clearance

Page 22: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

22

W-12 - Inclination Report

W-12 must cover entire wellbore. If horizontal or directional well, W-12 and/or directional survey(s) must cover entire wellbore.

Page 23: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

23

W-12 – Inclination Report (Bottom)From last shot point

From drill permit

If Yes, then must have directional surveys

Must be signed by company performing survey

Page 24: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

24

FORM W-15 - CEMENTING REPORT

Statewide Rules 13 & 14 Filed with all new completions and

dry hole completions District Office has primary audit

responsibility & approval Must be signed by cementing

company

Page 25: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

25

FORM L-1 - ELECTRIC LOG STATUS REPORT

Statewide Rule 16 File with all new gas, oil, deepened wells and

dry holes If no log was run check Box A Indicate if confidentiality is requested Log header required to be attached with

request for confidentiality If log marked attached – mail to Austin office

Page 26: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

26

FORM P-4 - CERTIFICATE OF COMPLIANCE

Statewide Rule 58 Form P-4 is a certificate of compliance as well

as authorization for gathering the product Same form used for oil leases and gas wells One form per oil lease and one for each gas

well New lease P-4’s can be completed with online

completion packet . All other P-4’s should be mailed to Austin Office

Page 27: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

27

FORM P-4 (CONTINUED)

Fill out the P-4 in its entirety - listing complete company names (even if information is not being changed)

Item 12 – check all appropriate box for changes being made

All percentages need to add up to 100% Always show a system code for the gas purchaser Show the company that actually moves the stock;

purchaser is not required for liquid gatherer MUST have original signatures for operator changes

Page 28: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

28

FORM P-4 (CONTINUED)

You can verify the gatherer/purchaser you are selecting is valid by utilizing the Organization (P-5) Query under our Oil & Gas Data queries section.

Page 29: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

29

FORM P-8 - REQUEST FOR CLEARANCE

Statewide Rule 80 Filed before the well is assigned an

ID/Lease number An allowable will be needed to cover

this production P-8’s can be filed on-line District office processes all P-8 requests. Copy of Form P-4 must be attached

Page 30: BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES

30

CONTACT INFORMATION

Please take advantage of the Well Compliance Phone Queue System for immediate assistance with general proration questions, online filings, opening packets, etc. A knowledgeable member of the Well Compliance staff will assist you.

E-mail: [email protected]: 512-463-6975