bab 3.3 - d-value muto
DESCRIPTION
gempaTRANSCRIPT
![Page 1: Bab 3.3 - D-Value Muto](https://reader036.vdocuments.mx/reader036/viewer/2022081719/55725c27497959da6be8bb9d/html5/thumbnails/1.jpg)
Analisa Struktur dengan Metoda D-Value Muto
III – 39
2. Kekakuan Struktur
Kekakuan Kolom (kk)
Kolom b h Hk Ik Kk kk
(cm) (cm) (cm) (cm4) (kg-cm)
K1 30,0 30,0 300,0 67500,00 225,00 E 0,2250
K2 35,0 35,0 400,0 125052,08 312,63 E 0,3126
K3 40,0 40,0 450,0 213333,33 474,07 E 0,4741
K4 30,0 30,0 350,0 67500,00 192,86 E 0,1929
Keterangan :
Momen Inersia Kolom (Ik1) :
Ik1 = 1/12 b h3
Kekakuan Kolom (Kk1) :
Kk1 = 1
1
k
k
h
EI
Rasio Kekakuan Kolom (kk1) :
kk1 = o
k
K
K 1 ; Ko = 1000 E
kb1 kb2
kb3 kb4
kk 1 kk 1 kk 1
kk 2 kk 3 kk 4
4,5
m
3,0
m
A
C
B
3,5
m
Lantai – 1
Lantai – 2
4,0
m
4,0 m 5,0 m
h
b
D F
E
G I H
![Page 2: Bab 3.3 - D-Value Muto](https://reader036.vdocuments.mx/reader036/viewer/2022081719/55725c27497959da6be8bb9d/html5/thumbnails/2.jpg)
Analisa Struktur dengan Metoda D-Value Muto
III – 40
Kekakuan Balok (kb)
Balok bb hb hf bf Lb A1 y1
(cm) (cm) (cm) (cm) (cm) (cm)2 (cm)
B1 25,0 35,0 10,0 100,0 400,0 625,0 22,5
B2 30,0 40,0 10,0 125,0 500,0 900,0 25,0
B3 25,0 35,0 12,0 100,0 400,0 575,0 23,5
B4 30,0 40,0 12,0 125,0 500,0 840,0 26,0
Balok A2 y2 ỹ Ib Kb kb
(cm)2 (cm) (cm) (cm)
4 (kg-cm)
B1 1000,0 5,0 11,73 158673,88 396,68 0,3967
B2 1250,0 5,0 13,37 287218,99 574,44 0,5744
B3 1200,0 6,0 11,67 158797,21 396,99 0,3970
B4 1500,0 6,0 13,18 288264,62 576,53 0,5765
Keterangan :
Lebar efektif flens balok
(bf), adalah nilai terkecil
dari nilai-nilai berikut :
– bf = ¼ Lb
– bf = bb + 16 hf
Lokasi Garis Netral Balok (ỹ), terhadap serat atas balok :
ỹ = 21
2211
AA
yAyA
dimana :
A1 = bb (hb – hf) ; y1 = ½ (hb + hf)
A2 = bf . hf ; y2 = ½ hf
Momen Inersia Balok (Ib) :
Ib = 1/12 bb (hb – hf)3 + A1 (y1 - ỹ)
2 + 1/12 bf hf
3
+ A2 (ỹ - y2)2
hf
bb
hb
bf
![Page 3: Bab 3.3 - D-Value Muto](https://reader036.vdocuments.mx/reader036/viewer/2022081719/55725c27497959da6be8bb9d/html5/thumbnails/3.jpg)
Analisa Struktur dengan Metoda D-Value Muto
III – 41
Kekakuan Balok (Kb) : Rasio Kekakuan Balok (kb) :
Kb = b
b
L
EI kb =
oK
K b
Ko = 1000 E
3. ”D – Value” masing-masing Kolom
Untuk Kolom Tingkat 2
Kolom DG
k = 1
31
2 k
bb
k
kk =
)2250,0(2
3970,03967,0 = 1,7638
a = k
k
2 =
7638,12
7638,1 = 0,4686
D = a . kk1 = 0,4686 0,2250 = 0,1054
Kolom EH
k = 1
4321
2
)()(
k
bbbb
k
kkkk
= )2250,0(2
)5765,03970,0()5744,03967,0( = 4,3213
a = k
k
2 =
3213,42
3213,4 = 0,6836
D = a . kk1 = 0,6836 0,2250 = 0,1538
Kolom FI
k = 1
42
2 k
bb
k
kk =
)225,0(2
5765,05744,0 = 2,5576
a = k
k
2 =
5576,22
5576,2 = 0,5612
D = a . kk1 = 0,5612 0,2250 = 0,1263
Untuk Kolom Tingkat 1
Kolom AD
k = 2
3
k
b
k
k =
3126,0
3970,0 = 1,2700
![Page 4: Bab 3.3 - D-Value Muto](https://reader036.vdocuments.mx/reader036/viewer/2022081719/55725c27497959da6be8bb9d/html5/thumbnails/4.jpg)
Analisa Struktur dengan Metoda D-Value Muto
III – 42
a = k
k
2
5,0 =
2700,12
2700,15,0 = 0,5413
D = a . kk2 = 0,5413 0,3126 = 0,1692
Kolom BE
k = 3
43
k
bb
k
kk =
4741,0
5765,03970,0 = 2,0534
a = k
k
21
5,0 =
)0534,2(21
)0534,2(5,0 = 0,2010
a’ = a’
2
BE
AD
H
H = 0,2010
2
5,4
0,4 = 0,1588
D = a . kk3 = 0,1588 0,4741 = 0,0753
Kolom CF
k = 4
4
k
b
k
k =
1929,0
5765,0 = 2,9886
a = k
k
2
5,0 =
9886,22
9886,25,0 = 0,6993
a = a’
2
CF
AD
H
H = 0,6993
2
5,3
0,4 = 0,9134
D = a . kk3 = 0,9134 0,1929 = 0,1762
B
0,3967 0,5744
0,3970 0,5765
0,2
250
0,2
250
0,2
250
0,3
126
0,4
741
0,1
929
A
C
k = 1,7638
a = 0,4686 D = 0,1054
k = 4,3213
a = 0,6836 D = 0,1538
k = 2,5576
a = 0,5612 D = 0,1263
k = 1,2699
a = 0,5413
D = 0,1692
k = 2,9886
a = 0,6993
a’ = 0,9134
D = 0,1762
k = 2,0543
a = 0,2010
a’ = 0,1588 D = 0,0753
E
D F
H G I
![Page 5: Bab 3.3 - D-Value Muto](https://reader036.vdocuments.mx/reader036/viewer/2022081719/55725c27497959da6be8bb9d/html5/thumbnails/5.jpg)
Analisa Struktur dengan Metoda D-Value Muto
III – 43
4. Gaya Geser Kolom (Qi-kolom)
Qi-kolom = i
i
D
D . Qi-portal
Lantai Kolom Qi-portal Di
Qi-kolom
(ton) (ton)
Lantai 2
DG
50,0
0,1054 13,6706
EH 0,1538 19,9481
FI 0,1263 16,3813
Σ 0,3855 50,0000
Lantai 1
AD
80,0
0,1692 32,1749
BE 0,0753 14,3190
CF 0,1762 33,5061
Σ 0,4207 80,0000
5. Momen Kolom (Kolom Atas dan Kolom Bawah)
Lokasi Titik Belok Kolom (y)
Lantai 2 Lantai 1
as – A as – B as – C as – A as – B as – C
k 1,7638 4,3213 2,5576 1,2699 2,0543 2,9886
α1 0,9992 0,9975 0,9964 – – –
α2 – – – – – –
α3 – – – – – –
yo 0,4500 0,4661 0,4500 0,5865 0,0000 0,5500
y1 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000
y2 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000
y3 0,0000 0,0000 0,0000 0,0000 0,0000 0,0000
y 0,4500 0,4661 0,4500 0,5865 0,0000 0,5500
![Page 6: Bab 3.3 - D-Value Muto](https://reader036.vdocuments.mx/reader036/viewer/2022081719/55725c27497959da6be8bb9d/html5/thumbnails/6.jpg)
Analisa Struktur dengan Metoda D-Value Muto
III – 44
Momen Kolom Atas (Ma) dan Momen Kolom Bawah (Mb)
Kolom Qi-kolom Hk
y Matas (t.m) Mbawah (t.m)
(ton) (m) [ Qi Hk (1-y) ] [ Qi Hk y ]
Lantai 2
DG 13,6706 3,00 0,4500 22,5565 18,4553
EH 19,9481 3,00 0,4661 31,9509 27,8934
FI 16,3813 3,00 0,4500 27,0291 22,1148
Lantai 1
AD 32,1749 4,00 0,5865 53,2173 75,4823
BE 14,3190 4,50 0,0000 64,4355 0,0000
CF 33,5061 3,50 0,5500 52,7721 64,4992
Momen dan Gaya Geser pada Kolom
5. Momen dan Gaya Geser Balok
Untuk Balok pada Tingkat 2
Momen dan Gaya Geser pada Balok GH
MGH = MGD = 22,5565 t.m
MHG = 21
1
bb
b
kk
k MHE =
5744,03967,0
3967,0 (31,9509)
= 13,0521 t.m
E D F
19,9481
52,7721
31,9509
18,4553 27,8934
27,0291
22,1148
53,2173 64,4355
75,4823
0,00
64,4992
B
22,5565
3,0 m
A
C
4,0 m
13,6706 16,3813
32,1749 14,3190 33,5061
H G I
![Page 7: Bab 3.3 - D-Value Muto](https://reader036.vdocuments.mx/reader036/viewer/2022081719/55725c27497959da6be8bb9d/html5/thumbnails/7.jpg)
Analisa Struktur dengan Metoda D-Value Muto
III – 45
QGH = GH
HGGH
L
MM =
00,4
0521,135565,22 = 8,9021 t
Momen dan Gaya Geser pada Balok HI
MHI = 21
2
bb
b
kk
k MHE
= 5744,03967,0
5744,0 (31,9509) = 18,8988 t.m
MIH = MIF = 27,0291 t.m
QHI = HI
IHHI
L
MM =
00,5
0291,278988,18 = 9,1856 t
Untuk Balok pada Tingkat 1
Momen dan Gaya Geser pada Balok DE
MDE = MDG + MDA = 18,4553 + 53,2173 = 71,6726 t.m
MED = 43
3
bb
b
kk
k (MEH + MEB)
= 5765,03970,0
3970,0 (27,8934 + 64,4355) = 37,6524 t.m
QDE = DE
EDDE
L
MM =
00,4
6524,376726,71 = 27,3313 t
Momen dan Gaya Geser pada Balok EF
MEF = 43
4
bb
b
kk
k (MFI + MFC)
= 5765,03970,0
5765,0 (27,8934 + 64,4355) = 54,6765 t.m
MFE = MFI + MFC = 22,1148 + 52,7721 = 74,8869 t.m
QEF = EF
FEEF
L
MM =
00,5
8869,746765,54 = 25,9127 t
![Page 8: Bab 3.3 - D-Value Muto](https://reader036.vdocuments.mx/reader036/viewer/2022081719/55725c27497959da6be8bb9d/html5/thumbnails/8.jpg)
Analisa Struktur dengan Metoda D-Value Muto
III – 46
Momen dan Gaya Geser pada Balok
6. Gaya Aksial pada Balok dan Kolom
8,9021 9,1856 0,2835
19,9481
19,9481
14,3190
14,3190
27,3313
E
D F
H
G I
22,5565
13,0521
18,8988
9,1856
27,0291
8,9021
71,6726
37,6524
54,6765
25,9127
74,8869
4,0 m 5,0 m
1,1351 35,0983 36,2334
9,1856 0,2835
1,1351 35,0983
36,3294
16,3813
32,1749
32,1749
13,6706
8,9021 8,9021 9,1856 9,1856
27,3313 27,3313 25,9127 25,9127
13,6706 16,3813
16,3813
33,5061
33,5061
36,3294
16,3813
17,1248 17,1248 11,4957 11,4957
8,9021
36,2334
E D F
E D F
B A C
H G I
H G I H
E D F E
![Page 9: Bab 3.3 - D-Value Muto](https://reader036.vdocuments.mx/reader036/viewer/2022081719/55725c27497959da6be8bb9d/html5/thumbnails/9.jpg)
Analisa Struktur dengan Metoda D-Value Muto
III – 47
7. Reaksi Perletakan Struktur
Kontrol Reaksi Perletakan !!
ΣV = 0
– VA + VB + VC = 0 – 36,2334 + 1,1351 – 35,0983 = 0
– 36,2334 + 36,2334 = 0
0 = 0 …… OK !!
ΣH = 0
P1 + P2 – HA – HB – HC = 0
30 + 50 – 32,1749 – 14,3190 – 33,5061 = 0
80,0 – 80,0 = 0
0 = 0 …… OK !!
ΣMA = 0
4P1 + 7P2 – 4VB – 9VC + 0,5HB – 0,5HC – MA – MC = 0
4 (30) + 7 (50) – 4 (1,1351) – 9 (35,0983) + 0,5 (14,3190) – 0,5 (33,5061) – 75,4823 – 64,4992 = 0
120,0 + 350,0 – 4,5404 – 315,8847 + 7,1595 – 16,7530
– 139,9815 = 0
470,0 – 320,4251 – 9,5935 – 139,9815 = 0
470,0 – 470,0001 = 0
– 0,0001 ≈ 0 …… OK !!
B
A 32,1749
14,3190
4,0 m 5,0 m
3,0 m
4,0 m
P2 = 50 ton
P1 = 30 ton
1,1351
35,0983
36,2334
33,5061
75,4823 64,4992
C
![Page 10: Bab 3.3 - D-Value Muto](https://reader036.vdocuments.mx/reader036/viewer/2022081719/55725c27497959da6be8bb9d/html5/thumbnails/10.jpg)
Analisa Struktur dengan Metoda D-Value Muto
III – 48
Contoh 3.3 :
Suatu gedung perkantoran bertingkat 5 akan dibangun di kota Padang.
Dari hasil penyelidikan tanah, diperoleh bahwa kondisi tanah di bawah
bangunan termasuk tanah lunak. Gedung perkantoran dibuat dari beton
bertulang dengan dimensi balok dan kolom dapat dilihat pada gambar.
Data-data Bangunan :
– tebal pelat lantai atap = 10,0 cm
– tebal pelat lantai typical = 12,0 cm
– pada setiap lantai, terdapat tembok ½ bata setinggi 1,0 m di seke-
liling bangunan.
– pada as B/II – B/IV dan as D/II – D/IV (kecuali lantai atap) ter-dapat dinding ½ bata setinggi 1,65 m dan jendela kaca setinggi
1,00 m.
– pada as II/B – II/D dan as IV/B – IV/D (kecuali lantai atap) ter-
dapat dinding ½ bata setinggi 1,10 m dan jendela kaca setinggi
1,50 m.
Denah Lantai Typical
20/50 20/50
30/40 30/40
30/40 30/40
30/40
30/40 30/40
20/50 20/50
20
/50
20
/50
25
/35
25
/35
25
/35
25
/35
25
/35
25
/35
25
/35
25
/35
20
/50
20
/50
2,0 m
4,0 m
4,0 m
2,0 m
A B C D E
V
IV
III
II
I
2,0 m 4,0 m 2,0 m 3,0 m 3,0 m
![Page 11: Bab 3.3 - D-Value Muto](https://reader036.vdocuments.mx/reader036/viewer/2022081719/55725c27497959da6be8bb9d/html5/thumbnails/11.jpg)
Analisa Struktur dengan Metoda D-Value Muto
III – 49
Contoh 3.4 :
Pada suatu struktur portal tiga lantai, bekerja beban horizontal pada tiap-
tiap tingkatnya, seperti yang terlihat pada gambar di bawah ini :
Balok diasumsikan monolit dengan pelat lantai. Tebal pelat lantai 1 dan
2 adalah 12,0 cm dan tebal lantai 3 adalah 10,0 cm. Antara lantai 2 dan
lantai 3 terdapat balok dengan tebal pelat lantai 10,0 cm.
Tentukanlah reaksi perletakan dan gaya-gaya dalam struktur dengan
menggunakan Metoda ”D – Value” MUTO.
P2 = 40 t
P1 = 20 t
P3 = 60 t
B
25/35 25/35 25/35
25/30
30/30 30/30 30/30
40/40
40/40 40/40
4,0
m
2,0 m
A
C
6,0 m 4,0 m
3,0 m
E
D
F
H
G
I
40/40
4,0 m
3,0 m
30/30 30/30 30/30
25/30
30/40 30/40 30/40
30/40 30/40 30/40
35/35 35/35 35/35 35/35
35/35
J
L
K
M O
N
P Q S R
4,0 m