b0054827-4 erection arrangement drb-xcl pc fired burner c.w
TRANSCRIPT
425
REF
TYP
1'-4
3/4
"
3051'-0"
432
1'-5
"
686 REF TYP2'-3"
8°
15°5
6'
15°30'
36°42'
2°5'
23°5
5'
10°
3°46
'
14°30'
1275"
25°
1656 1/2"
2286 INSIDE WINDBOX7'-6"
5331'-9"
508
TO
CO
AL
ELBO
W1'
-8"
438 I.D.1'-5 1/4"
546 B.C.1'-9 1/2"
FRONT VIEW
27
IGNITOR
(NE10 & NE12)UNIT #2 R.W. - 2E-1, 2E-3, 2E-5UNIT #1 R.W. - 1E-1, 1E-3, 1E-5
B&W HIGHENERGYEXCITER
9
THIS BURNER ARRANGEMENT FOR BURNERS:
NE18G1 &
RATCHET DRIVEAIR ZONE DISK
JUNCTION BOXTHERMOCOUPLE
DOOROBSERVATION
MOUNTSCANNER
CFS OIL
MOUNTSCANNER
IGNITOR
CONNECTIONAIR MONITORLOW PRESSURE
CONNECTIONAIR MONITORHIGH PRESSURE
HANDLEVANE PULLOUTER AIR
HANDLE
W.P. W.P.
6
10
INNER AIRVANE PULL
32
H
H
F
F
G
G
E E
DD
C
C
B
B
A
A
5 CM WC ABOVE FURNACE
6
2" WC ABOVE FURNACE /HR
ITEM NO QTY DESCRIPTION DRAWING NUMBER
4
PART NUMBER
1
FLANGE SEGMENT
1 ASSEMBLY BURNER ELEMENT C.W. B0054843 6419608
2 1 ASSEMBLY SLIP SEAL 2729173C 2729173
3 2 RETAINER BAR 2345650A 2345650
4 1 17 1/4" CONICAL DIFFUSER (SILICON CARBIDE) 2135985C 2135985
5 1 17 1/4" DEFLECTOR (SILICON CARBIDE) 2343811D 2343811
MATCH PAINT LINE OF COAL NOZZLE WITH MOUNTING PLATE. SEE GENERAL ARRANGEMENT FOR CORRECT ORIENTATION. FOR ALIGNMENT DIFFUSER (INSIDE NOZZLE) IN LINE WITH CENTERLINE OF COAL ELBOW INLET. IN COAL ELBOW. ERECTOR TO ROTATE CENTERLINE OF DEFLECTOR ANDNE10. ERECTOR TO ROTATE NOZZLE IF NECESSARY TO LINE UP WITH BOLT HOLES
NE9. FOR WELDING CERAMIC LINED COMPONENTS, SEE DRAWING 275065A.
IS COMPLETE.NE8. ERECTOR TO INSURE PROPER DISK MOVEMENT AFTER BURNER INSTALLATION
THE ERECTOR UNLESS OTHERWISE SPECIFIED.NE7. THE FIELD INSTALLED INSULATION AND LAGGING IS THE RESPONSIBILITY OF
PACKING IN PLACE. INSTALL ROPE PACKING AND BEND SLIP SEAL TABS OVER TO HOLD THEN COMPLETE THE WELDING OF THE SLIP SEAL TO THE FRONT PLATE. ALL SUPPORT BRACKETS MUST BE CARRYING THE LOAD OF THE BURNER. POSSIBLE WITHOUT INFRINGING ON THE 13 [1/2"] + 6 [1/4"] -0" GAP TOLERANCE.NE6. BURNERS ARE TO BE AS LEVEL AND PERPENDICULAR TO THE WALL TUBES AS
BURNER WEIGHT ON SLIP SEAL.) AIR SLEEVE WITH RESPECT TO THE THROAT OPENING. (DO NOT SUPPORT +/- 1/8". SLIP SEAL WILL SERVE AS A GUIDE FOR POSITIONING THE BURNERNE5. TACK WELD SLIP SEAL TO FRONT PLATE CONCENTRIC WITH THROAT OPENING
DIMENSIONS AT SUPPORT BRACKETS. BEFORE WELDING SUPPORT CHANNELS, ERECTOR TO INSURE CLEARANCE CENTERLINE OF BURNER AND RESTING ON SUPPORT CHANNELS IN WINDBOX.NE4. SUPPORT CHANNELS TO BE PARALLEL TO TUBE WALL, PERPENDICULAR TO
SLEEVE SUPPORT BARS.) (DO NOT LIFT BURNER BY AIR LUG ON COVER PLATE AND AIR SLEEVE.
NE3. TO AVOID DAMAGE TO BURNERS, USE 38 [1 1/2"] DIA HOLES PROVIDED IN LIFTING
COVER PLATE. TO INSURE CLEARANCE THRU AIR VANES. THEN WELD LIGHTER PIPE AT TUBE WALL. TACK WELD LIGHTER ASSEMBLY THEN STROKE AIR CYLINDERNE17. INSURE PROPER LOCATION FROM LIGHTER SHIELD TO CENTERLINE OF
REVERSE THIS PROCEDURE TO ATTAIN THE FULLY CLOSED POSITION. E) EXTEND RATCHET JACK BACK TO MECHANICALLY OPENED POSITION. D) RETIGHTEN U-BOLTS C) RETRACT RATCHET JACK 102 [4"]NI16 CONTINUED:
WELDING INSTRUCTIONS FOR CERAMIC COMPONENTS . . . . . . .275065AFIELD WELD SCHEDULE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B0054841
INDICATES BURNER TERMINAL
REFERENCE DRAWINGS:
R
SYMBOL:
ERECTION ARRANGEMENT DIFFERENTIAL PRESSURE GAGE . . . . .B0054842ARRANGEMENT RECOMMENDED SPARE PARTS . . . . . . . . . . . . . .B0054840ERECTION ARRANGEMENT THERMOCOUPLES . . . . . . . . . . . . . . . B0054839ERECTION ARRANGEMENT SECTIONS & VIEWS 2 . . . . . . . . . . . . . B0054838ERECTION ARRANGEMENT SECTIONS & VIEWS 1. . . . . . . . . . . . . .B0054837GENERAL ARRANGEMENT REAR WALL . . . . . . . . . . . . . . . . . . . . . B0054793GENERAL ARRANGEMENT FRONT WALL . . . . . . . . . . . . . . . . . . . . B0054792
B) LOOSEN U-BOLTS A) ASSURE THAT RATCHET JACK IS MECHANICALLY OPEN POSITION YOU MUST: CLOSED TO 102 [4"] FROM FULLY OPENED. TO ACHIEVE THE FULLY OPENED RATCHET JACK WILL ALLOW FOR 203 [8"] OF TRAVEL: FROM FULLY FULLY CLOSED POSITION. IN IT'S CURRENT POSITION THENE16. BURNERS ARE SHIPPED WITH THE RATCHET JACK DRIVES IN THE
FOR LIFTING BURNER.) AFTER INSTALLATION IS COMPLETE. (DO NOT USE THESE MEMBERSNE15. ERECTOR TO REMOVE ALL SUPPORT MEMBERS PAINTED YELLOW
16 & 18 1" DIA BOLT & NUT 245 33.9 17 3/8" SCREW 15 2 FIND NO. DESCRIPTION FT-LBS KG/MNE14. TORQUE REQUIREMENTS:
BURNER ELEMENT ASSEMBLY: 1590 KG [3503 LBS]NE13. ESTIMATED WEIGHTS:
BY MANUFACTURING.
ERECTION NOTES:
BY BURNER NUMBER AND NOZZLES ROTATED TO THEIR APPROXIMATE LOCATIONS BURNER NUMBER PER THE GENERAL ARRANGEMENTS. BURNERS ARE STENCILEDNE12. ERECTOR MUST INSERT BURNERS IN THEIR APPROPRIATE LOCATIONS BY
FILL HOLES IN COAL NOZZLE FOR DEFLECTOR RETAINER BARS WITH RTV SEALER.NE11. APPLY RTV SEALER TO LEADING EDGE OF DEFLECTOR AND COAL NOZZLE.
NE2. DISSIMILAR WELD SST TO CARBON. SEE FIELD WELD SCHEDULE DRAWING.
GOOD INDUSTRY PRACTICE.NE1. UNLESS OTHERWISE NOTED: ALL NPP TO NPP WELDS SHALL CONFORM TO
c) ALL REMAINING BOLTS.
USER DEFINED FIELD UNIT #2 UNIT #1
563-0061-39-53ORIG CONTRACT NO
PROJECT NO
NE28. FIELD PROCEDURE FOR REMOVAL AND INSTALLATION FO COAL ELBOW COVER:
0635-212G b) FOUR (4) CORNER BOLTS FOR FLAGNES #2. a) FOUR (4) CORNER BOLTS FOR FLANGES #1. C) REBOLT FLANGES SEQUENTIALLY AS FOLLOWS: B) CLEAN FLANGES AND APPLY HIGH TEMPERATURE RTV. A) UNBOLT AND REMOVE COVER.
CERAMIC IS A VERY BRITTLE PRODUCT AND REQUIRES SPECIAL HANDLING
T
NE27. TRIM VANES AS NEEDED TO MAINTAIN TOMERANCES.
PRIOR TO INSTERTING THE COAL NOZZLE INTO THE BURNER. THE COAL NOZZLE THERMOCOUPLES ARE TO BE INSTALLED ON THE COAL NOZZLE
SEE BURNER GENERAL ARRANGEMENT DRAWINGS FOR CORRECT ORIENTATIONS. MOUNTING HOELS ARE INLINE WITH THE CENTERLIN EOF THE COAL ELBOW INLET.NE26. ORIENTATE COAL NOZZLE SO THE CNETERLINE BETWEEN THE DEFLECTOR
BE FLUSH WITH CLAMPS WHEN PROBE TIP IS FLUSH WITH OIL IGNITOR SHIELD.NE22. ERECTOR TO FILE MARK SPARK TCD WITH (4) 6 [1/4"] INCREMENTS. FIRST MARK TO
OBJECTS, ANY IMPACT CAN DAMAGE THE CERAMIC. D) CARE SHOULD BE TAKEN TO AVOID CONTACT WITH ANY OTHER CERAMIC PART FOR LIFTING. C) DO NOT USE A CABLE OR CHAIN THROUGH OR AROUND ANY B) FOR PARTS WITHOUT LIFTING LUGS, USE NYLON SLING FOR LIFTING. A) ALWAYS USE LIFTING LUGS, IF PROVIDED, TO LIFT PART. TO AVOID BREAKING, CRACKING AND CHIPPING:
< 10V @ 25 MA AC VOLTAGE DROP . . . . . . . <8V @ 25 MA DC 2.5 MA @ 121-250 VAC/DC LEAKAGE CURRENT . . . . .1.7 MA @ 120 VAC/DC LOAC CURRENT . . . . . . . .2-25 MA VOLTAGE RANGE . . . . . . 20-250 VAC/DCG5. ELECTRICAL DATA FOR OIL IGNITOR PROXIMITY SWITCH:
PER STROKE3
: .0005M2
5.6-8.4 KG/CM
80-120 PSIG: .017 CF PER STROKE CYLINDER:G4. AIR REQUIREMENTS FOR OIL IGNITOR PROBE DRIVE
PER STORKE3
: .0025M2
5.6-8.4 KG/CM
80-120 PSIG: .087 CF PER STROKEG3. AIR REQUIREMENTS FOR OIL IGNITOR DRIVE CYLINDER:
G2. SEAL AIR REQUIREMENTS:
85-250 VAC, 50-60 HZ, 1 PHASE, 100VAG1. ELECTRICAL REQUIREMENTS FOR HIGH ENERGY SPARK IGNITOR:GENERAL NOTES:
NE21. GENERAL HANDLING FOR CERAMIC COMPONENTS:
THREADS. (NO ADJUSTMENTS TO BE MADE BY TWISTING HOSE.)NE20. TO PREVENT DAMAGE TO HOSE, ALL ADJUSTMENTS MUST BE MADE IN PIPE
TWISTING HOSE DURING INSTALLATION. TWISTING. NO TORSIONAL FORCES MAY BE APPLIED TO HOSE BY PARALLEL TO THE VERTICAL CENTERLINE OF BURNER TO PREVENTNE19. LOOP OF HOSE TO BE INSTALLED IN A VERTICAL POSITION AND
HIGH ENERGY EXCITER ON WINDBOX CASING.NE18. LOCATE HIGH ENERGY EXCITER WITHIN 3048 [10'-0"] OF LIGHTER. DO NOT MOUNT
2763817A 2763817
7 1 DIFFUSER MOUNTING BRACKET 299350B 2174414
8 1 GASKET 356104C 4688613
9 1 EXCITER HIGH ENERGY 348822C 4688147
REVISIONSREV DESCRIPTION DATE APPROVED
1 ADDED CUSTOMER TITLE BLOCK. CAI/DAS
DESCRIPTION FLOW PRESSURE
a OIL IGNITOR CONN.5 SCFM
8.5NM3 /HR
2" WC ABOVE WINDBOX5 CM WC ABOVE WINDBOX
b OIL IGNITOR CONN.10 SCFM
17 NM3
0458702WASHER PLN 3/8" TYPE B (W) F844415
4591668PACKING ROUND ROPE FIBERFRAX 2300 5/8"31 FT14
0330146SEALER, RED SILICONE RUBBER.5 TUBE13
4678009C6 X 10.5 X 1'-4" LG. A36412
4539895162770ABURNER SUPPORT BRACKET RETAINER411
64193092269078EIGNITOR CFS OIL L.H. "L" = 10'-0" "LS"= 8'-0 5/16"110
DWD3/1/2010NOs. 32-34. REVISED CUSTOMER TITLE BLOCK. CAI/DASCHG'D DESC AND P/N FOR ITEM NO. 9. ADDED ITEM4
DWD6/16/2009 DASREVISED DRAWING REVISION NUMBERS IN TITLE BLOCK.3
DWD6/2/2009TO BNR. CAI/DASADDED NE26-28. REVISED CUSTOMER TITLE BLOCK FROM YYY AND SECTION A-A. ADDED SECTION AB-AB. REVISED NE14. ADDEDITEM NO. 27-30. UPDATED GRAPHICS IN FRONT VIEW
2
DWD2/3/2009
ITEM NO QTY DESCRIPTION DRAWING NUMBER PART NUMBER
16 16 NUT HEX 1" A563B (GR5) 4685586
17 4 SCREW CAP HEX 3/8"-16UNC-2A X 1 1/4" A307A 8004289
18 16 BOLT HEX 1" X 3 1/4" LG. A449TP1 (GR5) 4695347
19 2 ASSEMBLY FLEXIBLE HOSE 3/8" X 50" LG 6253420
20 2 TEE THRD 1/2" X 3000# STL 3017087
21 2 BSHG HEX HD SCRD 1/2" X 3/8 SA105 0350068
22 2 PLUG THRD SQ HD 1/4" 3000# STL 3026365
23 2 BSHG HEX HD SCRD 1/2" X 1/4" STL 3014711
24 2 BALL VALVE 1/2" SHARPE 54574N 4688127
25 2 NIPPLE 1/2" X 3" LG TBE NPT SA106B 2235574
27 1 ASSEMBLY 17 1/4" I.D. CERAMIC LINED COAL ELBOW B0054931 6436045
28 1 ASSEMBLY 16 1/2" I.D CERMIC LINED COAL NOZZLE B0054911 6425470
29 1 ASSEMBLY MOUNTING PLATE B0054905 6425088
30 1 COAL NOZZLE MOUNTING PLATE B0054895 6423304
32 1 ASSEMBLY CABLE 15'-0" 4688148
33 1 HIGH ENERGY SPARK ROD PL-12" = 9'-11 9/16" 188723B 2226783
34 1 HIGH ENERGY SPARK PROBE TIP 188722B 8804376
OPERATION, AND FOR SOLICITING BIDS FOR THE ERECTION OF, THE EQUIPMENT DISCLOSED HEREIN.
8 7 6 5 4 3 2 1
A
J
I
H
G
F
E
D
C
B
J
I
H
G
F
E
D
C
B
A
12345678B0054827
- DO NOT SCALE -
NODWG
J44-Customer.slddrt
1 1/2"=1'-0"
NO
YES
YES
563-0060-39-53
REV
JDWG NOCOAPROJECT NO
DIST MFG
DIST EREC
DIST CUST
SCALE
DATE
CHKD
APPVD
DWN
USER DEFINED FIELD
B0054827.slddrw
DRB-XCL PC FIREDERECTION ARRANGEMENT
C.W.
4B0054827AC51000635-212F
BURNER
USE DIMENSIONS ONLY
ORIG CONTRACT NO
12/11/08
D.W.DOWDELL
D.A.SMITH
C.A.IAFANO
TYPE PROJECT
Babcock & Wilcox Power Generation Group, Inc.©2007 BABCOCK & WILCOX POWER GENERATION GROUP, INC. ALL RIGHTS RESERVED.
THIS DRAWING IS THE PROPERTY OF BABCOCK & WILCOX POWER GENERATION GROUP, INC. (B&W PGG) AND ITS USE IS GOVERNED BY THE TERMS AND CONDITIONS OF THE CONTRACT FOR WHICH IT WAS CREATED. B&W PGG GRANTS A
NON-EXCLUSIVE LICENSE TO USE, REPRODUCE AND DISTRIBUTE THIS DRAWING SOLELY FOR THE MAINTENANCE, REPAIR AND
20 SOUTH VAN BUREN AVENUE, BARBERTON, OHIO
VIEW L
VIEW K
?
29
1'-9 1/2" B.C.
SECTION A-A
ON 76 [3"] CENTERS
4
NE14
5
NE3
NE3
21
16 188
2 1/2" O.D. TUBES
28
(16) 7/8" DIA THRU
IN W
IND
BOX
CLSTRADDLE
INLE
T FL
AN
GE
NE14 & NE28FLANGE #2
NE14 & NE28FLANGE #2
NE14 & NE28
LIFTING LUG
FLANGE #1
27
30
EQ SPC'D ON
8 [5/16]
NE9,NE10& NE27
1'-3"
1'-4
1/2
" I.
D.
419
381
368 REF1'-2 1/2"
1397
DIA
OPE
NIN
G4'
-7"
914
3'-0
" I.
D. T
HRO
AT
1/4"6
1/4"
4'-5
" IN
SID
E13
46
6 REF
610 O.D.2'-0"
J
J
AB
AB
EMPLOYER’S DOCUMENT REVIEW AND STATUS LOG IN
DATE 08/09/09 REVIEW BY REVISION STATUS DISTRIBUTION 1
COMM NO : 0310 MECHANICAL
A : ACCEPTED X CONTRACTOR X
LOG OUT
DATE 16/10/09 ELECTRICAL B : ACCEPTED AS NOTED □ RECORD 1
COMM NO: 0231 I & C C : NOT ACCEPTED □ PIKITRING JBN 1
RELEASED BY : DATE: 16/10/09 SUPPORT I : INFORMATION ONLY □ PROJECT 1
Owner :
PT. PLN (PERSERO) SURALAYA STEAM POWER PLANT UNIT 1- 4 ( 4 X 400 MW) LOT 1 : BOILER UNIT 1 & 2 REHABILITATION PROJECT Contract No. 255.PJ/041/DIR/2008
PT PLN (PERSERO) JASA ENJINIRING
DRAWING TITLE :
PLN DRAWING No. REV 0 1 0 4 1 L 1 - 0 2 - M - 5 1 - H J A - 0 0 4
Contractor :
MARUBENI CORPORATION
Revision History Rev. Rev. Date Created by Checked
by Approved by Description
01 2/03/2009 C.A. IAFANO D. SMITH D.W. DOWDELL ADDED CUSTOMER TITLE BLOCK. 02 6/02/2009 C.A. IAFANO D. SMITH D.W. DOWDELL ADDED COAL NOZZLE AND RELATED PARTS. 03 6/16/2009 D.SMITH D.SMITH D.W.DOWDELL REVISED DRAWING REVISION NUMBERS 04 3/1/2010 C.A.IAFANO D.SMITH D.W.DOWDELL CHG’D DESC AND P/N FOR ITEM 9. ADDED ITEMS
32-34. REVISED CUSTOMER TITLE BLOCK. Contractor’s (Partner, Subcontractor)
Babcock & Wilcox Power Generation Group
Scale 1 1/2"=1’-0
Contractor’s Document / Drawing No SRLSPP12-1-255-BNR-A-002-04
Responsible dept. ISP
Created by C.A. IAFANO
Checked by D.A. SMITH
Approved by D.W. DOWDELL
Size J
Originator B&W
Document Title (Subtitle) ERECTION ARRANGEMENT DRB-XCL ® PC FIRED BURNER C.W.
Document Type For FINAL Identification number
B0054827 Rev. 04
Date 3/1/2010
Sheet 1/1