avion corporate presentation

26
A Growing Gold Producer in West Africa with Exploration Upside June 2012 TSX: AVR OTCQX: AVGCF

Upload: avion-gold-corporation

Post on 20-Jun-2015

338 views

Category:

Investor Relations


1 download

TRANSCRIPT

Page 1: Avion Corporate Presentation

A Growing Gold Producer in West Africa with Exploration Upside

June 2012 TSX: AVR OTCQX: AVGCF

Page 2: Avion Corporate Presentation

TSX: AVR

Forward Looking Statement This presentation of Avion Gold Corporation (the ”Company”) contains forward-looking statements under Canadian securities legislation. Forward-looking statements include, but are not limited to, statements with respect to the development potential and timetable of the projects; the Company’s ability to raise additional funds as necessary; the future price of gold; the estimation of mineral resources; conclusions of economic evaluation (including scoping studies); the realization of mineral resource estimates; the timing and amount of estimated future production, development and exploration; costs of future activities; capital and operating expenditures; success of exploration activities; mining or processing issues; currency exchange rates; government regulation of mining operations; and environmental risks. Generally, forward-looking statements can be identified by the use of forward-looking terminology such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved”. Forward-looking statements are based on the opinions and estimates of management as of the date such statements are made. Estimates regarding the anticipated timing, amount and cost of mining at the Mali projects are based on assumptions underlying mineral resource estimates and the realization of such estimates; results of previous mining activities at the projects, and detailed research and analysis completed by independent consultants and management of the Company; research and estimates regarding the timing of delivery for long-lead items; knowledge regarding the factors involved in building a mine and other factors described in the annual information form of the Company. Capital and operating cost estimates are based on results of previous mining activities, research of the Company and independent consultants, recent estimates of construction and mining costs and other factors that are set out in the scoping study. Production estimates are based on mine plans and production schedules, which have been developed by the Company’s personnel and independent consultants. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking statements, including but not limited to risks related to: timing and availability of external financing on acceptable terms; unexpected events and delays during construction, expansion and start-up; variations in ore grade and recovery rates; receipt and revocation of government approvals; actual results of exploration and mining activities; changes in project parameters as plans continue to be refined; future prices of gold; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry. Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company does not undertake to update any forward-looking statements except in accordance with applicable securities laws. Investors are advised that National Instrument NI 43-101 of the Canadian Securities Administrators requires that each category of mineral reserves and mineral resources be reported separately. Mineral resources that are not mineral reserves do not have demonstrated economic viability. The Company uses the term “cash costs” in this presentation. Cash costs is a non-GAAP figure. Please see the Company’s Management Discussion & Analysis for an explanation of this figure and the associated uncertainty. Andrew Bradfield, P.Eng., the Chief Operations Officer and Don Dudek, P.Geo., the Senior Vice President, Exploration, of the Company and are “qualified persons” under National Instrument 43-101 and have reviewed and approved the scientific and technical information contained in this news release. Cautionary Note to U.S. Investors Concerning Estimates of Measured, Indicated or Inferred Resources The information presented uses the terms “measured”, “indicated” and “inferred” mineral resources. United States investors are advised that while such terms are recognized and required by Canadian regulations, the United States Securities and Exchange Commission does not recognize these terms. “Inferred mineral resources” have a great amount of uncertainty as to their existence, and as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or other economic studies. United States investors are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be converted into mineral reserves. United States investors are also cautioned not to assume that all or any part of an inferred mineral resource exists, or is economically or legally mineable.

2

Page 3: Avion Corporate Presentation

TSX: AVR

Avion Properties –West African Focus

3

Coup Update

Constitutional Law reinstated April 8th

Interim Gov’t appointed with elections in ~1 year

Borders are open with fuel and supplies arriving at site

Production continues at Tabakoto

Expect a significant positive valuation change as the perception of country risk reduces after coup

Page 4: Avion Corporate Presentation

TSX: AVR

Investment Highlights Profitable Production

Tabakoto underground exceeding expectations

New sources of ore for the Tabakoto Mill

Houndé PEA in progress with H2 delivery of report expected

Continued Exploration success

4

Page 5: Avion Corporate Presentation

TSX: AVR

Mali: Africa’s Third Largest Gold Producer

5

*See Appendix for details of mineral reserve and resource estimates

Page 6: Avion Corporate Presentation

TSX: AVR

Updated – Corporate Mineral Resources*

Tonnes

Grade (g/t Au)

Gold Ounces

Proven & Probable (Stock Pile/Open Pit)(1)

(1 to 2 g/t Au Cut-off) 2,300,000 2.20 162,500

Proven & Probable(Underground) (2 g/t Au Cut-off) 4,606,000 4.49 664,000

Measured & Indicated (0.5 to 2 g/t Au Cut-off) 21,843,545 2.40 1,653,480

Inferred (0.5 to 2 g/t Au Cut-off) 29,891,923 2.63 2,487,546

(1) Includes stockpile of 1,291,000 tonnes grading 1.12g/t Au containing 46,300ozs as of January 1, 2012 • The resource study for the Tabakoto, Segala Main West, Segala NW and Djambaye II deposits were prepared by Avion under the supervision of Don Dudek, P. Geo.

Eugene Puritch, P.Eng. and Antoine Yassa, P. Geo of P&E Mining Consultants Inc. who are qualified persons under NI 43-101, prepared the resource estimates for Segala Main, Dar Salam and Dioulafoundou, Kofi Project and Vindaloo deposits. Final resources, were adjusted for Segala Main and Dioulafoundou after mining drawdown. Note that open pit mineral resources were calculated at a cut-off of 0.5 and 1.0 g/t Au and underground mineral resources were calculated using a 2.0 g/t cut-off.

• Estimates include 93.75% of Kofi Project resources to reflect ownership (2) Mineral resources that are not mineral reserves do not have demonstrated economic viability

Strong Assets

Global Resource Base

6

Page 7: Avion Corporate Presentation

TSX: AVR

7

-

1,000,000

2,000,000

3,000,000

2008 2009 2010 2011

Acquistions

Production

Reserves

M&I

Inferred

Project Resource Base Growth

87% average total resource growth year over year

Page 8: Avion Corporate Presentation

TSX: AVR

8

Gold Production at Tabakoto

$-

$100

$200

$300

$400

$500

$600

$700

$800

$900

$1,000

-

5,000

10,000

15,000

20,000

25,000

30,000

Q1-11 Q2-11 Q3-11 Q4-11 Q1-12

Oz. Produced

Cost/Oz.

2011 – 91,200 oz. Produced 2012 – 90,000 – 100,000 oz. Forecasted

Page 9: Avion Corporate Presentation

TSX: AVR

Avion Production to Date Average mined

grade to date of 3.61 g/t Au

Average recovery 95.5%

Avion produced 256,378 ozs to date

* Estimated 2012 production from 90,000-100,000 ounces 9

0

50,000

100,000

2009 2010 2011 2012*

Increasing Production

2009

2010

2011

2012*

Page 10: Avion Corporate Presentation

TSX: AVR

*Does not include Houndé Production Tabakoto and Segala deposit mine schedules from 2011 to 2014 are based on Avion’s NI43-101 technical report on Tabakoto Mining Operations, issued on August 17, 2011, and filed on SEDAR. For subsequent years, and for projections of the Kofi and Houndé deposits, Inferred Mineral Resources have been included, and the plan is based on an in-house study by Avion. Production growth assumes 100% of project, adding incremental feed to the Tabakoto mill and that African Barrick does not exercise their back-in right for the Houndé Project

Gold Production Growth

10

- Mali - Burkina Faso

0

100,000

200,000

2011 2012 2013 2014 2015 2016-21

Kofi

Hounde

Open PIt

Segala UG

Taba UG

* * *

Page 11: Avion Corporate Presentation

TSX: AVR

Production Forecast 90,000-100,000 oz

Anticipated project milestones 2012

Q1 Q2 Q3 Q4

60,000 metre exploration program

Tabakoto underground stoping

Issue updated resource and reserve reports

Start new open pit mine at Djambaye II

Segala underground development

Houndé resource update & P.E.A. report

11

Page 12: Avion Corporate Presentation

TSX: AVR

Strong Assets

Fuel Supply – max 5 million Litres Camp – now houses >350 staff

12

Milling Facility – expanding to 4,000 tpd Milling Facility – 2,100 tpd

Page 13: Avion Corporate Presentation

TSX: AVR

Recent Tabakoto Underground Development

13

Tabakoto Pit

Tabakoto Underground

Tabakoto Underground Development

Page 14: Avion Corporate Presentation

TSX: AVR

Underground Process

Stoping started February 9, 2012

YTD to end of April UG production Mined 5% less tonnes than planned 11% more ounces produced than planned Approximately 0.75 g/t higher in grade than forecast Dilution is less than expected and grades slightly

higher

14

Page 15: Avion Corporate Presentation

TSX: AVR

Target-Rich Mining Camp (~600 km2)

2011 discovery cost overall ~$6.6/oz Inf ~$23.5/oz Ind

Exploration Program of ~$11.4 Million for 2012 (all properties)

Total Corp. (Tabakoto + Kofi + Hounde) Resource of: P&P Res: 0.83 M ozs (Jan.1, 2011) M&I: 1.7 M ozs* Inf: 2.5 M ozs*

* At 0.5 to 2.0 g/t cut-offs

Kofi Resource Doubled in 2011

Tabakoto & Kofi - Mali

15

Page 16: Avion Corporate Presentation

TSX: AVR

Houndé – Burkina Faso Excellent Resource Expansion

Potential <5% of property evaluated

Current Resource of: Ind: 893,000 ozs Inf: 712,000 ozs

Vindaloo resource strike ~2.6 km,

mineralized trend ~ 5.7 km open, target 15+ km long

Preliminary Economic Assessment initiated for completion Q4 2012

$8.0 Million Exploration program for 2012

16

Page 17: Avion Corporate Presentation

TSX: AVR

Opportunity Summary

Mali - Short term production 90,000 to 100,000 ounces per year mid term production doubling supported by two high quality project assets in 20 million ounce plus mining camp

Burkina Faso - Expanding 2+ g/t Au open pit resource base with great logistics 3 km from paved highway 1.5 km from high tension power line Nearby community and work force

17

Page 18: Avion Corporate Presentation

TSX: AVR

Capital Structure Exchange: TSX

Ticker: AVR

Shares Outstanding – basic: Fully diluted:

441.1 million 466.0 million

52-Week High/Low: $2.57 - $0.44

Recent Price (June 6, 2012): $0.57

Market Capitalization: ~$251 million

18

Page 19: Avion Corporate Presentation

TSX: AVR

Source: NBF Estimates, Bloomberg, Thomson (May 17, 2012)

Undervalued Compared to Peers Avion is undervalued relative to producing peer group based on a price to earnings and cash flow multiples

19

For companies above, FY is 2012. Note: For Royalty Co's a 3% discount rate is applied (FNV, RGLD, SSL).

Page 20: Avion Corporate Presentation

TSX: AVR

Avion Gold Corporation

MAJOR SHAREHOLDERS

20

Sentry Investments ~15% Oppenheimerfunds ~2%

Sprott Asset Management ~13% RBC Asset Management ~2%

Fidelity Asset Management ~12% Management & Directors ~2%

Maple Leaf Partners ~8% AGF Asset Management ~1%

Van Eck Jr Gold ETF ~5% Altamira Asset Management ~1%

Regent Pacific ~3% BlackRock Asset Management ~1%

Carmignac Gestion ~2% TD Asset Management ~1%

Craton Capital ~2% Summary of other positions at less than 1%

~7%

Page 21: Avion Corporate Presentation

TSX: AVR

Independent Research and Media Coverage

Firm Analyst

BMO Capital Markets Andrew Breichmanas

Canaccord Genuity Steven Butler

Cormark Securities Mike Kozak

Mackie Research Capital Barry Allen

NB Financial Tara Hassan

Independent Research – Full Coverage

Firm Analyst

Desjardins Securities Brian Christie

PI Financial Eric Zaunscherb

Independent Research – Research Notes

Firm

Casey Research

Gecko Research

Media Coverage

21

Page 22: Avion Corporate Presentation

TSX: AVR

Experienced Management Team & Board

MANAGEMENT

John Begeman, President, Chief Executive Officer and Director Don Dudek, Senior Vice President Exploration Alex Dann, Chief Financial Officer Andrew Bradfield, Chief Operating Officer Neil Said, Legal Corporate Counsel BOARD OF DIRECTORS

James Coleman–Independent Chairman John Begeman Stan Bharti George Faught Bruce Humphrey Lewis Mackenzie, Major General (Ret.) Honourable Pierre Pettigrew, P.C.

22

Page 23: Avion Corporate Presentation

TSX: AVR

Avion Gold Corporation

Contacts: Address:

John Begeman 65 Queen Street West, Suite 800 President & CEO PO Box 67 Tel: (416) 861-5884 Toronto, ON M5H 2M5 [email protected] Website: www.aviongoldcorp.com Michael McAllister Manager, Investor Relations Follow us: Tel: (416) 309-2134 [email protected]

23

Segala Pit

Page 24: Avion Corporate Presentation

TSX: AVR

Appendix

24

Page 25: Avion Corporate Presentation

TSX: AVR

(1) Effective reserve date of January 1, 2011. Update planned for mid Q2, 2012 (2) Includes stockpile of 1,207,300 tonnes grading 1.53 g/t Au containing 59,600 ozs as of January 1, 2011

• The resource study was prepared by Eugene Puritch, P.Eng. and Antoine Yassa, P. Geo of P&E Mining Consultants Inc. who are qualified persons under NI 43-101. Note that open pit mineral resources were calculated at a cut-off of 0.5 and 1.0 g/t Au and underground mineral resources were calculated using a 2.0 g/t cut-off.

(3) Andrew Bradfield, P.Eng. and Don Dudek, P.Geo., Senior Officers of Avion and “qualified persons”, as such term is defined under NI 43-101, are responsible for the Mineral Reserve estimates.

(4) The Mineral Reserves were estimated using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve Definitions and adopted by CIM Council.

(3) The Inferred Resources are in addition to the Measured and Indicated Resources. (4) The Mineral Reserves have been classified in accordance with the requirements of National Instrument 43-101 based on a gold price of US$1,183 per ounce and a 94% process plant

recovery rate. (5) Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. (6) “UG” stands for underground , “OP” stands for open pit and “SP” stands for stock pile (7) For a full description of the key parameters, assumptions and methods used to estimate the above Mineral Reserves and a discussion of the legal, political and environmental risks

that may have an impact on those estimates, refer to the Reserves Report.

Strong Assets

Global Resource Base

25

Tabakoto Kofi (93.75% ownership) Houndé Avion

Tonnes Grade Oz Au Tonnes Grade Oz Au Tonnes Grade Oz Au Total (Ozs)

P&P* (OP + SP)(1) 2,300,000 2.20 162,500 162,500

P&P* (UG) 4,606,000 4.49 664,000 664,000

M&I 1,964,400 4.62 292,100 6,469,125 2.25 468,375 13,410,000 2.07 893,000 1,653,480

Inferred 7,598,000 4.57 1,117,400 11,583,750 1.77 658,125 10,710,000 2.07 715,000 2,487546

Page 26: Avion Corporate Presentation

TSX: AVR

Call Options Explanation

26

Avion sold 12 European style call options exercisable over 12 quarters (1st option June 1, 2012 - 12th option March 1, 2015) for $25MM upfront cash for a total of 36,396 ounces ($687/ounce)

Each option allows the institution to purchase 3,033 ounces of gold at a set price. The first 4 options are priced at $700, the remaining 8 options are priced at $900

If the call option is exercised on the specific date, Avion will remit to the institution, the difference between the LME gold price and the price of the option

Quarterly Option Calculation example: on June 1, 2013, if the gold price is $1,650, Avion will remit $2.27MM to the institution (3,033 ozs * ($1,650 - $900) ) and retain $2.73MM (3,033ozs * $900 ). Total amount to Avion for those 3,033 ounces in the call option would be $1,587 per ounce ($687 upfront + $900 option)

For example, at a $1,650 gold price, each ounce sold equates to roughly $1,520 for Avion (undiscounted).