available at: 6.2 – develop a gantt chart develop a gantt chart

11
ailable at: www.etcurr.com Lesson 6.2 – Develop a Gantt Chart Develop a Gantt Chart

Upload: chad-singleton

Post on 31-Dec-2015

239 views

Category:

Documents


1 download

TRANSCRIPT

Available at: www.etcurr.com Lesson 6.2 – Develop a Gantt Chart

Develop a Gantt Chart

Available at: www.etcurr.com Lesson 6.2 – Develop a Gantt Chart

Performance Objective: Given a VEX Robotics Challenge, develop a Gantt chart, that outlines the schedule to be followed by the team.

Enabling Objectives: Describe a Gantt chart Explain the purpose of a Gantt chart List the primary tasks of developing a robot for a

competition

Available at: www.etcurr.com Lesson 6.2 – Develop a Gantt Chart

What is a Gantt chart?

A Gantt chart is a type of bar chart that illustrates a project schedule

Gantt charts illustrate the start and finish dates of the tasks of a project

These tasks comprise the work breakdown structure of the project

Available at: www.etcurr.com Lesson 6.2 – Develop a Gantt Chart

Tasks

The chart consists of primary and secondary tasks Primary tasks are the major tasks that need to be

completed Secondary tasks are subtasks of the primary tasks Each task should be given dates for when the task will

start and finish Each task should have a team member assigned to

oversee the completion of the task

Available at: www.etcurr.com Lesson 6.2 – Develop a Gantt Chart

Primary Tasks

A list of primary tasks can include: Preliminary tasks Preparing for the challenge Designing robot Build robot Prepare for competition Compete at regional tournament Raising funds

Available at: www.etcurr.com Lesson 6.2 – Develop a Gantt Chart

Secondary Tasks

Each primary task consists of several secondary tasks Preliminary Tasks• Select team members• Fundraise

Can you think of other secondary tasks?

Available at: www.etcurr.com Lesson 6.2 – Develop a Gantt Chart

Secondary tasks

What are some of the secondary tasks that would fall under the primary task of preparing for the challenge?

Available at: www.etcurr.com Lesson 6.2 – Develop a Gantt Chart

Preparing for the challenge

Examples of secondary tasks Learn Challenge rules Analyze Challenge rules Discuss Challenge strategy Hold preliminary design review

Available at: www.etcurr.com Lesson 6.2 – Develop a Gantt Chart

Creating a Gantt chart

There are programs design to assist you in creating a Gantt chart

A popular program is Microsoft Project In a few easy steps you can have a

professional looking Gantt chart

Available at: www.etcurr.com Lesson 6.2 – Develop a Gantt Chart

Microsoft Project

Microsoft has developed tutorials to assist you in creating a project.

Visit this link to watch a video on the basics of Microsoft Project: http://office.microsoft.com/en-us/project-help/getting-started-with-project-2010-HA010388396.aspx

Available at: www.etcurr.com Lesson 6.2 – Develop a Gantt Chart

You should now be able to compile a Gantt chart for your teams robot!