austin isd recommended facility master plan
TRANSCRIPT
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 1/317
Austin independent school district
District-WiDe FacilityMaster Plan
March 2011
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 2/317
As a planning team we appreciate the opportunity to serve the Austin Independent School District. DeJONG-RICHTER LLC
Magellan ConsultingCuningham Group
BLGY Architecture
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 3/317
Ac know ledgeme nts .......................................................................................................................................................................... 3
Introduc tion ........................................................................................................................................................................................ 5
Exec utive Summary ........................................................................................................................................................................... 6
Facility Recommendations ............................................................................................................................................................. 10Timeline for Facility Master Plan Implementation ......................................................................................................................... 13Estimated Budget ...................................................................................................................................................................... 15
Area Fac ility Op tions .......................................................................................................................................................................16
Ad ditiona l Rec om me ndations ........................................................................................................................................................ 32Policy Recommendations ........................................................................................................................................................ 32
Management Recommendations ...........................................................................................................................................33
Staffing Recommendations ...................................................................................................................................................... 33
Energy Efficiency Recommendations......................................................................................................................................34 Maintenance Recommendations............................................................................................................................................34
Design Recommendations........................................................................................................................................................ 35 Safety and Security Recommendations .................................................................................................................................. 35
Use Recommendations ................................................................................................................................................................... 36Technology Recommendations ............................................................................................................................................... 36
Other Recommendations ......................................................................................................................................................... 37
Fac ility Summa ry Rep orts w ith Fac ility Master Plan Rec om me ndatio ns ..................................................................................... 38Elementary Schools (Alpha) ............................................................................................................................................................ 39Middle Schools (Alpha) ................................................................................................................................................................. 119
High Schools (Alpha) ...................................................................................................................................................................... 138
Special Schools (Alpha) ................................................................................................................................................................. 151Support Facilities (Alpha) ............................................................................................................................................................... 154
Educational Framework ....................................................................................................................................................................... 165
Planning Guidelines ...................................................................................................................................................................... 165Programmatic Considerations .................................................................................................................................................... 166
Enrollment Projec tions ................................................................................................................................................................... 169
Historical Enrollment ...................................................................................................................................................................... 169
Birth Data ........................................................................................................................................................................................ 175Projected Enrollment .................................................................................................................................................................... 176
EXHIBIT "B"
Page 1
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 4/317
Capac ity Analysis .......................................................................................................................................................................... 178
Utilization ........................................................................................................................................................................................ 180
Fac ility Cond ition Analysis ............................................................................................................................................................ 184 Educational Adequacy Assessment ............................................................................................................................................ 186
Building Deficiencies ...................................................................................................................................................................... 187
Fac ility Op tions ..............................................................................................................................................................................189
Criteria .............................................................................................................................................................................................. 189
AppendicesAppendix A ........................................................................................................................FCI White Paper and Facility FCI Charts
Ap pend ix B ...................................................................................................................................................Facility Capacity Charts Appendix C .........................................................................................................................................Visioning Workshop SummaryAppendix D .................................................................................................................................... Community Dialogue #1 ResultsAp pend ix E .....................................................................................................................................Community Dialogue #2 ResultsAp pend ix F ...............................................................................................................................Community Meeting #3 CommentsAppendix G ............................................................................................................. Summary of Facility Options Discussed by FMPTFAppe ndix H .................................................................................................................................................................... Glossary of Terms
EXHIBIT "B"
Page 2
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 5/317
Acknowledgements
We would like to extend our appreciation to the Austin Independent School District Board of Trustees for its commitment
to the Facility Master Planning Process. We realize that the recommendations contained within the plan will createchallenges for the community in the months and years to come. With the support of the school district and communitymembers, the Austin Independent School District can continue its mission to provide a comprehensive educationalexperience that is high quality, challenging, and inspires all students to make a positive contribution to society.
Boa rd o f Trustee s
Mark Williams, District 5, PresidentVincent M. Torres, District 4, Vice President
Lori Moya, District 6, Secretary
Cheryl Bradley, District 1Sam Guzman, District 2
Christine Brister, District 3Robert Schneider, District 7
Annette LoVoi, At-Large Position 8Tamala Barksdale, At-Large Position 9
Austin Independent School District
Dr. Meria Carstarphen, Superintendent of SchoolsLawrence Fryer, Chief Operations Officer
Paul Turner, Executive Director of FacilitiesCurt Shaw, Director of Construction Management
Pat Rossett, Assistant Director of Bond PlanningJoe Silva, Assistant Director of Planning
Beth Wilson, Project Facilitator
EXHIBIT "B"
Page 3
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 6/317
Fac ility Ma ster Plan Task Forc e
We take this opportunity to acknowledge the Facility Mater Plan Task Force for its efforts in guiding the planning process.We thank the members for their dedication and commitment to this process that resulted in the development of the
facility plan for Austin Independent School District.
Co-Chairs: Richard Frazier Janet Mitchell
John AlawnehLarry AmaroAdolphus AndersonEvelyn AndrewsTony Arnold
Frederick BentleySally BrackettChris Carrillo-SpanoJacqueline ChathamTommy CoxJoey CrumleyBill De Dufour Julie DelgadoJanet DeweyElizabeth DickeyDan Diehl
Freddie B. Dixon, Sr.Martha DolmanJim Evans
Kelly EvansFrances Vicki Everett
Rene GargantaGreg GoodmanAnnette Gregory
Zoe GriffithSilas Griggs
Janis GuerreroKris HafezizadehBergeron HarrisAnne M. HeinenHeath HignightLawrence P. HuangLinda JohnsonBob King
J. Laverne Morris-Parker
Lucia MarkertCarolyn MerrittAdelina Miller Paul Mitchell
Susan MoffatChris MooreAudrea MoyersBeth OrtaMark Penniman
Elizabeth Polk Jacqueline Porter Pete PriceDouglas RhodenbaughJohn RochaMichelle Rusnak Dave SandersCurt ShawDavid W. SullivanKathie TovoLaura Tuma
Paul Turner Texanna Turner Chad Williams
EXHIBIT "B"
Page 4
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 7/317
Introduction
Facility Master Plan Vision Statement
All AISD schools will inspire high student achievement and support common community goals throughequitable, inviting facilities that integrate technology and are optimally used, accessible, sustainable, and
meet highest educational adequacy standards.
The Austin Independent School District is committed to
providing high quality and challenging educationalexperiences for all students who are enrolled in itsschools. To ensure this commitment, the Districtdeveloped the AISD 2010-2015 Strategic Plan . As part of
Strategy #4 of that plan, key steps 4.5 and 4.7 includeddevelopment of a long-range facility master plan asfollows.
Strategy #4 – align resources to accomplish prioritieswithin a balanced budget
4.5 Develop and implement long-range plans for facilities, transportation, libraries and technologythat align infrastructure with the district’seducational plan
4.7 Ensure efficiency and efficacy of existingfacilities before investing in new facilities
This planning process, which is data driven, takes intoconsideration enrollments, school building capacities,educational framework, educational vision, and facilityconditions for 114 school campuses and 12 supportfacilities in the District.
The facility master planning process is a proactiveapproach to explore long- and short-term academicand facility options and solutions. Among the mostimportant components contributing to the success of theplan is the involvement and input gathered from Austincommunity members.
The recommendations contained within will serve as thebasis from which Austin Independent School Districtfacilities will be transformed into a new generation ofschools that accommodates educational needs todayand in the future. The final Austin Independent SchoolDistrict Facility Master Plan will serve as a road map thatwill address facility conditions, an implementationtimeframe, and project costs.
EXHIBIT "B"
Page 5
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 8/317
Exec utive Summ ary
District Statistics
AISD maintains approximately 87,000 permanent
classroom seats and an additional 16,000 seats inportable/temporary buildings in 11.5 million square feetof educational facilities. The enrollment for the 2010-11school year was approximately 86,000 students. Based
on the latest demographic study, enrollment is projectedto continue to increase to 98,000 by 2020.
Tota l Enrollm ent 2010-2011: 85,929
Grades Pre-K-5: 48,167Grades 6-8: 16,577
Grades 9-12: 20,662Separate and Special Campuses: 523 114 School Campuses
80 Elementary Schools19 Middle Schools12 High Schools3 Special Schools
12 Support Facilities
UtilizationBy the numbers, there is an excess of 1,000 seats in
addition to the capacity in portable buildings. The realityis that there are some areas experiencing population
growth and others experiencing decline within the
District. Combined with student migration patterns,there are significantly over- and under-utilized facilities asa result.
Facility Condition
Approximately $1.1 billion in deficiencies was identified in
the facility condition assessment, including a functionalequity and ADA/TAS analysis, completed in 2010, andthe most recent educational adequacy assessmentcompleted the summer of 2010. These deficiencies have
been categorized into the following priorities.
Priority 1: Currently Critical (Immediate)Priority 2: Potentially Critical (To be corrected within one
year)Priority 3: Necessary / Not Yet Critical (1-2 Years)
Priority 4: Recommended (3-5 Years)Priority 5: Does Not Meet Current Code/Standards/Grandfathered
Addressing Growth
The north central and southern areas of AISD continue toexperience the most enrollment growth. The following
new construction programs, funded by current andprevious bond programs, will help address overcrowdingissues.
Baldwin ES – Opened 2010 Early Childhood Center – Opens 2012 and will
relieve Linder ES New North Central ES – Currently in site selection
process New ES – Undesignated
In addition, land acquisition and funding have beenapproved for a new middle school site in the
EXHIBIT "B"
Page 6
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 9/317
southeastern part of the District, and a new high schoolsite in the southern region of the District. The constructionof the middle and high schools is anticipated to be apart of a future bond program.
As enrollment is projected to increase, it is estimated thatthree new elementary schools and additions at sevenelementary schools and one middle school would berequired. Currently, the District targets a 125% utilizationrate as a precipitant for potential new construction or additions.
Process
In April of 2010, a Facility Master Plan Task Force wascreated and an educational planning firm was hired byAISD in order to develop the District-wide Facility Master Plan. The Task Force, comprised of parents, communitymembers, teachers, principals, and AISD staff wascharged with the following tasks.
Monitor the process to ensure equity and fairnessacross the District
Review and confirm recommendations andresolve conflicting recommendations
Prepare information and host community
dialogues and meetings Review and analyze data Review and analyze community input Develop and recommend an Educational
Framework to the Board of Trustees Develop facility options to improve efficiency and
address student needs
Develop and recommend the district-wide FacilityMaster Plan to the Board of Trustees
The Facility Master Plan Task Force held 25 meetings over
the course of 10 months and hosted 11 communitymeetings. In addition, the Task Force Co-chairs attendedten meetings at various school campuses throughout the
District. The community meetings provided invaluableinput to the Task Force throughout the process. Resultsand comments from these meetings are available in theappendix of this report.
Challenges
During the process, the Task Force was faced withseveral challenges and complex issues associated withAISD facilities and planning for the future. The followingoutline is meant to provide an understanding and
reflection of the real issues with which the Task Force hasbeen struggling, and the resulting implications for facilitymaster planning.
Challenge #1: Acc omp lishing priorities within a shrinking
budget
In order for AISD to continue operating as it is today, anassessed budget shortfall between $94 and $100 millionfor fiscal year 2012 will have to be addressed. Canincreasing facility efficiency decrease the budget
shortfall, and how can this be balanced with the futureof neighborhood schools, their design, size, andsustainability?
Challenge #2: Student m igration
The number of students previously living within the Austin
urban core, has declined over the past 20 years, resultingin 25% of schools housing less than 85% of their permanent student capacities. Conversely, there have
EXHIBIT "B"
Page 7
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 10/317
been large population increases in the outer areas of theDistrict, resulting in 50% of schools housing more than105% of their permanent student capacities.
However, not all under- and over-utilization is a directresult of population and demographic shifts. Largenumbers of students that travel outside of the boundaryof their assigned school present a challenge whenmaking future facility decisions. Should long-termplanning address the number of students living within theattendance area, or should it address the number ofstudents currently attending that school, includingtransfer students? What are the principles of the currenttransfer policies and how will they be applied in thefuture?
Cha llenge #3: The role of fac ility planning in suppo rtingand c omp lementing educ ational program planning
AISD strives to maintain academic standards, programs,and performance consistently throughout the District.From a facilities perspective, what recommendationscan be made to help move the District towardincreasing graduation rates and eliminating theachievement gap? Since programs are capable of
changing faster than bricks and mortar, how canfacilities remain flexible and be retrofitted for multi-usewhere practical? How can facility decisions positivelyimpact student achievement? For example, is it morebeneficial to offer duplicate programs, such as fine artsor career technology education, or is it better to providetransportation to a single program? What are the costimplications?
Challenge #4: Bounda ry adjustment solutions
A logical solution to improve efficiencies amongovercrowded and under-utilized schools is to adjust the
attendance boundaries and assign more or fewer students as appropriate. In practice, it is not that simple.In some cases, under-utilization occurs when a largenumber of students migrate to schools outside of their geographical attendance zone. Increasing the size ofthe boundary of the under-utilized school will not fix theproblem. In addition, if the aforementioned migratingstudents decided to attend their home schools, the resultcould be an overcrowded scenario.
In other cases, there are too many overcrowded or under-enrolled schools adjacent to each other. Thisresults in a “domino effect” of moving students from onelocation to the other in order to increase or decreaseenrollment. In many instances, students would not beable to attend the school closest to their homes or in their neighborhoods. In fact, they may have to drive past aschool closer to their home in order to attend another school to achieve balanced enrollment.
Challenge #5: Balanc ing short- and long- term needs
Significant resources will be needed to address thecapital projects outlined in this facility plan. In additionto the funds needed to renovate AISD’s facility inventory,additional investment in deferred maintenance andsmall capital projects will continue as buildings age. Atthe same time, new schools will need to be constructed
to accommodate growth.
EXHIBIT "B"
Page 8
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 11/317
Test_
EXHIBIT "B"
Page 9
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 12/317
Fac ility Rec omm enda tions
I. Portable Reduction
The annual cost to operate a portable building in AISDis approximately $4.00 per square foot. The District
currently has 668 portable buildings which equates toapproximately 1,336 classrooms.
The criteria used to identify portable reduction include: A utilization rate (enrollment/permanent
capacity) at the school location that fallsbelow 85%.
Age and condition of the portableswould be used to determine which
portables to take out of service unlesstheir current location would causeadditional moving costs.
There is a potential to reduce the total number ofportables in the District by 108, using the above criteriaof 85% utilization. Based on a minimum annualoperating cost of $4.00 per square foot, this wouldresult in an annual savings of $663,552.
II. Funded New Construction
The following new construction projects, funded bycurrent and previous bond programs, will help addresssome overcrowding issues.
a. Baldwin ES – Opened 2010
b. Early Childhood Center – Opens 2012 and willrelieve Linder ES
c. New North Central ES – Currently in site selectionprocess
d. New ES – The Facility Master Plan Task Force
recommends locating the 2008 Bond Program
undesignated ES to the North Central area.e. District-wide Performing Arts Center
III. Unfunded New Construction a nd Ca pital
Improvement
a. Priority 1 & 2 Needs
Priority 1 & 2 needs identified by the facility conditionassessment during 2007-2010, include currently criticaland potentially critical needs at each school campus
and support facility. The total cost to address theseneeds is approximately $319,528,000 phased over eightyears.
b. Func tiona l Equ ity
A functional equity study was completed by the Districtduring 2008-2010. This study identified core areas andsome specialized classrooms, within specific schoolcampuses that did not meet the current educational
specification standards. The cost to resolve these issues isapproximately $131,000,000, phased over eight years.
c . New Sc hools and Add itions
Land acquisition and funding has been approved for anew middle school site in the southeastern part of theDistrict, and a new high school site in south Austin. The
construction of the middle and high schools isanticipated to be a part of a future bond program.
EXHIBIT "B"
Page 10
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 13/317
As enrollment is projected to increase, it is estimated thattwo additional elementary schools would be required.Currently, the District targets a 125% utilization rate as aprecipitant for potential new construction or additions.The unfunded new construction recommendationsinclude the following:
1. Three new elementary schools2. Seven elementary school classroom additions3. One new middle school4. One middle school classroom addition5. One new high school
IV. Closures/C onsolida tions
Although the Task Force’s recommendations include the
consideration of school closures because of the severityof the District’s budget short fall, significant concernswere expressed by some members of the Task Forceregarding the impact of school closures on communities,especially in those where recent gains in studentperformance could be jeopardized.
a. Consider consolidating/closing one middle school.
b. Consider consolidating/closing eight elementaryschools.
V. Programs Rec omm enda tions
a. Relocate Alternative Learning Center (ALC)possibly in a different quadrant of the city .
b. Identify a Pre-K-8 school (begin Pre-K-5) to relievenorth central overcrowding. Also, consider thismodel in other areas of the district.
c. Consider moving 6th grade from elementary tomiddle school to relieve overcrowding in
elementary schools and under-utilization in middleschools.
d. Explore Pre-K Centers to address overcrowding
e. Conduct intensive planning for School for Young
Men (site TBD based on community input,feasibility, and availability of funding).
f. Conduct planning for district open-enrollment
signature programs and vertical team signatureprograms, and their equitable geographicdistribution.
g. Complete analysis of changes to district programsthat generate facility needs.
h. Conduct planning for Career Tech Hubs (sites TBDbased on community input, feasibility, andavailability of funding).
i. Consider options for separating some elementaryschools into Pre-K-3 and 4-8 grade configurationsto address overcrowding.
VI. Policy
a. Seriously consider redrawing boundaries in mostcritically overcrowded regions where possible.
b. Initiate a District-wide boundary assessment andpossible realignment beginning January 2012 to
balance enrollment and improve verticalalignment.
c. Address strict application of transfer policy as itapplies to overcrowding and under-utilization.
VII. Operating Efficiency and Potential Revenue
a. Do not renew administrative leases that end in
FY’11.
EXHIBIT "B"
Page 11
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 14/317
b. Do not renew administrative leases that end inFY’14.
c. Prepare and sell Baker Administrative Center.
d. Prepare and sell Carruth Administrative Center.
e. Expand District energy efficiency programs,including coordinated facilities summer shutdowns where feasible.
f. Identify additional energy efficiencies to
include in 2012 bond package.
EXHIBIT "B"
Page 12
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 15/317
Timeline for Fac ility Master Plan Imp leme ntation
FY ‘12 FY ‘13 FY ‘14 FY ‘15 FY ‘16 FY ‘17 FY ‘18 FY ‘19 FY ‘20 FY ‘21
2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21
Seriously consider redrawing boundaries inmost critically overcrowdedregions where possible
Boundary review andredraw TBD
Boundary review andredraw TBD
Boundary review andredraw TBD
Open classroom additionsat four elementary schools(requires future bond
funding, $4.8M each)
Open classroom additions attwo elementary schools(requires bond future
funding, $4.8M each)
Open classroom addition atone middle school (requiresfuture bond funding, $4.8M)
Open classroom addition atone elementary school(requires future bondfunding, $4.8M)
Consider consolidating/closing onemiddle school and four elementary schools
Consider consolidating/closing four elementary schools
Preliminary planning for upcoming bond proposals(every 4 yrs.)
Proposed Bond ProgramElection (>$500M*)
Proposed Bond ProgramElection (TBD*)
Proposed Bond ProgramElection (TBD*)
Open Linder EarlyChildhood Center (2008Bond funding available,$21.6M)
Open Performing ArtsCenter (2008 Bond, fundingavailable, $40M)_ __ Open North CentralElementary School (2004Bond funding available,
$28.1M)
Open new undesignated ES-recommended for NorthCentral (2008 Bond, fundingavailable, $28.1M)__ _ Open new undesignated ES(requires future bondfunding, $24.5M)_________
Open new undesignated ES(requires future bondfunding, $24.5M)
Open new undesignated ES(requires future bondfunding, $24.5M)
Open new Southeast MS(requires future bondfunding, $55.7M)
Open new South HighSchool (requires future bondfunding, $106.6M)
Relocate AlternativeLearning Center (consider possibilities in differentquadrant of the city) Identify pre-k-8 school(begin pre-k-5) to relievenorth central elementaryschool overcrowding. Also,consider this model in other areas of the district.
Consider options for separating some ES into Pk-3rd and 4th – 8th to addressovercrowding__ _ Explore 3rd Pre-k center toaddress overcrowding TBD
Consider moving 6th gradefrom elementary to middleschool to relieveovercrowding andunderutilization
Consider moving 6thgradefrom elementary to middleschool to relieveovercrowding andunderutilization
Consider moving 6th gradefrom elementary to middleschool to relieveovercrowding andunderutilization
Consider moving 6thgradefrom elementary to middleschool to relieveovercrowding andunderutilization
Analyze each school todetermine if limitations totransfers/choice options areneeded
Review application of transfer policy for efficacyand fidelity
Note: In 2015-16 projected student enrollment > 92,000In 2020-21 projected student enrollment > 98,000
*The Bond Program will focus on Priority 1 and 2 building systems renovations, functional equity improvements, and new schools as indicated by demographic projections and the recommendations of a Bond Advisory Committee that are approvedby the Board of Trustees. The specific dates and total bond election amounts must be approved by the Board of Trustees
EXHIBIT "B"
Page 13
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 16/317
FY ‘12 FY ‘13 FY ‘14 FY ‘15 FY ‘16 FY ‘17 FY ‘18 FY ‘19 FY ‘20 FY ‘21
2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21
Address Priority 1 and 2renovations and functionalequity improvements(requires future bondfunding)
Address Priority 1 and 2renovations and functionalequity improvements(requires future bondfunding)
Address Priority 1 and 2renovations and functionalequity improvements(requires future bondfunding)
Address Priority 1 and 2renovations and functionalequity improvements(requires future bondfunding)
Address Priority 1 and 2renovations and functionalequity improvements(requires future bondfunding)
Address Priority 1 and 2renovations and functionalequity improvements(requires future bondfunding)
Address Priority 1 and 2renovations and functionalequity improvements(requires future bondfunding)
Address Priority 1 and 2renovations and functionalequity improvements(requires future bondfunding)
Portable reduction Portable reduction Portable reduction Portable reduction Portable reduction Portable reduction Portable reduction Portable reduction Portable reduction Portable reduction
Do not renew administrative
leases that finish in FY’11__ Explore terminatingadministrative leases thatfinish in FY’14
Do not renew administrative
leases that finish in FY’14
Prepare and sell Baker
Prepare and sell CAC
Expand existing districtenergy efficiency programs,including coordinatedfacilities summer shutdownswhere feasible___________ Identify additional energyefficiency facility needs toinclude in 2012 bondpackage
Reduce energy usage to95% of baseline
Reduce energy usage to90% of baseline or lower
Reduce energy usage to85% of baseline or lower
Reduce energy usage to80% of baseline or lower
Reduce energy usage to75% of baseline or lower
Reduce energy usage to75% of baseline or lower
Reduce energy usage to75% of baseline or lower
Reduce energy usage to70% of baseline or lower
Reduce energy usage to65% of baseline or lower
Programs
Intensive planning for School for Young Men (siteTBD based on communityinput, feasibility, availabilityof funding)
Open School for Young Men(if feasible and fundingavailable)
Planning for district open-enrollment signatureprograms, and vertical teamsignature programs andtheir equitable geographicdistribution_____________ Complete analysis of changes to district programsthat generate facilitiesneedsPlanning for Career TechHubs (locations and fundingsources TBD)
Open Career Tech Hubs(1 north, 1 south)
Note: In 2015-16 projected student enrollment > 92,000In 2020-21 projected student enrollment > 98,000
*The Bond Program will focus on Priority 1 and 2 building systems renovations, functional equity improvements, and new schools as indicated by demographic projections and the recommendations of a Bond Advisory Committee that are approvedby the Board of Trustees. The specific dates and total bond election amounts must be approved by the Board of Trustees.
EXHIBIT "B"
Page 14
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 17/317
Estimated Budget
The following tables provide an estimated budget, including estimated costs or savings by year, for the facilityrecommendations. The estimated costs or savings are based on AISD budgeted operating costs and recently completedfacility evaluations.
FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 TOTAL
I. Operational Cost Savings
Portab le Reduct ions (600,000)$ (600,000)$ (600,000)$ (600,000)$ (600,000)$ (600,000)$ (600,000)$ (600,000)$ (600,000)$ (600,000)$ (6,000,000)$
Total Cost / (Savings) (600,000)$ (600,000)$ (600,000)$ (600,000)$ (600,000)$ (600,000)$ (600,000)$ (600,000)$ (600,000)$ (600,000)$ (6,000,000)$
II. Funded New Construction
Early Childhood Center -$ 21,600,000$ -$ -$ -$ -$ -$ -$ -$ -$ 21,600,000$
New North Central ES -$ -$ 28,100,000$ -$ -$ -$ -$ -$ -$ -$ 28,100,000$
P erforming Arts Cen ter -$ -$ 40,000,000$ -$ -$ -$ -$ -$ -$ -$ 40,000,000$
New E S (North Cen tral) -$ -$ -$ 28,100,000$ -$ -$ -$ -$ -$ -$ 28,100,000$
Total Cost / (Savings) -$ 21,600,000$ 68,100,000$ 28,100,000$ -$ -$ -$ -$ 117,800,000$
III. Un-Funded New Construction and Capital Improvements
Priority 1 & 2 Needs -$ -$ 39,941,000$ 39,941,000$ 39,941,000$ 39,941,000$ 39,941,000$ 39,941,000$ 39,941,000$ 39,941,000$ 319,528,000$
Functional Equity -$ -$ 16,350,000$ 16,350,000$ 16,350,000$ 16,350,000$ 16,350,000$ 16,350,000$ 16,350,000$ 16,350,000$ 130,800,000$
New Schools
New ES -$ -$ -$ 24,500,000$ -$ -$ -$ -$ -$ -$ 24,500,000$
New ES -$ -$ -$ 24,500,000$ -$ -$ -$ -$ -$ -$ 24,500,000$
New ES -$ -$ -$ -$ 24,500,000$ -$ -$ -$ -$ -$ 24,500,000$
New MS -$ -$ -$ -$ -$ 55,700,000$ -$ -$ -$ -$ 55,700,000$
New HS -$ -$ -$ -$ -$ -$ 106,600,000$ -$ -$ -$ 106,600,000$Additions
4 ES Classroom Additions -$ 19,200,000$ -$ -$ -$ -$ -$ -$ -$ 19,200,000$
2 ES Classroom Additions -$ -$ 9,600,000$ -$ -$ -$ -$ -$ -$ 9,600,000$
1 ES Classroom Addition -$ -$ -$ 4,800,000$ -$ -$ -$ -$ -$ 4,800,000$
1 MS Classroom Addition -$ -$ -$ 4,800,000$ -$ -$ -$ -$ -$ 4,800,000$
Total Cost / (Savings) -$ -$ 75,491,000$ 114,891,000$ 90,391,000$ 111,991,000$ 162,891,000$ 56,291,000$ 56,291,000$ 56,291,000$ 724,528,000$
EXHIBIT "B"
Page 15
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 18/317
Area Facility Options
The following pages describe, outline, and
summarize facility options by area in the District. The
District has been divided into the 10 following with amap provided on the following page.
Area 1: Northwest – Anderson HS, Murchison MS,
Davis ES, Doss ES, Hill ES, Summitt ES
Area 2: North Central – Lanier HS, Burnet MS, Dobie
MS, Barrington ES, Cook ES, Graham ES, Hart ES,
McBee ES, Pillow ES, Walnut Creek ES, Wooldridge
ES, Wooten ES, Read Pre-K Center
Area 3: Central West – McCallum HS, Lamar MS,
Brentwood ES, Brown ES, Bryker Woods ES, Casis ES,
Gullet ES, Highland Park ES, Lee ES, Mathews ES,
Pease ES, Pickle ES, Reilly ES, Ridgetop ES
Area 4: Northeast – LASA HS, LBJ HS, Reagan HS,
Garcia MS, Pearce MS, Webb MS, Andrews ES,
Blanton ES, Harris ES, Jordan ES, Maplewood ES,
Overton ES, Pecan Springs ES, Winn ES
Area 5: Central East – Eastside Memorial HS, Kealing
MS, Martin MS, Allan ES, Allison ES, Blackshear ES,
Brooke ES, Campbell ES, Govalle ES, Metz ES,
Norman ES, Oak Springs ES, Ortega ES, Sanchez ES,
Sims ES, Zavala ES, Garza Independence HS,
Alternative Learning Center (ALC)
Area 6: Central – Austin HS, Travis HS, Fulmore MS,
O.Henry MS, Barton Hills ES, Becker ES, Dawson ES,
Linder ES, Travis Heights ES, Zilker ES
Area 7: Southwest – Bowie HS, Bailey MS, GorzyckiMS, Small MS, Baldwin ES, Baranoff ES, Clayton ES,
Kiker ES, Mills ES, Oak Hill ES, Patton ES
Area 8: South – Crockett HS, Bedichek MS,
Covington MS, Boone ES, Cunningham ES, Galindo
ES, Joslin ES, St. Elmo ES, Sunset Valley ES, The Ann
Richards School for Young Women Leaders
Area 9: Southeast – Mendez MS, Blazier ES, Houston
ES, Langford ES, Palm ES, Perez ES, Rodriguez ES,Widen ES
Area 10: Far South – Akins HS, Paredes MS, Casey ES,
Cowan ES, Kocurek ES, Menchaca ES, Odom ES,
Pleasant Hill ES, Williams ES
EXHIBIT "B"
Page 16
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 19/317
EXHIBIT "B"
Page 17
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 20/317
AREA 1 – NORTHWEST
Anderson High School
Murchison Middle School
Davis, Doss, Hill and Summitt elementary
schoolsArea IssuesBased on the number of students living in the area for the 2010-11 school year:
The area has a slight deficiency in thenumber of seats available at the elementaryand middle school levels.
The number of students migrating into thearea is higher than the number of studentsmigrating out of the area at all levels.
Spa c e Utilization
Based on the 2010-11 enrollment of schools in the area: One elementary school, Doss, is severely
overcrowded (above 125% of permanentcapacity)
Two elementary schools, Hill and Summitt, areovercrowded (between 115% and 125% ofpermanent capacity)
One elementary school, Davis, is in thetarget range of percent of permanentcapacity (between 85% and 105%)
The middle school, Murchison, isovercrowded (between 115% and 125% of
permanent capacity) The high school, Anderson, is in the target
range of percent of permanent capacity(between 85% and 105%)
Educ ational Enhanc ement
Academic Ratings:
Future Growth
Moderate population growth is projected in thisarea in the next five years.
Facility Condition
On average, the facilities have an FCI (FacilityCondition Index) slightly above the District FCI(22.8%).
Ma ster Plan Task Forc e Opt ions for 10-Year Plan
Construct an eight-classroom addition at one
elementary school. Construct an eight-classroom addition at one
middle school. Address priorities 1 & 2 and functional equity
improvements.Community Impac t
Consult with the community regarding boundaryadjustments.
Cost Saving s
NA
Exemplary
Doss ES
Hill ES
Summitt ES
Recognized
Davis ES
Murchison MS
Anderson HS
Elementary School Capacity 2,633 Elementary Migration IN - 478
Elementary School Population 2,731 Elementary Migration OUT - 166
Excess / (Deficient) Seats (98) Net Migration - 312
Middle School Capacity 1,113 Middle School Migration IN - 220
Middle School Population 1,171 Middle School Migration OUT - 110
Excess / (Deficient) Seats (58) Net Mirgation - 110
High School Capacity 2,017 High School Migrat ion IN - 391
High School Population 1,962 High School Migration OUT - 257
Excess / (Deficient) Seats 55 Net Migration - 134
Acceptable
None
EXHIBIT "B"
Page 18
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 21/317
AREA 2 – NORTH CENTRAL
Lanier High School
Burnet and Dobie middle schools
Barrington, Cook, Graham, Hart, McBee,
Pillow, Walnut Creek, Wooldridge, Wootenelementary schools and Read Pre-K Center
Area Issues
Based on the number of students living in the area for the 2010-11 school year:
The area has a severe deficiency in thenumber of seats available at the elementaryschool levels.
The number of students migrating out of thearea is higher than the number of students
migrating in, especially at the elementaryand high school levels.
Spa ce Utilization
Based on the 2010-11 enrollment of schools in thearea: Nine elementary schools, Barrington, Cook,
Graham, Hart, McBee, Read, Walnut Creek,Wooldridge and Wooten, are severelyovercrowded (above 125% of permanent
capacity) One elementary school, Pillow, is
overcrowded (between 115% and 125% ofpermanent capacity)
One middle school, Burnet, is in the target
range of percent of permanentcapacity(between 85% and 105%), while onemiddle school, Dobie, is under enrolled
(below 85% of permanent capacity) The high school, Lanier, is in the target range
of percent of permanent capacity (between85% and 105%)
Educ ational Enhanc ement
Academic Ratings:
Future Growth
Highest population growth in district is
projected in this area in the next five years
Facility Condition
On average, the facilities have an FCI slightlyless than the District FCI (22.8%), with two
Recognized
Cook ES
Hart ES
McBee ES
Wooten ES
Dobie MS
Exemplary
Graham ES
Pillow ES
Acceptable
Barrington ES
Walnut Creek ES
Wooldridge ES
Burnet MSLanier HS
Elementary School Capacity 5,568 Elementary Migration IN - 641
Elementary School Population 8,370 Elementary Migration OUT - 1,587
Excess / (Deficient) Seats (2,802) Net Migration (946)
Middle School Capacity 1,941 Middle School Migration IN - 123
Middle School Population 1,889 Middle School Migration OUT - 333
Excess / (Deficient) Seats 52 Net Migration (210)
High School Capacity 1,627 High School Migrat ion IN - 121
High School Population 1,981 High School Migration OUT - 557
Excess / (Deficient) Seats (354) Net Migration (436)
EXHIBIT "B"
Page 19
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 22/317
elementary schools and one middle schoolrequiring more extensive renovations.
Fac ility Ma ster Plan Task Forc e Op tions for 10-Yea r Plan
Construct two additional elementary schools. Construct eight-classroom additions at two
elementary schools. Address priorities 1 & 2 and functional equity
improvements.Community Impac t
Consult with the community regardingmiddle school redesign.
Consult with the community regardingboundary adjustments.
Cost Saving s
NA
AREA 3 – CENTRAL WEST
McCallum High School
Lamar Middle School
Brentwood, Brown, Bryker Woods, Casis,
Gullett, Highland Park, Lee, Mathews, Pickle,Reilly and Ridgetop elementary schools
Pease Elementary School*Area Issues
Based on the number of students living in the area for the 2010-11 school year:
The area has available seats at all schoollevels.
The number of students migrating into thearea is higher than the number of students
migrating out of the area at all levels. Attendance zone population under 300
students at three elementary schools,Matthews, Pease, and Ridgetop.
There are three elementary schools, Bryker Woods, Pease and Ridgetop that have apermanent capacity of less than 300 seats.
Permanent capacity for the middle and highschools are within target ranges.
The Fine Arts Academy at McCallum HS
results in a higher “in” migration at the highschool level. Elementary School Capacity 4,953 Elementary Migration IN - 1,253
Elementary School Population 4,762 Elementary Migration OUT - 623
Excess / (Deficient) Seats 191 Net Migration - 630
Middle School Capacity 1,008 Middle School Migration IN - 223
Middle School Population 583 Middle School Migration OUT - 191
Excess / (Deficient) Seats 425 Net Migration - 32
High School Capacity 1,596 High School Migrat ion IN - 795
High School Population 1,316 High School Migration OUT - 296Excess / (Deficient) Seats 280 Net Migration - 499
EXHIBIT "B"
Page 20
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 23/317
Spa ce Utilization
Based on the 2010-11 enrollment of schools in thearea:
Two elementary schools, Bryker Woodsand Gullett, are severely overcrowded
(above 125% of permanent capacity). Two elementary schools, Casis and Pickle,
are overcrowded (between 115% and125% of permanent capacity)
Three elementary schools, Brown,Highland Park and Ridgetop, are over capacity (between 105% and 115% ofpermanent capacity)
Four elementary schools, Lee, MathewsPease, and Reilly, are within the target
range of percent of permanent capacity(between 85% and 105%)
One elementary school, Brentwood, isunder enrolled (below 85% of permanentcapacity)
The middle school, Lamar, is under enrolled (below 85% of permanentcapacity)
The high school, McCallum, is overcrowded(between 115% and 125% of permanent
capacity)Educ ational Enhanc ement Academic Ratings:
Future Growth
Moderate population growth is projected in
this area in the next five years.Facility Condition
On average, the facilities have an FCI slightly
higher than the District FCI (22.8%), with two
elementary schools requiring more extensive
renovations.
Fac ility Ma ster Plan Task Forc e Op tions for 10-Yea r Plan
Address priorities 1 & 2 and functional equityimprovements.
Consolidate/close one elementary school.Community Impac t
Consult with community regarding the use of
closed/consolidated elementary school. Consult with community if boundary
adjustments are needed.Cost Saving s
Cost savings for closure of one elementaryschool is $700,000 in M&O savings.
Capital cost avoidance –$8.1M if oneelementary school was closed / consolidated.
*Pease Elementary School does not have an attendance boundaryand receives transfer students from all parts of the District, therefore its
capacity, enrollment, and in-migration counts are not included in thearea summaries.
Exemplary
Casis ES
Gullett ES
Highland Park ES
Lee ES
Matthews ES
Pease ES
Ridgetop ES
Recognized
Brentwood ES
Bryker Woods ES
Pickle ES
Reilly ES
Acceptable
Brown ES
Lamar MS
McCallum HS
EXHIBIT "B"
Page 21
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 24/317
AREA 4 – NORTHEAST
LASA, LBJ and Reagan high schools
Garcia, Pearce and Webb middle schools, Andrews, Blanton, Harris, Jordan, Maplewood,
Overton, Pecan Springs and Winn elementary
schoolsArea Issues
Based on the number of students living in the area for the 2010-11 school year:
The area has available seats at the middle andhigh school levels, but is deficient at theelementary school level.
The number of students migrating out of thearea is higher than the number of studentsmigrating into the area at all levels, especially at
the middle and high school levels. The magnet program, LASA, located at LBJ High
School attracts students from outside the LBJattendance area.
Spa c e Utilization
Based on the 2010-11 enrollment of schools in thearea: Three elementary schools, Andrews, Harris
and Jordan, are severely overcrowded
(above 125% of permanent capacity). Three elementary schools, Maplewood,
Overton and Pecan Springs, areovercrowded (between 115% and 125% ofpermanent capacity).
Two elementary schools, Blanton and Winn,are within the target range of percent of
permanent capacity (between 85% and105%).
All three middle schools, are under enrolled
(below 85% of permanent capacity). One high school, Reagan, is under enrolled
(below 85% of permanent capacity), whileLBJ and LASA are within the target range ofpercent of permanent capacity (between85% and 105%)
Educ ational Enhanc ement
New Programs for 2011-12:
Early College Prep at one middle school Early College High School / Early College
Start at two high schools
Academic Ratings:
Exemplary
Blanton ES
LASA HS
Recognized
Andrews ES
Harris ES
Jordan ES
Overton ES
Winn ES
Acceptable
Maplewood ES
Pecan Springs ES
Garcia MS
Pearce MS
Webb MS
LBJ HS
Reagan HS
NORTHEAST
Elementary School Capacity 4,301 Elementary Migration IN - 685
Elementary School Population 5,006 Elementary Migration OUT - 849
Excess / (Deficient) Seats (705) Net Migration - (164)
Middle School Capacity 3,097 Middle School Migration IN - 93
Middle School Population 2,272 Middle School Migration OUT - 665
Excess / (Deficient) Seats 825 Net Mirgation - (572)
High School Capacity 3,430 High School Migration IN - 247
High School Population 2,635 High School Migration OUT - 1,018
Excess / (Deficient) Seats 795 Net Migration - (771)
EXHIBIT "B"
Page 22
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 25/317
Future Growth
Significant population growth is projected inthis area in the next five years.
Facility Condition
On average, the facilities have an FCI (Facility
Condition Index) lower than the District FCI(22.8%), with two elementary schools requiringmore extensive renovations
Fac ility Master Plan Task Forc e Op tions for 10-Year
Plan
Construct one elementary school. Construct an eight classroom addition at one
elementary school.
Close /consolidate one middle school.
Adjust boundaries between elementary
schools. Address priorities 1 & 2 and functional equity
improvements.Community Impac t
Consult with community regarding plans for closure/consolidation of one middle schooland its repurposing.
Cost Savings Cost savings for closure of one middle school is
$1.8M in M&O savings. Capital cost avoidance –$7.4M if one middleschool was closed / consolidated.
AREA 5 – CENTRAL EAST
Eastside Memorial High School at the JohnstonCampus - Global Tech. , Green Tech., andInternational high schools
Kealing and Martin middle schools Allan, Allison, Blackshear, Brooke, Campbell,
Govalle, Metz, Norman, Oak Springs, Ortega,Sanchez, Sims and Zavala elementary schools
Garza Independence High School* and theAlternative Learning Center (ALC)
Area Issues
Based on the number of students living in the area for the 2010-11 school year:
The area has available seats at all school levels. The number of students migrating out of the area is
higher than the number of students migrating intothe area at the elementary and high schools levels.The magnet program at Kealing MS results in ahigher “in” migration at the middle school level.
Attendance zone populations are under 300
students at three elementary schools, Blackshear,Oak Springs and Ortega.
Permanent capacity for all schools is within targetranges.
International High School provides programs for
limited English speaking high school students whoqualify.
Elementary School Capacity 6,639 Elementary Migration IN - 665
Elementary School Population 5,173 Elementary Migration OUT - 810
Excess / (Deficient) Seats 1,466 Net Migration - (145)
Middle School Capacity 2,136 Middle School Migration IN - 881
Middle School Population 1,597 Middle School Migration OUT - 493
Excess / (Deficient) Seats 539 Net Migration - 388
High School Capacity 1,548 High School Migrat ion IN - 125High School Population 1,249 High School Migration OUT - 955
Excess / (Deficient) Seats 299 Net Migration - (830)
EXHIBIT "B"
Page 23
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 26/317
Spa ce Utilization
Based on the 2010-11 enrollment of schools in thearea: One elementary school, Allison, is over
capacity (between 105% and 115% of
permanent capacity) Three elementary schools, Brooke, Metz and
Sanchez, are within the target range ofpercent of permanent capacity (between85% and 105%)
Nine elementary schools, Allan, Blackshear,Campbell, Govalle, Norman, Oak Springs,Ortega, Sims and Zavala are under enrolled(below 85% of permanent capacity)
One middle school, Kealing, is within the
target range of permanent capacity(between 85% and 105%), while Martin isunder enrolled (below 85% of permanentcapacity).
The high school, Eastside Memorial, is under enrolled (below 85% of permanentcapacity).
Educ ational Enhanc eme nt Academic Ratings:
Future Growth
No significant population growth is projectedin this area in the next five years.
Facility Condition
On average, the facilities have an FCI abovethe District FCI (22.8%), with three elementaryschools and one secondary schools requiringmore extensive renovations.
There are significant structural issues at theAlternative Learning Center (ALC).
Fac ility Ma ster Plan Task Forc e fo r 10-Year Plan
Consolidate / close four elementary schools. Construct one replacement elementary
school. Address priorities 1 & 2 and functional equity
improvements.Community Impac t
Consult with community to discuss use /repurposing of elementary schools to beclosed and the relocation of ALC.
Cost Saving s
M & O savings ($5.1M) could be realized iffour elementary schools were closed /consolidated.
Capital cost avoidance - $25.2M if four
elementary schools were closed /consolidated; however, it would cost $28M toconstruct a replacement elementary school.
*Garza Independence High School and the AlternativeLearning Center do not have attendance boundaries andreceive transfer students from all parts of the District, thereforetheir capacity, enrollment, and in-migration counts are notincluded in the area summaries.
Exemplary
Metz ES
Oak Springs ES
Ortega ES
Sims ES
Recognized
Brooke ES
Norman ES
Sanchez ES
Zavala ES
Acceptable
Allan ES
Allison ES
Blackshear ES
Campbell ES
Govalle ES
Kealing MS
Martin MS
Eastside Global HS
Garza Independence HS
Unacceptable
Eastside Green HS
EXHIBIT "B"
Page 24
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 27/317
AREA 6 – CENTRAL
Austin and Travis high schools
Fulmore and O. Henry middle schools Barton Hills, Becker, Dawson, Linder, Travis
Heights and Zilker elementary schoolsArea Issues
Based on the number of students living in the area for
the 2010-11 school year: The area has available seats at all school levels.
The number of students migrating into the area ishigher than the number of students migratingout of the area at the elementary and middle
school levels. There are slightly more studentsmigrating out of the area at the high school
level. Attendance zone populations are under 300
students at three elementary schools, Barton Hills,
Becker and Dawson. One elementary school, Barton Hills, has a
permanent capacity of less than 300 seats.
Spa ce Utilization
Based on the 2010-11 enrollment of schools in thearea: Two elementary schools, Barton Hills and
Linder, are severely overcrowded (above
125% of permanent capacity) Two elementary schools, Travis Heights and
Zilker, are over capacity (between 105% and115% of permanent capacity).
Two elementary school, Becker and Dawson,are under enrolled (below 85% of permanentcapacity)
One middle school, O.Henry, is overcrowded(above 125% of permanent capacity), whileFulmore is within the target range of
permanent capacity (between 85% and105%).
One high school, Austin, is overcrowded(above 125% of permanent capacity), whileTravis is under enrolled (below 85% ofpermanent capacity).
Educ ational Enhanc ement
Academic Ratings:
Exemplary
Barton Hills ES
Becker ES
Dawson ES
Zilker ES
Recognized
Linder ES
Travis Heights ES
Austin HS
Acceptable
Fulmore MS
O.Henry MS
Travis HS
Elementary School Capacity 2,768 Elementary Migration IN - 729
Elementary School Population 2,547 Elementary Migration OUT - 433
Excess / (Deficient) Seats 221 Net Migration - 296
Middle School Capacity 2,023 Middle School Migration IN - 780
Middle School Population 1,654 Middle School Migration OUT - 321
Excess / (Deficient) Seats 369 Net Migration - 459
High School Capacity 4,067 High School Migrat ion IN - 936
High School Population 3,860 High School Migration OUT - 1,126
Excess / (Deficient) Seats 207 Net Migration - (187)
EXHIBIT "B"
Page 25
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 28/317
Future Growth
Moderate population growth is projected inthis area, specifically within the Linder andTravis Heights attendance zones.
Facility Condition
With the exception of one elementary with ahigh FCI, on average, the facilities have anFCI above the the district average (22.8),with three elementary schools and onemiddle school requiring more extensiverenovations.
Fac ility Ma ster Plan Task Forc e Op tions for 10-Yea r Plan
Consolidate/close two elementary schools.
Address priorities 1& 2 and functional equityimprovements.
Community Impac t Consult with the community regarding the
use closed/consolidated elementaryschool(s).
Cost Saving s
• M&O savings for two elementary schools -$2.2M.
• Capital cost avoidance for three elementaryschools- $17.5M.
AREA 7 – SOUTHWEST
Bowie High School Bailey, Gorzycki and Small middle schools
Baldwin, Baranoff, Clayton, Kiker, Mills, Oak Hill andPatton elementary schools
Area IssuesBased on the number of students living in the area for
the 2010-11 school year: The area has available seats at the middle school
level, and is slightly deficient at the elementaryand high schools levels.
The number of students migrating into the area is
higher than the number of students migrating out
of the area at all levels.
Spa ce Utilization
Based on the 2010-11 enrollment of schools in the area: Three elementary schools, Kiker, Mills and Patton,
are overcrowded (between 115% and 125% of
permanent capacity) One elementary school, Baranoff, is over capacity
(between 105% and 115% of permanentcapacity).
Elementary School Capacity 5,392 Elementary Migration IN - 633
Elementary School Population 5,727 Elementary Migration OUT - 545
Excess / (Deficient) Seats (335) Net Migration - 88
Middle School Capacity 3,738 Middle School Migration IN - 487
Middle School Population 2,844 Middle School Migration OUT - 358
Excess / (Deficient) Seats 894 Net Migration - 129
High School Capacity 2,535 High School Migrat ion IN - 505
High School Population 2,606 High School Migration OUT - 231Excess / (Deficient) Seats (71) Net Migration - 274
EXHIBIT "B"
Page 26
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 29/317
Two elementary schools, Clayton and Oak Hill, arewithin the target range of percent of permanentcapacity (between 85% and 105%)
One elementary school, Baldwin, is under enrolled(below 85% of permanent capacity)
One middle school, Bailey, is within the targetrange of percent of permanent capacity(between 85% and 105%).
Two middle schools, Gorzycki and Small are under enrolled (below 85% of permanent capacity)
One high school, Bowie, is over capacity(between 105% and 115% of permanentcapacity).
Educ ational Enhanc eme nt Academic Ratings:
Future Growth
Moderate population growth is projected inthis area at the elementary and middleschool levels.
Facility Condition
On average, the facilities have an FCI wellbelow the District FCI (22.8%).
Fac ility Master Plan Task Forc e Op tions for 10-YearPlan
Construct an eight-classroom addition at oneelementary school.
Adjust boundaries among elementaryschools.
Address priorities 1 & 2 and functional equityimprovements.
Community Impac t Consult with community regarding boundary
adjustments.Cost Saving s
NA
Recognized
Bailey MS
Bowie HS
Gorzycki MS
Small MS
No Rating
Baldwin ES
Exemplary
Baranoff ES
Clayton ES
Kiker ES
Mills ES
Oak Hill ES
Patton ES
Acceptable
None
EXHIBIT "B"
Page 27
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 30/317
AREA 8 - SOUTH
Crockett High School,
Bedichek and Covington middle schools, Boone, Cunningham, Galindo, Joslin, St. Elmo
and Sunset Valley elementary schools The Ann Richards School for Young Women
Leaders*Area Issues
Based on the number of students living in the area for the 2010-11 school year:
• The area has available seats at theelementary and high school levels, and isslightly deficient at the middle schools level.
The number of students migrating out of thearea is higher than the number of students
migrating into the area, especially at themiddle and high school levels.
Spa ce Utilization
Based on the 2010-11 enrollment of schools in the area: Two elementary schools, Galindo and Joslin,
are within the target range of permanentcapacity (between 85% and 105%).
Four elementary schools, Boone,Cunningham, St. Elmo and Sunset Valley, are
under enrolled (below 85% of permanentcapacity).
One middle school, Bedichek, is over capacity (between 105% and 115% ofpermanent capacity) while Covington is
under enrolled (below 85% of permanentcapacity.
The high school, Crockett, is under enrolled(below 85% of permanent capacity).
Educ ational Enhanc eme nts
Academic Ratings:
Future Growth
Moderate population growth projected inthe area.
Facility Condition
On average, the facilities have an FCI above
the District FCI (22.8%) with four elementaryschools and one middle school requiringmore extensive renovations.
Fac ility Master Plan Task Forc e Op tions for 10-YearPlan
Consolidate/close one elementary school. Adjust boundaries between high schools
(Akins and Crockett).
Address Priorities 1 & 2 and functional equityimprovements.
Exemplary
Joslin ES
Sunset Valley ES
The Ann RichardSchool for Young
Women Leaders
Recognized
Boone ES
Galindo ES
St. Elmo ES
Acceptable
Cunningham ES
Bedichek MS
Covington MSCrockett HS
Elementary School Capacity 3,436 Elementary Migration IN - 566
Elementary School Population 2,921 Elementary Migration OUT - 656
Excess / (Deficient) Seats 515 Net Migration - (90)
Middle School Capacity 2,066 Middle School Migration IN - 281
Middle School Population 2,124 Middle School Migration OUT - 508
Excess / (Deficient) Seats (58) Net Migration - (227)
High School Capacity 2,163 High School Migrat ion IN - 285
High School Population 1,883 High School Migration OUT - 510
Excess / (Deficient) Seats 280 Net Migration - (225)
EXHIBIT "B"
Page 28
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 31/317
Community Impac t
Consult with the community regardingclosure and repurposing of elementaryschool.
Cost Sav ings Cost savings for closure of elementary school
is $1.26M in M&O savings. Capital cost avoidance –$8.4M.
*The Ann Richards School does not have an attendance boundaryand receives transfer students from all parts of the District, therefore itscapacity, population, and in-migration counts are not included in thearea summaries.
AREA 9 – SOUTHEAST
Mendez Middle School,
Blazier, Houston, Langford, Palm, Perez,Rodriguez and Widen elementary schools
Area IssuesBased on the number of students living in the area for the 2010-11 school year:
The area is severely deficient in the number of seats at the elementary level, and is slightlydeficient at the middle school level.
The number of students migrating out of thearea is higher than the number of studentsmigrating into the area.
Spa ce Utilization
Based on the 2010-11 enrollment of schools in the area: Four elementary schools, Blazier, Houston, Perez
and Rodriguez, are severely overcrowded (over 125% of permanent capacity).
Two elementary schools, Langford and Widen, areovercrowded (between 115% and 125% ofpermanent capacity).
One elementary school, Palm, is within the targetrange of percent of permanent capacity(between 85% and 105%).
The middle school, Mendez, is under enrolled(below 85% of permanent capacity).
There is no high school in this area.
Elementary School Capacity 4,637 Elementary Migration IN - 503
Elementary School Population 6,109 Elementary Migration OUT - 865
Excess / (Deficient) Seats (1,472) Net Migration - (362)
Middle School Capacity 1,215 Middle School Migration IN - 27
Middle School Population 1,266 Middle School Migration OUT - 396
Excess / (Deficient) Seats (51) Net Migration - (369)
EXHIBIT "B"
Page 29
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 32/317
Educ ation Enhanc eme nt Academic Ratings:
Future Growth
Moderate population growth is projected inthis area.
Facility Condition
On average, the facilities have an FCI that isbelow the District FCI (22.8%), with one
elementary school requiring more extensiverenovations.
Fac ility Master Plan Task Forc e Op tions for 10-Year
Plan
Evaluate reduction of portables at middleschool.
Construct eight-classroom additions at two
elementary schools. Adjust boundaries among area elementary
schools to reduce overcrowding. Adjust boundaries among area middleschools.
Address priority 1& 2 and functional equityimprovements
Community Impac t
Consult with the community regardingelementary and middle school boundaryadjustments.
Cost Sav ings
NA
AREA 10 – FAR SOUTH
Akins High School
Paredes Middle School Casey, Cowan, Kocurek, Menchaca, Odom,
Pleasant Hill and Williams elementary schools
Area IssuesBased on the number of students living in the area for the 2010-11 school year:
The area is deficient is the number of seats atthe elementary and high school levels.
The number of students migrating out of thearea is higher than the number of studentsmigrating into the area, especially at themiddle and high school levels.
Spa ce UtilizationBased on the 2010-11 enrollment of schools in the area:
Three elementary schools, Cowan, Odom andPleasant Hill, are overcrowded (between 115% and125% of permanent capacity).
Two elementary schools, Menchaca and Williams,are over capacity (between 105% and 115%permanent capacity).
Two elementary schools, Casey andKocurek, are within the target range of
Recognized
Houston ES
Palm ES
Perez ES
Acceptable
Blazier ES
Langford ES
Rodriguez ES
Mendez MS
Widen ES
Elementary School Capacity 4,286 Elementary Migration IN - 773
Elementary School Population 4,819 Elementary Migration OUT - 873
Excess / (Deficient) Seats (533) Net Migration - (100)
Middle School Capacity 1,156 Middle School Migration IN - 69
Middle School Population 1,165 Middle School Migration OUT - 291
Excess / (Deficient) Seats (9) Net Migration - (222)
High School Capacity 2,394 High School Migrat ion IN - 176
High School Population 3,092 High School Migration OUT - 596
Excess / (Deficient) Seats (698) Net Migration - (420)
Exemplary
None
EXHIBIT "B"
Page 30
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 33/317
percent of permanent capacity (between85% and 105%).
The middle school, Paredes, is under enrolled (below 85% of permanentcapacity).
The high school, Akins, is over capacity(between 105% and 115% of permanentcapacity).
Educ ational Enhanc eme nt
Academic Ratings:
Future Growth
No significant population growth is projected inthe area for the elementary and middle schoollevels; however, continued moderate growth isprojected at the high school level.
Facility Condition
On average, the facilities have an FCI belowthe District FCI (22.8%), with two elementaryschools requiring more extensive renovations.
Fac ility Master Plan Task Forc e Op tions for 10-Year
Plan Priority 1& 2 and functional equity
improvements.
Adjust boundaries between high schools(Akins and Crockett to reduceovercrowding).
Community Impac t
Consult with community regarding highschool boundary adjustments and possibleelementary boundary adjustments.
Cost Saving s NA
Exemplary
Cowan ES
Recognized
Akins HS
Paredes MS
Acceptable
Casey ES
Kocurek ES
Menchaca ES
Odom ESPleasant Hill ES
Williams ES
EXHIBIT "B"
Page 31
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 34/317
Add itional Rec omm enda tions
The Facilities Master Plan Task Force recommends the
following District-wide initiatives and policy
recommendations. Some recommendations mayrequire additional planning and research from other AISD
departments and outside entities. The Task Force does
not want to lose sight of these very important ideas and
recognizes that the Facility Master Plan is a dynamic
document and should be updated periodically toincorporate building improvements, updates in
community demographics, and changes in educational
programming.
I. Policy Rec omm enda tions
1. Consider school closures only after all other
alternatives and options, both programmatic and
facilities use, have been thoroughly examined
and discussed with the affected communities.
2. Create a community engagement process, led
by the Superintendent and the Senior LeadershipTeam, to work directly with the local community
as part of the implementation planning process.
3. Establish a standing committee of parents,
teachers, district staff, and other stakeholders(e.g., City, Chamber of Commerce, realtors) to
track and maintain the Facility Master Plan over
time.
4. Conduct campus assessments for future bond
work in consultation with each school's Campus
Advisory Council to ensure accurate, first-hand
knowledge of campus conditions and priorities.For continuity, each campus will maintain a
Facilities Improvement Plan documenting prior
campus evaluations, including a Principal's Log,
in which the principal or his/her designee will
record relevant discussions regarding how thecampus facilities are functioning and note any
concerns for future administrators and CACs.
5. When new schools or consolidations are being
considered, first evaluate existing District sites(both presently undeveloped or in use) anddetermine if any are candidates for new
construction, renovation, or re-construction. Thismay assist the District in locating schools in better
locations than can be achieved with the
purchase of new land.
6. Continue to identify ways to improve
collaborative planning with the City of Austin.The Austin ISD, City of Austin, and Travis County
have adopted a joint resolution that specifically
commits these entities to collaborative planningefforts including the AISD Facility Master Plan and
the City’s Comprehensive Plan.
7. Initiate a District-wide boundary assessment and
possible realignment beginning January 2012 to
EXHIBIT "B"
Page 32
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 35/317
balance enrollment and improve vertical
alignment.
8. District Departments/staff should be moved into
available spaces at under-utilized schools so thatthe District may sell valuable property, avoid
leasing buildings and allow for all schools toremain open.
9. Aggressively pursue joint-use opportunities for existing underutilized campuses, as well as new
facilities; potential partners include the City of
Austin, Central Health/CommUnityCare, and artsorganizations and other nonprofit organizations.
10. Closed schools should be reused by the District or another governmental entity for office/
administrative use, or by another educationaluser, and then returned to use as AISD
instructional space when student population
growth makes it prudent.
11. Review current District transfer policies and
implementation, in particular using campus’“permanent capacity”, as opposed to
“functional capacity” when evaluating availablespace.
12. Analyze current “out migration” trends from
campus/zones to understand the underlying
issues, AND then address those issues in order to
support the return of students to their neighborhood schools.
13. Conduct a complete review of the day-to-day
application of the district's transfer policy,
regardless of overcrowding or underutilization.
Include the impact that “out migration” can haveon under-utilized schools as much as “in migration
can impact overcrowded schools.
14. Support the neighborhood school model.
II. Manag ement Reco mmenda tions
15. Institute a well-defined system for handling
maintenance requests that is communicated in
writing to all staff at the start of each school year including:
how and to whom to report amaintenance issue, and how to receive
the estimated time for a response, how to track a maintenance request
electronically in real time,
who to contact if the contractor or maintenance person fails to arrive,
what to do if work is poorly completed or isincomplete, and
who is responsible for signing off on
completed work.
III. Staffing Rec omm enda tions
16. Develop a plan to supervise custodians centrally
to allow more flexibility in the use of resources,
reduce overtime costs through flexible
EXHIBIT "B"
Page 33
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 36/317
scheduling, improved supervision and quality
control, and improved facility scheduling andenergy management.
17. Consolidate maintenance functions, including
field maintenance for athletic fields, under theMaintenance Department to provide more
efficient and flexible use of available resources.
IV. Energy Efficienc y Rec omm endations
18. Implement a centrally supervised summer custodial program to achieve cost reductions by
returning some custodians on each campus,through attrition, to a 10-month employment
year.
19. Continue the current District focus on energy
usage reduction through more efficient
equipment, technology applications to managethe operation of buildings more effectively, and
engagement of campus and facility occupants
to assist working toward the goal of reducedusage.
20. Continue efforts toward a coordinated shutdown
of facilities in the summer months as is feasible.
21. As soon as feasible, fund energy coordinator
position to implement and monitor energysavings initiatives at campuses. Savings
generated from funding this position would more
than offset the cost.
22. Implement an educational campaign to raise or
lower thermostats in schools four degrees.(Estimates based on examples project savings of
between 5% and 20%.)
23. Continue to upgrade and improve data and
systems to measure utility usage by campus.
V. Maintenance Reco mmenda tions
24. Institute bond counsel-approved strategies to
designate funds for building system renovations in
future bond programs to protect the District’scapital investments.
25. Include furniture and equipment replacementschedule in the next bond program scope of
work; invest in high quality equipment that will not
require frequent maintenance or replacement.
26. Institute industry-standard performance measures
for bond programs, per the 2009 MGT EfficiencyStudy, to maintain and publish the following types
of data: cost per foot of construction projectscompared to peer districts and regional and
national averages, final estimate compared to
final bid, change-order rate, completionschedules, consultant ratings.
EXHIBIT "B"
Page 34
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 37/317
VI. Design Rec omm enda tions
27. Engage in public/private partnerships in the siting,engineering, and design of “healthy” schools and
neighborhood environments that supportincreased outdoor physical activities for childrenand their families.
28. Explore flexible design for future school facilities toaccommodate population fluctuations. Some
strategies include implementing consistent
building designs with modular components that
may expand or contract with student population
changes, or using a Mobile Technology unit thatallows specialized equipment to be shared by
two or more campuses for a portion of a year.
29. Create flexible learning spaces, where students
can work in groups utilizing the wireless network
with portable devices.
30. Design large-scale facilities to provide suitable
space for multiple uses such as conferences,
meetings, and professional development (ideallyin conjunction with other local governmental
partners to share costs and maintenance).
31. Design, construct and operate high-performance
schools and other facilities that are sensitive tonatural resource use, conserve energy and
water, reduce pollution and waste, promote and
attract active transportation by healthy outdoor design that includes, but is not limited to, bicycle
racks for students within a two-mile radius of a
campus and outdoor space designed for multi-purpose neighborhood and community use.
32. The site selection process for high-performanceschools and other faculties should include a
matrix that rewards the availability of masstransportation options that include, but are not
limited to, Capital Metro buses, commuter rail,
and metro rail to reduce transportation costs and
the carbon footprint of a facility.
33. To avoid the costs of building and maintaining
additional high schools, pursue options such as 7
a.m. to 8 p.m. schedules that offer challenging
curriculums, distance learning, and advancedplacement courses. Online courses could also be
more widely implemented and available to all
students.
VII. Safety a nd Sec urity Rec omm enda tions
34. Make safe walkable routes a priority whenconstructing or repurposing school facilities.
35. Assess nighttime security and add securitycameras and lighting in high need areas.
36. Work with appropriate entities to encourage
construction of fences and barriers at railroad
crossings.
EXHIBIT "B"
Page 35
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 38/317
37. Ensure the installation of adequate public address
and alarm systems in all schools, including allportables.
38. Address campus traffic issues as identified by thecampus.
VIII. Use Rec omm enda tions
39. Increase building rental rates to increase cost-
recovery for community use of schools.
40. Appropriately consolidate students in underutilized
campuses to make available as much classroomspace as possible, and issue Requests for Proposals
to identify educational groups or childcare
providers interested in leasing excess space and
assuming or sharing maintenance and operation
costs.
41. Implement an aggressive marketing campaign to
rent the Burger Activity and Delco Activity centersto interested parties for conferences, athletic
events, and other activities.
IX. Tec hnology Rec omm enda tions
42. Design “Twenty-first Century Classrooms,” media
rich classrooms with projectors, audio system,
document cameras, and interactive tools.
43. Expand the staff use of online meeting software(live video/audio/screen sharing) to facilitate
communication and allow people in different
spaces to be in the same space virtually. “Green”meetings reduce employee travel time and have
a smaller carbon footprint.
44. Institute cloud computing with anytime/anywhere
access that works with all computer types and
devices.
45. Use Web 2.0 tools to communicate, collaborate,
and create.
46. Use tools such as video “chat” to expand beyond
the classroom (i.e., virtual field trips, interactions
with other students from across town, or across theglobe).
47. Create a single web entry point (portal) with single
sign-on for all student and teacher resources inone place.
48. Increase use of online assessment tools to receive
results more quickly and reduce paper usage, i.e.,
dashboards.
49. Improve access to meaningful student data to
guide instructional decisions.
50. Create online courses for students and teacher
professional development which would beconducted entirely online and blended with face-
to-face and online contact.
EXHIBIT "B"
Page 36
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 39/317
51. Increase use of mobile computing (including
personal devices such as smart phones) andmobile devices (netbooks). Fewer desktop
computers (use less energy, smaller foot print,), less
need for dedicated traditional computer lab.
X. Other Rec omm enda tions
52. Assess administrative fees for general, sibling, or
tracking school transfers, with no fee for students
qualified for free and reduced lunch, and withprovisions for hardship waivers.
53. Consider the feasibility of sharing administrative
staff or resources and services among small
campuses.
54. Determine cost effectiveness of duplicatingspecial programs in different areas of the Districtversus providing transportation to a single
program.
EXHIBIT B
Page 37
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 40/317
Fac ility Summ ary Data Reports with Fac ility Master Plan Rec om me nda tions
The following pages include a summary of each facility with the information listed below, in alphabetical order by school
type (ES, MS, HS). Support facilities are included subsequent to the school summaries.
School ID number, name, and address
Grades served
Permanent and portable/temporary square
footage Number of classrooms
Permanent Capacity
2010-11 Enrollment
2010-11 Attendance Zone Population
2015-16 Projected Attendance Zone Population
2010-11 In Migration
2010-11 Out Migration
Site size and number of parking spaces
Individual building data
Facility condition data
Deficiency costs by building system and priority
Facility master plan recommendations
EXHIBIT B
Page 38
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 41/317
School Summ ary Report2010 Educational Suitability Assessment
142 Allan Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 53%
2010-11 Attendance Zone Population 354 319
Excess/DeficitSeats
2010-11 Out Migration 031
2010-11 In Migration 057
2015-16 Proj'd At tendance Zone Populat ion 364 309
Utilization (by enrollment) 56% Percent of Capacity
Area (GSF) per student 297 0 297
Gross Area 112,608 112,608
Perm Temp Total
2010-11 Campus Enrollment 379
Permanent Capacity 673
Number of Classrooms 42 0 42
Parking Spaces 72
Gross Sit e Area (Acres) 19.5
Sit e Data
School Data
Mechanical 1 1957 1,092 27.6%
Building B 1 1958 10,577 35.3%
Building A 1 1957 100,939 30.3%
Per m Buildings 112,608
Floor s Yr . Built GSF FCI
Building Data
30.3%
Austin, Texas 78702 1957 AA No
4900 Gonzales Yr. Open Rating Historic
Interior $457 357 $323 054 $780 411
Site - - $156,255 $85,341 - $241,597
Exterior - $3,333 $2,797,431 $36,448 - $2,837,212
Structural - - - - - $0
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $2,943,565*
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 42/317
School Summ ary Report2010 Educational Suitability Assessment
101 Allison Elementary School Gr ades Served PK-6 (ES)
2010-11 Ut ilizat ion (by populat ion) 120%
2010-11 Attendance Zone Population 585 -99
Excess/DeficitSeats
2010-11 Out Migration 079
2010-11 In Migration 031
2015-16 Proj'd Attendance Zone Populat ion 590 -104
Utilization (by enrollment) 112% Percent of Capacity
Area (GSF) per student 113 14 127
Gross Area 61,426 7,680 69,106
Perm Temp Total
2010-11 Campus Enrollment 543
Permanent Capacity 486
Number of Classrooms 30 9 39
Parking Spaces 61
Gross Sit e Area (Acres) 10.7
Sit e Data
School Data
Building A 1 1955 61,426 21.6%
Perm Buildings 61,426
Floor s Yr . Built GSF FCI
Building Data
20.4%
Austin, Texas 78741 1955 AA No
515 Vargas Rd. Yr. Open Rating Historic
Interior $133 897 $256 139 $115 111 $505 146
Site - $2,222 $67,896 - - $70,119
Exterior - $435 $49,328 - - $49,763
Structural - - - - - $0
Roofing - - $7,992 - - $7,992
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,527,749*
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 43/317
School Summ ary Report2010 Educational Suitability Assessment
102 Andrews Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 142%
2010-11 Att endance Zone Populat ion 692 -206
Excess/DeficitSeats
2010-11 Out Migration 075
2010-11 In Migration 061
2015-16 Proj'd Attendance Zone Populat ion 764 -278
Utilization (by enrollment) 147% Percent of Capacity
Area (GSF) per student 81 17 99
Gross Area 58,376 12,288 70,664
Perm Temp Total
2010-11 Campus Enrollment 717
Permanent Capacity 486
Number of Classrooms 31 16 47
Parking Spaces 39
Gross Site Area (Acr es) 7.7
Sit e Data
School Data
Building B 1 1986 4,422 8.1%
Building A 1 1962 53,954 38.8%
Perm Buildings 58,376
Floor s Yr . Built GSF FCI
Building Data
32.1%
Austin, Texas 78723 1962 RC No
6801 Nor theast Dr. Yr. Open Rating Historic
Interior $128 866 $530 543 $44 545 $703 954
Site - $54,271 $150,146 - - $204,417
Exterior - $619,584 $13,720 - - $633,304
Structural - - - - - $0
Roofing - $20,585 - - - $20,585
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $3,207,050*
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 44/317
School Summ ary Report2010 Educational Suitability Assessment
187 Baldwin Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 83%
2010-11 Attendance Zone Population 557 112
Excess/DeficitSeats
2010-11 Out Migration 081
2010-11 In Migration 036
2015-16 Proj'd At tendance Zone Populat ion 642 27
Utilization (by enrollment) 76% Percent of Capacity
Area (GSF) per student 171 0 171
Gross Area 86,751 86,751
Perm Temp Total
2010-11 Campus Enrollment 508
Permanent Capacity 669
Number of Classrooms 38 0 38
Parking Spaces
Gross Site Area (Acres) .0
Sit e Data
School Data
Building A 2 2010 86,751
Perm Buildings 86,751
Floor s Yr . Built GSF FCI
Building Data
0.0%
, Texas 0 No
Yr. Open Rating Historic
Interior $0
Site - - - - - $0
Exterior - - - - - $0
Structural - - - - - $0
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $000*
EXHIBIT "B"
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 45/317
School Summ ary Report2010 Educational Suitability Assessment
182 Baranoff Elementary School Gr ades Served K-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 112%
2010-11 Attendance Zone Population 891 -97
Excess/DeficitSeats
2010-11 Out Migration 093
2010-11 In Migration 081
2015-16 Proj'd At tendance Zone Populat ion 874 -80
Utilization (by enrollment) 110% Percent of Capacity
Area (GSF) per student 91 7 98
Gross Area 80,088 6,144 86,232
Perm Temp Total
2010-11 Campus Enrollment 876
Permanent Capacity 794
Number of Classrooms 44 8 52
Parking Spaces 84
Gross Sit e Area (Acres) 15.6
Sit e Data
School Data
Classroom 1 2008 10,996 5.8%
Building A 1 1999 69,092 13.2%
Perm Buildings 80,088
Floor s Yr . Built GSF FCI
Building Data
11.0%
Austin, Texas 78748 1999 EX No
12009 Buckingham Gate Yr. Open Rating Historic
Interior $926 $42 710 $270 307 $9 202 $323 145
Site - - $9,548 - - $9,548
Exterior - - $5,556 - - $5,556
Structural - - - - - $0
Roofing - $4,702 $521,184 - - $525,885
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $729,123*
EXHIBIT "B"
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 46/317
School Summ ary Report2010 Educational Suitability Assessment
149 Barr ington Elementary School Gr ades Served PK-6 (ES)
2010-11 Ut ilizat ion (by populat ion) 146%
2010-11 Att endance Zone Populat ion 955 -301
Excess/DeficitSeats
2010-11 Out Migration 086
2010-11 In Migration 084
2015-16 Proj'd Attendance Zone Population 1,098 -444
Utilization (by enrollment) 152% Percent of Capacity
Area (GSF) per student 79 22 101
Gross Area 78,971 21,504 100,475
Perm Temp Total
2010-11 Campus Enrollment 996
Permanent Capacity 655
Number of Classrooms 41 24 65
Parking Spaces 68
Gross Sit e Area (Acres) 12.1
Sit e Data
School Data
Building D 1 2010 12,794 0.0%
Building C 1 2010 100
Building B 1 1999 15,285 4.9%
Building A 1 1969 50,792 39.6%
Perm Buildings 78,971
Floor s Yr . Built GSF FCI
Building Data
21.2%
Austin, Texas 78753 1969 AA No
400 Cooper Dr ive Yr. Open Rating Historic
Interior $11 761 $447 963 $46 058 $505 782
Site - $7,043 $71,576 $54,752 - $133,371
Exterior - - $19,209 - - $19,209
Structural - - - - - $0
Roofing - $7,091 - - - $7,091
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $806,409*
EXHIBIT "B"
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 47/317
School Summ ary Report2010 Educational Suitability Assessment
103 Bar ton Hills Elementary School Gr ades Served K-6 (ES)
2010-11 Ut ilizat ion (by populat ion) 81%
2010-11 Attendance Zone Population 203 48
Excess/DeficitSeats
2010-11 Out Migration 021
2010-11 In Migration 172
2015-16 Proj'd At tendance Zone Populat ion 199 52
Utilization (by enrollment) 154% Percent of Capacity
Area (GSF) per student 99 28 127
Gross Area 38,291 10,752 49,043
Perm Temp Total
2010-11 Campus Enrollment 386
Permanent Capacity 251
Number of Classrooms 14 13 27
Parking Spaces 43
Gross Site Area (Acr es) 9.9
Sit e Data
School Data
Band 1 2007 3,205 0.5%
Building B 1 1964 2,985 20.7%
Building A 1 1964 32,101 33.1%
Perm Buildings 38,291
Floor s Yr . Built GSF FCI
Building Data
29.8%
Austin, Texas 78704 1964 EX No
2108 Barton Hills Dr. Yr. Open Rating Historic
Interior $347 145 $9 067 $356 211
Site - $4,606 $90,727 - - $95,333
Exterior - - $82,715 $383,049 - $465,764
Structural $15,245 - $769 - - $16,014
Roofing $1,970 - $17,708 - - $19,678
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,258,939*
EXHIBIT "B"
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 48/317
School Summ ary Report2010 Educational Suitability Assessment
104 Becker Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 43%
2010-11 Attendance Zone Population 226 298
Excess/DeficitSeats
2010-11 Out Migration 086
2010-11 In Migration 069
2015-16 Proj'd At tendance Zone Populat ion 256 268
Utilization (by enrollment) 40% Percent of Capacity
Area (GSF) per student 287 15 302
Gross Area 59,670 3,072 62,742
Perm Temp Total
2010-11 Campus Enrollment 208
Permanent Capacity 524
Number of Classrooms 33 3 36
Parking Spaces 0
Gross Site Area (Acr es) 3.7
Sit e Data
School Data
Building D 1 1936 1,099 23.9%
Building C 1 1936 1,237 21.4%
Mechanical 1 1939 499 26.9%
Building A 1 1936 56,835 39.2%
Perm Buildings 59,670
Floor s Yr . Built GSF FCI
Building Data
38.1%
Austin, Texas 78704 1936 EX Yes
906 Milton St. West Yr. Open Rating Historic
Interior $44 583 $185 934 $80 564 $311 082
Site - $4,927 $342,183 $2,225 - $349,335
Exterior - - $8,103 $19,303 - $27,407
Structural - $7,792 - - - $7,792
Roofing - $608,432 $37,370 $28,130 - $673,931
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $3,232,456*
EXHIBIT "B"
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 49/317
School Summ ary Report2010 Educational Suitability Assessment
105 Blackshear Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 48%
2010-11 Attendance Zone Population 288 310
Excess/DeficitSeats
2010-11 Out Migration 058
2010-11 In Migration 021
2015-16 Proj'd At tendance Zone Populat ion 275 323
Utilization (by enrollment) 41% Percent of Capacity
Area (GSF) per student 290 0 290
Gross Area 70,726 70,726
Perm Temp Total
2010-11 Campus Enrollment 244
Permanent Capacity 598
Number of Classrooms 37 0 37
Parking Spaces 52
Gross Site Area (Acr es) 5.3
Sit e Data
School Data
Building A 1 1937 70,726 34.3%
Perm Buildings 70,726
Floor s Yr . Built GSF FCI
Building Data
35.0%
Austin, Texas 78702 1937 AA Yes
1712 East 11th St. Yr. Open Rating Historic
Interior $4 532 $387 531 $3 206 $395 269
Site - - $170,707 $95,689 - $266,396
Exterior - $3,785 $452,580 $575,423 - $1,031,789
Structural $4,394 - - - - $4,394
Roofing - $1,423 $632,834 - - $634,256
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $2,366,412*
EXHIBIT "B"
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 50/317
School Summ ary Report2010 Educational Suitability Assessment
106 Blanton Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 99%
2010-11 Attendance Zone Population 630 6
Excess/DeficitSeats
2010-11 Out Migration 157
2010-11 In Migration 078
2015-16 Proj'd Attendance Zone Populat ion 799 -163
Utilization (by enrollment) 93% Percent of Capacity
Area (GSF) per student 122 18 140
Gross Area 71,817 10,752 82,569
Perm Temp Total
2010-11 Campus Enrollment 591
Permanent Capacity 636
Number of Classrooms 40 10 50
Parking Spaces 75
Gross Site Area (Acr es) 8.0
Sit e Data
School Data
Greenhouse 1 2004 317 35.8%
Building C 1 2000 11,424 6.9%
Building B 1 1964 3,546 26.8%
Building A 1 1964 56,530 22.1%
Perm Buildings 71,817
Floor s Yr . Built GSF FCI
Building Data
19.6%
Austin, Texas 78723 1964 EX No
5408 Westminster Dr. Yr. Open Rating Historic
Interior $106 775 $200 675 $46 975 $354 425
Site - - $288,274 - - $288,274
Exterior - - $2,793 - - $2,793
Structural - - - - - $0
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,725,011*
EXHIBIT B
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 51/317
School Summ ary Report2010 Educational Suitability Assessment
185 Blazier Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 150%
2010-11 Att endance Zone Populat ion 896 -298
Excess/DeficitSeats
2010-11 Out Migration 168
2010-11 In Migration 049
2015-16 Proj'd Attendance Zone Populat ion 993 -395
Utilization (by enrollment) 130% Percent of Capacity
Area (GSF) per student 107 14 121
Gross Area 82,897 10,752 93,649
Perm Temp Total
2010-11 Campus Enrollment 775
Permanent Capacity 598
Number of Classrooms 38 10 48
Parking Spaces 95
Gross Sit e Area (Acres) 15.4
Sit e Data
School Data
Building A 1 2008 82,897 4.6%
Perm Buildings 82,897
Floor s Yr . Built GSF FCI
Building Data
5.1%
Austin, Texas 78747 2008 AA No
8601 Vertex Blvd. Yr. Open Rating Historic
Interior $64 065 $88 567 $12 027 $164 658
Site - - $508 $40,134 - $40,642
Exterior - - - - - $0
Structural - - - - - $0
Roofing - - $21,733 - - $21,733
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $314,660*
EXHIBIT B
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 52/317
School Summ ary Report2010 Educational Suitability Assessment
170 Boone Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 64%
2010-11 Attendance Zone Population 478 274
Excess/DeficitSeats
2010-11 Out Migration 106
2010-11 In Migration 130
2015-16 Proj'd At tendance Zone Populat ion 468 284
Utilization (by enrollment) 67% Percent of Capacity
Area (GSF) per student 147 0 147
Gross Area 73,690 73,690
Perm Temp Total
2010-11 Campus Enrollment 501
Permanent Capacity 752
Number of Classrooms 42 0 42
Parking Spaces 82
Gross Sit e Area (Acres) 12.5
Sit e Data
School Data
Building B 1 1998 10,017 7.9%
Building A 1 1986 63,673 18.5%
Perm Buildings 73,690
Floor s Yr . Built GSF FCI
Building Data
17.5%
Austin, Texas 78749 1986 RC No
8101 Croftwood Dr. Yr. Open Rating Historic
Interior $186 467 $50 972 $237 439
Site - - - $125,012 - $125,012
Exterior - $9,899 - - - $9,899
Structural - - $9,058 - - $9,058
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $625,336*
EXHIBIT B
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 53/317
School Summ ary Report2010 Educational Suitability Assessment
107 Brentwood Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 78%
2010-11 Attendance Zone Population 456 129
Excess/DeficitSeats
2010-11 Out Migration 110
2010-11 In Migration 149
2015-16 Proj'd At tendance Zone Populat ion 450 135
Utilization (by enrollment) 85% Percent of Capacity
Area (GSF) per student 127 6 133
Gross Area 62,891 3,072 65,963
Perm Temp Total
2010-11 Campus Enrollment 495
Permanent Capacity 585
Number of Classrooms 33 3 36
Parking Spaces 68
Gross Sit e Area (Acres) 16.7
Sit e Data
School Data
Building B 1 1951 572
Building A 1 1951 62,319 23.7%
Perm Buildings 62,891
Floor s Yr . Built GSF FCI
Building Data
23.2%
Austin, Texas 78757 1951 RC No
6700 Arroyo Seco Yr. Open Rating Historic
Interior $868 $682 430 $45 770 $729 067
Site $12,102 - $60,185 - - $72,287
Exterior - - $134,776 - - $134,776
Structural - - $7,945 - - $7,945
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $980,422*
EXHIBIT B
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 54/317
School Summ ary Report2010 Educational Suitability Assessment
108 Brooke Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 103%
2010-11 Attendance Zone Population 441 -11
Excess/DeficitSeats
2010-11 Out Migration 081
2010-11 In Migration 075
2015-16 Proj'd At tendance Zone Populat ion 471 -41
Utilization (by enrollment) 102% Percent of Capacity
Area (GSF) per student 119 9 128
Gross Area 52,282 3,858 56,140
Perm Temp Total
2010-11 Campus Enrollment 439
Permanent Capacity 430
Number of Classrooms 27 5 32
Parking Spaces 43
Gross Site Area (Acr es) 5.9
Sit e Data
School Data
Building A 1 1954 52,282 25.6%
Perm Buildings 52,282
Floor s Yr . Built GSF FCI
Building Data
24.9%
Austin, Texas 78702 1954 RC No
3100 East 4th St. Yr. Open Rating Historic
Interior $42 710 $129 374 $149 501 $321 585
Site - - $35,849 - - $35,849
Exterior - - $89,580 $13,732 - $103,312
Structural - - $1,461 - - $1,461
Roofing - $23,223 - - - $23,223
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,195,217*
EXHIBIT B
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 55/317
School Summ ary Report2010 Educational Suitability Assessment
109 Brown Elementary School Gr ades Served PK-6 (ES)
2010-11 Ut ilizat ion (by populat ion) 112%
2010-11 Attendance Zone Population 525 -58
Excess/DeficitSeats
2010-11 Out Migration 096
2010-11 In Migration 074
2015-16 Proj'd At tendance Zone Populat ion 546 -79
Utilization (by enrollment) 111% Percent of Capacity
Area (GSF) per student 104 18 122
Gross Area 53,853 9,216 63,069
Perm Temp Total
2010-11 Campus Enrollment 519
Permanent Capacity 468
Number of Classrooms 29 12 41
Parking Spaces 58
Gross Sit e Area (Acres) 10.1
Sit e Data
School Data
Building A 1 1957 53,853 32.0%
Perm Buildings 53,853
Floor s Yr . Built GSF FCI
Building Data
28.1%
Austin, Texas 78752 1957 AA No
505 W. Anderson Ln. Yr. Open Rating Historic
Interior $106 775 $47 418 $499 529 $653 722
Site - - $25,359 $40,134 - $65,492
Exterior - - $61,590 - - $61,590
Structural - - - - - $0
Roofing $954,050 - $20,585 - - $974,635
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $2,733,352*
EXHIBIT B
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 56/317
School Summ ary Report2010 Educational Suitability Assessment
110 Bryker W oods Elementary School Gr ades Served K-6 (ES)
2010-11 Ut ilizat ion (by populat ion) 115%
2010-11 Attendance Zone Population 312 -40
Excess/DeficitSeats
2010-11 Out Migration 047
2010-11 In Migration 094
2015-16 Proj'd At tendance Zone Populat ion 333 -61
Utilization (by enrollment) 149% Percent of Capacity
Area (GSF) per student 93 23 116
Gross Area 37,517 9,216 46,733
Perm Temp Total
2010-11 Campus Enrollment 404
Permanent Capacity 272
Number of Classrooms 16 12 28
Parking Spaces 33
Gross Site Area (Acr es) 6.3
Sit e Data
School Data
Multi-Use 1 1949 1,202
Multi-Use 1 1949 451 14.8%
Building B 1 1999 4,874 10.9%
Building A 1 1939 30,990 42.3%
Perm Buildings 37,517
Floor s Yr . Built GSF FCI
Building Data
33.4%
Austin, Texas 78703 1939 RC No
3309 Kerbey Lane Yr. Open Rating Historic
Interior $85 420 $186 592 $86 382 $358 394
Site $11,503 $2,135 - $64,475 - $78,114
Exterior - $3,842 $594,025 - - $597,867
Structural - - $585 - - $585
Roofing - - $49,869 - - $49,869
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,308,938*
EXHIBIT B
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 57/317
School Summ ary Report2010 Educational Suitability Assessment
111 Campbell Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 70%
2010-11 Attendance Zone Population 367 157
Excess/DeficitSeats
2010-11 Out Migration 063
2010-11 In Migration 056
2015-16 Proj'd At tendance Zone Populat ion 379 145
Utilization (by enrollment) 69% Percent of Capacity
Area (GSF) per student 172 4 176
Gross Area 61,793 1,536 63,329
Perm Temp Total
2010-11 Campus Enrollment 360
Permanent Capacity 524
Number of Classrooms 33 2 35
Parking Spaces 71
Gross Site Area (Acr es) 9.7
Sit e Data
School Data
Building A 1 1992 61,793 20.6%
Perm Buildings 61,793
Floor s Yr . Built GSF FCI
Building Data
20.8%
Austin, Texas 78722 1992 AA No
2613 Rogers Ave. Yr. Open Rating Historic
Interior $21 355 $141 699 $44 826 $207 880
Site $2,209 - $194,564 $19,758 - $216,531
Exterior - - $1,436 - - $1,436
Structural - - $3,992 - - $3,992
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $691,291*
EXHIBIT B
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 58/317
School Summ ary Report2010 Educational Suitability Assessment
173 Casey Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 107%
2010-11 Attendance Zone Population 763 -52
Excess/DeficitSeats
2010-11 Out Migration 171
2010-11 In Migration 083
2015-16 Proj'd At tendance Zone Populat ion 768 -57
Utilization (by enrollment) 94% Percent of Capacity
Area (GSF) per student 122 2 124
Gross Area 81,506 1,536 83,042
Perm Temp Total
2010-11 Campus Enrollment 669
Permanent Capacity 711
Number of Classrooms 44 2 46
Parking Spaces 90
Gross Sit e Area (Acres) 17.9
Sit e Data
School Data
Building A 1 1998 81,506 17.1%
Perm Buildings 81,506
Floor s Yr . Built GSF FCI
Building Data
16.7%
Austin, Texas 78748 1998 AA No
9400 Texas Oaks Drive Yr. Open Rating Historic
Interior $21 355 $103 475 $259 333 $384 163
Site - - $11,274 - - $11,274
Exterior - - - - - $0
Structural - - - - - $0
Roofing - - - $1,823,016 - $1,823,016
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $551,453*
EXHIBIT B
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 59/317
School Summ ary Report2010 Educational Suitability Assessment
112 Casis Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 109%
2010-11 Attendance Zone Population 731 -62
Excess/DeficitSeats
2010-11 Out Migration 016
2010-11 In Migration 110
2015-16 Proj'd At tendance Zone Populat ion 764 -95
Utilization (by enrollment) 123% Percent of Capacity
Area (GSF) per student 94 17 111
Gross Area 77,911 13,824 91,735
Perm Temp Total
2010-11 Campus Enrollment 825
Permanent Capacity 669
Number of Classrooms 38 16 54
Parking Spaces 74
Gross Sit e Area (Acres) 14.2
Sit e Data
School Data
Storage 1 1977 201
Building A 1 1951 77,710 17.8%
Perm Buildings 77,911
Floor s Yr . Built GSF FCI
Building Data
17.4%
Austin, Texas 78703 1951 EX No
2710 Exposition Blvd. Yr. Open Rating Historic
Interior $158 014 $91 098 $192 609 $441 722
Site - - $110,394 $128,950 - $239,343
Exterior - - $125,554 - - $125,554
Structural $3,372 - - - - $3,372
Roofing - $24,163 - - - $24,163
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $912,046*
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 60/317
School Summ ary Report2010 Educational Suitability Assessment
184 Clayton Elementary School Gr ades Served K-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 100%
2010-11 Attendance Zone Population 837 -1
Excess/DeficitSeats
2010-11 Out Migration 048
2010-11 In Migration 087
2015-16 Proj'd At tendance Zone Populat ion 905 -69
Utilization (by enrollment) 104% Percent of Capacity
Area (GSF) per student 115 7 122
Gross Area 99,921 6,144 106,065
Perm Temp Total
2010-11 Campus Enrollment 867
Permanent Capacity 836
Number of Classrooms 47 8 55
Parking Spaces 80
Gross Sit e Area (Acres) 16.8
Sit e Data
School Data
Building A 1 2006 99,921 6.0%
Perm Buildings 99,921
Floor s Yr . Built GSF FCI
Building Data
5.9%
Austin, Texas 78739 2006 EX No
7525 La Crosse Ave. Yr. Open Rating Historic
Interior $110 324 $11 953 $122 276
Site - - $104,860 - - $104,860
Exterior - - - - - $0
Structural - - - - - $0
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $518,872*
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 61/317
School Summ ary Report2010 Educational Suitability Assessment
161 Cook Elementary School Gr ades Served K-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 223%
2010-11 At tendance Zone Populat ion 1,252 -691
Excess/DeficitSeats
2010-11 Out Migration 379
2010-11 In Migration 036
2015-16 Proj'd Attendance Zone Population 1,388 -827
Utilization (by enrollment) 161% Percent of Capacity
Area (GSF) per student 75 20 95
Gross Area 67,344 18,432 85,776
Perm Temp Total
2010-11 Campus Enrollment 901
Permanent Capacity 561
Number of Classrooms 35 23 58
Parking Spaces 102
Gross Sit e Area (Acres) 12.7
Sit e Data
School Data
Building B 1 1998 9,101 7.2%
Building A 1 1974 58,243 37.0%
Perm Buildings 67,344
Floor s Yr . Built GSF FCI
Building Data
27.5%
Austin, Texas 78758 1974 RC No
1511 Cripple Creek Yr. Open Rating Historic
Interior $24 947 $292 679 $56 423 $374 049
Site $5,447 $368,828 $71,282 $99,999 - $545,557
Exterior - $5,057 $13,275 - - $18,332
Structural - $27,464 $124,896 - - $152,360
Roofing - $23,862 - - - $23,862
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $3,894,721*
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 62/317
School Summ ary Report2010 Educational Suitability Assessment
183 Cowan Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 106%
2010-11 Attendance Zone Population 707 -38
Excess/DeficitSeats
2010-11 Out Migration 121
2010-11 In Migration 196
2015-16 Proj'd At tendance Zone Populat ion 704 -35
Utilization (by enrollment) 117% Percent of Capacity
Area (GSF) per student 90 12 101
Gross Area 70,234 9,216 79,450
Perm Temp Total
2010-11 Campus Enrollment 783
Permanent Capacity 669
Number of Classrooms 37 12 49
Parking Spaces 84
Gross Sit e Area (Acres) 22.5
Sit e Data
School Data
Building A 1 1999 70,234 8.1%
Perm Buildings 70,234
Floor s Yr . Built GSF FCI
Building Data
9.1%
Austin, Texas 78748 1999 EX No
2817 Kentish Drive Yr. Open Rating Historic
Interior $21 355 $195 024 $48 518 $264 897
Site - $4,606 $18,655 $75,046 - $98,307
Exterior - - - $770 - $770
Structural - - - - - $0
Roofing - - $57,513 - - $57,513
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $723,486*
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 63/317
School Summ ary Report2010 Educational Suitability Assessment
113 Cunningham Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 78%
2010-11 Attendance Zone Population 573 159
Excess/DeficitSeats
2010-11 Out Migration 174
2010-11 In Migration 116
2015-16 Proj'd At tendance Zone Populat ion 560 172
Utilization (by enrollment) 70% Percent of Capacity
Area (GSF) per student 140 42 182
Gross Area 71,600 21,504 93,104
Perm Temp Total
2010-11 Campus Enrollment 512
Permanent Capacity 732
Number of Classrooms 41 21 62
Parking Spaces 62
Gross Site Area (Acr es) 8.8
Sit e Data
School Data
Building B 1 1990 9,722 33.0%
Building A 1 1963 61,878 43.2%
Perm Buildings 71,600
Floor s Yr . Built GSF FCI
Building Data
34.3%
Austin, Texas 78745 1963 AA No
2200 Berkeley Ave. Yr. Open Rating Historic
Interior $2 068 $210 570 $46 250 $258 889
Site - - $779,622 $272,621 - $1,052,243
Exterior $483 - $26,308 - - $26,791
Structural - $1,685 - - - $1,685
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $378,644*
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 64/317
School Summ ary Report2010 Educational Suitability Assessment
179 Davis Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 91%
2010-11 Attendance Zone Population 666 66
Excess/DeficitSeats
2010-11 Out Migration 035
2010-11 In Migration 047
2015-16 Proj'd At tendance Zone Populat ion 702 30
Utilization (by enrollment) 93% Percent of Capacity
Area (GSF) per student 106 7 112
Gross Area 72,149 4,608 76,757
Perm Temp Total
2010-11 Campus Enrollment 683
Permanent Capacity 732
Number of Classrooms 41 6 47
Parking Spaces 104
Gross Sit e Area (Acres) 13.2
Sit e Data
School Data
Building B 1 1999 9,981 4.9%
Building A 1 1993 62,168 28.5%
Perm Buildings 72,149
Floor s Yr . Built GSF FCI
Building Data
23.3%
Austin, Texas 78727 1993 RC No
5214 Duval Rd. Yr. Open Rating Historic
Interior $1 219 $21 355 $1 112 754 $53 085 $1 188 414
Site - - $1,852 $40,134 - $41,985
Exterior - - - - - $0
Structural - - $3,372 - - $3,372
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $621,725*
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 65/317
School Summ ary Report2010 Educational Suitability Assessment
154 Doss Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 134%
2010-11 Att endance Zone Populat ion 728 -185
Excess/DeficitSeats
2010-11 Out Migration 024
2010-11 In Migration 071
2015-16 Proj'd Attendance Zone Populat ion 747 -204
Utilization (by enrollment) 141% Percent of Capacity
Area (GSF) per student 78 16 94
Gross Area 60,228 12,288 72,516
Perm Temp Total
2010-11 Campus Enrollment 768
Permanent Capacity 543
Number of Classrooms 30 16 46
Parking Spaces 73
Gross Site Area (Acr es) 9.7
Sit e Data
School Data
Bldg B 1 2009 4,646 0.6%
Building A 1 1970 55,582 34.4%
Perm Buildings 60,228
Floor s Yr . Built GSF FCI
Building Data
26.2%
Austin, Texas 78731 1970 EX No
7005 Northledge Dr Yr. Open Rating Historic
Interior $401 625 $50 410 $452 035
Site - $4,606 $68,518 $40,134 - $113,258
Exterior - - $731 - - $731
Structural - $5,493 $68,609 - - $74,102
Roofing - - $464,424 - - $464,424
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $2,030,684*
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 66/317
School Summ ary Report2010 Educational Suitability Assessment
114 Dawson Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 55%
2010-11 Attendance Zone Population 276 229
Excess/DeficitSeats
2010-11 Out Migration 059
2010-11 In Migration 113
2015-16 Proj'd At tendance Zone Populat ion 282 223
Utilization (by enrollment) 66% Percent of Capacity
Area (GSF) per student 167 16 183
Gross Area 55,301 5,394 60,695
Perm Temp Total
2010-11 Campus Enrollment 331
Permanent Capacity 505
Number of Classrooms 32 3 35
Parking Spaces 56
Gross Site Area (Acr es) 8.7
Sit e Data
School Data
Building C 1 1991 9,965 10.7%
Building B 1 1986 299 3.5%
Building A 1 1954 45,037 28.2%
Perm Buildings 55,301
Floor s Yr . Built GSF FCI
Building Data
27.2%
Austin, Texas 78704 1954 EX No
3001 South 1st Yr. Open Rating Historic
Interior $27 673 $85 420 $121 022 $10 149 $244 264
Site - $236,494 $42,588 - - $279,082
Exterior - - $58,409 - - $58,409
Structural - - $27,004 - - $27,004
Roofing - $1,297 $32,523 - - $33,821
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $2,613,471*
2010 Ed i l S i bili A
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 67/317
School Summ ary Report2010 Educational Suitability Assessment
176 Galindo Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 97%
2010-11 Attendance Zone Population 689 22
Excess/DeficitSeats
2010-11 Out Migration 091
2010-11 In Migration 103
2015-16 Proj'd At tendance Zone Populat ion 705 6
Utilization (by enrollment) 99% Percent of Capacity
Area (GSF) per student 121 11 132
Gross Area 85,482 7,680 93,162
Perm Temp Total
2010-11 Campus Enrollment 704
Permanent Capacity 711
Number of Classrooms 44 10 54
Parking Spaces 98
Gross Sit e Area (Acres) 10.8
Sit e Data
School Data
Mechanical 1 2001 900 91.0%
Building A 1 1989 84,582 10.0%
Perm Buildings 85,482
Floor s Yr . Built GSF FCI
Building Data
11.4%
Austin, Texas 78704 1989 RC No
3800 S. 2nd St. Yr. Open Rating Historic
Interior $87 858 $147 364 $46 940 $282 163
Site - $4,218 $5,085 - - $9,303
Exterior - - $3,160 - - $3,160
Structural - - - - - $0
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,190,697*
2010 Ed ti l S it bilit A t
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 68/317
School Summ ary Report2010 Educational Suitability Assessment
116 Govalle Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 76%
2010-11 Attendance Zone Population 452 146
Excess/DeficitSeats
2010-11 Out Migration 104
2010-11 In Migration 052
2015-16 Proj'd At tendance Zone Populat ion 509 89
Utilization (by enrollment) 69% Percent of Capacity
Area (GSF) per student 187 0 187
Gross Area 77,638 77,638
Perm Temp Total
2010-11 Campus Enrollment 415
Permanent Capacity 598
Number of Classrooms 37 0 37
Parking Spaces 71
Gross Site Area (Acr es) 8.4
Sit e Data
School Data
Building B 1 1940 501 172.8%
Building A 1 1940 77,137 30.5%
Perm Buildings 77,638
Floor s Yr . Built GSF FCI
Building Data
30.9%
Austin, Texas 78702 1940 AA No
3601 Govalle Ave. Yr. Open Rating Historic
Interior $11 544 $114 440 $804 011 $929 995
Site - $4,606 $43,809 - - $48,415
Exterior - $17,361 $1,182,064 - - $1,199,425
Structural - $5,349 $10,309 - - $15,658
Roofing - - $33,366 - - $33,366
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,479,660*
2010 Ed ti l S it bilit A t
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 69/317
School Summ ary Report2010 Educational Suitability Assessment
159 Graham Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 138%
2010-11 Att endance Zone Populat ion 825 -227
Excess/DeficitSeats
2010-11 Out Migration 114
2010-11 In Migration 049
2015-16 Proj'd Attendance Zone Populat ion 850 -252
Utilization (by enrollment) 127% Percent of Capacity
Area (GSF) per student 93 14 107
Gross Area 70,589 10,752 81,341
Perm Temp Total
2010-11 Campus Enrollment 761
Permanent Capacity 598
Number of Classrooms 38 11 49
Parking Spaces 77
Gross Site Area (Acr es) 9.9
Sit e Data
School Data
Building C 1 2008 11,232 4.7%
Building B 1 1993 14,411 14.5%
Building A 1 1972 44,946 45.0%
Perm Buildings 70,589
Floor s Yr . Built GSF FCI
Building Data
30.4%
Austin, Texas 78753 1972 EX No
11211 Tom Adams Dr. Yr. Open Rating Historic
Interior $46 368 $177 156 $252 277 $475 801
Site $1,180 $91,328 $230,407 $86,383 - $409,299
Exterior - $1,716 $3,157 - - $4,874
Structural - $16,429 $76,531 $296 - $93,256
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $4,718,571*
S S2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 70/317
School Summ ary Report2010 Educational Suitability Assessment
117 Gullet t Elementary School Gr ades Served K-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 78%
2010-11 Attendance Zone Population 325 93
Excess/DeficitSeats
2010-11 Out Migration 030
2010-11 In Migration 247
2015-16 Proj'd At tendance Zone Populat ion 342 76
Utilization (by enrollment) 129% Percent of Capacity
Area (GSF) per student 74 21 95
Gross Area 39,827 11,525 51,352
Perm Temp Total
2010-11 Campus Enrollment 541
Permanent Capacity 418
Number of Classrooms 24 14 38
Parking Spaces 30
Gross Sit e Area (Acres) 17.9
Sit e Data
School Data
Mechanical 1 1972 179 11.7%
Building A 1 1956 39,648 35.0%
Perm Buildings 39,827
Floor s Yr . Built GSF FCI
Building Data
29.2%
Austin, Texas 78757 1956 EX No
6310 Treadwell Blvd. Yr. Open Rating Historic
Interior $42 710 $102 541 $45 619 $190 871
Site - $10,933 $96,959 $40,134 - $148,025
Exterior - $917 $51,820 - - $52,737
Structural - - - - - $0Roofing - $7,113 $92,238 - - $99,351
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $774,178*
S h l S R t2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 71/317
School Summ ary Report2010 Educational Suitability Assessment
118 Harr is Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 139%
2010-11 Att endance Zone Populat ion 755 -213
Excess/DeficitSeats
2010-11 Out Migration 106
2010-11 In Migration 052
2015-16 Proj'd Attendance Zone Populat ion 789 -247
Utilization (by enrollment) 140% Percent of Capacity
Area (GSF) per student 74 20 94
Gross Area 56,066 15,360 71,426
Perm Temp Total
2010-11 Campus Enrollment 758
Permanent Capacity 542
Number of Classrooms 34 16 50
Parking Spaces 33
Gross Site Area (Acr es) 7.3
Sit e Data
School Data
Building B 1 1998 14,112 11.3%
Building A 1 1955 41,954 32.2%
Perm Buildings 56,066
Floor s Yr . Built GSF FCI
Building Data
21.5%
Austin, Texas 78723 1955 RC No
1711 Wheless Ln. Yr. Open Rating Historic
Interior $110 532 $8 601 $119 133
Site - - - $174,752 - $174,752
Exterior - $2,099 $333,669 - - $335,768
Structural - $2,401 - - - $2,401Roofing $16,363 $232,231 $16,363 - - $264,958
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $631,447*
S h l S R t2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 72/317
School Summ ary Report2010 Educational Suitability Assessment
163 Hart Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 125%
2010-11 Att endance Zone Populat ion 888 -177
Excess/DeficitSeats
2010-11 Out Migration 088
2010-11 In Migration 101
2015-16 Proj'd Attendance Zone Populat ion 982 -271
Utilization (by enrollment) 126% Percent of Capacity
Area (GSF) per student 90 15 106
Gross Area 81,042 13,824 94,866
Perm Temp Total
2010-11 Campus Enrollment 898
Permanent Capacity 711
Number of Classrooms 44 18 62
Parking Spaces 62
Gross Sit e Area (Acres) 15.7
Sit e Data
School Data
Building B 1 2010 11,175 4.0%
Building A 1 1998 69,867 12.6%
Perm Buildings 81,042
Floor s Yr . Built GSF FCI
Building Data
10.3%
Austin, Texas 78753 1998 RC No
8301 Furness Yr. Open Rating Historic
Interior $16 366 $27 849 $54 049 $41 169 $139 433
Site $85,478 - $37,799 $29,425 - $152,702
Exterior $2,221 $388 $202 - - $2,811
Structural $824 $3,296 $1,169 - - $5,289Roofing - $7,887 - - - $7,887
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $869,405*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 73/317
School Summ ary Report2010 Educational Suitability Assessment
119 Highland Park Elementary School Gr ades Served K-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 102%
2010-11 Attendance Zone Population 599 -14
Excess/DeficitSeats
2010-11 Out Migration 054
2010-11 In Migration 116
2015-16 Proj'd At tendance Zone Populat ion 648 -63
Utilization (by enrollment) 113% Percent of Capacity
Area (GSF) per student 88 14 102
Gross Area 58,550 9,216 67,766
Perm Temp Total
2010-11 Campus Enrollment 662
Permanent Capacity 585
Number of Classrooms 33 12 45
Parking Spaces 60
Gross Site Area (Acr es) 6.3
Sit e Data
School Data
Building A 1 1952 58,550 34.0%
Perm Buildings 58,550
Floor s Yr . Built GSF FCI
Building Data
31.1%
Austin, Texas 78731 1952 EX No
4900 Fairview Yr. Open Rating Historic
Interior $42 710 $127 305 $59 113 $229 128
Site - - $230,132 $40,134 - $270,265
Exterior - - $25,788 - - $25,788
Structural - - - - - $0Roofing - $21,733 $511,227 - - $532,959
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $928,077*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 74/317
School Summ ary Report2010 Educational Suitability Assessment
155 Hill Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 114%
2010-11 Attendance Zone Population 714 -87
Excess/DeficitSeats
2010-11 Out Migration 050
2010-11 In Migration 072
2015-16 Proj'd Attendance Zone Populat ion 734 -107
Utilization (by enrollment) 117% Percent of Capacity
Area (GSF) per student 95 13 108
Gross Area 69,626 9,216 78,842
Perm Temp Total
2010-11 Campus Enrollment 732
Permanent Capacity 627
Number of Classrooms 35 11 46
Parking Spaces 74
Gross Site Area (Acr es) 8.9
Sit e Data
School Data
Building B 1 1990 7,616 17.3%
Building A 1 1970 62,010 32.1%
Perm Buildings 69,626
Floor s Yr . Built GSF FCI
Building Data
26.8%
Austin, Texas 78759 1970 EX No
8601 Tallwood Drive Yr. Open Rating Historic
Interior $106 775 $102 128 $47 029 $255 933
Site - - $8,269 $40,134 - $48,403
Exterior - - $292 - - $292
Structural - - - - - $0Roofing - - $1,982,976 - - $1,982,976
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,132,041*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 75/317
School Summ ary Report2010 Educational Suitability Assessment
162 Houston Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 130%
2010-11 Att endance Zone Populat ion 897 -205
Excess/DeficitSeats
2010-11 Out Migration 102
2010-11 In Migration 128
2015-16 Proj'd Attendance Zone Populat ion 872 -180
Utilization (by enrollment) 133% Percent of Capacity
Area (GSF) per student 89 17 105
Gross Area 81,360 15,360 96,720
Perm Temp Total
2010-11 Campus Enrollment 917
Permanent Capacity 692
Number of Classrooms 43 19 62
Parking Spaces 93
Gross Sit e Area (Acres) 13.8
Sit e Data
School Data
Building D 1 2006 11,380 10.8%
Building C 1 1991 5,303 25.9%
Building B 1 1991 8,863 32.5%
Building A 1 1976 55,814 54.5%
Perm Buildings 81,360
Floor s Yr . Built GSF FCI
Building Data
36.5%
Austin, Texas 78744 1976 RC No
5409 Ponciana Dr. Yr. Open Rating Historic
Interior $54 696 $540 337 $62 669 $657 703
Site - $5,847 $9,453 $40,134 - $55,433
Exterior - - $3,658 $8,855 - $12,514
Structural - - $8,788 - - $8,788Roofing - - $899,896 - - $899,896
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $5,403,989*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 76/317
School Summ ary Report2010 Educational Suitability Assessment
178 Jordan Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 108%
2010-11 Attendance Zone Population 706 -52
Excess/DeficitSeats
2010-11 Out Migration 075
2010-11 In Migration 200
2015-16 Proj'd At tendance Zone Populat ion 707 -53
Utilization (by enrollment) 127% Percent of Capacity
Area (GSF) per student 89 15 104
Gross Area 74,460 12,288 86,748
Perm Temp Total
2010-11 Campus Enrollment 833
Permanent Capacity 655
Number of Classrooms 41 16 57
Parking Spaces 114
Gross Sit e Area (Acres) 11.5
Sit e Data
School Data
Building B 1 2008 12,205 4.8%
Building A 1 1992 62,255 27.2%
Perm Buildings 74,460
Floor s Yr . Built GSF FCI
Building Data
22.0%
Austin, Texas 78724 1992 RC No
6711 Johnny Mor ris Rd. Yr. Open Rating Historic
Interior $21 355 $249 307 $55 637 $326 299
Site - $5,980 $153,950 $40,134 - $200,064
Exterior - - $32,022 - - $32,022
Structural - - $6,370 - - $6,370Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $870,552*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 77/317
School Summ ary Reporty
120 Joslin Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 88%
2010-11 Attendance Zone Population 329 45
Excess/DeficitSeats
2010-11 Out Migration 056
2010-11 In Migration 089
2015-16 Proj'd At tendance Zone Populat ion 345 29
Utilization (by enrollment) 97% Percent of Capacity
Area (GSF) per student 123 21 145
Gross Area 44,826 7,680 52,506
Perm Temp Total
2010-11 Campus Enrollment 363
Permanent Capacity 374
Number of Classrooms 24 9 33
Parking Spaces 56
Gross Site Area (Acr es) 5.1Sit e Data
School Data
Building C 1 1986 3,250 5.0%
Building B 1 1957 10,642 41.4%
Building A 1 1954 30,934 55.6%
Perm Buildings 44,826
Floor s Yr . Built GSF FCI
Building Data
40.6%
Austin, Texas 78745 1954 EX No
4500 Manchaca Rd. Yr. Open Rating Historic
Interior $41 905 $212 692 $254 597
Site - $165,935 $4,802 - - $170,737
Exterior - - $1,232,954 - - $1,232,954
Structural - $4,719 $1,537 - - $6,256Roofing - $606,704 $219,611 - - $826,316
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $2,024,241*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 78/317
School Summ ary Reporty
180 Kiker Elementary School Gr ades Served K-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 117%
2010-11 Att endance Zone Populat ion 883 -131
Excess/DeficitSeats
2010-11 Out Migration 080
2010-11 In Migration 129
2015-16 Proj'd Attendance Zone Populat ion 852 -100
Utilization (by enrollment) 124% Percent of Capacity
Area (GSF) per student 82 16 98
Gross Area 76,332 15,360 91,692
Perm Temp Total
2010-11 Campus Enrollment 933
Permanent Capacity 752
Number of Classrooms 42 13 55
Parking Spaces 90
Gross Sit e Area (Acres) 12.4Sit e Data
School Data
Building B 1 2007 12,783 4.5%
Building A 1 1992 63,549 21.1%
Perm Buildings 76,332
Floor s Yr . Built GSF FCI
Building Data
16.4%
Austin, Texas 78739 1992 EX No
5913 La Crosse Ave. Yr. Open Rating Historic
Interior $128 130 $344 258 $41 886 $514 274
Site - - $10,547 $87,037 - $97,584
Exterior $62,649 - $590 - - $63,239
Structural - $3,302 - - - $3,302Roofing - $20,585 - - - $20,585
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $751,145*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 79/317
School Summ ary Reporty
172 Kocurek Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 102%
2010-11 Attendance Zone Population 687 -14
Excess/DeficitSeats
2010-11 Out Migration 131
2010-11 In Migration 106
2015-16 Proj'd At tendance Zone Populat ion 698 -25
Utilization (by enrollment) 98% Percent of Capacity
Area (GSF) per student 119 2 121
Gross Area 78,528 1,536 80,064
Perm Temp Total
2010-11 Campus Enrollment 660
Permanent Capacity 673
Number of Classrooms 42 2 44
Parking Spaces 70
Gross Sit e Area (Acres) 12.3Sit e Data
School Data
Building B 1 1998 10,499 8.3%
Building A 1 1986 68,029 28.6%
Perm Buildings 78,528
Floor s Yr . Built GSF FCI
Building Data
25.5%
Austin, Texas 78748 1986 AA No
9800 Curlew Dr . Yr. Open Rating Historic
Interior $121 380 $45 109 $166 489
Site - $20,597 $118,823 $73,933 - $213,354
Exterior - $258 $21,688 $7,965 - $29,911
Structural - - $3,472 $23,558 - $27,030Roofing - $7,927 - - - $7,927
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,015,969*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 80/317
Sc oo Su a y epo t
168 Langford Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 129%
2010-11 Att endance Zone Populat ion 895 -203
Excess/DeficitSeats
2010-11 Out Migration 103
2010-11 In Migration 054
2015-16 Proj'd Attendance Zone Populat ion 946 -254
Utilization (by enrollment) 121% Percent of Capacity
Area (GSF) per student 94 20 114
Gross Area 78,250 16,896 95,146
Perm Temp Total
2010-11 Campus Enrollment 834
Permanent Capacity 692
Number of Classrooms 43 21 64
Parking Spaces 83
Gross Sit e Area (Acres) 10.7Sit e Data
School Data
Building C 1 2010 11,831 3.8%
Building B 1 1996 8,753 16.9%
Building A 1 1980 57,666 51.7%
Perm Buildings 78,250
Floor s Yr . Built GSF FCI
Building Data
33.6%
Austin, Texas 78744 1980 AA No
2206 Blue Meadow Yr. Open Rating Historic
Interior $24 894 $437 101 $47 124 $509 120
Site - $45,535 $75,331 $42,669 - $163,535
Exterior - $79,485 $202 - - $79,688
Structural - - $2,170 - - $2,170Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $6,366,305*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 81/317
y p
121 Lee Elementary School Gr ades Served K-6 (ES)
2010-11 Ut ilizat ion (by populat ion) 74%
2010-11 Attendance Zone Population 308 110
Excess/DeficitSeats
2010-11 Out Migration 025
2010-11 In Migration 109
2015-16 Proj'd At tendance Zone Populat ion 325 93
Utilization (by enrollment) 102% Percent of Capacity
Area (GSF) per student 108 2 110
Gross Area 46,265 768 47,033
Perm Temp Total
2010-11 Campus Enrollment 428
Permanent Capacity 418
Number of Classrooms 24 1 25
Parking Spaces 35
Gross Site Area (Acr es) 4.8Sit e Data
School Data
Building D 1 1939 1,310 24.2%Library 1 1998 5,679 8.4%
Mechanical 1 1939 460 13.7%
Building A 1 1939 38,816 44.8%
Perm Buildings 46,265
Floor s Yr . Built GSF FCI
Building Data
41.1%
Austin, Texas 78705 1939 EX No
3308 Hampton Rd. Yr. Open Rating Historic
Interior $3 267 $289 684 $48 675 $341 626
Site - $6,267 $78,354 - - $84,621
Exterior - $137,099 $17,506 - - $154,605
Structural - $32,808 - - - $32,808Roofing - $78,378 $7,013 - - $85,391
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,992,020*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 82/317
y p
160 Linder Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 176%
2010-11 Att endance Zone Populat ion 956 -414
Excess/DeficitSeats
2010-11 Out Migration 132
2010-11 In Migration 062
2015-16 Proj'd Attendance Zone Population 1,031 -489
Utilization (by enrollment) 164% Percent of Capacity
Area (GSF) per student 78 19 97
Gross Area 69,250 16,896 86,146
Perm Temp Total
2010-11 Campus Enrollment 892
Permanent Capacity 542
Number of Classrooms 34 22 56
Parking Spaces 86
Gross Site Area (Acr es) 9.1Sit e Data
School Data
Building A 1 1972 69,250 23.7%
Perm Buildings 69,250
Floor s Yr . Built GSF FCI
Building Data
19.9%
Austin, Texas 78741 1972 RC No
2800 Metcalfe Rd. Yr. Open Rating Historic
Interior $85 420 $188 004 $156 894 $430 318
Site - - $194,636 $40,134 - $234,770
Exterior - - $397 - - $397
Structural - - $48,399 - - $48,399Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,657,659*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 83/317
122 Maplewood Elementary School Gr ades Served PK-6 (ES)
2010-11 Ut ilizat ion (by populat ion) 84%
2010-11 Attendance Zone Population 300 55
Excess/DeficitSeats
2010-11 Out Migration 069
2010-11 In Migration 129
2015-16 Proj'd At tendance Zone Populat ion 383 -28
Utilization (by enrollment) 114% Percent of Capacity
Area (GSF) per student 112 23 134
Gross Area 45,390 9,216 54,606
Perm Temp Total
2010-11 Campus Enrollment 406
Permanent Capacity 355
Number of Classrooms 20 12 32
Parking Spaces 42
Gross Site Area (Acr es) 6.4Sit e Data
School Data
Storage 1 1952 572 6.0%
Building A 1 1951 44,818 41.9%
Perm Buildings 45,390
Floor s Yr . Built GSF FCI
Building Data
37.4%
Austin, Texas 78722 1951 AA No
3808 Maplewood Ave. Yr. Open Rating Historic
Interior $1 159 $296 359 $36 200 $333 719
Site - $8,593 $528,568 - - $537,161
Exterior - - $98,285 - - $98,285
Structural - - $2,844 - - $2,844Roofing - $107,641 - - - $107,641
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,997,762*
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 84/317
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 85/317
165 McBee Elementary School Gr ades Served K-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 178%
2010-11 At tendance Zone Populat ion 1,031 -451
Excess/DeficitSeats
2010-11 Out Migration 301
2010-11 In Migration 030
2015-16 Proj'd Attendance Zone Population 1,083 -503
Utilization (by enrollment) 132% Percent of Capacity
Area (GSF) per student 91 12 103
Gross Area 69,717 9,216 78,933
Perm Temp Total
2010-11 Campus Enrollment 765
Permanent Capacity 580
Number of Classrooms 36 12 48
Parking Spaces 90
Gross Sit e Area (Acres) 10.9Sit e Data
School Data
Building A 1 1999 69,717 7.8%
Perm Buildings 69,717
Floor s Yr . Built GSF FCI
Building Data
7.9%
Austin, Texas 78758 1999 RC No
1001 West Braker Lane Yr. Open Rating Historic
Interior $89 744 $84 538 $124 936 $299 218
Site $58,760 $1,308 $1,112 - - $61,180
Exterior - - $1,716 - - $1,716
Structural - - - - - $0Roofing - - $4,268 - - $4,268
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $556,867*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 86/317
147 Menchaca Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 113%
2010-11 Attendance Zone Population 685 -79
Excess/DeficitSeats
2010-11 Out Migration 117
2010-11 In Migration 113
2015-16 Proj'd At tendance Zone Populat ion 629 -23
Utilization (by enrollment) 113% Percent of Capacity
Area (GSF) per student 87 16 103
Gross Area 59,978 10,752 70,730
Perm Temp Total
2010-11 Campus Enrollment 686
Permanent Capacity 606
Number of Classrooms 34 12 46
Parking Spaces 83
Gross Sit e Area (Acres) 19.8Sit e Data
School Data
Building A 1 1975 59,978 43.5%
Perm Buildings 59,978
Floor s Yr . Built GSF FCI
Building Data
36.9%
Austin, Texas 78748 1975 AA No
12120 Manchaca Rd. Yr. Open Rating Historic
Interior $128 130 $257 782 $462 745 $848 657
Site - $42,176 $111,016 $73,933 - $227,126
Exterior - - $4,712 - - $4,712
Structural - - $877 - - $877Roofing - $32,373 $28,907 - - $61,280
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $4,551,155*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 87/317
124 Metz Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 88%
2010-11 Attendance Zone Population 477 65
Excess/DeficitSeats
2010-11 Out Migration 064
2010-11 In Migration 088
2015-16 Proj'd At tendance Zone Populat ion 509 33
Utilization (by enrollment) 92% Percent of Capacity
Area (GSF) per student 124 6 130
Gross Area 61,905 3,072 64,977
Perm Temp Total
2010-11 Campus Enrollment 498
Permanent Capacity 542
Number of Classrooms 34 4 38
Parking Spaces 45
Gross Site Area (Acr es) 6.4Sit e Data
School Data
Building A 1 1993 61,905 32.3%
Perm Buildings 61,905
Floor s Yr . Built GSF FCI
Building Data
30.6%
Austin, Texas 78702 1993 EX No
84 Robert T. Martinez, Jr. Yr. Open Rating Historic
Interior $42 710 $68 165 $52 813 $163 688
Site $1,481 $654 $14,812 $2,225 - $19,172
Exterior - $2,221 - - - $2,221
Structural - - - - - $0Roofing - $1,686,580 $373 - - $1,686,953
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $2,443,840*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 88/317
181 Mills Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 105%
2010-11 Attendance Zone Population 831 -37
Excess/DeficitSeats
2010-11 Out Migration 031
2010-11 In Migration 134
2015-16 Proj'd At tendance Zone Populat ion 821 -27
Utilization (by enrollment) 117% Percent of Capacity
Area (GSF) per student 88 13 101
Gross Area 81,368 12,288 93,656
Perm Temp Total
2010-11 Campus Enrollment 928
Permanent Capacity 794
Number of Classrooms 44 16 60
Parking Spaces 104
Gross Sit e Area (Acres) 10.7Sit e Data
School Data
Building A 1 1998 81,368 13.7%
Perm Buildings 81,368
Floor s Yr . Built GSF FCI
Building Data
12.7%
Austin, Texas 78749 1998 EX No
6201 Davis Ln. Yr. Open Rating Historic
Interior $85 420 $238 434 $12 904 $336 758
Site - - $4,271 $140,421 - $144,692
Exterior - - $12,051 - - $12,051
Structural - - $2,701 - - $2,701Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $692,608*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 89/317
150 Norman Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 77%
2010-11 Attendance Zone Population 376 110
Excess/DeficitSeats
2010-11 Out Migration 073
2010-11 In Migration 024
2015-16 Proj'd At tendance Zone Populat ion 348 138
Utilization (by enrollment) 68% Percent of Capacity
Area (GSF) per student 176 5 180
Gross Area 58,519 1,536 60,055
Perm Temp Total
2010-11 Campus Enrollment 333
Permanent Capacity 486
Number of Classrooms 30 2 32
Parking Spaces 74
Gross Sit e Area (Acres) 10.2Sit e Data
School Data
Classroom 1 2007 13,827 4.7%
Building A 1 1970 44,692 41.8%
Perm Buildings 58,519
Floor s Yr . Built GSF FCI
Building Data
32.6%
Austin, Texas 78721 1970 RC No
4001 Tannehill Ln. Yr. Open Rating Historic
Interior $499 495 $43 010 $542 505
Site - - $87,439 $114,067 - $201,506
Exterior - - - - - $0
Structural - $1,873 - - - $1,873Roofing - - $453,578 - - $453,578
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $2,110,870*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 90/317
125 Oak Springs Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 71%
2010-11 Attendance Zone Population 293 118
Excess/DeficitSeats
2010-11 Out Migration 046
2010-11 In Migration 036
2015-16 Proj'd At tendance Zone Populat ion 330 81
Utilization (by enrollment) 67% Percent of Capacity
Area (GSF) per student 172 22 194
Gross Area 47,102 6,144 53,246
Perm Temp Total
2010-11 Campus Enrollment 274
Permanent Capacity 411
Number of Classrooms 26 6 32
Parking Spaces 47
Gross Site Area (Acr es) 8.6Sit e Data
School Data
Building B 1 1984 3,971 15.9%
Building A 1 1958 43,131 28.1%
Perm Buildings 47,102
Floor s Yr . Built GSF FCI
Building Data
26.0%
Austin, Texas 78702 1958 EX No
3601 Webberville Rd. Yr. Open Rating Historic
Interior $85 420 $163 853 $75 624 $324 898
Site - - $65,735 - - $65,735
Exterior - - $160,769 - - $160,769
Structural - - - - - $0Roofing - $12,365 $4,355 - - $16,719
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,980,974*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 91/317
156 Odom Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 130%
2010-11 Att endance Zone Populat ion 706 -164
Excess/DeficitSeats
2010-11 Out Migration 101
2010-11 In Migration 058
2015-16 Proj'd Attendance Zone Populat ion 719 -177
Utilization (by enrollment) 121% Percent of Capacity
Area (GSF) per student 93 21 114
Gross Area 61,009 13,824 74,833
Perm Temp Total
2010-11 Campus Enrollment 658
Permanent Capacity 542
Number of Classrooms 34 14 48
Parking Spaces 72
Gross Site Area (Acr es) 8.6Sit e Data
School Data
Building A 1 1970 61,009 21.8%
Perm Buildings 61,009
Floor s Yr . Built GSF FCI
Building Data
19.2%
Austin, Texas 78745 1970 AA No
1010 Turtle Creek Blvd. Yr. Open Rating Historic
Interior $106 775 $158 316 $115 216 $380 308
Site - $47,393 $18,972 - - $66,364
Exterior - - $202 - - $202
Structural - $5,518 - - - $5,518Roofing - - $41,171 - - $41,171
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $869,872*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 92/317
148 Oak Hill Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 106%
2010-11 Attendance Zone Population 820 -47
Excess/DeficitSeats
2010-11 Out Migration 117
2010-11 In Migration 057
2015-16 Proj'd Attendance Zone Populat ion 918 -145
Utilization (by enrollment) 100% Percent of Capacity
Area (GSF) per student 98 14 112
Gross Area 75,784 10,752 86,536
Perm Temp Total
2010-11 Campus Enrollment 772
Permanent Capacity 773
Number of Classrooms 43 14 57
Parking Spaces 97
Gross Sit e Area (Acres) 13.7Sit e Data
School Data
Building B 1 1984 16,210 20.7%
Building A 1 1974 59,574 43.2%
Perm Buildings 75,784
Floor s Yr . Built GSF FCI
Building Data
33.6%
Austin, Texas 78735 1974 EX No
6101 Patton Ranch Rd. Yr. Open Rating Historic
Interior $42 710 $1 072 603 $180 232 $1 295 545
Site - $8,459 $125,527 $73,933 - $207,920
Exterior - - $38,383 - - $38,383
Structural - - $3,335 - - $3,335Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $3,140,659*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 93/317
126 Or tega Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 71%
2010-11 Attendance Zone Population 266 108
Excess/DeficitSeats
2010-11 Out Migration 023
2010-11 In Migration 053
2015-16 Proj'd At tendance Zone Populat ion 269 105
Utilization (by enrollment) 79% Percent of Capacity
Area (GSF) per student 160 10 170
Gross Area 47,302 3,072 50,374
Perm Temp Total
2010-11 Campus Enrollment 296
Permanent Capacity 374
Number of Classrooms 24 1 25
Parking Spaces 36
Gross Site Area (Acr es) 7.4Sit e Data
School Data
Administration 1 1968 2,143 4.7%Building C 1 1959 5,146 62.8%
Building B 1 1966 20,907 33.7%
Building A 1 1959 19,106 51.8%
Perm Buildings 47,302
Floor s Yr . Built GSF FCI
Building Data
40.0%
Austin, Texas 78721 1959 EX No
1135 Garland Ave. Yr. Open Rating Historic
Interior $21 355 $33 243 $49 806 $104 404
Site - - $40,487 $12,624 - $53,112
Exterior - - $1,040 - - $1,040
Structural - - $101,906 - - $101,906Roofing - $1,515,309 $25,714 - - $1,541,023
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $3,139,712*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 94/317
189 Over ton Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 154%
2010-11 Att endance Zone Populat ion 948 -331
Excess/DeficitSeats
2010-11 Out Migration 217
2010-11 In Migration 044
2015-16 Proj'd Attendance Zone Populat ion 972 -355
Utilization (by enrollment) 108% Percent of Capacity
Area (GSF) per student 136 18 155
Gross Area 91,163 12,288 103,451
Perm Temp Total
2010-11 Campus Enrollment 668
Permanent Capacity 617
Number of Classrooms 39 15 54
Parking Spaces 175
Gross Sit e Area (Acres) 70.4Sit e Data
School Data
Building A 1 2007 91,163 4.2%
Perm Buildings 91,163
Floor s Yr . Built GSF FCI
Building Data
4.7%
Austin, Texas 78724 2007 RC No
7201 Colony Loop Dr. Yr. Open Rating Historic
Interior $21 355 $95 057 $48 506 $164 918
Site - - $5,287 $114,067 - $119,354
Exterior - - - - - $0
Structural - - - - - $0Roofing - - $14,805 - - $14,805
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $351,852*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 95/317
171 Palm Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 95%
2010-11 Attendance Zone Population 637 36
Excess/DeficitSeats
2010-11 Out Migration 081
2010-11 In Migration 050
2015-16 Proj'd At tendance Zone Populat ion 667 6
Utilization (by enrollment) 90% Percent of Capacity
Area (GSF) per student 130 5 136
Gross Area 79,082 3,072 82,154
Perm Temp Total
2010-11 Campus Enrollment 606
Permanent Capacity 673
Number of Classrooms 42 4 46
Parking Spaces 90
Gross Sit e Area (Acres) 13.2Sit e Data
School Data
Building B 1 2005 10,963 7.4%
Building A 1 1987 68,119 10.9%
Perm Buildings 79,082
Floor s Yr . Built GSF FCI
Building Data
11.1%
Austin, Texas 78744 1987 RC No
7601 Dixie Dr. Yr. Open Rating Historic
Interior $23 156 $115 259 $69 249 $207 664
Site - $18,391 $37,763 $40,134 - $96,287
Exterior $242 - $8,918 $38,694 - $47,854
Structural - - - - - $0
Roofing - $6,899 - - - $6,899
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $682,248*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 96/317
143 Pat ton Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 117%
2010-11 Att endance Zone Populat ion 908 -135
Excess/DeficitSeats
2010-11 Out Migration 095
2010-11 In Migration 109
2015-16 Proj'd Attendance Zone Populat ion 966 -193
Utilization (by enrollment) 118% Percent of Capacity
Area (GSF) per student 84 12 96
Gross Area 76,687 10,752 87,439
Perm Temp Total
2010-11 Campus Enrollment 914
Permanent Capacity 773
Number of Classrooms 43 13 56
Parking Spaces 109
Gross Sit e Area (Acres) 24.1Sit e Data
School Data
Building A 1 1986 76,687 19.6%
Perm Buildings 76,687
Floor s Yr . Built GSF FCI
Building Data
18.1%
Austin, Texas 78744 1986 EX No
6001 Westcreek Dr. Yr. Open Rating Historic
Interior $741 $149 485 $75 569 $40 077 $265 872
Site - $13,373 $4,610 - - $17,982
Exterior - $2,114 $1,121 - - $3,234
Structural - - - - - $0
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,905,083*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 97/317
128 Pease Elementary School Gr ades Served K-6 (ES)
2010-11 Ut ilizat ion (by populat ion) n/a
2010-11 Attendance Zone Population 293
Excess/DeficitSeats
2010-11 Out Migration 000
2010-11 In Migration 220
2015-16 Proj'd At tendance Zone Population 293
Utilization (by enrollment) 87% Percent of Capacity
Area (GSF) per student 139 0 139
Gross Area 35,624 35,624
Perm Temp Total
2010-11 Campus Enrollment 256
Permanent Capacity 293
Number of Classrooms 17 0 17
Parking Spaces 45
Gross Site Area (Acr es) 2.8Sit e Data
School Data
Building B 1 1998 4,870 17.0%
Building A 1 1876 30,754 82.3%
Perm Buildings 35,624
Floor s Yr . Built GSF FCI
Building Data
75.8%
Austin, Texas 78701 1876 EX Yes
1106 Rio Grande Yr. Open Rating Historic
Interior $661 149 $8 135 $669 284
Site - $172,907 $664,245 $191,141 - $1,028,292
Exterior - $14,064 $451,081 - - $465,145
Structural - - $35,507 - - $35,507
Roofing - $287,386 - - - $287,386
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $3,205,258*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 98/317
129 Pecan Springs Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 101%
2010-11 Attendance Zone Population 490 -4
Excess/DeficitSeats
2010-11 Out Migration 068
2010-11 In Migration 077
2015-16 Proj'd At tendance Zone Populat ion 501 -15
Utilization (by enrollment) 109% Percent of Capacity
Area (GSF) per student 107 17 124
Gross Area 56,992 9,216 66,208
Perm Temp Total
2010-11 Campus Enrollment 532
Permanent Capacity 486
Number of Classrooms 30 16 46
Parking Spaces 63
Gross Site Area (Acr es) 7.6Sit e Data
School Data
Building B 1 1990 10,783 26.8%
Building A 1 1957 46,209 44.0%
Perm Buildings 56,992
Floor s Yr . Built GSF FCI
Building Data
37.2%
Austin, Texas 78723 1957 AA No
3100 Rogge Ln. Yr. Open Rating Historic
Interior $230 050 $99 850 $329 899
Site - - $11,743 $298,033 - $309,776
Exterior - - $882,228 - - $882,228
Structural - - - - - $0
Roofing - $20,585 $20,585 $984,274 - $1,025,445
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $558,706*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 99/317
190 Perez Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 158%
2010-11 Att endance Zone Populat ion 945 -347
Excess/DeficitSeats
2010-11 Out Migration 123
2010-11 In Migration 066
2015-16 Proj'd Attendance Zone Populat ion 980 -382
Utilization (by enrollment) 148% Percent of Capacity
Area (GSF) per student 93 17 110
Gross Area 82,223 15,360 97,583
Perm Temp Total
2010-11 Campus Enrollment 886
Permanent Capacity 598
Number of Classrooms 37 19 56
Parking Spaces 106
Gross Sit e Area (Acres) 28.0Sit e Data
School Data
Building A 1 2006 82,223 10.0%
Perm Buildings 82,223
Floor s Yr . Built GSF FCI
Building Data
9.0%
Austin, Texas 78744 2006 RC No
7500 S. Pleasant Valley Rd. Yr. Open Rating Historic
Interior $42 710 $89 644 $11 718 $144 072
Site - - $7,999 - - $7,999
Exterior - - $11,450 - - $11,450
Structural - - - - - $0
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,422,361*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 100/317
164 Pickle Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 119%
2010-11 Att endance Zone Populat ion 737 -120
Excess/DeficitSeats
2010-11 Out Migration 058
2010-11 In Migration 056
2015-16 Proj'd Attendance Zone Populat ion 802 -185
Utilization (by enrollment) 120% Percent of Capacity
Area (GSF) per student 163 8 172
Gross Area 120,862 6,144 127,006
Perm Temp Total
2010-11 Campus Enrollment 740
Permanent Capacity 617
Number of Classrooms 39 8 47
Parking Spaces 132
Gross Sit e Area (Acres) 17.5Sit e Data
School Data
Building A 1 2001 120,862 5.3%
Per m Buildings 120,862
Floor s Yr . Built GSF FCI
Building Data
5.7%
Austin, Texas 78752 2001 RC No
1101 Wheatley Avenue Yr. Open Rating Historic
Interior $64 065 $92 964 $43 330 $200 359
Site - - $31,650 $193,425 - $225,074
Exterior - - $12,894 - - $12,894
Structural - - $3,616 - - $3,616
Roofing - - $2,429 - - $2,429
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $550,286*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 101/317
151 Pillow Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 125%
2010-11 Att endance Zone Populat ion 651 -129
Excess/DeficitSeats
2010-11 Out Migration 090
2010-11 In Migration 095
2015-16 Proj'd Attendance Zone Populat ion 734 -212
Utilization (by enrollment) 125% Percent of Capacity
Area (GSF) per student 83 16 100
Gross Area 54,247 10,752 64,999
Perm Temp Total
2010-11 Campus Enrollment 653
Permanent Capacity 523
Number of Classrooms 29 14 43
Parking Spaces 53
Gross Sit e Area (Acres) 10.0Sit e Data
School Data
Building A 1 1969 54,247 52.3%
Perm Buildings 54,247
Floor s Yr . Built GSF FCI
Building Data
42.9%
Austin, Texas 78757 1969 EX No
3025 Crosscreek Dr. Yr. Open Rating Historic
Interior $42 710 $293 433 $44 466 $380 609
Site - $97,541 $62,869 $15,011 - $175,421
Exterior - - $30,260 - - $30,260
Structural - - - - - $0
Roofing - - $2,131,311 - - $2,131,311
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $570,972*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 102/317
130 Pleasant Hill Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 121%
2010-11 Att endance Zone Populat ion 631 -107
Excess/DeficitSeats
2010-11 Out Migration 099
2010-11 In Migration 087
2015-16 Proj'd Attendance Zone Populat ion 680 -156
Utilization (by enrollment) 118% Percent of Capacity
Area (GSF) per student 106 12 119
Gross Area 65,729 7,680 73,409
Perm Temp Total
2010-11 Campus Enrollment 619
Permanent Capacity 524
Number of Classrooms 33 10 43
Parking Spaces 71
Gross Sit e Area (Acres) 10.1Sit e Data
School Data
Building A 1 1985 65,729 21.5%
Perm Buildings 65,729
Floor s Yr . Built GSF FCI
Building Data
19.6%
Austin, Texas 78745 1985 AA No
6405 Circle S Rd. Yr. Open Rating Historic
Interior $106 775 $74 494 $11 393 $192 662
Site - $1,550 $82,599 - - $84,149
Exterior - - $14,892 - - $14,892
Structural - - - - - $0
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $760,750*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 103/317
131 Lucy Read Pre-K School Grades Served PK (Pre-K)
2010-11 Ut ilizat ion (by populat ion) n/a
2010-11 Attendance Zone Population 393
Excess/DeficitSeats
2010-11 Out Migration 000
2010-11 In Migration 510
2015-16 Proj'd At tendance Zone Population 393
Utilization (by enrollment) 130% Percent of Capacity
Area (GSF) per student 127 18 145
Gross Area 64,644 9,216 73,860
Perm Temp Total
2010-11 Campus Enrollment 509
Permanent Capacity 393
Number of Classrooms 23 7 30
Parking Spaces 98
Gross Site Area (Acr es) 9.9Sit e Data
School Data
Building B 1 1961 3,069 6.2%
Building A 1 1961 61,575 11.3%
Perm Buildings 64,644
Floor s Yr . Built GSF FCI
Building Data
11.0%
Austin, Texas 78757 1961 No
2608 RichCreek Yr. Open Rating Historic
Interior $118 391 $10 593 $128 985
Site - - - $40,134 - $40,134
Exterior - - $51,949 - - $51,949
Structural - - $1,365 - - $1,365
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,034,762*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 104/317
132 Reilly Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 112%
2010-11 Attendance Zone Population 357 -39
Excess/DeficitSeats
2010-11 Out Migration 100
2010-11 In Migration 045
2015-16 Proj'd At tendance Zone Populat ion 366 -48
Utilization (by enrollment) 93% Percent of Capacity
Area (GSF) per student 141 21 161
Gross Area 41,646 6,144 47,790
Perm Temp Total
2010-11 Campus Enrollment 296
Permanent Capacity 318
Number of Classrooms 20 8 28
Parking Spaces 45
Gross Sit e Area (Acres) 10.8
Sit e Data
School Data
Building A 1 1954 41,646 32.0%
Perm Buildings 41,646
Floor s Yr . Built GSF FCI
Building Data
28.5%
Austin, Texas 78752 1954 RC No
405 Denson Dr. Yr. Open Rating Historic
Interior $32 360 $97 077 $48 191 $177 628
Site - $4,606 $54,280 $40,134 - $99,019
Exterior - - $369,460 - - $369,460
Structural - $77,800 - - - $77,800
Roofing - $81,281 - - - $81,281
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,182,946*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 105/317
133 Ridgetop Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 62%
2010-11 Attendance Zone Population 128 78
Excess/DeficitSeats
2010-11 Out Migration 056
2010-11 In Migration 147
2015-16 Proj'd At tendance Zone Populat ion 131 75
Utilization (by enrollment) 106% Percent of Capacity
Area (GSF) per student 162 21 184
Gross Area 35,585 4,608 40,193
Perm Temp Total
2010-11 Campus Enrollment 219
Permanent Capacity 206
Number of Classrooms 13 6 19
Parking Spaces 32
Gross Site Area (Acr es) 5.0
Sit e Data
School Data
Building B 1 1939 400 8.6%
Building A 1 1939 35,185 32.0%
Perm Buildings 35,585
Floor s Yr . Built GSF FCI
Building Data
31.4%
Austin, Texas 78751 1939 EX No
5005 Caswell Ave. Yr. Open Rating Historic
Interior $42 710 $29 297 $451 012 $523 019
Site - $267,544 $75,461 - - $343,005
Exterior - - $21,397 - - $21,397
Structural - - $4,502 - - $4,502
Roofing - - $3,940 - - $3,940
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,330,337*
School Summ ary Report2010 Educational Suitability Assessment
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 106/317
174 Rodriguez Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 147%
2010-11 At tendance Zone Populat ion 1,045 -334
Excess/DeficitSeats
2010-11 Out Migration 202
2010-11 In Migration 079
2015-16 Proj'd Attendance Zone Population 1,062 -351
Utilization (by enrollment) 128% Percent of Capacity
Area (GSF) per student 88 19 106
Gross Area 79,918 16,932 96,850
Perm Temp Total
2010-11 Campus Enrollment 910
Permanent Capacity 711
Number of Classrooms 44 22 66
Parking Spaces 114
Gross Sit e Area (Acres) 15.0
Sit e Data
School Data
Classroom 1 2006 10,004 8.3%
Building A 1 1999 69,914 7.7%
Perm Buildings 79,918
Floor s Yr . Built GSF FCI
Building Data
8.0%
Austin, Texas 78744 1999 AA No
4400 Franklin Park Dr. Yr. Open Rating Historic
Interior $132 079 $110 219 $11 709 $254 006
Site - $7,621 $141,062 $42,669 - $191,353
Exterior - - $534 - - $534
Structural - $238 - - - $238
Roofing - - $985 - - $985
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $565,395*
School Summ ary Report2010 Educational Suitability Assessment
G S S
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 107/317
127 Sanchez Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 101%
2010-11 Attendance Zone Population 584 -4
Excess/DeficitSeats
2010-11 Out Migration 061
2010-11 In Migration 074
2015-16 Proj'd At tendance Zone Populat ion 644 -64
Utilization (by enrollment) 101% Percent of Capacity
Area (GSF) per student 134 11 144
Gross Area 78,131 6,144 84,275
Perm Temp Total
2010-11 Campus Enrollment 585
Permanent Capacity 580
Number of Classrooms 36 8 44
Parking Spaces 70
Gross Site Area (Acr es) 9.2
Sit e Data
School Data
Building A 1 1976 78,131 28.7%
Perm Buildings 78,131
Floor s Yr . Built GSF FCI
Building Data
26.5%
Austin, Texas 78702 1976 RC No
73 San Marcos Yr. Open Rating Historic
Interior $628 109 $114 615 $742 724
Site $1,177 - $71,710 $40,134 - $113,020
Exterior - $387 $1,716 - - $2,103
Structural - - - - - $0
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $3,696,487*
School Summ ary Report2010 Educational Suitability Assessment
S El El S h l G d S d PK 5 (ES)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 108/317
136 St . Elmo Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 90%
2010-11 Attendance Zone Population 369 42
Excess/DeficitSeats
2010-11 Out Migration 094
2010-11 In Migration 029
2015-16 Proj'd At tendance Zone Populat ion 361 50
Utilization (by enrollment) 74% Percent of Capacity
Area (GSF) per student 159 10 169
Gross Area 48,212 3,072 51,284
Perm Temp Total
2010-11 Campus Enrollment 304
Permanent Capacity 411
Number of Classrooms 26 4 30
Parking Spaces 60
Gross Site Area (Acr es) 9.4
Sit e Data
School Data
Building A 1 1960 48,212 40.6%
Perm Buildings 48,212
Floor s Yr . Built GSF FCI
Building Data
41.2%
Austin, Texas 78745 1960 RC No
600 W. St. Elmo Rd. Yr. Open Rating Historic
Interior $21 355 $168 428 $14 646 $204 429
Site - $797 $48,045 $82,803 - $131,645
Exterior - - $1,484,314 - - $1,484,314
Structural - - - - - $0
Roofing - $42,906 - - - $42,906
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,198,396*
School Summ ary Report2010 Educational Suitability Assessment
139 Si El t S h l G d S d PK 5 (ES)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 109/317
139 Sims Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 97%
2010-11 Attendance Zone Population 343 12
Excess/DeficitSeats
2010-11 Out Migration 084
2010-11 In Migration 016
2015-16 Proj'd At tendance Zone Populat ion 359 -4
Utilization (by enrollment) 78% Percent of Capacity
Area (GSF) per student 160 22 182
Gross Area 44,337 6,144 50,481
Perm Temp Total
2010-11 Campus Enrollment 277
Permanent Capacity 355
Number of Classrooms 22 8 30
Parking Spaces 66
Gross Site Area (Acr es) 8.4
Sit e Data
School Data
Building F 1 1956 292 81.0%
Building E 1 1956 7,503 32.4%
Building D 1 1956 4,570 57.8%Building C 1 1956 2,482 36.3%
Building B 1 1961 17,056 35.3%
Building A 1 1956 12,434 55.6%
Perm Buildings 44,337
Floor s Yr . Built GSF FCI
Building Data
39.4%
Austin, Texas 78721 1956 EX No
1203 Springdale Rd. Yr. Open Rating Historic
Site - $31,481 $130,753 $129,820 - $292,054
Structural - $7,498 - - - $7,498
Roofing - $216,011 $10,801 - - $226,812
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,554,022*
School Summ ary Report2010 Educational Suitability Assessment
138 S itt El t S h l G d S d PK 5 (ES)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 110/317
138 Summ itt Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 85%
2010-11 Attendance Zone Population 623 109
Excess/DeficitSeats
2010-11 Out Migration 057
2010-11 In Migration 288
2015-16 Proj'd At tendance Zone Populat ion 662 70
Utilization (by enrollment) 117% Percent of Capacity
Area (GSF) per student 89 13 101
Gross Area 75,902 10,752 86,654
Perm Temp Total
2010-11 Campus Enrollment 854
Permanent Capacity 732
Number of Classrooms 41 14 55
Parking Spaces 107
Gross Sit e Area (Acres) 14.5
Sit e Data
School Data
Building B 1 1989 9,966 24.2%
Building A 1 1986 65,936 28.9%
Perm Buildings 75,902
Floor s Yr . Built GSF FCI
Building Data
25.2%
Austin, Texas 78727 1986 EX No
12207 Brigadoon Ln. Yr. Open Rating Historic
Interior $7 415 $302 725 $108 624 $418 765
Site - - $131,854 - - $131,854
Exterior - - - - - $0
Structural - - - - - $0
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $870,328*
School Summ ary Report2010 Educational Suitability Assessment
158 S t V ll El t S h l Gr ades Served PK 5 (ES)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 111/317
158 Sunset Valley Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 86%
2010-11 Attendance Zone Population 483 78
Excess/DeficitSeats
2010-11 Out Migration 135
2010-11 In Migration 099
2015-16 Proj'd At tendance Zone Populat ion 543 18
Utilization (by enrollment) 80% Percent of Capacity
Area (GSF) per student 147 7 154
Gross Area 66,467 3,072 69,539
Perm Temp Total
2010-11 Campus Enrollment 451
Permanent Capacity 561
Number of Classrooms 35 2 37
Parking Spaces 86
Gross Sit e Area (Acres) 10.4
Sit e Data
School Data
Building B 1 1996 9,169 11.6%
Building A 1 1971 57,298 50.9%
Perm Buildings 66,467
Floor s Yr . Built GSF FCI
Building Data
42.3%
Austin, Texas 78745 1971 EX No
3000 Jones Rd. Yr. Open Rating Historic
Interior $42 710 $230 079 $81 622 $354 411
Site - $23,148 $223,578 - - $246,726
Exterior - - $22,439 - - $22,439
Structural - - - - - $0
Roofing - - $2,043,970 - - $2,043,970
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $2,972,404*
School Summ ary Report2010 Educational Suitability Assessment
140 Tr avis Heights Elementary School Gr ades Served PK 5 (ES)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 112/317
140 Tr avis Heights Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 113%
2010-11 Attendance Zone Population 548 -62
Excess/DeficitSeats
2010-11 Out Migration 117
2010-11 In Migration 109
2015-16 Proj'd Attendance Zone Populat ion 605 -119
Utilization (by enrollment) 110% Percent of Capacity
Area (GSF) per student 111 9 120
Gross Area 59,589 4,608 64,197
Perm Temp Total
2010-11 Campus Enrollment 537
Permanent Capacity 486
Number of Classrooms 31 6 37
Parking Spaces 44
Gross Site Area (Acr es) 3.2
Sit e Data
School Data
Building C 1 1994 14,021 20.4%
Building B 1 1985 4,992 35.5%
Building A 1 1938 40,576 39.7%
Perm Buildings 59,589
Floor s Yr . Built GSF FCI
Building Data
36.6%
Austin, Texas 78704 1938 RC No
2010 Alameda Dr. Yr. Open Rating Historic
Interior $64 065 $158 357 $67 889 $290 311
Site $223,178 $188,278 $2,109 $1,112 - $414,676
Exterior - - $2,778 $321,483 - $324,261
Structural - - - - - $0
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $3,445,212*
School Summ ary Report2010 Educational Suitability Assessment
141 W alnut Creek Elementary School Gr ades Served K 6 (ES)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 113/317
141 W alnut Creek Elementary School Gr ades Served K-6 (ES)
2010-11 Ut ilizat ion (by populat ion) 143%
2010-11 Att endance Zone Populat ion 936 -282
Excess/DeficitSeats
2010-11 Out Migration 094
2010-11 In Migration 060
2015-16 Proj'd Attendance Zone Population 1,002 -348
Utilization (by enrollment) 140% Percent of Capacity
Area (GSF) per student 87 18 105
Gross Area 79,536 16,896 96,432
Perm Temp Total
2010-11 Campus Enrollment 916
Permanent Capacity 655
Number of Classrooms 41 21 62
Parking Spaces 94
Gross Sit e Area (Acres) 11.5
Sit e Data
School Data
Building B 1 1999 34,499 5.6%
Building A 1 1961 45,037 27.3%
Perm Buildings 79,536
Floor s Yr . Built GSF FCI
Building Data
15.3%
Austin, Texas 78753 1961 AA No
401 W. Braker Ln. Yr. Open Rating Historic
Interior $610 $3 560 $53 758 $57 599 $115 526
Site - $4,606 $67,837 - - $72,444
Exterior $2,925 - $837,033 - - $839,957
Structural - - - - - $0
Roofing $1,499 $141,304 - - - $142,803
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,535,934*
School Summ ary Report2010 Educational Suitability Assessment
175 W iden Elementary School Gr ades Served PK 5 (ES)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 114/317
175 W iden Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 118%
2010-11 Att endance Zone Populat ion 794 -121
Excess/DeficitSeats
2010-11 Out Migration 086
2010-11 In Migration 077
2015-16 Proj'd Attendance Zone Populat ion 780 -107
Utilization (by enrollment) 114% Percent of Capacity
Area (GSF) per student 97 20 117
Gross Area 74,523 15,360 89,883
Perm Temp Total
2010-11 Campus Enrollment 769
Permanent Capacity 673
Number of Classrooms 42 20 62
Parking Spaces 92
Gross Sit e Area (Acres) 10.7
Sit e Data
School Data
Building B 1 1989 10,857 7.4%
Building A 1 1986 63,666 15.5%
Perm Buildings 74,523
Floor s Yr . Built GSF FCI
Building Data
12.9%
Austin, Texas 78744 1986 AA No
5605 Nuckols Crossing Yr. Open Rating Historic
Interior $106 775 $133 079 $87 980 $327 835
Site - - $121,427 $4,049 - $125,476
Exterior - $2,640 $13,732 - - $16,372
Structural $1,801 - $1,474 $2,648 - $5,923
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $864,638*
School Summ ary Report2010 Educational Suitability Assessment
166 W illiams Elementary School Gr ades Served PK-5 (ES)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 115/317
166 W illiams Elementary School Gr ades Served PK-5 (ES)
2010-11 Ut ilizat ion (by populat ion) 114%
2010-11 Attendance Zone Population 640 -79
Excess/DeficitSeats
2010-11 Out Migration 133
2010-11 In Migration 130
2015-16 Proj'd At tendance Zone Populat ion 621 -60
Utilization (by enrollment) 114% Percent of Capacity
Area (GSF) per student 101 14 115
Gross Area 64,846 9,216 74,062
Perm Temp Total
2010-11 Campus Enrollment 642
Permanent Capacity 561
Number of Classrooms 35 12 47
Parking Spaces 107
Gross Sit e Area (Acres) 14.0
Sit e Data
School Data
Building A 1 1976 64,846 40.0%
Perm Buildings 64,846
Floor s Yr . Built GSF FCI
Building Data
36.9%
Austin, Texas 78748 1976 AA No
500 Mairo Yr. Open Rating Historic
Interior $106 775 $464 627 $11 930 $583 332
Site - - $132,390 $129,820 - $262,210
Exterior - - $37,251 $223,445 - $260,696
Structural - - - - - $0
Roofing - - $20,585 - - $20,585
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $4,203,762*
School Summ ary Report2010 Educational Suitability Assessment
157 W inn Elementary School Gr ades Served PK-5 (ES)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 116/317
157 W inn Elementary School Gr ades Served PK 5 (ES)
2010-11 Ut ilizat ion (by populat ion) 93%
2010-11 Attendance Zone Population 485 39
Excess/DeficitSeats
2010-11 Out Migration 082
2010-11 In Migration 044
2015-16 Proj'd At tendance Zone Populat ion 531 -7
Utilization (by enrollment) 88% Percent of Capacity
Area (GSF) per student 134 10 144
Gross Area 62,087 4,608 66,695
Perm Temp Total
2010-11 Campus Enrollment 463
Permanent Capacity 524
Number of Classrooms 33 6 39
Parking Spaces 66
Gross Sit e Area (Acres) 10.0
Sit e Data
School Data
Building B 1 1990 9,970 21.1%
Building A 1 1970 52,117 21.7%
Perm Buildings 62,087
Floor s Yr . Built GSF FCI
Building Data
22.5%
Austin, Texas 78723 1970 RC No
3500 Susquehanna Ln. Yr. Open Rating Historic
Interior $42 710 $212 677 $189 878 $445 265
Site $1,255 - $107,297 $40,134 - $148,686
Exterior - - $10,312 - - $10,312
Structural - $2,248 - - - $2,248
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,207,781*
School Summ ary Report2010 Educational Suitability Assessment
152 W ooldr idge Elementary School Gr ades Served K-5 (ES)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 117/317
152 W ooldr idge Elementary School Gr ades Served K 5 (ES)
2010-11 Ut ilizat ion (by populat ion) 222%
2010-11 At tendance Zone Populat ion 1,160 -636
Excess/DeficitSeats
2010-11 Out Migration 342
2010-11 In Migration 061
2015-16 Proj'd Attendance Zone Population 1,255 -731
Utilization (by enrollment) 168% Percent of Capacity
Area (GSF) per student 78 23 101
Gross Area 68,543 19,968 88,511
Perm Temp Total
2010-11 Campus Enrollment 878
Permanent Capacity 524
Number of Classrooms 33 26 59
Parking Spaces 60
Gross Sit e Area (Acres) 11.6
Sit e Data
School Data
Building B 1 1998 9,738 13.4%
Building A 1 1969 58,805 32.1%
Perm Buildings 68,543
Floor s Yr . Built GSF FCI
Building Data
23.0%
Austin, Texas 78758 1969 AA No
1412 Norseman Terrace Yr. Open Rating Historic
Interior $111 004 $148 224 $259 227
Site - $4,606 $31,668 $64,475 - $100,749
Exterior - - $56,049 - - $56,049
Structural - - - - - $0
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $2,461,020*
School Summ ary Report2010 Educational Suitability Assessment
144 W ooten Elementary School Gr ades Served PK-5 (ES)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 118/317
144 W ooten Elementary School Gr ades Served PK 5 (ES)
2010-11 Ut ilizat ion (by populat ion) 144%
2010-11 Att endance Zone Populat ion 672 -205
Excess/DeficitSeats
2010-11 Out Migration 093
2010-11 In Migration 125
2015-16 Proj'd Attendance Zone Populat ion 737 -270
Utilization (by enrollment) 149% Percent of Capacity
Area (GSF) per student 77 27 104
Gross Area 53,689 18,432 72,121
Perm Temp Total
2010-11 Campus Enrollment 695
Permanent Capacity 468
Number of Classrooms 29 22 51
Parking Spaces 37
Gross Site Area (Acr es) 6.7
Sit e Data
School Data
Building A 1 1955 53,689 63.2%
Perm Buildings 53,689
Floor s Yr . Built GSF FCI
Building Data
51.2%
Austin, Texas 78757 1955 RC No
1406 Dale Yr. Open Rating Historic
Interior $206 992 $235 337 $44 338 $486 667
Site - $1,112 $629,572 $322,375 - $953,059
Exterior $1,537 $5,198 $776,990 - - $783,726
Structural - - - - - $0
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $4,243,830*
School Summ ary Report2010 Educational Suitability Assessment
145 Zavala Elementary School Gr ades Served PK-6 (ES)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 119/317
145 Zavala Elementary School Gr ades Served PK 6 (ES)
2010-11 Ut ilizat ion (by populat ion) 60%
2010-11 Attendance Zone Population 347 233
Excess/DeficitSeats
2010-11 Out Migration 043
2010-11 In Migration 082
2015-16 Proj'd At tendance Zone Populat ion 353 227
Utilization (by enrollment) 70% Percent of Capacity
Area (GSF) per student 170 0 170
Gross Area 69,333 69,333
Perm Temp Total
2010-11 Campus Enrollment 407
Permanent Capacity 580
Number of Classrooms 36 0 36
Parking Spaces 12
Gross Site Area (Acr es) 3.4
Sit e Data
School Data
Building A 1 1937 69,333 32.5%
Perm Buildings 69,333
Floor s Yr . Built GSF FCI
Building Data
32.8%
Austin, Texas 78702 1937 RC No
310 Robert Martinez, Jr. Yr. Open Rating Historic
Interior $260 945 $236 385 $497 329
Site - $1,196 $285,274 - - $286,470
Exterior - - $38,935 $14,187 - $53,122
Structural - - - - - $0
Roofing - $798 - - - $798
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,284,691*
School Summ ary Report2010 Educational Suitability Assessment
146 Zilker Elementary School Gr ades Served PK-6 (ES)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 120/317
146 Zilker Elementary School ( )
2010-11 Ut ilizat ion (by populat ion) 74%
2010-11 Attendance Zone Population 338 122
Excess/DeficitSeats
2010-11 Out Migration 018
2010-11 In Migration 204
2015-16 Proj'd At tendance Zone Populat ion 358 102
Utilization (by enrollment) 114% Percent of Capacity
Area (GSF) per student 98 21 118
Gross Area 50,941 10,752 61,693
Perm Temp Total
2010-11 Campus Enrollment 522
Permanent Capacity 460
Number of Classrooms 26 14 40
Parking Spaces 54
Gross Sit e Area (Acres) 11.8
Sit e Data
School Data
Vocational 1 1950 597 53.3%
Library 1 1990 5,488 24.8%
Gymnasium 1 1961 2,827 49.5%
Building A 1 1950 42,029 69.2%
Perm Buildings 50,941
Floor s Yr . Built GSF FCI
Building Data
56.4%
Austin, Texas 78704 1950 EX No
1900 Bluebonnet Lane Yr. Open Rating Historic
Interior $22 794 $233 891 $434 142 $690 827
Site - - $720,410 $210,344 - $930,754
Exterior $28,203 - $338,242 - - $366,445
Structural - - - - - $0
Roofing - $1,307,652 $59,313 - - $1,366,966
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $2,874,015*
School Summ ary Report2010 Educational Suitability Assessment
059 Bailey Middle School Gr ades Served 6-8 (MS)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 121/317
059 Bailey Middle School ( )
2010-11 Ut ilizat ion (by populat ion) 83%
2010-11 Attendance Zone Population 979 197
Excess/DeficitSeats
2010-11 Out Migration 129
2010-11 In Migration 196
2015-16 Proj'd Attendance Zone Populat ion 1,048 128
Utilization (by enrollment) 89% Percent of Capacity
Area (GSF) per student 142 10 153
Gross Area 148,143 10,752 158,895
Perm Temp Total
2010-11 Campus Enrollment 1,041
Permanent Capacity 1,176
Number of Classrooms 56 11 67
Parking Spaces 138
Gross Sit e Area (Acres) 41.3
Sit e Data
School Data
Building A 1 1993 148,143 15.1%
Per m Buildings 148,143
Floor s Yr . Built GSF FCI
Building Data
16.4%
Austin, Texas 78739 1993 RC No
4020 Lost Oasis Hollow Yr. Open Rating Historic
Interior $149 485 $94 214 $72 955 $316 654
Site - $16,193 $27,289 $824,676 - $868,157
Exterior - - $220,269 $192,392 - $412,661
Structural - - - - - $0
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $3,025,915*
School Summ ary Report2010 Educational Suitability Assessment
054 Bedichek Middle School Gr ades Served 6-8 (MS)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 122/317
054 Bedichek Middle School ( )
2010-11 Ut ilizat ion (by populat ion) 130%
2010-11 At tendance Zone Populat ion 1,219 -278
Excess/DeficitSeats
2010-11 Out Migration 248
2010-11 In Migration 100
2015-16 Proj'd Attendance Zone Population 1,340 -399
Utilization (by enrollment) 112% Percent of Capacity
Area (GSF) per student 124 26 150
Gross Area 130,600 27,018 157,618
Perm Temp Total
2010-11 Campus Enrollment 1,054
Permanent Capacity 941
Number of Classrooms 48 31 79
Parking Spaces 140
Gross Sit e Area (Acres) 23.3
Sit e Data
School Data
Building C 1 1997 9,909 5.8%
Gymnasium 1 1972 28,847 55.2%
Building A 1 1972 91,844 32.0%
Per m Buildings 130,600
Floor s Yr . Built GSF FCI
Building Data
30.6%
Austin, Texas 78745 1972 AA No
6800 Bill Hughes Rd. Yr. Open Rating Historic
Interior $224 $192 195 $807 140 $331 731 $1 331 290
Site - - $192,275 $824,676 - $1,016,951
Exterior - - $2,951 - - $2,951
Structural - $11,113 - - - $11,113
Roofing - $849,916 - - - $849,916
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $9,999,588*
School Summ ary Report2010 Educational Suitability Assessment
046 Burnet Middle School Gr ades Served 6-8 (MS)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 123/317
2010-11 Ut ilizat ion (by populat ion) 113%
2010-11 At tendance Zone Populat ion 1,170 -131
Excess/DeficitSeats
2010-11 Out Migration 203
2010-11 In Migration 060
2015-16 Proj'd Attendance Zone Population 1,365 -326
Utilization (by enrollment) 96% Percent of Capacity
Area (GSF) per student 138 18 157
Gross Area 137,768 18,432 156,200
Perm Temp Total
2010-11 Campus Enrollment 998
Permanent Capacity 1,039
Number of Classrooms 53 22 75
Parking Spaces 50
Gross Sit e Area (Acres) 23.7
Sit e Data
School Data
Mechanical 1 1969 1,025 0.4%
Building A 1 1961 136,743 37.5%
Per m Buildings 137,768
Floor s Yr . Built GSF FCI
Building Data
34.5%
Austin, Texas 78757 1961 AA No
8401 Hathaway Yr. Open Rating Historic
Interior $219 280 $300 419 $20 695 $540 393
Site - $106,911 - $1,052,251 - $1,159,162
Exterior - $127,204 $7,663 - - $134,868
Structural - $3,472 $868 - - $4,340
Roofing - - $2,095,309 - - $2,095,309
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $7,925,349*
School Summ ary Report2010 Educational Suitability Assessment
057 Covington Middle School Gr ades Served 6-8 (MS)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 124/317
g
2010-11 Ut ilizat ion (by populat ion) 68%
2010-11 Attendance Zone Population 905 418
Excess/DeficitSeats
2010-11 Out Migration 260
2010-11 In Migration 181
2015-16 Proj'd At tendance Zone Populat ion 984 339
Utilization (by enrollment) 61% Percent of Capacity
Area (GSF) per student 216 6 221
Gross Area 173,636 4,608 178,244
Perm Temp Total
2010-11 Campus Enrollment 805
Permanent Capacity 1,323
Number of Classrooms 63 5 68
Parking Spaces 122
Gross Sit e Area (Acres) 21.3
Sit e Data
School Data
Vocational 1 1986 18,307 18.9%
Auditorium 1 1986 20,672 20.3%
Building A 1 1986 134,657 18.9%
Per m Buildings 173,636
Floor s Yr . Built GSF FCI
Building Data
18.7%
Austin, Texas 78749 1986 AA No
3700 Convict Hill Rd Yr. Open Rating Historic
Interior $21 355 $126 060 $187 566 $334 981
Site - $243 $220,213 $79,540 - $299,996
Exterior - $6,006 $31,080 - - $37,086
Structural - - $1,775 - - $1,775
Roofing - $165,465 $1,050 - - $166,514
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $4,753,039*
School Summ ary Report2010 Educational Suitability Assessment
055 Dobie Middle School Gr ades Served 6-8 (MS)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 125/317
2010-11 Ut ilizat ion (by populat ion) 80%
2010-11 Attendance Zone Population 719 183
Excess/DeficitSeats
2010-11 Out Migration 130
2010-11 In Migration 063
2015-16 Proj'd At tendance Zone Populat ion 828 74
Utilization (by enrollment) 70% Percent of Capacity
Area (GSF) per student 214 10 223
Gross Area 134,563 6,144 140,707
Perm Temp Total
2010-11 Campus Enrollment 630
Permanent Capacity 902
Number of Classrooms 46 8 54
Parking Spaces 120
Gross Sit e Area (Acres) 20.2
Sit e Data
School Data
Building B 1 2006 10,564 8.3%
Building A 1 1973 123,999 14.0%
Per m Buildings 134,563
Floor s Yr . Built GSF FCI
Building Data
15.2%
Austin, Texas 78753 1973 RC No
1200 E. Rundberg Ln. Yr. Open Rating Historic
Interior $42 171 $6 076 $648 770 $22 550 $719 567
Site - - $229,980 $779,468 - $1,009,448
Exterior $15,417 - - - - $15,417
Structural - - - - - $0
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,851,474*
School Summ ary Report2010 Educational Suitability Assessment
043 Fulmore Middle School Gr ades Served 6-8 (MS)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 126/317
2010-11 Ut ilizat ion (by populat ion) 79%
2010-11 Attendance Zone Population 850 228
Excess/DeficitSeats
2010-11 Out Migration 138
2010-11 In Migration 295
2015-16 Proj'd At tendance Zone Populat ion 990 88
Utilization (by enrollment) 92% Percent of Capacity
Area (GSF) per student 161 8 168
Gross Area 159,699 7,680 167,379
Perm Temp Total
2010-11 Campus Enrollment 995
Permanent Capacity 1,078
Number of Classrooms 55 9 64
Parking Spaces 85
Gross Site Area (Acr es) 9.8
Sit e Data
School Data
Building D 1 2002 13,392 8.0%
Vocational 1 1980 18,500 56.1%
Cafeteria 1 1980 55,143 40.8%
Building A 1 1911 72,664 46.9%
Per m Buildings 159,699
Floor s Yr . Built GSF FCI
Building Data
40.6%
Austin, Texas 78704 1911 AA No
201 East Mary Yr. Open Rating Historic
Interior $55 906 $611 384 $484 733 $1 152 023
Site $3,001 $4,218 $435,203 $16,796 - $459,218
Exterior - $2,011 $115,027 - - $117,038
Structural - $3,151 $33,724 - - $36,876
Roofing $4,239 - $30,865 - - $35,104
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $9,580,793*
School Summ ary Report2010 Educational Suitability Assessment
056 Garcia Middle School Gr ades Served 6-8 (MS)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 127/317
2010-11 Ut ilizat ion (by populat ion) 68%
2010-11 Attendance Zone Population 829 386
Excess/DeficitSeats
2010-11 Out Migration 131
2010-11 In Migration 027
2015-16 Proj'd At tendance Zone Populat ion 901 314
Utilization (by enrollment) 54% Percent of Capacity
Area (GSF) per student 244 0 244
Gross Area 160,764 160,764
Perm Temp Total
2010-11 Campus Enrollment 658
Permanent Capacity 1,215
Number of Classrooms 62 0 62
Parking Spaces 160
Gross Sit e Area (Acres) 41.3
Sit e Data
School Data
Building A 1 2008 160,764 4.8%
Per m Buildings 160,764
Floor s Yr . Built GSF FCI
Building Data
4.7%
Austin, Texas 78724 2008 AA No
7414 Johnny Mor ris Rd. Yr. Open Rating Historic
Interior $105 789 $65 660 $171 449
Site - - - - - $0
Exterior - - - - - $0
Structural - - - - - $0
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $717,098*
School Summ ary Report2010 Educational Suitability Assessment
062 Gorzycki Middle School Gr ades Served 6-8 (MS)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 128/317
2010-11 Ut ilizat ion (by populat ion) 75%
2010-11 Attendance Zone Population 989 334
Excess/DeficitSeats
2010-11 Out Migration 132
2010-11 In Migration 108
2015-16 Proj'd Attendance Zone Populat ion 1,071 252
Utilization (by enrollment) 73% Percent of Capacity
Area (GSF) per student 182 0 182
Gross Area 175,543 175,543
Perm Temp Total
2010-11 Campus Enrollment 963
Permanent Capacity 1,323
Number of Classrooms 63 0 63
Parking Spaces 160
Gross Sit e Area (Acres) 14.2
Sit e Data
School Data
Building A 1 2009 175,543 4.7%
Per m Buildings 175,543
Floor s Yr . Built GSF FCI
Building Data
4.6%
Austin, Texas 78749 2009 RC No
7412 West Slaughter Ln. Yr. Open Rating Historic
Interior $108 064 $73 924 $181 987
Site - - - $40,134 - $40,134
Exterior - - - - - $0
Structural - - - - - $0
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $640,006*
School Summ ary Report2010 Educational Suitability Assessment
044 Kealing Middle School Gr ades Served 6-8 (MS)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 129/317
2010-11 Ut ilizat ion (by populat ion) 35%
2010-11 Att endance Zone Populat ion 541 1,027
Excess/DeficitSeats
2010-11 Out Migration 064
2010-11 In Migration 806
2015-16 Proj'd At tendance Zone Populat ion 614 954
Utilization (by enrollment) 79% Percent of Capacity
Area (GSF) per student 156 0 156
Gross Area 192,181 192,181
Perm Temp Total
2010-11 Campus Enrollment 1,233
Permanent Capacity 1,568
Number of Classrooms 80 0 80
Parking Spaces 160
Gross Sit e Area (Acres) 13.2
Sit e Data
School Data
Building C 1 2007 34,819 3.8%
Gym/Café/Aud 1 1986 55,783 24.8%
Building A 1 1986 101,579 20.4%
Per m Buildings 192,181
Floor s Yr . Built GSF FCI
Building Data
18.6%
Austin, Texas 78702 1986 AA No
1607 Pennsylvania Ave. Yr. Open Rating Historic
Interior $30 226 $364 771 $127 864 $522 860
Site - - $82,009 $322,375 - $404,383
Exterior - - $129,828 - - $129,828
Structural - - - - - $0
Roofing - $3,999,808 - - - $3,999,808
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $5,350,903*
School Summ ary Report2010 Educational Suitability Assessment
045 Lamar Middle School Gr ades Served 6-8 (MS)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 130/317
2010-11 Ut ilizat ion (by populat ion) 58%
2010-11 Attendance Zone Population 583 425
Excess/DeficitSeats
2010-11 Out Migration 191
2010-11 In Migration 223
2015-16 Proj'd At tendance Zone Populat ion 642 366
Utilization (by enrollment) 60% Percent of Capacity
Area (GSF) per student 201 8 209
Gross Area 121,371 4,608 125,979
Perm Temp Total
2010-11 Campus Enrollment 604
Permanent Capacity 1,008
Number of Classrooms 48 4 52
Parking Spaces 106
Gross Sit e Area (Acres) 14.3
Sit e Data
School Data
Mechanical 1 2000 2,004 0.1%
Building C 1 2000 5,354 8.3%
Band 1 2000 9,032 6.0%
Building A 1 1955 104,981 20.2%
Per m Buildings 121,371
Floor s Yr . Built GSF FCI
Building Data
19.3%
Austin, Texas 78757 1955 AA No
6201 Wynona Yr. Open Rating Historic
Interior $85 501 $243 886 $24 393 $353 780
Site $5,195 - $29,823 $869,155 - $904,172
Exterior $898 $433,743 - - - $434,641
Structural $9,432 - $39,783 - - $49,215
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $3,730,973*
School Summ ary Report2010 Educational Suitability Assessment
051 Mart in Middle School Gr ades Served 6-8 (MS)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 131/317
2010-11 Ut ilizat ion (by populat ion) 131%
2010-11 At tendance Zone Populat ion 1,056 -252
Excess/DeficitSeats
2010-11 Out Migration 429
2010-11 In Migration 075
2015-16 Proj'd Attendance Zone Population 1,184 -380
Utilization (by enrollment) 79% Percent of Capacity
Area (GSF) per student 169 17 186
Gross Area 107,983 10,752 118,735
Perm Temp Total
2010-11 Campus Enrollment 639
Permanent Capacity 804
Number of Classrooms 41 11 52
Parking Spaces 94
Gross Site Area (Acr es) 9.9
Sit e Data
School Data
Gym/Café/Aud 1 1966 52,693 26.2%
Building A 1 1966 55,290 36.4%
Per m Buildings 107,983
Floor s Yr . Built GSF FCI
Building Data
28.8%
Austin, Texas 78702 1966 AA No
1601 Haskell Yr. Open Rating Historic
Interior $109 213 $899 675 $43 981 $1 052 869
Site - $775 $85,474 $86,678 - $172,927
Exterior - $435 $50,001 $112,643 - $163,079
Structural - - $1,395 $8,681 - $10,075
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $6,538,211*
School Summ ary Report2010 Educational Suitability Assessment
058 Mendez Middle School Gr ades Served 6-8 (MS)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 132/317
2010-11 Ut ilizat ion (by populat ion) 104%
2010-11 Att endance Zone Populat ion 1,266 -51
Excess/DeficitSeats
2010-11 Out Migration 396
2010-11 In Migration 027
2015-16 Proj'd Attendance Zone Population 1,373 -158
Utilization (by enrollment) 73% Percent of Capacity
Area (GSF) per student 195 16 210
Gross Area 173,382 13,824 187,206
Perm Temp Total
2010-11 Campus Enrollment 890
Permanent Capacity 1,215
Number of Classrooms 62 18 80
Parking Spaces 139
Gross Sit e Area (Acres) 20.7
Sit e Data
School Data
Vocational 1 1987 17,552 20.4%
Auditorium 1 1987 20,672 15.0%
Building A 1 1987 135,158 13.4%
Per m Buildings 173,382
Floor s Yr . Built GSF FCI
Building Data
15.0%
Austin, Texas 78744 1987 AA No
5106 Village Square Yr. Open Rating Historic
Interior $60 254 $235 743 $17 936 $313 933
Site - $3,144 $30,858 $482,213 - $516,215
Exterior - $193 $3,653 $25,747 - $29,594
Structural - - - - - $0
Roofing - $5,877 - - - $5,877
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $5,149,951*
School Summ ary Report2010 Educational Suitability Assessment
052 Murchison Middle School Gr ades Served 6-8 (MS)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 133/317
2010-11 Ut ilizat ion (by populat ion) 105%
2010-11 Att endance Zone Populat ion 1,171 -58
Excess/DeficitSeats
2010-11 Out Migration 110
2010-11 In Migration 220
2015-16 Proj'd Attendance Zone Population 1,301 -188
Utilization (by enrollment) 115% Percent of Capacity
Area (GSF) per student 96 13 109
Gross Area 123,348 16,256 139,604
Perm Temp Total
2010-11 Campus Enrollment 1,281
Permanent Capacity 1,113
Number of Classrooms 53 20 73
Parking Spaces 124
Gross Sit e Area (Acres) 26.2
Sit e Data
School Data
Greenhouse 1 1979 896 11.5%
Storage 1 1987 367
Building B 1 1998 16,628 6.1%
Building A 1 1967 105,457 25.8%
Per m Buildings 123,348
Floor s Yr . Built GSF FCI
Building Data
19.9%
Austin, Texas 78731 1967 RC No
3700 North Hills Dr. Yr. Open Rating Historic
Interior $170 840 $149 672 $724 559 $1 045 070
Site - - $17,512 - - $17,512
Exterior - $5,383 $337 - - $5,720
Structural - - - - - $0
Roofing - $928,708 - - - $928,708
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $2,108,676*
School Summ ary Report2010 Educational Suitability Assessment
047 O. Henry Middle School Gr ades Served 6-8 (MS)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 134/317
2010-11 Ut ilizat ion (by populat ion) 85%
2010-11 Attendance Zone Population 804 141
Excess/DeficitSeats
2010-11 Out Migration 183
2010-11 In Migration 485
2015-16 Proj'd At tendance Zone Populat ion 897 48
Utilization (by enrollment) 109% Percent of Capacity
Area (GSF) per student 121 6 127
Gross Area 124,320 6,144 130,464
Perm Temp Total
2010-11 Campus Enrollment 1,026
Permanent Capacity 945
Number of Classrooms 45 8 53
Parking Spaces 103
Gross Sit e Area (Acres) 13.8
Sit e Data
School Data
Building A 1 1953 124,320 12.3%
Per m Buildings 124,320
Floor s Yr . Built GSF FCI
Building Data
13.3%
Austin, Texas 78703 1953 AA No
2610 West 10th St. Yr. Open Rating Historic
Interior $85 420 $158 448 $37 802 $281 670
Site - - $532,421 $5,561 - $537,983
Exterior - $725 $49,612 - - $50,337
Structural - - $33,856 - - $33,856
Roofing - - $70,588 - - $70,588
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,075,336*
School Summ ary Report2010 Educational Suitability Assessment
061 Paredes Middle School Gr ades Served 6-8 (MS)
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 135/317
2010-11 Ut ilizat ion (by populat ion) 101%
2010-11 Attendance Zone Population 1,165 -9
Excess/DeficitSeats
2010-11 Out Migration 291
2010-11 In Migration 069
2015-16 Proj'd Attendance Zone Population 1,293 -137
Utilization (by enrollment) 80% Percent of Capacity
Area (GSF) per student 160 7 166
Gross Area 148,695 6,144 154,839
Perm Temp Total
2010-11 Campus Enrollment 930
Permanent Capacity 1,156
Number of Classrooms 59 8 67
Parking Spaces 108
Gross Sit e Area (Acres) 78.2
Sit e Data
School Data
Gymnasium 1 2000 34,358 5.4%
Band 1 2000 9,072 9.4%
Cafeteria 1 2000 15,854 4.6%
Building C 1 2000 4,035 29.8%
Administration 1 2000 6,002 8.6%
Building A 1 2000 79,374 10.5%
Per m Buildings 148,695
Floor s Yr . Built GSF FCI
Building Data
11.0%
Austin, Texas 78748 2000 RC No
10100 S. Mary Moore Searight Dr. Yr. Open Rating Historic
Site - $99,871 $121,562 $208,564 - $429,998
Structural - - - - - $0
Roofing - $36,100 - - - $36,100
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,294,994*
School Summ ary Report2010 Educational Suitability Assessment
048 Pearce Middle School Gr ades Served 6-8 (MS)
6401 N H D
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 136/317
2010-11 Ut ilizat ion (by populat ion) 66%
2010-11 Attendance Zone Population 712 366
Excess/DeficitSeats
2010-11 Out Migration 510
2010-11 In Migration 328
2015-16 Proj'd At tendance Zone Populat ion 846 232
Utilization (by enrollment) 31% Percent of Capacity
Area (GSF) per student 403 5 408
Gross Area 132,596 1,536 134,132
Perm Temp Total
2010-11 Campus Enrollment 329
Permanent Capacity 1,078
Number of Classrooms 55 1 56
Parking Spaces 82
Gross Sit e Area (Acres) 14.8
Sit e Data
School Data
Auditorium 1 1958 8,637 4.4%
Building A 1 1958 123,959 15.7%
Per m Buildings 132,596
Floor s Yr . Built GSF FCI
Building Data
15.0%
Austin, Texas 78723 1958 AA No
6401 N. Hampton Dr. Yr. Open Rating Historic
Interior $28 343 $236 543 $120 791 $385 677
Site - $144,156 $120,754 $79,542 - $344,451
Exterior - - $277,949 - - $277,949
Structural - - - - - $0
Roofing - $438,273 - - - $438,273
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $2,266,328*
School Summ ary Report2010 Educational Suitability Assessment
028 Ann Richards School Gr ades Served 6-9 (MS)
2206 P th L
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 137/317
2010-11 Ut ilizat ion (by populat ion) n/a
2010-11 Attendance Zone Population 924
Excess/DeficitSeats
2010-11 Out Migration 000
2010-11 In Migration 526
2015-16 Proj'd At tendance Zone Population 924
Utilization (by enrollment) 57% Percent of Capacity
Area (GSF) per student 247 14 261
Gross Area 130,240 7,424 137,664
Perm Temp Total
2010-11 Campus Enrollment 528
Permanent Capacity 924
Number of Classrooms 44 6 50
Parking Spaces 90
Gross Sit e Area (Acres) 15.3
Sit e Data
School Data
Building D 1 2010 7,000 4.9%
Band 1 1998 3,471 12.6%
Mechanical 1 1958 1,114 3.4%
Building A 1 1958 118,655 39.9%
Per m Buildings 130,240
Floor s Yr . Built GSF FCI
Building Data
34.3%
Austin, Texas 78704 1958 EX No
2206 Prather Ln. Yr. Open Rating Historic
Interior $212 810 $181 719 $394 529
Site - $2,658 $92,455 $322,375 - $417,487
Exterior - - $32,701 - - $32,701
Structural $7,066 $10,864 $6,455 - - $24,385
Roofing - $2,660 $1,640,134 - - $1,642,794
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $4,241,489*
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 138/317
School Summ ary Report2010 Educational Suitability Assessment
053 W ebb Middle School Gr ades Served 6-8 (MS)
601 E St Johns O
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 139/317
2010-11 Ut ilizat ion (by populat ion) 91%
2010-11 Attendance Zone Population 731 73
Excess/DeficitSeats
2010-11 Out Migration 131
2010-11 In Migration 047
2015-16 Proj'd At tendance Zone Populat ion 866 -62
Utilization (by enrollment) 74% Percent of Capacity
Area (GSF) per student 205 16 220
Gross Area 120,987 9,216 130,203
Perm Temp Total
2010-11 Campus Enrollment 591
Permanent Capacity 804
Number of Classrooms 41 11 52
Parking Spaces 93
Gross Sit e Area (Acres) 15.6
Sit e Data
School Data
Building B 1 2008 10,854 0.2%
Building A 1 1961 110,133 21.1%
Per m Buildings 120,987
Floor s Yr . Built GSF FCI
Building Data
19.8%
Austin, Texas 78752 1961 AA No
601 E. St. Johns Yr. Open Rating Historic
Interior $106 775 $134 051 $258 925 $499 751
Site - $31,426 $67,218 $824,676 - $923,320
Exterior - - $42,118 - - $42,118
Structural - - - - - $0
Roofing - $1,036,854 - - - $1,036,854
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $3,935,971*
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 140/317
School Summ ary Report2010 Educational Suitability Assessment
009 Anderson High School Gr ades Served 9-12 (HS)
8403 Mesa Drive Y O R ti Hi t i
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 141/317
2010-11 Ut ilizat ion (by populat ion) 83%
2010-11 Att endance Zone Populat ion 1,962 411
Excess/DeficitSeats
2010-11 Out Migration 257
2010-11 In Migration 391
2015-16 Proj'd Attendance Zone Populat ion 2,147 226
Utilization (by enrollment) 88% Percent of Capacity
Area (GSF) per student 148 1 149
Gross Area 309,329 1,536 310,865
Perm Temp Total
2010-11 Campus Enrollment 2,089
Permanent Capacity 2,373
Number of Classrooms 113 1 114
Parking Spaces 760
Gross Sit e Area (Acres) 38.8
Sit e Data
School Data
Library 1 2000 17,078 2.8%
Gym/Café/Aud 1 1973 121,018 36.1%
Building A 1 1973 171,233 24.2%
Per m Buildings 309,329
Floor s Yr . Built GSF FCI
Building Data
27.6%
Austin, Texas 78759 1973 RC No
8403 Mesa Drive Yr. Open Rating Historic
Interior $22 177 $3 519 578 $944 064 $4 485 819
Site - - $134,285 $51,280 - $185,565
Exterior $2,067 - $204,242 - - $206,309
Structural - - $62,479 - - $62,479
Roofing - $96,476 - - - $96,476
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $8,153,203*
School Summ ary Report2010 Educational Suitability Assessment
002 Aust in High School Gr ades Served 9-12 (HS)
1715 W Cesar Chavez Yr Open Rating Historic
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 142/317
2010-11 Ut ilizat ion (by populat ion) 89%
2010-11 Att endance Zone Populat ion 1,958 247
Excess/DeficitSeats
2010-11 Out Migration 449
2010-11 In Migration 789
2015-16 Proj'd Attendance Zone Populat ion 2,146 59
Utilization (by enrollment) 106% Percent of Capacity
Area (GSF) per student 131 3 135
Gross Area 307,089 7,680 314,769
Perm Temp Total
2010-11 Campus Enrollment 2,337
Permanent Capacity 2,205
Number of Classrooms 105 8 113
Parking Spaces 544
Gross Sit e Area (Acres) 44.3
Sit e Data
School Data
Theatre 1 2000 23,571 3.2%
Gym/Café/Aud 1 1975 283,518 33.1%
Per m Buildings 307,089
Floor s Yr . Built GSF FCI
Building Data
31.1%
Austin, Texas 78703 1975 RC No
1715 W. Cesar Chavez Yr. Open Rating Historic
Interior $21 355 $4 141 426 $2 540 593 $6 703 375
Site - - $557,354 $811,547 - $1,368,901
Exterior $20,833 $539 $36,126 $112,707 - $170,205
Structural - $35,970 - - - $35,970
Roofing - $1,609,284 - - - $1,609,284
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 -$10,420,955*
School Summ ary Report2010 Educational Suitability Assessment
013 Bowie High School Gr ades Served 9-12 (HS)
4103 Slaughter Ln Yr Open Rating Historic
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 143/317
2010-11 Ut ilizat ion (by populat ion) 87%
2010-11 Att endance Zone Populat ion 2,606 376
Excess/DeficitSeats
2010-11 Out Migration 231
2010-11 In Migration 505
2015-16 Proj'd Attendance Zone Populat ion 2,715 267
Utilization (by enrollment) 96% Percent of Capacity
Area (GSF) per student 145 7 152
Gross Area 417,702 19,968 437,670
Perm Temp Total
2010-11 Campus Enrollment 2,876
Permanent Capacity 2,982
Number of Classrooms 142 25 167
Parking Spaces 678
Gross Sit e Area (Acres) 66.0
Sit e Data
School Data
Gym/Café/Aud 1 1988 107,282 19.2%
Mechanical 1 1988 5,462 49.0%
Vocational 1 1988 27,588 51.6%
Greenhouse 1 1988 913 11.4%
Greenhouse 1 1988 634 16.2%
Building B 1 1988 261,135 24.8%
Administ rat ion 1 1988 14,688 16.4%
Per m Buildings 417,702
Floor s Yr . Built GSF FCI
Building Data
31.4%
Austin, Texas 78749 1988 RC No
4103 Slaughter Ln. Yr. Open Rating Historic
Site - $36,278 $13,022 - - $49,300
Roofing - $4,399 - $483 - $4,882
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 -$14,762,227*
School Summ ary Report2010 Educational Suitability Assessment
008 Crocket t High School Gr ades Served 9-12 (HS)
5601 Manchaca Road Yr Open Rating Historic
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 144/317
2010-11 Ut ilizat ion (by populat ion) 87%
2010-11 Att endance Zone Populat ion 1,883 280
Excess/DeficitSeats
2010-11 Out Migration 510
2010-11 In Migration 285
2015-16 Proj'd Attendance Zone Populat ion 2,026 137
Utilization (by enrollment) 78% Percent of Capacity
Area (GSF) per student 199 6 205
Gross Area 335,087 10,752 345,839
Perm Temp Total
2010-11 Campus Enrollment 1,686
Permanent Capacity 2,163
Number of Classrooms 103 13 116
Parking Spaces 666
Gross Sit e Area (Acres) 39.5
Sit e Data
School Data
Theatre 1 1988 12,929 50.5%
Gym/Café/Aud 1 1969 322,158 30.3%
Per m Buildings 335,087
Floor s Yr . Built GSF FCI
Building Data
31.2%
Austin, Texas 78745 1969 AA No
5601 Manchaca Road Yr. Open Rating Historic
Interior $105 620 $2 134 141 $90 119 $2 329 881
Site $4,218 $9,966 $999,378 $199,650 - $1,213,212
Exterior - $3,931 $460,633 - - $464,564
Structural - $5,402 - - - $5,402
Roofing - - $240,940 $1,431,074 - $1,672,014
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 -$12,432,213*
School Summ ary Report2010 Educational Suitability Assessment
019 Eastside Memor ial High Schools (EMHSJC) Gr ades Served 9-12 (HS)
1012 Arthur Stiles Yr Open Rating Historic
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 145/317
2010-11 Ut ilizat ion (by populat ion) 81%
2010-11 Att endance Zone Populat ion 1,249 299
Excess/DeficitSeats
2010-11 Out Migration 955
2010-11 In Migration 125
2015-16 Proj'd Attendance Zone Populat ion 1,354 194
Utilization (by enrollment) 58% Percent of Capacity
Area (GSF) per student 299 3 302
Gross Area 267,140 2,976 270,116
Perm Temp Total
2010-11 Campus Enrollment 894
Permanent Capacity 1,548
Number of Classrooms 79 2 81
Parking Spaces 228
Gross Sit e Area (Acres) 27.6
Sit e Data
School Data
Green Tech 1 1998 25,816 1.6%
Mechanical 1 1998 248
Classroom 1 1986 24,940 7.6%
Theatre 1 1986 10,851 35.4%
Gym/Café/Aud 1 1960 205,285 32.6%
Per m Buildings 267,140
Floor s Yr . Built GSF FCI
Building Data
27.0%
Austin, Te 78721 0 NR No
1012 Arthur Stiles Yr. Open Rating Historic
Site $608 - $291,746 - - $292,354
Exterior - $3,456,001 $301,327 $4,120 - $3,761,448
Structural - - - $1,946 - $1,946
Roofing - $70,262 $3,372,487 - - $3,442,749
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 -$15,634,366*
School Summ ary Report2010 Educational Suitability Assessment
015 Garza Independence High School Grades Served 11-12 (HS)
1600 Chicon Street Yr Open Rating Historic
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 146/317
2010-11 Ut ilizat ion (by populat ion) n/a
2010-11 Attendance Zone Population 378
Excess/DeficitSeats
2010-11 Out Migration 000
2010-11 In Migration 251
2015-16 Proj'd At tendance Zone Population 378
Utilization (by enrollment) 69% Percent of Capacity
Area (GSF) per student 172 36 209
Gross Area 44,754 9,480 54,234
Perm Temp Total
2010-11 Campus Enrollment 260
Permanent Capacity 378
Number of Classrooms 18 8 26
Parking Spaces 36
Gross Site Area (Acr es) 3.1
Sit e Data
School Data
Building E 1 1939 248
Building D 1 1939 48
Mechanical 1 1939 493 183.5%
Building B 1 1965 11,435 11.5%
Building A 1 1939 32,530 21.1%
Perm Buildings 44,754
Floor s Yr . Built GSF FCI
Building Data
21.5%
Austin, Texas 78702 1939 AA No
Yr. Open Rating Historic
Site - $33,221 $33,788 $40,134 - $107,143
Exterior - - $252,129 - - $252,129
Structural - - $942 - - $942
Roofing - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,454,494*
School Summ ary Report2010 Educational Suitability Assessment
014 Johnson (LBJ) High School Gr ades Served 9-12 (HS)
7309 Lazy Creek Dr. Yr Open Rating Historic
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 147/317
2010-11 Ut ilizat ion (by populat ion) 59%
2010-11 Att endance Zone Populat ion 1,083 759
Excess/DeficitSeats
2010-11 Out Migration 239
2010-11 In Migration 167
2015-16 Proj'd Attendance Zone Populat ion 1,155 687
Utilization (by enrollment) 102% Percent of Capacity
Area (GSF) per student 155 7 162
Gross Area 291,406 13,824 305,230
Perm Temp Total
2010-11 Campus Enrollment 1,881
Permanent Capacity 1,842
Number of Classrooms 94 17 111
Parking Spaces 598
Gross Sit e Area (Acres) 41.4
Sit e Data
School Data
Theatre 1 2006 16,140 9.9%
Gym/Café/Aud 1 1974 275,266 14.9%
Per m Buildings 291,406
Floor s Yr . Built GSF FCI
Building Data
14.4%
Austin, Texas 78724 1974 AA No
y Yr. Open Rating Historic
Interior $128 130 $266 097 $1 143 379 $1 537 606
Site - $51,493 $104,860 - - $156,353
Exterior - - $14,049 $110,561 - $124,610
Structural - - $122,523 - - $122,523
Roofing - $2,932 $57,987 - - $60,919
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $5,015,587*
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 148/317
School Summ ary Report2010 Educational Suitability Assessment
Other $175,164 - $324,594 - $176,389 $676,147
* I l d l ti d i lt t f t f d th d i i t ti t
Total $1,328,937 $4,526,958 $12,659,556 $1,639,563 $176,389 $20,331,402
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 149/317
* Includes escalation, design consultant fees, program management fees, and other administrative costs.
School Summ ary Report2010 Educational Suitability Assessment
005 McCallum High School Gr ades Served 9-12 (HS)
5600 Sunshine Dr. Yr. Open Rating Historic
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 150/317
2010-11 Ut ilizat ion (by populat ion) 82%
2010-11 Att endance Zone Populat ion 1,316 280
Excess/DeficitSeats
2010-11 Out Migration 296
2010-11 In Migration 795
2015-16 Proj'd Attendance Zone Populat ion 1,434 162
Utilization (by enrollment) 114% Percent of Capacity
Area (GSF) per student 133 9 142
Gross Area 242,667 16,896 259,563
Perm Temp Total
2010-11 Campus Enrollment 1,824
Permanent Capacity 1,596
Number of Classrooms 76 22 98
Parking Spaces 301
Gross Sit e Area (Acres) 31.1
Sit e Data
School Data
Building H 1 2010 3,000 5.1%
Storage 1 1978 464
Storage 1 1993 3,732 0.0%
Mechanical 1 1953 1,139
Gymnasium 1 1987 18,939 15.3%
Theatre 1 1987 28,997 10.0%
Mechanical 1 1953 2,364 11.1%
Building A 1 1953 184,032 25.1%
Per m Buildings 242,667
Floor s Yr . Built GSF FCI
Building Data
20.4%
Austin, Texas 78756 1953 AA No
p g
Site - - - - - $0
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $4,913,137*
School Summ ary Report2010 Educational Suitability Assessment
006 Reagan High School Gr ades Served 9-12 (HS)
7104 Berkman Dr. Yr. Open Rating Historic
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 151/317
2010-11 Ut ilizat ion (by populat ion) 98%
2010-11 Att endance Zone Populat ion 1,552 36
Excess/DeficitSeats
2010-11 Out Migration 779
2010-11 In Migration 080
2015-16 Proj'd Attendance Zone Population 1,769 -181
Utilization (by enrollment) 57% Percent of Capacity
Area (GSF) per student 277 3 280
Gross Area 249,609 3,072 252,681
Perm Temp Total
2010-11 Campus Enrollment 901
Permanent Capacity 1,588
Number of Classrooms 81 1 82
Parking Spaces 447
Gross Sit e Area (Acres) 31.8
Sit e Data
School Data
Vocational 1 1987 42,262 25.2%
Classroom 1 1967 42,718 10.7%
Building G 1 1965 24,939 14.4%
Mechanical 1 1965 4,549 8.7%
Vocational 1 1965 17,949 15.9%
Band 1 1965 2,982 10.0%
Gymnasium 1 1965 47,562 16.9%
Building B 1 1965 60,797 22.2%
Administ rat ion 1 1965 5,851 19.2%
Per m Buildings 249,609
Floor s Yr . Built GSF FCI
Building Data
22.2%
Austin, Texas 78752 1965 AA No
p g
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 152/317
School Summ ary Report2010 Educational Suitability Assessment
852 Clifton Center Grades Served A lt . Ed. (Al t . Ed.)
1519 Coronado Hills Dr. Yr. Open Rating Historic
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 153/317
2010-11 Ut ilizat ion (by populat ion) n/a
2010-11 Attendance Zone Population 209
Excess/DeficitSeats
2010-11 Out Migration
2010-11 In Migration
2015-16 Proj'd At tendance Zone Population 209
Utilization (by enrollment) n/a Percent of Capacity
Area (GSF) per student #Error n/a n/a
Gross Area 39,039 1,536 40,575
Perm Temp Total
2010-11 Campus Enrollment n/a
Permanent Capacity 209
Number of Classrooms 12 1 13
Parking Spaces 71
Gross Site Area (Acr es) 7.8
Sit e Data
School Data
Building B 1 1977 3,840 2.7%
Building A 1 1977 35,199 41.0%
Perm Buildings 39,039
Floor s Yr . Built GSF FCI
Building Data
40.8%
Austin, Texas 78752 1977 NR No
Interior $21 355 $127 350 $116 858 $265 563
Site - $79,594 $88,237 $381,866 - $549,698
Exterior - $8,004 $5,265 - - $13,269
Structural - - - - - $0
Roofing - $20,585 - - - $20,585
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $2,045,003*
School Summ ary Report2010 Educational Suitability Assessment
012 Ridgeview ALC Grades Served 6-12 (Alt. Ed.)
901 Neal Yr. Open Rating Historic
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 154/317
2010-11 Ut ilizat ion (by populat ion) n/a
2010-11 Attendance Zone Population 462
Excess/DeficitSeats
2010-11 Out Migration 000
2010-11 In Migration 139
2015-16 Proj'd At tendance Zone Population 462
Utilization (by enrollment) 29% Percent of Capacity
Area (GSF) per student 657 68 725
Gross Area 88,677 9,216 97,893
Perm Temp Total
2010-11 Campus Enrollment 135
Permanent Capacity 462
Number of Classrooms 22 6 28
Parking Spaces 120
Gross Sit e Area (Acres) 19.8
Sit e Data
School Data
Building C 1 1968 3,201 49.7%
Building B 1 1970 1,167 24.2%
Building A 1 1953 84,309 36.6%
Perm Buildings 88,677
Floor s Yr . Built GSF FCI
Building Data
34.4%
Austin, Texas 78702 1953 NR Yes
Interior $318 518 $315 973 $634 491
Site - - $57,810 $40,134 - $97,944
Exterior - - $132,297 $1,000,183 - $1,132,480
Structural - $21,088 $7,827 - - $28,915
Roofing - - $183,006 - - $183,006
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorities 1 & 2 - $1,647,347*
School Summ ary Report2010 Educational Suitability Assessment
251 Rosedale School Grades Served A lt . Ed. (Al t . Ed.)
2117 W. 49th St. Yr. Open Rating Historic
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 155/317
2010-11 Ut ilizat ion (by populat ion) n/a
2010-11 Attendance Zone Population 314
Excess/DeficitSeats
2010-11 Out Migration 000
2010-11 In Migration 158
2015-16 Proj'd At tendance Zone Population 314
Utilization (by enrollment) 52% Percent of Capacity
Area (GSF) per student 228 47 275
Gross Area 37,112 7,680 44,792
Perm Temp Total
2010-11 Campus Enrollment 163
Permanent Capacity 314
Number of Classrooms 18 5 23
Parking Spaces 43
Gross Site Area (Acr es) 4.9
Sit e Data
School Data
Building C 1 1940 658 15.8%
Building B 1 1939 460 8.8%
Building A 1 1939 35,994 33.4%
Perm Buildings 37,112
Floor s Yr . Built GSF FCI
Building Data
32.5%
Austin, Texas 78756 1939 NR No
Interior $242 847 $73 485 $316 333
Site - - $364,134 $40,134 - $404,267
Exterior $7,439 $3,845 $539,718 $5,265 - $556,266
Structural - - - - - $0
Roofing - - $20,585 - - $20,585
Facility Condit ion - System by Prior it y
Priority
System 1 2 3 4 5 Total
Facilit y Master PlanRecommendations
Repair priorit ies 1 & 2 - $955,183*
Austin Independent School District Monday, 21 February 2011
2010 Facility Master Plan
252 Baker Center
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 156/317
3908 Avenue B, Austin Texas 78751
Current Use:
Past Use:
Campus Overview Perm Temp Total
Total Building Area (GSF) 65,868 - 65,868
Site Area (Acres) 4.8
Parking Spaces 60
Buildings Floors Date GSF FCI
Building A 1 1911 63,810 16.7%
Building B 1 1952 1,600 0.0%
Building C 1 1911 458 110.2%
Administration and Professional Development Center
Elementary School
Austin Independent School District Monday, 21 February 2011
2010 Facility Master Plan
951 Burger Athletic Complex
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 157/317
g p
3200 Jones Road, Austin Texas 78745
Current Use:
Past Use:
Campus Overview Perm Temp Total
Total Building Area (GSF) 180,614 - 180,614
Site Area (Acres) 48.1
Parking Spaces
Buildings Floors Date GSF FCI
Building A 2 1977 70 39.7%
Building B Restroom 1 1977 5,832 9.7%
Building C Concession 1 1977 4,927 0.9%
Building D Restroom 1 1977 5,839 1.4%
Building E Ticket 1 1977 142 23.4%
Buildin F Restroom 1 1977 5,839 2.4%
Athletic complex
N/A
Building G Concession 1 1977 4,927 0.9%
Building H Restroom 1 1977 5,832 1.1%
Building I Ticket 1 1977 142 23.4%
Building J Ticket 1 1977 59 0.0%
Building K Press Box 2 1977 12,255 2.2%
Building L Ticket 1 1977 59 77.8%
Building M 1 1977 31,119 0.6%
Austin Independent School District Monday, 21 February 2011
2010 Facility Master Plan
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 158/317
941 Carruth Admin Center
1111 W. 6th Street, Austin Texas 78703
Current Use:
Past Use:
Campus Overview Perm Temp Total
Total Building Area (GSF) 133,988 - 133,988
Site Area (Acres) 2.8
Parking Spaces
Buildings Floors Date GSF FCI
Building A 4 1991 61,310 15.6%
Building B 4 1991 21,687 19.3%
Building C 1 3 11,821 21.6%Building D 3 1991 15,948 22.1%
Central Administration
Carruth was retail space prior to conversion to AISD administration
u ng , .
Building P Parking 2 1991 6,007 32.0%
Austin Independent School District Monday, 21 February 2011
2010 Facility Master Plan
922 Central Warehouse
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 159/317
3701 Woodbury Drive, Austin Texas 78704
Current Use:
Past Use:
Campus Overview Perm Temp Total
Total Building Area (GSF) 96,303 - 96,303
Site Area (Acres) 18.7
Parking Spaces
Buildings Floors Date GSF FCI
Building A 1 1983 96,303 5.1%
AISD Warehouse
N/A
Austin Independent School District Monday, 21 February 2011
2010 Facility Master Plan
949 Delco Activity Center
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 160/317
4601 Pecan Brook Drive, Austin Texas 78724
Current Use:
Past Use:
Campus Overview Perm Temp Total
Total Building Area (GSF) 60,294 - 60,294
Site Area (Acres) 44.1
Parking Spaces
Buildings Floors Date GSF FCI
Building A 3 2003 60,294 3.4%
Athletic faciltiies and Athletic administration
N/A
Austin Independent School District Monday, 21 February 2011
2010 Facility Master Plan
948 House Park
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 161/317
1301 Shoal Creek Blvd, Austin Texas 78701
Current Use:
Past Use:
Campus Overview Perm Temp Total
Total Building Area (GSF) 32,069 - 32,069
Site Area (Acres) 11.1
Parking Spaces
Buildings Floors Date GSF FCI
Building A 1 1940 3,325 0.0%
Building B 1 1986 2,106 0.0%
Building C 1 1940 213 0.0%
Building D 1 1940 294 0.0%
Building E 1 1963 358 0.0%
Buildin F 1 1940 96 17.9%
Athletic complex
N/A
Building G 1 2000 64 0.0%
Building H 1 1963 240 94.4%
Building I 1 1940 215 0.0%
Building J 1 1940 248 0.0%
Building K 1 1939 12,473 1.0%
Building L 1 1936 11,331 0.8%
Building M 2 1938 573 11.2%
Austin Independent School District Monday, 21 February 2011
2010 Facility Master Plan
281 Nelson Field
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 162/317
7400 Berkman Drive, Austin Texas 78752
Current Use:
Past Use:
Campus Overview Perm Temp Total
Total Building Area (GSF) 59,005 - 59,005
Site Area (Acres) 20.1
Parking Spaces
Buildings Floors Date GSF FCI
Building A 1 1963 2,880 43.1%
Building B 1 1963 374 59.6%
Building C 1 1963 796 93.5%
Building D 1 1963 320 48.2%
Building E 1 1963 320 58.7%
Buildin F 1 1963 374 59.2%
Athletic complex
N/A
Building G 1 1963 796 7.5%
Building H 1 1963 320 51.8%
Building I 1 1963 320 56.7%
Building J 1 1963 800 19.9%
Building K 1 1963 64 0.0%
Building L 1 1963 80 29.8%
Building M 1 1963 64 0.0%
Austin Independent School District Monday, 21 February 2011
2010 Facility Master Plan
959 Nelson Field Bus Terminal
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 163/317
7400 Berkman Drive, Austin Texas 78752
Current Use:
Past Use:
Campus Overview Perm Temp Total
Total Building Area (GSF) 13,093 1,536 14,629
Site Area (Acres) 6.6
Parking Spaces
Buildings Floors Date GSF FCI
Building A 1 1995 13,093 4.9%
Portable P097 1 1969 1,536 68.3%
Bus Terminal
N/A
Austin Independent School District Monday, 21 February 2011
2010 Facility Master Plan
950 Noack Sports Complex
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 164/317
5300 Crainway Drive, Austin Texas 78724
Current Use:
Past Use:
Campus Overview Perm Temp Total
Total Building Area (GSF) 3,231 - 3,231
Site Area (Acres) 11.2
Parking Spaces
Buildings Floors Date GSF FCI
Building A 1 2004 1,242 0.4%
Building B 1 2004 1,520 4.1%
Building C 1 2004 101 0.0%
Building D 1 2004 101 0.0%
Building E 1 2004 76 0.0%
Buildin F 1 2004 96 0.0%
Athletic complex
N/A
Building G 1 2004 96 0.0%
Austin Independent School District Monday, 21 February 2011
2010 Facility Master Plan
960 Saegert Transportation
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 165/317
3300 Jones Road, Austin Texas 78745
Current Use:
Past Use:
Campus Overview Perm Temp Total
Total Building Area (GSF) 26,916 1,536 28,452
Site Area (Acres) 10.6
Parking Spaces
Buildings Floors Date GSF FCI
Building A 1 2004 1,242 0.0%
Building B 1 2004 1,520 0.0%
Building C 1 2004 101 0.0%
Building D 1 2004 101 0.0%
Bus Terminal
N/A
Austin Independent School District Monday, 21 February 2011
2010 Facility Master Plan
962 Service Center
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 166/317
5101 E. 51st Street, Austin Texas 78723
Current Use:
Past Use:
Campus Overview Perm Temp Total
Total Building Area (GSF) 54,307 - 54,307
Site Area (Acres) 16.7
Parking Spaces
Buildings Floors Date GSF FCI
Building A 3 1991 27,435 15.3%
Building B 1 1991 11,219 7.0%
Building C 2 2000 6,602 4.8%
Building D 1 1995 848 0.0%
Building E 1 2007 8,203 0.0%
Maintenance and Administration
N/A
Educ ationa l Frame work
The following Educational Framework was used as a
planning tool to aid in decision making by the Facility
i. Campus layout and organization
j. Neighborhood accessibilityk F d tt i t
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 167/317
Master Plan Task Force. It was not a mandate, but a set
of guidelines, and was intended to be flexible in order toalign resources that will provide optimal learning
environments for all AISD students. The guiding principle
for teaching and learning, as set by the Board of Trustees,
is performance-based empowerment and earnedautonomy.
1. Planning Guidelines
A. Priorities for Decision Making and Optimal
Lea rning Environme nts
1) Safety and Sec urity
2) Equitable Learning Opportunities for AllStudents - Ensure that all facilities offer
Alternative Learning Education programs
and are in full compliance with theAmericans with Disabilities Act (ADA).
3) Quality Fac ility Co nditions
a. Physical condition and safety
b. Support for academic programsc . Indoor-air quality – e.g. proper ventilation, monitoring of indoor pollutants
d. Natural lightinge. Environmental condition
f. Green Building concepts – e.g. energy,
water and materials efficiencyg. Application of current and emerging
technology – e.g. wireless networksh. Site acreage
k. Feeder pattern impact4) School Performance - The Board may
consider a campus intervention, including
closure or repurposing, for schools that havenot met academic criteria established by
the District, state or federal accountabilitysystems.
5) Facility Utilizationa. Facility condition
b. Capacityc . Enrollmentd. Economic efficiency
e.
Intensity of use
Page 165
B. Fac ility Utilization Alternatives
1) Portab le/ Tem po rary Classroom s – TheFacility Master Plan seeks to reduce the
2. Programm atic Considerations
A. School Size
1) The following school-size targets are
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 168/317
number of portable/temporary classrooms.
When additional classrooms are neededand are anticipated to be needed over
time, the Facility Master Plan will includeplans to replace portable/temporary
buildings with permanent buildings. 2) Shared Use of Facilities – The AISD Facility
Master Plan will, wherever possible, provide
access to school facilities for outside
programs in order to create and promote
successful community-school partnerships.
C. School Closure, Consolidation and Boundaries –
The AISD Facility Master Plan Task Force willconsider recommending options for adjustingboundaries and the consolidation or repurposing
of schools to balance enrollment with capacity,to ensure an optimal learning environment for all
students, and to realize necessary economic
efficiencies. The AISD Facility Master Plan Task Force will continue to consider criteria and
options for schools that are not successful in
providing adequate and/or equitable learning
environments.1) Transfer Pol ic y – When possible, reduce thenumber of transfers to align with the efficient
use of facilities.
guidelines based on community input that,fiscally, may be achievable only through
creative design concepts, such as multiple
schools sharing the same campus. It isunlikely that every large school will reduce its
enrollment to match these specifications.Therefore, it is necessary to exercise flexibility
with these general guideline, which should
also be applied to site-specific and/or program-specific facilities. The utilization
target is 85% - 105%.
Elementary Schools 300-500 students
Middle Sc hools 600-800 studentsHigh Schoo ls 1,500-2,000 students
2) The following school size standards have
been utilized by AISD for construction of new
school facilities since the 1996 Bond Program.
Elementary Schools 720-800 studentsMiddle Sc hools 1,100 students
High Schoo ls 2,200-2,400 students
B. Grade Configuration – The current AISD grade
configuration for each facility will remain.Recommendations may be developed for
schools in which flexibility in configuration might
better meet student and neighborhood needs.
Page 166
C. Student Assignment – When developing facilityoptions, student assignment would optimally be
based on the following:
provided by the District [e.g. International
Baccalaureate, Global Studies, Early College
High School, Early College Start, etc.].
G M t S h l (O E ll t Si t
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 169/317
Elementary Schools - Neighborhood Schools /
Vertical AlignmentMiddle Scho ols - Neighborhood Schools/ Vertical
Alignment and Choice(depending upon which option provides the
best level of consistency for students).High Schools - Vertical Alignment and Choice
D. Transportation o f Choic e Students –
Transportation should not be provided to
students attending schools outside of their
attendance area by choice, with the exceptionof those opting for choice due to No Child Left
Behind or for those students whose applicationshave been approved for enrollment in aMagnet School (Open Enrollment Signature
Program).
E. Fine Arts - The AISD Facility Master Plan Task
Force will seek opportunities to supportincreasing and enhancing the availability and
quality of Fine Arts programs.
F. Vertica l Tea m Signa ture Programs – The AISDFacility Master Plan Task Force will seek opportunities to support increasing and
enhancing the availability and quality of
Signature Programs, which are offered in eachschool and/or vertical team. These programs are
interest-based, and transportation is not
G. Magne t Sc hoo ls (Open Enrollment Signa ture
Programs) - The AISD Facility Master Plan Task
Force will seek opportunities to support
increasing and enhancing the availability andquality of Magnet Schools that offer a
specialized curriculum that draws students
across boundaries, requires an application, and
transportation is provided [e.g., LASA, Kealing,Fulmore, Ann Richards]. The Facility Master Plan
Task Force will utilize community input to assist
the District in developing other categories, if
needed, for programs that do not fit existingdefinitions and criteria.
H. Athletic Programs - The AISD Facility Master Plan
Task Force will seek opportunities to supportincreasing and enhancing the availability and
quality of athletic programs and facilities. The
plan will also address the facilities that receivemore frequent and intensive use.
I. Career and Tec hnica l Programs - The AISDFacility Master Plan Task Force will seek
opportunities to support increasing andenhancing the availability and quality of Career
and Technical Programs [e.g., Cosmetology,
Culinary Arts, etc.].
J. Pre-Kindergarten/ Early Childho od Programs –
Pre-K and early childhood services should be
Page 167
expanded to the greatest extent that iseconomically feasible to serve all children of the
community.
K S d S i Th AISD F ilit M t Pl
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 170/317
K. Student Services – The AISD Facility Master Plan
Task Force will seek opportunities to providespace for student services based on the
demographic and economic needs of thestudent population.
L. Adm inistrative Spa ce s - Administrative buildingsand spaces will be reviewed and
recommendations developed as part of the
comprehensive Facility Master Plan.
Page 168
Enrollment Projections
Historical Enrollment
The Austin Independent School District has
i d i ifi t i i ll t
Historica l Enrollment – By Grad e Leve l
The Austin Independent School District experienced
f i
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 171/317
experienced a significant increase in enrollment, over
7,500 students, during the past nine years. Since 2002-03, student enrollment has increased by an average
of approximately 835 students, or 11% each year. The
current school year, 2010-11, had a notable increase
of an additional 933 students. Specifically, enrollmentincreased by 610 elementary, 246 middle, and 54
high school students.
The graph below illustrates the progression of
enrollment changes by year.
growth from 2002-03 to 2010-11 in all grade levels.
Enrollment in grades Pre-K - 5 increased by a total of
7,233 students. Enrollment in grades 6 - 8 increased by atotal of 88 students. Enrollment in grades 9-12 increased
by a total of 199 students. The graph below and the
chart on the following page indicate enrollment by
grade over the past nine years.
0
10,000
20,000
30,000
40,000
50,000
60,000
AISD Historic Enrollmentby Grade Level
2002-03 to 2010-11
PK-5
6-8
"9-12"
Source: A ISD Office of Facilities
0
10,00020,00030,00040,00050,00060,00070,00080,00090,000
100,000
AISD Historic Enrollment2002-03 to 2010-2011
Source: AISD Office of Facilities
Page 169
Historica l Enrollment – By Grad e Leve l
The following chart depicts the progression of increasing enrollment throughout the previous nine years.
A i I d d S h l Di i
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 172/317
Grade 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11
EC & PreK 4,421 4,704 5,125 4,943 4,933 5,053 5,044 5,406 5,564
Kindergarten 6,431 6,728 6,849 7,462 7,309 7,391 7,589 7,668 7,660
1 6,405 6,512 6,898 7,055 7,493 7,297 7,498 7,543 7,644
2 6,115 6,235 6,373 6,669 6,898 7,107 7,027 7,354 7,225
3 6,104 6,013 6,174 6,278 6,571 6,617 6,856 6,796 7,102
4 5,866 5,912 5,897 6,073 6,136 6,254 6,477 6,595 6,679
5 5,592 5,754 5,676 5,823 5,870 5,847 6,028 6,195 6,293
Subtotal PK-5 40,934 41,858 42,992 44,303 45,210 45,566 46,519 47,557 48,167
6 5,582 5,390 5,517 5,379 5,511 5,506 5,519 5,568 5,740
7 5,655 5,517 5,278 5,443 5,344 5,300 5,421 5,425 5,513
8 5,252 5,507 5,423 5,258 5,337 5,278 5,229 5,338 5,324
Subtotal 6-8 16,489 16,414 16,218 16,080 16,192 16,084 16,169 16,331 16,577
9 6,764 6,371 6,512 6,332 6,313 6,371 6,366 6,252 6,127
10 5,093 5,321 4,962 5,337 5,183 5,043 5,084 5,148 5,212
11 4,427 4,389 4,694 4,423 4,576 4,588 4,569 4,644 4,724
12 4,179 4,048 4,126 4,368 4,118 4,590 4,511 4,564 4,599
Subtotal 9-12 20,463 20,129 20,294 20,460 20,190 20,592 20,530 20,608 20,662
Separate Campuses 318 239 271 339 350 329 337 311 332
Special Campuses 207 119 121 113 121 168 175 189 191
Subtotal Sep & Spec 525 358 392 452 471 497 512 500 523
Total 78,411 78,759 79,896 81,295 82,063 82,739 83,730 84,996 85,929
Source: AISD Office of Facilities
Historical Enrollment
2002-03 to 2010-2011
Austin Independent School District
Page 170
Historical Enrollment by School
Elementa ry Schoo ls
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 173/317
Page 171
Elementa ry Schoo ls cont.
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 174/317
Page 172
Middle Scho ols
SCHOOL NAME 1999- 00 2000- 01 2001- 02 2002- 03 2003- 04 2004 -05 2005- 06 2006- 07 2007- 08 2008 -09 2009- 10 2010- 11
Bailey MS 1 529 1 217 1 173 1 144 1 099 1 074 1 134 1 175 1 147 1 206 959 1 041
Austin Independent School District Historic Enrollment 1999/2000 - 2010/2011
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 175/317
Bailey MS 1,529 1,217 1,173 1,144 1,099 1,074 1,134 1,175 1,147 1,206 959 1,041Bedichek MS 1,136 1,004 998 889 904 908 912 1,039 1,150 1,119 1,018 1,054Burnet MS 1,126 1,065 1,063 1,008 1,084 1,045 970 1,005 988 912 969 998Covington MS 752 855 939 945 911 889 862 910 1,014 954 950 805
Dobie MS 874 913 921 763 746 739 808 849 517 566 603 630Fulmore MS 764 749 872 957 992 1,054 1,037 1,029 1,045 1,036 1,007 995Garcia MS - - - - - - - - 605 649 689 658Gorzycki MS - - - - - - - - - - 835 963Kealing MS 958 1,058 978 948 1,029 1,277 1,190 1,251 1,215 1,279 1,242 1,233Lamar MS 915 855 798 779 791 701 675 671 741 780 668 604Martin MS 495 622 632 648 736 738 676 702 760 744 691 639Mendez MS 1,313 874 857 828 840 776 840 1,108 1,029 903 871 890Murchison MS 1,236 1,232 1,240 1,213 1,210 1,227 1,257 1,216 1,156 1,156 1,254 1,281O. Henry MS 681 743 866 887 885 801 747 789 881 982 1,005 1,026Paredes MS - 959 1,060 1,208 1,227 1,292 1,330 1,067 989 957 899 930Pearce MS 958 849 859 852 847 801 810 809 580 516 452 329Richards ( 6-8) MS - - - - - - - - 224 334 362 378Small MS 929 1,054 1,080 1,108 1,129 1,088 1,114 1,140 1,167 1,188 944 959
Webb MS 805 777 779 789 767 748 663 658 495 522 573 591
Middle School Total 1 4, 471 14,826 15,115 14,966 15,197 15,158 15,025 15,418 15,703 15,803 15,991 16,004
Page 173
High Schoo ls
SCHOOL NAME 1999- 00 2000- 01 2001- 02 2002- 03 2003 -04 2004- 05 2005- 06 2006- 07 2007- 08 2008- 09 2009- 10 2010- 11Akins HS - 1 076 1 544 2 053 2 219 2 257 2 389 2 359 2 507 2 663 2 710 2 720
Austin Independent School District Historic Enrollment 1999/2000 - 2010/2011
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 176/317
Akins HS - 1,076 1,544 2,053 2,219 2,257 2,389 2,359 2,507 2,663 2,710 2,720Anderson HS 1,804 1,742 1,763 1,959 1,959 1,997 2,121 2,013 2,093 2,096 2,000 2,089Austin HS 2,167 2,014 2,136 2,149 2,158 2,245 2,207 2,124 2,240 2,343 2,390 2,337Bowie HS 3,045 2,608 2,435 2,370 2,485 2,613 2,699 2,821 2,778 2,768 2,828 2,876Crockett HS 2,529 2,414 2,174 2,099 1,999 1,962 2,038 1,992 1,907 1,857 1,763 1,686E astside HS 1,826 1,479 1,359 1,008 975 1,068 775 760 691 556 679 718Garza HS 318 339 384 347 307 266 280 308 315 301 258 260International HS - - - - - - 258 264 185 202 230 176LASA HS - - - - - - - - 858 860 874 881LBJ HS 1,619 1,654 1,812 1,811 1,717 1,671 1,676 1,703 1,001 1,046 1,018 1,000Lanier HS 1,855 1,762 1,666 1,915 1,794 1,793 1,674 1,619 1,693 1,608 1,594 1,624McCallum HS 1,666 1,652 1,676 1,705 1,709 1,686 1,724 1,706 1,717 1,733 1,793 1,824Reagan HS 1,405 1,394 1,276 1,304 1,169 1,064 1,029 989 973 988 958 901Richards 9th and 10th - - - - - - - - - - 79 150Travis HS 1,709 1,691 1,665 1,718 1,638 1,672 1,590 1,532 1,634 1,509 1,434 1,420
High School Total 19,943 19,825 19,890 20,438 20,129 20,294 20,460 20,190 20,592 20,530 20,608 20,662
Separate Campuses 102 44 311 318 239 271 339 350 329 337 311 332Special Campuses 159 145 155 207 119 121 113 121 168 175 189 191
District Total 77,117 76,755 77,088 77,720 78,114 79,268 80,666 81,705 82,739 83,730 84,996 85,929
Page 174
Birth Da ta Historical birth data for the 31 zip codes comprising the
District was collected. The total number of live births for
this area has steadily increased from 1994 to 2008 InAustin Indep endent School Distri ct
h
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 177/317
this area has steadily increased from 1994 to 2008. In
1994, there were 9,175 births compared to 12,733 in 2008.A slight decline of 45 births followed in 2009. The increase
in births points to continued growth at the elementaryschool level. Live birth data is commonly used to predict
future kindergarten enrollment.
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
Live Births by Yearin Zip Codes within AISD Boundaries
Source: Texas Department of State Health Services & the
Dennis D. Harner and Associates Demographic Analysis &
Enrollment Projections, 2010
Year Births1994 9,175
1995 9,417
1996 9,650
1997 9,822
1998 10,329
1999 10,829
2000 11,426
2001 11,346
2002 11,1602003 11,270
2004 11,492
2005 11,383
2006 12,539
2007 12,744
2008 12,733
2009 12,688
Live Births
1994-2009
Source: Texas Department of State Health Services & the
Dennis D. Harner and Associates Demographic Analysis &
Enrollment Projections, 2010
Page 175
Projected EnrollmentIn 2010, AISD commissioned Dennis D. Harner and Associatesto develop enrollment projections. According to this report,
the total projected enrollment for AISD is expected to
increase by 12 356 students or 14 4% from the 2010-11
Projected Enrollment – By Grade Level
Projected enrollment for the 2011-12 through 2020-21 school
years shows a steady increase in enrollment in all grade
levels. At the elementary level, which reflects Pre-K throughGrade 5 the projected enrollment shows an increase of
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 178/317
increase by 12,356 students, or 14.4%, from the 2010-11
school year to the 2020-21 school year.
The enrollment forecasts were calculated using a “cohort
survival” method. Each grade (cohort) is advanced from
one year to the next based upon historical trends. Live birth
data is also collected and used to compare the relationship
between kindergarten and enrollment five years later. Acohort (grade) is advanced from one grade to the next
based upon historical trends. The number of live births, and
subsequently, the number of children, enrolled in
kindergarten, has steadily increased since 2002.
Grade 5, the projected enrollment shows an increase of
5,225 students from the 2010-11 school year to the 2020-21
school year.
Similarly, the middle school enrollment, which reflects
Grades 6 through 8, shows an increase of 3,334 students. Thehigh school level, reflecting Grades 9 through 12, shows an
increase of 4,166 students during this same timeframe. Thetable below shows projected enrollment by year and grade
level.
Source: Dennis D. Harner & A ssociates Demographic A nalysis and E nrollment Projections, 2010
020,000
40,000
60,000
80,000
100,000
120,000
Mid-Range Total ProjectedEnrollment
2011-12 to 2020-2021
0
10,000
20,000
30,000
40,000
50,000
60,000
AISD Projected Enrollmentby Grade Level
2011-12 to 2020-21
PK-5
6-8
9-12
Page 176
Projected Enrollment – By Grade Level The following chart depicts the progression of increasing enrollment throughout the next ten years.
Austin Independent School District
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 179/317
Grade 201 1- 12 201 2- 13 201 3-1 4 201 4-1 5 201 5- 16 201 6- 17 201 7-1 8 201 8- 19 201 9- 20 2020-21
E C & PreK 5,368 5,419 5,471 5,524 5,575 5,628 5,679 5,731 5,782 5,834
Kindergarten 7,773 7,848 7,923 7,998 8,073 8,148 8,223 8,298 8,373 8,448
1 7,757 7,832 7,907 7,982 8,057 8,132 8,207 8,282 8,357 8,432
2 7,426 7,532 7,607 7,682 7,757 7,832 7,907 7,982 8,057 8,132
3 6,988 7,176 7,282 7,357 7,432 7,507 7,582 7,657 7,732 7,807
4 6,926 6,788 6,976 7,082 7,157 7,232 7,307 7,382 7,457 7,532
5 6,423 6,676 6,538 6,726 6,832 6,907 6,982 7,057 7,132 7,207Subtotal PK-5 48,661 49,271 49,704 50,351 50,883 51 ,386 5 1,887 52,389 52,890 5 3,392
6 5,952 6,073 6,326 6,188 6,376 6,482 6,557 6,632 6,707 6,782
7 5,677 5,877 5,998 6,251 6,113 6,301 6,407 6,482 6,557 6,632
8 5,471 5,617 5,817 5,938 6,191 6,053 6,241 6,347 6,422 6,497
Subtotal 6-8 17,100 17,567 18,141 18,377 18,680 18,836 19,205 19,461 19,686 19,911
9 6,497 6,621 6,767 6,967 7,088 7,341 7,203 7,391 7,497 7,572
10 4,882 5,197 5,321 5,467 5,667 5,788 6,041 5,903 6,091 6,197
11 4,623 4,382 4,697 4,821 4,967 5,167 5,288 5,541 5,403 5,59112 4,761 4,648 4,407 4,722 4,846 4,992 5,192 5,313 5,566 5,428
Subtotal 9-12 20,763 20,848 21,1 92 21 ,977 22,568 23,288 23,724 24,1 48 24,557 24,788
Total 86,524 87,686 89,037 90,705 92,131 93,510 94,816 95,998 97,133 98,091
Source: Dennis D. Harner & Associates Demographic Analysis and Enrollment Projections, 2010
Mid-Range Projected Enrollment
2010-11 to 2019-20
Page 177
Capa c ity Analysis
How many students can a building accommodate? This
question often arises, and in the development of a
facility master plan, can be one of the most debated
In AISD, functional capacity is reviewed on an annualbasis. Functional capacity is a more realistic analysis of
what a building can accommodate and takes into
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 180/317
facility master plan, can be one of the most debated
issues. It is not uncommon to review an evaluation of anexisting building only to find that the capacity which was
once assigned to the building is considerably more thanwhat the building can reasonably accommodate today.
The main reason for this is that the programs in a public
school system and the manner in which they are
delivered have changed significantly since the building
was originally built. More than half the square footage in
AISD was built before 1985. Twenty-five years ago,computer labs were just beginning to be incorporated
into schools, and severely handicapped students,
previously assigned to specialized facilities, were not yetmainstreamed into public schools. In addition, statelegislation has mandated smaller student/teacher ratios.
In facility planning, the term design capacity is used to
describe simply counting the number of classrooms in a
building and multiplying by an average class size. Eventhough at first glance this seems only to be common
sense, this methodology does not take into account the
programmatic implications of school facilities.
what a building can accommodate and takes intoaccount all special programs available at the school
that year, in addition to any portable buildings located
on site, to determine how many students can beassigned to a particular school campus each school
year.
For master planning purposes, an updated methodology
to the former AISD permanent capacity methodologywas developed and applied. The formula for long-range
planning should reflect District programs, but should be
kept simple and equitable since programs change from
year to year while classroom square footages remain, for
the most part, the same. Permanent capacity does notincorporate temporary or portable classrooms, but only
permanent space.
Elementa ry School Permanent Cap ac ity
The elementary program is usually delivered based onstudents being assigned to a home room and attending
special programs such as art, music, and physical
education in a specialized classroom. The number ofspecial classrooms required is reflective of the total
number of students enrolled and is subtracted from thetotal number of classrooms since the vacated home
room cannot be utilized by other students.Age of AISD Permanent Buildings
Page 178
A 95% efficiency factor is applied since students do notalways arrive in perfect sets of 22 students. Additionally,
due to reduced class size and increased support spaceneeds for Title 1 schools, an 85% efficiency factor is
applied to compute permanent capacity at these
movement to block scheduling, an efficiency factor of
75% is applied.
The following describes the permanent capacity
methodology for secondary schools.
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 181/317
pp p p p y
facilities.
The following describes the permanent capacitymethodology for elementary schools.
Count permanent classrooms.
Subtract special areas for music, art, etc. (3-7classrooms based on staffing ratios).
Multiply by 22 (average class size).
Apply 95% efficiency factor; 85% efficiency factor for Title 1 schools.
Sec onda ry Scho ol Permanent Capa city
Unlike elementary schools, at the secondary levelstudents are not in self-contained environments but aretraveling from one location to another each period. All
classrooms are counted including the specializedspaces. Since it is difficult to schedule every teaching
space every period of the day, in addition to the
Count permanent classrooms.
Multiply by 28 (average class size).
Apply 75% efficiency factor; 70% efficiency factor for Title 1 schools.
Core Capac ity
Core capacity is defined as those spaces that large
groups of students utilize at some point during the schoolday, including the cafeteria, gymnasium, and library. As
part of the new methodology, consideration was given
to lower permanent capacity if the cafeteria or gymnasium was less than 85% of permanent capacity,
based on the number of classrooms.
The chart below shows the AISD standard for core space
sizes based on the current approved educationalstandards.
Grade Level
School Size
(# of students)
Total
Square Feet SF/Student
Total
Square Feet SF/Student
Total
Square Feet SF/Student
Elementary 880 4,200 4.77 3,000 3.41 3,500 3.98
Middle 1,100 4,500 4.10 13,400 12.18 4,800 4.36
High 2,400 9,000 3.75 20,720 8.63 8,400 3.50
Source: AISD, Office of Facilities
Cafeteria Gym LibraryCore Space Standards
Page 179
Utilization
Utilization, or efficiency, of a school facility, is calculated
by dividing the enrollment of the school by its permanent
capacity. The target range as determined by the Facility
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 182/317
p y g g y y
Master Plan Task Force for the purposes of long-range
planning is 85%-105%. Schools below 85% may be able to
provide relief for overcrowded schools or may beconsidered as potential candidates for closure or
consolidation. Schools above 105% should be monitored
for additional growth, and schools that exceed 125% are
considered for additions or for relief through theconstruction of new schools.
The chart below indicates that district-wide, AISD is within
the 85%-105% target range; however, by grade level, theelementary schools are above the target and the middle
schools are below. In other words, the District is short3,833 seats at the elementary level, but has 4,263 too
many at the middle school level.
On an individual basis, there are 29 schools, or 25% of allschool campuses, that fall below 85% of permanent
capacity. Fifty-three schools, or 46% of all schoolcampuses, operate at above 105%. The map to the right
and the ones on the following pages illustrate the 2010-11
school year enrollment utilization.
Grade Level
2010
Enrollment
Permanent
Capacity
Utilization
Rate
Elementary 48,738 44,905 109%
Middle 16,154 20,417 79%
High 20,512 21,698 95%
Districtwide 85,404 87,020 98%Source: AISD, Office of Facilities
Page 180
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 183/317
Page 181
Enrollment versus Population
The population (number of students that live within an
attendance zone) is not always equal to the enrollment(number of students that attend) of a school. No Child
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 184/317
Left Behind, transfer policies, and open enrollmentsignature programs are some of the reasons students
migrate in and out of their assigned attendance zones.
In a few cases in AISD, students migrating into a school
comprise more than 40% of its enrollment. When largenumbers of students travel outside of the boundary of
their assigned school, to attend a different school, it
presents a challenge when planning for long-term facilityneeds.
Because the number of students migrating in and out of
an attendance zone may vary year to year, it isimportant to also look at the attendance zonepopulation. Population projections, which are derived
from birth data, census data, and housing stock analysis
are used in long-range planning efforts to identify trendsin growth and decline. Population projections are more
reliable than anticipating the rates of in and outmigration.
The following maps provide the 2010-11 population as apercent of permanent capacity by school. This provides
a different picture than the enrollment utilization maps onthe preceding pages. For example, a school that falls
below the target utilization of 85% based on enrollment
may in fact be above 85% based on population.
Page 182
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 185/317
Page 183
Fac ility Co ndition Ana lysis
Facility condition is the state of repair of the buildinginfrastructure. Facility condition takes into considerationall of the building systems from roofs and windows to
Of course, FCI is not the only factor used to identifybuildings that need renovation, replacement or even
closure. Historical significance, enrollment trends,community sentiment, and the availability of capital areadditional factors that are analyzed when making school
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 186/317
= Facility Condition Index (FCI)
electrical and mechanical systems. Although there is a
cost associated with renovating every building
according to current codes and standards, this does notmean that all schools need massive and immediaterepairs and renovations. Rather, this provides anunderstanding of the effort it would take to bring all
facilities up to the same standard.
The facility condition information does provide thefollowing.
Comparative analysis of building conditions
Approximate cost to address the facility conditions
of all buildings in the District Understanding of which buildings are in the worse
conditions and that might be slated for moreimmediate focus
Since 1991, the facility management industry has used anindex called the Facility Condition Index (FCI) to
benchmark the relative condition of a group of schools.This index simply divides the identified repair costs in afacility by the total cost to replace the facility. For
example, take a 100,000 square foot building that mighttheoretically cost $10 million to construct new and now
has $1 million in identified repairs. Dividing $1 million by$10 million results in an FCI of 10 percent. Industrystandards and financial modeling dictate that FCInumbers above 65% or greater are more cost-effectiveto replace than to repair. This is due to efficiency gainswith more modern facilities and the value of the buildingat the end of the analysis period.
facility decisions.
The chart below indicates the distribution of campusesby ranges of FCI in AISD. Please note that the supportfacilities are included. Only one facility, Pease ES, fallsinto the replace category; however, two schools, Zilker ESand Wooten ES are between 50-59% and should be
considered for major renovation or replacement.
Cost of RepairsCost of Replacement
FCI Campuses
<10% 18
10-19% 35
20-29% 30
30-39% 31
40-49% 9
50-59% 2
60-69%
- 70-79% 1
80-89% -
90-100% -
>100% -
Total 126
Repair
Renovate
Replace
Page 184
FCI: The Denom inator
The denominator is the bottom part of the equation andpossibly the easiest with which to start. The denominator is the theoretical cost to replace the facility. It isimportant to recognize that this cost is based on the
l f b ildi i h h f ili h i h
engineering assessors to identify deficient conditions inthe buildings.
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 187/317
replacement of a building with another facility that is thesame size and is fully code compliant. If, for example,
you are comparing the FCI on a 3,450 square footgymnasium building at a campus, the replacement costis the theoretical cost to replace that same 3,450 squarefoot building. Since the replacement cost comparison isprimarily driven by the type of facility (elementary school,middle school, high school, administration, etc.), a set ofcost models have been developed that estimate thecost per square foot for new construction and areindicated in the chart to the right. The cost models takeinto account national industry averages from a
recognized industry data source called RSMeans®,adjusted to Austin, Texas, as well as the District’s recentexperience in the Austin construction market. The costsper square foot are then multiplied by the size of theschool or building under consideration. Thismethodology is used for both permanent and portablebuildings.
FCI: The Numera tor
The numerator is the estimated cost to complete therepairs on the building in its current condition. This repair cost is generally considered to be like-for-like repairs.Within reason, the deficient conditions would be repairedor systems replaced to put the building into fullyserviceable condition to meet current codes.
At AISD, the District retained a firm in 2007 to assess all ofthe facilities in the district and develop cost estimates tomake needed repairs. That effort included anassessment of all facilities using architectural and
This survey focused, for the most part, on the condition ofthe existing buildings and did not initially include
educational adequacy or functional equity needs. All ofthe identified needs were grouped into building systems,and a Uniformat® cost structure supported by RSMeans®
nationally-based cost data adjusted to the Austin, Texasarea, was employed to develop consistent costestimates across all schools. These cost estimates, usingthe industry-standard, line- item costs, comprise themajority of the costs in the AISD facility assessment
database and are included in the numerator of the FCIcalculation.
In addition, ADA (American with Disabilities Act)/TAS(Texas Accessibility Standards) reports were developedto address ADA issues against current guidelines during2008-09. A functional equity study identified core areasand specialized classroom areas, within specific school
campuses that did not meet AISD educationalspecifications. The cost to resolve these issues has beenincluded in the deficiencies and numerator of thecurrent FCI numbers.
Page 185
Educ ational Adequacy Assessment
As part of this master planning effort, AISD conducted aneducational adequacy assessment of all schools. Aneducational adequacy assessment evaluates how wellthe campus is equipped to deliver the instructional
• Relationship of Spaces: Proximity of instructionalspaces to support areas such as libraries, labs, andlecture halls.
Th h t b l id tifi th d ti l d
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 188/317
program.
During the summer of 2010, a team of assessors went toeach school and collected an inventory of each spaceat the classroom level. This data was then compared tothe District developed standards to identify when anindividual space did not meet a specific level ofcompliance. When an item did not meet the standard,the condition was noted and a line item was added tothe assessment database with a budget to correct thatcondition.
This applied a standards-based approach to determinethe overall educational adequacy by evaluating eightoverall criteria as follows.
Capacity: Ability of the facility to meet the needs ofthe student population.
Support for Programs: Provision of special spaces or classrooms to support the instructional program.
Tec hnology : Presence of infrastructure, datadistribution, and equipment.
Supervision & Sec urity: Extent to which physical
configurations help or hinder building operation.
Instructional Aids: Presence of necessary equipmentwithin teaching spaces.
Physical Characteristics: Sizes and shapes ofteaching spaces.Learning Environment: Degree to which learningareas are comfortable, well-lit, odor-free,controllable and quiet.
The chart below identifies the educational adequacydeficiency costs by the eight overall criteria.
Technology, instructional aids, and security andsupervision make up the greatest need in terms ofeducational adequacy.
Page 186
Building Deficienc ies
The combination of the building condition and the educational adequacy items currently represents over 41,000 lineitems district-wide. Deficiencies are categorized by the following priorities.
Priority 1: currently critical (immediate need, i.e., fire safety systems)P i it 2 t ti ll iti l (t b t d ithi i j HVAC i t it t )
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 189/317
Priority 2: potentially critical (to be corrected within one year, i.e., major HVAC equipment, security systems)Priority 3: necessary/not yet critical (1-2 years, i.e., site lighting, sanitation sewer, educational adequacy)
Priority 4: recommended (3-5 years, i.e., finishes, educational adequacy)Priority 5: does not meet current code/standards/grandfathered (i.e., functional equity, 3rd tier ADA/TAS)
The chart below lists the facility type and the costs associated with correcting priorities 1 through 5. Logically, the greatestneed is at the elementary schools since this makes up the largest number of schools and the most square footage in theDistrict.
Renovation Costs by Priority, by Campus
Type Priority 1 Priority 2 Priority 3 Priority 4 Priority 5 Total
Schools
PreK Centers 191,332$ 843,430$ 1,221,125$ 154,414$ 9,470$ 2,419,771$
Elementary Schools 36,765,169$ 101,426,669$ 259,226,302$ 30,846,706$ 78,109,545$ 506,374,392$
Middle Schools 19,163,034$ 56,423,338$ 88,591,082$ 17,785,740$ 42,995,421$ 224,958,615$
High Schools 16,483,563$ 69,061,730$ 141,365,127$ 36,842,162$ 22,301,333$ 286,053,916$
Alternative Education 1,342,426$ 3,305,106$ 13,807,291$ 2,473,156$ 136,888$ 21,064,868$
Total Schools 73,945,525$ 231,060,273$ 504,210,927$ 88,102,178$ 143,552,658$ 1,040,871,561$
Other District Facilities
Support Facilities 2,135,310$ 7,374,941$ 6,094,116$ 45,901$ 291,467$ 15,941,735$
Administrative 732,481$ 2,760,465$ 9,054,486$ 363,873$ 202,910$ 13,114,216$
Maintenance and Transp. 637,830$ 880,329$ 3,343,222$ 277,590$ 199,746$ 5,338,716$
Total Other District Facil 3,505,621$ 11,015,735$ 18,491,824$ 687,363$ 694,123$ 34,394,666$
Grand Total 77,451,146$ 242,076,008$ 522,702,751$ 88,789,541$ 144,246,781$ 1,075,266,227$
Page 187
The chart below provides a crosstab by building system. The greatest building system deficiency, as is typically the case,is in the area of Heating Ventilation and Air Conditioning (HVAC). Please note that the “Other” building system categoryincludes functional equity and ADA/TAS compliance.
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 190/317
A summary of building system by priority by individua l scho ol c amp us is ava ilable in the Fac ility Summa ry Reports with
Fac ility Master Plan Rec om me nda tions sec tion of this repo rt, pa ge s 38-164.
Districtwide Crosstab by Priority by System
Building System 1 2 3 4 5 Total
Site 498,041$ 3,002,131$ 20,459,959$ 15,715,200$ -$ 39,675,332$
Roofing 1,016,327$ 20,921,438$ 22,268,609$ 4,912,452$ -$ 49,118,826$
Exterior 195,604$ 5,079,548$ 20,391,721$ 3,620,156$ -$ 29,287,028$
Structure 191,655$ 392,439$ 997,978$ 63,077$ -$ 1,645,149$
Interior 126,632$ 6,550,035$ 44,089,416$ 20,438,059$ -$ 71,204,142$
HVAC 12,732,977$ 147,968,144$ 149,987,307$ 1,725,368$ -$ 312,413,796$
Plumbing 16,072,172$ 7,908,635$ 66,458,213$ 3,840,468$ 1,568$ 94,281,056$
Electrical 575,073$ 23,329,696$ 68,672,377$ 5,273,377$ -$ 97,850,523$
Technology -$ 9,936,855$ 77,335,604$ -$ -$ 87,272,458$
Fire and Safety 19,377,531$ 11,607,150$ 1,133,648$ 567,724$ -$ 32,686,053$
Conveyances 223,695$ 5,132,182$ 8,858$ -$ -$ 5,364,736$
Specialties 37,115$ 247,755$ 19,236,791$ 32,633,662$ -$ 52,155,323$
Other 26,404,324$ -$ 31,662,269$ -$ 144,245,213$ 202,311,806$
Total 77,451,146$ 242,076,008$ 522,702,751$ 88,789,541$ 144,246,781$ 1,075,266,227$
Facility Condition Assessment Priority
Page 188
Fac ility Op tions
Using the Educational Framework as guiding principles,the Facility Master Plan Task Force began thecomplicated task of developing facility options and
i i d t t th i h f d l i
Future growth – account for future populationgrowth/decreases
Facility condition – facility condition index rating
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 191/317
scenarios in order to meet their charge of developing
recommendations to improve facility efficiencies through
objective data analysis and community input.
The information and data considered included thefollowing.
Current condition of buildings (FCI) Educational adequacy of schools Current and proposed instructional programs Current and projected population growth and
decline
Lease obligations, current and possible use ofbuildings, and administrative facilities
The following criteria were used for decision making.
Educational enhancement – meet theeducational needs of all students
Efficient space utilization – optimum utilizationrange was between 85%-105% of permanentcapacity
Cost savings – decrease M&O expenses or capitalcost avoidance of correcting building
deficiencies and building operating costs per student
Community Impact – impact of change versus thegains
Over the course of seven months, 108 options that weredeveloped by the Task Force, consultants, and staff,were reviewed and evaluated by the Task Force.
An outline of the 108 options is provided in App endix G o fthis rep ort.
Page 189
AUSTIN INDEPENDENT SCHOOL DISTRICT
District-Wide Facility Master Plan
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 192/317
Appendix AFCI White Paper and Facility FCI Charts
Page 190
White Paper:
Facility Condition Index (FCI) at Austin ISD
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 193/317
Facility Condition Index (FCI) at Austin ISD
The assessment of school facilities and the development of long-range master plans, is MagellanConsulting’s core business. District-wide master plans, by their very nature, recommend changes acrossa district. In nearly every district in which we work, there are building condition and student capacitychallenges. Often, there exists enough capacity across the district when compared to total studentenrollment; however, that capacity is rarely in the right place. In the last five years, every large urban
district we have worked with has faced considerable loss of enrollment district-wide which eventuallynecessitates reducing overall footprint and closing schools. We typically see changes in educationalprograms that make the alignment of facilities a challenge, as curriculum and delivery methods are ever-
evolving. Nearly 90 percent of our country’s 21st century schools were designed and constructed in the20th century, most in the mid 20th century, under an industrial age factory model with a long row of classrooms down a double-loaded corridor. The condition of schools, with the exception of verywealthy districts, is declining across the country. The recent economic climate is exacerbates thisproblem as maintenance funds are decreasing. Texas the new education funding system in Texas isplacing greater emphasis on the use of Maintenance and Operations (M&O) funds. Unfortunately,deferred maintenance does not go away with reduced funding, and the unmet need continues to builduntil the cost to repair eventually exceeds the cost to replace the facility.
Commonly, communities have a widespread perception that school districts shape, hide, or manipulatebuilding condition data to obtain a desired result. This perception may even result in a law suit, whichcreates the necessity to engage in projects that are driven by legal requirements. While years ago theremay have been school districts that were guilty of these charges, particularly in the era of racialsegregation and the court-ordered desegregation that followed, the fact is that we have not seen datamanipulation at any of the districts in which we have worked for over a decade.
School district administrators and facility staffs continually request that we simplify the data and planningparameters. The process of engaging the community offers a broad spectrum of individuals who want toparticipate These diverse groups of individuals may speak different languages have different educational
Since 1991, the facility management industry has used an index called the FCI to benchmark the relativecondition of a group of schools This index simply divides the identified repair costs in a facility by the
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 194/317
FCI Campuses
<10%
10-19%
20-29%
30-39%
40-49%
50-59%
60-69%
70-79%
80-89%
90-100%
>100%
Repair
Renovate
Replace
condition of a group of schools. This index simply divides the identified repair costs in a facility by thetotal cost to replace the facility. For example, take a 100,000 square foot building that might
theoretically cost $10 million to construct new and now has $1 millionin identified repairs. Dividing $1 million by $10 million results in anFCI of 10 percent. The National Association of College and University
Business Officers has suggested for college planning that an FCI of lessthan 5 percent is good, an FCI between 5 and 10 percent is fair, and anFCI greater than 10 percent is poor. In K-12 public school planning,the gulf between 10 percent and 100 percent is just not stratified
enough. For several years, Magellan Consulting has used the chart
displayed to the right, with clients to provide a little more gradation.
We often find district-wide FCI averages in the 20 to 30 percent range.Schools in the 30 to 60 percent range are probably the most difficultto plan for long-term. Financial modeling has shown that over a 30-year period, schools that fall in the 65 percent or greater range aremore cost-effective to replace than to repair. This is due to efficiencygains with more modern facilities and the value of the building at theend of the analysis period. Of course, FCI is not the only factor used
to identify buildings that need renovation, replacement or evenclosure. Historical significance, enrollment trends, communitysentiment, and the availability of capital are additional factors that are
analyzed when making school facility decision.
The FCI calculation, while seemingly simple, yields a consistent result that can commonly be comparedacross districts, as the same factors are almost always considered in deriving the numerator and thedenominator. It should also be noted that there are nuances regarding the process for calculating FCI
that must be understood.
the district’s recent experience in the Austin construction market. The costs per square foot are thenmultiplied by the size of the school or building under consideration.
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 195/317
multiplied by the size of the school or building under consideration.
“Construction Cost” is a term that may mean different things to different people. To contractors,construction cost generally means the amount they are paid to construct the building, and that figuregenerally does not include a contingency for unforeseen conditions. To the school district facilities staff,
construction cost typically refers to the planning budget to construct the building plus a smallcontingency for unforeseen conditions and may also include the cost to bring utilities to a site. To theschool board, construction cost often means the total costs spent on the project which includes thearchitects’ fees and the cost to manage the overall construction program. Therefore, it is important to
be careful which costs to include in the replacement cost denominator calculation. For FCI purposes,
we include all of the costs associated with completing the project for the amount of funding that isrequired in total. That includes the base construction cost (often referred to as “hard costs”); plus
inflation; plus professional fees; plus administrative costs for testing, surveys, and advertising; plusmanagement costs; plus contingencies; plus escalation to an estimated mid-point of construction (oftenreferred to as “soft costs”). These total costs are significantly more than the base construction costpaid to the contractor. The following table shows the average costs used in determining thereplacement cost for AISD, based on the building type and the buildings’ gross square footage measuredto the outside of exterior walls.
ES MS HS Admin PortableSquare Feet 82,500 170,000 330,000 20,000 1,536 Cost / SqFt 185.54$ 204.20$ 201.53$ 176.65$ 85.97$
Construction Cost 15,306,924.11$ 34,714,158.47$ 66,504,421.68$ 3,532,981.28$ 132,047.22$
A/E Services 1,224,553.93$ 2,777,132.68$ 5,320,353.73$ 317,968.32$ 11,884.25$Site/Survey 30,613.85$ 69,428.32$ 133,008.84$ 7,065.96$ 264.09$Permits/Fees 68,881.16$ 156,213.71$ 299,269.90$ 15,898.42$ 198.07$Testing 114,801.93$ 260,356.19$ 498,783.16$ 26,497.36$ 660.24$Furn/Fixt/Equip (FF&E) 918,415.45$ 2,082,849.51$ 3,990,265.30$ 141,319.25$ 7,262.60$Other 612,276.96$ 1,388,566.34$ 2,660,176.87$ 137,654.34$ 6,602.36$
Project Budget 18,276,467$ 41,448,705$ 79,406,279$ 4,179,385$ 158,919$
Program-level contg @ 10% 1,827,647 4,144,871 7,940,628 417,938 15,892
state to that of what would be replaced today. Generally, studies or hazardous material costs that mightbe encountered even under a demolition scenario would not be included.
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 196/317
be encountered even under a demolition scenario would not be included.
At AISD, the district retained a firm in 2006 to assess all of the facilities in the district and develop costestimates to make needed repairs. That effort included a walkthrough of all facilities using architects andengineers to identify deficient conditions in the buildings. This survey focused, for the most part, on the
condition of the existing buildings and did not include educational adequacy or functional equity typeneeds (more on that later). All of the identified needs were grouped into building systems, and aUniformat® cost structure supported by RSMeans® nationally-based cost data adjusted to the Austin,Texas area was employed to develop consistent cost estimates across all schools. These cost estimates,
using the industry standard line item costs, comprise the majority of the costs in the AISD facility
assessment database and are included in the numerator of the FCI calculation. The construction costvalue of all of these deficient conditions, prior to adding soft costs for professional fees, contingency, and
escalation total approximately $444.9 million.
However, the facility condition assessment did not focus on what the assessment industry calls“educational adequacy” items. Where a building assessment focuses on the condition of the building andwhat is broken, an educational adequacy assessment focuses on how well the school supports theinstructional mission and looks objectively at what is missing . As part of this master planning effort,AISD conducted an educational adequacy assessment of all schools. This assessment made use of the
district’s educational specifications, supplemented with information collected during a three-dayworkshop that involved numerous staff, principals, and teachers. A set of standards was developed foreach school type, the buildings typically found on the campus, and for each instructional space. These
standards identified in detail the size of the teaching spaces, the number of students in each space,physical conditions, plumbing requirements, the number of computer outlets and electrical plugs, andthe type of instructional support for each space, in addition to safety and supervision considerations.During the summer of 2010, a team of assessors went to each school and collected an inventory of eachspace at the classroom level. This data was then compared to the previously developed standards to
identify when an individual space did not meet a specific standard. When an item did not meet thestandard, the condition was noted and a line item was added to the assessment database with a budget
own soft cost model. The following chart shows the percentage factors that are applied to every $100of estimated repair cost to derive the total repair cost figure used in calculating the FCI.
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 197/317
p p g g
The total facility condition cost totals approximately $963.1 million after adding soft costs to the costsfor correcting deficient building and ADA conditions and the educational adequacy costs. During theAugust work sessions, the need was approximated at $875 million, but at that time it was believed thatthe need would eventually be lowered as data was reviewed. The $875 million figure really represented
the total construction cost (hard cost) required to correct current deficiencies. Indeed the comparablecost has decreased to about $558.4 million; however, the overall total need is now about $1.1 billion,including functional equity needs at 44 campuses (discussed in more detail below). Since the Augustworksession:
1 Deficiencies have been reviewed and, in some cases, modified by AISD facilities staff (part of ongoing AISD facility management procedures) – decreased cost.
2 Overlapping cost between ADA studies and building condition deficiencies have been addressed– decreased cost.
3 Overlapping cost between functional equity deficiencies, ADA deficiencies, and buildingcondition deficiencies have been addressed decreased cost
Default HVAC Life Safety ADA EquityCost Basis 100.00$ 100.00$ 100.00$ 100.00$ 100.00$
Construction Cost 138.46$ 138.46$ 103.46$ 196.37$ 196.37$
A/E Services 20.77$ 20.77$ 4.14$ 29.46$ 29.46$
Permits/Fees 0.62$ 0.62$ 0.47$ 0.88$ 0.88$
Testing 0.42$ 0.42$ -$ 0.59$ 0.59$
Other 23.26$ 28.11$ 1.34$ 32.99$ 32.99$
Project Budget 184$ 188$ 109$ 260$ 260$
Program-level contg @ 10% 18 19 11 26 26
Program Management 10$ 10$ 6$ 14$ 14$
Escalation - 3 yrs. @ 5% 34$ 35$ 21$ 49$ 49$
Total Program Cost 246$ 253$ 147$ 350$ 350$
Soft Cost Factor (%) 78% 83% 42% 78% 78%
Functional Equity Additions / Renovations
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 198/317
School Number and Name Library Gym Cafeteria Admin Classroom Total
009 Anderson HS - 7,558,381 - - 737,651 8,296,032
002 Austin HS 93,707 1,000,768 - 341,590 6,583,925 8,019,990
005 McCallum HS 1,056,715 974,456 - - - 2,031,171
007 Travis HS - 497,614 - - - 497,614
054 Bedichek MS 1,226,494 1,200,183 - 279,273 10,809,492 13,515,442
046 Burnet MS - - 1,121,709 - - 1,121,709
057 Covington MS - - - - 1,256,499 1,256,499
055 Dobie MS - 4,791,499 778,272 - 290,814 5,860,584
051 Martin MS 830,896 1,996,919 - - - 2,827,815
058 Mendez MS - - - - 1,323,155 1,323,155
052 Murchison MS 382,212 - 791,197 252,361 6,564,076 7,989,847
047 O. Henry MS - - 702,568 - 2,492,687 3,195,256
048 Pearce MS - - - - 751,499 751,499
053 Webb MS - - - 703,953 - 703,953
142 Allan ES 756,946 - - - - 756,946
102 Andrews ES 1,197,967 110,786 - - - 1,308,753
149 Barrington ES - 2,377,285 119,095 - - 2,496,380 107 Brentwood ES - 720,110 718,725 - - 1,438,834
109 Brown ES 101,554 2,561,928 - - - 2,663,482
161 Cook ES - 2,949,680 115,402 - - 3,065,082
113 Cunningham ES - 2,543,464 115,402 812,893 - 3,471,759
114 Dawson ES - 913,985 - 284,351 - 1,198,336
154 Doss ES - - - 486,074 - 486,074
116 Govalle ES 847,514 2,460,375 - 177,258 - 3,485,146
117 Gullett ES 1,154,714 482,843 1,442,527 698,414 1,307,276 5,085,774
119 Highland Park ES - 886,289 796,275 - 517,002 2,199,566
155 Hill ES - 2,404,981 135,713 - - 2,540,694
FCI ResultsFor AISD, the FCI calculations include the building condition assessment results, the educational
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 199/317
, g ,adequacy assessment results, and the type one and two ADA compliance considerations and then
compare them to the cost of replacing the same facility. These FCI figures provide a benchmark that canbe used to consistently compare AISD facilities district-wide. The planning team refers to the FCI to aidin decision making when a school or building is subject to renovation, when a change in educational
program is contemplated, or when the school is targeted for replacement, consolidation, or closure forefficiency reasons. It is not the principle driver, but rather a supporting consideration to guide thedistrict and hopefully prohibit the district from making additional investment into a building that is closeto or has reached the end of its serviceable life. The following chart is a summary of all of the district’s
facilities by FCI. The one school that falls in the 70-79 percent range is Pease Elementary, a historic
location celebrated as the longest operating public school in the state.
FCI Campuses
<10% 18
10-19% 35
20-29% 30
30-39% 31
40-49% 9
50-59% 2
60-69% -
70-79% 1
Repair
Renovate
Replace
AISD School/Facility FCI Summary Total minus NC
Priorities 1-5 and Some ADA
No. Campus Name
Grades
Served Age Site Priority 1 Priority 2
Total Priority
1 a nd 2 P ri or it y 3 P rio rit y 4 P ri or it y 5
Total Facility
Condition
Cost
FCI Related
Facility Cost
Total
Replacement
Cost FCI
Functional
Equity
Educational
Adequacy
Elementary Schools
142 Allan Element ary Schoo l PK-5 1957 19.5 1,254,683$ 1,688,882$ 2,943,565$ 6,645,881$ 558,919$ 1,074,557$ 11,222,922$ 10,148,366$ 33,497,560$ 30.3% 1,030,588$ 1,511,428$
101 Allison Element ary School PK-6 1955 10.7 173,617$ 1,354,132$ 1,527,749$ 2,450,503$ 210,014$ 10,288$ 4,198,553$ 4,188,265$ 20,556,998$ 20.4% -$ 907,125$
102 Andrews Elem entar y S cho ol PK-5 1962 7.7 573,941$ 2,633,109$ 3,207,050$ 3,502,631$ 190,659$ 1,517,264$ 8,417,604$ 6,737,774$ 21,020,456$ 32.1% 1,453,514$ 1,030,292$
187 Baldwin Elementary School PK-5 2010 0.0 -$ -$ -$ -$ -$ -$ -$ -$ -$ 0.0% -$ -$
182 Bara noff Elem enta ry S chool K-5 1999 15.6 197,873$ 531,250$ 729,123$ 1,814,399$ 277,997$ 121,554$ 2,943,072$ 2,821,518$ 25,651,479$ 11.0% -$ 1,069,123$
149 B arr ingt on Elem enta ry S chool PK-6 1969 12.1 329,948$ 476,461$ 806,409$ 5,220,479$ 311,342$ 2,708,483$ 9,046,714$ 6,338,231$ 29,888,351$ 21.2% 2,688,134$ 1,146,187$
1 03 B ar to n H il ls E le me nt ar y S ch oo l K -6 1 964 9 .9 1 ,0 22 ,2 69$ 236,671$ 1,258,939$ 2,637,192$ 447,186$ 2,391$ 4,345,708$ 4,343,317$ 14,588,847$ 29.8% -$ 439,914$
104 B k El t S h l PK 5 1936 3 7 1 114 902$ 2 117 554$ 3 232 456$ 3 621 985$ 252 949$ 118 363$ 7 225 752$ 7 107 389$ 18 663 896$ 38 1% $ 977 746$
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 200/317
104 Becker Element ary School PK-5 1936 3.7 1,114,902$ 2,117,554$ 3,232,456$ 3,621,985$ 252,949$ 118,363$ 7,225,752$ 7,107,389$ 18,663,896$ 38.1% -$ 977,746$
105 B lackshear Element ar y S cho ol PK-5 1937 5.3 188,148$ 2,178,265$ 2,366,412$ 4,202,512$ 796,536$ 58,019$ 7,423,480$ 7,365,461$ 21,038,900$ 35.0% -$ 705,474$
106 Blanton Elementary School PK-5 1964 8.0 642,778$ 1,082,233$ 1,725,011$ 2,850,419$ 230,709$ 59,146$ 4,865,285$ 4,806,139$ 24,561,843$ 19.6% -$ 1,313,917$
185 Blazier Elementa ry School PK-5 2008 15.4 136,781$ 177,879$ 314,660$ 897,555$ 205,711$ -$ 1,417,926$ 1,417,926$ 27,857,817$ 5.1% -$ 978,883$
170 Boone Elementary School PK-5 1986 12.5 489,966$ 135,370$ 625,336$ 2,854,265$ 348,141$ 318,391$ 4,146,133$ 3,827,742$ 21,920,602$ 17.5% -$ 991,368$
107 B rent woo d Elem entar y S chool PK-5 1951 16.7 286,613$ 693,809$ 980,422$ 3,381,304$ 190,212$ 1,625,875$ 6,177,813$ 4,551,938$ 19,622,049$ 23.2% 1,622,094$ 973,002$
108 Brooke Elementary School PK-5 1954 5.9 466,533$ 728,683$ 1,195,217$ 2,708,300$ 262,136$ 37,886$ 4,203,538$ 4,165,652$ 16,699,995$ 24.9% -$ 888,465$
109 Brown Elementa ry School PK-6 1957 10.1 1,580,199$ 1,153,153$ 2,733,352$ 1,909,309$ 635,293$ 2,665,997$ 7,943,951$ 5,277,954$ 18,761,168$ 28.1% 2,663,484$ 801,611$
1 10 B ry ke r W oo ds E le me nt ar y S ch oo l K -6 1 939 6 .3 1 89 ,4 11$ 1,119,527$ 1,308,938$ 2,979,081$ 348,606$ 44,654$ 4,681,279$ 4,636,625$ 13,901,689$ 33.4% -$ 863,756$
111 Cam pbell Elem entar y S chool PK-5 1992 9.7 311,592$ 379,698$ 691,291$ 3,030,703$ 197,160$ 377,355$ 4,296,509$ 3,919,154$ 18,838,511$ 20.8% -$ 766,024$
173 Casey Elementary School PK-5 1998 17.9 332,832$ 218,621$ 551,453$ 1,280,715$ 2,281,070$ 78,748$ 4,191,986$ 4,113,238$ 24,702,547$ 16.7% -$ 930,563$
112 Casis Elementary School PK-5 1951 14.2 280,022$ 632,024$ 912,046$ 3,096,268$ 731,873$ 60,579$ 4,800,767$ 4,740,187$ 27,288,458$ 17.4% -$ 1,460,287$
184 Clayton Elementary School K-5 2006 16.8 136,427$ 382,446$ 518,872$ 1,142,866$ 215,392$ -$ 1,877,130$ 1,877,130$ 31,551,211$ 5.9% -$ 1,404,862$
161 Cook Elementary School K-5 1974 12.7 847,723$ 3,046,998$ 3,894,721$ 2,836,484$ 275,616$ 3,529,726$ 10,536,548$ 7,006,822$ 25,515,832$ 27.5% 3,472,684$ 1,093,546$
183 Cowan Elementary School PK-5 1999 22.5 441,004$ 282,482$ 723,486$ 1,163,772$ 269,668$ 287,289$ 2,444,215$ 2,156,926$ 23,634,032$ 9.1% -$ 1,007,303$
113 C unningham Elem ent ar y S cho ol PK-5 1963 8.8 174,656$ 203,988$ 378,644$ 8,662,602$ 475,256$ 3,523,663$ 13,040,166$ 9,488,259$ 27,695,695$ 34.3% 3,471,761$ 1,336,362$
179 Davis Elementary School PK-5 1993 13.2 375,946$ 245,779$ 621,725$ 4,466,364$ 242,164$ 172,691$ 5,502,944$ 5,330,253$ 22,832,945$ 23.3% -$ 1,062,050$
114 Dawson Elementary School PK-5 1954 8.7 825,023$ 1,788,448$ 2,613,471$ 2,164,807$ 124,053$ 1,374,936$ 6,277,266$ 4,902,331$ 18,054,973$ 27.2% 1,332,942$ 812,429$
154 Doss Elementary School PK-5 1970 9.7 277,493$ 1,753,192$ 2,030,684$ 3,366,419$ 262,383$ 585,467$ 6,244,954$ 5,659,486$ 21,571,372$ 26.2% 548,668$ 867,630$
176 Ga lindo Elementa ry School PK-5 1989 10.8 718,525$ 472,173$ 1,190,697$ 1,724,238$ 237,955$ 162,944$ 3,315,834$ 3,152,890$ 27,712,949$ 11.4% -$ 1,255,082$
116 Govalle Elementary School PK-5 1940 8.4 340,133$ 1,139,527$ 1,479,660$ 4,269,803$ 1,386,730$ 3,711,107$ 10,847,299$ 7,136,192$ 23,095,017$ 30.9% 3,614,398$ 935,305$
159 Graham Elementary School PK-5 1972 9.9 776,380$ 3,942,191$ 4,718,571$ 2,175,356$ 462,863$ 145,540$ 7,502,330$ 7,356,790$ 24,196,550$ 30.4% -$ 874,097$
117 Gullett Elementary School K-5 1956 17.9 296,279$ 477,899$ 774,178$ 3,404,040$ 278,491$ 5,578,522$ 10,035,231$ 4,456,709$ 15,275,706$ 29.2% 5,538,153$ 1,100,391$
118 Harris Elementary School PK-5 1955 7.3 168,662$ 462,786$ 631,447$ 3,593,988$ 351,166$ 26,321$ 4,602,922$ 4,576,600$ 21,247,129$ 21.5% -$ 1,301,321$
163 Hart Elementary School PK-5 1998 15.7 440,103$ 429,303$ 869,405$ 1,705,738$ 330,538$ 150,402$ 3,056,083$ 2,905,681$ 28,219,837$ 10.3% -$ 1,071,119$
1 19 H i gh la nd P ar k El em en ta ry S ch oo l K -5 1 952 6 .3 3 78 ,5 90$ 549,487$ 928,077$ 5,117,848$ 220,844$ 2,357,371$ 8,624,139$ 6,266,769$ 20,158,386$ 31.1% 2,314,969$ 1,112,435$
155 Hill Elementary School PK-5 1970 8.9 369,298$ 762,743$ 1,132,041$ 4,753,883$ 395,173$ 2,849,188$ 9,130,285$ 6,281,096$ 23,453,170$ 26.8% 2,816,276$ 921,105$
162 Houst on El ementa ry School PK-5 1976 13.8 347,984$ 5,056,005$ 5,403,989$ 4,782,952$ 313,940$ 513,050$ 11,013,932$ 10,500,882$ 28,771,349$ 36.5% 452,838$ 1,698,239$
178 Jordan Elementary School PK-5 1992 11.5 344,244$ 526,308$ 870,552$ 4,497,788$ 305,917$ 366,415$ 6,040,673$ 5,674,257$ 25,804,974$ 22.0% -$ 1,294,151$
120 Joslin Elementary School PK-5 1954 5.1 365,427$ 1,658,814$ 2,024,241$ 3,828,081$ 489,316$ 1,761,730$ 8,103,367$ 6,341,638$ 15,618,987$ 40.6% 1,726,417$ 905,386$
180 Kiker Elementary School K-5 1992 12.4 465,453$ 285,692$ 751,145$ 3,481,469$ 231,480$ 270,058$ 4,734,153$ 4,464,095$ 27,275,667$ 16.4% -$ 945,244$
172 Kocurek Element ary Schoo l PK-5 1986 12.3 276,757$ 739,213$ 1,015,969$ 4,710,718$ 337,850$ 84,409$ 6,148,946$ 6,064,538$ 23,816,680$ 25.5% -$ 1,239,761$
168 La ngfor d Elem entar y S cho ol PK-5 1980 10.7 543,183$ 5,823,122$ 6,366,305$ 2,847,265$ 293,128$ 600,073$ 10,106,772$ 9,506,698$ 28,303,131$ 33.6% -$ 1,519,228$
121 Lee Elementary School K-6 1939 4.8 426,784$ 1,565,236$ 1,992,020$ 3,564,212$ 200,247$ 36,675$ 5,793,153$ 5,756,478$ 13,990,931$ 41.1% -$ 1,268,395$
160 Linder Elementary School PK-5 1972 9.1 170,717$ 1,486,942$ 1,657,659$ 3,064,256$ 373,892$ 5,824,800$ 10,920,607$ 5,095,807$ 25,625,896$ 19.9% 5,754,971$ 876,187$
131 Lucy Read Pre-K School PK 1961 9.9 191,332$ 843,430$ 1,034,762$ 1,221,125$ 154,414$ 9,470$ 2,419,771$ 2,410,301$ 21,971,173$ 11.0% -$ 715,064$
1 22 M ap le wo od E le me nt ar y S ch oo l P K- 6 1 951 6 .4 1 ,6 30 ,2 35$ 367,527$ 1,997,762$ 3,955,287$ 119,540$ 2,005,569$ 8,078,158$ 6,072,588$ 16,243,675$ 37.4% 1,958,007$ 648,571$
123 Ma thews Elem enta ry S chool PK-6 1916 2.3 103,898$ 1,407,923$ 1,511,822$ 2,537,969$ 285,980$ 2,282,922$ 6,618,692$ 4,335,770$ 13,897,228$ 31.2% 2,258,699$ 841,669$
165 McBee Elementary School K-5 1999 10.9 237,524$ 319,343$ 556,867$ 1,036,048$ 242,383$ 57,384$ 1,892,682$ 1,835,298$ 23,236,719$ 7.9% -$ 883,087$
Page 198
AISD School/Facility FCI Summary Total minus NC
Priorities 1-5 and Some ADA
No. Campus Name
Grades
Served Age Site Priority 1 Priority 2
Total Priority
1 a nd 2 P ri or it y 3 P rio rit y 4 P ri or it y 5
Total Facility
Condition
Cost
FCI Related
Facility Cost
Total
Replacement
Cost FCI
Functional
Equity
Educational
Adequacy
147 M enchaca Element ary S choo l PK-5 1975 19.8 237,446$ 4,313,709$ 4,551,155$ 2,516,965$ 693,652$ 82,611$ 7,844,383$ 7,761,772$ 21,040,089$ 36.9% -$ 1,093,862$
124 Metz Elementary School PK-5 1993 6.4 245,693$ 2,198,147$ 2,443,840$ 3,224,075$ 239,898$ 213,073$ 6,120,886$ 5,907,813$ 19,328,741$ 30.6% -$ 958,961$
181 Mills Elementary School PK-5 1998 10.7 254,583$ 438,024$ 692,608$ 2,241,637$ 604,743$ 163,005$ 3,701,993$ 3,538,989$ 27,859,900$ 12.7% -$ 1,316,271$
150 No rma n Elem entar y S cho ol PK-5 1970 10.2 491,997$ 1,618,873$ 2,110,870$ 3,488,359$ 249,133$ 1,961,658$ 7,810,019$ 5,819,127$ 17,864,592$ 32.6% 1,896,243$ 880,325$
148 O ak Hill Elementa ry School PK-5 1974 13.7 577,910$ 2,562,750$ 3,140,659$ 5,082,614$ 417,412$ 46,822$ 8,687,508$ 8,640,685$ 25,741,908$ 33.6% -$ 1,650,197$
125 Oak Spr ings Elementa ry School PK-5 1958 8.6 436,196$ 1,544,778$ 1,980,974$ 1,913,526$ 218,887$ 30,328$ 4,143,715$ 4,113,386$ 15,839,115$ 26.0% -$ 712,476$
156 Odom Elementary School PK-5 1970 8.6 314,793$ 555,080$ 869,872$ 3,051,516$ 304,204$ 75,095$ 4,300,687$ 4,225,593$ 22,017,089$ 19.2% -$ 783,022$
126 Ortega Elementary School PK-5 1959 7.4 554,133$ 2,585,580$ 3,139,712$ 2,666,838$ 188,616$ 55,295$ 6,050,462$ 5,995,167$ 14,984,780$ 40.0% -$ 794,706$
189 Ove rto n Elem entar y S cho ol PK-5 2007 70.4 129,148$ 222,703$ 351,852$ 812,642$ 285,677$ -$ 1,450,171$ 1,450,171$ 30,773,624$ 4.7% -$ 1,014,803$
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 201/317
171 Palm Elementary School PK-5 1987 13.2 326,618$ 355,630$ 682,248$ 1,716,073$ 302,890$ 156,623$ 2,857,834$ 2,701,211$ 24,438,393$ 11.1% -$ 1,129,509$
143 Patton Elementary School PK-5 1986 24.1 553,125$ 1,351,958$ 1,905,083$ 2,641,513$ 172,467$ 309,114$ 5,028,177$ 4,719,062$ 26,010,525$ 18.1% -$ 969,016$
128 Pease Elementary School K-6 1876 2.8 366,438$ 2,838,820$ 3,205,258$ 4,030,819$ 795,232$ 51,831$ 8,083,139$ 8,031,308$ 10,597,089$ 75.8% -$ 743,252$
1 29 P ec an S pr ing s El em en ta ry S ch oo l P K- 5 1 957 7 .6 2 04 ,1 13$ 354,593$ 558,706$ 5,221,971$ 1,542,355$ 90,134$ 7,413,166$ 7,323,032$ 19,694,928$ 37.2% -$ 1,346,708$
190 Perez Elem enta ry S chool PK-5 2006 28.0 1,206,199$ 216,162$ 1,422,361$ 1,028,182$ 150,809$ -$ 2,601,352$ 2,601,352$ 29,028,065$ 9.0% -$ 1,027,736$
164 Pickle Elementary School PK-5 2001 17.5 267,092$ 283,194$ 550,286$ 1,241,301$ 347,992$ 116,853$ 2,256,432$ 2,139,580$ 37,780,539$ 5.7% -$ 1,225,897$
151 Pillow Elementary School PK-5 1969 10.0 223,451$ 347,521$ 570,972$ 7,437,607$ 293,128$ 2,716,120$ 11,017,828$ 8,301,708$ 19,335,286$ 42.9% 2,695,012$ 1,237,573$
1 30 P le as ant H il l E le me nt ar y S ch oo l P K- 5 1 985 1 0. 1 3 38 ,9 74$ 421,776$ 760,750$ 3,408,419$ 101,031$ 473,908$ 4,744,109$ 4,270,200$ 21,837,014$ 19.6% 367,071$ 767,791$
132 Reilly Elementary School PK-5 1954 10.8 397,166$ 785,780$ 1,182,946$ 2,658,687$ 203,051$ 11,517$ 4,056,202$ 4,044,685$ 14,216,116$ 28.5% -$ 623,670$
133 Ridget op Element ary Schoo l PK-5 1939 5.0 165,485$ 1,164,852$ 1,330,337$ 1,527,895$ 899,377$ 22,541$ 3,780,150$ 3,757,609$ 11,956,232$ 31.4% -$ 492,082$
174 R odr iguez Element ary Schoo l PK-5 1999 15.0 229,804$ 335,591$ 565,395$ 1,437,448$ 305,732$ 64,181$ 2,372,756$ 2,308,575$ 28,810,020$ 8.0% -$ 1,238,887$
127 Sanchez Elementary School PK-5 1976 9.2 169,463$ 3,527,025$ 3,696,487$ 2,600,313$ 340,250$ 2,934,744$ 9,571,794$ 6,637,050$ 25,069,329$ 26.5% 2,843,511$ 1,158,542$
139 Sims Elementary School PK-5 1956 8.4 929,492$ 624,530$ 1,554,022$ 4,091,216$ 273,990$ 868,224$ 6,787,451$ 5,919,228$ 15,016,609$ 39.4% 837,082$ 928,787$
136 S t. Elmo Elementary School PK-5 1960 9.4 516,693$ 681,703$ 1,198,396$ 4,849,681$ 238,602$ 1,342,548$ 7,629,227$ 6,286,679$ 15,255,478$ 41.2% 1,326,203$ 1,045,047$
138 Summit t Element ar y S cho ol PK-5 1986 14.5 459,077$ 411,250$ 870,328$ 5,355,622$ 258,428$ 177,876$ 6,662,254$ 6,484,378$ 25,777,010$ 25.2% -$ 1,075,677$
1 58 S uns et V al le y E le me nt ar y S ch oo l P K- 5 1 971 1 0. 4 1 70 ,7 70$ 2,801,633$ 2,972,404$ 5,549,996$ 235,908$ 2,385,867$ 11,144,175$ 8,758,308$ 20,685,803$ 42.3% 2,339,157$ 1,005,839$
1 40 T ra vi s H ei ght s E le me nt ar y S ch oo l P K- 5 1 938 3 .2 9 64 ,4 51$ 2,480,760$ 3,445,212$ 3,035,427$ 505,213$ 1,545,119$ 8,530,971$ 6,985,852$ 19,096,715$ 36.6% 1,471,609$ 991,804$
1 41 W al nu t C re ek E le me nt ar y S ch oo l K -6 1 961 1 1. 5 3 78 ,3 61$ 1,157,572$ 1,535,934$ 2,650,418$ 199,636$ 10,090$ 4,396,078$ 4,385,988$ 28,685,677$ 15.3% -$ 1,064,371$
175 Widen Elementary School PK-5 1986 10.7 344,749$ 519,889$ 864,638$ 2,387,370$ 207,421$ 244,825$ 3,704,253$ 3,459,428$ 26,737,543$ 12.9% -$ 1,026,980$
166 William s Elem ent ar y S cho ol PK-5 1976 14.0 207,027$ 3,996,735$ 4,203,762$ 3,314,316$ 634,239$ 2,107,462$ 10,259,778$ 8,123,194$ 22,031,262$ 36.9% 2,037,080$ 1,806,830$
157 Winn Elementary School PK-5 1970 10.0 449,115$ 758,666$ 1,207,781$ 2,895,852$ 360,778$ 6,696,886$ 11,161,297$ 4,464,411$ 19,839,796$ 22.5% 6,617,626$ 1,369,856$
152 W ooldr idge Elementa ry School K-5 1969 11.6 681,037$ 1,779,983$ 2,461,020$ 3,258,538$ 345,503$ 3,072$ 6,068,132$ 6,065,060$ 26,329,413$ 23.0% -$ 961,821$
144 Woot en El ementa ry School PK-5 1955 6.7 1,154,161$ 3,089,669$ 4,243,830$ 6,189,133$ 541,732$ 1,429,495$ 12,404,189$ 10,974,694$ 21,453,872$ 51.2% 1,380,857$ 1,403,037$
145 Zavala Elementary School PK-6 1937 3.4 874,332$ 410,359$ 1,284,691$ 5,062,642$ 414,056$ 19,700$ 6,781,088$ 6,761,389$ 20,624,524$ 32.8% -$ 1,032,634$
146 Zilker Elementary School PK-6 1950 11.8 895,527$ 1,978,488$ 2,874,015$ 6,699,936$ 776,182$ 2,565,129$ 12,915,262$ 10,350,133$ 18,351,848$ 56.4% 2,409,599$ 1,023,970$
Page 199
AISD School/Facility FCI Summary Total minus NC
Priorities 1-5 and Some ADA
No. Campus Name
Grades
Se rve d Age Site Prior ity 1 Prior ity 2
Total Priority
1 a nd 2 P ri ori ty 3 P ri ori ty 4 P ri or ity 5
Total Facility
Condition Cost
FCI Related
Facility Cost
Total
Replacement
Cost FCI
Functional
Equity
Educational
Adequacy
Middle Schools
059 Bailey Middle School 6-8 1993 41.3 718,590$ 2,307,324$ 3,025,915$ 4,249,984$ 1,260,797$ 175,348$ 8,712,044$ 8,538,264$ 52,022,435$ 16.4% -$ 2,483,427$
054 Bedichek Middle School 6-8 1972 23.3 6,051,876$ 3,947,712$ 9,999,588$ 4,289,394$ 1,517,014$ 13,820,241$ 29,626,237$ 15,805,996$ 51,604,343$ 30.6% 13,761,948$ 2,467,186$
046 Burnet Middle School 6-8 1961 23.7 696,528$ 7,228,821$ 7,925,349$ 8,242,121$ 1,461,392$ 1,228,083$ 18,856,946$ 17,628,862$ 51,140,088$ 34.5% 1,167,871$ 2,786,054$
057 Covington Middle School 6-8 1986 21.3 961,398$ 3,791,641$ 4,753,039$ 5,457,787$ 679,240$ 1,960,490$ 12,850,556$ 10,890,066$ 58,357,322$ 18.7% 1,633,542$ 2,218,938$
055 Dobie Middle School 6-8 1973 20.2 819,317$ 1,032,156$ 1,851,474$ 3,993,260$ 1,153,996$ 6,327,599$ 13,326,328$ 6,998,729$ 46,067,662$ 15.2% 6,294,500$ 2,605,739$
043 Fulmore Middle School 6-8 1911 9.8 1,675,047$ 7,905,746$ 9,580,793$ 11,125,201$ 1,520,831$ 353,775$ 22,580,600$ 22,226,825$ 54,800,107$ 40.6% -$ 1,873,471$
056 Garcia Middle School 6-8 2008 41.3 341,779$ 375,320$ 717,098$ 1,477,213$ 256,690$ -$ 2,451,001$ 2,451,001$ 52,634,348$ 4.7% -$ 1,785,189$
062 Gorzycki Middle School 6-8 2009 14.2 309,464$ 330,542$ 640,006$ 1,551,469$ 435,269$ -$ 2,626,743$ 2,626,743$ 57,473,012$ 4.6% -$ 1,948,774$
044 Kealing Middle School 6-8 1986 13.2 375,942$ 4,974,961$ 5,350,903$ 5,384,570$ 962,232$ 464,321$ 12,162,026$ 11,697,705$ 62,920,315$ 18.6% -$ 2,797,674$
045 Lamar Middle School 6-8 1955 14.3 868,115$ 2,862,857$ 3,730,973$ 3,240,381$ 1,109,337$ 19,344$ 8,100,034$ 7,963,458$ 41,245,693$ 19.3% -$ 2,294,389$
051 Martin Middle School 6-8 1966 9 9 529 628$ 6 008 583$ 6 538 211$ 4 037 673$ 630 629$ 3 297 183$ 14 503 696$ 11 206 513$ 38 873 997$ 28 8% 3 222 769$ 1 488 156$
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 202/317
051 Martin Middle School 6 8 1966 9.9 529,628$ 6,008,583$ 6,538,211$ 4,037,673$ 630,629$ 3,297,183$ 14,503,696$ 11,206,513$ 38,873,997$ 28.8% 3,222,769$ 1,488,156$
058 Mendez Middle School 6-8 1987 20.7 1,080,210$ 4,069,741$ 5,149,951$ 3,162,498$ 903,869$ 1,830,512$ 11,046,831$ 9,216,319$ 61,291,493$ 15.0% 1,701,214$ 2,294,128$
052 Murchison Middle School 6-8 1967 26.2 485,127$ 1,623,549$ 2,108,676$ 5,951,701$ 1,040,012$ 8,153,256$ 17,253,644$ 9,100,388$ 45,706,537$ 19.9% 7,989,851$ 1,754,965$
047 O. Henry Middle School 6-8 1953 13.8 287,063$ 788,273$ 1,075,336$ 4,249,201$ 368,706$ 3,270,833$ 8,964,076$ 5,693,243$ 42,714,090$ 13.3% 3,236,248$ 1,604,680$
061 Paredes Middle School 6-8 2000 78.2 639,397$ 655,597$ 1,294,994$ 2,788,004$ 1,505,034$ 274,674$ 5,862,705$ 5,588,032$ 50,694,496$ 11.0% -$ 3,031,743$
048 Pearce Middle School 6-8 1958 14.8 797,160$ 1,469,168$ 2,266,328$ 3,870,033$ 437,683$ 797,883$ 7,371,927$ 6,574,044$ 43,914,998$ 15.0% 770,887$ 1,421,448$
028 Ann Richards School 6-10 1958 15.3 1,751,415$ 2,490,074$ 4,241,489$ 10,459,899$ 775,306$ 126,188$ 15,602,883$ 15,476,695$ 45,071,376$ 34.3% -$ 1,975,612$
060 Small Middle School 6-8 1999 36.5 354,444$ 1,045,835$ 1,400,279$ 1,980,661$ 354,205$ 162,029$ 3,897,174$ 3,735,145$ 54,088,993$ 6.9% -$ 1,928,150$
053 Webb Middle School 6-8 1961 15.6 420,533$ 3,515,438$ 3,935,971$ 3,080,033$ 1,413,498$ 733,661$ 9,163,164$ 8,429,502$ 42,628,637$ 19.8% 703,954$ 2,101,392$
High Schools
017 Akins High School 9-12 2000 57.7 954,259$ 1,208,558$ 2,162,817$ 3,966,511$ 1,452,488$ 134,171$ 7,715,986$ 7,581,815$ 115,209,011$ 6.6% -$ 4,294,809$
009 Anderson High School 9-12 1973 38.8 883,879$ 7,269,324$ 8,153,203$ 9,335,056$ 1,959,665$ 8,421,936$ 27,869,861$ 27,743,960$ 100,442,692$ 27.6% 8,296,036$ 5,596,292$
002 Austin High School 9-12 1975 44.3 1,821,769$ 8,599,187$ 10,420,955$ 17,067,949$ 4,155,102$ 8,187,414$ 39,831,421$ 31,644,007$ 101,704,101$ 31.1% 8,019,994$ 4,786,572$
013 Bowie High School 9-12 1988 66.0 1,142,743$ 13,619,484$ 14,762,227$ 14,517,730$ 15,147,412$ 884,595$ 45,311,964$ 44,427,369$ 141,414,289$ 31.4% -$ 16,682,721$
008 Crockett High School 9-12 1969 39.5 1,822,148$ 10,610,065$ 12,432,213$ 19,394,213$ 3,011,592$ 186,183$ 35,024,201$ 34,838,018$ 111,743,044$ 31.2% -$ 3,899,330$
0 19 E as ts id e M em or ia l H ig h S ch oo ls ( EM HS JC ) 9 -1 2 1 96 0 2 7. 6 3 ,5 10 ,9 42$ 12,123,425$ 15,634,366$ 7,266,111$ 650,888$ 213,544$ 23,764,910$ 23,551,366$ 87,276,402$ 27.0% -$ 2,370,779$
015 Garza Inde pe ndence High Scho ol 11-12 1939 3.1 528,781$ 925,712$ 1,454,494$ 1,791,072$ 516,483$ 198,632$ 3,960,682$ 3,762,050$ 17,523,392$ 21.5% -$ 1,160,890$
029 International High School 9-10 -$ -$ -$ -$ -$ -$ -$ -$ -$ 0.0% -$ -$
014 Johnson (LBJ) High School 9-12 1974 41.4 1,082,734$ 3,932,853$ 5,015,587$ 7,240,361$ 1,922,200$ 96,326$ 14,274,474$ 14,178,148$ 98,621,982$ 14.4% -$ 3,610,445$
004 Lanier High School 9-12 1966 28.5 1,328,937$ 4,526,958$ 5,855,895$ 12,659,556$ 1,639,563$ 176,389$ 20,331,402$ 20,155,013$ 91,315,888$ 22.1% -$ 3,798,556$
018 LASA 9-12 -$ -$ -$ -$ -$ -$ -$ -$ -$ 0.0% -$ -$
005 McCallum High School 9-12 1953 31.1 1,149,580$ 3,763,557$ 4,913,137$ 10,864,608$ 1,362,340$ 2,583,395$ 19,723,479$ 17,140,084$ 83,866,651$ 20.4% 2,352,452$ 3,347,251$
006 Reagan High School 9-12 1965 31.8 1,208,310$ 865,508$ 2,073,817$ 12,941,528$ 3,120,501$ 348,003$ 18,483,850$ 18,135,847$ 81,643,031$ 22.2% -$ 5,067,540$
007 Travis High School 9-12 1953 34.8 1,049,482$ 1,617,099$ 2,666,581$ 24,320,432$ 1,903,928$ 870,745$ 29,761,687$ 28,890,942$ 95,250,042$ 30.3% 685,951$ 3,901,369$
Other Facilities
852 Clifton Center Alt. Ed. 1977 7.8 255,304$ 1,789,699$ 2,045,003$ 2,557,341$ 752,437$ 36,615$ 5,391,397$ 5,354,782$ 13,110,071$ 40.8% -$ 1,163,512$
012 Ridgeview ALC 6-12 1953 1 9.8 594,690$ 1,052,657$ 1,647,347$ 7,759,365$ 1,468,980$ 32,018$ 10,907,709$ 10,875,692$ 31,629,925$ 34.4% -$ 843,199$
251 Rosedale School Alt. Ed. 1939 4.9 492,433$ 462,750$ 955,183$ 3,490,585$ 251,739$ 68,255$ 4,765,762$ 4,697,506$ 14,472,614$ 32.5% -$ 777,226$
252 Baker Center 1911 4.8 282,216$ 1,676,261$ 1,958,477$ 1,224,224$ -$ 202,910$ 3,385,610$ 3,182,700$ 18,483,157$ 17.2% -$ -$
951 Burger Athletic Complex 1977 48.1 1,189,463$ 7,099,714$ 8,289,176$ 3,529,618$ 35,546$ 42,012$ 11,896,352$ 11,854,340$ 50,681,646$ 23.4% -$ -$
941 Carruth Administration Center 1991 2.8 180,247$ 903,444$ 1,083,691$ 5,448,615$ 269,285$ -$ 6,801,590$ 6,801,590$ 37,598,528$ 18.1% -$ -$
922 Central Warehouse 1983 18.7 268,665$ 404,270$ 672,935$ 725,905$ -$ 11,195$ 1,410,034$ 1,398,840$ 27,023,496$ 5.2% -$ -$
949 Delco Activity Center 2003 44.1 259,623$ 205,193$ 464,817$ 170,579$ 10,355$ -$ 645,750$ 645,750$ 16,919,044$ 3.8% -$ -$
948 House Park 1936 11.1 137,227$ 70,034$ 207,260$ 730,632$ -$ 157,489$ 1,095,381$ 915,722$ 8,999,133$ 10.2% -$ -$
281 Nelson Field 1963 20.1 422,773$ -$ 422,773$ 1,663,288$ -$ 91,966$ 2,178,027$ 2,086,061$ 16,557,338$ 12.6% -$ -$
959 Nelson Field Bus Terminal 1995 6.6 70,197$ 81,921$ 152,119$ 58,564$ 61,039$ 24,167$ 295,889$ 271,722$ 4,105,030$ 6.6% -$ -$
950 Noack Sports Complex 2004 11.2 126,224$ -$ 126,224$ -$ -$ -$ 126,224$ 126,224$ 906,929$ 13.9% -$ -$
942 Pleasant Hill Annex 1936 2.0 270,019$ 180,761$ 450,779$ 2,381,648$ 94,588$ -$ 2,927,015$ 2,927,015$ 7,228,209$ 40.5% -$ -$
960 Saegert Transportation 1975 10.6 128,439$ 185,122$ 313,561$ 1,456,374$ 172,306$ 28,659$ 1,970,900$ 1,942,241$ 7,983,889$ 24.3% -$ -$
962 Se rvice Ce nter - Building & Grounds 1991 16.7 170,528$ 209,015$ 379,543$ 1,102,379$ 44,245$ 135,726$ 1,661,892$ 1,526,167$ 15,239,037$ 10.0% -$ 15,999$
Total 77,451,146$ 242,076,008$ 319,527,153$ 0 522,702,751$ 88,789,541$ 144,246,781$ 1,075,266,227$ 0 938,928,480$ 4,112,139,818$ 22.8% 130,776,864$ 184,824,729$
Page 200
A list of the FCIs for all AISD campuses and their replacement cost is shown in the following table.
S S / i i C S
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 203/317
AISD School/Facility FCI Summary
No. Campus Name Total Area
Total Facility
Condition Cost
FCI Related
Facility Cost
Total Replacement
Cost FCI
Pre-K
131 Lucy Read Pre-K School 73,860 2,355,781$ 2,346,311$ 21,971,173$ 10.7%
Elementary Schools
101 Allison Elementary School 69,106 4,089,675$ 4,079,387$ 20,556,998$ 19.8%
102 Andrews Elementary School 69,128 7,599,425$ 6,064,356$ 20,563,542$ 29.5%
103 Barton Hills Elementary School 49,043 4,894,150$ 4,879,804$ 14,588,847$ 33.4%
104 Becker Elementary School 62,742 7,036,234$ 6,917,872$ 18,663,896$ 37.1%
105 Blackshear Elementary School 70,726 7,349,617$ 7,291,599$ 21,038,900$ 34.7%
106 Blanton Elementary School 81,033 5,068,277$ 5,009,131$ 24,104,928$ 20.8%
107 Brentwood Elementary School 65,963 5,994,554$ 4,551,938$ 19,622,049$ 23.2%
108 Brooke Elementary School 56,140 5,477,387$ 5,439,501$ 16,699,995$ 32.6%
109 Brown Elementary School 58,523 8,933,788$ 6,267,791$ 17,408,867$ 36.0%
110 Bryker Woods Elementary School 45,197 4,636,795$ 4,592,141$ 13,444,775$ 34.2%
111 Campbell Elementary School 63,329 4,294,266$ 3,916,911$ 18,838,511$ 20.8%
112 Casis Elementary School 91,735 4,800,432$ 4,739,853$ 27,288,458$ 17.4%
113 Cunningham Elementary School 77,744 12,674,635$ 9,122,729$ 23,126,547$ 39.4%
114 Dawson Elementary School 60,695 6,110,749$ 4,870,418$ 18,054,973$ 27.0%
116 Govalle Elementary School 77,638 11,910,197$ 8,328,341$ 23,095,017$ 36.1%
117 Gullett Elementary School 51,352 8,464,128$ 4,645,259$ 15,275,706$ 30.4%
118 Harris Elementary School 66,818 4,751,949$ 4,725,627$ 19,876,385$ 23.8%
119 Highland Park Elementary School 67,766 10,584,925$ 8,342,957$ 20,158,386$ 41.4%
120 Joslin Elementary School 52,506 8,466,116$ 6,889,953$ 15,618,987$ 44.1%
121 Lee Elementary School 47,033 5,737,368$ 5,700,693$ 13,990,931$ 40.7%
122 Maplewood Elementary School 54,606 7,376,745$ 5,936,739$ 16,243,675$ 36.5%
123 Mathews Elementary School 45,182 6,508,124$ 4,275,795$ 13,440,313$ 31.8%
124 Metz Elementary School 64,977 5,914,131$ 5,701,058$ 19,328,741$ 29.5%
AUSTIN INDEPENDENT SCHOOL DISTRICT
District-Wide Facility Master Plan
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 204/317
Appendix B Facility Capacity Charts and
Population Updates
Page 202
LOC Elementary
Permanent
Capacity
2010
Enrollment
% of Perm.
Capacity
by Enroll.
2009-10
Population
% of Perm.
Capacity
by Pop.
Classroom
Count
Special
Rooms
(ES Only)
Average
Students
per
Classroom
Efficiency
Factor
Classroom
Capacity
Café Area
(SF)
4.77 SF per
student
Capacity
based on
Café Size
Café /
Classroom
Gym Area
(SF)
3.41 SF per
student
Capacity
based on
Gym Size
Gym /
Classroom
Library
Area (SF)
3.98 SF per
student
Capacity
based on
Library Size
Library /
Classroom
142 Allan 673 379 56% 357 53% 42 6 22 85% 673 5,483 4.77 1 ,1 49 1 71 % 6,160 3.41 1 ,8 06 2 68 % 6,704 3.98 1 ,6 85 2 50 %
101 Allison 486 543 112% 536 110% 30 4 22 85% 486 3,513 4.77 736 151% 2,972 3.41 871 179% 3,636 3.98 914 188%
102 Andrews 486 717 147% 604 124% 31 5 22 85% 486 3,361 4.77 705 145% 3,192 3.41 936 192% 2,217 3.98 557 115%
187 Baldwin 669 508 76% 488 73% 38 6 22 95% 669 4,507 4.77 945 141% 3,183 3.41 933 140% 3,598 3.98 904 135%
182 Baranoff 794 876 110% 881 111% 44 6 22 95% 794 3,845 4.77 806 102% 2,878 3.41 844 106% 2,850 3.98 716 90%
149 Barrington 556 996 179% 909 163% 41 6 22 85% 655 2,574 4.77 540 82% 2,558 3.41 750 115% 2,642 3.98 664 101%
103 Barton Hills 251 386 154% 184 73% 14 2 22 95% 251 2,707 4.77 567 226% 2,329 3.41 683 272% 2,834 3.98 712 284%
104 Becker 524 208 40% 214 4 1% 33 5 22 85% 524 3,337 4.77 700 134% 3,403 3.41 998 191% 2,116 3.98 532 102%
105 Blackshear 598 244 41% 255 43% 37 5 22 85% 598 3,117 4.77 653 109% 3,054 3.41 896 150% 2,246 3.98 564 94%
106 Blanton 636 591 93% 667 105% 40 6 22 85% 636 3,052 4.77 640 101% 2,531 3.41 742 117% 2,723 3.98 684 108%
185 Blazier 598 775 130% 827 138% 38 6 22 85% 598 5,258 4.77 1,102 184% 3,203 3.41 939 157% 3,480 3.98 874 146%
170 Boone 752 501 67% 496 6 6% 42 6 22 95% 752 4,052 4.77 850 113% 2,887 3.41 847 113% 3,384 3.98 850 113%
107 Brentwood 585 495 85% 419 72% 33 5 22 95% 585 2,468 4.77 517 88% 2,447 3.41 718 123% 3,078 3.98 773 132%
Classroom Capacity
Cafeteria = 4,200 SF / 880 Students
4.77 SF per Student
Gym = 3,000 SF / 880 Students
3.41 SF per Student
Library = 3,500 SF / 880 Students
3.98 SF per Student
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 205/317
108 Brooke 430 439 102% 449 104% 27 4 22 85% 430 2,363 4.77 495 115% 2,328 3.41 683 159% 2,743 3.98 689 160%
109 Brown 468 519 111% 480 103% 29 4 22 85% 468 3,944 4.77 827 177% 2,426 3.41 712 152% 3,139 3.98 789 169%
110 Bryker Woods 272 404 149% 283 104% 16 3 22 95% 272 2,296 4.77 481 177% 2,987 3.41 876 322% 2,307 3.98 580 213%
111 Campbell 524 360 69% 377 72% 33 5 22 85% 524 4,129 4.77 866 165% 3,030 3.41 889 170% 2,777 3.98 698 133%
173 Casey 711 669 94% 652 9 2% 44 6 22 85% 711 4,425 4.77 928 131% 3,055 3.41 896 126% 2,757 3.98 693 97%
112 Casis 669 825 123% 729 109% 38 6 22 95% 669 3,962 4.77 831 124% 2,588 3.41 759 113% 3,736 3.98 939 140%
184 Clayton 836 867 104% 734 88% 47 7 22 95% 836 4,282 4.77 898 107% 3,025 3.41 887 106% 3,576 3.98 898 107%
161 Cook 561 901 161% 1,173 209% 35 5 22 85% 561 3,242 4.77 680 121% 2,365 3.41 694 124% 3,375 3.98 848 151%
183 Cowan 669 783 117% 678 101% 37 5 22 95% 669 4,060 4.77 851 127% 2,985 3.41 875 131% 2,968 3.98 746 111%
113 Cunningham 627 512 82% 632 101% 35 5 22 95% 627 3,363 4.77 705 112% 2,518 3.41 738 118% 3,091 3.98 777 124%
179 Davis 731 683 93% 675 92% 41 6 22 95% 731 3,995 4.77 837 114% 3,047 3.41 894 122% 2,848 3.98 716 98%
114 Dawson 505 331 6 6% 279 55% 32 5 22 85% 505 2,470 4.77 518 103% 2,338 3.41 686 136% 2,121 3.98 533 106%
154 Doss 543 768 141% 679 125% 30 4 22 95% 543 4,623 4.77 969 178% 3,027 3.41 888 163% 2,925 3.98 735 135%
176 Galindo 711 704 99% 715 101% 44 6 22 85% 711 4,287 4.77 899 126% 3,041 3.41 892 125% 3,545 3.98 891 125%
116 Govalle 598 415 69% 450 75% 37 5 22 85% 598 3,570 4.77 749 125% 2,301 3.41 675 113% 2,225 3.98 559 93%
159 Graham 598 761 127% 759 127% 38 6 22 85% 598 4,280 4.77 897 150% 3,217 3.41 943 158% 3,068 3.98 771 129%
117 Gullett 418 541 129% 340 81% 24 4 22 95% 418 2,195 4.77 460 110% 2,401 3.41 704 168% 2,434 3.98 612 146%
118 Harris 542 758 140% 793 146% 34 5 22 85% 542 3,408 4.77 714 132% 2,267 3.41 665 123% 2,594 3.98 652 120%
163 Hart 711 898 126% 865 122% 44 6 22 85% 711 3,667 4.77 769 108% 3,040 3.41 892 125% 2,848 3.98 716 101%
119 Highland Park 585 662 113% 567 97% 33 5 22 95% 585 2,469 4.77 518 88% 2,514 3.41 737 126% 1,951 3.98 490 84%
155 Hill 627 732 117% 677 108% 35 5 22 95% 627 2,723 4.77 571 91% 2,456 3.41 720 115% 3,357 3.98 844 135%
162 Houston 692 915 132% 911 132% 43 6 22 85% 692 4,951 4.77 1 ,0 38 1 50 % 3,483 3.41 1 ,0 21 1 48 % 3,645 3.98 916 132%
178 Jordan 655 833 127% 672 103% 41 6 22 85% 655 4,159 4.77 872 133% 2,997 3.41 879 134% 2,807 3.98 705 108%
120 Joslin 374 363 97% 314 84% 24 4 22 85% 374 3,595 4.77 754 202% 2,375 3.41 696 186% 2,080 3.98 523 140%
180 Kiker 752 933 124% 866 115% 42 6 22 95% 752 3,779 4.77 792 105% 3,211 3.41 942 125% 2,782 3.98 699 93%
172 Kocurek 673 660 98% 676 100% 42 6 22 85% 673 4,292 4.77 900 134% 2,962 3.41 869 129% 3,561 3.98 895 133%168 Langford 692 834 121% 914 132% 43 6 22 85% 692 2,881 4.77 604 87% 2,579 3.41 756 109% 2,519 3.98 633 91%
121 Lee 418 428 102% 293 70% 24 4 22 95% 418 2,059 4.77 432 103% 2,238 3.41 656 157% 2,647 3.98 665 159%
160 Linder 542 892 164% 906 167% 34 5 22 85% 542 2,738 4.77 574 106% 2,507 3.41 735 136% 2,322 3.98 584 108%
122 Maplewood 355 406 114% 302 85% 20 3 22 95% 355 2,470 4.77 518 146% 2,447 3.41 718 202% 1,941 3.98 488 137%
123 Mathews 397 405 102% 299 75% 23 4 22 95% 397 1,906 4.77 400 101% 2,377 3.41 697 176% 2,278 3.98 572 144%
165 McBee 580 765 132% 1,026 177% 36 5 22 85% 580 5,127 4.77 1 ,0 75 1 85 % 3,045 3.41 893 154% 2,852 3.98 717 124%
147 Menchaca 606 686 113% 702 116% 34 5 22 95% 606 3,572 4.77 749 124% 2,501 3.41 734 121% 2,442 3.98 614 101%
124 Metz 542 498 92% 481 89% 34 5 22 85% 542 4,045 4.77 848 156% 3,013 3.41 884 163% 2,816 3.98 708 130%
181 Mills 794 928 117% 860 108% 44 6 22 95% 794 3,759 4.77 788 99% 3,052 3.41 895 113% 2,747 3.98 690 87%
150 Norman 486 333 6 8% 380 78% 30 4 22 85% 486 2,876 4.77 603 124% 2,259 3.41 662 136% 2,647 3.98 665 137%
148 Oak Hill 773 772 100% 783 101% 43 6 22 95% 773 4,567 4.77 957 124% 3,393 3.41 995 129% 3,330 3.98 837 108%
125 Oak Springs 411 274 67% 336 82% 26 4 22 85% 411 2,086 4.77 437 106% 2,985 3.41 875 213% 2,130 3.98 535 130%
156 Odom 542 658 121% 740 136% 34 5 22 85% 542 2,643 4.77 554 102% 2,421 3.41 710 131% 2,877 3.98 723 133%
126 Ortega 374 296 79% 263 70% 24 4 22 85% 374 2,734 4.77 573 153% 2,323 3.41 681 182% 1,468 3.98 369 99%
189 Overton 617 668 108% 904 146% 39 6 22 85% 617 4,148 4.77 870 141% 7,853 3.41 2 ,3 03 3 73 % 3,560 3.98 894 145%
171 Palm 673 606 90% 687 102% 42 6 22 85% 673 4,189 4.77 878 130% 3,075 3.41 902 134% 3,757 3.98 944 140%
143 Patton 773 914 118% 894 116% 43 6 22 95% 773 4,849 4.77 1 ,0 17 1 31 % 3,067 3.41 899 116% 3,542 3.98 890 115%
128 Pease 293 256 87% 0 0% 17 3 22 95% 293 1,307 4.77 274 94% 2,995 3.41 878 300% 1,468 3.98 369 126%
129 Pecan Springs 486 532 109% 520 107% 30 4 22 85% 486 3,220 4.77 675 139% 2,412 3.41 707 146% 2,986 3.98 750 154%
190 Perez 598 886 148% 864 144% 37 5 22 85% 598 4,158 4.77 872 146% 3,295 3.41 966 161% 3,467 3.98 871 146%
164 Pickle 617 740 120% 618 100% 39 6 22 85% 617 4,363 4.77 915 148% 9,153 3.41 2 ,6 84 4 35 % 2,882 3.98 724 117%
151 Pillow 522 653 125% 617 118% 29 4 22 95% 522 2,761 4.77 579 111% 3,069 3.41 900 172% 2,282 3.98 573 110%
130 Pleasant Hill 524 619 118% 662 126% 33 5 22 85% 524 3,991 4.77 837 160% 3,022 3.41 886 169% 3,546 3.98 891 170%131 Read Pre-K 393 509 129% 0 0% 23 - 18 95% 393 2,982 4.77 625 159% NA 3.41 NA NA 2,148 3.98 540 137%
132 Reilly 318 296 93% 342 108% 20 3 22 85% 318 2,287 4.77 479 151% 2,398 3.41 703 221% 1,637 3.98 411 129%
133 Ridgetop 206 219 106% 123 60% 13 2 22 85% 206 2,309 4.77 484 235% 2,336 3.41 685 333% 1,762 3.98 443 215%
Page 203
174 Rodriguez 711 910 1 28% 1,044 1 47% 44 6 22 85% 711 3,714 4.77 779 110% 3,056 3.41 896 126% 2,818 3.98 708 100%
127 Sanchez 580 585 101% 564 97% 36 5 22 85% 580 2,959 4.77 620 107% 2,399 3.41 704 121% 3,028 3.98 761 131%
139 Sims 355 277 78% 366 103% 22 3 22 85% 355 2,599 4.77 545 153% 2,484 3.41 728 205% 2,625 3.98 660 186%
136 St. Elmo 411 304 74% 407 99% 26 4 22 85% 411 2,825 4.77 592 144% 2,259 3.41 662 161% 3,149 3.98 791 192%
138 Summitt 731 854 117% 572 78% 41 6 22 95% 731 3,683 4.77 772 106% 3,064 3.41 898 123% 4,017 3.98 1 ,0 09 1 38 %
158 Sunset Valley 561 451 80% 494 88% 35 5 22 85% 561 2,987 4.77 626 112% 2,376 3.41 697 124% 2,952 3.98 742 132%
140 Travis Heights 486 537 110% 556 114% 31 5 22 85% 486 2,992 4.77 627 129% 2,812 3.41 825 170% 1,962 3.98 493 101%
141 Walnut Creek 655 916 140% 918 140% 41 6 22 85% 655 4,721 4.77 990 151% 2,638 3.41 773 118% 3,706 3.98 931 142%
175 Widen 673 769 114% 834 124% 42 6 22 85% 673 3,851 4.77 807 120% 3,051 3.41 895 133% 3,363 3.98 845 126%
166 Williams 561 642 114% 728 130% 35 5 22 85% 561 3,040 4.77 637 114% 2,500 3.41 733 131% 2,923 3.98 734 131%
157 Winn 524 463 88% 601 115% 33 5 22 85% 524 2,565 4.77 538 103% 2,322 3.41 681 130% 2,348 3.98 590 113%
152 Wooldridge 524 878 1 68% 1,096 209% 33 5 22 85% 524 4,120 4.77 864 165% 2,580 3.41 757 145% 2,319 3.98 583 111%
144 Wooten 468 695 149% 740 158% 29 4 22 85% 468 3,534 4.77 741 158% 2,534 3.41 743 159% 3,036 3.98 763 163%
145 Zavala 580 407 7 0% 339 58% 36 5 22 85% 580 2,618 4.77 549 95% 2,740 3.41 804 139% 2,714 3.98 682 118%
146 Zilker 460 522 114% 329 7 2% 26 4 22 95% 460 2,894 4.77 607 132% 2,217 3.41 650 141% 2,703 3.98 679 148%
44,905 4 8,738 47,366
ClassroomCapacity
Cafeteria = 4,500 SF / 1,100 Students
4 10 SF per Student
Gym = 13,400 SF / 1,100 Students
12 18 SF per Student
Library = 4,800 SF / 1,100 Students
4 36 SF per Student
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 206/317
LOC Middle
Permanent
Capacity
2010
Enrollment
% of Perm.
Capacity
by Enroll.
2009-10
Population
% of Perm.
Capacity
by Pop.
Classroom
Count
Special
Rooms
(ES Only)
Average
Students
per
Classroom
Efficiency
Factor
Classroom
Capacity
Café Area
(SF)
4.10 SF per
student
Capacity
based on
Café Size
Café /
Classroom
Gym Area
(SF)
12.18 SF
per
student
Capacity
based on
Gym Size
Gym /
Classroom
Library
Area (SF)
4.36 SF per
student
Capacity
based on
Library Size
Library /
Classroom
59 Bailey 1,176 1,041 89% 997 85% 56 0 28 75% 1,176 4,752 4.10 1,159 99% 13,668 12.18 1,122 95% 4,013 4.36 920 78%
54 Bedichek 941 1,054 112% 1,171 124% 48 0 28 70% 941 6,348 4.10 1,548 165% 11,555 12.18 949 101% 3,657 4.36 839 89%
46 Burnet 1,039 998 96% 1,163 112% 53 0 28 70% 1,039 5,765 4.10 1,406 135% 11,877 12.18 975 94% 3,243 4.36 744 72%
57 Covington 1,125 805 72% 922 82% 63 0 28 75% 1 ,323 4,461 4.10 1,088 82% 13,935 12.18 1,144 86% 4,044 4.36 928 70%
55 Dobie 902 630 70% 709 79% 46 0 28 70% 902 4,790 4.10 1,168 130% 11,388 12.18 935 104% 3,553 4.36 815 90%
43 Fulmore 1,078 995 92% 898 83% 55 0 28 70% 1,078 5,452 4.10 1,330 123% 13,196 12.18 1,083 101% 4,127 4.36 947 88%
56 Garcia 1,215 658 54% 801 66% 62 0 28 70% 1,215 5,220 4.10 1,273 105% 15,986 12.18 1,312 108% 4,666 4.36 1,070 88%
62 Gorzycki 1,323 963 73% 943 71% 63 0 28 75% 1,323 4,669 4.10 1,139 86% 15,396 12.18 1,264 96% 5,616 4.36 1,288 97%
44 Kealing 1,333 1,233 93% 563 42% 80 0 28 70% 1,568 4,433 4.10 1,081 69% 12,344 12.18 1,013 65% 4,499 4.36 1,032 66%
45 Lamar 1,008 604 60% 554 55% 48 0 28 75% 1,008 6,725 4.10 1,640 163% 10,575 12.18 868 86% 3,665 4.36 841 83%
51 Martin 804 639 80% 1,070 133% 41 0 28 70% 804 4,022 4.10 981 122% 11,740 12.18 964 120% 2,983 4.36 684 85%
58 Mendez 1,215 890 73% 1,224 1 01% 62 0 28 70% 1,215 4,501 4.10 1,098 90% 13,699 12.18 1,125 93% 4,044 4.36 928 76%
52 Murchison 1,113 1,281 115% 1,187 107% 53 0 28 75% 1,113 4,879 4.10 1,190 107% 11,857 12.18 974 87% 3,413 4.36 783 70%
47 O. Henry 945 1,026 109% 764 81% 45 0 28 75% 945 5,199 4.10 1,268 134% 10,628 12.18 873 92% 3,147 4.36 722 76%
61 Paredes 1,156 930 80% 1,123 97% 59 0 28 70% 1 ,156 5,953 4.10 1,452 126% 12,775 12.18 1,049 91% 2,798 4.36 642 55%
48 Pearce 1,078 329 31% 683 63% 55 0 28 70% 1,078 5,057 4.10 1,234 114% 13,147 12.18 1,079 100% 4,293 4.36 985 91%
28 Richards YWL 924 528 57% 0 0% 44 0 28 75% 924 5,272 4.10 1,286 139% 11,751 12.18 965 104% 5,046 4.36 1 ,1 57 1 25 %
60 Small 1,239 959 77% 873 70% 59 0 28 75% 1,239 6,244 4.10 1,523 123% 13,899 12.18 1,141 92% 3,142 4.36 721 58%
53 Webb 804 591 74% 692 86% 41 0 28 70% 804 4,348 4.10 1,061 132% 12,023 12.18 987 123% 4,399 4.36 1 ,0 09 1 26 %
20,417 1 6,154 16,337
LOC High
Permanent
Capacity
2010
Enrollment
% of Perm.
Capacity
by Enroll.
2009-10
Population
% of Perm.
Capacity
by Pop.
Classroom
Count
Special
Rooms
(ES Only)
Average
Students
per
Classroom
Efficiency
Factor
Classroom
Capacity
Café Area
(SF)
3.75 SF per
student
School
Capacity
based on
Café Size
Café /
Classroom
Gym Area
(SF)
8.63 SF per
student
School
Capacity
based on
Gym Size
Gym /
Classroom
Library
Area (SF)
3.50 SF per
student
School
Capacity
based on
Library Size
Library /
Classroom
17 Akins 2,394 2,720 114% 3,076 128% 114 0 28 75% 2 ,394 1 0,9 35 3 .7 5 2 ,9 16 1 22 % 2 1,4 71 8 .6 3 2 ,4 88 1 04 % 8,371 3.50 2 ,3 92 1 00 %
9 Anderson 2,017 2,089 104% 1,912 95% 113 0 28 75% 2,373 8,178 3.75 2,181 92% 1 7,0 68 8 .6 3 1,978 83% 9,864 3.50 2 ,8 18 1 19 %
2 Austin 2,205 2,337 1 06% 1,964 89% 105 0 28 75% 2,205 1 0,0 74 3 .7 5 2 ,6 86 1 22 % 1 7,4 88 8 .6 3 2,026 92% 5,977 3.50 1,708 77%
13 Bowie 2,535 2,876 113% 2,594 102% 142 0 28 75% 2,982 9,200 3.75 2,453 82% 2 2,0 36 8 .6 3 2,553 86% 9,862 3.50 2,818 94%
8 Crockett 2,163 1,686 78% 1,927 89% 103 0 28 75% 2,163 8,955 3.75 2 ,3 88 1 10 % 1 7,0 50 8 .6 3 1,976 91% 7,671 3.50 2 ,1 92 1 01 %
19/20/29
EMHSJC /
International 1,548 894 58% 1,310 85% 79 0 28 70% 1,548 8,952 3.75 2 ,3 87 1 54 % 1 6,4 19 8 .6 3 1 ,9 03 1 23 % 6,106 3.50 1 ,7 45 1 13 %
15 Garza 321 260 81% 0 0% 18 0 28 75% 378 1,834 3.75 489 129% 2,282 8.63 264 70% 1,223 3.50 349 92%
4 Lanier 1,627 1,624 1 00% 2,037 1 25% 83 0 28 70% 1,627 1 3,5 13 3 .7 5 3 ,6 03 2 21 % 2 3,4 65 8 .6 3 2 ,7 19 1 67 % 7,677 3.50 2 ,1 94 1 35 %
14/18 LBJ / LASA 1,842 1,881 102% 1,110 60% 94 0 28 70% 1,842 8,026 3.75 2 ,1 40 1 16 % 1 8,9 36 8 .6 3 2 ,1 94 1 19 % 8,856 3.50 2 ,5 30 1 37 %
5 McCallum 1,596 1,824 114% 1,343 84% 76 0 28 75% 1,596 6,244 3.75 1 ,6 65 1 04 % 1 5,7 65 8 .6 3 1 ,8 27 1 14 % 6,981 3.50 1 ,9 94 1 25 %
6 Reagan 1,588 901 57% 1,597 101% 81 0 28 70% 1 ,588 8,600 3.75 2 ,2 93 1 44 % 2 2,1 80 8 .6 3 2 ,5 70 1 62 % 6,226 3.50 1 ,7 79 1 12 %
7 Travis 1,862 1,420 76% 1,994 1 07% 95 0 28 70% 1,862 9,462 3.75 2 ,5 23 1 36 % 1 4,8 70 8 .6 3 1,723 93% 7,017 3.50 2 ,0 05 1 08 %
21,698 2 0,512 20,864
Classroom Capacity
Cafeteria = 9,000 SF / 2,400 Students
3.75 SF per Student
Gym = 20,720 SF / 2,400 Students
8.63 SF per Student
Library = 8,400 SF / 2,400 Students
3.50 SF per Student
Classroom Capacity 4.10 SF per Student 12.18 SF per Student 4.36 SF per Student
Page 204
LOC Elementary
Permanent
Capacity
2010
Enrollment
% of Perm.
Capacity
by Enroll.
2010-11
Population
% of Perm.
Capacity
by Pop.
142 Allan 673 379 56% 354 53%
101 Allison 486 543 112% 585 120%
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 207/317
102 Andrews 486 717 147% 692 142%187 Baldwin 669 508 76% 557 83%
182 Baranoff 794 876 110% 891 112%
149 Barrington 556 996 179% 955 172%
103 Barton Hills 251 386 154% 203 81%
104 Becker 524 208 40% 226 43%
105 Blackshear 598 244 41% 288 48%
106 Blanton 636 591 93% 630 99%
185 Blazier 598 775 130% 896 150%
170 Boone 752 501 67% 478 64%
107 Brentwood 585 495 85% 456 78%
108 Brooke 430 439 102% 441 103%
109 Brown 468 519 111% 525 112%
110 Bryker Woods 272 404 149% 312 115%
111 Campbell 524 360 69% 367 70%
173 Casey 711 669 94% 763 107%112 Casis 669 825 123% 731 109%
184 Clayton 836 867 104% 837 100%
161 Cook 561 901 161% 1,252 223%
183 Cowan 669 783 117% 707 106%
113 Cunningham 627 512 82% 573 91%
179 Davis 731 683 93% 666 91%
114 Dawson 505 331 66% 276 55%
154 Doss 543 768 141% 728 134%
165 McBee 580 765 132% 1,031 178%
147 Menchaca 606 686 113% 685 113%
124 Metz 542 498 92% 477 88%
181 Mills 794 928 117% 831 105%
150 Norman 486 333 68% 376 77%
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 208/317
150 Norman 486 333 68% 376 77%
148 Oak Hill 773 772 100% 820 106%125 Oak Springs 411 274 67% 293 71%
156 Odom 542 658 121% 706 130%
126 Ortega 374 296 79% 266 71%
189 Overton 617 668 108% 948 154%
171 Palm 673 606 90% 637 95%
143 Patton 773 914 118% 908 117%
128 Pease 293 256 87% 0 0%
129 Pecan Springs 486 532 109% 490 101%
190 Perez 598 886 148% 945 158%
164 Pickle 617 740 120% 737 119%
151 Pillow 522 653 125% 651 125%
130 Pleasant Hill 524 619 118% 631 121%
131 Read Pre-K 393 509 129% 0 0%
132 Reilly 318 296 93% 357 112%
133 Ridgetop 206 219 106% 128 62%
174 Rodriguez 711 910 128% 1,045 147%
127 Sanchez 580 585 101% 584 101%
139 Sims 355 277 78% 343 97%
136 St. Elmo 411 304 74% 369 90%
138 Summitt 731 854 117% 623 85%
158 Sunset Valley 561 451 80% 483 86%
140 Travis Heights 486 537 110% 548 113%141 Walnut Creek 655 916 140% 936 143%
LOC Middle
Permanent
Capacity
2010
Enrollment
% of Perm.
Capacity
by Enroll.
2010-11
Population
% of Perm.
Capacity
by Pop.
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 209/317
59 Bailey 1,176 1,041 89% 979 83%54 Bedichek 941 1,054 112% 1,219 130%
46 Burnet 1,039 998 96% 1,170 113%
57 Covington 1,125 805 72% 905 80%
55 Dobie 902 630 70% 719 80%
43 Fulmore 1,078 995 92% 850 79%
56 Garcia 1,215 658 54% 829 68%
62 Gorzycki 1,323 963 73% 989 75%
44 Kealing 1,333 1,233 93% 541 41%
45 Lamar 1,008 604 60% 583 58%
51 Martin 804 639 80% 1,056 131%
58 Mendez 1,215 890 73% 1,266 104%
52 Murchison 1,113 1,281 115% 1,171 105%
47 O. Henry 945 1,026 109% 804 85%
61 Paredes 1,156 930 80% 1,165 101%
48 Pearce 1,078 329 31% 712 66%28 Richards YWL 924 528 57% 0 0%
60 Small 1,239 959 77% 876 71%
53 Webb 804 591 74% 731 91%
20,417 16,154 16,565
LOC High
Permanent
Capacity
2010
Enrollment
% of Perm.
Capacity
by Enroll
2010-11
Population
% of Perm.
Capacity
by Pop
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 210/317
May 13 & 14, 2010
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 211/317
AUSTIN ISDFacility Master PlanVisioning Workshop
Acknowledgements
Cuningham Group Architecture P.A., as a consultant to DeJONG-RICHTER, prepared this document with
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 212/317
the support and assistance of the following Facility Master Plan Vision Workshop participants:
John Alawneh AISD - TechnologyTony Arnold City of Austin – Parks & RecreationJohn Blazier Business Partner Kathrin Brewer Austin Partners in EducationBill Caritij AISD - Chief AccountabilityMeria Carstarphen AISD - Superintendent
Nan Clayton Former AISD Board Member Ariel Cloud AISD – Asst. Superintendent ElementaryNicole Conley-Abram AISD - CFOTommy Cowan Business Partner Paul Cruz Chief of SchoolsAshton Cumberbatch Community Seton HospitalElizabeth Dickey AISD Special EducationBill De Dufour AISD - Technology
Richard Frazier AISD – Teacher / Task Force Chair Janna Griffin Asst. Supt. Office - ElementaryJanis Guerrero AISD – Community RelationsBergeron Harris AISD – Asst. Supt. Middle SchoolsJanna Lilly AISD – Special EducationViviana Lopez AISD – Curriculum/Special ProjectsEliza May CommunityJanet Mitchell Community – Task Force Chair
Chris Moore City of Austin – Child SafetyJ i P t E l Childh d
AUSTIN ISD Facility Master Plan Visioning Workshop
Table of Contents
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 213/317
Introduction
Day OneA. Greatest HopesB. Provocation I: Sir Ken RobinsonC. Issues & Assets
D. Provocation II: School of One
E. I See…We See… F. Facility Master Plan Vision StatementG. Provocation III: Environment MattersH. Values: AISD Strategic Plan 2010-2015 ReviewI. Story Time
Day TwoA. ReflectionsB. Provocation III: John A. JohnsonC. Facility Principles
AppendicesA. Day One Presentation
Facility Master Plan Visioning Workshop AUSTIN ISD
Introduction
This document is the result of a Facility Master Plan Visioning Workshop held May 13th & 14th, 2010 with
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 214/317
participants from the Austin Independent School District and the community. The purpose of this workshopwas to create a Facility Master Plan Vision Statement and Facility Principles.
The purpose of a Facility Master Plan is to create a clear and compelling vision of the future for AISD,aligning facilities with learning. A Facility Master Plan Vision Statement creates a filter by which futuredecisions can be made and Facility Principles create over arching ideas about what‟s important for allschools in AISD.
The process used during the Visioning Workshop was interactive and included “Provocations” and smalland whole group work. The following is a summary of our work during both days.
AUSTIN ISD Facility Master Plan Visioning Workshop
Greatest Hopes:Day one started with participants sharing their Greatest Hopes for the Facility Master Planning process.Below are some of the hopes shared by participants:
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 215/317
Facility Master Plan Visioning Workshop AUSTIN ISD
Provocation I: Sir Ken Robinson: Do Schools Kill Creativity?http://www.ted.com/talks/lang/eng/ken_robinson_says_schools_kill_creativity.html
Reactions to the video included the following:
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 216/317
Reactions to the video included the following: Learning occurs in many ways – public education focuses on academic achievement Career/Vocational Education is not emphasized but some children want – we need to provide the right
programs for all children The system is structurally set up to fail some children – there are ethnocentric, gender, and cultural
differences we need to consider Everyone learns differently Focus on where students can be successful through application Plan for the future but not at the expense of today There is a knowing/doing gap in education – establish the courage to do what we know is right – “thou shalt”
…accountability We continue to build boxes for people to teach in that look the same – we need more flexible, collaborative
spaces We need to respond to changes in the world; we need to be agile and our environment affects us The challenge is that we have given critical responsibility to one group of adults: teachers; we need to
consider the role of parents and the community to create creative thinkers. Open possibilities for kids tolearn from and in whole world – engage the community
AUSTIN ISD Facility Master Plan Visioning Workshop
Issues & Assets We discussed and prioritized Issues and Assets in Austin ISD. This was a way to find out what wasimportant to those present and what they thought were key to the success of a Facilities Master Plan. As is
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 217/317
noted below on the sheets the key issues identified were: Equity of facilities and resources across the district Efficient use of resources throughout the community Partnering Future flexibility for teaching in the future Competition and school choices (Middle class participates in public schools but they have other
choices) School boundaries
Facility Master Plan Visioning Workshop AUSTIN ISD
Provocation II: School of One http://schools.nyc.gov/community/innovation/SchoolofOne/default.htm
The group watched a video on the School of One a program that started the summer of 2009 in New York
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 218/317
The group watched a video on the School of One, a program that started the summer of 2009, in New YorkCity.
From the above website:
“The mission of School of One is to provide students with personalized, effective, and dynamic classroominstruction so that teachers have more time to focus on the quality of their instruction.To achieve this mission, School of One re-imagines the traditional classroom model. Instead of one teacher
and 25-30 students in a classroom, each student participates in multiple instructional modalities, including acombination of teacher-led instruction, one-on-one tutoring, independent learning, and work with virtualtutors.
To organize this type of learning, each student receives a unique daily schedule based on his or her academic strengths and needs. As a result, students within the same school or even the same classroomcan receive profoundly different instruction as each student‟s schedule is tailored to the skills they need andthe ways they best learn. Teachers acquire data about student achievement each day and then adapt their
live instructional lessons accordingly
By leveraging technology to play a more essential role in planning instruction, teachers have more time tofocus on doing what they do best - delivering quality instruction and ensuring that all students learn. ”
AUSTIN ISD Facility Master Plan Visioning Workshop
Activity I: I See…We See…
“Vision is the art of seeing the invisible” Jonathan Swift
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 219/317
To start the visioning process we asked participants to „imagine it‟s 10 years out, the AISD Facility Master Plan has given the district amazing learning places that reflect the community and help the districtaccomplish its mission. People visit because its facilities are so successful in accomplishing the goals of the District. Imagine you‟re giving someone a tour – what do you see?‟
Individually participants created I See statements: One-on-one time with teachers
Entire staff focused and engaged with kids Teachers focused on teaching the kids and not other issues Schools are the pride of the community and the first choice of middle class families
Large yet flexible spaces built to fit our growing population Repurposed spaces that are vintage yet functional for the community All facilities are beautifully maintained and are supportive of the instructional programs
All schools are painted in bright colors – place of exciting learning A dramatically reduced number of schools, yet a mix of small, medium, and large facilities 50 years later the space is still current (or can be)
Public and private, city and school district co-location of offices, classrooms, theaters, and meeting areas Art facilities which involve all our students and the world class Austin arts community in a learning partnership Shared facilities with the city Zachary Scott Theater, Long Center, AT&T, IBM, CAN. ACC – classroom days around
and within the city Students integrated within the community, downtown, capitol, tech companies, Whole Foods; “what do you do days”
Students a large part of the day as interns and apprentices Schools have clear feeder patterns and each feeder pattern has a special focus Engaged, enthusiastic students that want to be there. Eager to explain their love for learning.
Loud sounds from playing and team problems solving
Quiet places for reading and silent learning contemplation Team sports, yoga, and meditation
Facility Master Plan Visioning Workshop AUSTIN ISD
Schools that welcome visitors and are responsive to visitors Classrooms that are interactive include technology but also instructionally interactive – kids engaged with each other
and teacher All students have internet access at home
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 220/317
Staff, students and parents can readily access results and academic plans Students have exactly the information they need in the best format Realization of the promise of “instructional TV” to help teachers with complex, real world concepts such velocity,
acceleration, gravity, history of Middle Eastern areas, areas on curves, environmental science, poetry etc… Virtual lab for HS students to work on course credits. Teachers as side facilitators. As I walk through the facility I see a number of distant learning centers where students and teachers participating in a
collaborative learning process. These rooms have state of the art technology. State of the art facilities on each campus and two district-wide performing art centers
Students attend neighborhood schools as best opportunity
Classroom instruction that accommodates different student learning styles and provides support and enrichment basedon student learning needs
Stimulating and inviting learning environments that are fun to be in Inviting/welcoming face to the facility Parents working with students throughout the school Spaces for collaboration between teachers, parents and students Parents present, actively engaged, knowing learning goals of students Space for community/parents to be engaged
Outside area is an extension of the learning environment
Students learning in flexible indoor and outdoor spaces Gardens, fountains and trails instead of carpet and grass Active learning Classrooms that make use of indoor and outdoor settings for learning Students moving and active in the learning process
Students actively engaged in their learning Classrooms which comfortably hold 30 students in a variety of ways Students working in small groups collaboratively
I see building design geared towards multi -sensory student engagement A clean, well maintained visually appealing school for every student Tables instead of desks
AUSTIN ISD Facility Master Plan Visioning Workshop
Social skills training as part the degree program (such as mediation training) Flex schedules for students in high school Young children given the time and opportunity to learn through play Access to all resources within a school for every student
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 221/317
Curriculum that is differentiated to fit individuals needs and flexible schedules to allow the best use of time Secondary classrooms that allow for small group work (not just rows of chairs) A flower bed at the entrance of school, there are trees that have been pruned, and doors have been painted recently
and rooms are brightly painted, there are posters on the walls along with student work. The facilities reflect attention todetail
As we enter the library, there is a bank of computers and students working in small groups accessing databases fromaround the world. The students are engaged and the noise level is amazingly semi quiet.
Technology driven learning in every classroom in AISD facility
Language development academy, producing fluent 2nd and 3rd language proficiency
Fine arts integrated with academics integrated with social learning Music academy generating music professionals, singers, etc.
Spaces that are student/teacher friendly Teachers interacting with students Community advocate centers/service for students and family members
Learning centers for 0 to 4-year olds All students actively involved in learning Collaboration between AISD and ACC that produces HS graduates interested in graduation with certificates in medical
technology, nursing, construction, etc…
Central headquarters reduced in physical size, in more compact, effective structure Substantial revenue generated from space use that can be reinvested into important programming Private and corporate donation to AISD foundation in excess of $50 million Number-one rated HS in the country in Austin due to technology or live music/jazz, band or other with an awesome
facility/stages, media rooms, etc…
I See Wordle
www.wordle.net
Facility Master Plan Visioning Workshop AUSTIN ISD
In small groups participants then shared these I See… statements and created We See… statements.Listed below are the We see… statements worked on by participants in small groups. These became thebasis of the Vision Statement.
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 222/317
We see….. An overall environment that is both encouraging and engaging Purposeful, functional, modular facilities that serve all students needs Facilities “co-purposed” for student and community usage Teachers totally focused on education and innovation
Students in a variety of learning environments with technology support, integrated to ensure development
of individual learning styles and goals, supported by community partnerships on an ongoing basis (24/7)
Facilities that are inviting, welcoming, flexible enough to accommodate and support a variety of instructionalarrangements and incorporates:
instructional technology family and community access to information teacher access to information and resources
Facilities with dedicated spaces to foster and engage parents/community Facilities that use the outdoors and indoors in ways that are environmentally responsible and
allows for learning to take place in a variety of ways Facilities that engage with the community to provide extended learning opportunities both within
the school walls and beyond Classrooms large enough to allow for flex grouping and active hands-on learning A variety of multi-use areas Facilities where technology is integrated in every space and accessible to all students and staff
Spaces that allow for differentiated instruction and flexible school day
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 223/317
Facility Master Plan Visioning Workshop AUSTIN ISD
Facility Master Plan Vision Statement
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 224/317
The purpose of a vision statement is to guide the entire process, help set priorities, align resources againstpriorities and facilitate an efficient decision making process. The following vision statement was created byparticipants from the work done together:
All AISD schools inspire high student achievement and commoncommunity goals through inviting, accessible, and efficient facilities that
integrate technology and sustainability.
Revised Version:
All AISD schools will inspire high student achievementand support common community goals through equitable,
inviting facilities that integrate technology and are
optimally used, accessible, sustainable, and meet highest
educational adequacy standards.
AUSTIN ISD Facility Master Plan Visioning Workshop
Provocation III: Environment Matters “The only true voyage of discovery consists not of visiting new places, but seeing with new eyes.” Voltaire
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 225/317
As a part of the process of thinking about the future of Austin schools, the group looked at learning styles,the learning environment and current examples of what other districts are doing with their facilities. Beloware examples of what was discussed. The presentation is included in the May 13th presentation in theappendix of this document.
Facility Master Plan Visioning Workshop AUSTIN ISD
Values Building on the work that has already been done in the District we reviewed the Austin ISD Strategic Planand expanded on the Values contained in the Plan:
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 226/317
AISD Strategic Plan 2010-2015:
Mission (What We Do)In partnership with parents and our community, AISD exists to provide a comprehensive educationalexperience that is high quality, challenging, and inspires all students to make a positive contribution tosociety.
Vision (Where We Want to Be)AISD will be nationally recognized as an outstanding school district, instilling a passion for life-long learningin all students.
Goals (What We Want to Accomplish) Goal 1: All students will perform at or above grade level. Goal 2: Achievement gaps among all student groups will be eliminated. Goal 3: All students will graduate ready for college, career, and life in a globally competitive economy.
Goal 4: All schools will meet or exceed state accouintability standards, and the district will meet federalstandards and exceed state standards.
Strategies (How We Will Achieve Our Goals) Provide a high-quality, well-rounded educational experience to all students that is rigorous, culturally
relevant, healthful, and engaging. Build strong relationships with students, families, and the community to increase trust and shared
responsibility.
Ensure that every classroom has a high-quality, effective educator, supported by high-quality, effectiveadministrators and support staff
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 227/317
Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 228/317
AUSTIN ISD Facility Master Plan Visioning Workshop
Story Time As a way to think more about how learning will happen in the future and what role the facilities play,participants were asked to work in small groups and answer the following question:
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 229/317
Imagine it is 2020 and AISD has met its strategic plan goals for 2015 and has addressed many of the keyfacility needs as defined in the Facility Master Plan of 2010.
Imagine you are (a student, a community member, a teacher, a staff member) Describe your typical day inan AISD school – what does your day look like?
1. What are you doing? What is the process of learning and what are the outcomes or expectations?
2. Who are you with? How is your day organized?3. What is your environment like? Where are you and how do you feel?4. What makes AISD a special place to learn?
Facility Master Plan Visioning Workshop AUSTIN ISD
Day Two: ReflectionsWhile Day One was about creating a Facility Master Plan Vision Statement, Day Two of the workshopwas about creating Facility Principles. Facility Principles create over arching ideas about what‟s
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 230/317
important for all schools in AISD.
To start off Day Two the group reflected on Day One and on a video assigned as homework:Dave Eggers‟ Wish: Once Upon a School. http://www.ted.com/talks/lang/eng/dave_eggers_makes_his_ted_prize_wish_once_upon_a_school.html
AUSTIN ISD Facility Master Plan Visioning Workshop
Provocation IV: John A. JohnsonFrom the KnowledgeWorks website: http://www.kwfdn.org/resource_library/_resources/sacc_video_guide.asp
"Schools as Centers of Community: John A. Johnson Achievement Plus Elementary School” is a video
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 231/317
y ycase study and discussion guide that assists local leaders and residents in creating constructive,meaningful dialogue on the importance of good school design and ways schools can become centersof their communities. KnowledgeWorks Foundation partnered with the American ArchitecturalFoundation to create the guide and video.
Video link:http://www.archfoundation.org/aaf/gsbd/Videos.SCC.htm
Facility Master Plan Visioning Workshop AUSTIN ISD
Facility PrinciplesStarting with the Austin ISD 2010-2015 Strategic Plan Strategies, participants worked in small groups todefine Facility Principles. Facility Principles are overarching ideas about what‟s important for all schools inthe Austin Independent School District.
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 232/317
p
For each of the Strategies groups defined what this meant for facilities. So, for example, if the Austin ISD iscommitted to an engaging/healthy experience for all students, this means what in terms of facilities.
AUSTIN ISD Facility Master Plan Visioning Workshop
Facility Principles
The Austin Independent School District is committed to An engaging/healthy experience for all students …
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 233/317
This means…
• All schools will have a space identified to engage parents and be responsive to student needs(learning/language/cultural/socioeconomic)
• All schools will have spaces dedicated to active learning and diverse learning styles
• All schools will be equipped to provide technology resources in classrooms and other learningareas
• Create and maintain clean and attractive grounds that encourage physical activities• Provide safe entry and exit for cyclists, walkers, skateboarders, etc.
• Develop spaces that promote social and recreational interaction
• Common areas for active, hands-on group activities
• Coordinate and cooperate with other entities (YMCA, YWCA, Parks & Recreation) to share and/or build new facilities (pools, gyms, parks)
• All schools will have good indoor air quality, climate control, and day-lighting
• Our facilities will support high quality, rigorous, well rounded learning
Facility Master Plan Visioning Workshop AUSTIN ISD
Facility Principles
The Austin Independent School District is committed to Strong relationships with students/families/community …
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 234/317
This means… • Community hubs for services and programs
• Flexible spaces and hours to accommodate changes in learning styles, instructional deliverysupported by technological resources for students, families and communities
• Facilities to provide learning spaces that support student collaboration, teamwork and relationshipbuilding
AUSTIN ISD Facility Master Plan Visioning Workshop
Facility Principles
The Austin Independent School District is committed to Supporting and engaging high quality effective staff …
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 235/317
This means… • AISD facility decisions promote long-term value
• AISD facilities should be equitable and adequate across the district
• AISD staff and community must have input into facility decisions to ensure adequate resources(examples: space, storage, technology, outlets)
•
AISD facilities to provide high quality professional development spaces• AISD facilities must provide an appropriate environment for staff effectiveness (example: HVAC,
light, acoustics, security)
• AISD facilities must include adequate, flexible-use core facilities (library, gym, cafeteria)
• AISD staff must have appropriate access to various spaces to meet student needs of a high qualityrigorous educational experience
Facility Master Plan Visioning Workshop AUSTIN ISD
Facility Principles
The Austin Independent School District is committed to Aligning resources with priorities…
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 236/317
This means… • Leverage Austin public and private resources for more effective and efficient use of existing and
new facilities by:
• Revisit efficiency study
• Align decisions with fiscal impact statement
•
“CAN” concept (Community Action Network) to engage various public entities (e.g. UT, ACC,Travis County, Seton, St. David‟s, etc…) for purpose of repurposing facilities including charters andco-location
• Must at least break even or generate revenue
• Strategy for maintenance and operations to support facilities and address deferred, routine, andpreventative maintenance
• Develop detailed capital plan schedule/report that includes budget/actuals/completion dates and M& O impact by project
• CAN concept must be integrated into bond planning process to address shared facilities and amore comprehensive set of services
• Develop strategic partnerships to obtain private donations /endowments in excess of $50 million
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 237/317
Facility Master Plan Visioning Workshop AUSTIN ISD
Appendices
Contained on the following pages are the presentations from both days.
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 238/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 239/317
Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 240/317
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 241/317
Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 242/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 243/317
Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 244/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 245/317
Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 246/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 247/317
Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 248/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 249/317
Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 250/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 251/317
Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 252/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 253/317
Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 254/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 255/317
Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 256/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 257/317
Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 258/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 259/317
Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 260/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 261/317
Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 262/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 263/317
Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 264/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 265/317
Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 266/317
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 267/317
Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 268/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 269/317
Facility Master Plan Visioning Workshop AUSTIN ISD
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 270/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 271/317
Facility Master Plan Visioning Workshop AUSTIN ISD
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 272/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 273/317
Facility Master Plan Visioning Workshop AUSTIN ISD
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 274/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 275/317
Facility Master Plan Visioning Workshop AUSTIN ISD
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 276/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 277/317
Facility Master Plan Visioning Workshop AUSTIN ISD
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 278/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 279/317
Facility Master Plan Visioning Workshop AUSTIN ISD
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 280/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 281/317
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 282/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 283/317
Facility Master Plan Visioning Workshop AUSTIN ISD
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 284/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 285/317
Facility Master Plan Visioning Workshop AUSTIN ISD
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 286/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 287/317
Facility Master Plan Visioning Workshop AUSTIN ISD
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 288/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 289/317
Facility Master Plan Visioning Workshop AUSTIN ISD
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 290/317
AUSTIN ISD Facility Master Plan Visioning Workshop
Photos taken during the Workshop
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 291/317
Facility Master Plan Visioning Workshop AUSTIN ISD
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 292/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 293/317
Facility Master Plan Visioning Workshop AUSTIN ISD
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 294/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 295/317
Facility Master Plan Visioning Workshop AUSTIN ISD
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 296/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 297/317
Facility Master Plan Visioning Workshop AUSTIN ISD
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 298/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 299/317
Facility Master Plan Visioning Workshop AUSTIN ISD
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 300/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 301/317
Facility Master Plan Visioning Workshop AUSTIN ISD
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 302/317
AUSTIN ISD Facility Master Plan Visioning Workshop EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 303/317
Facility Master Plan Visioning Workshop AUSTIN ISD
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 304/317
AUSTIN INDEPENDENT SCHOOL DISTRICT
District-Wide Facility Master Plan
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 305/317
Appendices D, E, and F
Appendix D: Community Dialogue #1 Results
Appendix E: Community Dialogue #2 Results
Appendix F: Community Meeting #3 Results
Due to the volume of these reports, see the following link to access this information:
http://rcpt.yousendit.com/1042147173/d50a3fb54a75365c932c5df95adbd0c4
Page 303
AUSTIN INDEPENDENT SCHOOL DISTRICT
District-Wide Facility Master Plan
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 306/317
Appendix G
Summary of Facility Options Discussed by the FMPTF
Page 304
0.1
Cut all bus service for magnet schools and signature
programs $1,994,516
0.2
Redraw boundaries for the entire district with the
greatest weight on vertical alignmentUnknown Unknown $0
0 4
Move International HS from Eastside HS to ALC. Relocate
ALC students to Blackshear ES. Move Blachsear ES
t d t t Z l ES k $0 $0
NOTE: Highlighted op tions were p resented at the Com munity Mee tings held on January 12 & 13, 2011
DescriptionOption M&O Savings
Cost
Avoidance
Future Bond
Impact
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 307/317
0.4 students to Zavala ES Unknown $0 $0
0.5
Repurpose Allan ES as a Pre-K thru 8 and move Allison ES
attendance area middle school students from Martin MS
to Allan Pre-K-8 Unknown $0 $0
0.6
Repurpose Blackshear ES to a Pre-K - 8 school, and Oak Springs ES as a Pre-K - 6th, move middle school students
from these attendance zones from Kealing MS Unknown $0 $0
0.7
Repurpose Campbell ES as a Pre-K -8th school and move
middle school students from Kealing MS to Campbell Pre-
K-8th Unknown $0 $0
0.8
Repurpose Brentwood ES as a Pre-K-6th school, move
sixth grade students in this attendance zone from Lamar
MS to Brentwood PreK-6 School Unknown $0 $0
0.9
Repurpose Zavala ES to a Pre-K-8th school and move
middle school students from Martin MS to the new school Unknown $0 $0
0.10
Add a sixth grade class to Metz ES, Govalle ES, Ortega ES,
Norman ES, and Sims ES, move sixth grade students from
Martin MS and Garcia MS. Unknown $0 $0
Assuming all changes in options 0 5 through 0 10 are
NOTE: Highlighted op tions were p resented at the Com munity Mee tings held on January 12 & 13, 2011
DescriptionOption M&O Savings
Cost
Avoidance
Future Bond
Impact
0.18
Build a new middle school - Southeast (land funded from
previous bond) $0 $0 $55,700,000
0.19
Build a new high school - South (land funded from
previous bond)$0 $0 $106,600,000
0.20 School for Young Men
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 308/317
0.21
Global option to remove 6th grade from all elementary
schools when room is available in middle schools
1.1
Consolidate Reilly ES and Ridgetop ES at a new school
built on the Reilly ES site $2,076,204 $7,734,391 $24,000,000
1.2 Reassign students from Brown ES to Reilly ES $0 $0 $0
2.1Move a portion of student population from Cowan ES toBoone ES ($72,607) $0 $0
2.2
Close Joslin ES and move students to Sunset Valley ES
and Boone ES $1,259,273 $8,466,116 $0
2.2A
Close Joslin ES and move students to Sunset Valley ES.
Move a portion of Sunset Valley ES students to Boone ES $1,259,273 $8,466,116 $0
2.2 B
Close Joslin ES and move students to Sunset Valley ES.
Move a portion of Sunset Valley ES students to Boone ES
and Cunningham ES. Adjust boundaries between
Cowan ES and Boone ES. $1,266,595 $8,466,116 $0
2.2 C
Close Joslin ES and move students to Sunset Valley ES.
Move a portion of Sunset Valley ES students to Boone ES
and Cunningham ES. $1,266,595 $8,466,116 $0
2 2 D
Close Joslin ES and move students to Sunset Valley ES.
Move a portion of Sunset Valley ES students to Boone ES
d C i h ES $1 276 967 $8 466 116 $0
NOTE: Highlighted op tions were p resented at the Com munity Mee tings held on January 12 & 13, 2011
DescriptionOption M&O Savings
Cost
Avoidance
Future Bond
Impact
3.4 Adjust boundaries for Maplewood ES and Campbell ES $0 $0 $0
3.5Close Oak Springs ES and Ortega ES and consolidatestudents into Blackshear ES, Sims ES, and Norman ES $2,300,842 $10,308,022 $0
3.6 Close Pease ES $712,296 $7,302,501 $0
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 309/317
3.7
Close Govalle ES and Oak Springs ES and move students
to Allan ES, Zavala ES, and Blackshear ES $2,510,507 $16,136,129 $0
3.8
Repurpose Blackshear ES as a Hutson-Tillotson
demonstration school, training site for future teachers $0 $0 $0
3.9 A
Close Brooke ES and move students to Allan ES andZavala ES. Adjust boundary between Allan ES and
Norman ES. $1,301,382 $5,477,387 $0
3.9 B1 Close Ortega ES and move students to Govalle ES. $1,153,873 $6,082,090 $0
3.9 B2
Close Oak Springs ES and move students to Blackshear
ES. $1,146,969 $4,225,932 $0
3.9 C
Close Sanchez ES and move students north of Town Laketo Zavala ES and Metz ES. Adjust boundaries between
Zavala ES and Linder ES. Build a new 800-student
elementary south of Town Lake to receive students from
Sanchez ES, Metz ES and Travis Heights ES. $1,556,924 $9,424,688
* included in
Option 0.17
3.12
Close Allan ES and repurpose as a middle school for
Young Men, repurpose Martin MS as a middle school for
Young Women. Reassign Allan ES students to Govalle ES,
Ortega ES and Norman ES $12,203 $0 $15,389,258
NOTE: Highlighted op tions were p resented at the Com munity Mee tings held on January 12 & 13, 2011
DescriptionOption M&O Savings
Cost
Avoidance
Future Bond
Impact
4.4B
Close Barton Hills ES and Zilker ES and move students to
Becker ES and Dawson ES. $2,266,637 $17,543,935 $0
4.5
Close Barton Hills ES and Becker ES and move students
into Zilker ES and Dawson ES $2,207,301 $11,930,384 $0
4.6
Close Barton Hills ES and Joslin ES and move students into
Zilker ES and Dawson ES $2,367,541 $13,360,266 $0
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 310/317
4.7
Close Barton Hills ES and reassign students to Zilker ES and
close Becker ES and reassgin students to Dawson ES $2,207,301 $11,930,384 $0
4.8
Reassign a portion of Linder ES to Travis Heights ES and
reassign a portion of Travis Heights ES to Becker ES $0 $0 $0
5.1
Do not accept transfers into Bryker Woods ES, Casis ES,
Gullett ES, and Highland Park ES $0 $0 $0
5.2
Discontinue the option to offer 6th grade at Bryker
Woods ES $0 $0 $0
5.3
Adjust boundaries between Bryker Woods ES, Gullett ES,
and Brentwood ES $0 $0 $0
5.4
Build new school and adjust boundaries for Highland
Park ES, Doss ES, and Hill ES $0 $0 $25,200,000
5.5 Adjust boundaries between Mathews ES and Casis ES $0 $0 $0
6.1
Adjust boundaries between Norman ES, Overton ES, and
Ortega ES ($1,220) $0 $0
6.3
Add Pre-K center to Winn ES to provide relief for Andrews
ES, Pecan Springs ES, Jordan ES and Overton ES Unknown $0 $0
M K li MS t t M ti MS M
NOTE: Highlighted op tions were p resented at the Com munity Mee tings held on January 12 & 13, 2011
DescriptionOption M&O Savings
Cost
Avoidance
Future Bond
Impact
8.4
Close Webb MS and repurpose school as a School for
Young Men ($98,844) $0 $0
9.1
Reassign a portion of Bedichek MS population to
Covington MS($28,677) $0 $0
9.2
Adjust boundary between Bedichek MS and Covington
MS ($234,298) $0 $0
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 311/317
10.1 Adjust boundary between Reagan HS and McCallum HS $0 $0 $0
10.2
Improve programming at Reagan HS by providing cross-
training and mentoring with McCallum staff. Provide
nurturing environment to draw students back into
Reagan HS. $0 $0 $0
10.3
Give Reagan HS students the option to attend
specialized signature programs at McCallum HS with
transportation provided. $0 $0
10.4 Close Eastside HS and consolidate into Reagan HS ($539,373) $0 $0
10.5
Close Reagan HS and CAC, repurpose Reagan HS as
administrative center $0 $0 $0
10.6
Close Reagan HS and repurpose as Junior College /
ACC Partner $0 $0 $0
11.1
Identify surplus portables and build new elementary
school in the next bond $0 $0 $0
11.2
Repurpose Langford ES as a Pre-K center and adjust
boundaries with adjacent schools $0 $0 $0
12 1
Close Dobie MS and repurpose as elementary school to
provide relief for Hart ES, Graham ES, Walnut Creek ES
and Barrington ES. Reassign Dobie MS students to Webb
MS d P MS ($437 477) $0 $0
NOTE: Highlighted op tions were p resented at the Com munity Mee tings held on January 12 & 13, 2011
DescriptionOption M&O Savings
Cost
Avoidance
Future Bond
Impact
12.7
Repurpose Garcia MS as a 4 - 8 school and reassign a
portion of the population (Sims ES and Norman ES
attendance areas) to Pearce MS. Reassign Overton ESand Jordan ES 4 - 5 grade to new Garcia 4 - 8.
13 1
Adjust boundaries between Maplewood ES and
Campbell ES $0 $0 $0
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 312/317
13.1 Campbell ES $0 $0 $0
13.2
Build new elementary school in Mueller to relieve
overcrowding at Andrews ES, Harris ES, and Blanton ES ($58,093) $0 $24,000,000
13.3 Adjust boundaries between Andrews ES and Winn ES ($84,811) $0 $0
13.4
Build a Pre-K center to relieve Andrews ES, Winn ES,
Blanton ES, Pecan Springs ES, and Blanton ES $0 $0 $21,600,000
14.1 Build a new school west of Clayton ES $0 $0 $25,200,000
14.2
Adjust boundaries between Mills ES, Kiker ES, Cowan ES,
and Boone ES ($6,120) $0 $0
14.3 Add a K-8th grade school in southwest area Unknown $0
14.4 Adjust boundaries between Clayton ES and Baldwin ES $0 $0 $014.5 Repurpose Boone ES as a PK - 8 school $0 $0 $0
15.1
Repurpose Casey ES as a Pre-K Center and adjust
boundaries between Williams ES, Menchaca ES, Casey
ES, Odom ES, and Pleasant Hill ES $0 $0 $0
15.2
Build Pre-K center in the Williams ES attendance zone to
relieve Williams ES, Casey ES, Menchaca ES, Odom ES,
and Pleasant Hill ES $0 $0 $21,600,000
C t t d dd t t
AUSTIN INDEPENDENT SCHOOL DISTRICT
District-Wide Facility Master Plan
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 313/317
Appendix H
Glossary
Page 311
District-wide Facility Master Plan
Glossary of Terms – Update 02/15/2011 Glossary
The following is a list of definitions of known abbreviations
and terms used throughout the District-wide Facility
Master Plan Report.
ADA - Americans with Disabilities Act; addresses
modifications of facilities to ensure access for persons
with disabilities.
Attendance Zone – The geographical area from which
students are assigned a school to attend.
Capital Cost Avoidance – Buying less, or buying nothing
at all, to improve a permanent structure or aspect of a
property.
Capital Improvement - The addition or restoration of a
permanent structure or some aspect of a property that
will either enhance the property’s overall value or
increase its useful life.
Closure - A school that is no longer open to students.
Cohort - A specific group of students established for
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 314/317
i
g
Bond Program – The capital improvement efforts
associated with funding generated from a local voter-
approved tax levy for capital spending.
Building - A structure that houses children or equipment
on a school site or campus.
CAC - Carruth Administration Center; AISD’s
administrative headquarters complex.
CAC – Campus Advisory Council; a campus level
advisory council, required by state law, that addresses
the concerns of school communities.
Campus - A campus is a site where one or more
schools/buildings is/are located. For example, anelementary school can share a site with a middle school;
therefore, it is considered a campus.
monitoring purposes, particularly over time.
Consolidation - When a school is closed, its student
population will be combined with another student
population in another facility.
Core Spaces - Large areas within a building that areutilized by most students throughout the school day, i.e.,
cafeteria, gymnasium, library.
Deficiency - A construction deficiency is an item or
condition that is considered sub-standard or does not
meet current standards or building codes.
Educational Adequacy - An assessment of a facility to
evaluate how well the campus is equipped to deliver the
instructional program. For example, does the facility
have the standard types of technology within the
classroom that a teacher requires for the current
curriculum? Is there the proper amount of white board
Page 312
District-wide Facility Master Plan
Glossary of Terms – Update 02/15/2011 space in the classroom? Is there the correct number of
lab stations in a science room and do they have the
proper equipment?
Educational Specifications - Document that describes
the current standards for program areas, equipment
needs, technology needs, square footage, and special
considerations for a new school.
Enrollment - The number of students attending a school.
Facility Condition Assessment - An evaluation of a school
Impervious Cover - Any type of surface that will not allow
rainfall or runoff to soak into the ground (e.g. pavement
or buildings). Local ordinance may limit impervious cover
in developments for environmental protection or runoff
control purposes.
In Migration – Students attending a school that live
outside of that school’s attendance zone.
M&O – Maintenance and Operations; school funding
that pays for day-to-day administrative and operational
costs.
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 315/317
ii
facility that identifies current building and building system
deficiencies.
FCI - Facility Condition Index; an indicator of a facilities
condition obtained by dividing the repair costs by the
replacement cost of the same building.
FF&E - Furniture, Fixtures, and Equipment; the moveable
equipment that is used by the occupants inside a facility.
Generally includes furniture and computers.
Functional Equity - Comparison of identified core areas
and other specialized classroom space and the level at
which they meet the AISD educational specification
standards.
GIS - Geographic Information System; an automated
system for referencing geocoded data, e.g., a database
of addresses for students enrolled in a school system.
HVAC - Heating, Ventilation, and Air Conditioning.
costs.
Open Enrollment – A policy or practice that allows
students to attend other AISD outside their assigned
attendance area zone.
Operating Cost - Costs associated with operating a
school facility including administration, custodial and
maintenance supplies and staffing, and food service.
Out Migration - Students leaving their attendance zones
to attend another school in the district.
Over-enrolled - A school enrollment that is greater than
105% of permanent capacity.
Over-utilized - A school enrollment that is greater than
105% of permanent capacity.
Permanent Capacity - The number of students a school
can accommodate within its permanent building(s). See
pages 182-183 for additional information.
Page 313
District-wide Facility Master Plan
Glossary of Terms – Update 02/15/2011 Portable/Temporary Building - A building designed and
built to be movable rather than as a permanent
structure. A typical portable building in AISD contains
two classrooms.
Priority - A categorization of building deficiencies,
defined as follows.
Priority 1: currently critical (immediate need, i.e., firesafety systems)
Priority 2: potentially critical (to be corrected within one
i j HVAC i t it t )
Signature Program – A specialized curriculum
implemented in a vertical team to enhance the vertical
team’s instructional program.
Soft Costs - Generally refers to a collection of costs
added to the construction costs and may include items
like professional fees, construction testing and permitting,
contingencies, or administrative costs.
Site - Geographical location of a school’s building[s].
SQL - Structured Query Language; a form of database
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 316/317
iii
year, i.e., major HVAC equipment, security systems)
Priority 3: necessary/not yet critical (1-2 years, i.e., sitelighting, sanitation sewer, educational adequacy)
Priority 4: recommended (3-5 years, i.e., finishes,
educational adequacy)
Priority 5: does not meet current code/standards
/grandfathered (i.e., functional equity, 3rd tier ADA)
School Choice - Refers to a policy or practice that allows
parents and students to attend schools outside their
assigned attendance zones for specific program
offerings or for reasons permitted in the District’s transfer
policy.
School Zone Population - The number of AISD students
living within the attendance zone of a school.
that allows the analysis of data by sorting it into
categories.
TAS – Texas Accessibility Standards; standards set by the
TDLR (Texas Department of Licensing and Regulation) for
accessibility to public buildings and facilities, places of
public accommodation, and commercial facilities, by
individuals with disabilities.
Teaching Space - A room or designated area where
classes or instruction are held.
TBD - To be determined.
Title 1 - Funding provided by the federal government for
schools with high percentages of students who qualify for
free and reduced lunch. The funding must supplement
existing funding provided by the school district for
curriculum, instruction, and related services.
Page 314
District-wide Facility Master Plan
Glossary of Terms – Update 02/15/2011 Under-enrolled - A school enrollment that is less than 85%
of permanent capacity.
Under-utilized - A school enrollment that is less than 85%
of permanent capacity.
Utilization Factor - The enrollment of a school divided by
its permanent capacity, also known as percent of
permanent capacity.
Vertical Team - A group of campuses consisting of a high
school and its feeder middle and elementary schools.
EXHIBIT "B"
8/7/2019 Austin ISD Recommended Facility Master Plan
http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 317/317