Austin independent school district District-WiDe Facility Master Plan March 2011 EXHIBIT "B"

Upload: kutnews

Post on 08-Apr-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 1/317

Austin independent school district

District-WiDe FacilityMaster Plan

March 2011

EXHIBIT "B"

Page 2: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 2/317

 

As a planning team we appreciate the opportunity to serve the Austin Independent School District. DeJONG-RICHTER LLC

Magellan ConsultingCuningham Group

BLGY Architecture

EXHIBIT "B"

Page 3: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 3/317

Ac know ledgeme nts .......................................................................................................................................................................... 3 

Introduc tion ........................................................................................................................................................................................ 5 

Exec utive Summary ........................................................................................................................................................................... 6 

Facility Recommendations ............................................................................................................................................................. 10Timeline for Facility Master Plan Implementation ......................................................................................................................... 13Estimated Budget ...................................................................................................................................................................... 15

Area Fac ility Op tions .......................................................................................................................................................................16 

Ad ditiona l Rec om me ndations ........................................................................................................................................................ 32Policy Recommendations ........................................................................................................................................................ 32 

Management Recommendations ...........................................................................................................................................33 

Staffing Recommendations ...................................................................................................................................................... 33 

Energy Efficiency Recommendations......................................................................................................................................34 Maintenance Recommendations............................................................................................................................................34 

Design Recommendations........................................................................................................................................................ 35 Safety and Security Recommendations .................................................................................................................................. 35 

Use Recommendations ................................................................................................................................................................... 36Technology Recommendations ............................................................................................................................................... 36 

Other Recommendations ......................................................................................................................................................... 37 

Fac ility Summa ry Rep orts w ith Fac ility Master Plan Rec om me ndatio ns ..................................................................................... 38Elementary Schools (Alpha) ............................................................................................................................................................ 39Middle Schools (Alpha) ................................................................................................................................................................. 119 

High Schools (Alpha) ...................................................................................................................................................................... 138 

Special Schools (Alpha) ................................................................................................................................................................. 151Support Facilities (Alpha) ............................................................................................................................................................... 154 

Educational Framework ....................................................................................................................................................................... 165 

Planning Guidelines ...................................................................................................................................................................... 165Programmatic Considerations .................................................................................................................................................... 166

Enrollment Projec tions ................................................................................................................................................................... 169 

Historical Enrollment ...................................................................................................................................................................... 169

Birth Data ........................................................................................................................................................................................ 175Projected Enrollment .................................................................................................................................................................... 176

EXHIBIT "B"

 

Page 1

Page 4: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 4/317

 

Capac ity Analysis .......................................................................................................................................................................... 178

Utilization ........................................................................................................................................................................................ 180

Fac ility Cond ition Analysis ............................................................................................................................................................ 184 Educational Adequacy Assessment ............................................................................................................................................ 186 

Building Deficiencies ...................................................................................................................................................................... 187 

Fac ility Op tions ..............................................................................................................................................................................189 

Criteria .............................................................................................................................................................................................. 189 

AppendicesAppendix A ........................................................................................................................FCI White Paper and Facility FCI Charts 

Ap pend ix B ...................................................................................................................................................Facility Capacity Charts Appendix C .........................................................................................................................................Visioning Workshop SummaryAppendix D .................................................................................................................................... Community Dialogue #1 ResultsAp pend ix E .....................................................................................................................................Community Dialogue #2 ResultsAp pend ix F ...............................................................................................................................Community Meeting #3 CommentsAppendix G ............................................................................................................. Summary of Facility Options Discussed by FMPTFAppe ndix H .................................................................................................................................................................... Glossary of Terms 

EXHIBIT "B"

 

Page 2

Page 5: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 5/317

 

Acknowledgements

We would like to extend our appreciation to the Austin Independent School District Board of Trustees for its commitment

to the Facility Master Planning Process. We realize that the recommendations contained within the plan will createchallenges for the community in the months and years to come. With the support of the school district and communitymembers, the Austin Independent School District can continue its mission to provide a comprehensive educationalexperience that is high quality, challenging, and inspires all students to make a positive contribution to society.

Boa rd o f Trustee s

Mark Williams, District 5, PresidentVincent M. Torres, District 4, Vice President

Lori Moya, District 6, Secretary

Cheryl Bradley, District 1Sam Guzman, District 2

Christine Brister, District 3Robert Schneider, District 7

Annette LoVoi, At-Large Position 8Tamala Barksdale, At-Large Position 9

Austin Independent School District

Dr. Meria Carstarphen, Superintendent of SchoolsLawrence Fryer, Chief Operations Officer 

Paul Turner, Executive Director of FacilitiesCurt Shaw, Director of Construction Management

Pat Rossett, Assistant Director of Bond PlanningJoe Silva, Assistant Director of Planning

Beth Wilson, Project Facilitator 

EXHIBIT "B"

 

Page 3

Page 6: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 6/317

 

Fac ility Ma ster Plan Task Forc e

We take this opportunity to acknowledge the Facility Mater Plan Task Force for its efforts in guiding the planning process.We thank the members for their dedication and commitment to this process that resulted in the development of the

facility plan for Austin Independent School District.

Co-Chairs: Richard Frazier Janet Mitchell

John AlawnehLarry AmaroAdolphus AndersonEvelyn AndrewsTony Arnold

Frederick BentleySally BrackettChris Carrillo-SpanoJacqueline ChathamTommy CoxJoey CrumleyBill De Dufour Julie DelgadoJanet DeweyElizabeth DickeyDan Diehl

Freddie B. Dixon, Sr.Martha DolmanJim Evans

Kelly EvansFrances Vicki Everett

Rene GargantaGreg GoodmanAnnette Gregory

Zoe GriffithSilas Griggs

Janis GuerreroKris HafezizadehBergeron HarrisAnne M. HeinenHeath HignightLawrence P. HuangLinda JohnsonBob King

J. Laverne Morris-Parker 

Lucia MarkertCarolyn MerrittAdelina Miller Paul Mitchell

Susan MoffatChris MooreAudrea MoyersBeth OrtaMark Penniman

Elizabeth Polk Jacqueline Porter Pete PriceDouglas RhodenbaughJohn RochaMichelle Rusnak Dave SandersCurt ShawDavid W. SullivanKathie TovoLaura Tuma

Paul Turner Texanna Turner Chad Williams

EXHIBIT "B"

 

Page 4

Page 7: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 7/317

 

Introduction

Facility Master Plan Vision Statement

All AISD schools will inspire high student achievement and support common community goals throughequitable, inviting facilities that integrate technology and are optimally used, accessible, sustainable, and

meet highest educational adequacy standards.

The Austin Independent School District is committed to

providing high quality and challenging educationalexperiences for all students who are enrolled in itsschools. To ensure this commitment, the Districtdeveloped the AISD 2010-2015 Strategic Plan . As part of

Strategy #4 of that plan, key steps 4.5 and 4.7 includeddevelopment of a long-range facility master plan asfollows.

Strategy #4 – align resources to accomplish prioritieswithin a balanced budget

4.5 Develop and implement long-range plans for facilities, transportation, libraries and technologythat align infrastructure with the district’seducational plan

4.7 Ensure efficiency and efficacy of existingfacilities before investing in new facilities

This planning process, which is data driven, takes intoconsideration enrollments, school building capacities,educational framework, educational vision, and facilityconditions for 114 school campuses and 12 supportfacilities in the District.

The facility master planning process is a proactiveapproach to explore long- and short-term academicand facility options and solutions. Among the mostimportant components contributing to the success of theplan is the involvement and input gathered from Austincommunity members.

The recommendations contained within will serve as thebasis from which Austin Independent School Districtfacilities will be transformed into a new generation ofschools that accommodates educational needs todayand in the future. The final Austin Independent SchoolDistrict Facility Master Plan will serve as a road map thatwill address facility conditions, an implementationtimeframe, and project costs.

EXHIBIT "B"

 

Page 5

Page 8: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 8/317

Exec utive Summ ary

District Statistics

AISD maintains approximately 87,000 permanent

classroom seats and an additional 16,000 seats inportable/temporary buildings in 11.5 million square feetof educational facilities. The enrollment for the 2010-11school year was approximately 86,000 students. Based

on the latest demographic study, enrollment is projectedto continue to increase to 98,000 by 2020.

  Tota l Enrollm ent 2010-2011: 85,929

Grades Pre-K-5: 48,167Grades 6-8: 16,577

Grades 9-12: 20,662Separate and Special Campuses: 523  114 School Campuses

80 Elementary Schools19 Middle Schools12 High Schools3 Special Schools

  12 Support Facilities 

UtilizationBy the numbers, there is an excess of 1,000 seats in

addition to the capacity in portable buildings. The realityis that there are some areas experiencing population

growth and others experiencing decline within the

District. Combined with student migration patterns,there are significantly over- and under-utilized facilities asa result.

Facility Condition

Approximately $1.1 billion in deficiencies was identified in

the facility condition assessment, including a functionalequity and ADA/TAS analysis, completed in 2010, andthe most recent educational adequacy assessmentcompleted the summer of 2010. These deficiencies have

been categorized into the following priorities.

Priority 1: Currently Critical (Immediate)Priority 2: Potentially Critical (To be corrected within one

year)Priority 3: Necessary / Not Yet Critical (1-2 Years)

Priority 4: Recommended (3-5 Years)Priority 5: Does Not Meet Current Code/Standards/Grandfathered

Addressing Growth

The north central and southern areas of AISD continue toexperience the most enrollment growth. The following

new construction programs, funded by current andprevious bond programs, will help address overcrowdingissues.

  Baldwin ES – Opened 2010  Early Childhood Center – Opens 2012 and will

relieve Linder ES  New North Central ES – Currently in site selection

process  New ES – Undesignated

In addition, land acquisition and funding have beenapproved for a new middle school site in the

EXHIBIT "B"

 

Page 6

Page 9: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 9/317

southeastern part of the District, and a new high schoolsite in the southern region of the District. The constructionof the middle and high schools is anticipated to be apart of a future bond program.

As enrollment is projected to increase, it is estimated thatthree new elementary schools and additions at sevenelementary schools and one middle school would berequired. Currently, the District targets a 125% utilizationrate as a precipitant for potential new construction or additions.

Process

In April of 2010, a Facility Master Plan Task Force wascreated and an educational planning firm was hired byAISD in order to develop the District-wide Facility Master Plan. The Task Force, comprised of parents, communitymembers, teachers, principals, and AISD staff wascharged with the following tasks.

  Monitor the process to ensure equity and fairnessacross the District

  Review and confirm recommendations andresolve conflicting recommendations

  Prepare information and host community

dialogues and meetings  Review and analyze data  Review and analyze community input  Develop and recommend an Educational

Framework to the Board of Trustees  Develop facility options to improve efficiency and

address student needs

  Develop and recommend the district-wide FacilityMaster Plan to the Board of Trustees

The Facility Master Plan Task Force held 25 meetings over 

the course of 10 months and hosted 11 communitymeetings. In addition, the Task Force Co-chairs attendedten meetings at various school campuses throughout the

District. The community meetings provided invaluableinput to the Task Force throughout the process. Resultsand comments from these meetings are available in theappendix of this report.

Challenges

During the process, the Task Force was faced withseveral challenges and complex issues associated withAISD facilities and planning for the future. The followingoutline is meant to provide an understanding and

reflection of the real issues with which the Task Force hasbeen struggling, and the resulting implications for facilitymaster planning.

Challenge #1: Acc omp lishing priorities within a shrinking

budget

In order for AISD to continue operating as it is today, anassessed budget shortfall between $94 and $100 millionfor fiscal year 2012 will have to be addressed. Canincreasing facility efficiency decrease the budget

shortfall, and how can this be balanced with the futureof neighborhood schools, their design, size, andsustainability?

Challenge #2: Student m igration

The number of students previously living within the Austin

urban core, has declined over the past 20 years, resultingin 25% of schools housing less than 85% of their permanent student capacities. Conversely, there have

EXHIBIT "B"

 

Page 7

Page 10: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 10/317

been large population increases in the outer areas of theDistrict, resulting in 50% of schools housing more than105% of their permanent student capacities.

However, not all under- and over-utilization is a directresult of population and demographic shifts. Largenumbers of students that travel outside of the boundaryof their assigned school present a challenge whenmaking future facility decisions. Should long-termplanning address the number of students living within theattendance area, or should it address the number ofstudents currently attending that school, includingtransfer students? What are the principles of the currenttransfer policies and how will they be applied in thefuture?

Cha llenge #3: The role of fac ility planning in suppo rtingand c omp lementing educ ational program planning

AISD strives to maintain academic standards, programs,and performance consistently throughout the District.From a facilities perspective, what recommendationscan be made to help move the District towardincreasing graduation rates and eliminating theachievement gap? Since programs are capable of

changing faster than bricks and mortar, how canfacilities remain flexible and be retrofitted for multi-usewhere practical? How can facility decisions positivelyimpact student achievement? For example, is it morebeneficial to offer duplicate programs, such as fine artsor career technology education, or is it better to providetransportation to a single program? What are the costimplications?

Challenge #4: Bounda ry adjustment solutions

A logical solution to improve efficiencies amongovercrowded and under-utilized schools is to adjust the

attendance boundaries and assign more or fewer students as appropriate. In practice, it is not that simple.In some cases, under-utilization occurs when a largenumber of students migrate to schools outside of their geographical attendance zone. Increasing the size ofthe boundary of the under-utilized school will not fix theproblem. In addition, if the aforementioned migratingstudents decided to attend their home schools, the resultcould be an overcrowded scenario.

In other cases, there are too many overcrowded or under-enrolled schools adjacent to each other. Thisresults in a “domino effect” of moving students from onelocation to the other in order to increase or decreaseenrollment. In many instances, students would not beable to attend the school closest to their homes or in their neighborhoods. In fact, they may have to drive past aschool closer to their home in order to attend another school to achieve balanced enrollment.

Challenge #5: Balanc ing short- and long- term needs

Significant resources will be needed to address thecapital projects outlined in this facility plan. In additionto the funds needed to renovate AISD’s facility inventory,additional investment in deferred maintenance andsmall capital projects will continue as buildings age. Atthe same time, new schools will need to be constructed

to accommodate growth.

EXHIBIT "B"

 

Page 8

Page 11: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 11/317

 

Test_ 

EXHIBIT "B"

 

Page 9

Page 12: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 12/317

Fac ility Rec omm enda tions

I.  Portable Reduction

The annual cost to operate a portable building in AISDis approximately $4.00 per square foot. The District

currently has 668 portable buildings which equates toapproximately 1,336 classrooms.

The criteria used to identify portable reduction include:  A utilization rate (enrollment/permanent

capacity) at the school location that fallsbelow 85%.

  Age and condition of the portableswould be used to determine which

portables to take out of service unlesstheir current location would causeadditional moving costs.

There is a potential to reduce the total number ofportables in the District by 108, using the above criteriaof 85% utilization. Based on a minimum annualoperating cost of $4.00 per square foot, this wouldresult in an annual savings of $663,552.

II.  Funded New Construction

The following new construction projects, funded bycurrent and previous bond programs, will help addresssome overcrowding issues.

a.  Baldwin ES – Opened 2010

b.  Early Childhood Center – Opens 2012 and willrelieve Linder ES

c.  New North Central ES – Currently in site selectionprocess

d.  New ES – The Facility Master Plan Task Force

recommends locating the 2008 Bond Program

undesignated ES to the North Central area.e.  District-wide Performing Arts Center 

III.  Unfunded New Construction a nd Ca pital

Improvement

a.  Priority 1 & 2 Needs

Priority 1 & 2 needs identified by the facility conditionassessment during 2007-2010, include currently criticaland potentially critical needs at each school campus

and support facility. The total cost to address theseneeds is approximately $319,528,000 phased over eightyears.

b.  Func tiona l Equ ity

A functional equity study was completed by the Districtduring 2008-2010. This study identified core areas andsome specialized classrooms, within specific schoolcampuses that did not meet the current educational

specification standards. The cost to resolve these issues isapproximately $131,000,000, phased over eight years.

c .  New Sc hools and Add itions

Land acquisition and funding has been approved for anew middle school site in the southeastern part of theDistrict, and a new high school site in south Austin. The

construction of the middle and high schools isanticipated to be a part of a future bond program.

EXHIBIT "B"

 

Page 10

Page 13: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 13/317

As enrollment is projected to increase, it is estimated thattwo additional elementary schools would be required.Currently, the District targets a 125% utilization rate as aprecipitant for potential new construction or additions.The unfunded new construction recommendationsinclude the following:

1.  Three new elementary schools2.  Seven elementary school classroom additions3.  One new middle school4.  One middle school classroom addition5.  One new high school

IV.  Closures/C onsolida tions

Although the Task Force’s recommendations include the

consideration of school closures because of the severityof the District’s budget short fall, significant concernswere expressed by some members of the Task Forceregarding the impact of school closures on communities,especially in those where recent gains in studentperformance could be jeopardized.

a.  Consider consolidating/closing one middle school.

b.  Consider consolidating/closing eight elementaryschools.

V.  Programs Rec omm enda tions

a.  Relocate Alternative Learning Center (ALC)possibly in a different quadrant of the city .

b.  Identify a Pre-K-8 school (begin Pre-K-5) to relievenorth central overcrowding. Also, consider thismodel in other areas of the district.

c.  Consider moving 6th grade from elementary tomiddle school to relieve overcrowding in

elementary schools and under-utilization in middleschools.

d.  Explore Pre-K Centers to address overcrowding

e.  Conduct intensive planning for School for Young

Men (site TBD based on community input,feasibility, and availability of funding).

f.  Conduct planning for district open-enrollment

signature programs and vertical team signatureprograms, and their equitable geographicdistribution.

g.  Complete analysis of changes to district programsthat generate facility needs.

h.  Conduct planning for Career Tech Hubs (sites TBDbased on community input, feasibility, andavailability of funding).

i.  Consider options for separating some elementaryschools into Pre-K-3 and 4-8 grade configurationsto address overcrowding.

VI.  Policy

a.  Seriously consider redrawing boundaries in mostcritically overcrowded regions where possible.

b.  Initiate a District-wide boundary assessment andpossible realignment beginning January 2012 to

balance enrollment and improve verticalalignment.

c.  Address strict application of transfer policy as itapplies to overcrowding and under-utilization.

VII.  Operating Efficiency and Potential Revenue

a.  Do not renew administrative leases that end in

FY’11.

EXHIBIT "B"

 

Page 11

Page 14: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 14/317

b.  Do not renew administrative leases that end inFY’14.

c.  Prepare and sell Baker Administrative Center.

d.  Prepare and sell Carruth Administrative Center.

e.  Expand District energy efficiency programs,including coordinated facilities summer shutdowns where feasible.

f.  Identify additional energy efficiencies to

include in 2012 bond package.

EXHIBIT "B"

 

Page 12

Page 15: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 15/317

Timeline for Fac ility Master Plan Imp leme ntation

FY ‘12 FY ‘13 FY ‘14 FY ‘15 FY ‘16 FY ‘17 FY ‘18 FY ‘19 FY ‘20 FY ‘21

2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21

Seriously consider redrawing boundaries inmost critically overcrowdedregions where possible

Boundary review andredraw TBD

Boundary review andredraw TBD

Boundary review andredraw TBD

Open classroom additionsat four elementary schools(requires future bond

funding, $4.8M each)

Open classroom additions attwo elementary schools(requires bond future

funding, $4.8M each)

Open classroom addition atone middle school (requiresfuture bond funding, $4.8M)

Open classroom addition atone elementary school(requires future bondfunding, $4.8M)

Consider consolidating/closing onemiddle school and four elementary schools

Consider consolidating/closing four elementary schools 

Preliminary planning for upcoming bond proposals(every 4 yrs.)

Proposed Bond ProgramElection (>$500M*)

Proposed Bond ProgramElection (TBD*)

Proposed Bond ProgramElection (TBD*)

Open Linder EarlyChildhood Center (2008Bond funding available,$21.6M)

Open Performing ArtsCenter (2008 Bond, fundingavailable, $40M)_ __ Open North CentralElementary School (2004Bond funding available,

$28.1M) 

Open new undesignated ES-recommended for NorthCentral (2008 Bond, fundingavailable, $28.1M)__ _ Open new undesignated ES(requires future bondfunding, $24.5M)_________ 

Open new undesignated ES(requires future bondfunding, $24.5M)

Open new undesignated ES(requires future bondfunding, $24.5M)

Open new Southeast MS(requires future bondfunding, $55.7M)

Open new South HighSchool (requires future bondfunding, $106.6M)

Relocate AlternativeLearning Center (consider possibilities in differentquadrant of the city) Identify pre-k-8 school(begin pre-k-5) to relievenorth central elementaryschool overcrowding. Also,consider this model in other areas of the district.

Consider options for separating some ES into Pk-3rd and 4th – 8th to addressovercrowding__ _  Explore 3rd Pre-k center toaddress overcrowding TBD

Consider moving 6th gradefrom elementary to middleschool to relieveovercrowding andunderutilization

Consider moving 6thgradefrom elementary to middleschool to relieveovercrowding andunderutilization

Consider moving 6th gradefrom elementary to middleschool to relieveovercrowding andunderutilization

Consider moving 6thgradefrom elementary to middleschool to relieveovercrowding andunderutilization

Analyze each school todetermine if limitations totransfers/choice options areneeded

Review application of transfer policy for efficacyand fidelity

Note: In 2015-16 projected student enrollment > 92,000In 2020-21 projected student enrollment > 98,000

*The Bond Program will focus on Priority 1 and 2 building systems renovations, functional equity improvements, and new schools as indicated by demographic projections and the recommendations of a Bond Advisory Committee that are approvedby the Board of Trustees. The specific dates and total bond election amounts must be approved by the Board of Trustees 

EXHIBIT "B"

 

Page 13

Page 16: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 16/317

 FY ‘12 FY ‘13 FY ‘14 FY ‘15 FY ‘16 FY ‘17 FY ‘18 FY ‘19 FY ‘20 FY ‘21

2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21

Address Priority 1 and 2renovations and functionalequity improvements(requires future bondfunding)

Address Priority 1 and 2renovations and functionalequity improvements(requires future bondfunding)

Address Priority 1 and 2renovations and functionalequity improvements(requires future bondfunding)

Address Priority 1 and 2renovations and functionalequity improvements(requires future bondfunding)

Address Priority 1 and 2renovations and functionalequity improvements(requires future bondfunding)

Address Priority 1 and 2renovations and functionalequity improvements(requires future bondfunding)

Address Priority 1 and 2renovations and functionalequity improvements(requires future bondfunding)

Address Priority 1 and 2renovations and functionalequity improvements(requires future bondfunding)

Portable reduction Portable reduction Portable reduction Portable reduction Portable reduction Portable reduction Portable reduction Portable reduction Portable reduction Portable reduction

Do not renew administrative

leases that finish in FY’11__ Explore terminatingadministrative leases thatfinish in FY’14

Do not renew administrative

leases that finish in FY’14

Prepare and sell Baker 

Prepare and sell CAC

Expand existing districtenergy efficiency programs,including coordinatedfacilities summer shutdownswhere feasible___________ Identify additional energyefficiency facility needs toinclude in 2012 bondpackage

Reduce energy usage to95% of baseline

Reduce energy usage to90% of baseline or lower 

Reduce energy usage to85% of baseline or lower 

Reduce energy usage to80% of baseline or lower 

Reduce energy usage to75% of baseline or lower 

Reduce energy usage to75% of baseline or lower 

Reduce energy usage to75% of baseline or lower 

Reduce energy usage to70% of baseline or lower 

Reduce energy usage to65% of baseline or lower 

Programs 

Intensive planning for School for Young Men (siteTBD based on communityinput, feasibility, availabilityof funding)

Open School for Young Men(if feasible and fundingavailable)

Planning for district open-enrollment signatureprograms, and vertical teamsignature programs andtheir equitable geographicdistribution_____________ Complete analysis of changes to district programsthat generate facilitiesneedsPlanning for Career TechHubs (locations and fundingsources TBD)

Open Career Tech Hubs(1 north, 1 south)

Note: In 2015-16 projected student enrollment > 92,000In 2020-21 projected student enrollment > 98,000

*The Bond Program will focus on Priority 1 and 2 building systems renovations, functional equity improvements, and new schools as indicated by demographic projections and the recommendations of a Bond Advisory Committee that are approvedby the Board of Trustees. The specific dates and total bond election amounts must be approved by the Board of Trustees. 

EXHIBIT "B"

 

Page 14

Page 17: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 17/317

Estimated Budget

The following tables provide an estimated budget, including estimated costs or savings by year, for the facilityrecommendations. The estimated costs or savings are based on AISD budgeted operating costs and recently completedfacility evaluations.

FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 TOTAL

I. Operational Cost Savings

Portab le Reduct ions (600,000)$ (600,000)$ (600,000)$ (600,000)$ (600,000)$ (600,000)$ (600,000)$ (600,000)$ (600,000)$ (600,000)$ (6,000,000)$

Total Cost / (Savings) (600,000)$ (600,000)$ (600,000)$ (600,000)$ (600,000)$ (600,000)$ (600,000)$ (600,000)$ (600,000)$ (600,000)$ (6,000,000)$

II. Funded New Construction

Early Childhood Center -$ 21,600,000$ -$ -$ -$ -$ -$ -$ -$ -$ 21,600,000$

New North Central ES -$ -$ 28,100,000$ -$ -$ -$ -$ -$ -$ -$ 28,100,000$

P erforming Arts Cen ter -$ -$ 40,000,000$ -$ -$ -$ -$ -$ -$ -$ 40,000,000$

New E S (North Cen tral) -$ -$ -$ 28,100,000$ -$ -$ -$ -$ -$ -$ 28,100,000$

Total Cost / (Savings) -$ 21,600,000$ 68,100,000$ 28,100,000$ -$ -$ -$ -$ 117,800,000$

III. Un-Funded New Construction and Capital Improvements

Priority 1 & 2 Needs -$ -$ 39,941,000$ 39,941,000$ 39,941,000$ 39,941,000$ 39,941,000$ 39,941,000$ 39,941,000$ 39,941,000$ 319,528,000$

Functional Equity -$ -$ 16,350,000$ 16,350,000$ 16,350,000$ 16,350,000$ 16,350,000$ 16,350,000$ 16,350,000$ 16,350,000$ 130,800,000$

New Schools

New ES -$ -$ -$ 24,500,000$ -$ -$ -$ -$ -$ -$ 24,500,000$

New ES -$ -$ -$ 24,500,000$ -$ -$ -$ -$ -$ -$ 24,500,000$

New ES -$ -$ -$ -$ 24,500,000$ -$ -$ -$ -$ -$ 24,500,000$

New MS -$ -$ -$ -$ -$ 55,700,000$ -$ -$ -$ -$ 55,700,000$

New HS -$ -$ -$ -$ -$ -$ 106,600,000$ -$ -$ -$ 106,600,000$Additions

4 ES Classroom Additions -$ 19,200,000$ -$ -$ -$ -$ -$ -$ -$ 19,200,000$

2 ES Classroom Additions -$ -$ 9,600,000$ -$ -$ -$ -$ -$ -$ 9,600,000$

1 ES Classroom Addition -$ -$ -$ 4,800,000$ -$ -$ -$ -$ -$ 4,800,000$

1 MS Classroom Addition -$ -$ -$ 4,800,000$ -$ -$ -$ -$ -$ 4,800,000$

Total Cost / (Savings) -$ -$ 75,491,000$ 114,891,000$ 90,391,000$ 111,991,000$ 162,891,000$ 56,291,000$ 56,291,000$ 56,291,000$ 724,528,000$

EXHIBIT "B"

 

Page 15

Page 18: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 18/317

Area Facility Options

The following pages describe, outline, and

summarize facility options by area in the District. The

District has been divided into the 10 following with amap provided on the following page.

Area 1:  Northwest – Anderson HS, Murchison MS,

Davis ES, Doss ES, Hill ES, Summitt ES

Area 2: North Central – Lanier HS, Burnet MS, Dobie

MS, Barrington ES, Cook ES, Graham ES, Hart ES,

McBee ES, Pillow ES, Walnut Creek ES, Wooldridge

ES, Wooten ES, Read Pre-K Center 

Area 3:  Central West – McCallum HS, Lamar MS,

Brentwood ES, Brown ES, Bryker Woods ES, Casis ES,

Gullet ES, Highland Park ES, Lee ES, Mathews ES,

Pease ES, Pickle ES, Reilly ES, Ridgetop ES

Area 4:  Northeast – LASA HS, LBJ HS, Reagan HS,

Garcia MS, Pearce MS, Webb MS, Andrews ES,

Blanton ES, Harris ES, Jordan ES, Maplewood ES,

Overton ES, Pecan Springs ES, Winn ES

Area 5:  Central East – Eastside Memorial HS, Kealing

MS, Martin MS, Allan ES, Allison ES, Blackshear ES,

Brooke ES, Campbell ES, Govalle ES, Metz ES,

Norman ES, Oak Springs ES, Ortega ES, Sanchez ES,

Sims ES, Zavala ES, Garza Independence HS,

Alternative Learning Center (ALC)

Area 6:  Central – Austin HS, Travis HS, Fulmore MS,

O.Henry MS, Barton Hills ES, Becker ES, Dawson ES,

Linder ES, Travis Heights ES, Zilker ES

Area 7:  Southwest – Bowie HS, Bailey MS, GorzyckiMS, Small MS, Baldwin ES, Baranoff ES, Clayton ES,

Kiker ES, Mills ES, Oak Hill ES, Patton ES

Area 8:  South – Crockett HS, Bedichek MS,

Covington MS, Boone ES, Cunningham ES, Galindo

ES, Joslin ES, St. Elmo ES, Sunset Valley ES, The Ann

Richards School for Young Women Leaders

Area 9:  Southeast – Mendez MS, Blazier ES, Houston

ES, Langford ES, Palm ES, Perez ES, Rodriguez ES,Widen ES

Area 10: Far South – Akins HS, Paredes MS, Casey ES,

Cowan ES, Kocurek ES, Menchaca ES, Odom ES,

Pleasant Hill ES, Williams ES

EXHIBIT "B"

 

Page 16

Page 19: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 19/317

 

EXHIBIT "B"

 

Page 17

Page 20: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 20/317

AREA 1 – NORTHWEST

  Anderson High School 

  Murchison Middle School

  Davis, Doss, Hill and Summitt elementary

schoolsArea IssuesBased on the number of students living in the area for the 2010-11 school year:

  The area has a slight deficiency in thenumber of seats available at the elementaryand middle school levels.

  The number of students migrating into thearea is higher than the number of studentsmigrating out of the area at all levels.

 

Spa c e Utilization

Based on the 2010-11 enrollment of schools in the area:  One elementary school, Doss, is severely

overcrowded (above 125% of permanentcapacity)

  Two elementary schools, Hill and Summitt, areovercrowded (between 115% and 125% ofpermanent capacity)

  One elementary school, Davis, is in thetarget range of percent of permanentcapacity (between 85% and 105%)

  The middle school, Murchison, isovercrowded (between 115% and 125% of

permanent capacity)  The high school, Anderson, is in the target

range of percent of permanent capacity(between 85% and 105%)

Educ ational Enhanc ement

Academic Ratings: 

Future Growth

  Moderate population growth is projected in thisarea in the next five years.

Facility Condition

  On average, the facilities have an FCI (FacilityCondition Index) slightly above the District FCI(22.8%).

Ma ster Plan Task Forc e Opt ions for 10-Year Plan

  Construct an eight-classroom addition at one

elementary school.  Construct an eight-classroom addition at one

middle school.  Address priorities 1 & 2 and functional equity

improvements.Community Impac t

  Consult with the community regarding boundaryadjustments.

Cost Saving s

 NA

Exemplary

Doss ES

Hill ES

Summitt ES

Recognized

Davis ES

Murchison MS

Anderson HS

Elementary School Capacity 2,633 Elementary Migration IN - 478

Elementary School Population 2,731 Elementary Migration OUT - 166

Excess / (Deficient) Seats (98) Net Migration - 312

Middle School Capacity 1,113 Middle School Migration IN - 220

Middle School Population 1,171 Middle School Migration OUT - 110

Excess / (Deficient) Seats (58) Net Mirgation - 110

High School Capacity 2,017 High School Migrat ion IN - 391

High School Population 1,962 High School Migration OUT - 257

Excess / (Deficient) Seats 55 Net Migration - 134

Acceptable

None

EXHIBIT "B"

 

Page 18

Page 21: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 21/317

AREA 2 – NORTH CENTRAL

  Lanier High School

  Burnet and Dobie middle schools

  Barrington, Cook, Graham, Hart, McBee,

Pillow, Walnut Creek, Wooldridge, Wootenelementary schools and Read Pre-K Center 

Area Issues

Based on the number of students living in the area for the 2010-11 school year:

  The area has a severe deficiency in thenumber of seats available at the elementaryschool levels.

  The number of students migrating out of thearea is higher than the number of students

migrating in, especially at the elementaryand high school levels.

Spa ce Utilization

Based on the 2010-11 enrollment of schools in thearea:  Nine elementary schools, Barrington, Cook,

Graham, Hart, McBee, Read, Walnut Creek,Wooldridge and Wooten, are severelyovercrowded (above 125% of permanent

capacity)  One elementary school, Pillow, is

overcrowded (between 115% and 125% ofpermanent capacity)

  One middle school, Burnet, is in the target

range of percent of permanentcapacity(between 85% and 105%), while onemiddle school, Dobie, is under enrolled

(below 85% of permanent capacity)  The high school, Lanier, is in the target range

of percent of permanent capacity (between85% and 105%)

Educ ational Enhanc ement

Academic Ratings:

Future Growth

  Highest population growth in district is

projected in this area in the next five years

Facility Condition

  On average, the facilities have an FCI slightlyless than the District FCI (22.8%), with two

Recognized

Cook ES

Hart ES

McBee ES

Wooten ES

Dobie MS

Exemplary

Graham ES

Pillow ES

Acceptable

Barrington ES

Walnut Creek ES

Wooldridge ES

Burnet MSLanier HS

Elementary School Capacity 5,568 Elementary Migration IN - 641

Elementary School Population 8,370 Elementary Migration OUT - 1,587

Excess / (Deficient) Seats (2,802) Net Migration (946)

Middle School Capacity 1,941 Middle School Migration IN - 123

Middle School Population 1,889 Middle School Migration OUT - 333

Excess / (Deficient) Seats 52 Net Migration (210)

High School Capacity 1,627 High School Migrat ion IN - 121

High School Population 1,981 High School Migration OUT - 557

Excess / (Deficient) Seats (354) Net Migration (436)

EXHIBIT "B"

 

Page 19

Page 22: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 22/317

elementary schools and one middle schoolrequiring more extensive renovations.

Fac ility Ma ster Plan Task Forc e Op tions for 10-Yea r Plan

  Construct two additional elementary schools.  Construct eight-classroom additions at two

elementary schools.  Address priorities 1 & 2 and functional equity

improvements.Community Impac t

  Consult with the community regardingmiddle school redesign.

  Consult with the community regardingboundary adjustments.

Cost Saving s

NA

AREA 3 – CENTRAL WEST

  McCallum High School

  Lamar Middle School

  Brentwood, Brown, Bryker Woods, Casis,

Gullett, Highland Park, Lee, Mathews, Pickle,Reilly and Ridgetop elementary schools

  Pease Elementary School*Area Issues

Based on the number of students living in the area for the 2010-11 school year:

  The area has available seats at all schoollevels.

  The number of students migrating into thearea is higher than the number of students

migrating out of the area at all levels.  Attendance zone population under 300

students at three elementary schools,Matthews, Pease, and Ridgetop.

  There are three elementary schools, Bryker Woods, Pease and Ridgetop that have apermanent capacity of less than 300 seats.

  Permanent capacity for the middle and highschools are within target ranges.

  The Fine Arts Academy at McCallum HS

results in a higher “in” migration at the highschool level. Elementary School Capacity 4,953 Elementary Migration IN - 1,253

Elementary School Population 4,762 Elementary Migration OUT - 623

Excess / (Deficient) Seats 191 Net Migration - 630

Middle School Capacity 1,008 Middle School Migration IN - 223

Middle School Population 583 Middle School Migration OUT - 191

Excess / (Deficient) Seats 425 Net Migration - 32

High School Capacity 1,596 High School Migrat ion IN - 795

High School Population 1,316 High School Migration OUT - 296Excess / (Deficient) Seats 280 Net Migration - 499

EXHIBIT "B"

 

Page 20

Page 23: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 23/317

Spa ce Utilization

Based on the 2010-11 enrollment of schools in thearea:

  Two elementary schools, Bryker Woodsand Gullett, are severely overcrowded

(above 125% of permanent capacity).  Two elementary schools, Casis and Pickle,

are overcrowded (between 115% and125% of permanent capacity)

  Three elementary schools, Brown,Highland Park and Ridgetop, are over capacity (between 105% and 115% ofpermanent capacity)

  Four elementary schools, Lee, MathewsPease, and Reilly, are within the target

range of percent of permanent capacity(between 85% and 105%)

  One elementary school, Brentwood, isunder enrolled (below 85% of permanentcapacity)

  The middle school, Lamar, is under enrolled (below 85% of permanentcapacity)

  The high school, McCallum, is overcrowded(between 115% and 125% of permanent

capacity)Educ ational Enhanc ement Academic Ratings:

Future Growth

  Moderate population growth is projected in

this area in the next five years.Facility Condition

  On average, the facilities have an FCI slightly

higher than the District FCI (22.8%), with two

elementary schools requiring more extensive

renovations.

Fac ility Ma ster Plan Task Forc e Op tions for 10-Yea r Plan

  Address priorities 1 & 2 and functional equityimprovements.

  Consolidate/close one elementary school.Community Impac t

  Consult with community regarding the use of

closed/consolidated elementary school.  Consult with community if boundary

adjustments are needed.Cost Saving s

  Cost savings for closure of one elementaryschool is $700,000 in M&O savings.

  Capital cost avoidance –$8.1M if oneelementary school was closed / consolidated.

*Pease Elementary School does not have an attendance boundaryand receives transfer students from all parts of the District, therefore its

capacity, enrollment, and in-migration counts are not included in thearea summaries. 

Exemplary

Casis ES

Gullett ES

Highland Park ES

Lee ES

Matthews ES

Pease ES

Ridgetop ES

Recognized

Brentwood ES

Bryker Woods ES

Pickle ES

Reilly ES

Acceptable

Brown ES

Lamar MS

McCallum HS

EXHIBIT "B"

 

Page 21

Page 24: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 24/317

AREA 4 – NORTHEAST

  LASA, LBJ and Reagan high schools

  Garcia, Pearce and Webb middle schools,  Andrews, Blanton, Harris, Jordan, Maplewood,

Overton, Pecan Springs and Winn elementary

schoolsArea Issues

Based on the number of students living in the area for the 2010-11 school year:

  The area has available seats at the middle andhigh school levels, but is deficient at theelementary school level.

  The number of students migrating out of thearea is higher than the number of studentsmigrating into the area at all levels, especially at

the middle and high school levels.  The magnet program, LASA, located at LBJ High

School attracts students from outside the LBJattendance area.

Spa c e Utilization

Based on the 2010-11 enrollment of schools in thearea:  Three elementary schools, Andrews, Harris

and Jordan, are severely overcrowded

(above 125% of permanent capacity).  Three elementary schools, Maplewood,

Overton and Pecan Springs, areovercrowded (between 115% and 125% ofpermanent capacity).

  Two elementary schools, Blanton and Winn,are within the target range of percent of

permanent capacity (between 85% and105%).

 All three middle schools, are under enrolled

(below 85% of permanent capacity).  One high school, Reagan, is under enrolled

(below 85% of permanent capacity), whileLBJ and LASA are within the target range ofpercent of permanent capacity (between85% and 105%)

Educ ational Enhanc ement

New Programs for 2011-12:

  Early College Prep at one middle school  Early College High School / Early College

Start at two high schools

Academic Ratings:

Exemplary

Blanton ES

LASA HS

Recognized

Andrews ES

Harris ES

Jordan ES

Overton ES

Winn ES

Acceptable

Maplewood ES

Pecan Springs ES

Garcia MS

Pearce MS

Webb MS

LBJ HS

Reagan HS

NORTHEAST

Elementary School Capacity 4,301 Elementary Migration IN - 685

Elementary School Population 5,006 Elementary Migration OUT - 849

Excess / (Deficient) Seats (705) Net Migration - (164)

Middle School Capacity 3,097 Middle School Migration IN - 93

Middle School Population 2,272 Middle School Migration OUT - 665

Excess / (Deficient) Seats 825 Net Mirgation - (572)

High School Capacity 3,430 High School Migration IN - 247

High School Population 2,635 High School Migration OUT - 1,018

Excess / (Deficient) Seats 795 Net Migration - (771)

EXHIBIT "B"

 

Page 22

Page 25: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 25/317

Future Growth

  Significant population growth is projected inthis area in the next five years.

Facility Condition

  On average, the facilities have an FCI (Facility

Condition Index) lower than the District FCI(22.8%), with two elementary schools requiringmore extensive renovations

Fac ility Master Plan Task Forc e Op tions for 10-Year

Plan

  Construct one elementary school.  Construct an eight classroom addition at one

elementary school.

  Close /consolidate one middle school.

 Adjust boundaries between elementary

schools.  Address priorities 1 & 2 and functional equity

improvements.Community Impac t

  Consult with community regarding plans for closure/consolidation of one middle schooland its repurposing.

Cost Savings   Cost savings for closure of one middle school is

$1.8M in M&O savings.  Capital cost avoidance –$7.4M if one middleschool was closed / consolidated.

AREA 5 – CENTRAL EAST

  Eastside Memorial High School at the JohnstonCampus - Global Tech. , Green Tech., andInternational high schools

  Kealing and Martin middle schools  Allan, Allison, Blackshear, Brooke, Campbell,

Govalle, Metz, Norman, Oak Springs, Ortega,Sanchez, Sims and Zavala elementary schools

  Garza Independence High School* and theAlternative Learning Center (ALC)

Area Issues

Based on the number of students living in the area for the 2010-11 school year:

  The area has available seats at all school levels.  The number of students migrating out of the area is

higher than the number of students migrating intothe area at the elementary and high schools levels.The magnet program at Kealing MS results in ahigher “in” migration at the middle school level.

  Attendance zone populations are under 300

students at three elementary schools, Blackshear,Oak Springs and Ortega.

  Permanent capacity for all schools is within targetranges.

  International High School provides programs for 

limited English speaking high school students whoqualify.

Elementary School Capacity 6,639 Elementary Migration IN - 665

Elementary School Population 5,173 Elementary Migration OUT - 810

Excess / (Deficient) Seats 1,466 Net Migration - (145)

Middle School Capacity 2,136 Middle School Migration IN - 881

Middle School Population 1,597 Middle School Migration OUT - 493

Excess / (Deficient) Seats 539 Net Migration - 388

High School Capacity 1,548 High School Migrat ion IN - 125High School Population 1,249 High School Migration OUT - 955

Excess / (Deficient) Seats 299 Net Migration - (830)

EXHIBIT "B"

 

Page 23

Page 26: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 26/317

Spa ce Utilization

Based on the 2010-11 enrollment of schools in thearea:  One elementary school, Allison, is over 

capacity (between 105% and 115% of

permanent capacity)  Three elementary schools, Brooke, Metz and

Sanchez, are within the target range ofpercent of permanent capacity (between85% and 105%)

  Nine elementary schools, Allan, Blackshear,Campbell, Govalle, Norman, Oak Springs,Ortega, Sims and Zavala are under enrolled(below 85% of permanent capacity)

 One middle school, Kealing, is within the

target range of permanent capacity(between 85% and 105%), while Martin isunder enrolled (below 85% of permanentcapacity).

  The high school, Eastside Memorial, is under enrolled (below 85% of permanentcapacity).

Educ ational Enhanc eme nt Academic Ratings:

Future Growth

  No significant population growth is projectedin this area in the next five years.

Facility Condition

  On average, the facilities have an FCI abovethe District FCI (22.8%), with three elementaryschools and one secondary schools requiringmore extensive renovations.

  There are significant structural issues at theAlternative Learning Center (ALC).

Fac ility Ma ster Plan Task Forc e fo r 10-Year Plan

  Consolidate / close four elementary schools.  Construct one replacement elementary

school.  Address priorities 1 & 2 and functional equity

improvements.Community Impac t

  Consult with community to discuss use /repurposing of elementary schools to beclosed and the relocation of ALC.

Cost Saving s

  M & O savings ($5.1M) could be realized iffour elementary schools were closed /consolidated.

 Capital cost avoidance - $25.2M if four 

elementary schools were closed /consolidated; however, it would cost $28M toconstruct a replacement elementary school.

*Garza Independence High School and the AlternativeLearning Center do not have attendance boundaries andreceive transfer students from all parts of the District, thereforetheir capacity, enrollment, and in-migration counts are notincluded in the area summaries.

Exemplary

Metz ES

Oak Springs ES

Ortega ES

Sims ES

Recognized

Brooke ES

Norman ES

Sanchez ES

Zavala ES

Acceptable

Allan ES

Allison ES

Blackshear ES

Campbell ES

Govalle ES

Kealing MS

Martin MS

Eastside Global HS

Garza Independence HS

Unacceptable

Eastside Green HS

EXHIBIT "B"

 

Page 24

Page 27: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 27/317

AREA 6 – CENTRAL

  Austin and Travis high schools

  Fulmore and O. Henry middle schools  Barton Hills, Becker, Dawson, Linder, Travis

Heights and Zilker elementary schoolsArea Issues

Based on the number of students living in the area for 

the 2010-11 school year:  The area has available seats at all school levels.

  The number of students migrating into the area ishigher than the number of students migratingout of the area at the elementary and middle

school levels. There are slightly more studentsmigrating out of the area at the high school

level.  Attendance zone populations are under 300

students at three elementary schools, Barton Hills,

Becker and Dawson.  One elementary school, Barton Hills, has a

permanent capacity of less than 300 seats.

Spa ce Utilization

Based on the 2010-11 enrollment of schools in thearea:  Two elementary schools, Barton Hills and

Linder, are severely overcrowded (above

125% of permanent capacity)  Two elementary schools, Travis Heights and

Zilker, are over capacity (between 105% and115% of permanent capacity).

  Two elementary school, Becker and Dawson,are under enrolled (below 85% of permanentcapacity)

  One middle school, O.Henry, is overcrowded(above 125% of permanent capacity), whileFulmore is within the target range of

permanent capacity (between 85% and105%).

  One high school, Austin, is overcrowded(above 125% of permanent capacity), whileTravis is under enrolled (below 85% ofpermanent capacity).

Educ ational Enhanc ement

Academic Ratings:

Exemplary

Barton Hills ES

Becker ES

Dawson ES

Zilker ES

Recognized

Linder ES

Travis Heights ES

Austin HS

Acceptable

Fulmore MS

O.Henry MS

Travis HS

Elementary School Capacity 2,768 Elementary Migration IN - 729

Elementary School Population 2,547 Elementary Migration OUT - 433

Excess / (Deficient) Seats 221 Net Migration - 296

Middle School Capacity 2,023 Middle School Migration IN - 780

Middle School Population 1,654 Middle School Migration OUT - 321

Excess / (Deficient) Seats 369 Net Migration - 459

High School Capacity 4,067 High School Migrat ion IN - 936

High School Population 3,860 High School Migration OUT - 1,126

Excess / (Deficient) Seats 207 Net Migration - (187)

EXHIBIT "B"

 

Page 25

Page 28: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 28/317

Future Growth

  Moderate population growth is projected inthis area, specifically within the Linder andTravis Heights attendance zones.

Facility Condition

  With the exception of one elementary with ahigh FCI, on average, the facilities have anFCI above the the district average (22.8),with three elementary schools and onemiddle school requiring more extensiverenovations.

Fac ility Ma ster Plan Task Forc e Op tions for 10-Yea r Plan

  Consolidate/close two elementary schools.

  Address priorities 1& 2 and functional equityimprovements.

Community Impac t  Consult with the community regarding the

use closed/consolidated elementaryschool(s). 

Cost Saving s

•  M&O savings for two elementary schools -$2.2M.

•  Capital cost avoidance for three elementaryschools- $17.5M.

AREA 7 – SOUTHWEST

  Bowie High School  Bailey, Gorzycki and Small middle schools

  Baldwin, Baranoff, Clayton, Kiker, Mills, Oak Hill andPatton elementary schools

Area IssuesBased on the number of students living in the area for 

the 2010-11 school year:  The area has available seats at the middle school

level, and is slightly deficient at the elementaryand high schools levels.

  The number of students migrating into the area is

higher than the number of students migrating out

of the area at all levels.

Spa ce Utilization

Based on the 2010-11 enrollment of schools in the area:  Three elementary schools, Kiker, Mills and Patton,

are overcrowded (between 115% and 125% of

permanent capacity)  One elementary school, Baranoff, is over capacity

(between 105% and 115% of permanentcapacity).

Elementary School Capacity 5,392 Elementary Migration IN - 633

Elementary School Population 5,727 Elementary Migration OUT - 545

Excess / (Deficient) Seats (335) Net Migration - 88

Middle School Capacity 3,738 Middle School Migration IN - 487

Middle School Population 2,844 Middle School Migration OUT - 358

Excess / (Deficient) Seats 894 Net Migration - 129

High School Capacity 2,535 High School Migrat ion IN - 505

High School Population 2,606 High School Migration OUT - 231Excess / (Deficient) Seats (71) Net Migration - 274

EXHIBIT "B"

 

Page 26

Page 29: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 29/317

  Two elementary schools, Clayton and Oak Hill, arewithin the target range of percent of permanentcapacity (between 85% and 105%)

  One elementary school, Baldwin, is under enrolled(below 85% of permanent capacity)

  One middle school, Bailey, is within the targetrange of percent of permanent capacity(between 85% and 105%).

  Two middle schools, Gorzycki and Small are under enrolled (below 85% of permanent capacity)

  One high school, Bowie, is over capacity(between 105% and 115% of permanentcapacity).

Educ ational Enhanc eme nt Academic Ratings:

Future Growth

  Moderate population growth is projected inthis area at the elementary and middleschool levels.

Facility Condition

  On average, the facilities have an FCI wellbelow the District FCI (22.8%).

Fac ility Master Plan Task Forc e Op tions for 10-YearPlan

  Construct an eight-classroom addition at oneelementary school.

  Adjust boundaries among elementaryschools.

  Address priorities 1 & 2 and functional equityimprovements.

Community Impac t  Consult with community regarding boundary

adjustments.Cost Saving s

  NA

Recognized

Bailey MS

Bowie HS

Gorzycki MS

Small MS

No Rating

Baldwin ES

Exemplary

Baranoff ES

Clayton ES

Kiker ES

Mills ES

Oak Hill ES

Patton ES

Acceptable

None

EXHIBIT "B"

 

Page 27

Page 30: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 30/317

AREA 8 - SOUTH

  Crockett High School,

  Bedichek and Covington middle schools,  Boone, Cunningham, Galindo, Joslin, St. Elmo

and Sunset Valley elementary schools  The Ann Richards School for Young Women

Leaders*Area Issues

Based on the number of students living in the area for the 2010-11 school year:

•  The area has available seats at theelementary and high school levels, and isslightly deficient at the middle schools level.

  The number of students migrating out of thearea is higher than the number of students

migrating into the area, especially at themiddle and high school levels. 

Spa ce Utilization

Based on the 2010-11 enrollment of schools in the area:  Two elementary schools, Galindo and Joslin,

are within the target range of permanentcapacity (between 85% and 105%).

  Four elementary schools, Boone,Cunningham, St. Elmo and Sunset Valley, are

under enrolled (below 85% of permanentcapacity).

  One middle school, Bedichek, is over capacity (between 105% and 115% ofpermanent capacity) while Covington is

under enrolled (below 85% of permanentcapacity.

  The high school, Crockett, is under enrolled(below 85% of permanent capacity).

Educ ational Enhanc eme nts

Academic Ratings:

Future Growth

  Moderate population growth projected inthe area.

Facility Condition

  On average, the facilities have an FCI above

the District FCI (22.8%) with four elementaryschools and one middle school requiringmore extensive renovations.

Fac ility Master Plan Task Forc e Op tions for 10-YearPlan

  Consolidate/close one elementary school.  Adjust boundaries between high schools

(Akins and Crockett).

  Address Priorities 1 & 2 and functional equityimprovements.

Exemplary

Joslin ES

Sunset Valley ES

The Ann RichardSchool for Young

Women Leaders

Recognized

Boone ES

Galindo ES

St. Elmo ES

Acceptable

Cunningham ES

Bedichek MS

Covington MSCrockett HS

Elementary School Capacity 3,436 Elementary Migration IN - 566

Elementary School Population 2,921 Elementary Migration OUT - 656

Excess / (Deficient) Seats 515 Net Migration - (90)

Middle School Capacity 2,066 Middle School Migration IN - 281

Middle School Population 2,124 Middle School Migration OUT - 508

Excess / (Deficient) Seats (58) Net Migration - (227)

High School Capacity 2,163 High School Migrat ion IN - 285

High School Population 1,883 High School Migration OUT - 510

Excess / (Deficient) Seats 280 Net Migration - (225)

EXHIBIT "B"

 

Page 28

Page 31: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 31/317

 

Community Impac t

  Consult with the community regardingclosure and repurposing of elementaryschool.

Cost Sav ings  Cost savings for closure of elementary school

is $1.26M in M&O savings.  Capital cost avoidance –$8.4M.

*The Ann Richards School does not have an attendance boundaryand receives transfer students from all parts of the District, therefore itscapacity, population, and in-migration counts are not included in thearea summaries.

AREA 9 – SOUTHEAST

  Mendez Middle School,

  Blazier, Houston, Langford, Palm, Perez,Rodriguez and Widen elementary schools

Area IssuesBased on the number of students living in the area for the 2010-11 school year:

  The area is severely deficient in the number of seats at the elementary level, and is slightlydeficient at the middle school level.

  The number of students migrating out of thearea is higher than the number of studentsmigrating into the area.

Spa ce Utilization

Based on the 2010-11 enrollment of schools in the area:  Four elementary schools, Blazier, Houston, Perez

and Rodriguez, are severely overcrowded (over 125% of permanent capacity).

  Two elementary schools, Langford and Widen, areovercrowded (between 115% and 125% ofpermanent capacity).

  One elementary school, Palm, is within the targetrange of percent of permanent capacity(between 85% and 105%).

  The middle school, Mendez, is under enrolled(below 85% of permanent capacity).

  There is no high school in this area.

Elementary School Capacity 4,637 Elementary Migration IN - 503

Elementary School Population 6,109 Elementary Migration OUT - 865

Excess / (Deficient) Seats (1,472) Net Migration - (362)

Middle School Capacity 1,215 Middle School Migration IN - 27

Middle School Population 1,266 Middle School Migration OUT - 396

Excess / (Deficient) Seats (51) Net Migration - (369)

EXHIBIT "B"

 

Page 29

Page 32: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 32/317

Educ ation Enhanc eme nt Academic Ratings:

Future Growth

  Moderate population growth is projected inthis area.

Facility Condition

  On average, the facilities have an FCI that isbelow the District FCI (22.8%), with one

elementary school requiring more extensiverenovations.

Fac ility Master Plan Task Forc e Op tions for 10-Year

Plan

  Evaluate reduction of portables at middleschool.

  Construct eight-classroom additions at two

elementary schools.  Adjust boundaries among area elementary

schools to reduce overcrowding.  Adjust boundaries among area middleschools.

  Address priority 1& 2 and functional equityimprovements

Community Impac t

  Consult with the community regardingelementary and middle school boundaryadjustments.

Cost Sav ings

  NA

AREA 10 – FAR SOUTH

  Akins High School

  Paredes Middle School  Casey, Cowan, Kocurek, Menchaca, Odom,

Pleasant Hill and Williams elementary schools

Area IssuesBased on the number of students living in the area for the 2010-11 school year:

  The area is deficient is the number of seats atthe elementary and high school levels.

  The number of students migrating out of thearea is higher than the number of studentsmigrating into the area, especially at themiddle and high school levels.

Spa ce UtilizationBased on the 2010-11 enrollment of schools in the area:

  Three elementary schools, Cowan, Odom andPleasant Hill, are overcrowded (between 115% and125% of permanent capacity).

  Two elementary schools, Menchaca and Williams,are over capacity (between 105% and 115%permanent capacity).

  Two elementary schools, Casey andKocurek, are within the target range of

Recognized

Houston ES

Palm ES

Perez ES

Acceptable

Blazier ES

Langford ES

Rodriguez ES

Mendez MS

Widen ES

Elementary School Capacity 4,286 Elementary Migration IN - 773

Elementary School Population 4,819 Elementary Migration OUT - 873

Excess / (Deficient) Seats (533) Net Migration - (100)

Middle School Capacity 1,156 Middle School Migration IN - 69

Middle School Population 1,165 Middle School Migration OUT - 291

Excess / (Deficient) Seats (9) Net Migration - (222)

High School Capacity 2,394 High School Migrat ion IN - 176

High School Population 3,092 High School Migration OUT - 596

Excess / (Deficient) Seats (698) Net Migration - (420)

Exemplary

None

EXHIBIT "B"

 

Page 30

Page 33: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 33/317

percent of permanent capacity (between85% and 105%).

  The middle school, Paredes, is under enrolled (below 85% of permanentcapacity).

  The high school, Akins, is over capacity(between 105% and 115% of permanentcapacity).

Educ ational Enhanc eme nt

Academic Ratings:

Future Growth

  No significant population growth is projected inthe area for the elementary and middle schoollevels; however, continued moderate growth isprojected at the high school level.

Facility Condition

  On average, the facilities have an FCI belowthe District FCI (22.8%), with two elementaryschools requiring more extensive renovations.

Fac ility Master Plan Task Forc e Op tions for 10-Year

Plan  Priority 1& 2 and functional equity

improvements.

  Adjust boundaries between high schools(Akins and Crockett to reduceovercrowding).

Community Impac t

  Consult with community regarding highschool boundary adjustments and possibleelementary boundary adjustments.

Cost Saving s  NA

Exemplary

Cowan ES

Recognized

Akins HS

Paredes MS

Acceptable

Casey ES

Kocurek ES

Menchaca ES

Odom ESPleasant Hill ES

Williams ES

EXHIBIT "B"

 

Page 31

Page 34: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 34/317

Add itional Rec omm enda tions

The Facilities Master Plan Task Force recommends the

following District-wide initiatives and policy

recommendations. Some recommendations mayrequire additional planning and research from other AISD

departments and outside entities. The Task Force does

not want to lose sight of these very important ideas and

recognizes that the Facility Master Plan is a dynamic

document and should be updated periodically toincorporate building improvements, updates in

community demographics, and changes in educational

programming.

I.  Policy Rec omm enda tions

1.  Consider school closures only after all other 

alternatives and options, both programmatic and

facilities use, have been thoroughly examined

and discussed with the affected communities.

2.  Create a community engagement process, led

by the Superintendent and the Senior LeadershipTeam, to work directly with the local community

as part of the implementation planning process.

3.  Establish a standing committee of parents,

teachers, district staff, and other stakeholders(e.g., City, Chamber of Commerce, realtors) to

track and maintain the Facility Master Plan over 

time.

4.  Conduct campus assessments for future bond

work in consultation with each school's Campus

Advisory Council to ensure accurate, first-hand

knowledge of campus conditions and priorities.For continuity, each campus will maintain a

Facilities Improvement Plan documenting prior 

campus evaluations, including a Principal's Log,

in which the principal or his/her designee will

record relevant discussions regarding how thecampus facilities are functioning and note any

concerns for future administrators and CACs.

5.  When new schools or consolidations are being

considered, first evaluate existing District sites(both presently undeveloped or in use) anddetermine if any are candidates for new

construction, renovation, or re-construction. Thismay assist the District in locating schools in better 

locations than can be achieved with the

purchase of new land.

6.  Continue to identify ways to improve

collaborative planning with the City of Austin.The Austin ISD, City of Austin, and Travis County

have adopted a joint resolution that specifically

commits these entities to collaborative planningefforts including the AISD Facility Master Plan and

the City’s Comprehensive Plan.

7.  Initiate a District-wide boundary assessment and

possible realignment beginning January 2012 to

EXHIBIT "B"

 

Page 32

EXHIBIT "B"

Page 35: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 35/317

balance enrollment and improve vertical

alignment.

8.  District Departments/staff should be moved into

available spaces at under-utilized schools so thatthe District may sell valuable property, avoid

leasing buildings and allow for all schools toremain open.

9.  Aggressively pursue joint-use opportunities for existing underutilized campuses, as well as new

facilities; potential partners include the City of

Austin, Central Health/CommUnityCare, and artsorganizations and other nonprofit organizations.

10. Closed schools should be reused by the District or another governmental entity for office/

administrative use, or by another educationaluser, and then returned to use as AISD

instructional space when student population

growth makes it prudent.

11. Review current District transfer policies and

implementation, in particular using campus’“permanent capacity”, as opposed to

“functional capacity” when evaluating availablespace.

12. Analyze current “out migration” trends from

campus/zones to understand the underlying

issues, AND then address those issues in order to

support the return of students to their neighborhood schools.

13. Conduct a complete review of the day-to-day

application of the district's transfer policy,

regardless of overcrowding or underutilization.

Include the impact that “out migration” can haveon under-utilized schools as much as “in migration

can impact overcrowded schools.

14. Support the neighborhood school model.

II. Manag ement Reco mmenda tions

15. Institute a well-defined system for handling

maintenance requests that is communicated in

writing to all staff at the start of each school year including:

 how and to whom to report amaintenance issue, and how to receive

the estimated time for a response, how to track a maintenance request

electronically in real time,

 who to contact if the contractor or maintenance person fails to arrive,

 what to do if work is poorly completed or isincomplete, and

 who is responsible for signing off on

completed work.

III. Staffing Rec omm enda tions

16. Develop a plan to supervise custodians centrally

to allow more flexibility in the use of resources,

reduce overtime costs through flexible

EXHIBIT "B"

 

Page 33

EXHIBIT "B"

Page 36: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 36/317

scheduling, improved supervision and quality

control, and improved facility scheduling andenergy management.

17. Consolidate maintenance functions, including

field maintenance for athletic fields, under theMaintenance Department to provide more

efficient and flexible use of available resources.

IV. Energy Efficienc y Rec omm endations

18. Implement a centrally supervised summer custodial program to achieve cost reductions by

returning some custodians on each campus,through attrition, to a 10-month employment

year.

19. Continue the current District focus on energy

usage reduction through more efficient

equipment, technology applications to managethe operation of buildings more effectively, and

engagement of campus and facility occupants

to assist working toward the goal of reducedusage.

20. Continue efforts toward a coordinated shutdown

of facilities in the summer months as is feasible.

21. As soon as feasible, fund energy coordinator 

position to implement and monitor energysavings initiatives at campuses. Savings

generated from funding this position would more

than offset the cost.

22. Implement an educational campaign to raise or 

lower thermostats in schools four degrees.(Estimates based on examples project savings of

between 5% and 20%.)

23. Continue to upgrade and improve data and

systems to measure utility usage by campus.

V. Maintenance Reco mmenda tions

24. Institute bond counsel-approved strategies to

designate funds for building system renovations in

future bond programs to protect the District’scapital investments.

25. Include furniture and equipment replacementschedule in the next bond program scope of

work; invest in high quality equipment that will not

require frequent maintenance or replacement.

26. Institute industry-standard performance measures

for bond programs, per the 2009 MGT EfficiencyStudy, to maintain and publish the following types

of data: cost per foot of construction projectscompared to peer districts and regional and

national averages, final estimate compared to

final bid, change-order rate, completionschedules, consultant ratings.

EXHIBIT "B"

 

Page 34

EXHIBIT "B"

Page 37: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 37/317

VI. Design Rec omm enda tions

27. Engage in public/private partnerships in the siting,engineering, and design of “healthy” schools and

neighborhood environments that supportincreased outdoor physical activities for childrenand their families.

28. Explore flexible design for future school facilities toaccommodate population fluctuations. Some

strategies include implementing consistent

building designs with modular components that

may expand or contract with student population

changes, or using a Mobile Technology unit thatallows specialized equipment to be shared by

two or more campuses for a portion of a year.

29. Create flexible learning spaces, where students

can work in groups utilizing the wireless network 

with portable devices.

30. Design large-scale facilities to provide suitable

space for multiple uses such as conferences,

meetings, and professional development (ideallyin conjunction with other local governmental

partners to share costs and maintenance).

31. Design, construct and operate high-performance

schools and other facilities that are sensitive tonatural resource use, conserve energy and

water, reduce pollution and waste, promote and

attract active transportation by healthy outdoor design that includes, but is not limited to, bicycle

racks for students within a two-mile radius of a

campus and outdoor space designed for multi-purpose neighborhood and community use.

32. The site selection process for high-performanceschools and other faculties should include a

matrix that rewards the availability of masstransportation options that include, but are not

limited to, Capital Metro buses, commuter rail,

and metro rail to reduce transportation costs and

the carbon footprint of a facility.

33.  To avoid the costs of building and maintaining

additional high schools, pursue options such as 7

a.m. to 8 p.m. schedules that offer challenging

curriculums, distance learning, and advancedplacement courses. Online courses could also be

more widely implemented and available to all

students.

VII. Safety a nd Sec urity Rec omm enda tions

34. Make safe walkable routes a priority whenconstructing or repurposing school facilities.

35. Assess nighttime security and add securitycameras and lighting in high need areas.

36. Work with appropriate entities to encourage

construction of fences and barriers at railroad

crossings.

EXHIBIT "B"

 

Page 35

EXHIBIT "B"

Page 38: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 38/317

37. Ensure the installation of adequate public address

and alarm systems in all schools, including allportables.

38. Address campus traffic issues as identified by thecampus.

VIII. Use Rec omm enda tions

39. Increase building rental rates to increase cost-

recovery for community use of schools.

40. Appropriately consolidate students in underutilized

campuses to make available as much classroomspace as possible, and issue Requests for Proposals

to identify educational groups or childcare

providers interested in leasing excess space and

assuming or sharing maintenance and operation

costs.

41. Implement an aggressive marketing campaign to

rent the Burger Activity and Delco Activity centersto interested parties for conferences, athletic

events, and other activities.

IX. Tec hnology Rec omm enda tions

42. Design “Twenty-first Century Classrooms,” media

rich classrooms with projectors, audio system,

document cameras, and interactive tools.

43. Expand the staff use of online meeting software(live video/audio/screen sharing) to facilitate

communication and allow people in different

spaces to be in the same space virtually. “Green”meetings reduce employee travel time and have

a smaller carbon footprint.

44. Institute cloud computing with anytime/anywhere

access that works with all computer types and

devices.

45. Use Web 2.0 tools to communicate, collaborate,

and create.

46. Use tools such as video “chat” to expand beyond

the classroom (i.e., virtual field trips, interactions

with other students from across town, or across theglobe).

47. Create a single web entry point (portal) with single

sign-on for all student and teacher resources inone place.

48. Increase use of online assessment tools to receive

results more quickly and reduce paper usage, i.e.,

dashboards.

49. Improve access to meaningful student data to

guide instructional decisions.

50. Create online courses for students and teacher 

professional development which would beconducted entirely online and blended with face-

to-face and online contact.

EXHIBIT "B"

 

Page 36

EXHIBIT "B"

Page 39: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 39/317

51. Increase use of mobile computing (including

personal devices such as smart phones) andmobile devices (netbooks). Fewer desktop

computers (use less energy, smaller foot print,), less

need for dedicated traditional computer lab.

X. Other Rec omm enda tions

52. Assess administrative fees for general, sibling, or 

tracking school transfers, with no fee for students

qualified for free and reduced lunch, and withprovisions for hardship waivers.

53. Consider the feasibility of sharing administrative

staff or resources and services among small

campuses.

54. Determine cost effectiveness of duplicatingspecial programs in different areas of the Districtversus providing transportation to a single

program.

EXHIBIT B

 

Page 37

EXHIBIT "B"

Page 40: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 40/317

Fac ility Summ ary Data Reports with Fac ility Master Plan Rec om me nda tions

The following pages include a summary of each facility with the information listed below, in alphabetical order by school

type (ES, MS, HS). Support facilities are included subsequent to the school summaries.

  School ID number, name, and address

  Grades served

  Permanent and portable/temporary square

footage  Number of classrooms

  Permanent Capacity

  2010-11 Enrollment

  2010-11 Attendance Zone Population

  2015-16 Projected Attendance Zone Population

  2010-11 In Migration

  2010-11 Out Migration

  Site size and number of parking spaces

  Individual building data

  Facility condition data

  Deficiency costs by building system and priority

  Facility master plan recommendations

EXHIBIT B

 

Page 38

Page 41: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 41/317

School Summ ary Report2010 Educational Suitability Assessment

142 Allan Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 53%

2010-11 Attendance Zone Population 354 319

Excess/DeficitSeats

2010-11 Out Migration 031

2010-11 In Migration 057

2015-16 Proj'd At tendance Zone Populat ion 364 309

Utilization (by enrollment) 56% Percent of Capacity

Area (GSF) per student 297 0 297

Gross Area 112,608 112,608

Perm Temp Total

2010-11 Campus Enrollment 379

Permanent Capacity 673

Number of Classrooms 42 0 42

Parking Spaces 72

Gross Sit e Area (Acres) 19.5

Sit e Data

School Data

Mechanical 1 1957 1,092 27.6%

Building B 1 1958 10,577 35.3%

Building A 1 1957 100,939 30.3%

Per m Buildings 112,608

Floor s Yr . Built GSF FCI

Building Data

30.3%

Austin, Texas 78702 1957 AA No

4900 Gonzales Yr. Open Rating Historic

Interior $457 357 $323 054 $780 411

Site - - $156,255 $85,341 - $241,597

Exterior - $3,333 $2,797,431 $36,448 - $2,837,212

Structural - - - - - $0

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $2,943,565*

EXHIBIT "B"

Page 42: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 42/317

School Summ ary Report2010 Educational Suitability Assessment

101 Allison Elementary School Gr ades Served PK-6 (ES)

2010-11 Ut ilizat ion (by populat ion) 120%

2010-11 Attendance Zone Population 585 -99

Excess/DeficitSeats

2010-11 Out Migration 079

2010-11 In Migration 031

2015-16 Proj'd Attendance Zone Populat ion 590 -104

Utilization (by enrollment) 112% Percent of Capacity

Area (GSF) per student 113 14 127

Gross Area 61,426 7,680 69,106

Perm Temp Total

2010-11 Campus Enrollment 543

Permanent Capacity 486

Number of Classrooms 30 9 39

Parking Spaces 61

Gross Sit e Area (Acres) 10.7

Sit e Data

School Data

Building A 1 1955 61,426 21.6%

Perm Buildings 61,426

Floor s Yr . Built GSF FCI

Building Data

20.4%

Austin, Texas 78741 1955 AA No

515 Vargas Rd. Yr. Open Rating Historic

Interior $133 897 $256 139 $115 111 $505 146

Site - $2,222 $67,896 - - $70,119

Exterior - $435 $49,328 - - $49,763

Structural - - - - - $0

Roofing - - $7,992 - - $7,992

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,527,749*

EXHIBIT "B"

Page 43: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 43/317

School Summ ary Report2010 Educational Suitability Assessment

102 Andrews Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 142%

2010-11 Att endance Zone Populat ion 692 -206

Excess/DeficitSeats

2010-11 Out Migration 075

2010-11 In Migration 061

2015-16 Proj'd Attendance Zone Populat ion 764 -278

Utilization (by enrollment) 147% Percent of Capacity

Area (GSF) per student 81 17 99

Gross Area 58,376 12,288 70,664

Perm Temp Total

2010-11 Campus Enrollment 717

Permanent Capacity 486

Number of Classrooms 31 16 47

Parking Spaces 39

Gross Site Area (Acr es) 7.7

Sit e Data

School Data

Building B 1 1986 4,422 8.1%

Building A 1 1962 53,954 38.8%

Perm Buildings 58,376

Floor s Yr . Built GSF FCI

Building Data

32.1%

Austin, Texas 78723 1962 RC No

6801 Nor theast Dr. Yr. Open Rating Historic

Interior $128 866 $530 543 $44 545 $703 954

Site - $54,271 $150,146 - - $204,417

Exterior - $619,584 $13,720 - - $633,304

Structural - - - - - $0

Roofing - $20,585 - - - $20,585

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $3,207,050*

EXHIBIT "B"

Page 44: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 44/317

School Summ ary Report2010 Educational Suitability Assessment

187 Baldwin Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 83%

2010-11 Attendance Zone Population 557 112

Excess/DeficitSeats

2010-11 Out Migration 081

2010-11 In Migration 036

2015-16 Proj'd At tendance Zone Populat ion 642 27

Utilization (by enrollment) 76% Percent of Capacity

Area (GSF) per student 171 0 171

Gross Area 86,751 86,751

Perm Temp Total

2010-11 Campus Enrollment 508

Permanent Capacity 669

Number of Classrooms 38 0 38

Parking Spaces

Gross Site Area (Acres) .0

Sit e Data

School Data

Building A 2 2010 86,751

Perm Buildings 86,751

Floor s Yr . Built GSF FCI

Building Data

0.0%

, Texas 0 No

Yr. Open Rating Historic

Interior $0

Site - - - - - $0

Exterior - - - - - $0

Structural - - - - - $0

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $000*

EXHIBIT "B"

EXHIBIT "B"

Page 45: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 45/317

School Summ ary Report2010 Educational Suitability Assessment

182 Baranoff Elementary School Gr ades Served K-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 112%

2010-11 Attendance Zone Population 891 -97

Excess/DeficitSeats

2010-11 Out Migration 093

2010-11 In Migration 081

2015-16 Proj'd At tendance Zone Populat ion 874 -80

Utilization (by enrollment) 110% Percent of Capacity

Area (GSF) per student 91 7 98

Gross Area 80,088 6,144 86,232

Perm Temp Total

2010-11 Campus Enrollment 876

Permanent Capacity 794

Number of Classrooms 44 8 52

Parking Spaces 84

Gross Sit e Area (Acres) 15.6

Sit e Data

School Data

Classroom 1 2008 10,996 5.8%

Building A 1 1999 69,092 13.2%

Perm Buildings 80,088

Floor s Yr . Built GSF FCI

Building Data

11.0%

Austin, Texas 78748 1999 EX No

12009 Buckingham Gate Yr. Open Rating Historic

Interior $926 $42 710 $270 307 $9 202 $323 145

Site - - $9,548 - - $9,548

Exterior - - $5,556 - - $5,556

Structural - - - - - $0

Roofing - $4,702 $521,184 - - $525,885

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $729,123*

EXHIBIT "B"

EXHIBIT "B"

Page 46: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 46/317

School Summ ary Report2010 Educational Suitability Assessment

149 Barr ington Elementary School Gr ades Served PK-6 (ES)

2010-11 Ut ilizat ion (by populat ion) 146%

2010-11 Att endance Zone Populat ion 955 -301

Excess/DeficitSeats

2010-11 Out Migration 086

2010-11 In Migration 084

2015-16 Proj'd Attendance Zone Population 1,098 -444

Utilization (by enrollment) 152% Percent of Capacity

Area (GSF) per student 79 22 101

Gross Area 78,971 21,504 100,475

Perm Temp Total

2010-11 Campus Enrollment 996

Permanent Capacity 655

Number of Classrooms 41 24 65

Parking Spaces 68

Gross Sit e Area (Acres) 12.1

Sit e Data

School Data

Building D 1 2010 12,794 0.0%

Building C 1 2010 100

Building B 1 1999 15,285 4.9%

Building A 1 1969 50,792 39.6%

Perm Buildings 78,971

Floor s Yr . Built GSF FCI

Building Data

21.2%

Austin, Texas 78753 1969 AA No

400 Cooper Dr ive Yr. Open Rating Historic

Interior $11 761 $447 963 $46 058 $505 782

Site - $7,043 $71,576 $54,752 - $133,371

Exterior - - $19,209 - - $19,209

Structural - - - - - $0

Roofing - $7,091 - - - $7,091

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $806,409*

EXHIBIT "B"

EXHIBIT "B"

Page 47: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 47/317

School Summ ary Report2010 Educational Suitability Assessment

103 Bar ton Hills Elementary School Gr ades Served K-6 (ES)

2010-11 Ut ilizat ion (by populat ion) 81%

2010-11 Attendance Zone Population 203 48

Excess/DeficitSeats

2010-11 Out Migration 021

2010-11 In Migration 172

2015-16 Proj'd At tendance Zone Populat ion 199 52

Utilization (by enrollment) 154% Percent of Capacity

Area (GSF) per student 99 28 127

Gross Area 38,291 10,752 49,043

Perm Temp Total

2010-11 Campus Enrollment 386

Permanent Capacity 251

Number of Classrooms 14 13 27

Parking Spaces 43

Gross Site Area (Acr es) 9.9

Sit e Data

School Data

Band 1 2007 3,205 0.5%

Building B 1 1964 2,985 20.7%

Building A 1 1964 32,101 33.1%

Perm Buildings 38,291

Floor s Yr . Built GSF FCI

Building Data

29.8%

Austin, Texas 78704 1964 EX No

2108 Barton Hills Dr. Yr. Open Rating Historic

Interior $347 145 $9 067 $356 211

Site - $4,606 $90,727 - - $95,333

Exterior - - $82,715 $383,049 - $465,764

Structural $15,245 - $769 - - $16,014

Roofing $1,970 - $17,708 - - $19,678

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,258,939*

EXHIBIT "B"

EXHIBIT "B"

Page 48: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 48/317

School Summ ary Report2010 Educational Suitability Assessment

104 Becker Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 43%

2010-11 Attendance Zone Population 226 298

Excess/DeficitSeats

2010-11 Out Migration 086

2010-11 In Migration 069

2015-16 Proj'd At tendance Zone Populat ion 256 268

Utilization (by enrollment) 40% Percent of Capacity

Area (GSF) per student 287 15 302

Gross Area 59,670 3,072 62,742

Perm Temp Total

2010-11 Campus Enrollment 208

Permanent Capacity 524

Number of Classrooms 33 3 36

Parking Spaces 0

Gross Site Area (Acr es) 3.7

Sit e Data

School Data

Building D 1 1936 1,099 23.9%

Building C 1 1936 1,237 21.4%

Mechanical 1 1939 499 26.9%

Building A 1 1936 56,835 39.2%

Perm Buildings 59,670

Floor s Yr . Built GSF FCI

Building Data

38.1%

Austin, Texas 78704 1936 EX Yes

906 Milton St. West Yr. Open Rating Historic

Interior $44 583 $185 934 $80 564 $311 082

Site - $4,927 $342,183 $2,225 - $349,335

Exterior - - $8,103 $19,303 - $27,407

Structural - $7,792 - - - $7,792

Roofing - $608,432 $37,370 $28,130 - $673,931

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $3,232,456*

EXHIBIT "B"

EXHIBIT "B"

Page 49: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 49/317

School Summ ary Report2010 Educational Suitability Assessment

105 Blackshear Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 48%

2010-11 Attendance Zone Population 288 310

Excess/DeficitSeats

2010-11 Out Migration 058

2010-11 In Migration 021

2015-16 Proj'd At tendance Zone Populat ion 275 323

Utilization (by enrollment) 41% Percent of Capacity

Area (GSF) per student 290 0 290

Gross Area 70,726 70,726

Perm Temp Total

2010-11 Campus Enrollment 244

Permanent Capacity 598

Number of Classrooms 37 0 37

Parking Spaces 52

Gross Site Area (Acr es) 5.3

Sit e Data

School Data

Building A 1 1937 70,726 34.3%

Perm Buildings 70,726

Floor s Yr . Built GSF FCI

Building Data

35.0%

Austin, Texas 78702 1937 AA Yes

1712 East 11th St. Yr. Open Rating Historic

Interior $4 532 $387 531 $3 206 $395 269

Site - - $170,707 $95,689 - $266,396

Exterior - $3,785 $452,580 $575,423 - $1,031,789

Structural $4,394 - - - - $4,394

Roofing - $1,423 $632,834 - - $634,256

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $2,366,412*

EXHIBIT "B"

EXHIBIT "B"

Page 50: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 50/317

School Summ ary Report2010 Educational Suitability Assessment

106 Blanton Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 99%

2010-11 Attendance Zone Population 630 6

Excess/DeficitSeats

2010-11 Out Migration 157

2010-11 In Migration 078

2015-16 Proj'd Attendance Zone Populat ion 799 -163

Utilization (by enrollment) 93% Percent of Capacity

Area (GSF) per student 122 18 140

Gross Area 71,817 10,752 82,569

Perm Temp Total

2010-11 Campus Enrollment 591

Permanent Capacity 636

Number of Classrooms 40 10 50

Parking Spaces 75

Gross Site Area (Acr es) 8.0

Sit e Data

School Data

Greenhouse 1 2004 317 35.8%

Building C 1 2000 11,424 6.9%

Building B 1 1964 3,546 26.8%

Building A 1 1964 56,530 22.1%

Perm Buildings 71,817

Floor s Yr . Built GSF FCI

Building Data

19.6%

Austin, Texas 78723 1964 EX No

5408 Westminster Dr. Yr. Open Rating Historic

Interior $106 775 $200 675 $46 975 $354 425

Site - - $288,274 - - $288,274

Exterior - - $2,793 - - $2,793

Structural - - - - - $0

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,725,011*

EXHIBIT B

EXHIBIT "B"

Page 51: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 51/317

School Summ ary Report2010 Educational Suitability Assessment

185 Blazier Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 150%

2010-11 Att endance Zone Populat ion 896 -298

Excess/DeficitSeats

2010-11 Out Migration 168

2010-11 In Migration 049

2015-16 Proj'd Attendance Zone Populat ion 993 -395

Utilization (by enrollment) 130% Percent of Capacity

Area (GSF) per student 107 14 121

Gross Area 82,897 10,752 93,649

Perm Temp Total

2010-11 Campus Enrollment 775

Permanent Capacity 598

Number of Classrooms 38 10 48

Parking Spaces 95

Gross Sit e Area (Acres) 15.4

Sit e Data

School Data

Building A 1 2008 82,897 4.6%

Perm Buildings 82,897

Floor s Yr . Built GSF FCI

Building Data

5.1%

Austin, Texas 78747 2008 AA No

8601 Vertex Blvd. Yr. Open Rating Historic

Interior $64 065 $88 567 $12 027 $164 658

Site - - $508 $40,134 - $40,642

Exterior - - - - - $0

Structural - - - - - $0

Roofing - - $21,733 - - $21,733

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $314,660*

EXHIBIT B

EXHIBIT "B"

Page 52: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 52/317

School Summ ary Report2010 Educational Suitability Assessment

170 Boone Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 64%

2010-11 Attendance Zone Population 478 274

Excess/DeficitSeats

2010-11 Out Migration 106

2010-11 In Migration 130

2015-16 Proj'd At tendance Zone Populat ion 468 284

Utilization (by enrollment) 67% Percent of Capacity

Area (GSF) per student 147 0 147

Gross Area 73,690 73,690

Perm Temp Total

2010-11 Campus Enrollment 501

Permanent Capacity 752

Number of Classrooms 42 0 42

Parking Spaces 82

Gross Sit e Area (Acres) 12.5

Sit e Data

School Data

Building B 1 1998 10,017 7.9%

Building A 1 1986 63,673 18.5%

Perm Buildings 73,690

Floor s Yr . Built GSF FCI

Building Data

17.5%

Austin, Texas 78749 1986 RC No

8101 Croftwood Dr. Yr. Open Rating Historic

Interior $186 467 $50 972 $237 439

Site - - - $125,012 - $125,012

Exterior - $9,899 - - - $9,899

Structural - - $9,058 - - $9,058

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $625,336*

EXHIBIT B

EXHIBIT "B"

Page 53: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 53/317

School Summ ary Report2010 Educational Suitability Assessment

107 Brentwood Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 78%

2010-11 Attendance Zone Population 456 129

Excess/DeficitSeats

2010-11 Out Migration 110

2010-11 In Migration 149

2015-16 Proj'd At tendance Zone Populat ion 450 135

Utilization (by enrollment) 85% Percent of Capacity

Area (GSF) per student 127 6 133

Gross Area 62,891 3,072 65,963

Perm Temp Total

2010-11 Campus Enrollment 495

Permanent Capacity 585

Number of Classrooms 33 3 36

Parking Spaces 68

Gross Sit e Area (Acres) 16.7

Sit e Data

School Data

Building B 1 1951 572

Building A 1 1951 62,319 23.7%

Perm Buildings 62,891

Floor s Yr . Built GSF FCI

Building Data

23.2%

Austin, Texas 78757 1951 RC No

6700 Arroyo Seco Yr. Open Rating Historic

Interior $868 $682 430 $45 770 $729 067

Site $12,102 - $60,185 - - $72,287

Exterior - - $134,776 - - $134,776

Structural - - $7,945 - - $7,945

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $980,422*

EXHIBIT B

EXHIBIT "B"

Page 54: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 54/317

School Summ ary Report2010 Educational Suitability Assessment

108 Brooke Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 103%

2010-11 Attendance Zone Population 441 -11

Excess/DeficitSeats

2010-11 Out Migration 081

2010-11 In Migration 075

2015-16 Proj'd At tendance Zone Populat ion 471 -41

Utilization (by enrollment) 102% Percent of Capacity

Area (GSF) per student 119 9 128

Gross Area 52,282 3,858 56,140

Perm Temp Total

2010-11 Campus Enrollment 439

Permanent Capacity 430

Number of Classrooms 27 5 32

Parking Spaces 43

Gross Site Area (Acr es) 5.9

Sit e Data

School Data

Building A 1 1954 52,282 25.6%

Perm Buildings 52,282

Floor s Yr . Built GSF FCI

Building Data

24.9%

Austin, Texas 78702 1954 RC No

3100 East 4th St. Yr. Open Rating Historic

Interior $42 710 $129 374 $149 501 $321 585

Site - - $35,849 - - $35,849

Exterior - - $89,580 $13,732 - $103,312

Structural - - $1,461 - - $1,461

Roofing - $23,223 - - - $23,223

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,195,217*

EXHIBIT B

EXHIBIT "B"

Page 55: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 55/317

School Summ ary Report2010 Educational Suitability Assessment

109 Brown Elementary School Gr ades Served PK-6 (ES)

2010-11 Ut ilizat ion (by populat ion) 112%

2010-11 Attendance Zone Population 525 -58

Excess/DeficitSeats

2010-11 Out Migration 096

2010-11 In Migration 074

2015-16 Proj'd At tendance Zone Populat ion 546 -79

Utilization (by enrollment) 111% Percent of Capacity

Area (GSF) per student 104 18 122

Gross Area 53,853 9,216 63,069

Perm Temp Total

2010-11 Campus Enrollment 519

Permanent Capacity 468

Number of Classrooms 29 12 41

Parking Spaces 58

Gross Sit e Area (Acres) 10.1

Sit e Data

School Data

Building A 1 1957 53,853 32.0%

Perm Buildings 53,853

Floor s Yr . Built GSF FCI

Building Data

28.1%

Austin, Texas 78752 1957 AA No

505 W. Anderson Ln. Yr. Open Rating Historic

Interior $106 775 $47 418 $499 529 $653 722

Site - - $25,359 $40,134 - $65,492

Exterior - - $61,590 - - $61,590

Structural - - - - - $0

Roofing $954,050 - $20,585 - - $974,635

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $2,733,352*

EXHIBIT B

EXHIBIT "B"

Page 56: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 56/317

School Summ ary Report2010 Educational Suitability Assessment

110 Bryker W oods Elementary School Gr ades Served K-6 (ES)

2010-11 Ut ilizat ion (by populat ion) 115%

2010-11 Attendance Zone Population 312 -40

Excess/DeficitSeats

2010-11 Out Migration 047

2010-11 In Migration 094

2015-16 Proj'd At tendance Zone Populat ion 333 -61

Utilization (by enrollment) 149% Percent of Capacity

Area (GSF) per student 93 23 116

Gross Area 37,517 9,216 46,733

Perm Temp Total

2010-11 Campus Enrollment 404

Permanent Capacity 272

Number of Classrooms 16 12 28

Parking Spaces 33

Gross Site Area (Acr es) 6.3

Sit e Data

School Data

Multi-Use 1 1949 1,202

Multi-Use 1 1949 451 14.8%

Building B 1 1999 4,874 10.9%

Building A 1 1939 30,990 42.3%

Perm Buildings 37,517

Floor s Yr . Built GSF FCI

Building Data

33.4%

Austin, Texas 78703 1939 RC No

3309 Kerbey Lane Yr. Open Rating Historic

Interior $85 420 $186 592 $86 382 $358 394

Site $11,503 $2,135 - $64,475 - $78,114

Exterior - $3,842 $594,025 - - $597,867

Structural - - $585 - - $585

Roofing - - $49,869 - - $49,869

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,308,938*

EXHIBIT B

EXHIBIT "B"

Page 57: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 57/317

School Summ ary Report2010 Educational Suitability Assessment

111 Campbell Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 70%

2010-11 Attendance Zone Population 367 157

Excess/DeficitSeats

2010-11 Out Migration 063

2010-11 In Migration 056

2015-16 Proj'd At tendance Zone Populat ion 379 145

Utilization (by enrollment) 69% Percent of Capacity

Area (GSF) per student 172 4 176

Gross Area 61,793 1,536 63,329

Perm Temp Total

2010-11 Campus Enrollment 360

Permanent Capacity 524

Number of Classrooms 33 2 35

Parking Spaces 71

Gross Site Area (Acr es) 9.7

Sit e Data

School Data

Building A 1 1992 61,793 20.6%

Perm Buildings 61,793

Floor s Yr . Built GSF FCI

Building Data

20.8%

Austin, Texas 78722 1992 AA No

2613 Rogers Ave. Yr. Open Rating Historic

Interior $21 355 $141 699 $44 826 $207 880

Site $2,209 - $194,564 $19,758 - $216,531

Exterior - - $1,436 - - $1,436

Structural - - $3,992 - - $3,992

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $691,291*

EXHIBIT B

EXHIBIT "B"

Page 58: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 58/317

School Summ ary Report2010 Educational Suitability Assessment

173 Casey Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 107%

2010-11 Attendance Zone Population 763 -52

Excess/DeficitSeats

2010-11 Out Migration 171

2010-11 In Migration 083

2015-16 Proj'd At tendance Zone Populat ion 768 -57

Utilization (by enrollment) 94% Percent of Capacity

Area (GSF) per student 122 2 124

Gross Area 81,506 1,536 83,042

Perm Temp Total

2010-11 Campus Enrollment 669

Permanent Capacity 711

Number of Classrooms 44 2 46

Parking Spaces 90

Gross Sit e Area (Acres) 17.9

Sit e Data

School Data

Building A 1 1998 81,506 17.1%

Perm Buildings 81,506

Floor s Yr . Built GSF FCI

Building Data

16.7%

Austin, Texas 78748 1998 AA No

9400 Texas Oaks Drive Yr. Open Rating Historic

Interior $21 355 $103 475 $259 333 $384 163

Site - - $11,274 - - $11,274

Exterior - - - - - $0

Structural - - - - - $0

Roofing - - - $1,823,016 - $1,823,016

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $551,453*

EXHIBIT B

EXHIBIT "B"

Page 59: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 59/317

School Summ ary Report2010 Educational Suitability Assessment

112 Casis Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 109%

2010-11 Attendance Zone Population 731 -62

Excess/DeficitSeats

2010-11 Out Migration 016

2010-11 In Migration 110

2015-16 Proj'd At tendance Zone Populat ion 764 -95

Utilization (by enrollment) 123% Percent of Capacity

Area (GSF) per student 94 17 111

Gross Area 77,911 13,824 91,735

Perm Temp Total

2010-11 Campus Enrollment 825

Permanent Capacity 669

Number of Classrooms 38 16 54

Parking Spaces 74

Gross Sit e Area (Acres) 14.2

Sit e Data

School Data

Storage 1 1977 201

Building A 1 1951 77,710 17.8%

Perm Buildings 77,911

Floor s Yr . Built GSF FCI

Building Data

17.4%

Austin, Texas 78703 1951 EX No

2710 Exposition Blvd. Yr. Open Rating Historic

Interior $158 014 $91 098 $192 609 $441 722

Site - - $110,394 $128,950 - $239,343

Exterior - - $125,554 - - $125,554

Structural $3,372 - - - - $3,372

Roofing - $24,163 - - - $24,163

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $912,046*

EXHIBIT "B"

Page 60: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 60/317

School Summ ary Report2010 Educational Suitability Assessment

184 Clayton Elementary School Gr ades Served K-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 100%

2010-11 Attendance Zone Population 837 -1

Excess/DeficitSeats

2010-11 Out Migration 048

2010-11 In Migration 087

2015-16 Proj'd At tendance Zone Populat ion 905 -69

Utilization (by enrollment) 104% Percent of Capacity

Area (GSF) per student 115 7 122

Gross Area 99,921 6,144 106,065

Perm Temp Total

2010-11 Campus Enrollment 867

Permanent Capacity 836

Number of Classrooms 47 8 55

Parking Spaces 80

Gross Sit e Area (Acres) 16.8

Sit e Data

School Data

Building A 1 2006 99,921 6.0%

Perm Buildings 99,921

Floor s Yr . Built GSF FCI

Building Data

5.9%

Austin, Texas 78739 2006 EX No

7525 La Crosse Ave. Yr. Open Rating Historic

Interior $110 324 $11 953 $122 276

Site - - $104,860 - - $104,860

Exterior - - - - - $0

Structural - - - - - $0

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $518,872*

EXHIBIT "B"

Page 61: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 61/317

School Summ ary Report2010 Educational Suitability Assessment

161 Cook Elementary School Gr ades Served K-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 223%

2010-11 At tendance Zone Populat ion 1,252 -691

Excess/DeficitSeats

2010-11 Out Migration 379

2010-11 In Migration 036

2015-16 Proj'd Attendance Zone Population 1,388 -827

Utilization (by enrollment) 161% Percent of Capacity

Area (GSF) per student 75 20 95

Gross Area 67,344 18,432 85,776

Perm Temp Total

2010-11 Campus Enrollment 901

Permanent Capacity 561

Number of Classrooms 35 23 58

Parking Spaces 102

Gross Sit e Area (Acres) 12.7

Sit e Data

School Data

Building B 1 1998 9,101 7.2%

Building A 1 1974 58,243 37.0%

Perm Buildings 67,344

Floor s Yr . Built GSF FCI

Building Data

27.5%

Austin, Texas 78758 1974 RC No

1511 Cripple Creek Yr. Open Rating Historic

Interior $24 947 $292 679 $56 423 $374 049

Site $5,447 $368,828 $71,282 $99,999 - $545,557

Exterior - $5,057 $13,275 - - $18,332

Structural - $27,464 $124,896 - - $152,360

Roofing - $23,862 - - - $23,862

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $3,894,721*

EXHIBIT "B"

Page 62: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 62/317

School Summ ary Report2010 Educational Suitability Assessment

183 Cowan Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 106%

2010-11 Attendance Zone Population 707 -38

Excess/DeficitSeats

2010-11 Out Migration 121

2010-11 In Migration 196

2015-16 Proj'd At tendance Zone Populat ion 704 -35

Utilization (by enrollment) 117% Percent of Capacity

Area (GSF) per student 90 12 101

Gross Area 70,234 9,216 79,450

Perm Temp Total

2010-11 Campus Enrollment 783

Permanent Capacity 669

Number of Classrooms 37 12 49

Parking Spaces 84

Gross Sit e Area (Acres) 22.5

Sit e Data

School Data

Building A 1 1999 70,234 8.1%

Perm Buildings 70,234

Floor s Yr . Built GSF FCI

Building Data

9.1%

Austin, Texas 78748 1999 EX No

2817 Kentish Drive Yr. Open Rating Historic

Interior $21 355 $195 024 $48 518 $264 897

Site - $4,606 $18,655 $75,046 - $98,307

Exterior - - - $770 - $770

Structural - - - - - $0

Roofing - - $57,513 - - $57,513

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $723,486*

EXHIBIT "B"

Page 63: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 63/317

School Summ ary Report2010 Educational Suitability Assessment

113 Cunningham Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 78%

2010-11 Attendance Zone Population 573 159

Excess/DeficitSeats

2010-11 Out Migration 174

2010-11 In Migration 116

2015-16 Proj'd At tendance Zone Populat ion 560 172

Utilization (by enrollment) 70% Percent of Capacity

Area (GSF) per student 140 42 182

Gross Area 71,600 21,504 93,104

Perm Temp Total

2010-11 Campus Enrollment 512

Permanent Capacity 732

Number of Classrooms 41 21 62

Parking Spaces 62

Gross Site Area (Acr es) 8.8

Sit e Data

School Data

Building B 1 1990 9,722 33.0%

Building A 1 1963 61,878 43.2%

Perm Buildings 71,600

Floor s Yr . Built GSF FCI

Building Data

34.3%

Austin, Texas 78745 1963 AA No

2200 Berkeley Ave. Yr. Open Rating Historic

Interior $2 068 $210 570 $46 250 $258 889

Site - - $779,622 $272,621 - $1,052,243

Exterior $483 - $26,308 - - $26,791

Structural - $1,685 - - - $1,685

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $378,644*

EXHIBIT "B"

Page 64: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 64/317

School Summ ary Report2010 Educational Suitability Assessment

179 Davis Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 91%

2010-11 Attendance Zone Population 666 66

Excess/DeficitSeats

2010-11 Out Migration 035

2010-11 In Migration 047

2015-16 Proj'd At tendance Zone Populat ion 702 30

Utilization (by enrollment) 93% Percent of Capacity

Area (GSF) per student 106 7 112

Gross Area 72,149 4,608 76,757

Perm Temp Total

2010-11 Campus Enrollment 683

Permanent Capacity 732

Number of Classrooms 41 6 47

Parking Spaces 104

Gross Sit e Area (Acres) 13.2

Sit e Data

School Data

Building B 1 1999 9,981 4.9%

Building A 1 1993 62,168 28.5%

Perm Buildings 72,149

Floor s Yr . Built GSF FCI

Building Data

23.3%

Austin, Texas 78727 1993 RC No

5214 Duval Rd. Yr. Open Rating Historic

Interior $1 219 $21 355 $1 112 754 $53 085 $1 188 414

Site - - $1,852 $40,134 - $41,985

Exterior - - - - - $0

Structural - - $3,372 - - $3,372

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $621,725*

EXHIBIT "B"

Page 65: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 65/317

School Summ ary Report2010 Educational Suitability Assessment

154 Doss Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 134%

2010-11 Att endance Zone Populat ion 728 -185

Excess/DeficitSeats

2010-11 Out Migration 024

2010-11 In Migration 071

2015-16 Proj'd Attendance Zone Populat ion 747 -204

Utilization (by enrollment) 141% Percent of Capacity

Area (GSF) per student 78 16 94

Gross Area 60,228 12,288 72,516

Perm Temp Total

2010-11 Campus Enrollment 768

Permanent Capacity 543

Number of Classrooms 30 16 46

Parking Spaces 73

Gross Site Area (Acr es) 9.7

Sit e Data

School Data

Bldg B 1 2009 4,646 0.6%

Building A 1 1970 55,582 34.4%

Perm Buildings 60,228

Floor s Yr . Built GSF FCI

Building Data

26.2%

Austin, Texas 78731 1970 EX No

7005 Northledge Dr Yr. Open Rating Historic

Interior $401 625 $50 410 $452 035

Site - $4,606 $68,518 $40,134 - $113,258

Exterior - - $731 - - $731

Structural - $5,493 $68,609 - - $74,102

Roofing - - $464,424 - - $464,424

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $2,030,684*

EXHIBIT "B"

Page 66: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 66/317

School Summ ary Report2010 Educational Suitability Assessment

114 Dawson Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 55%

2010-11 Attendance Zone Population 276 229

Excess/DeficitSeats

2010-11 Out Migration 059

2010-11 In Migration 113

2015-16 Proj'd At tendance Zone Populat ion 282 223

Utilization (by enrollment) 66% Percent of Capacity

Area (GSF) per student 167 16 183

Gross Area 55,301 5,394 60,695

Perm Temp Total

2010-11 Campus Enrollment 331

Permanent Capacity 505

Number of Classrooms 32 3 35

Parking Spaces 56

Gross Site Area (Acr es) 8.7

Sit e Data

School Data

Building C 1 1991 9,965 10.7%

Building B 1 1986 299 3.5%

Building A 1 1954 45,037 28.2%

Perm Buildings 55,301

Floor s Yr . Built GSF FCI

Building Data

27.2%

Austin, Texas 78704 1954 EX No

3001 South 1st Yr. Open Rating Historic

Interior $27 673 $85 420 $121 022 $10 149 $244 264

Site - $236,494 $42,588 - - $279,082

Exterior - - $58,409 - - $58,409

Structural - - $27,004 - - $27,004

Roofing - $1,297 $32,523 - - $33,821

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $2,613,471*

2010 Ed i l S i bili A

EXHIBIT "B"

Page 67: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 67/317

School Summ ary Report2010 Educational Suitability Assessment

176 Galindo Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 97%

2010-11 Attendance Zone Population 689 22

Excess/DeficitSeats

2010-11 Out Migration 091

2010-11 In Migration 103

2015-16 Proj'd At tendance Zone Populat ion 705 6

Utilization (by enrollment) 99% Percent of Capacity

Area (GSF) per student 121 11 132

Gross Area 85,482 7,680 93,162

Perm Temp Total

2010-11 Campus Enrollment 704

Permanent Capacity 711

Number of Classrooms 44 10 54

Parking Spaces 98

Gross Sit e Area (Acres) 10.8

Sit e Data

School Data

Mechanical 1 2001 900 91.0%

Building A 1 1989 84,582 10.0%

Perm Buildings 85,482

Floor s Yr . Built GSF FCI

Building Data

11.4%

Austin, Texas 78704 1989 RC No

3800 S. 2nd St. Yr. Open Rating Historic

Interior $87 858 $147 364 $46 940 $282 163

Site - $4,218 $5,085 - - $9,303

Exterior - - $3,160 - - $3,160

Structural - - - - - $0

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,190,697*

2010 Ed ti l S it bilit A t

EXHIBIT "B"

Page 68: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 68/317

School Summ ary Report2010 Educational Suitability Assessment

116 Govalle Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 76%

2010-11 Attendance Zone Population 452 146

Excess/DeficitSeats

2010-11 Out Migration 104

2010-11 In Migration 052

2015-16 Proj'd At tendance Zone Populat ion 509 89

Utilization (by enrollment) 69% Percent of Capacity

Area (GSF) per student 187 0 187

Gross Area 77,638 77,638

Perm Temp Total

2010-11 Campus Enrollment 415

Permanent Capacity 598

Number of Classrooms 37 0 37

Parking Spaces 71

Gross Site Area (Acr es) 8.4

Sit e Data

School Data

Building B 1 1940 501 172.8%

Building A 1 1940 77,137 30.5%

Perm Buildings 77,638

Floor s Yr . Built GSF FCI

Building Data

30.9%

Austin, Texas 78702 1940 AA No

3601 Govalle Ave. Yr. Open Rating Historic

Interior $11 544 $114 440 $804 011 $929 995

Site - $4,606 $43,809 - - $48,415

Exterior - $17,361 $1,182,064 - - $1,199,425

Structural - $5,349 $10,309 - - $15,658

Roofing - - $33,366 - - $33,366

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,479,660*

2010 Ed ti l S it bilit A t

EXHIBIT "B"

Page 69: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 69/317

School Summ ary Report2010 Educational Suitability Assessment

159 Graham Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 138%

2010-11 Att endance Zone Populat ion 825 -227

Excess/DeficitSeats

2010-11 Out Migration 114

2010-11 In Migration 049

2015-16 Proj'd Attendance Zone Populat ion 850 -252

Utilization (by enrollment) 127% Percent of Capacity

Area (GSF) per student 93 14 107

Gross Area 70,589 10,752 81,341

Perm Temp Total

2010-11 Campus Enrollment 761

Permanent Capacity 598

Number of Classrooms 38 11 49

Parking Spaces 77

Gross Site Area (Acr es) 9.9

Sit e Data

School Data

Building C 1 2008 11,232 4.7%

Building B 1 1993 14,411 14.5%

Building A 1 1972 44,946 45.0%

Perm Buildings 70,589

Floor s Yr . Built GSF FCI

Building Data

30.4%

Austin, Texas 78753 1972 EX No

11211 Tom Adams Dr. Yr. Open Rating Historic

Interior $46 368 $177 156 $252 277 $475 801

Site $1,180 $91,328 $230,407 $86,383 - $409,299

Exterior - $1,716 $3,157 - - $4,874

Structural - $16,429 $76,531 $296 - $93,256

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $4,718,571*

S S2010 Educational Suitability Assessment

EXHIBIT "B"

Page 70: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 70/317

School Summ ary Report2010 Educational Suitability Assessment

117 Gullet t Elementary School Gr ades Served K-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 78%

2010-11 Attendance Zone Population 325 93

Excess/DeficitSeats

2010-11 Out Migration 030

2010-11 In Migration 247

2015-16 Proj'd At tendance Zone Populat ion 342 76

Utilization (by enrollment) 129% Percent of Capacity

Area (GSF) per student 74 21 95

Gross Area 39,827 11,525 51,352

Perm Temp Total

2010-11 Campus Enrollment 541

Permanent Capacity 418

Number of Classrooms 24 14 38

Parking Spaces 30

Gross Sit e Area (Acres) 17.9

Sit e Data

School Data

Mechanical 1 1972 179 11.7%

Building A 1 1956 39,648 35.0%

Perm Buildings 39,827

Floor s Yr . Built GSF FCI

Building Data

29.2%

Austin, Texas 78757 1956 EX No

6310 Treadwell Blvd. Yr. Open Rating Historic

Interior $42 710 $102 541 $45 619 $190 871

Site - $10,933 $96,959 $40,134 - $148,025

Exterior - $917 $51,820 - - $52,737

Structural - - - - - $0Roofing - $7,113 $92,238 - - $99,351

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $774,178*

S h l S R t2010 Educational Suitability Assessment

EXHIBIT "B"

Page 71: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 71/317

School Summ ary Report2010 Educational Suitability Assessment

118 Harr is Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 139%

2010-11 Att endance Zone Populat ion 755 -213

Excess/DeficitSeats

2010-11 Out Migration 106

2010-11 In Migration 052

2015-16 Proj'd Attendance Zone Populat ion 789 -247

Utilization (by enrollment) 140% Percent of Capacity

Area (GSF) per student 74 20 94

Gross Area 56,066 15,360 71,426

Perm Temp Total

2010-11 Campus Enrollment 758

Permanent Capacity 542

Number of Classrooms 34 16 50

Parking Spaces 33

Gross Site Area (Acr es) 7.3

Sit e Data

School Data

Building B 1 1998 14,112 11.3%

Building A 1 1955 41,954 32.2%

Perm Buildings 56,066

Floor s Yr . Built GSF FCI

Building Data

21.5%

Austin, Texas 78723 1955 RC No

1711 Wheless Ln. Yr. Open Rating Historic

Interior $110 532 $8 601 $119 133

Site - - - $174,752 - $174,752

Exterior - $2,099 $333,669 - - $335,768

Structural - $2,401 - - - $2,401Roofing $16,363 $232,231 $16,363 - - $264,958

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $631,447*

S h l S R t2010 Educational Suitability Assessment

EXHIBIT "B"

Page 72: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 72/317

School Summ ary Report2010 Educational Suitability Assessment

163 Hart Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 125%

2010-11 Att endance Zone Populat ion 888 -177

Excess/DeficitSeats

2010-11 Out Migration 088

2010-11 In Migration 101

2015-16 Proj'd Attendance Zone Populat ion 982 -271

Utilization (by enrollment) 126% Percent of Capacity

Area (GSF) per student 90 15 106

Gross Area 81,042 13,824 94,866

Perm Temp Total

2010-11 Campus Enrollment 898

Permanent Capacity 711

Number of Classrooms 44 18 62

Parking Spaces 62

Gross Sit e Area (Acres) 15.7

Sit e Data

School Data

Building B 1 2010 11,175 4.0%

Building A 1 1998 69,867 12.6%

Perm Buildings 81,042

Floor s Yr . Built GSF FCI

Building Data

10.3%

Austin, Texas 78753 1998 RC No

8301 Furness Yr. Open Rating Historic

Interior $16 366 $27 849 $54 049 $41 169 $139 433

Site $85,478 - $37,799 $29,425 - $152,702

Exterior $2,221 $388 $202 - - $2,811

Structural $824 $3,296 $1,169 - - $5,289Roofing - $7,887 - - - $7,887

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $869,405*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 73: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 73/317

School Summ ary Report2010 Educational Suitability Assessment

119 Highland Park Elementary School Gr ades Served K-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 102%

2010-11 Attendance Zone Population 599 -14

Excess/DeficitSeats

2010-11 Out Migration 054

2010-11 In Migration 116

2015-16 Proj'd At tendance Zone Populat ion 648 -63

Utilization (by enrollment) 113% Percent of Capacity

Area (GSF) per student 88 14 102

Gross Area 58,550 9,216 67,766

Perm Temp Total

2010-11 Campus Enrollment 662

Permanent Capacity 585

Number of Classrooms 33 12 45

Parking Spaces 60

Gross Site Area (Acr es) 6.3

Sit e Data

School Data

Building A 1 1952 58,550 34.0%

Perm Buildings 58,550

Floor s Yr . Built GSF FCI

Building Data

31.1%

Austin, Texas 78731 1952 EX No

4900 Fairview Yr. Open Rating Historic

Interior $42 710 $127 305 $59 113 $229 128

Site - - $230,132 $40,134 - $270,265

Exterior - - $25,788 - - $25,788

Structural - - - - - $0Roofing - $21,733 $511,227 - - $532,959

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $928,077*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 74: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 74/317

School Summ ary Report2010 Educational Suitability Assessment

155 Hill Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 114%

2010-11 Attendance Zone Population 714 -87

Excess/DeficitSeats

2010-11 Out Migration 050

2010-11 In Migration 072

2015-16 Proj'd Attendance Zone Populat ion 734 -107

Utilization (by enrollment) 117% Percent of Capacity

Area (GSF) per student 95 13 108

Gross Area 69,626 9,216 78,842

Perm Temp Total

2010-11 Campus Enrollment 732

Permanent Capacity 627

Number of Classrooms 35 11 46

Parking Spaces 74

Gross Site Area (Acr es) 8.9

Sit e Data

School Data

Building B 1 1990 7,616 17.3%

Building A 1 1970 62,010 32.1%

Perm Buildings 69,626

Floor s Yr . Built GSF FCI

Building Data

26.8%

Austin, Texas 78759 1970 EX No

8601 Tallwood Drive Yr. Open Rating Historic

Interior $106 775 $102 128 $47 029 $255 933

Site - - $8,269 $40,134 - $48,403

Exterior - - $292 - - $292

Structural - - - - - $0Roofing - - $1,982,976 - - $1,982,976

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,132,041*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 75: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 75/317

School Summ ary Report2010 Educational Suitability Assessment

162 Houston Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 130%

2010-11 Att endance Zone Populat ion 897 -205

Excess/DeficitSeats

2010-11 Out Migration 102

2010-11 In Migration 128

2015-16 Proj'd Attendance Zone Populat ion 872 -180

Utilization (by enrollment) 133% Percent of Capacity

Area (GSF) per student 89 17 105

Gross Area 81,360 15,360 96,720

Perm Temp Total

2010-11 Campus Enrollment 917

Permanent Capacity 692

Number of Classrooms 43 19 62

Parking Spaces 93

Gross Sit e Area (Acres) 13.8

Sit e Data

School Data

Building D 1 2006 11,380 10.8%

Building C 1 1991 5,303 25.9%

Building B 1 1991 8,863 32.5%

Building A 1 1976 55,814 54.5%

Perm Buildings 81,360

Floor s Yr . Built GSF FCI

Building Data

36.5%

Austin, Texas 78744 1976 RC No

5409 Ponciana Dr. Yr. Open Rating Historic

Interior $54 696 $540 337 $62 669 $657 703

Site - $5,847 $9,453 $40,134 - $55,433

Exterior - - $3,658 $8,855 - $12,514

Structural - - $8,788 - - $8,788Roofing - - $899,896 - - $899,896

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $5,403,989*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 76: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 76/317

School Summ ary Report2010 Educational Suitability Assessment

178 Jordan Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 108%

2010-11 Attendance Zone Population 706 -52

Excess/DeficitSeats

2010-11 Out Migration 075

2010-11 In Migration 200

2015-16 Proj'd At tendance Zone Populat ion 707 -53

Utilization (by enrollment) 127% Percent of Capacity

Area (GSF) per student 89 15 104

Gross Area 74,460 12,288 86,748

Perm Temp Total

2010-11 Campus Enrollment 833

Permanent Capacity 655

Number of Classrooms 41 16 57

Parking Spaces 114

Gross Sit e Area (Acres) 11.5

Sit e Data

School Data

Building B 1 2008 12,205 4.8%

Building A 1 1992 62,255 27.2%

Perm Buildings 74,460

Floor s Yr . Built GSF FCI

Building Data

22.0%

Austin, Texas 78724 1992 RC No

6711 Johnny Mor ris Rd. Yr. Open Rating Historic

Interior $21 355 $249 307 $55 637 $326 299

Site - $5,980 $153,950 $40,134 - $200,064

Exterior - - $32,022 - - $32,022

Structural - - $6,370 - - $6,370Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $870,552*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 77: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 77/317

School Summ ary Reporty

120 Joslin Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 88%

2010-11 Attendance Zone Population 329 45

Excess/DeficitSeats

2010-11 Out Migration 056

2010-11 In Migration 089

2015-16 Proj'd At tendance Zone Populat ion 345 29

Utilization (by enrollment) 97% Percent of Capacity

Area (GSF) per student 123 21 145

Gross Area 44,826 7,680 52,506

Perm Temp Total

2010-11 Campus Enrollment 363

Permanent Capacity 374

Number of Classrooms 24 9 33

Parking Spaces 56

Gross Site Area (Acr es) 5.1Sit e Data

School Data

Building C 1 1986 3,250 5.0%

Building B 1 1957 10,642 41.4%

Building A 1 1954 30,934 55.6%

Perm Buildings 44,826

Floor s Yr . Built GSF FCI

Building Data

40.6%

Austin, Texas 78745 1954 EX No

4500 Manchaca Rd. Yr. Open Rating Historic

Interior $41 905 $212 692 $254 597

Site - $165,935 $4,802 - - $170,737

Exterior - - $1,232,954 - - $1,232,954

Structural - $4,719 $1,537 - - $6,256Roofing - $606,704 $219,611 - - $826,316

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $2,024,241*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 78: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 78/317

School Summ ary Reporty

180 Kiker Elementary School Gr ades Served K-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 117%

2010-11 Att endance Zone Populat ion 883 -131

Excess/DeficitSeats

2010-11 Out Migration 080

2010-11 In Migration 129

2015-16 Proj'd Attendance Zone Populat ion 852 -100

Utilization (by enrollment) 124% Percent of Capacity

Area (GSF) per student 82 16 98

Gross Area 76,332 15,360 91,692

Perm Temp Total

2010-11 Campus Enrollment 933

Permanent Capacity 752

Number of Classrooms 42 13 55

Parking Spaces 90

Gross Sit e Area (Acres) 12.4Sit e Data

School Data

Building B 1 2007 12,783 4.5%

Building A 1 1992 63,549 21.1%

Perm Buildings 76,332

Floor s Yr . Built GSF FCI

Building Data

16.4%

Austin, Texas 78739 1992 EX No

5913 La Crosse Ave. Yr. Open Rating Historic

Interior $128 130 $344 258 $41 886 $514 274

Site - - $10,547 $87,037 - $97,584

Exterior $62,649 - $590 - - $63,239

Structural - $3,302 - - - $3,302Roofing - $20,585 - - - $20,585

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $751,145*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 79: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 79/317

School Summ ary Reporty

172 Kocurek Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 102%

2010-11 Attendance Zone Population 687 -14

Excess/DeficitSeats

2010-11 Out Migration 131

2010-11 In Migration 106

2015-16 Proj'd At tendance Zone Populat ion 698 -25

Utilization (by enrollment) 98% Percent of Capacity

Area (GSF) per student 119 2 121

Gross Area 78,528 1,536 80,064

Perm Temp Total

2010-11 Campus Enrollment 660

Permanent Capacity 673

Number of Classrooms 42 2 44

Parking Spaces 70

Gross Sit e Area (Acres) 12.3Sit e Data

School Data

Building B 1 1998 10,499 8.3%

Building A 1 1986 68,029 28.6%

Perm Buildings 78,528

Floor s Yr . Built GSF FCI

Building Data

25.5%

Austin, Texas 78748 1986 AA No

9800 Curlew Dr . Yr. Open Rating Historic

Interior $121 380 $45 109 $166 489

Site - $20,597 $118,823 $73,933 - $213,354

Exterior - $258 $21,688 $7,965 - $29,911

Structural - - $3,472 $23,558 - $27,030Roofing - $7,927 - - - $7,927

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,015,969*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 80: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 80/317

Sc oo Su a y epo t

168 Langford Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 129%

2010-11 Att endance Zone Populat ion 895 -203

Excess/DeficitSeats

2010-11 Out Migration 103

2010-11 In Migration 054

2015-16 Proj'd Attendance Zone Populat ion 946 -254

Utilization (by enrollment) 121% Percent of Capacity

Area (GSF) per student 94 20 114

Gross Area 78,250 16,896 95,146

Perm Temp Total

2010-11 Campus Enrollment 834

Permanent Capacity 692

Number of Classrooms 43 21 64

Parking Spaces 83

Gross Sit e Area (Acres) 10.7Sit e Data

School Data

Building C 1 2010 11,831 3.8%

Building B 1 1996 8,753 16.9%

Building A 1 1980 57,666 51.7%

Perm Buildings 78,250

Floor s Yr . Built GSF FCI

Building Data

33.6%

Austin, Texas 78744 1980 AA No

2206 Blue Meadow Yr. Open Rating Historic

Interior $24 894 $437 101 $47 124 $509 120

Site - $45,535 $75,331 $42,669 - $163,535

Exterior - $79,485 $202 - - $79,688

Structural - - $2,170 - - $2,170Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $6,366,305*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 81: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 81/317

y p

121 Lee Elementary School Gr ades Served K-6 (ES)

2010-11 Ut ilizat ion (by populat ion) 74%

2010-11 Attendance Zone Population 308 110

Excess/DeficitSeats

2010-11 Out Migration 025

2010-11 In Migration 109

2015-16 Proj'd At tendance Zone Populat ion 325 93

Utilization (by enrollment) 102% Percent of Capacity

Area (GSF) per student 108 2 110

Gross Area 46,265 768 47,033

Perm Temp Total

2010-11 Campus Enrollment 428

Permanent Capacity 418

Number of Classrooms 24 1 25

Parking Spaces 35

Gross Site Area (Acr es) 4.8Sit e Data

School Data

Building D 1 1939 1,310 24.2%Library 1 1998 5,679 8.4%

Mechanical 1 1939 460 13.7%

Building A 1 1939 38,816 44.8%

Perm Buildings 46,265

Floor s Yr . Built GSF FCI

Building Data

41.1%

Austin, Texas 78705 1939 EX No

3308 Hampton Rd. Yr. Open Rating Historic

Interior $3 267 $289 684 $48 675 $341 626

Site - $6,267 $78,354 - - $84,621

Exterior - $137,099 $17,506 - - $154,605

Structural - $32,808 - - - $32,808Roofing - $78,378 $7,013 - - $85,391

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,992,020*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 82: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 82/317

y p

160 Linder Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 176%

2010-11 Att endance Zone Populat ion 956 -414

Excess/DeficitSeats

2010-11 Out Migration 132

2010-11 In Migration 062

2015-16 Proj'd Attendance Zone Population 1,031 -489

Utilization (by enrollment) 164% Percent of Capacity

Area (GSF) per student 78 19 97

Gross Area 69,250 16,896 86,146

Perm Temp Total

2010-11 Campus Enrollment 892

Permanent Capacity 542

Number of Classrooms 34 22 56

Parking Spaces 86

Gross Site Area (Acr es) 9.1Sit e Data

School Data

Building A 1 1972 69,250 23.7%

Perm Buildings 69,250

Floor s Yr . Built GSF FCI

Building Data

19.9%

Austin, Texas 78741 1972 RC No

2800 Metcalfe Rd. Yr. Open Rating Historic

Interior $85 420 $188 004 $156 894 $430 318

Site - - $194,636 $40,134 - $234,770

Exterior - - $397 - - $397

Structural - - $48,399 - - $48,399Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,657,659*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 83: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 83/317

122 Maplewood Elementary School Gr ades Served PK-6 (ES)

2010-11 Ut ilizat ion (by populat ion) 84%

2010-11 Attendance Zone Population 300 55

Excess/DeficitSeats

2010-11 Out Migration 069

2010-11 In Migration 129

2015-16 Proj'd At tendance Zone Populat ion 383 -28

Utilization (by enrollment) 114% Percent of Capacity

Area (GSF) per student 112 23 134

Gross Area 45,390 9,216 54,606

Perm Temp Total

2010-11 Campus Enrollment 406

Permanent Capacity 355

Number of Classrooms 20 12 32

Parking Spaces 42

Gross Site Area (Acr es) 6.4Sit e Data

School Data

Storage 1 1952 572 6.0%

Building A 1 1951 44,818 41.9%

Perm Buildings 45,390

Floor s Yr . Built GSF FCI

Building Data

37.4%

Austin, Texas 78722 1951 AA No

3808 Maplewood Ave. Yr. Open Rating Historic

Interior $1 159 $296 359 $36 200 $333 719

Site - $8,593 $528,568 - - $537,161

Exterior - - $98,285 - - $98,285

Structural - - $2,844 - - $2,844Roofing - $107,641 - - - $107,641

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,997,762*

Page 84: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 84/317

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 85: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 85/317

165 McBee Elementary School Gr ades Served K-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 178%

2010-11 At tendance Zone Populat ion 1,031 -451

Excess/DeficitSeats

2010-11 Out Migration 301

2010-11 In Migration 030

2015-16 Proj'd Attendance Zone Population 1,083 -503

Utilization (by enrollment) 132% Percent of Capacity

Area (GSF) per student 91 12 103

Gross Area 69,717 9,216 78,933

Perm Temp Total

2010-11 Campus Enrollment 765

Permanent Capacity 580

Number of Classrooms 36 12 48

Parking Spaces 90

Gross Sit e Area (Acres) 10.9Sit e Data

School Data

Building A 1 1999 69,717 7.8%

Perm Buildings 69,717

Floor s Yr . Built GSF FCI

Building Data

7.9%

Austin, Texas 78758 1999 RC No

1001 West Braker Lane Yr. Open Rating Historic

Interior $89 744 $84 538 $124 936 $299 218

Site $58,760 $1,308 $1,112 - - $61,180

Exterior - - $1,716 - - $1,716

Structural - - - - - $0Roofing - - $4,268 - - $4,268

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $556,867*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 86: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 86/317

147 Menchaca Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 113%

2010-11 Attendance Zone Population 685 -79

Excess/DeficitSeats

2010-11 Out Migration 117

2010-11 In Migration 113

2015-16 Proj'd At tendance Zone Populat ion 629 -23

Utilization (by enrollment) 113% Percent of Capacity

Area (GSF) per student 87 16 103

Gross Area 59,978 10,752 70,730

Perm Temp Total

2010-11 Campus Enrollment 686

Permanent Capacity 606

Number of Classrooms 34 12 46

Parking Spaces 83

Gross Sit e Area (Acres) 19.8Sit e Data

School Data

Building A 1 1975 59,978 43.5%

Perm Buildings 59,978

Floor s Yr . Built GSF FCI

Building Data

36.9%

Austin, Texas 78748 1975 AA No

12120 Manchaca Rd. Yr. Open Rating Historic

Interior $128 130 $257 782 $462 745 $848 657

Site - $42,176 $111,016 $73,933 - $227,126

Exterior - - $4,712 - - $4,712

Structural - - $877 - - $877Roofing - $32,373 $28,907 - - $61,280

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $4,551,155*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 87: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 87/317

124 Metz Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 88%

2010-11 Attendance Zone Population 477 65

Excess/DeficitSeats

2010-11 Out Migration 064

2010-11 In Migration 088

2015-16 Proj'd At tendance Zone Populat ion 509 33

Utilization (by enrollment) 92% Percent of Capacity

Area (GSF) per student 124 6 130

Gross Area 61,905 3,072 64,977

Perm Temp Total

2010-11 Campus Enrollment 498

Permanent Capacity 542

Number of Classrooms 34 4 38

Parking Spaces 45

Gross Site Area (Acr es) 6.4Sit e Data

School Data

Building A 1 1993 61,905 32.3%

Perm Buildings 61,905

Floor s Yr . Built GSF FCI

Building Data

30.6%

Austin, Texas 78702 1993 EX No

84 Robert T. Martinez, Jr. Yr. Open Rating Historic

Interior $42 710 $68 165 $52 813 $163 688

Site $1,481 $654 $14,812 $2,225 - $19,172

Exterior - $2,221 - - - $2,221

Structural - - - - - $0Roofing - $1,686,580 $373 - - $1,686,953

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $2,443,840*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 88: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 88/317

181 Mills Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 105%

2010-11 Attendance Zone Population 831 -37

Excess/DeficitSeats

2010-11 Out Migration 031

2010-11 In Migration 134

2015-16 Proj'd At tendance Zone Populat ion 821 -27

Utilization (by enrollment) 117% Percent of Capacity

Area (GSF) per student 88 13 101

Gross Area 81,368 12,288 93,656

Perm Temp Total

2010-11 Campus Enrollment 928

Permanent Capacity 794

Number of Classrooms 44 16 60

Parking Spaces 104

Gross Sit e Area (Acres) 10.7Sit e Data

School Data

Building A 1 1998 81,368 13.7%

Perm Buildings 81,368

Floor s Yr . Built GSF FCI

Building Data

12.7%

Austin, Texas 78749 1998 EX No

6201 Davis Ln. Yr. Open Rating Historic

Interior $85 420 $238 434 $12 904 $336 758

Site - - $4,271 $140,421 - $144,692

Exterior - - $12,051 - - $12,051

Structural - - $2,701 - - $2,701Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $692,608*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 89: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 89/317

150 Norman Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 77%

2010-11 Attendance Zone Population 376 110

Excess/DeficitSeats

2010-11 Out Migration 073

2010-11 In Migration 024

2015-16 Proj'd At tendance Zone Populat ion 348 138

Utilization (by enrollment) 68% Percent of Capacity

Area (GSF) per student 176 5 180

Gross Area 58,519 1,536 60,055

Perm Temp Total

2010-11 Campus Enrollment 333

Permanent Capacity 486

Number of Classrooms 30 2 32

Parking Spaces 74

Gross Sit e Area (Acres) 10.2Sit e Data

School Data

Classroom 1 2007 13,827 4.7%

Building A 1 1970 44,692 41.8%

Perm Buildings 58,519

Floor s Yr . Built GSF FCI

Building Data

32.6%

Austin, Texas 78721 1970 RC No

4001 Tannehill Ln. Yr. Open Rating Historic

Interior $499 495 $43 010 $542 505

Site - - $87,439 $114,067 - $201,506

Exterior - - - - - $0

Structural - $1,873 - - - $1,873Roofing - - $453,578 - - $453,578

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $2,110,870*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 90: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 90/317

125 Oak Springs Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 71%

2010-11 Attendance Zone Population 293 118

Excess/DeficitSeats

2010-11 Out Migration 046

2010-11 In Migration 036

2015-16 Proj'd At tendance Zone Populat ion 330 81

Utilization (by enrollment) 67% Percent of Capacity

Area (GSF) per student 172 22 194

Gross Area 47,102 6,144 53,246

Perm Temp Total

2010-11 Campus Enrollment 274

Permanent Capacity 411

Number of Classrooms 26 6 32

Parking Spaces 47

Gross Site Area (Acr es) 8.6Sit e Data

School Data

Building B 1 1984 3,971 15.9%

Building A 1 1958 43,131 28.1%

Perm Buildings 47,102

Floor s Yr . Built GSF FCI

Building Data

26.0%

Austin, Texas 78702 1958 EX No

3601 Webberville Rd. Yr. Open Rating Historic

Interior $85 420 $163 853 $75 624 $324 898

Site - - $65,735 - - $65,735

Exterior - - $160,769 - - $160,769

Structural - - - - - $0Roofing - $12,365 $4,355 - - $16,719

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,980,974*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 91: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 91/317

156 Odom Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 130%

2010-11 Att endance Zone Populat ion 706 -164

Excess/DeficitSeats

2010-11 Out Migration 101

2010-11 In Migration 058

2015-16 Proj'd Attendance Zone Populat ion 719 -177

Utilization (by enrollment) 121% Percent of Capacity

Area (GSF) per student 93 21 114

Gross Area 61,009 13,824 74,833

Perm Temp Total

2010-11 Campus Enrollment 658

Permanent Capacity 542

Number of Classrooms 34 14 48

Parking Spaces 72

Gross Site Area (Acr es) 8.6Sit e Data

School Data

Building A 1 1970 61,009 21.8%

Perm Buildings 61,009

Floor s Yr . Built GSF FCI

Building Data

19.2%

Austin, Texas 78745 1970 AA No

1010 Turtle Creek Blvd. Yr. Open Rating Historic

Interior $106 775 $158 316 $115 216 $380 308

Site - $47,393 $18,972 - - $66,364

Exterior - - $202 - - $202

Structural - $5,518 - - - $5,518Roofing - - $41,171 - - $41,171

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $869,872*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 92: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 92/317

148 Oak Hill Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 106%

2010-11 Attendance Zone Population 820 -47

Excess/DeficitSeats

2010-11 Out Migration 117

2010-11 In Migration 057

2015-16 Proj'd Attendance Zone Populat ion 918 -145

Utilization (by enrollment) 100% Percent of Capacity

Area (GSF) per student 98 14 112

Gross Area 75,784 10,752 86,536

Perm Temp Total

2010-11 Campus Enrollment 772

Permanent Capacity 773

Number of Classrooms 43 14 57

Parking Spaces 97

Gross Sit e Area (Acres) 13.7Sit e Data

School Data

Building B 1 1984 16,210 20.7%

Building A 1 1974 59,574 43.2%

Perm Buildings 75,784

Floor s Yr . Built GSF FCI

Building Data

33.6%

Austin, Texas 78735 1974 EX No

6101 Patton Ranch Rd. Yr. Open Rating Historic

Interior $42 710 $1 072 603 $180 232 $1 295 545

Site - $8,459 $125,527 $73,933 - $207,920

Exterior - - $38,383 - - $38,383

Structural - - $3,335 - - $3,335Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $3,140,659*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 93: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 93/317

126 Or tega Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 71%

2010-11 Attendance Zone Population 266 108

Excess/DeficitSeats

2010-11 Out Migration 023

2010-11 In Migration 053

2015-16 Proj'd At tendance Zone Populat ion 269 105

Utilization (by enrollment) 79% Percent of Capacity

Area (GSF) per student 160 10 170

Gross Area 47,302 3,072 50,374

Perm Temp Total

2010-11 Campus Enrollment 296

Permanent Capacity 374

Number of Classrooms 24 1 25

Parking Spaces 36

Gross Site Area (Acr es) 7.4Sit e Data

School Data

Administration 1 1968 2,143 4.7%Building C 1 1959 5,146 62.8%

Building B 1 1966 20,907 33.7%

Building A 1 1959 19,106 51.8%

Perm Buildings 47,302

Floor s Yr . Built GSF FCI

Building Data

40.0%

Austin, Texas 78721 1959 EX No

1135 Garland Ave. Yr. Open Rating Historic

Interior $21 355 $33 243 $49 806 $104 404

Site - - $40,487 $12,624 - $53,112

Exterior - - $1,040 - - $1,040

Structural - - $101,906 - - $101,906Roofing - $1,515,309 $25,714 - - $1,541,023

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $3,139,712*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 94: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 94/317

189 Over ton Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 154%

2010-11 Att endance Zone Populat ion 948 -331

Excess/DeficitSeats

2010-11 Out Migration 217

2010-11 In Migration 044

2015-16 Proj'd Attendance Zone Populat ion 972 -355

Utilization (by enrollment) 108% Percent of Capacity

Area (GSF) per student 136 18 155

Gross Area 91,163 12,288 103,451

Perm Temp Total

2010-11 Campus Enrollment 668

Permanent Capacity 617

Number of Classrooms 39 15 54

Parking Spaces 175

Gross Sit e Area (Acres) 70.4Sit e Data

School Data

Building A 1 2007 91,163 4.2%

Perm Buildings 91,163

Floor s Yr . Built GSF FCI

Building Data

4.7%

Austin, Texas 78724 2007 RC No

7201 Colony Loop Dr. Yr. Open Rating Historic

Interior $21 355 $95 057 $48 506 $164 918

Site - - $5,287 $114,067 - $119,354

Exterior - - - - - $0

Structural - - - - - $0Roofing - - $14,805 - - $14,805

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $351,852*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 95: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 95/317

171 Palm Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 95%

2010-11 Attendance Zone Population 637 36

Excess/DeficitSeats

2010-11 Out Migration 081

2010-11 In Migration 050

2015-16 Proj'd At tendance Zone Populat ion 667 6

Utilization (by enrollment) 90% Percent of Capacity

Area (GSF) per student 130 5 136

Gross Area 79,082 3,072 82,154

Perm Temp Total

2010-11 Campus Enrollment 606

Permanent Capacity 673

Number of Classrooms 42 4 46

Parking Spaces 90

Gross Sit e Area (Acres) 13.2Sit e Data

School Data

Building B 1 2005 10,963 7.4%

Building A 1 1987 68,119 10.9%

Perm Buildings 79,082

Floor s Yr . Built GSF FCI

Building Data

11.1%

Austin, Texas 78744 1987 RC No

7601 Dixie Dr. Yr. Open Rating Historic

Interior $23 156 $115 259 $69 249 $207 664

Site - $18,391 $37,763 $40,134 - $96,287

Exterior $242 - $8,918 $38,694 - $47,854

Structural - - - - - $0

Roofing - $6,899 - - - $6,899

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $682,248*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 96: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 96/317

143 Pat ton Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 117%

2010-11 Att endance Zone Populat ion 908 -135

Excess/DeficitSeats

2010-11 Out Migration 095

2010-11 In Migration 109

2015-16 Proj'd Attendance Zone Populat ion 966 -193

Utilization (by enrollment) 118% Percent of Capacity

Area (GSF) per student 84 12 96

Gross Area 76,687 10,752 87,439

Perm Temp Total

2010-11 Campus Enrollment 914

Permanent Capacity 773

Number of Classrooms 43 13 56

Parking Spaces 109

Gross Sit e Area (Acres) 24.1Sit e Data

School Data

Building A 1 1986 76,687 19.6%

Perm Buildings 76,687

Floor s Yr . Built GSF FCI

Building Data

18.1%

Austin, Texas 78744 1986 EX No

6001 Westcreek Dr. Yr. Open Rating Historic

Interior $741 $149 485 $75 569 $40 077 $265 872

Site - $13,373 $4,610 - - $17,982

Exterior - $2,114 $1,121 - - $3,234

Structural - - - - - $0

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,905,083*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 97: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 97/317

128 Pease Elementary School Gr ades Served K-6 (ES)

2010-11 Ut ilizat ion (by populat ion) n/a

2010-11 Attendance Zone Population 293

Excess/DeficitSeats

2010-11 Out Migration 000

2010-11 In Migration 220

2015-16 Proj'd At tendance Zone Population 293

Utilization (by enrollment) 87% Percent of Capacity

Area (GSF) per student 139 0 139

Gross Area 35,624 35,624

Perm Temp Total

2010-11 Campus Enrollment 256

Permanent Capacity 293

Number of Classrooms 17 0 17

Parking Spaces 45

Gross Site Area (Acr es) 2.8Sit e Data

School Data

Building B 1 1998 4,870 17.0%

Building A 1 1876 30,754 82.3%

Perm Buildings 35,624

Floor s Yr . Built GSF FCI

Building Data

75.8%

Austin, Texas 78701 1876 EX Yes

1106 Rio Grande Yr. Open Rating Historic

Interior $661 149 $8 135 $669 284

Site - $172,907 $664,245 $191,141 - $1,028,292

Exterior - $14,064 $451,081 - - $465,145

Structural - - $35,507 - - $35,507

Roofing - $287,386 - - - $287,386

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $3,205,258*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 98: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 98/317

129 Pecan Springs Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 101%

2010-11 Attendance Zone Population 490 -4

Excess/DeficitSeats

2010-11 Out Migration 068

2010-11 In Migration 077

2015-16 Proj'd At tendance Zone Populat ion 501 -15

Utilization (by enrollment) 109% Percent of Capacity

Area (GSF) per student 107 17 124

Gross Area 56,992 9,216 66,208

Perm Temp Total

2010-11 Campus Enrollment 532

Permanent Capacity 486

Number of Classrooms 30 16 46

Parking Spaces 63

Gross Site Area (Acr es) 7.6Sit e Data

School Data

Building B 1 1990 10,783 26.8%

Building A 1 1957 46,209 44.0%

Perm Buildings 56,992

Floor s Yr . Built GSF FCI

Building Data

37.2%

Austin, Texas 78723 1957 AA No

3100 Rogge Ln. Yr. Open Rating Historic

Interior $230 050 $99 850 $329 899

Site - - $11,743 $298,033 - $309,776

Exterior - - $882,228 - - $882,228

Structural - - - - - $0

Roofing - $20,585 $20,585 $984,274 - $1,025,445

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $558,706*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 99: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 99/317

190 Perez Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 158%

2010-11 Att endance Zone Populat ion 945 -347

Excess/DeficitSeats

2010-11 Out Migration 123

2010-11 In Migration 066

2015-16 Proj'd Attendance Zone Populat ion 980 -382

Utilization (by enrollment) 148% Percent of Capacity

Area (GSF) per student 93 17 110

Gross Area 82,223 15,360 97,583

Perm Temp Total

2010-11 Campus Enrollment 886

Permanent Capacity 598

Number of Classrooms 37 19 56

Parking Spaces 106

Gross Sit e Area (Acres) 28.0Sit e Data

School Data

Building A 1 2006 82,223 10.0%

Perm Buildings 82,223

Floor s Yr . Built GSF FCI

Building Data

9.0%

Austin, Texas 78744 2006 RC No

7500 S. Pleasant Valley Rd. Yr. Open Rating Historic

Interior $42 710 $89 644 $11 718 $144 072

Site - - $7,999 - - $7,999

Exterior - - $11,450 - - $11,450

Structural - - - - - $0

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,422,361*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 100: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 100/317

164 Pickle Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 119%

2010-11 Att endance Zone Populat ion 737 -120

Excess/DeficitSeats

2010-11 Out Migration 058

2010-11 In Migration 056

2015-16 Proj'd Attendance Zone Populat ion 802 -185

Utilization (by enrollment) 120% Percent of Capacity

Area (GSF) per student 163 8 172

Gross Area 120,862 6,144 127,006

Perm Temp Total

2010-11 Campus Enrollment 740

Permanent Capacity 617

Number of Classrooms 39 8 47

Parking Spaces 132

Gross Sit e Area (Acres) 17.5Sit e Data

School Data

Building A 1 2001 120,862 5.3%

Per m Buildings 120,862

Floor s Yr . Built GSF FCI

Building Data

5.7%

Austin, Texas 78752 2001 RC No

1101 Wheatley Avenue Yr. Open Rating Historic

Interior $64 065 $92 964 $43 330 $200 359

Site - - $31,650 $193,425 - $225,074

Exterior - - $12,894 - - $12,894

Structural - - $3,616 - - $3,616

Roofing - - $2,429 - - $2,429

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $550,286*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 101: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 101/317

151 Pillow Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 125%

2010-11 Att endance Zone Populat ion 651 -129

Excess/DeficitSeats

2010-11 Out Migration 090

2010-11 In Migration 095

2015-16 Proj'd Attendance Zone Populat ion 734 -212

Utilization (by enrollment) 125% Percent of Capacity

Area (GSF) per student 83 16 100

Gross Area 54,247 10,752 64,999

Perm Temp Total

2010-11 Campus Enrollment 653

Permanent Capacity 523

Number of Classrooms 29 14 43

Parking Spaces 53

Gross Sit e Area (Acres) 10.0Sit e Data

School Data

Building A 1 1969 54,247 52.3%

Perm Buildings 54,247

Floor s Yr . Built GSF FCI

Building Data

42.9%

Austin, Texas 78757 1969 EX No

3025 Crosscreek Dr. Yr. Open Rating Historic

Interior $42 710 $293 433 $44 466 $380 609

Site - $97,541 $62,869 $15,011 - $175,421

Exterior - - $30,260 - - $30,260

Structural - - - - - $0

Roofing - - $2,131,311 - - $2,131,311

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $570,972*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 102: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 102/317

130 Pleasant Hill Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 121%

2010-11 Att endance Zone Populat ion 631 -107

Excess/DeficitSeats

2010-11 Out Migration 099

2010-11 In Migration 087

2015-16 Proj'd Attendance Zone Populat ion 680 -156

Utilization (by enrollment) 118% Percent of Capacity

Area (GSF) per student 106 12 119

Gross Area 65,729 7,680 73,409

Perm Temp Total

2010-11 Campus Enrollment 619

Permanent Capacity 524

Number of Classrooms 33 10 43

Parking Spaces 71

Gross Sit e Area (Acres) 10.1Sit e Data

School Data

Building A 1 1985 65,729 21.5%

Perm Buildings 65,729

Floor s Yr . Built GSF FCI

Building Data

19.6%

Austin, Texas 78745 1985 AA No

6405 Circle S Rd. Yr. Open Rating Historic

Interior $106 775 $74 494 $11 393 $192 662

Site - $1,550 $82,599 - - $84,149

Exterior - - $14,892 - - $14,892

Structural - - - - - $0

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $760,750*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 103: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 103/317

131 Lucy Read Pre-K School Grades Served PK (Pre-K)

2010-11 Ut ilizat ion (by populat ion) n/a

2010-11 Attendance Zone Population 393

Excess/DeficitSeats

2010-11 Out Migration 000

2010-11 In Migration 510

2015-16 Proj'd At tendance Zone Population 393

Utilization (by enrollment) 130% Percent of Capacity

Area (GSF) per student 127 18 145

Gross Area 64,644 9,216 73,860

Perm Temp Total

2010-11 Campus Enrollment 509

Permanent Capacity 393

Number of Classrooms 23 7 30

Parking Spaces 98

Gross Site Area (Acr es) 9.9Sit e Data

School Data

Building B 1 1961 3,069 6.2%

Building A 1 1961 61,575 11.3%

Perm Buildings 64,644

Floor s Yr . Built GSF FCI

Building Data

11.0%

Austin, Texas 78757 1961 No

2608 RichCreek Yr. Open Rating Historic

Interior $118 391 $10 593 $128 985

Site - - - $40,134 - $40,134

Exterior - - $51,949 - - $51,949

Structural - - $1,365 - - $1,365

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,034,762*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 104: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 104/317

132 Reilly Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 112%

2010-11 Attendance Zone Population 357 -39

Excess/DeficitSeats

2010-11 Out Migration 100

2010-11 In Migration 045

2015-16 Proj'd At tendance Zone Populat ion 366 -48

Utilization (by enrollment) 93% Percent of Capacity

Area (GSF) per student 141 21 161

Gross Area 41,646 6,144 47,790

Perm Temp Total

2010-11 Campus Enrollment 296

Permanent Capacity 318

Number of Classrooms 20 8 28

Parking Spaces 45

Gross Sit e Area (Acres) 10.8

Sit e Data

School Data

Building A 1 1954 41,646 32.0%

Perm Buildings 41,646

Floor s Yr . Built GSF FCI

Building Data

28.5%

Austin, Texas 78752 1954 RC No

405 Denson Dr. Yr. Open Rating Historic

Interior $32 360 $97 077 $48 191 $177 628

Site - $4,606 $54,280 $40,134 - $99,019

Exterior - - $369,460 - - $369,460

Structural - $77,800 - - - $77,800

Roofing - $81,281 - - - $81,281

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,182,946*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 105: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 105/317

133 Ridgetop Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 62%

2010-11 Attendance Zone Population 128 78

Excess/DeficitSeats

2010-11 Out Migration 056

2010-11 In Migration 147

2015-16 Proj'd At tendance Zone Populat ion 131 75

Utilization (by enrollment) 106% Percent of Capacity

Area (GSF) per student 162 21 184

Gross Area 35,585 4,608 40,193

Perm Temp Total

2010-11 Campus Enrollment 219

Permanent Capacity 206

Number of Classrooms 13 6 19

Parking Spaces 32

Gross Site Area (Acr es) 5.0

Sit e Data

School Data

Building B 1 1939 400 8.6%

Building A 1 1939 35,185 32.0%

Perm Buildings 35,585

Floor s Yr . Built GSF FCI

Building Data

31.4%

Austin, Texas 78751 1939 EX No

5005 Caswell Ave. Yr. Open Rating Historic

Interior $42 710 $29 297 $451 012 $523 019

Site - $267,544 $75,461 - - $343,005

Exterior - - $21,397 - - $21,397

Structural - - $4,502 - - $4,502

Roofing - - $3,940 - - $3,940

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,330,337*

School Summ ary Report2010 Educational Suitability Assessment

EXHIBIT "B"

Page 106: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 106/317

174 Rodriguez Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 147%

2010-11 At tendance Zone Populat ion 1,045 -334

Excess/DeficitSeats

2010-11 Out Migration 202

2010-11 In Migration 079

2015-16 Proj'd Attendance Zone Population 1,062 -351

Utilization (by enrollment) 128% Percent of Capacity

Area (GSF) per student 88 19 106

Gross Area 79,918 16,932 96,850

Perm Temp Total

2010-11 Campus Enrollment 910

Permanent Capacity 711

Number of Classrooms 44 22 66

Parking Spaces 114

Gross Sit e Area (Acres) 15.0

Sit e Data

School Data

Classroom 1 2006 10,004 8.3%

Building A 1 1999 69,914 7.7%

Perm Buildings 79,918

Floor s Yr . Built GSF FCI

Building Data

8.0%

Austin, Texas 78744 1999 AA No

4400 Franklin Park Dr. Yr. Open Rating Historic

Interior $132 079 $110 219 $11 709 $254 006

Site - $7,621 $141,062 $42,669 - $191,353

Exterior - - $534 - - $534

Structural - $238 - - - $238

Roofing - - $985 - - $985

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $565,395*

School Summ ary Report2010 Educational Suitability Assessment

G S S

EXHIBIT "B"

Page 107: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 107/317

127 Sanchez Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 101%

2010-11 Attendance Zone Population 584 -4

Excess/DeficitSeats

2010-11 Out Migration 061

2010-11 In Migration 074

2015-16 Proj'd At tendance Zone Populat ion 644 -64

Utilization (by enrollment) 101% Percent of Capacity

Area (GSF) per student 134 11 144

Gross Area 78,131 6,144 84,275

Perm Temp Total

2010-11 Campus Enrollment 585

Permanent Capacity 580

Number of Classrooms 36 8 44

Parking Spaces 70

Gross Site Area (Acr es) 9.2

Sit e Data

School Data

Building A 1 1976 78,131 28.7%

Perm Buildings 78,131

Floor s Yr . Built GSF FCI

Building Data

26.5%

Austin, Texas 78702 1976 RC No

73 San Marcos Yr. Open Rating Historic

Interior $628 109 $114 615 $742 724

Site $1,177 - $71,710 $40,134 - $113,020

Exterior - $387 $1,716 - - $2,103

Structural - - - - - $0

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $3,696,487*

School Summ ary Report2010 Educational Suitability Assessment

S El El S h l G d S d PK 5 (ES)

EXHIBIT "B"

Page 108: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 108/317

136 St . Elmo Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 90%

2010-11 Attendance Zone Population 369 42

Excess/DeficitSeats

2010-11 Out Migration 094

2010-11 In Migration 029

2015-16 Proj'd At tendance Zone Populat ion 361 50

Utilization (by enrollment) 74% Percent of Capacity

Area (GSF) per student 159 10 169

Gross Area 48,212 3,072 51,284

Perm Temp Total

2010-11 Campus Enrollment 304

Permanent Capacity 411

Number of Classrooms 26 4 30

Parking Spaces 60

Gross Site Area (Acr es) 9.4

Sit e Data

School Data

Building A 1 1960 48,212 40.6%

Perm Buildings 48,212

Floor s Yr . Built GSF FCI

Building Data

41.2%

Austin, Texas 78745 1960 RC No

600 W. St. Elmo Rd. Yr. Open Rating Historic

Interior $21 355 $168 428 $14 646 $204 429

Site - $797 $48,045 $82,803 - $131,645

Exterior - - $1,484,314 - - $1,484,314

Structural - - - - - $0

Roofing - $42,906 - - - $42,906

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,198,396*

School Summ ary Report2010 Educational Suitability Assessment

139 Si El t S h l G d S d PK 5 (ES)

EXHIBIT "B"

Page 109: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 109/317

139 Sims Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 97%

2010-11 Attendance Zone Population 343 12

Excess/DeficitSeats

2010-11 Out Migration 084

2010-11 In Migration 016

2015-16 Proj'd At tendance Zone Populat ion 359 -4

Utilization (by enrollment) 78% Percent of Capacity

Area (GSF) per student 160 22 182

Gross Area 44,337 6,144 50,481

Perm Temp Total

2010-11 Campus Enrollment 277

Permanent Capacity 355

Number of Classrooms 22 8 30

Parking Spaces 66

Gross Site Area (Acr es) 8.4

Sit e Data

School Data

Building F 1 1956 292 81.0%

Building E 1 1956 7,503 32.4%

Building D 1 1956 4,570 57.8%Building C 1 1956 2,482 36.3%

Building B 1 1961 17,056 35.3%

Building A 1 1956 12,434 55.6%

Perm Buildings 44,337

Floor s Yr . Built GSF FCI

Building Data

39.4%

Austin, Texas 78721 1956 EX No

1203 Springdale Rd. Yr. Open Rating Historic

Site - $31,481 $130,753 $129,820 - $292,054

Structural - $7,498 - - - $7,498

Roofing - $216,011 $10,801 - - $226,812

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,554,022*

School Summ ary Report2010 Educational Suitability Assessment

138 S itt El t S h l G d S d PK 5 (ES)

EXHIBIT "B"

Page 110: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 110/317

138 Summ itt Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 85%

2010-11 Attendance Zone Population 623 109

Excess/DeficitSeats

2010-11 Out Migration 057

2010-11 In Migration 288

2015-16 Proj'd At tendance Zone Populat ion 662 70

Utilization (by enrollment) 117% Percent of Capacity

Area (GSF) per student 89 13 101

Gross Area 75,902 10,752 86,654

Perm Temp Total

2010-11 Campus Enrollment 854

Permanent Capacity 732

Number of Classrooms 41 14 55

Parking Spaces 107

Gross Sit e Area (Acres) 14.5

Sit e Data

School Data

Building B 1 1989 9,966 24.2%

Building A 1 1986 65,936 28.9%

Perm Buildings 75,902

Floor s Yr . Built GSF FCI

Building Data

25.2%

Austin, Texas 78727 1986 EX No

12207 Brigadoon Ln. Yr. Open Rating Historic

Interior $7 415 $302 725 $108 624 $418 765

Site - - $131,854 - - $131,854

Exterior - - - - - $0

Structural - - - - - $0

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $870,328*

School Summ ary Report2010 Educational Suitability Assessment

158 S t V ll El t S h l Gr ades Served PK 5 (ES)

EXHIBIT "B"

Page 111: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 111/317

158 Sunset Valley Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 86%

2010-11 Attendance Zone Population 483 78

Excess/DeficitSeats

2010-11 Out Migration 135

2010-11 In Migration 099

2015-16 Proj'd At tendance Zone Populat ion 543 18

Utilization (by enrollment) 80% Percent of Capacity

Area (GSF) per student 147 7 154

Gross Area 66,467 3,072 69,539

Perm Temp Total

2010-11 Campus Enrollment 451

Permanent Capacity 561

Number of Classrooms 35 2 37

Parking Spaces 86

Gross Sit e Area (Acres) 10.4

Sit e Data

School Data

Building B 1 1996 9,169 11.6%

Building A 1 1971 57,298 50.9%

Perm Buildings 66,467

Floor s Yr . Built GSF FCI

Building Data

42.3%

Austin, Texas 78745 1971 EX No

3000 Jones Rd. Yr. Open Rating Historic

Interior $42 710 $230 079 $81 622 $354 411

Site - $23,148 $223,578 - - $246,726

Exterior - - $22,439 - - $22,439

Structural - - - - - $0

Roofing - - $2,043,970 - - $2,043,970

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $2,972,404*

School Summ ary Report2010 Educational Suitability Assessment

140 Tr avis Heights Elementary School Gr ades Served PK 5 (ES)

EXHIBIT "B"

Page 112: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 112/317

140 Tr avis Heights Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 113%

2010-11 Attendance Zone Population 548 -62

Excess/DeficitSeats

2010-11 Out Migration 117

2010-11 In Migration 109

2015-16 Proj'd Attendance Zone Populat ion 605 -119

Utilization (by enrollment) 110% Percent of Capacity

Area (GSF) per student 111 9 120

Gross Area 59,589 4,608 64,197

Perm Temp Total

2010-11 Campus Enrollment 537

Permanent Capacity 486

Number of Classrooms 31 6 37

Parking Spaces 44

Gross Site Area (Acr es) 3.2

Sit e Data

School Data

Building C 1 1994 14,021 20.4%

Building B 1 1985 4,992 35.5%

Building A 1 1938 40,576 39.7%

Perm Buildings 59,589

Floor s Yr . Built GSF FCI

Building Data

36.6%

Austin, Texas 78704 1938 RC No

2010 Alameda Dr. Yr. Open Rating Historic

Interior $64 065 $158 357 $67 889 $290 311

Site $223,178 $188,278 $2,109 $1,112 - $414,676

Exterior - - $2,778 $321,483 - $324,261

Structural - - - - - $0

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $3,445,212*

School Summ ary Report2010 Educational Suitability Assessment

141 W alnut Creek Elementary School Gr ades Served K 6 (ES)

EXHIBIT "B"

Page 113: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 113/317

141 W alnut Creek Elementary School Gr ades Served K-6 (ES)

2010-11 Ut ilizat ion (by populat ion) 143%

2010-11 Att endance Zone Populat ion 936 -282

Excess/DeficitSeats

2010-11 Out Migration 094

2010-11 In Migration 060

2015-16 Proj'd Attendance Zone Population 1,002 -348

Utilization (by enrollment) 140% Percent of Capacity

Area (GSF) per student 87 18 105

Gross Area 79,536 16,896 96,432

Perm Temp Total

2010-11 Campus Enrollment 916

Permanent Capacity 655

Number of Classrooms 41 21 62

Parking Spaces 94

Gross Sit e Area (Acres) 11.5

Sit e Data

School Data

Building B 1 1999 34,499 5.6%

Building A 1 1961 45,037 27.3%

Perm Buildings 79,536

Floor s Yr . Built GSF FCI

Building Data

15.3%

Austin, Texas 78753 1961 AA No

401 W. Braker Ln. Yr. Open Rating Historic

Interior $610 $3 560 $53 758 $57 599 $115 526

Site - $4,606 $67,837 - - $72,444

Exterior $2,925 - $837,033 - - $839,957

Structural - - - - - $0

Roofing $1,499 $141,304 - - - $142,803

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,535,934*

School Summ ary Report2010 Educational Suitability Assessment

175 W iden Elementary School Gr ades Served PK 5 (ES)

EXHIBIT "B"

Page 114: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 114/317

175 W iden Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 118%

2010-11 Att endance Zone Populat ion 794 -121

Excess/DeficitSeats

2010-11 Out Migration 086

2010-11 In Migration 077

2015-16 Proj'd Attendance Zone Populat ion 780 -107

Utilization (by enrollment) 114% Percent of Capacity

Area (GSF) per student 97 20 117

Gross Area 74,523 15,360 89,883

Perm Temp Total

2010-11 Campus Enrollment 769

Permanent Capacity 673

Number of Classrooms 42 20 62

Parking Spaces 92

Gross Sit e Area (Acres) 10.7

Sit e Data

School Data

Building B 1 1989 10,857 7.4%

Building A 1 1986 63,666 15.5%

Perm Buildings 74,523

Floor s Yr . Built GSF FCI

Building Data

12.9%

Austin, Texas 78744 1986 AA No

5605 Nuckols Crossing Yr. Open Rating Historic

Interior $106 775 $133 079 $87 980 $327 835

Site - - $121,427 $4,049 - $125,476

Exterior - $2,640 $13,732 - - $16,372

Structural $1,801 - $1,474 $2,648 - $5,923

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $864,638*

School Summ ary Report2010 Educational Suitability Assessment

166 W illiams Elementary School Gr ades Served PK-5 (ES)

EXHIBIT "B"

Page 115: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 115/317

166 W illiams Elementary School Gr ades Served PK-5 (ES)

2010-11 Ut ilizat ion (by populat ion) 114%

2010-11 Attendance Zone Population 640 -79

Excess/DeficitSeats

2010-11 Out Migration 133

2010-11 In Migration 130

2015-16 Proj'd At tendance Zone Populat ion 621 -60

Utilization (by enrollment) 114% Percent of Capacity

Area (GSF) per student 101 14 115

Gross Area 64,846 9,216 74,062

Perm Temp Total

2010-11 Campus Enrollment 642

Permanent Capacity 561

Number of Classrooms 35 12 47

Parking Spaces 107

Gross Sit e Area (Acres) 14.0

Sit e Data

School Data

Building A 1 1976 64,846 40.0%

Perm Buildings 64,846

Floor s Yr . Built GSF FCI

Building Data

36.9%

Austin, Texas 78748 1976 AA No

500 Mairo Yr. Open Rating Historic

Interior $106 775 $464 627 $11 930 $583 332

Site - - $132,390 $129,820 - $262,210

Exterior - - $37,251 $223,445 - $260,696

Structural - - - - - $0

Roofing - - $20,585 - - $20,585

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $4,203,762*

School Summ ary Report2010 Educational Suitability Assessment

157 W inn Elementary School Gr ades Served PK-5 (ES)

EXHIBIT "B"

Page 116: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 116/317

157 W inn Elementary School Gr ades Served PK 5 (ES)

2010-11 Ut ilizat ion (by populat ion) 93%

2010-11 Attendance Zone Population 485 39

Excess/DeficitSeats

2010-11 Out Migration 082

2010-11 In Migration 044

2015-16 Proj'd At tendance Zone Populat ion 531 -7

Utilization (by enrollment) 88% Percent of Capacity

Area (GSF) per student 134 10 144

Gross Area 62,087 4,608 66,695

Perm Temp Total

2010-11 Campus Enrollment 463

Permanent Capacity 524

Number of Classrooms 33 6 39

Parking Spaces 66

Gross Sit e Area (Acres) 10.0

Sit e Data

School Data

Building B 1 1990 9,970 21.1%

Building A 1 1970 52,117 21.7%

Perm Buildings 62,087

Floor s Yr . Built GSF FCI

Building Data

22.5%

Austin, Texas 78723 1970 RC No

3500 Susquehanna Ln. Yr. Open Rating Historic

Interior $42 710 $212 677 $189 878 $445 265

Site $1,255 - $107,297 $40,134 - $148,686

Exterior - - $10,312 - - $10,312

Structural - $2,248 - - - $2,248

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,207,781*

School Summ ary Report2010 Educational Suitability Assessment

152 W ooldr idge Elementary School Gr ades Served K-5 (ES)

EXHIBIT "B"

Page 117: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 117/317

152 W ooldr idge Elementary School Gr ades Served K 5 (ES)

2010-11 Ut ilizat ion (by populat ion) 222%

2010-11 At tendance Zone Populat ion 1,160 -636

Excess/DeficitSeats

2010-11 Out Migration 342

2010-11 In Migration 061

2015-16 Proj'd Attendance Zone Population 1,255 -731

Utilization (by enrollment) 168% Percent of Capacity

Area (GSF) per student 78 23 101

Gross Area 68,543 19,968 88,511

Perm Temp Total

2010-11 Campus Enrollment 878

Permanent Capacity 524

Number of Classrooms 33 26 59

Parking Spaces 60

Gross Sit e Area (Acres) 11.6

Sit e Data

School Data

Building B 1 1998 9,738 13.4%

Building A 1 1969 58,805 32.1%

Perm Buildings 68,543

Floor s Yr . Built GSF FCI

Building Data

23.0%

Austin, Texas 78758 1969 AA No

1412 Norseman Terrace Yr. Open Rating Historic

Interior $111 004 $148 224 $259 227

Site - $4,606 $31,668 $64,475 - $100,749

Exterior - - $56,049 - - $56,049

Structural - - - - - $0

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $2,461,020*

School Summ ary Report2010 Educational Suitability Assessment

144 W ooten Elementary School Gr ades Served PK-5 (ES)

EXHIBIT "B"

Page 118: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 118/317

144 W ooten Elementary School Gr ades Served PK 5 (ES)

2010-11 Ut ilizat ion (by populat ion) 144%

2010-11 Att endance Zone Populat ion 672 -205

Excess/DeficitSeats

2010-11 Out Migration 093

2010-11 In Migration 125

2015-16 Proj'd Attendance Zone Populat ion 737 -270

Utilization (by enrollment) 149% Percent of Capacity

Area (GSF) per student 77 27 104

Gross Area 53,689 18,432 72,121

Perm Temp Total

2010-11 Campus Enrollment 695

Permanent Capacity 468

Number of Classrooms 29 22 51

Parking Spaces 37

Gross Site Area (Acr es) 6.7

Sit e Data

School Data

Building A 1 1955 53,689 63.2%

Perm Buildings 53,689

Floor s Yr . Built GSF FCI

Building Data

51.2%

Austin, Texas 78757 1955 RC No

1406 Dale Yr. Open Rating Historic

Interior $206 992 $235 337 $44 338 $486 667

Site - $1,112 $629,572 $322,375 - $953,059

Exterior $1,537 $5,198 $776,990 - - $783,726

Structural - - - - - $0

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $4,243,830*

School Summ ary Report2010 Educational Suitability Assessment

145 Zavala Elementary School Gr ades Served PK-6 (ES)

EXHIBIT "B"

Page 119: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 119/317

145 Zavala Elementary School Gr ades Served PK 6 (ES)

2010-11 Ut ilizat ion (by populat ion) 60%

2010-11 Attendance Zone Population 347 233

Excess/DeficitSeats

2010-11 Out Migration 043

2010-11 In Migration 082

2015-16 Proj'd At tendance Zone Populat ion 353 227

Utilization (by enrollment) 70% Percent of Capacity

Area (GSF) per student 170 0 170

Gross Area 69,333 69,333

Perm Temp Total

2010-11 Campus Enrollment 407

Permanent Capacity 580

Number of Classrooms 36 0 36

Parking Spaces 12

Gross Site Area (Acr es) 3.4

Sit e Data

School Data

Building A 1 1937 69,333 32.5%

Perm Buildings 69,333

Floor s Yr . Built GSF FCI

Building Data

32.8%

Austin, Texas 78702 1937 RC No

310 Robert Martinez, Jr. Yr. Open Rating Historic

Interior $260 945 $236 385 $497 329

Site - $1,196 $285,274 - - $286,470

Exterior - - $38,935 $14,187 - $53,122

Structural - - - - - $0

Roofing - $798 - - - $798

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,284,691*

School Summ ary Report2010 Educational Suitability Assessment

146 Zilker Elementary School Gr ades Served PK-6 (ES)

EXHIBIT "B"

Page 120: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 120/317

146 Zilker Elementary School ( )

2010-11 Ut ilizat ion (by populat ion) 74%

2010-11 Attendance Zone Population 338 122

Excess/DeficitSeats

2010-11 Out Migration 018

2010-11 In Migration 204

2015-16 Proj'd At tendance Zone Populat ion 358 102

Utilization (by enrollment) 114% Percent of Capacity

Area (GSF) per student 98 21 118

Gross Area 50,941 10,752 61,693

Perm Temp Total

2010-11 Campus Enrollment 522

Permanent Capacity 460

Number of Classrooms 26 14 40

Parking Spaces 54

Gross Sit e Area (Acres) 11.8

Sit e Data

School Data

Vocational 1 1950 597 53.3%

Library 1 1990 5,488 24.8%

Gymnasium 1 1961 2,827 49.5%

Building A 1 1950 42,029 69.2%

Perm Buildings 50,941

Floor s Yr . Built GSF FCI

Building Data

56.4%

Austin, Texas 78704 1950 EX No

1900 Bluebonnet Lane Yr. Open Rating Historic

Interior $22 794 $233 891 $434 142 $690 827

Site - - $720,410 $210,344 - $930,754

Exterior $28,203 - $338,242 - - $366,445

Structural - - - - - $0

Roofing - $1,307,652 $59,313 - - $1,366,966

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $2,874,015*

School Summ ary Report2010 Educational Suitability Assessment

059 Bailey Middle School Gr ades Served 6-8 (MS)

EXHIBIT "B"

Page 121: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 121/317

059 Bailey Middle School ( )

2010-11 Ut ilizat ion (by populat ion) 83%

2010-11 Attendance Zone Population 979 197

Excess/DeficitSeats

2010-11 Out Migration 129

2010-11 In Migration 196

2015-16 Proj'd Attendance Zone Populat ion 1,048 128

Utilization (by enrollment) 89% Percent of Capacity

Area (GSF) per student 142 10 153

Gross Area 148,143 10,752 158,895

Perm Temp Total

2010-11 Campus Enrollment 1,041

Permanent Capacity 1,176

Number of Classrooms 56 11 67

Parking Spaces 138

Gross Sit e Area (Acres) 41.3

Sit e Data

School Data

Building A 1 1993 148,143 15.1%

Per m Buildings 148,143

Floor s Yr . Built GSF FCI

Building Data

16.4%

Austin, Texas 78739 1993 RC No

4020 Lost Oasis Hollow Yr. Open Rating Historic

Interior $149 485 $94 214 $72 955 $316 654

Site - $16,193 $27,289 $824,676 - $868,157

Exterior - - $220,269 $192,392 - $412,661

Structural - - - - - $0

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $3,025,915*

School Summ ary Report2010 Educational Suitability Assessment

054 Bedichek Middle School Gr ades Served 6-8 (MS)

EXHIBIT "B"

Page 122: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 122/317

054 Bedichek Middle School ( )

2010-11 Ut ilizat ion (by populat ion) 130%

2010-11 At tendance Zone Populat ion 1,219 -278

Excess/DeficitSeats

2010-11 Out Migration 248

2010-11 In Migration 100

2015-16 Proj'd Attendance Zone Population 1,340 -399

Utilization (by enrollment) 112% Percent of Capacity

Area (GSF) per student 124 26 150

Gross Area 130,600 27,018 157,618

Perm Temp Total

2010-11 Campus Enrollment 1,054

Permanent Capacity 941

Number of Classrooms 48 31 79

Parking Spaces 140

Gross Sit e Area (Acres) 23.3

Sit e Data

School Data

Building C 1 1997 9,909 5.8%

Gymnasium 1 1972 28,847 55.2%

Building A 1 1972 91,844 32.0%

Per m Buildings 130,600

Floor s Yr . Built GSF FCI

Building Data

30.6%

Austin, Texas 78745 1972 AA No

6800 Bill Hughes Rd. Yr. Open Rating Historic

Interior $224 $192 195 $807 140 $331 731 $1 331 290

Site - - $192,275 $824,676 - $1,016,951

Exterior - - $2,951 - - $2,951

Structural - $11,113 - - - $11,113

Roofing - $849,916 - - - $849,916

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $9,999,588*

School Summ ary Report2010 Educational Suitability Assessment

046 Burnet Middle School Gr ades Served 6-8 (MS)

EXHIBIT "B"

Page 123: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 123/317

2010-11 Ut ilizat ion (by populat ion) 113%

2010-11 At tendance Zone Populat ion 1,170 -131

Excess/DeficitSeats

2010-11 Out Migration 203

2010-11 In Migration 060

2015-16 Proj'd Attendance Zone Population 1,365 -326

Utilization (by enrollment) 96% Percent of Capacity

Area (GSF) per student 138 18 157

Gross Area 137,768 18,432 156,200

Perm Temp Total

2010-11 Campus Enrollment 998

Permanent Capacity 1,039

Number of Classrooms 53 22 75

Parking Spaces 50

Gross Sit e Area (Acres) 23.7

Sit e Data

School Data

Mechanical 1 1969 1,025 0.4%

Building A 1 1961 136,743 37.5%

Per m Buildings 137,768

Floor s Yr . Built GSF FCI

Building Data

34.5%

Austin, Texas 78757 1961 AA No

8401 Hathaway Yr. Open Rating Historic

Interior $219 280 $300 419 $20 695 $540 393

Site - $106,911 - $1,052,251 - $1,159,162

Exterior - $127,204 $7,663 - - $134,868

Structural - $3,472 $868 - - $4,340

Roofing - - $2,095,309 - - $2,095,309

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $7,925,349*

School Summ ary Report2010 Educational Suitability Assessment

057 Covington Middle School Gr ades Served 6-8 (MS)

EXHIBIT "B"

Page 124: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 124/317

g

2010-11 Ut ilizat ion (by populat ion) 68%

2010-11 Attendance Zone Population 905 418

Excess/DeficitSeats

2010-11 Out Migration 260

2010-11 In Migration 181

2015-16 Proj'd At tendance Zone Populat ion 984 339

Utilization (by enrollment) 61% Percent of Capacity

Area (GSF) per student 216 6 221

Gross Area 173,636 4,608 178,244

Perm Temp Total

2010-11 Campus Enrollment 805

Permanent Capacity 1,323

Number of Classrooms 63 5 68

Parking Spaces 122

Gross Sit e Area (Acres) 21.3

Sit e Data

School Data

Vocational 1 1986 18,307 18.9%

Auditorium 1 1986 20,672 20.3%

Building A 1 1986 134,657 18.9%

Per m Buildings 173,636

Floor s Yr . Built GSF FCI

Building Data

18.7%

Austin, Texas 78749 1986 AA No

3700 Convict Hill Rd Yr. Open Rating Historic

Interior $21 355 $126 060 $187 566 $334 981

Site - $243 $220,213 $79,540 - $299,996

Exterior - $6,006 $31,080 - - $37,086

Structural - - $1,775 - - $1,775

Roofing - $165,465 $1,050 - - $166,514

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $4,753,039*

School Summ ary Report2010 Educational Suitability Assessment

055 Dobie Middle School Gr ades Served 6-8 (MS)

EXHIBIT "B"

Page 125: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 125/317

2010-11 Ut ilizat ion (by populat ion) 80%

2010-11 Attendance Zone Population 719 183

Excess/DeficitSeats

2010-11 Out Migration 130

2010-11 In Migration 063

2015-16 Proj'd At tendance Zone Populat ion 828 74

Utilization (by enrollment) 70% Percent of Capacity

Area (GSF) per student 214 10 223

Gross Area 134,563 6,144 140,707

Perm Temp Total

2010-11 Campus Enrollment 630

Permanent Capacity 902

Number of Classrooms 46 8 54

Parking Spaces 120

Gross Sit e Area (Acres) 20.2

Sit e Data

School Data

Building B 1 2006 10,564 8.3%

Building A 1 1973 123,999 14.0%

Per m Buildings 134,563

Floor s Yr . Built GSF FCI

Building Data

15.2%

Austin, Texas 78753 1973 RC No

1200 E. Rundberg Ln. Yr. Open Rating Historic

Interior $42 171 $6 076 $648 770 $22 550 $719 567

Site - - $229,980 $779,468 - $1,009,448

Exterior $15,417 - - - - $15,417

Structural - - - - - $0

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,851,474*

School Summ ary Report2010 Educational Suitability Assessment

043 Fulmore Middle School Gr ades Served 6-8 (MS)

EXHIBIT "B"

Page 126: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 126/317

2010-11 Ut ilizat ion (by populat ion) 79%

2010-11 Attendance Zone Population 850 228

Excess/DeficitSeats

2010-11 Out Migration 138

2010-11 In Migration 295

2015-16 Proj'd At tendance Zone Populat ion 990 88

Utilization (by enrollment) 92% Percent of Capacity

Area (GSF) per student 161 8 168

Gross Area 159,699 7,680 167,379

Perm Temp Total

2010-11 Campus Enrollment 995

Permanent Capacity 1,078

Number of Classrooms 55 9 64

Parking Spaces 85

Gross Site Area (Acr es) 9.8

Sit e Data

School Data

Building D 1 2002 13,392 8.0%

Vocational 1 1980 18,500 56.1%

Cafeteria 1 1980 55,143 40.8%

Building A 1 1911 72,664 46.9%

Per m Buildings 159,699

Floor s Yr . Built GSF FCI

Building Data

40.6%

Austin, Texas 78704 1911 AA No

201 East Mary Yr. Open Rating Historic

Interior $55 906 $611 384 $484 733 $1 152 023

Site $3,001 $4,218 $435,203 $16,796 - $459,218

Exterior - $2,011 $115,027 - - $117,038

Structural - $3,151 $33,724 - - $36,876

Roofing $4,239 - $30,865 - - $35,104

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $9,580,793*

School Summ ary Report2010 Educational Suitability Assessment

056 Garcia Middle School Gr ades Served 6-8 (MS)

EXHIBIT "B"

Page 127: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 127/317

2010-11 Ut ilizat ion (by populat ion) 68%

2010-11 Attendance Zone Population 829 386

Excess/DeficitSeats

2010-11 Out Migration 131

2010-11 In Migration 027

2015-16 Proj'd At tendance Zone Populat ion 901 314

Utilization (by enrollment) 54% Percent of Capacity

Area (GSF) per student 244 0 244

Gross Area 160,764 160,764

Perm Temp Total

2010-11 Campus Enrollment 658

Permanent Capacity 1,215

Number of Classrooms 62 0 62

Parking Spaces 160

Gross Sit e Area (Acres) 41.3

Sit e Data

School Data

Building A 1 2008 160,764 4.8%

Per m Buildings 160,764

Floor s Yr . Built GSF FCI

Building Data

4.7%

Austin, Texas 78724 2008 AA No

7414 Johnny Mor ris Rd. Yr. Open Rating Historic

Interior $105 789 $65 660 $171 449

Site - - - - - $0

Exterior - - - - - $0

Structural - - - - - $0

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $717,098*

School Summ ary Report2010 Educational Suitability Assessment

062 Gorzycki Middle School Gr ades Served 6-8 (MS)

EXHIBIT "B"

Page 128: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 128/317

2010-11 Ut ilizat ion (by populat ion) 75%

2010-11 Attendance Zone Population 989 334

Excess/DeficitSeats

2010-11 Out Migration 132

2010-11 In Migration 108

2015-16 Proj'd Attendance Zone Populat ion 1,071 252

Utilization (by enrollment) 73% Percent of Capacity

Area (GSF) per student 182 0 182

Gross Area 175,543 175,543

Perm Temp Total

2010-11 Campus Enrollment 963

Permanent Capacity 1,323

Number of Classrooms 63 0 63

Parking Spaces 160

Gross Sit e Area (Acres) 14.2

Sit e Data

School Data

Building A 1 2009 175,543 4.7%

Per m Buildings 175,543

Floor s Yr . Built GSF FCI

Building Data

4.6%

Austin, Texas 78749 2009 RC No

7412 West Slaughter Ln. Yr. Open Rating Historic

Interior $108 064 $73 924 $181 987

Site - - - $40,134 - $40,134

Exterior - - - - - $0

Structural - - - - - $0

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $640,006*

School Summ ary Report2010 Educational Suitability Assessment

044 Kealing Middle School Gr ades Served 6-8 (MS)

EXHIBIT "B"

Page 129: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 129/317

2010-11 Ut ilizat ion (by populat ion) 35%

2010-11 Att endance Zone Populat ion 541 1,027

Excess/DeficitSeats

2010-11 Out Migration 064

2010-11 In Migration 806

2015-16 Proj'd At tendance Zone Populat ion 614 954

Utilization (by enrollment) 79% Percent of Capacity

Area (GSF) per student 156 0 156

Gross Area 192,181 192,181

Perm Temp Total

2010-11 Campus Enrollment 1,233

Permanent Capacity 1,568

Number of Classrooms 80 0 80

Parking Spaces 160

Gross Sit e Area (Acres) 13.2

Sit e Data

School Data

Building C 1 2007 34,819 3.8%

Gym/Café/Aud 1 1986 55,783 24.8%

Building A 1 1986 101,579 20.4%

Per m Buildings 192,181

Floor s Yr . Built GSF FCI

Building Data

18.6%

Austin, Texas 78702 1986 AA No

1607 Pennsylvania Ave. Yr. Open Rating Historic

Interior $30 226 $364 771 $127 864 $522 860

Site - - $82,009 $322,375 - $404,383

Exterior - - $129,828 - - $129,828

Structural - - - - - $0

Roofing - $3,999,808 - - - $3,999,808

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $5,350,903*

School Summ ary Report2010 Educational Suitability Assessment

045 Lamar Middle School Gr ades Served 6-8 (MS)

EXHIBIT "B"

Page 130: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 130/317

2010-11 Ut ilizat ion (by populat ion) 58%

2010-11 Attendance Zone Population 583 425

Excess/DeficitSeats

2010-11 Out Migration 191

2010-11 In Migration 223

2015-16 Proj'd At tendance Zone Populat ion 642 366

Utilization (by enrollment) 60% Percent of Capacity

Area (GSF) per student 201 8 209

Gross Area 121,371 4,608 125,979

Perm Temp Total

2010-11 Campus Enrollment 604

Permanent Capacity 1,008

Number of Classrooms 48 4 52

Parking Spaces 106

Gross Sit e Area (Acres) 14.3

Sit e Data

School Data

Mechanical 1 2000 2,004 0.1%

Building C 1 2000 5,354 8.3%

Band 1 2000 9,032 6.0%

Building A 1 1955 104,981 20.2%

Per m Buildings 121,371

Floor s Yr . Built GSF FCI

Building Data

19.3%

Austin, Texas 78757 1955 AA No

6201 Wynona Yr. Open Rating Historic

Interior $85 501 $243 886 $24 393 $353 780

Site $5,195 - $29,823 $869,155 - $904,172

Exterior $898 $433,743 - - - $434,641

Structural $9,432 - $39,783 - - $49,215

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $3,730,973*

School Summ ary Report2010 Educational Suitability Assessment

051 Mart in Middle School Gr ades Served 6-8 (MS)

EXHIBIT "B"

Page 131: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 131/317

2010-11 Ut ilizat ion (by populat ion) 131%

2010-11 At tendance Zone Populat ion 1,056 -252

Excess/DeficitSeats

2010-11 Out Migration 429

2010-11 In Migration 075

2015-16 Proj'd Attendance Zone Population 1,184 -380

Utilization (by enrollment) 79% Percent of Capacity

Area (GSF) per student 169 17 186

Gross Area 107,983 10,752 118,735

Perm Temp Total

2010-11 Campus Enrollment 639

Permanent Capacity 804

Number of Classrooms 41 11 52

Parking Spaces 94

Gross Site Area (Acr es) 9.9

Sit e Data

School Data

Gym/Café/Aud 1 1966 52,693 26.2%

Building A 1 1966 55,290 36.4%

Per m Buildings 107,983

Floor s Yr . Built GSF FCI

Building Data

28.8%

Austin, Texas 78702 1966 AA No

1601 Haskell Yr. Open Rating Historic

Interior $109 213 $899 675 $43 981 $1 052 869

Site - $775 $85,474 $86,678 - $172,927

Exterior - $435 $50,001 $112,643 - $163,079

Structural - - $1,395 $8,681 - $10,075

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $6,538,211*

School Summ ary Report2010 Educational Suitability Assessment

058 Mendez Middle School Gr ades Served 6-8 (MS)

EXHIBIT "B"

Page 132: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 132/317

2010-11 Ut ilizat ion (by populat ion) 104%

2010-11 Att endance Zone Populat ion 1,266 -51

Excess/DeficitSeats

2010-11 Out Migration 396

2010-11 In Migration 027

2015-16 Proj'd Attendance Zone Population 1,373 -158

Utilization (by enrollment) 73% Percent of Capacity

Area (GSF) per student 195 16 210

Gross Area 173,382 13,824 187,206

Perm Temp Total

2010-11 Campus Enrollment 890

Permanent Capacity 1,215

Number of Classrooms 62 18 80

Parking Spaces 139

Gross Sit e Area (Acres) 20.7

Sit e Data

School Data

Vocational 1 1987 17,552 20.4%

Auditorium 1 1987 20,672 15.0%

Building A 1 1987 135,158 13.4%

Per m Buildings 173,382

Floor s Yr . Built GSF FCI

Building Data

15.0%

Austin, Texas 78744 1987 AA No

5106 Village Square Yr. Open Rating Historic

Interior $60 254 $235 743 $17 936 $313 933

Site - $3,144 $30,858 $482,213 - $516,215

Exterior - $193 $3,653 $25,747 - $29,594

Structural - - - - - $0

Roofing - $5,877 - - - $5,877

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $5,149,951*

School Summ ary Report2010 Educational Suitability Assessment

052 Murchison Middle School Gr ades Served 6-8 (MS)

EXHIBIT "B"

Page 133: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 133/317

2010-11 Ut ilizat ion (by populat ion) 105%

2010-11 Att endance Zone Populat ion 1,171 -58

Excess/DeficitSeats

2010-11 Out Migration 110

2010-11 In Migration 220

2015-16 Proj'd Attendance Zone Population 1,301 -188

Utilization (by enrollment) 115% Percent of Capacity

Area (GSF) per student 96 13 109

Gross Area 123,348 16,256 139,604

Perm Temp Total

2010-11 Campus Enrollment 1,281

Permanent Capacity 1,113

Number of Classrooms 53 20 73

Parking Spaces 124

Gross Sit e Area (Acres) 26.2

Sit e Data

School Data

Greenhouse 1 1979 896 11.5%

Storage 1 1987 367

Building B 1 1998 16,628 6.1%

Building A 1 1967 105,457 25.8%

Per m Buildings 123,348

Floor s Yr . Built GSF FCI

Building Data

19.9%

Austin, Texas 78731 1967 RC No

3700 North Hills Dr. Yr. Open Rating Historic

Interior $170 840 $149 672 $724 559 $1 045 070

Site - - $17,512 - - $17,512

Exterior - $5,383 $337 - - $5,720

Structural - - - - - $0

Roofing - $928,708 - - - $928,708

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $2,108,676*

School Summ ary Report2010 Educational Suitability Assessment

047 O. Henry Middle School Gr ades Served 6-8 (MS)

EXHIBIT "B"

Page 134: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 134/317

2010-11 Ut ilizat ion (by populat ion) 85%

2010-11 Attendance Zone Population 804 141

Excess/DeficitSeats

2010-11 Out Migration 183

2010-11 In Migration 485

2015-16 Proj'd At tendance Zone Populat ion 897 48

Utilization (by enrollment) 109% Percent of Capacity

Area (GSF) per student 121 6 127

Gross Area 124,320 6,144 130,464

Perm Temp Total

2010-11 Campus Enrollment 1,026

Permanent Capacity 945

Number of Classrooms 45 8 53

Parking Spaces 103

Gross Sit e Area (Acres) 13.8

Sit e Data

School Data

Building A 1 1953 124,320 12.3%

Per m Buildings 124,320

Floor s Yr . Built GSF FCI

Building Data

13.3%

Austin, Texas 78703 1953 AA No

2610 West 10th St. Yr. Open Rating Historic

Interior $85 420 $158 448 $37 802 $281 670

Site - - $532,421 $5,561 - $537,983

Exterior - $725 $49,612 - - $50,337

Structural - - $33,856 - - $33,856

Roofing - - $70,588 - - $70,588

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,075,336*

School Summ ary Report2010 Educational Suitability Assessment

061 Paredes Middle School Gr ades Served 6-8 (MS)

EXHIBIT "B"

Page 135: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 135/317

2010-11 Ut ilizat ion (by populat ion) 101%

2010-11 Attendance Zone Population 1,165 -9

Excess/DeficitSeats

2010-11 Out Migration 291

2010-11 In Migration 069

2015-16 Proj'd Attendance Zone Population 1,293 -137

Utilization (by enrollment) 80% Percent of Capacity

Area (GSF) per student 160 7 166

Gross Area 148,695 6,144 154,839

Perm Temp Total

2010-11 Campus Enrollment 930

Permanent Capacity 1,156

Number of Classrooms 59 8 67

Parking Spaces 108

Gross Sit e Area (Acres) 78.2

Sit e Data

School Data

Gymnasium 1 2000 34,358 5.4%

Band 1 2000 9,072 9.4%

Cafeteria 1 2000 15,854 4.6%

Building C 1 2000 4,035 29.8%

Administration 1 2000 6,002 8.6%

Building A 1 2000 79,374 10.5%

Per m Buildings 148,695

Floor s Yr . Built GSF FCI

Building Data

11.0%

Austin, Texas 78748 2000 RC No

10100 S. Mary Moore Searight Dr. Yr. Open Rating Historic

Site - $99,871 $121,562 $208,564 - $429,998

Structural - - - - - $0

Roofing - $36,100 - - - $36,100

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,294,994*

School Summ ary Report2010 Educational Suitability Assessment

048 Pearce Middle School Gr ades Served 6-8 (MS)

6401 N H D

EXHIBIT "B"

Page 136: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 136/317

2010-11 Ut ilizat ion (by populat ion) 66%

2010-11 Attendance Zone Population 712 366

Excess/DeficitSeats

2010-11 Out Migration 510

2010-11 In Migration 328

2015-16 Proj'd At tendance Zone Populat ion 846 232

Utilization (by enrollment) 31% Percent of Capacity

Area (GSF) per student 403 5 408

Gross Area 132,596 1,536 134,132

Perm Temp Total

2010-11 Campus Enrollment 329

Permanent Capacity 1,078

Number of Classrooms 55 1 56

Parking Spaces 82

Gross Sit e Area (Acres) 14.8

Sit e Data

School Data

Auditorium 1 1958 8,637 4.4%

Building A 1 1958 123,959 15.7%

Per m Buildings 132,596

Floor s Yr . Built GSF FCI

Building Data

15.0%

Austin, Texas 78723 1958 AA No

6401 N. Hampton Dr. Yr. Open Rating Historic

Interior $28 343 $236 543 $120 791 $385 677

Site - $144,156 $120,754 $79,542 - $344,451

Exterior - - $277,949 - - $277,949

Structural - - - - - $0

Roofing - $438,273 - - - $438,273

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $2,266,328*

School Summ ary Report2010 Educational Suitability Assessment

028 Ann Richards School Gr ades Served 6-9 (MS)

2206 P th L

EXHIBIT "B"

Page 137: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 137/317

2010-11 Ut ilizat ion (by populat ion) n/a

2010-11 Attendance Zone Population 924

Excess/DeficitSeats

2010-11 Out Migration 000

2010-11 In Migration 526

2015-16 Proj'd At tendance Zone Population 924

Utilization (by enrollment) 57% Percent of Capacity

Area (GSF) per student 247 14 261

Gross Area 130,240 7,424 137,664

Perm Temp Total

2010-11 Campus Enrollment 528

Permanent Capacity 924

Number of Classrooms 44 6 50

Parking Spaces 90

Gross Sit e Area (Acres) 15.3

Sit e Data

School Data

Building D 1 2010 7,000 4.9%

Band 1 1998 3,471 12.6%

Mechanical 1 1958 1,114 3.4%

Building A 1 1958 118,655 39.9%

Per m Buildings 130,240

Floor s Yr . Built GSF FCI

Building Data

34.3%

Austin, Texas 78704 1958 EX No

2206 Prather Ln. Yr. Open Rating Historic

Interior $212 810 $181 719 $394 529

Site - $2,658 $92,455 $322,375 - $417,487

Exterior - - $32,701 - - $32,701

Structural $7,066 $10,864 $6,455 - - $24,385

Roofing - $2,660 $1,640,134 - - $1,642,794

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $4,241,489*

Page 138: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 138/317

School Summ ary Report2010 Educational Suitability Assessment

053 W ebb Middle School Gr ades Served 6-8 (MS)

601 E St Johns O

EXHIBIT "B"

Page 139: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 139/317

2010-11 Ut ilizat ion (by populat ion) 91%

2010-11 Attendance Zone Population 731 73

Excess/DeficitSeats

2010-11 Out Migration 131

2010-11 In Migration 047

2015-16 Proj'd At tendance Zone Populat ion 866 -62

Utilization (by enrollment) 74% Percent of Capacity

Area (GSF) per student 205 16 220

Gross Area 120,987 9,216 130,203

Perm Temp Total

2010-11 Campus Enrollment 591

Permanent Capacity 804

Number of Classrooms 41 11 52

Parking Spaces 93

Gross Sit e Area (Acres) 15.6

Sit e Data

School Data

Building B 1 2008 10,854 0.2%

Building A 1 1961 110,133 21.1%

Per m Buildings 120,987

Floor s Yr . Built GSF FCI

Building Data

19.8%

Austin, Texas 78752 1961 AA No

601 E. St. Johns Yr. Open Rating Historic

Interior $106 775 $134 051 $258 925 $499 751

Site - $31,426 $67,218 $824,676 - $923,320

Exterior - - $42,118 - - $42,118

Structural - - - - - $0

Roofing - $1,036,854 - - - $1,036,854

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $3,935,971*

Page 140: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 140/317

School Summ ary Report2010 Educational Suitability Assessment

009 Anderson High School Gr ades Served 9-12 (HS)

8403 Mesa Drive Y O R ti Hi t i

EXHIBIT "B"

Page 141: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 141/317

2010-11 Ut ilizat ion (by populat ion) 83%

2010-11 Att endance Zone Populat ion 1,962 411

Excess/DeficitSeats

2010-11 Out Migration 257

2010-11 In Migration 391

2015-16 Proj'd Attendance Zone Populat ion 2,147 226

Utilization (by enrollment) 88% Percent of Capacity

Area (GSF) per student 148 1 149

Gross Area 309,329 1,536 310,865

Perm Temp Total

2010-11 Campus Enrollment 2,089

Permanent Capacity 2,373

Number of Classrooms 113 1 114

Parking Spaces 760

Gross Sit e Area (Acres) 38.8

Sit e Data

School Data

Library 1 2000 17,078 2.8%

Gym/Café/Aud 1 1973 121,018 36.1%

Building A 1 1973 171,233 24.2%

Per m Buildings 309,329

Floor s Yr . Built GSF FCI

Building Data

27.6%

Austin, Texas 78759 1973 RC No

8403 Mesa Drive Yr. Open Rating Historic

Interior $22 177 $3 519 578 $944 064 $4 485 819

Site - - $134,285 $51,280 - $185,565

Exterior $2,067 - $204,242 - - $206,309

Structural - - $62,479 - - $62,479

Roofing - $96,476 - - - $96,476

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $8,153,203*

School Summ ary Report2010 Educational Suitability Assessment

002 Aust in High School Gr ades Served 9-12 (HS)

1715 W Cesar Chavez Yr Open Rating Historic

EXHIBIT "B"

Page 142: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 142/317

2010-11 Ut ilizat ion (by populat ion) 89%

2010-11 Att endance Zone Populat ion 1,958 247

Excess/DeficitSeats

2010-11 Out Migration 449

2010-11 In Migration 789

2015-16 Proj'd Attendance Zone Populat ion 2,146 59

Utilization (by enrollment) 106% Percent of Capacity

Area (GSF) per student 131 3 135

Gross Area 307,089 7,680 314,769

Perm Temp Total

2010-11 Campus Enrollment 2,337

Permanent Capacity 2,205

Number of Classrooms 105 8 113

Parking Spaces 544

Gross Sit e Area (Acres) 44.3

Sit e Data

School Data

Theatre 1 2000 23,571 3.2%

Gym/Café/Aud 1 1975 283,518 33.1%

Per m Buildings 307,089

Floor s Yr . Built GSF FCI

Building Data

31.1%

Austin, Texas 78703 1975 RC No

1715 W. Cesar Chavez Yr. Open Rating Historic

Interior $21 355 $4 141 426 $2 540 593 $6 703 375

Site - - $557,354 $811,547 - $1,368,901

Exterior $20,833 $539 $36,126 $112,707 - $170,205

Structural - $35,970 - - - $35,970

Roofing - $1,609,284 - - - $1,609,284

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 -$10,420,955*

School Summ ary Report2010 Educational Suitability Assessment

013 Bowie High School Gr ades Served 9-12 (HS)

4103 Slaughter Ln Yr Open Rating Historic

EXHIBIT "B"

Page 143: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 143/317

2010-11 Ut ilizat ion (by populat ion) 87%

2010-11 Att endance Zone Populat ion 2,606 376

Excess/DeficitSeats

2010-11 Out Migration 231

2010-11 In Migration 505

2015-16 Proj'd Attendance Zone Populat ion 2,715 267

Utilization (by enrollment) 96% Percent of Capacity

Area (GSF) per student 145 7 152

Gross Area 417,702 19,968 437,670

Perm Temp Total

2010-11 Campus Enrollment 2,876

Permanent Capacity 2,982

Number of Classrooms 142 25 167

Parking Spaces 678

Gross Sit e Area (Acres) 66.0

Sit e Data

School Data

Gym/Café/Aud 1 1988 107,282 19.2%

Mechanical 1 1988 5,462 49.0%

Vocational 1 1988 27,588 51.6%

Greenhouse 1 1988 913 11.4%

Greenhouse 1 1988 634 16.2%

Building B 1 1988 261,135 24.8%

Administ rat ion 1 1988 14,688 16.4%

Per m Buildings 417,702

Floor s Yr . Built GSF FCI

Building Data

31.4%

Austin, Texas 78749 1988 RC No

4103 Slaughter Ln. Yr. Open Rating Historic

Site - $36,278 $13,022 - - $49,300

Roofing - $4,399 - $483 - $4,882

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 -$14,762,227*

School Summ ary Report2010 Educational Suitability Assessment

008 Crocket t High School Gr ades Served 9-12 (HS)

5601 Manchaca Road Yr Open Rating Historic

EXHIBIT "B"

Page 144: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 144/317

2010-11 Ut ilizat ion (by populat ion) 87%

2010-11 Att endance Zone Populat ion 1,883 280

Excess/DeficitSeats

2010-11 Out Migration 510

2010-11 In Migration 285

2015-16 Proj'd Attendance Zone Populat ion 2,026 137

Utilization (by enrollment) 78% Percent of Capacity

Area (GSF) per student 199 6 205

Gross Area 335,087 10,752 345,839

Perm Temp Total

2010-11 Campus Enrollment 1,686

Permanent Capacity 2,163

Number of Classrooms 103 13 116

Parking Spaces 666

Gross Sit e Area (Acres) 39.5

Sit e Data

School Data

Theatre 1 1988 12,929 50.5%

Gym/Café/Aud 1 1969 322,158 30.3%

Per m Buildings 335,087

Floor s Yr . Built GSF FCI

Building Data

31.2%

Austin, Texas 78745 1969 AA No

5601 Manchaca Road Yr. Open Rating Historic

Interior $105 620 $2 134 141 $90 119 $2 329 881

Site $4,218 $9,966 $999,378 $199,650 - $1,213,212

Exterior - $3,931 $460,633 - - $464,564

Structural - $5,402 - - - $5,402

Roofing - - $240,940 $1,431,074 - $1,672,014

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 -$12,432,213*

School Summ ary Report2010 Educational Suitability Assessment

019 Eastside Memor ial High Schools (EMHSJC) Gr ades Served 9-12 (HS)

1012 Arthur Stiles Yr Open Rating Historic

EXHIBIT "B"

Page 145: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 145/317

2010-11 Ut ilizat ion (by populat ion) 81%

2010-11 Att endance Zone Populat ion 1,249 299

Excess/DeficitSeats

2010-11 Out Migration 955

2010-11 In Migration 125

2015-16 Proj'd Attendance Zone Populat ion 1,354 194

Utilization (by enrollment) 58% Percent of Capacity

Area (GSF) per student 299 3 302

Gross Area 267,140 2,976 270,116

Perm Temp Total

2010-11 Campus Enrollment 894

Permanent Capacity 1,548

Number of Classrooms 79 2 81

Parking Spaces 228

Gross Sit e Area (Acres) 27.6

Sit e Data

School Data

Green Tech 1 1998 25,816 1.6%

Mechanical 1 1998 248

Classroom 1 1986 24,940 7.6%

Theatre 1 1986 10,851 35.4%

Gym/Café/Aud 1 1960 205,285 32.6%

Per m Buildings 267,140

Floor s Yr . Built GSF FCI

Building Data

27.0%

Austin, Te 78721 0 NR No

1012 Arthur Stiles Yr. Open Rating Historic

Site $608 - $291,746 - - $292,354

Exterior - $3,456,001 $301,327 $4,120 - $3,761,448

Structural - - - $1,946 - $1,946

Roofing - $70,262 $3,372,487 - - $3,442,749

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 -$15,634,366*

School Summ ary Report2010 Educational Suitability Assessment

015 Garza Independence High School Grades Served 11-12 (HS)

1600 Chicon Street Yr Open Rating Historic

EXHIBIT "B"

Page 146: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 146/317

2010-11 Ut ilizat ion (by populat ion) n/a

2010-11 Attendance Zone Population 378

Excess/DeficitSeats

2010-11 Out Migration 000

2010-11 In Migration 251

2015-16 Proj'd At tendance Zone Population 378

Utilization (by enrollment) 69% Percent of Capacity

Area (GSF) per student 172 36 209

Gross Area 44,754 9,480 54,234

Perm Temp Total

2010-11 Campus Enrollment 260

Permanent Capacity 378

Number of Classrooms 18 8 26

Parking Spaces 36

Gross Site Area (Acr es) 3.1

Sit e Data

School Data

Building E 1 1939 248

Building D 1 1939 48

Mechanical 1 1939 493 183.5%

Building B 1 1965 11,435 11.5%

Building A 1 1939 32,530 21.1%

Perm Buildings 44,754

Floor s Yr . Built GSF FCI

Building Data

21.5%

Austin, Texas 78702 1939 AA No

Yr. Open Rating Historic

Site - $33,221 $33,788 $40,134 - $107,143

Exterior - - $252,129 - - $252,129

Structural - - $942 - - $942

Roofing - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,454,494*

School Summ ary Report2010 Educational Suitability Assessment

014 Johnson (LBJ) High School Gr ades Served 9-12 (HS)

7309 Lazy Creek Dr. Yr Open Rating Historic

EXHIBIT "B"

Page 147: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 147/317

2010-11 Ut ilizat ion (by populat ion) 59%

2010-11 Att endance Zone Populat ion 1,083 759

Excess/DeficitSeats

2010-11 Out Migration 239

2010-11 In Migration 167

2015-16 Proj'd Attendance Zone Populat ion 1,155 687

Utilization (by enrollment) 102% Percent of Capacity

Area (GSF) per student 155 7 162

Gross Area 291,406 13,824 305,230

Perm Temp Total

2010-11 Campus Enrollment 1,881

Permanent Capacity 1,842

Number of Classrooms 94 17 111

Parking Spaces 598

Gross Sit e Area (Acres) 41.4

Sit e Data

School Data

Theatre 1 2006 16,140 9.9%

Gym/Café/Aud 1 1974 275,266 14.9%

Per m Buildings 291,406

Floor s Yr . Built GSF FCI

Building Data

14.4%

Austin, Texas 78724 1974 AA No

y Yr. Open Rating Historic

Interior $128 130 $266 097 $1 143 379 $1 537 606

Site - $51,493 $104,860 - - $156,353

Exterior - - $14,049 $110,561 - $124,610

Structural - - $122,523 - - $122,523

Roofing - $2,932 $57,987 - - $60,919

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $5,015,587*

Page 148: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 148/317

School Summ ary Report2010 Educational Suitability Assessment

Other $175,164 - $324,594 - $176,389 $676,147

* I l d l ti d i lt t f t f d th d i i t ti t

Total $1,328,937 $4,526,958 $12,659,556 $1,639,563 $176,389 $20,331,402

EXHIBIT "B"

Page 149: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 149/317

* Includes escalation, design consultant fees, program management fees, and other administrative costs.

School Summ ary Report2010 Educational Suitability Assessment

005 McCallum High School Gr ades Served 9-12 (HS)

5600 Sunshine Dr. Yr. Open Rating Historic

EXHIBIT "B"

Page 150: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 150/317

2010-11 Ut ilizat ion (by populat ion) 82%

2010-11 Att endance Zone Populat ion 1,316 280

Excess/DeficitSeats

2010-11 Out Migration 296

2010-11 In Migration 795

2015-16 Proj'd Attendance Zone Populat ion 1,434 162

Utilization (by enrollment) 114% Percent of Capacity

Area (GSF) per student 133 9 142

Gross Area 242,667 16,896 259,563

Perm Temp Total

2010-11 Campus Enrollment 1,824

Permanent Capacity 1,596

Number of Classrooms 76 22 98

Parking Spaces 301

Gross Sit e Area (Acres) 31.1

Sit e Data

School Data

Building H 1 2010 3,000 5.1%

Storage 1 1978 464

Storage 1 1993 3,732 0.0%

Mechanical 1 1953 1,139

Gymnasium 1 1987 18,939 15.3%

Theatre 1 1987 28,997 10.0%

Mechanical 1 1953 2,364 11.1%

Building A 1 1953 184,032 25.1%

Per m Buildings 242,667

Floor s Yr . Built GSF FCI

Building Data

20.4%

Austin, Texas 78756 1953 AA No

p g

Site - - - - - $0

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $4,913,137*

School Summ ary Report2010 Educational Suitability Assessment

006 Reagan High School Gr ades Served 9-12 (HS)

7104 Berkman Dr. Yr. Open Rating Historic

EXHIBIT "B"

Page 151: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 151/317

2010-11 Ut ilizat ion (by populat ion) 98%

2010-11 Att endance Zone Populat ion 1,552 36

Excess/DeficitSeats

2010-11 Out Migration 779

2010-11 In Migration 080

2015-16 Proj'd Attendance Zone Population 1,769 -181

Utilization (by enrollment) 57% Percent of Capacity

Area (GSF) per student 277 3 280

Gross Area 249,609 3,072 252,681

Perm Temp Total

2010-11 Campus Enrollment 901

Permanent Capacity 1,588

Number of Classrooms 81 1 82

Parking Spaces 447

Gross Sit e Area (Acres) 31.8

Sit e Data

School Data

Vocational 1 1987 42,262 25.2%

Classroom 1 1967 42,718 10.7%

Building G 1 1965 24,939 14.4%

Mechanical 1 1965 4,549 8.7%

Vocational 1 1965 17,949 15.9%

Band 1 1965 2,982 10.0%

Gymnasium 1 1965 47,562 16.9%

Building B 1 1965 60,797 22.2%

Administ rat ion 1 1965 5,851 19.2%

Per m Buildings 249,609

Floor s Yr . Built GSF FCI

Building Data

22.2%

Austin, Texas 78752 1965 AA No

p g

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Page 152: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 152/317

School Summ ary Report2010 Educational Suitability Assessment

852 Clifton Center Grades Served A lt . Ed. (Al t . Ed.)

1519 Coronado Hills Dr. Yr. Open Rating Historic

EXHIBIT "B"

Page 153: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 153/317

2010-11 Ut ilizat ion (by populat ion) n/a

2010-11 Attendance Zone Population 209

Excess/DeficitSeats

2010-11 Out Migration

2010-11 In Migration

2015-16 Proj'd At tendance Zone Population 209

Utilization (by enrollment) n/a Percent of Capacity

Area (GSF) per student #Error n/a n/a

Gross Area 39,039 1,536 40,575

Perm Temp Total

2010-11 Campus Enrollment n/a

Permanent Capacity 209

Number of Classrooms 12 1 13

Parking Spaces 71

Gross Site Area (Acr es) 7.8

Sit e Data

School Data

Building B 1 1977 3,840 2.7%

Building A 1 1977 35,199 41.0%

Perm Buildings 39,039

Floor s Yr . Built GSF FCI

Building Data

40.8%

Austin, Texas 78752 1977 NR No

Interior $21 355 $127 350 $116 858 $265 563

Site - $79,594 $88,237 $381,866 - $549,698

Exterior - $8,004 $5,265 - - $13,269

Structural - - - - - $0

Roofing - $20,585 - - - $20,585

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $2,045,003*

School Summ ary Report2010 Educational Suitability Assessment

012 Ridgeview ALC Grades Served 6-12 (Alt. Ed.)

901 Neal Yr. Open Rating Historic

EXHIBIT "B"

Page 154: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 154/317

2010-11 Ut ilizat ion (by populat ion) n/a

2010-11 Attendance Zone Population 462

Excess/DeficitSeats

2010-11 Out Migration 000

2010-11 In Migration 139

2015-16 Proj'd At tendance Zone Population 462

Utilization (by enrollment) 29% Percent of Capacity

Area (GSF) per student 657 68 725

Gross Area 88,677 9,216 97,893

Perm Temp Total

2010-11 Campus Enrollment 135

Permanent Capacity 462

Number of Classrooms 22 6 28

Parking Spaces 120

Gross Sit e Area (Acres) 19.8

Sit e Data

School Data

Building C 1 1968 3,201 49.7%

Building B 1 1970 1,167 24.2%

Building A 1 1953 84,309 36.6%

Perm Buildings 88,677

Floor s Yr . Built GSF FCI

Building Data

34.4%

Austin, Texas 78702 1953 NR Yes

Interior $318 518 $315 973 $634 491

Site - - $57,810 $40,134 - $97,944

Exterior - - $132,297 $1,000,183 - $1,132,480

Structural - $21,088 $7,827 - - $28,915

Roofing - - $183,006 - - $183,006

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorities 1 & 2 - $1,647,347*

School Summ ary Report2010 Educational Suitability Assessment

251 Rosedale School Grades Served A lt . Ed. (Al t . Ed.)

2117 W. 49th St. Yr. Open Rating Historic

EXHIBIT "B"

Page 155: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 155/317

2010-11 Ut ilizat ion (by populat ion) n/a

2010-11 Attendance Zone Population 314

Excess/DeficitSeats

2010-11 Out Migration 000

2010-11 In Migration 158

2015-16 Proj'd At tendance Zone Population 314

Utilization (by enrollment) 52% Percent of Capacity

Area (GSF) per student 228 47 275

Gross Area 37,112 7,680 44,792

Perm Temp Total

2010-11 Campus Enrollment 163

Permanent Capacity 314

Number of Classrooms 18 5 23

Parking Spaces 43

Gross Site Area (Acr es) 4.9

Sit e Data

School Data

Building C 1 1940 658 15.8%

Building B 1 1939 460 8.8%

Building A 1 1939 35,994 33.4%

Perm Buildings 37,112

Floor s Yr . Built GSF FCI

Building Data

32.5%

Austin, Texas 78756 1939 NR No

Interior $242 847 $73 485 $316 333

Site - - $364,134 $40,134 - $404,267

Exterior $7,439 $3,845 $539,718 $5,265 - $556,266

Structural - - - - - $0

Roofing - - $20,585 - - $20,585

Facility Condit ion - System by Prior it y

Priority

System 1 2 3 4 5 Total

Facilit y Master PlanRecommendations

Repair priorit ies 1 & 2 - $955,183*

Austin Independent School District Monday, 21 February 2011

2010 Facility Master Plan

252 Baker Center 

EXHIBIT "B"

Page 156: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 156/317

3908 Avenue B, Austin Texas 78751

Current Use:

Past Use:

Campus Overview Perm Temp Total  

Total Building Area (GSF) 65,868 - 65,868 

Site Area (Acres) 4.8

Parking Spaces 60

Buildings Floors Date GSF FCI

Building A 1 1911 63,810 16.7%

Building B 1 1952 1,600 0.0%

Building C 1 1911 458 110.2%

Administration and Professional Development Center 

Elementary School 

Austin Independent School District Monday, 21 February 2011

2010 Facility Master Plan

951 Burger Athletic Complex

EXHIBIT "B"

Page 157: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 157/317

g p

3200 Jones Road, Austin Texas 78745

Current Use:

Past Use:

Campus Overview Perm Temp Total  

Total Building Area (GSF) 180,614 - 180,614 

Site Area (Acres) 48.1

Parking Spaces

Buildings Floors Date GSF FCI

Building A 2 1977 70 39.7%

Building B Restroom 1 1977 5,832 9.7%

Building C Concession 1 1977 4,927 0.9%

Building D Restroom 1 1977 5,839 1.4%

Building E Ticket 1 1977 142 23.4%

Buildin F Restroom 1 1977 5,839 2.4%

Athletic complex 

N/A

 

Building G Concession 1 1977 4,927 0.9%

Building H Restroom 1 1977 5,832 1.1%

Building I Ticket 1 1977 142 23.4%

Building J Ticket 1 1977 59 0.0%

Building K Press Box 2 1977 12,255 2.2%

Building L Ticket 1 1977 59 77.8%

Building M 1 1977 31,119 0.6%

Austin Independent School District Monday, 21 February 2011

2010 Facility Master Plan

EXHIBIT "B"

Page 158: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 158/317

941 Carruth Admin Center 

1111 W. 6th Street, Austin Texas 78703

Current Use:

Past Use:

Campus Overview Perm Temp Total  

Total Building Area (GSF) 133,988 - 133,988 

Site Area (Acres) 2.8

Parking Spaces

Buildings Floors Date GSF FCI

Building A 4 1991 61,310 15.6%

Building B 4 1991 21,687 19.3%

Building C 1 3 11,821 21.6%Building D 3 1991 15,948 22.1%

 

Central Administration

Carruth was retail space prior to conversion to AISD administration

u ng , .

Building P Parking 2 1991 6,007 32.0%

Austin Independent School District Monday, 21 February 2011

2010 Facility Master Plan

922 Central Warehouse

EXHIBIT "B"

Page 159: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 159/317

3701 Woodbury Drive, Austin Texas 78704

Current Use:

Past Use:

Campus Overview Perm Temp Total  

Total Building Area (GSF) 96,303 - 96,303 

Site Area (Acres) 18.7

Parking Spaces

Buildings Floors Date GSF FCI

Building A 1 1983 96,303 5.1%

AISD Warehouse

N/A

Austin Independent School District Monday, 21 February 2011

2010 Facility Master Plan

949 Delco Activity Center 

EXHIBIT "B"

Page 160: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 160/317

4601 Pecan Brook Drive, Austin Texas 78724

Current Use:

Past Use:

Campus Overview Perm Temp Total  

Total Building Area (GSF) 60,294 - 60,294 

Site Area (Acres) 44.1

Parking Spaces

Buildings Floors Date GSF FCI

Building A 3 2003 60,294 3.4%

Athletic faciltiies and Athletic administration

N/A

Austin Independent School District Monday, 21 February 2011

2010 Facility Master Plan

948 House Park 

EXHIBIT "B"

Page 161: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 161/317

1301 Shoal Creek Blvd, Austin Texas 78701

Current Use:

Past Use:

Campus Overview Perm Temp Total  

Total Building Area (GSF) 32,069 - 32,069 

Site Area (Acres) 11.1

Parking Spaces

Buildings Floors Date GSF FCI

Building A 1 1940 3,325 0.0%

Building B 1 1986 2,106 0.0%

Building C 1 1940 213 0.0%

Building D 1 1940 294 0.0%

Building E 1 1963 358 0.0%

Buildin F 1 1940 96 17.9%

Athletic complex 

N/A

 

Building G 1 2000 64 0.0%

Building H 1 1963 240 94.4%

Building I 1 1940 215 0.0%

Building J 1 1940 248 0.0%

Building K 1 1939 12,473 1.0%

Building L 1 1936 11,331 0.8%

Building M 2 1938 573 11.2%

Austin Independent School District Monday, 21 February 2011

2010 Facility Master Plan

281 Nelson Field

EXHIBIT "B"

Page 162: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 162/317

7400 Berkman Drive, Austin Texas 78752

Current Use:

Past Use:

Campus Overview Perm Temp Total  

Total Building Area (GSF) 59,005 - 59,005 

Site Area (Acres) 20.1

Parking Spaces

Buildings Floors Date GSF FCI

Building A 1 1963 2,880 43.1%

Building B 1 1963 374 59.6%

Building C 1 1963 796 93.5%

Building D 1 1963 320 48.2%

Building E 1 1963 320 58.7%

Buildin F 1 1963 374 59.2%

Athletic complex 

N/A

 

Building G 1 1963 796 7.5%

Building H 1 1963 320 51.8%

Building I 1 1963 320 56.7%

Building J 1 1963 800 19.9%

Building K 1 1963 64 0.0%

Building L 1 1963 80 29.8%

Building M 1 1963 64 0.0%

Austin Independent School District Monday, 21 February 2011

2010 Facility Master Plan

959 Nelson Field Bus Terminal

EXHIBIT "B"

Page 163: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 163/317

7400 Berkman Drive, Austin Texas 78752

Current Use:

Past Use:

Campus Overview Perm Temp Total  

Total Building Area (GSF) 13,093 1,536 14,629 

Site Area (Acres) 6.6

Parking Spaces

Buildings Floors Date GSF FCI

Building A 1 1995 13,093 4.9%

Portable P097 1 1969 1,536 68.3%

Bus Terminal 

N/A

Austin Independent School District Monday, 21 February 2011

2010 Facility Master Plan

950 Noack Sports Complex

EXHIBIT "B"

Page 164: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 164/317

5300 Crainway Drive, Austin Texas 78724

Current Use:

Past Use:

Campus Overview Perm Temp Total  

Total Building Area (GSF) 3,231 - 3,231 

Site Area (Acres) 11.2

Parking Spaces

Buildings Floors Date GSF FCI

Building A 1 2004 1,242 0.4%

Building B 1 2004 1,520 4.1%

Building C 1 2004 101 0.0%

Building D 1 2004 101 0.0%

Building E 1 2004 76 0.0%

Buildin F 1 2004 96 0.0%

Athletic complex 

N/A

 

Building G 1 2004 96 0.0%

Austin Independent School District Monday, 21 February 2011

2010 Facility Master Plan

960 Saegert Transportation

EXHIBIT "B"

Page 165: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 165/317

3300 Jones Road, Austin Texas 78745

Current Use:

Past Use:

Campus Overview Perm Temp Total  

Total Building Area (GSF) 26,916 1,536 28,452 

Site Area (Acres) 10.6

Parking Spaces

Buildings Floors Date GSF FCI

Building A 1 2004 1,242 0.0%

Building B 1 2004 1,520 0.0%

Building C 1 2004 101 0.0%

Building D 1 2004 101 0.0%

Bus Terminal 

N/A

Austin Independent School District Monday, 21 February 2011

2010 Facility Master Plan

962 Service Center 

EXHIBIT "B"

Page 166: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 166/317

5101 E. 51st Street, Austin Texas 78723

Current Use:

Past Use:

Campus Overview Perm Temp Total  

Total Building Area (GSF) 54,307 - 54,307 

Site Area (Acres) 16.7

Parking Spaces

Buildings Floors Date GSF FCI

Building A 3 1991 27,435 15.3%

Building B 1 1991 11,219 7.0%

Building C 2 2000 6,602 4.8%

Building D 1 1995 848 0.0%

Building E 1 2007 8,203 0.0%

Maintenance and Administration

N/A

Educ ationa l Frame work  

The following Educational Framework was used as a

planning tool to aid in decision making by the Facility

i.  Campus layout and organization

j.  Neighborhood accessibilityk F d tt i t

EXHIBIT "B"

Page 167: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 167/317

Master Plan Task Force. It was not a mandate, but a set

of guidelines, and was intended to be flexible in order toalign resources that will provide optimal learning

environments for all AISD students. The guiding principle

for teaching and learning, as set by the Board of Trustees,

is performance-based empowerment and earnedautonomy.

1.  Planning Guidelines

A.  Priorities for Decision Making and Optimal

Lea rning Environme nts

1)  Safety and Sec urity

2)  Equitable Learning Opportunities for AllStudents - Ensure that all facilities offer 

Alternative Learning Education programs

and are in full compliance with theAmericans with Disabilities Act (ADA). 

3)  Quality Fac ility Co nditions

a.  Physical condition and safety

b.  Support for academic programsc .  Indoor-air quality – e.g. proper ventilation, monitoring of indoor pollutants

d.  Natural lightinge.  Environmental condition

f.  Green Building concepts – e.g. energy,

water and materials efficiencyg.  Application of current and emerging

technology – e.g. wireless networksh.  Site acreage

k.  Feeder pattern impact4)  School Performance - The Board may

consider a campus intervention, including

closure or repurposing, for schools that havenot met academic criteria established by

the District, state or federal accountabilitysystems.

5)  Facility Utilizationa.  Facility condition

b.  Capacityc .  Enrollmentd.  Economic efficiency

e.

 Intensity of use

 Page 165

 B.  Fac ility Utilization Alternatives

1)  Portab le/ Tem po rary Classroom s –  TheFacility Master Plan seeks to reduce the

2.  Programm atic Considerations

A.  School Size

1) The following  school-size  targets are

EXHIBIT "B"

Page 168: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 168/317

number of portable/temporary classrooms.

When additional classrooms are neededand are anticipated to be needed over 

time, the Facility Master Plan will includeplans to replace portable/temporary

buildings with permanent buildings. 2)  Shared Use of Facilities –  The AISD Facility

Master Plan will, wherever possible, provide

access to school facilities for outside

programs in order to create and promote

successful community-school partnerships.

C.  School Closure, Consolidation and Boundaries – 

The AISD Facility Master Plan Task Force willconsider recommending options for adjustingboundaries and the consolidation or repurposing

of schools to balance enrollment with capacity,to ensure an optimal learning environment for all

students, and to realize necessary economic

efficiencies. The AISD Facility Master Plan Task Force will continue to consider criteria and

options for schools that are not successful in

providing adequate and/or equitable learning

environments.1)  Transfer Pol ic y – When possible, reduce thenumber of transfers to align with the efficient

use of facilities.

 guidelines based on community input that,fiscally, may be achievable only through

creative design concepts, such as multiple

schools sharing the same campus. It isunlikely that every large school will reduce its

enrollment to match these specifications.Therefore, it is necessary to exercise flexibility

with these general guideline, which should

also be applied to site-specific and/or program-specific facilities. The utilization

target is 85% - 105%.

Elementary Schools 300-500 students

Middle Sc hools 600-800 studentsHigh Schoo ls 1,500-2,000 students

2)  The following school size standards have

been utilized by AISD for construction of new

school facilities since the 1996 Bond Program.

Elementary Schools 720-800 studentsMiddle Sc hools 1,100 students

High Schoo ls 2,200-2,400 students

B.  Grade Configuration – The current AISD grade

configuration for each facility will remain.Recommendations may be developed for 

schools in which flexibility in configuration might

better meet student and neighborhood needs.

 Page 166

C.  Student Assignment –   When developing facilityoptions, student assignment would optimally be

based on the following:

provided by the District [e.g. International

Baccalaureate, Global Studies, Early College

High School, Early College Start, etc.].

G M t S h l (O E ll t Si t

EXHIBIT "B"

Page 169: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 169/317

Elementary Schools - Neighborhood Schools /

Vertical AlignmentMiddle Scho ols - Neighborhood Schools/ Vertical

Alignment and Choice(depending upon which option provides the

best level of consistency for students).High Schools - Vertical Alignment and Choice

D.  Transportation o f Choic e Students – 

Transportation should not be provided to

students attending schools outside of their 

attendance area by choice, with the exceptionof those opting for choice due to No Child Left

Behind or for those students whose applicationshave been approved for enrollment in aMagnet School (Open Enrollment Signature

Program).

E.  Fine Arts - The AISD Facility Master Plan Task 

Force will seek opportunities to supportincreasing and enhancing the availability and

quality of Fine Arts programs. 

F.  Vertica l Tea m Signa ture Programs – The AISDFacility Master Plan Task Force will seek opportunities to support increasing and

enhancing the availability and quality of

Signature Programs, which are offered in eachschool and/or vertical team. These programs are

interest-based, and transportation is not

G.  Magne t Sc hoo ls (Open Enrollment Signa ture

Programs) - The AISD Facility Master Plan Task 

Force will seek opportunities to support

increasing and enhancing the availability andquality of Magnet Schools that offer a

specialized curriculum that draws students

across boundaries, requires an application, and

transportation is provided [e.g., LASA, Kealing,Fulmore, Ann Richards]. The Facility Master Plan

Task Force will utilize community input to assist

the District in developing other categories, if

needed, for programs that do not fit existingdefinitions and criteria.

H.  Athletic Programs - The AISD Facility Master Plan

Task Force will seek opportunities to supportincreasing and enhancing the availability and

quality of athletic programs and facilities. The

plan will also address the facilities that receivemore frequent and intensive use. 

I.  Career and Tec hnica l Programs - The AISDFacility Master Plan Task Force will seek 

opportunities to support increasing andenhancing the availability and quality of Career 

and Technical Programs [e.g., Cosmetology,

Culinary Arts, etc.]. 

J.  Pre-Kindergarten/ Early Childho od   Programs –  

Pre-K and early childhood services should be

 Page 167

expanded to the greatest extent that iseconomically feasible to serve all children of the

community.

K S d S i Th AISD F ilit M t Pl

EXHIBIT "B"

Page 170: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 170/317

K.  Student Services – The AISD Facility Master Plan

Task Force will seek opportunities to providespace for student services based on the

demographic and economic needs of thestudent population.

L.  Adm inistrative Spa ce s - Administrative buildingsand spaces will be reviewed and

recommendations developed as part of the

comprehensive Facility Master Plan.

 Page 168

Enrollment Projections

Historical Enrollment

The Austin Independent School District has

i d i ifi t i i ll t

Historica l Enrollment – By Grad e Leve l

The Austin Independent School District experienced

f i

EXHIBIT "B"

Page 171: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 171/317

experienced a significant increase in enrollment, over 

7,500 students, during the past nine years. Since 2002-03, student enrollment has increased by an average

of approximately 835 students, or 11% each year. The

current school year, 2010-11, had a notable increase

of an additional 933 students. Specifically, enrollmentincreased by 610 elementary, 246 middle, and 54

high school students.

The graph below illustrates the progression of

enrollment changes by year.

growth from 2002-03 to 2010-11 in all grade levels.

Enrollment in grades Pre-K - 5 increased by a total of

7,233 students. Enrollment in grades 6 - 8 increased by atotal of 88 students. Enrollment in grades 9-12 increased

by a total of 199 students. The graph below and the

chart on the following page indicate enrollment by

grade over the past nine years.

0

10,000

20,000

30,000

40,000

50,000

60,000

AISD Historic Enrollmentby Grade Level

2002-03 to 2010-11

PK-5

6-8

"9-12"

Source: A ISD Office of Facilities

0

10,00020,00030,00040,00050,00060,00070,00080,00090,000

100,000

AISD Historic Enrollment2002-03 to 2010-2011

Source: AISD Office of Facilities

 Page 169

Historica l Enrollment – By Grad e Leve l

The following chart depicts the progression of increasing enrollment throughout the previous nine years.

A i I d d S h l Di i

EXHIBIT "B"

Page 172: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 172/317

Grade 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11

EC & PreK 4,421 4,704 5,125 4,943 4,933 5,053 5,044 5,406 5,564

Kindergarten 6,431 6,728 6,849 7,462 7,309 7,391 7,589 7,668 7,660

1 6,405 6,512 6,898 7,055 7,493 7,297 7,498 7,543 7,644

2 6,115 6,235 6,373 6,669 6,898 7,107 7,027 7,354 7,225

3 6,104 6,013 6,174 6,278 6,571 6,617 6,856 6,796 7,102

4 5,866 5,912 5,897 6,073 6,136 6,254 6,477 6,595 6,679

5 5,592 5,754 5,676 5,823 5,870 5,847 6,028 6,195 6,293

Subtotal PK-5 40,934 41,858 42,992 44,303 45,210 45,566 46,519 47,557 48,167

6 5,582 5,390 5,517 5,379 5,511 5,506 5,519 5,568 5,740

7 5,655 5,517 5,278 5,443 5,344 5,300 5,421 5,425 5,513

8 5,252 5,507 5,423 5,258 5,337 5,278 5,229 5,338 5,324

Subtotal 6-8 16,489 16,414 16,218 16,080 16,192 16,084 16,169 16,331 16,577

9 6,764 6,371 6,512 6,332 6,313 6,371 6,366 6,252 6,127

10 5,093 5,321 4,962 5,337 5,183 5,043 5,084 5,148 5,212

11 4,427 4,389 4,694 4,423 4,576 4,588 4,569 4,644 4,724

12 4,179 4,048 4,126 4,368 4,118 4,590 4,511 4,564 4,599

Subtotal 9-12 20,463 20,129 20,294 20,460 20,190 20,592 20,530 20,608 20,662

Separate Campuses 318 239 271 339 350 329 337 311 332

Special Campuses 207 119 121 113 121 168 175 189 191

Subtotal Sep & Spec 525 358 392 452 471 497 512 500 523

Total 78,411 78,759 79,896 81,295 82,063 82,739 83,730 84,996 85,929

Source: AISD Office of Facilities

Historical Enrollment

2002-03 to 2010-2011

Austin Independent School District

 Page 170

Historical Enrollment by School

Elementa ry Schoo ls

EXHIBIT "B"

Page 173: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 173/317

 Page 171

Elementa ry Schoo ls cont.

EXHIBIT "B"

Page 174: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 174/317

 Page 172

Middle Scho ols

SCHOOL NAME 1999- 00 2000- 01 2001- 02 2002- 03 2003- 04 2004 -05 2005- 06 2006- 07 2007- 08 2008 -09 2009- 10 2010- 11

Bailey MS 1 529 1 217 1 173 1 144 1 099 1 074 1 134 1 175 1 147 1 206 959 1 041

Austin Independent School District Historic Enrollment 1999/2000 - 2010/2011

EXHIBIT "B"

Page 175: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 175/317

Bailey MS 1,529 1,217 1,173 1,144 1,099 1,074 1,134 1,175 1,147 1,206 959 1,041Bedichek MS 1,136 1,004 998 889 904 908 912 1,039 1,150 1,119 1,018 1,054Burnet MS 1,126 1,065 1,063 1,008 1,084 1,045 970 1,005 988 912 969 998Covington MS 752 855 939 945 911 889 862 910 1,014 954 950 805

Dobie MS 874 913 921 763 746 739 808 849 517 566 603 630Fulmore MS 764 749 872 957 992 1,054 1,037 1,029 1,045 1,036 1,007 995Garcia MS - - - - - - - - 605 649 689 658Gorzycki MS - - - - - - - - - - 835 963Kealing MS 958 1,058 978 948 1,029 1,277 1,190 1,251 1,215 1,279 1,242 1,233Lamar MS 915 855 798 779 791 701 675 671 741 780 668 604Martin MS 495 622 632 648 736 738 676 702 760 744 691 639Mendez MS 1,313 874 857 828 840 776 840 1,108 1,029 903 871 890Murchison MS 1,236 1,232 1,240 1,213 1,210 1,227 1,257 1,216 1,156 1,156 1,254 1,281O. Henry MS 681 743 866 887 885 801 747 789 881 982 1,005 1,026Paredes MS - 959 1,060 1,208 1,227 1,292 1,330 1,067 989 957 899 930Pearce MS 958 849 859 852 847 801 810 809 580 516 452 329Richards ( 6-8) MS - - - - - - - - 224 334 362 378Small MS 929 1,054 1,080 1,108 1,129 1,088 1,114 1,140 1,167 1,188 944 959

Webb MS 805 777 779 789 767 748 663 658 495 522 573 591

Middle School Total 1 4, 471 14,826 15,115 14,966 15,197  15,158 15,025 15,418 15,703 15,803 15,991  16,004

 Page 173

High Schoo ls

SCHOOL NAME 1999- 00 2000- 01 2001- 02 2002- 03 2003 -04 2004- 05 2005- 06 2006- 07 2007- 08 2008- 09 2009- 10 2010- 11Akins HS - 1 076 1 544 2 053 2 219 2 257 2 389 2 359 2 507 2 663 2 710 2 720

Austin Independent School District Historic Enrollment 1999/2000 - 2010/2011

EXHIBIT "B"

Page 176: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 176/317

Akins HS - 1,076 1,544 2,053 2,219 2,257 2,389 2,359 2,507 2,663 2,710 2,720Anderson HS 1,804 1,742 1,763 1,959 1,959 1,997 2,121 2,013 2,093 2,096 2,000 2,089Austin HS 2,167 2,014 2,136 2,149 2,158 2,245 2,207 2,124 2,240 2,343 2,390 2,337Bowie HS 3,045 2,608 2,435 2,370 2,485 2,613 2,699 2,821 2,778 2,768 2,828 2,876Crockett HS 2,529 2,414 2,174 2,099 1,999 1,962 2,038 1,992 1,907 1,857 1,763 1,686E astside HS 1,826 1,479 1,359 1,008 975 1,068 775 760 691 556 679 718Garza HS 318 339 384 347 307 266 280 308 315 301 258 260International HS - - - - - - 258 264 185 202 230 176LASA HS - - - - - - - - 858 860 874 881LBJ HS 1,619 1,654 1,812 1,811 1,717 1,671 1,676 1,703 1,001 1,046 1,018 1,000Lanier HS 1,855 1,762 1,666 1,915 1,794 1,793 1,674 1,619 1,693 1,608 1,594 1,624McCallum HS 1,666 1,652 1,676 1,705 1,709 1,686 1,724 1,706 1,717 1,733 1,793 1,824Reagan HS 1,405 1,394 1,276 1,304 1,169 1,064 1,029 989 973 988 958 901Richards 9th and 10th - - - - - - - - - - 79 150Travis HS 1,709 1,691 1,665 1,718 1,638 1,672 1,590 1,532 1,634 1,509 1,434 1,420

High School Total 19,943 19,825 19,890 20,438 20,129 20,294 20,460 20,190 20,592 20,530 20,608  20,662

Separate Campuses 102 44 311 318 239 271 339 350 329 337 311 332Special Campuses 159 145 155 207 119 121 113 121 168 175 189 191

District Total 77,117 76,755 77,088 77,720 78,114 79,268 80,666 81,705 82,739 83,730 84,996 85,929 

 Page 174

Birth Da ta  Historical birth data for the 31 zip codes comprising the

District was collected. The total number of live births for 

this area has steadily increased from 1994 to 2008 InAustin Indep endent School Distri ct

h

EXHIBIT "B"

Page 177: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 177/317

this area has steadily increased from 1994 to 2008. In

1994, there were 9,175 births compared to 12,733 in 2008.A slight decline of 45 births followed in 2009. The increase

in births points to continued growth at the elementaryschool level. Live birth data is commonly used to predict

future kindergarten enrollment.

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

Live Births by Yearin Zip Codes within AISD Boundaries

Source: Texas Department of State Health Services & the

Dennis D. Harner and Associates Demographic Analysis &

Enrollment Projections, 2010

Year Births1994 9,175

1995 9,417

1996 9,650

1997  9,822

1998 10,329

1999 10,829

2000 11,426

2001 11,346

2002 11,1602003 11,270

2004 11,492

2005 11,383

2006 12,539

2007  12,744

2008 12,733

2009 12,688

Live Births

1994-2009

Source: Texas Department of State Health Services & the

Dennis D. Harner and Associates Demographic Analysis &

Enrollment Projections, 2010

 Page 175

Projected EnrollmentIn 2010, AISD commissioned Dennis D. Harner and Associatesto develop enrollment projections. According to this report,

the total projected enrollment for AISD is expected to

increase by 12 356 students or 14 4% from the 2010-11

Projected Enrollment – By Grade Level 

Projected enrollment for the 2011-12 through 2020-21 school

years shows a steady increase in enrollment in all grade

levels. At the elementary level, which reflects Pre-K throughGrade 5 the projected enrollment shows an increase of

EXHIBIT "B"

Page 178: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 178/317

increase by 12,356 students, or 14.4%, from the 2010-11

school year to the 2020-21 school year.

The enrollment forecasts were calculated using a “cohort

survival” method. Each grade (cohort) is advanced from

one year to the next based upon historical trends. Live birth

data is also collected and used to compare the relationship

between kindergarten and enrollment five years later. Acohort (grade) is advanced from one grade to the next

based upon historical trends. The number of live births, and

subsequently, the number of children, enrolled in

kindergarten, has steadily increased since 2002.

Grade 5, the projected enrollment shows an increase of

5,225 students from the 2010-11 school year to the 2020-21

school year.

Similarly, the middle school enrollment, which reflects

Grades 6 through 8, shows an increase of 3,334 students. Thehigh school level, reflecting Grades 9 through 12, shows an

increase of 4,166 students during this same timeframe. Thetable below shows projected enrollment by year and grade

level.

Source: Dennis D. Harner & A ssociates Demographic A nalysis and E nrollment Projections, 2010

020,000

40,000

60,000

80,000

100,000

120,000

Mid-Range Total ProjectedEnrollment

2011-12 to 2020-2021

0

10,000

20,000

30,000

40,000

50,000

60,000

AISD Projected Enrollmentby Grade Level

2011-12 to 2020-21

PK-5

6-8

9-12

 Page 176

Projected Enrollment – By Grade Level The following chart depicts the progression of increasing enrollment throughout the next ten years.

Austin Independent School District

EXHIBIT "B"

Page 179: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 179/317

Grade 201 1- 12 201 2- 13 201 3-1 4 201 4-1 5 201 5- 16 201 6- 17 201 7-1 8 201 8- 19 201 9- 20 2020-21

E C & PreK 5,368 5,419 5,471 5,524 5,575 5,628 5,679 5,731 5,782 5,834

Kindergarten 7,773 7,848 7,923 7,998 8,073 8,148 8,223 8,298 8,373 8,448

1 7,757 7,832 7,907 7,982 8,057 8,132 8,207 8,282 8,357 8,432

2 7,426 7,532 7,607 7,682 7,757 7,832 7,907 7,982 8,057 8,132

3 6,988 7,176 7,282 7,357 7,432 7,507 7,582 7,657 7,732 7,807

4 6,926 6,788 6,976 7,082 7,157 7,232 7,307 7,382 7,457 7,532

5 6,423 6,676 6,538 6,726 6,832 6,907 6,982 7,057 7,132 7,207Subtotal PK-5 48,661 49,271 49,704 50,351 50,883 51 ,386 5 1,887 52,389 52,890 5 3,392

6 5,952 6,073 6,326 6,188 6,376 6,482 6,557 6,632 6,707 6,782

7 5,677 5,877 5,998 6,251 6,113 6,301 6,407 6,482 6,557 6,632

8 5,471 5,617 5,817 5,938 6,191 6,053 6,241 6,347 6,422 6,497

Subtotal 6-8 17,100 17,567 18,141 18,377 18,680 18,836 19,205 19,461 19,686 19,911

9 6,497 6,621 6,767 6,967 7,088 7,341 7,203 7,391 7,497 7,572

10 4,882 5,197 5,321 5,467 5,667 5,788 6,041 5,903 6,091 6,197

11 4,623 4,382 4,697 4,821 4,967 5,167 5,288 5,541 5,403 5,59112 4,761 4,648 4,407 4,722 4,846 4,992 5,192 5,313 5,566 5,428

Subtotal 9-12 20,763 20,848 21,1 92 21 ,977 22,568 23,288 23,724 24,1 48 24,557 24,788

Total 86,524 87,686 89,037 90,705 92,131 93,510 94,816 95,998 97,133 98,091

Source: Dennis D. Harner & Associates Demographic Analysis and Enrollment Projections, 2010

Mid-Range Projected Enrollment

2010-11 to 2019-20

 Page 177

Capa c ity Analysis

How many students can a building accommodate? This

question often arises, and in the development of a

facility master plan, can be one of the most debated

In AISD, functional capacity is reviewed on an annualbasis. Functional capacity is a more realistic analysis of

what a building can accommodate and takes into

EXHIBIT "B"

Page 180: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 180/317

facility master plan, can be one of the most debated

issues. It is not uncommon to review an evaluation of anexisting building only to find that the capacity which was

once assigned to the building is considerably more thanwhat the building can reasonably accommodate today.

The main reason for this is that the programs in a public

school system and the manner in which they are

delivered have changed significantly since the building

was originally built. More than half the square footage in

AISD was built before 1985. Twenty-five years ago,computer labs were just beginning to be incorporated

into schools, and severely handicapped students,

previously assigned to specialized facilities, were not yetmainstreamed into public schools. In addition, statelegislation has mandated smaller student/teacher ratios.

In facility planning, the term design capacity is used to

describe simply counting the number of classrooms in a

building and multiplying by an average class size. Eventhough at first glance this seems only to be common

sense, this methodology does not take into account the

programmatic implications of school facilities.

what a building can accommodate and takes intoaccount all special programs available at the school

that year, in addition to any portable buildings located

on site, to determine how many students can beassigned to a particular school campus each school

year.

For master planning purposes, an updated methodology

to the former AISD permanent capacity methodologywas developed and applied. The formula for long-range

planning should reflect District programs, but should be

kept simple and equitable since programs change from

year to year while classroom square footages remain, for 

the most part, the same. Permanent capacity does notincorporate temporary or portable classrooms, but only

permanent space.

Elementa ry School Permanent Cap ac ity

The elementary program is usually delivered based onstudents being assigned to a home room and attending

special programs such as art, music, and physical

education in a specialized classroom. The number ofspecial classrooms required is reflective of the total

number of students enrolled and is subtracted from thetotal number of classrooms since the vacated home

room cannot be utilized by other students.Age of AISD Permanent Buildings

 Page 178

A 95% efficiency factor is applied since students do notalways arrive in perfect sets of 22 students. Additionally,

due to reduced class size and increased support spaceneeds for Title 1 schools, an 85% efficiency factor is

applied to compute permanent capacity at these

movement to block scheduling, an efficiency factor of

75% is applied.

The following describes the permanent capacity

methodology for secondary schools. 

EXHIBIT "B"

Page 181: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 181/317

pp p p p y

facilities.

The following describes the permanent capacitymethodology for elementary schools.

  Count permanent classrooms.

  Subtract special areas for music, art, etc. (3-7classrooms based on staffing ratios).

  Multiply by 22 (average class size).

  Apply 95% efficiency factor; 85% efficiency factor for Title 1 schools.

Sec onda ry Scho ol Permanent Capa city

Unlike elementary schools, at the secondary levelstudents are not in self-contained environments but aretraveling from one location to another each period. All

classrooms are counted including the specializedspaces. Since it is difficult to schedule every teaching

space every period of the day, in addition to the

  Count permanent classrooms.

 Multiply by 28 (average class size).

  Apply 75% efficiency factor; 70% efficiency factor for Title 1 schools.

Core Capac ity

Core capacity is defined as those spaces that large

groups of students utilize at some point during the schoolday, including the cafeteria, gymnasium, and library. As

part of the new methodology, consideration was given

to lower permanent capacity if the cafeteria or gymnasium was less than 85% of permanent capacity,

based on the number of classrooms.

The chart below shows the AISD standard for core space

sizes based on the current approved educationalstandards. 

Grade Level

School Size

(# of students)

Total

Square Feet SF/Student

Total

Square Feet SF/Student

Total

Square Feet SF/Student

Elementary 880 4,200 4.77 3,000 3.41 3,500 3.98 

Middle 1,100 4,500 4.10 13,400 12.18 4,800 4.36 

High 2,400 9,000 3.75 20,720 8.63 8,400 3.50 

Source: AISD, Office of Facilities

Cafeteria Gym LibraryCore Space Standards

 Page 179

Utilization

Utilization, or efficiency, of a school facility, is calculated

by dividing the enrollment of the school by its permanent

capacity. The target range as determined by the Facility

EXHIBIT "B"

Page 182: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 182/317

p y g g y y

Master Plan Task Force for the purposes of long-range

planning is 85%-105%. Schools below 85% may be able to

provide relief for overcrowded schools or may beconsidered as potential candidates for closure or 

consolidation. Schools above 105% should be monitored

for additional growth, and schools that exceed 125% are

considered for additions or for relief through theconstruction of new schools.

The chart below indicates that district-wide, AISD is within

the 85%-105% target range; however, by grade level, theelementary schools are above the target and the middle

schools are below. In other words, the District is short3,833 seats at the elementary level, but has 4,263 too

many at the middle school level.

On an individual basis, there are 29 schools, or 25% of allschool campuses, that fall below 85% of permanent

capacity. Fifty-three schools, or 46% of all schoolcampuses, operate at above 105%. The map to the right

and the ones on the following pages illustrate the 2010-11

school year enrollment utilization.

Grade Level

2010

Enrollment

Permanent

Capacity

Utilization

Rate

Elementary 48,738 44,905 109%

Middle 16,154 20,417 79%

High 20,512 21,698 95%

Districtwide 85,404 87,020 98%Source: AISD, Office of Facilities

 Page 180

 

EXHIBIT "B"

Page 183: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 183/317

 Page 181

Enrollment versus Population

The population (number of students that live within an

attendance zone) is not always equal to the enrollment(number of students that attend) of a school. No Child

EXHIBIT "B"

Page 184: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 184/317

Left Behind, transfer policies, and open enrollmentsignature programs are some of the reasons students

migrate in and out of their assigned attendance zones.

In a few cases in AISD, students migrating into a school

comprise more than 40% of its enrollment. When largenumbers of students travel outside of the boundary of

their assigned school, to attend a different school, it

presents a challenge when planning for long-term facilityneeds.

Because the number of students migrating in and out of

an attendance zone may vary year to year, it isimportant to also look at the attendance zonepopulation. Population projections, which are derived

from birth data, census data, and housing stock analysis

are used in long-range planning efforts to identify trendsin growth and decline. Population projections are more

reliable than anticipating the rates of in and outmigration.

The following maps provide the 2010-11 population as apercent of permanent capacity by school. This provides

a different picture than the enrollment utilization maps onthe preceding pages. For example, a school that falls

below the target utilization of 85% based on enrollment

may in fact be above 85% based on population.

 Page 182

 

EXHIBIT "B"

Page 185: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 185/317

 Page 183

Fac ility Co ndition Ana lysis

Facility condition is the state of repair of the buildinginfrastructure. Facility condition takes into considerationall of the building systems from roofs and windows to

Of course, FCI is not the only factor used to identifybuildings that need renovation, replacement or even

closure. Historical significance, enrollment trends,community sentiment, and the availability of capital areadditional factors that are analyzed when making school

EXHIBIT "B"

Page 186: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 186/317

= Facility Condition Index (FCI)

electrical and mechanical systems. Although there is a

cost associated with renovating every building

according to current codes and standards, this does notmean that all schools need massive and immediaterepairs and renovations. Rather, this provides anunderstanding of the effort it would take to bring all

facilities up to the same standard.

The facility condition information does provide thefollowing.

  Comparative analysis of building conditions

 Approximate cost to address the facility conditions

of all buildings in the District  Understanding of which buildings are in the worse

conditions and that might be slated for moreimmediate focus

Since 1991, the facility management industry has used anindex called the Facility Condition Index (FCI) to

benchmark the relative condition of a group of schools.This index simply divides the identified repair costs in afacility by the total cost to replace the facility. For 

example, take a 100,000 square foot building that mighttheoretically cost $10 million to construct new and now

has $1 million in identified repairs. Dividing $1 million by$10 million results in an FCI of 10 percent. Industrystandards and financial modeling dictate that FCInumbers above 65% or greater are more cost-effectiveto replace than to repair. This is due to efficiency gainswith more modern facilities and the value of the buildingat the end of the analysis period.

facility decisions. 

The chart below indicates the distribution of campusesby ranges of FCI in AISD. Please note that the supportfacilities are included. Only one facility, Pease ES, fallsinto the replace category; however, two schools, Zilker ESand Wooten ES are between 50-59% and should be

considered for major renovation or replacement.

Cost of RepairsCost of Replacement

FCI Campuses

<10% 18 

10-19% 35 

20-29% 30 

30-39% 31 

40-49% 9 

50-59% 2 

60-69%

- 70-79% 1 

80-89% - 

90-100% - 

>100% - 

Total 126 

Repair

Renovate

Replace

 Page 184

FCI: The Denom inator

The denominator is the bottom part of the equation andpossibly the easiest with which to start. The denominator is the theoretical cost to replace the facility. It isimportant to recognize that this cost is based on the

l f b ildi i h h f ili h i h

engineering assessors to identify deficient conditions inthe buildings.

EXHIBIT "B"

Page 187: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 187/317

replacement of a building with another facility that is thesame size and is fully code compliant. If, for example,

you are comparing the FCI on a 3,450 square footgymnasium building at a campus, the replacement costis the theoretical cost to replace that same 3,450 squarefoot building. Since the replacement cost comparison isprimarily driven by the type of facility (elementary school,middle school, high school, administration, etc.), a set ofcost models have been developed that estimate thecost per square foot for new construction and areindicated in the chart to the right. The cost models takeinto account national industry averages from a

recognized industry data source called RSMeans®,adjusted to Austin, Texas, as well as the District’s recentexperience in the Austin construction market. The costsper square foot are then multiplied by the size of theschool or building under consideration. Thismethodology is used for both permanent and portablebuildings.

FCI: The Numera tor

The numerator is the estimated cost to complete therepairs on the building in its current condition. This repair cost is generally considered to be like-for-like repairs.Within reason, the deficient conditions would be repairedor systems replaced to put the building into fullyserviceable condition to meet current codes.

At AISD, the District retained a firm in 2007 to assess all ofthe facilities in the district and develop cost estimates tomake needed repairs. That effort included anassessment of all facilities using architectural and

This survey focused, for the most part, on the condition ofthe existing buildings and did not initially include

educational adequacy or functional equity needs. All ofthe identified needs were grouped into building systems,and a Uniformat® cost structure supported by RSMeans® 

nationally-based cost data adjusted to the Austin, Texasarea, was employed to develop consistent costestimates across all schools. These cost estimates, usingthe industry-standard, line- item costs, comprise themajority of the costs in the AISD facility assessment

database and are included in the numerator of the FCIcalculation.

In addition, ADA (American with Disabilities Act)/TAS(Texas Accessibility Standards) reports were developedto address ADA issues against current guidelines during2008-09. A functional equity study identified core areasand specialized classroom areas, within specific school

campuses that did not meet AISD educationalspecifications. The cost to resolve these issues has beenincluded in the deficiencies and numerator of thecurrent FCI numbers.

 Page 185

Educ ational Adequacy Assessment

As part of this master planning effort, AISD conducted aneducational adequacy assessment of all schools. Aneducational adequacy assessment evaluates how wellthe campus is equipped to deliver the instructional

•  Relationship of Spaces: Proximity of instructionalspaces to support areas such as libraries, labs, andlecture halls.

Th h t b l id tifi th d ti l d

EXHIBIT "B"

Page 188: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 188/317

program.

During the summer of 2010, a team of assessors went toeach school and collected an inventory of each spaceat the classroom level. This data was then compared tothe District developed standards to identify when anindividual space did not meet a specific level ofcompliance. When an item did not meet the standard,the condition was noted and a line item was added tothe assessment database with a budget to correct thatcondition.

 

This applied a standards-based approach to determinethe overall educational adequacy by evaluating eightoverall criteria as follows.

 Capacity: Ability of the facility to meet the needs ofthe student population.

 Support for Programs: Provision of special spaces or classrooms to support the instructional program.

 Tec hnology : Presence of infrastructure, datadistribution, and equipment.

 Supervision & Sec urity: Extent to which physical

configurations help or hinder building operation.

 Instructional Aids: Presence of necessary equipmentwithin teaching spaces.

 Physical Characteristics: Sizes and shapes ofteaching spaces.Learning Environment: Degree to which learningareas are comfortable, well-lit, odor-free,controllable and quiet.

The chart below identifies the educational adequacydeficiency costs by the eight overall criteria.

Technology, instructional aids, and security andsupervision make up the greatest need in terms ofeducational adequacy.

 Page 186

Building Deficienc ies

The combination of the building condition and the educational adequacy items currently represents over 41,000 lineitems district-wide. Deficiencies are categorized by the following priorities.

Priority 1: currently critical (immediate need, i.e., fire safety systems)P i it 2 t ti ll iti l (t b t d ithi i j HVAC i t it t )

EXHIBIT "B"

Page 189: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 189/317

Priority 2: potentially critical (to be corrected within one year, i.e., major HVAC equipment, security systems)Priority 3: necessary/not yet critical (1-2 years, i.e., site lighting, sanitation sewer, educational adequacy)

Priority 4: recommended (3-5 years, i.e., finishes, educational adequacy)Priority 5: does not meet current code/standards/grandfathered (i.e., functional equity, 3rd tier ADA/TAS)

The chart below lists the facility type and the costs associated with correcting priorities 1 through 5. Logically, the greatestneed is at the elementary schools since this makes up the largest number of schools and the most square footage in theDistrict.

Renovation Costs by Priority, by Campus

Type Priority 1 Priority 2 Priority 3 Priority 4 Priority 5 Total

Schools

PreK Centers 191,332$ 843,430$ 1,221,125$ 154,414$ 9,470$ 2,419,771$

Elementary Schools 36,765,169$ 101,426,669$ 259,226,302$ 30,846,706$ 78,109,545$ 506,374,392$

Middle Schools 19,163,034$ 56,423,338$ 88,591,082$ 17,785,740$ 42,995,421$ 224,958,615$

High Schools 16,483,563$ 69,061,730$ 141,365,127$ 36,842,162$ 22,301,333$ 286,053,916$

Alternative Education 1,342,426$ 3,305,106$ 13,807,291$ 2,473,156$ 136,888$ 21,064,868$

Total Schools 73,945,525$ 231,060,273$ 504,210,927$ 88,102,178$ 143,552,658$ 1,040,871,561$

Other District Facilities

Support Facilities 2,135,310$ 7,374,941$ 6,094,116$ 45,901$ 291,467$ 15,941,735$

Administrative 732,481$ 2,760,465$ 9,054,486$ 363,873$ 202,910$ 13,114,216$

Maintenance and Transp. 637,830$ 880,329$ 3,343,222$ 277,590$ 199,746$ 5,338,716$

Total Other District Facil 3,505,621$ 11,015,735$ 18,491,824$ 687,363$ 694,123$ 34,394,666$

Grand Total 77,451,146$ 242,076,008$ 522,702,751$ 88,789,541$ 144,246,781$ 1,075,266,227$

 Page 187

The chart below provides a crosstab by building system. The greatest building system deficiency, as is typically the case,is in the area of Heating Ventilation and Air Conditioning (HVAC). Please note that the “Other” building system categoryincludes functional equity and ADA/TAS compliance.

EXHIBIT "B"

Page 190: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 190/317

A summary of building system by priority by individua l scho ol c amp us is ava ilable in the Fac ility Summa ry Reports with

Fac ility Master Plan Rec om me nda tions sec tion of this repo rt, pa ge s 38-164.

Districtwide Crosstab by Priority by System

Building System 1 2 3 4 5 Total

Site 498,041$ 3,002,131$ 20,459,959$ 15,715,200$ -$ 39,675,332$

Roofing 1,016,327$ 20,921,438$ 22,268,609$ 4,912,452$ -$ 49,118,826$

Exterior  195,604$ 5,079,548$ 20,391,721$ 3,620,156$ -$ 29,287,028$

Structure 191,655$ 392,439$ 997,978$ 63,077$ -$ 1,645,149$

Interior  126,632$ 6,550,035$ 44,089,416$ 20,438,059$ -$ 71,204,142$

HVAC 12,732,977$ 147,968,144$ 149,987,307$ 1,725,368$ -$ 312,413,796$

Plumbing 16,072,172$ 7,908,635$ 66,458,213$ 3,840,468$ 1,568$ 94,281,056$

Electrical 575,073$ 23,329,696$ 68,672,377$ 5,273,377$ -$ 97,850,523$

Technology -$ 9,936,855$ 77,335,604$ -$ -$ 87,272,458$

Fire and Safety 19,377,531$ 11,607,150$ 1,133,648$ 567,724$ -$ 32,686,053$

Conveyances 223,695$ 5,132,182$ 8,858$ -$ -$ 5,364,736$

Specialties 37,115$ 247,755$ 19,236,791$ 32,633,662$ -$ 52,155,323$

Other  26,404,324$ -$ 31,662,269$ -$ 144,245,213$ 202,311,806$

Total 77,451,146$ 242,076,008$ 522,702,751$ 88,789,541$ 144,246,781$ 1,075,266,227$

Facility Condition Assessment Priority

 Page 188

Fac ility Op tions

Using the Educational Framework as guiding principles,the Facility Master Plan Task Force began thecomplicated task of developing facility options and

i i d t t th i h f d l i

  Future growth – account for future populationgrowth/decreases

  Facility condition – facility condition index rating

EXHIBIT "B"

Page 191: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 191/317

scenarios in order to meet their charge of developing

recommendations to improve facility efficiencies through

objective data analysis and community input.

The information and data considered included thefollowing.

  Current condition of buildings (FCI)  Educational adequacy of schools  Current and proposed instructional programs  Current and projected population growth and

decline

  Lease obligations, current and possible use ofbuildings, and administrative facilities

The following criteria were used for decision making.

  Educational enhancement – meet theeducational needs of all students

  Efficient space utilization – optimum utilizationrange was between 85%-105% of permanentcapacity

  Cost savings – decrease M&O expenses or capitalcost avoidance of correcting building

deficiencies and building operating costs per student

  Community Impact – impact of change versus thegains

Over the course of seven months, 108 options that weredeveloped by the Task Force, consultants, and staff,were reviewed and evaluated by the Task Force.

An outline of the 108 options is provided in App endix G o fthis rep ort.

 Page 189

AUSTIN INDEPENDENT SCHOOL DISTRICT

District-Wide Facility Master Plan

EXHIBIT "B"

Page 192: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 192/317

Appendix AFCI White Paper and Facility FCI Charts

 Page 190

 

White Paper:

Facility Condition Index (FCI) at Austin ISD

EXHIBIT "B"

Page 193: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 193/317

Facility Condition Index (FCI) at Austin ISD

The assessment of school facilities and the development of long-range master plans, is MagellanConsulting’s core business. District-wide master plans, by their very nature, recommend changes acrossa district. In nearly every district in which we work, there are building condition and student capacitychallenges. Often, there exists enough capacity across the district when compared to total studentenrollment; however, that capacity is rarely in the right place. In the last five years, every large urban

district we have worked with has faced considerable loss of enrollment district-wide which eventuallynecessitates reducing overall footprint and closing schools. We typically see changes in educationalprograms that make the alignment of facilities a challenge, as curriculum and delivery methods are ever-

evolving. Nearly 90 percent of our country’s 21st century schools were designed and constructed in the20th century, most in the mid 20th century, under an industrial age factory model with a long row of classrooms down a double-loaded corridor. The condition of schools, with the exception of verywealthy districts, is declining across the country. The recent economic climate is exacerbates thisproblem as maintenance funds are decreasing. Texas the new education funding system in Texas isplacing greater emphasis on the use of Maintenance and Operations (M&O) funds. Unfortunately,deferred maintenance does not go away with reduced funding, and the unmet need continues to builduntil the cost to repair eventually exceeds the cost to replace the facility.

Commonly, communities have a widespread perception that school districts shape, hide, or manipulatebuilding condition data to obtain a desired result. This perception may even result in a law suit, whichcreates the necessity to engage in projects that are driven by legal requirements. While years ago theremay have been school districts that were guilty of these charges, particularly in the era of racialsegregation and the court-ordered desegregation that followed, the fact is that we have not seen datamanipulation at any of the districts in which we have worked for over a decade.

School district administrators and facility staffs continually request that we simplify the data and planningparameters. The process of engaging the community offers a broad spectrum of individuals who want toparticipate These diverse groups of individuals may speak different languages have different educational

 

Since 1991, the facility management industry has used an index called the FCI to benchmark the relativecondition of a group of schools This index simply divides the identified repair costs in a facility by the

EXHIBIT "B"

Page 194: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 194/317

FCI Campuses

<10%

10-19%

20-29%

30-39%

40-49%

50-59%

60-69%

70-79%

80-89%

90-100%

>100%

Repair

Renovate

Replace

condition of a group of schools. This index simply divides the identified repair costs in a facility by thetotal cost to replace the facility. For example, take a 100,000 square foot building that might

theoretically cost $10 million to construct new and now has $1 millionin identified repairs. Dividing $1 million by $10 million results in anFCI of 10 percent. The National Association of College and University

Business Officers has suggested for college planning that an FCI of lessthan 5 percent is good, an FCI between 5 and 10 percent is fair, and anFCI greater than 10 percent is poor. In K-12 public school planning,the gulf between 10 percent and 100 percent is just not stratified

enough. For several years, Magellan Consulting has used the chart

displayed to the right, with clients to provide a little more gradation.

We often find district-wide FCI averages in the 20 to 30 percent range.Schools in the 30 to 60 percent range are probably the most difficultto plan for long-term. Financial modeling has shown that over a 30-year period, schools that fall in the 65 percent or greater range aremore cost-effective to replace than to repair. This is due to efficiencygains with more modern facilities and the value of the building at theend of the analysis period. Of course, FCI is not the only factor used

to identify buildings that need renovation, replacement or evenclosure. Historical significance, enrollment trends, communitysentiment, and the availability of capital are additional factors that are

analyzed when making school facility decision.

The FCI calculation, while seemingly simple, yields a consistent result that can commonly be comparedacross districts, as the same factors are almost always considered in deriving the numerator and thedenominator. It should also be noted that there are nuances regarding the process for calculating FCI

that must be understood.

 

the district’s recent experience in the Austin construction market. The costs per square foot are thenmultiplied by the size of the school or building under consideration.

EXHIBIT "B"

Page 195: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 195/317

multiplied by the size of the school or building under consideration.

“Construction Cost” is a term that may mean different things to different people. To contractors,construction cost generally means the amount they are paid to construct the building, and that figuregenerally does not include a contingency for unforeseen conditions. To the school district facilities staff,

construction cost typically refers to the planning budget to construct the building plus a smallcontingency for unforeseen conditions and may also include the cost to bring utilities to a site. To theschool board, construction cost often means the total costs spent on the project which includes thearchitects’ fees and the cost to manage the overall construction program. Therefore, it is important to

be careful which costs to include in the replacement cost denominator calculation. For FCI purposes,

we include all of the costs associated with completing the project for the amount of funding that isrequired in total. That includes the base construction cost (often referred to as “hard costs”); plus

inflation; plus professional fees; plus administrative costs for testing, surveys, and advertising; plusmanagement costs; plus contingencies; plus escalation to an estimated mid-point of construction (oftenreferred to as “soft costs”). These total costs are significantly more than the base construction costpaid to the contractor. The following table shows the average costs used in determining thereplacement cost for AISD, based on the building type and the buildings’ gross square footage measuredto the outside of exterior walls.

ES MS HS Admin PortableSquare Feet  82,500 170,000 330,000 20,000 1,536 Cost / SqFt  185.54$ 204.20$ 201.53$ 176.65$ 85.97$

Construction Cost 15,306,924.11$ 34,714,158.47$ 66,504,421.68$ 3,532,981.28$ 132,047.22$

A/E Services 1,224,553.93$ 2,777,132.68$ 5,320,353.73$ 317,968.32$ 11,884.25$Site/Survey 30,613.85$ 69,428.32$ 133,008.84$ 7,065.96$ 264.09$Permits/Fees 68,881.16$ 156,213.71$ 299,269.90$ 15,898.42$ 198.07$Testing 114,801.93$ 260,356.19$ 498,783.16$ 26,497.36$ 660.24$Furn/Fixt/Equip (FF&E) 918,415.45$ 2,082,849.51$ 3,990,265.30$ 141,319.25$ 7,262.60$Other 612,276.96$ 1,388,566.34$ 2,660,176.87$ 137,654.34$ 6,602.36$

Project Budget 18,276,467$ 41,448,705$ 79,406,279$ 4,179,385$ 158,919$

Program-level contg @ 10% 1,827,647 4,144,871 7,940,628 417,938 15,892 

 

state to that of what would be replaced today. Generally, studies or hazardous material costs that mightbe encountered even under a demolition scenario would not be included.

EXHIBIT "B"

Page 196: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 196/317

be encountered even under a demolition scenario would not be included.

At AISD, the district retained a firm in 2006 to assess all of the facilities in the district and develop costestimates to make needed repairs. That effort included a walkthrough of all facilities using architects andengineers to identify deficient conditions in the buildings. This survey focused, for the most part, on the

condition of the existing buildings and did not include educational adequacy or functional equity typeneeds (more on that later). All of the identified needs were grouped into building systems, and aUniformat® cost structure supported by RSMeans® nationally-based cost data adjusted to the Austin,Texas area was employed to develop consistent cost estimates across all schools. These cost estimates,

using the industry standard line item costs, comprise the majority of the costs in the AISD facility

assessment database and are included in the numerator of the FCI calculation. The construction costvalue of all of these deficient conditions, prior to adding soft costs for professional fees, contingency, and

escalation total approximately $444.9 million.

However, the facility condition assessment did not focus on what the assessment industry calls“educational adequacy” items. Where a building assessment focuses on the condition of the building andwhat is broken, an educational adequacy assessment focuses on how well the school supports theinstructional mission and looks objectively at what is missing . As part of this master planning effort,AISD conducted an educational adequacy assessment of all schools. This assessment made use of the

district’s educational specifications, supplemented with information collected during a three-dayworkshop that involved numerous staff, principals, and teachers. A set of standards was developed foreach school type, the buildings typically found on the campus, and for each instructional space. These

standards identified in detail the size of the teaching spaces, the number of students in each space,physical conditions, plumbing requirements, the number of computer outlets and electrical plugs, andthe type of instructional support for each space, in addition to safety and supervision considerations.During the summer of 2010, a team of assessors went to each school and collected an inventory of eachspace at the classroom level. This data was then compared to the previously developed standards to

identify when an individual space did not meet a specific standard. When an item did not meet thestandard, the condition was noted and a line item was added to the assessment database with a budget

 

own soft cost model. The following chart shows the percentage factors that are applied to every $100of estimated repair cost to derive the total repair cost figure used in calculating the FCI.

EXHIBIT "B"

Page 197: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 197/317

p p g g

The total facility condition cost totals approximately $963.1 million after adding soft costs to the costsfor correcting deficient building and ADA conditions and the educational adequacy costs. During theAugust work sessions, the need was approximated at $875 million, but at that time it was believed thatthe need would eventually be lowered as data was reviewed. The $875 million figure really represented

the total construction cost (hard cost) required to correct current deficiencies. Indeed the comparablecost has decreased to about $558.4 million; however, the overall total need is now about $1.1 billion,including functional equity needs at 44 campuses (discussed in more detail below). Since the Augustworksession:

1  Deficiencies have been reviewed and, in some cases, modified by AISD facilities staff (part of ongoing AISD facility management procedures) – decreased cost.

2  Overlapping cost between ADA studies and building condition deficiencies have been addressed– decreased cost.

3  Overlapping cost between functional equity deficiencies, ADA deficiencies, and buildingcondition deficiencies have been addressed decreased cost

Default HVAC Life Safety ADA EquityCost Basis  100.00$ 100.00$ 100.00$ 100.00$ 100.00$

Construction Cost 138.46$ 138.46$ 103.46$ 196.37$ 196.37$

A/E Services 20.77$ 20.77$ 4.14$ 29.46$ 29.46$

Permits/Fees 0.62$ 0.62$ 0.47$ 0.88$ 0.88$

Testing 0.42$ 0.42$ -$ 0.59$ 0.59$

Other 23.26$ 28.11$ 1.34$ 32.99$ 32.99$

Project Budget 184$ 188$ 109$ 260$ 260$

Program-level contg @ 10% 18 19 11 26 26 

Program Management 10$ 10$ 6$ 14$ 14$

Escalation - 3 yrs. @ 5% 34$ 35$ 21$ 49$ 49$

Total Program Cost 246$ 253$ 147$ 350$ 350$

Soft Cost Factor (%) 78% 83% 42% 78% 78%

 

Functional Equity Additions / Renovations

EXHIBIT "B"

Page 198: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 198/317

School Number and Name Library Gym Cafeteria Admin Classroom Total

009 Anderson HS - 7,558,381 - - 737,651  8,296,032 

002 Austin HS 93,707 1,000,768 - 341,590 6,583,925  8,019,990 

005 McCallum HS 1,056,715 974,456 - - -  2,031,171 

007 Travis HS - 497,614 - - -  497,614 

054 Bedichek MS 1,226,494 1,200,183 - 279,273 10,809,492  13,515,442 

046 Burnet MS - - 1,121,709 - -  1,121,709 

057 Covington MS - - - - 1,256,499  1,256,499 

055 Dobie MS - 4,791,499 778,272 - 290,814  5,860,584 

051 Martin MS 830,896 1,996,919 - - -  2,827,815 

058 Mendez MS - - - - 1,323,155  1,323,155 

052 Murchison MS 382,212 - 791,197 252,361 6,564,076  7,989,847 

047 O. Henry MS - - 702,568 - 2,492,687  3,195,256 

048 Pearce MS - - - - 751,499  751,499 

053 Webb MS - - - 703,953 -  703,953 

142 Allan ES 756,946 - - - -  756,946 

102 Andrews ES 1,197,967 110,786 - - -  1,308,753 

149 Barrington ES - 2,377,285 119,095 - -  2,496,380 107 Brentwood ES - 720,110 718,725 - -  1,438,834 

109 Brown ES 101,554 2,561,928 - - -  2,663,482 

161 Cook ES - 2,949,680 115,402 - -  3,065,082 

113 Cunningham ES - 2,543,464 115,402 812,893 -  3,471,759 

114 Dawson ES - 913,985 - 284,351 -  1,198,336 

154 Doss ES - - - 486,074 -  486,074 

116 Govalle ES 847,514 2,460,375 - 177,258 -  3,485,146 

117 Gullett ES 1,154,714 482,843 1,442,527 698,414 1,307,276  5,085,774 

119 Highland Park ES - 886,289 796,275 - 517,002  2,199,566 

155 Hill ES - 2,404,981 135,713 - - 2,540,694

 

FCI ResultsFor AISD, the FCI calculations include the building condition assessment results, the educational

EXHIBIT "B"

Page 199: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 199/317

, g ,adequacy assessment results, and the type one and two ADA compliance considerations and then

compare them to the cost of replacing the same facility. These FCI figures provide a benchmark that canbe used to consistently compare AISD facilities district-wide. The planning team refers to the FCI to aidin decision making when a school or building is subject to renovation, when a change in educational

program is contemplated, or when the school is targeted for replacement, consolidation, or closure forefficiency reasons. It is not the principle driver, but rather a supporting consideration to guide thedistrict and hopefully prohibit the district from making additional investment into a building that is closeto or has reached the end of its serviceable life. The following chart is a summary of all of the district’s

facilities by FCI. The one school that falls in the 70-79 percent range is Pease Elementary, a historic

location celebrated as the longest operating public school in the state.

FCI Campuses

<10% 18 

10-19% 35 

20-29% 30 

30-39% 31 

40-49% 9 

50-59% 2 

60-69% - 

70-79% 1 

Repair

Renovate

Replace

AISD School/Facility FCI Summary Total minus NC

Priorities 1-5 and Some ADA

No. Campus Name

Grades

Served Age Site Priority 1 Priority 2

Total Priority

1 a nd 2 P ri or it y 3 P rio rit y 4 P ri or it y 5

Total Facility

Condition

Cost

FCI Related

Facility Cost

Total

Replacement

Cost FCI

Functional

Equity

Educational

Adequacy

Elementary Schools

142 Allan Element ary Schoo l PK-5 1957 19.5 1,254,683$ 1,688,882$ 2,943,565$ 6,645,881$ 558,919$ 1,074,557$ 11,222,922$ 10,148,366$ 33,497,560$ 30.3% 1,030,588$ 1,511,428$

101 Allison Element ary School PK-6 1955 10.7 173,617$ 1,354,132$ 1,527,749$ 2,450,503$ 210,014$ 10,288$ 4,198,553$ 4,188,265$ 20,556,998$ 20.4% -$ 907,125$

102 Andrews Elem entar y S cho ol PK-5 1962 7.7 573,941$ 2,633,109$ 3,207,050$ 3,502,631$ 190,659$ 1,517,264$ 8,417,604$ 6,737,774$ 21,020,456$ 32.1% 1,453,514$ 1,030,292$

187 Baldwin Elementary School PK-5 2010 0.0 -$ -$ -$ -$ -$ -$ -$ -$ -$ 0.0% -$ -$

182 Bara noff Elem enta ry S chool K-5 1999 15.6 197,873$ 531,250$ 729,123$ 1,814,399$ 277,997$ 121,554$ 2,943,072$ 2,821,518$ 25,651,479$ 11.0% -$ 1,069,123$

149 B arr ingt on Elem enta ry S chool PK-6 1969 12.1 329,948$ 476,461$ 806,409$ 5,220,479$ 311,342$ 2,708,483$ 9,046,714$ 6,338,231$ 29,888,351$ 21.2% 2,688,134$ 1,146,187$

1 03 B ar to n H il ls E le me nt ar y S ch oo l K -6 1 964 9 .9 1 ,0 22 ,2 69$ 236,671$ 1,258,939$ 2,637,192$ 447,186$ 2,391$ 4,345,708$ 4,343,317$ 14,588,847$ 29.8% -$ 439,914$

104 B k El t S h l PK 5 1936 3 7 1 114 902$ 2 117 554$ 3 232 456$ 3 621 985$ 252 949$ 118 363$ 7 225 752$ 7 107 389$ 18 663 896$ 38 1% $ 977 746$

EXHIBIT "B"

Page 200: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 200/317

104 Becker Element ary School PK-5 1936 3.7 1,114,902$ 2,117,554$ 3,232,456$ 3,621,985$ 252,949$ 118,363$ 7,225,752$ 7,107,389$ 18,663,896$ 38.1% -$ 977,746$

105 B lackshear Element ar y S cho ol PK-5 1937 5.3 188,148$ 2,178,265$ 2,366,412$ 4,202,512$ 796,536$ 58,019$ 7,423,480$ 7,365,461$ 21,038,900$ 35.0% -$ 705,474$

106 Blanton Elementary School PK-5 1964 8.0 642,778$ 1,082,233$ 1,725,011$ 2,850,419$ 230,709$ 59,146$ 4,865,285$ 4,806,139$ 24,561,843$ 19.6% -$ 1,313,917$

185 Blazier Elementa ry School PK-5 2008 15.4 136,781$ 177,879$ 314,660$ 897,555$ 205,711$ -$ 1,417,926$ 1,417,926$ 27,857,817$ 5.1% -$ 978,883$

170 Boone Elementary School PK-5 1986 12.5 489,966$ 135,370$ 625,336$ 2,854,265$ 348,141$ 318,391$ 4,146,133$ 3,827,742$ 21,920,602$ 17.5% -$ 991,368$

107 B rent woo d Elem entar y S chool PK-5 1951 16.7 286,613$ 693,809$ 980,422$ 3,381,304$ 190,212$ 1,625,875$ 6,177,813$ 4,551,938$ 19,622,049$ 23.2% 1,622,094$ 973,002$

108 Brooke Elementary School PK-5 1954 5.9 466,533$ 728,683$ 1,195,217$ 2,708,300$ 262,136$ 37,886$ 4,203,538$ 4,165,652$ 16,699,995$ 24.9% -$ 888,465$

109 Brown Elementa ry School PK-6 1957 10.1 1,580,199$ 1,153,153$ 2,733,352$ 1,909,309$ 635,293$ 2,665,997$ 7,943,951$ 5,277,954$ 18,761,168$ 28.1% 2,663,484$ 801,611$

1 10 B ry ke r W oo ds E le me nt ar y S ch oo l K -6 1 939 6 .3 1 89 ,4 11$ 1,119,527$ 1,308,938$ 2,979,081$ 348,606$ 44,654$ 4,681,279$ 4,636,625$ 13,901,689$ 33.4% -$ 863,756$

111 Cam pbell Elem entar y S chool PK-5 1992 9.7 311,592$ 379,698$ 691,291$ 3,030,703$ 197,160$ 377,355$ 4,296,509$ 3,919,154$ 18,838,511$ 20.8% -$ 766,024$

173 Casey Elementary School PK-5 1998 17.9 332,832$ 218,621$ 551,453$ 1,280,715$ 2,281,070$ 78,748$ 4,191,986$ 4,113,238$ 24,702,547$ 16.7% -$ 930,563$

112 Casis Elementary School PK-5 1951 14.2 280,022$ 632,024$ 912,046$ 3,096,268$ 731,873$ 60,579$ 4,800,767$ 4,740,187$ 27,288,458$ 17.4% -$ 1,460,287$

184 Clayton Elementary School K-5 2006 16.8 136,427$ 382,446$ 518,872$ 1,142,866$ 215,392$ -$ 1,877,130$ 1,877,130$ 31,551,211$ 5.9% -$ 1,404,862$

161 Cook Elementary School K-5 1974 12.7 847,723$ 3,046,998$ 3,894,721$ 2,836,484$ 275,616$ 3,529,726$ 10,536,548$ 7,006,822$ 25,515,832$ 27.5% 3,472,684$ 1,093,546$

183 Cowan Elementary School PK-5 1999 22.5 441,004$ 282,482$ 723,486$ 1,163,772$ 269,668$ 287,289$ 2,444,215$ 2,156,926$ 23,634,032$ 9.1% -$ 1,007,303$

113 C unningham Elem ent ar y S cho ol PK-5 1963 8.8 174,656$ 203,988$ 378,644$ 8,662,602$ 475,256$ 3,523,663$ 13,040,166$ 9,488,259$ 27,695,695$ 34.3% 3,471,761$ 1,336,362$

179 Davis Elementary School PK-5 1993 13.2 375,946$ 245,779$ 621,725$ 4,466,364$ 242,164$ 172,691$ 5,502,944$ 5,330,253$ 22,832,945$ 23.3% -$ 1,062,050$

114 Dawson Elementary School PK-5 1954 8.7 825,023$ 1,788,448$ 2,613,471$ 2,164,807$ 124,053$ 1,374,936$ 6,277,266$ 4,902,331$ 18,054,973$ 27.2% 1,332,942$ 812,429$

154 Doss Elementary School PK-5 1970 9.7 277,493$ 1,753,192$ 2,030,684$ 3,366,419$ 262,383$ 585,467$ 6,244,954$ 5,659,486$ 21,571,372$ 26.2% 548,668$ 867,630$

176 Ga lindo Elementa ry School PK-5 1989 10.8 718,525$ 472,173$ 1,190,697$ 1,724,238$ 237,955$ 162,944$ 3,315,834$ 3,152,890$ 27,712,949$ 11.4% -$ 1,255,082$

116 Govalle Elementary School PK-5 1940 8.4 340,133$ 1,139,527$ 1,479,660$ 4,269,803$ 1,386,730$ 3,711,107$ 10,847,299$ 7,136,192$ 23,095,017$ 30.9% 3,614,398$ 935,305$

159 Graham Elementary School PK-5 1972 9.9 776,380$ 3,942,191$ 4,718,571$ 2,175,356$ 462,863$ 145,540$ 7,502,330$ 7,356,790$ 24,196,550$ 30.4% -$ 874,097$

117 Gullett Elementary School K-5 1956 17.9 296,279$ 477,899$ 774,178$ 3,404,040$ 278,491$ 5,578,522$ 10,035,231$ 4,456,709$ 15,275,706$ 29.2% 5,538,153$ 1,100,391$

118 Harris Elementary School PK-5 1955 7.3 168,662$ 462,786$ 631,447$ 3,593,988$ 351,166$ 26,321$ 4,602,922$ 4,576,600$ 21,247,129$ 21.5% -$ 1,301,321$

163 Hart Elementary School PK-5 1998 15.7 440,103$ 429,303$ 869,405$ 1,705,738$ 330,538$ 150,402$ 3,056,083$ 2,905,681$ 28,219,837$ 10.3% -$ 1,071,119$

1 19 H i gh la nd P ar k El em en ta ry S ch oo l K -5 1 952 6 .3 3 78 ,5 90$ 549,487$ 928,077$ 5,117,848$ 220,844$ 2,357,371$ 8,624,139$ 6,266,769$ 20,158,386$ 31.1% 2,314,969$ 1,112,435$

155 Hill Elementary School PK-5 1970 8.9 369,298$ 762,743$ 1,132,041$ 4,753,883$ 395,173$ 2,849,188$ 9,130,285$ 6,281,096$ 23,453,170$ 26.8% 2,816,276$ 921,105$

162 Houst on El ementa ry School PK-5 1976 13.8 347,984$ 5,056,005$ 5,403,989$ 4,782,952$ 313,940$ 513,050$ 11,013,932$ 10,500,882$ 28,771,349$ 36.5% 452,838$ 1,698,239$

178 Jordan Elementary School PK-5 1992 11.5 344,244$ 526,308$ 870,552$ 4,497,788$ 305,917$ 366,415$ 6,040,673$ 5,674,257$ 25,804,974$ 22.0% -$ 1,294,151$

120 Joslin Elementary School PK-5 1954 5.1 365,427$ 1,658,814$ 2,024,241$ 3,828,081$ 489,316$ 1,761,730$ 8,103,367$ 6,341,638$ 15,618,987$ 40.6% 1,726,417$ 905,386$

180 Kiker Elementary School K-5 1992 12.4 465,453$ 285,692$ 751,145$ 3,481,469$ 231,480$ 270,058$ 4,734,153$ 4,464,095$ 27,275,667$ 16.4% -$ 945,244$

172 Kocurek Element ary Schoo l PK-5 1986 12.3 276,757$ 739,213$ 1,015,969$ 4,710,718$ 337,850$ 84,409$ 6,148,946$ 6,064,538$ 23,816,680$ 25.5% -$ 1,239,761$

168 La ngfor d Elem entar y S cho ol PK-5 1980 10.7 543,183$ 5,823,122$ 6,366,305$ 2,847,265$ 293,128$ 600,073$ 10,106,772$ 9,506,698$ 28,303,131$ 33.6% -$ 1,519,228$

121 Lee Elementary School K-6 1939 4.8 426,784$ 1,565,236$ 1,992,020$ 3,564,212$ 200,247$ 36,675$ 5,793,153$ 5,756,478$ 13,990,931$ 41.1% -$ 1,268,395$

160 Linder Elementary School PK-5 1972 9.1 170,717$ 1,486,942$ 1,657,659$ 3,064,256$ 373,892$ 5,824,800$ 10,920,607$ 5,095,807$ 25,625,896$ 19.9% 5,754,971$ 876,187$

131 Lucy Read Pre-K School PK 1961 9.9 191,332$ 843,430$ 1,034,762$ 1,221,125$ 154,414$ 9,470$ 2,419,771$ 2,410,301$ 21,971,173$ 11.0% -$ 715,064$

1 22 M ap le wo od E le me nt ar y S ch oo l P K- 6 1 951 6 .4 1 ,6 30 ,2 35$ 367,527$ 1,997,762$ 3,955,287$ 119,540$ 2,005,569$ 8,078,158$ 6,072,588$ 16,243,675$ 37.4% 1,958,007$ 648,571$

123 Ma thews Elem enta ry S chool PK-6 1916 2.3 103,898$ 1,407,923$ 1,511,822$ 2,537,969$ 285,980$ 2,282,922$ 6,618,692$ 4,335,770$ 13,897,228$ 31.2% 2,258,699$ 841,669$

165 McBee Elementary School K-5 1999 10.9 237,524$ 319,343$ 556,867$ 1,036,048$ 242,383$ 57,384$ 1,892,682$ 1,835,298$ 23,236,719$ 7.9% -$ 883,087$

 

Page 198

AISD School/Facility FCI Summary Total minus NC

Priorities 1-5 and Some ADA

No. Campus Name

Grades

Served Age Site Priority 1 Priority 2

Total Priority

1 a nd 2 P ri or it y 3 P rio rit y 4 P ri or it y 5

Total Facility

Condition

Cost

FCI Related

Facility Cost

Total

Replacement

Cost FCI

Functional

Equity

Educational

Adequacy

147 M enchaca Element ary S choo l PK-5 1975 19.8 237,446$ 4,313,709$ 4,551,155$ 2,516,965$ 693,652$ 82,611$ 7,844,383$ 7,761,772$ 21,040,089$ 36.9% -$ 1,093,862$

124 Metz Elementary School PK-5 1993 6.4 245,693$ 2,198,147$ 2,443,840$ 3,224,075$ 239,898$ 213,073$ 6,120,886$ 5,907,813$ 19,328,741$ 30.6% -$ 958,961$

181 Mills Elementary School PK-5 1998 10.7 254,583$ 438,024$ 692,608$ 2,241,637$ 604,743$ 163,005$ 3,701,993$ 3,538,989$ 27,859,900$ 12.7% -$ 1,316,271$

150 No rma n Elem entar y S cho ol PK-5 1970 10.2 491,997$ 1,618,873$ 2,110,870$ 3,488,359$ 249,133$ 1,961,658$ 7,810,019$ 5,819,127$ 17,864,592$ 32.6% 1,896,243$ 880,325$

148 O ak Hill Elementa ry School PK-5 1974 13.7 577,910$ 2,562,750$ 3,140,659$ 5,082,614$ 417,412$ 46,822$ 8,687,508$ 8,640,685$ 25,741,908$ 33.6% -$ 1,650,197$

125 Oak Spr ings Elementa ry School PK-5 1958 8.6 436,196$ 1,544,778$ 1,980,974$ 1,913,526$ 218,887$ 30,328$ 4,143,715$ 4,113,386$ 15,839,115$ 26.0% -$ 712,476$

156 Odom Elementary School PK-5 1970 8.6 314,793$ 555,080$ 869,872$ 3,051,516$ 304,204$ 75,095$ 4,300,687$ 4,225,593$ 22,017,089$ 19.2% -$ 783,022$

126 Ortega Elementary School PK-5 1959 7.4 554,133$ 2,585,580$ 3,139,712$ 2,666,838$ 188,616$ 55,295$ 6,050,462$ 5,995,167$ 14,984,780$ 40.0% -$ 794,706$

189 Ove rto n Elem entar y S cho ol PK-5 2007 70.4 129,148$ 222,703$ 351,852$ 812,642$ 285,677$ -$ 1,450,171$ 1,450,171$ 30,773,624$ 4.7% -$ 1,014,803$

EXHIBIT "B"

Page 201: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 201/317

171 Palm Elementary School PK-5 1987 13.2 326,618$ 355,630$ 682,248$ 1,716,073$ 302,890$ 156,623$ 2,857,834$ 2,701,211$ 24,438,393$ 11.1% -$ 1,129,509$

143 Patton Elementary School PK-5 1986 24.1 553,125$ 1,351,958$ 1,905,083$ 2,641,513$ 172,467$ 309,114$ 5,028,177$ 4,719,062$ 26,010,525$ 18.1% -$ 969,016$

128 Pease Elementary School K-6 1876 2.8 366,438$ 2,838,820$ 3,205,258$ 4,030,819$ 795,232$ 51,831$ 8,083,139$ 8,031,308$ 10,597,089$ 75.8% -$ 743,252$

1 29 P ec an S pr ing s El em en ta ry S ch oo l P K- 5 1 957 7 .6 2 04 ,1 13$ 354,593$ 558,706$ 5,221,971$ 1,542,355$ 90,134$ 7,413,166$ 7,323,032$ 19,694,928$ 37.2% -$ 1,346,708$

190 Perez Elem enta ry S chool PK-5 2006 28.0 1,206,199$ 216,162$ 1,422,361$ 1,028,182$ 150,809$ -$ 2,601,352$ 2,601,352$ 29,028,065$ 9.0% -$ 1,027,736$

164 Pickle Elementary School PK-5 2001 17.5 267,092$ 283,194$ 550,286$ 1,241,301$ 347,992$ 116,853$ 2,256,432$ 2,139,580$ 37,780,539$ 5.7% -$ 1,225,897$

151 Pillow Elementary School PK-5 1969 10.0 223,451$ 347,521$ 570,972$ 7,437,607$ 293,128$ 2,716,120$ 11,017,828$ 8,301,708$ 19,335,286$ 42.9% 2,695,012$ 1,237,573$

1 30 P le as ant H il l E le me nt ar y S ch oo l P K- 5 1 985 1 0. 1 3 38 ,9 74$ 421,776$ 760,750$ 3,408,419$ 101,031$ 473,908$ 4,744,109$ 4,270,200$ 21,837,014$ 19.6% 367,071$ 767,791$

132 Reilly Elementary School PK-5 1954 10.8 397,166$ 785,780$ 1,182,946$ 2,658,687$ 203,051$ 11,517$ 4,056,202$ 4,044,685$ 14,216,116$ 28.5% -$ 623,670$

133 Ridget op Element ary Schoo l PK-5 1939 5.0 165,485$ 1,164,852$ 1,330,337$ 1,527,895$ 899,377$ 22,541$ 3,780,150$ 3,757,609$ 11,956,232$ 31.4% -$ 492,082$

174 R odr iguez Element ary Schoo l PK-5 1999 15.0 229,804$ 335,591$ 565,395$ 1,437,448$ 305,732$ 64,181$ 2,372,756$ 2,308,575$ 28,810,020$ 8.0% -$ 1,238,887$

127 Sanchez Elementary School PK-5 1976 9.2 169,463$ 3,527,025$ 3,696,487$ 2,600,313$ 340,250$ 2,934,744$ 9,571,794$ 6,637,050$ 25,069,329$ 26.5% 2,843,511$ 1,158,542$

139 Sims Elementary School PK-5 1956 8.4 929,492$ 624,530$ 1,554,022$ 4,091,216$ 273,990$ 868,224$ 6,787,451$ 5,919,228$ 15,016,609$ 39.4% 837,082$ 928,787$

136 S t. Elmo Elementary School PK-5 1960 9.4 516,693$ 681,703$ 1,198,396$ 4,849,681$ 238,602$ 1,342,548$ 7,629,227$ 6,286,679$ 15,255,478$ 41.2% 1,326,203$ 1,045,047$

138 Summit t Element ar y S cho ol PK-5 1986 14.5 459,077$ 411,250$ 870,328$ 5,355,622$ 258,428$ 177,876$ 6,662,254$ 6,484,378$ 25,777,010$ 25.2% -$ 1,075,677$

1 58 S uns et V al le y E le me nt ar y S ch oo l P K- 5 1 971 1 0. 4 1 70 ,7 70$ 2,801,633$ 2,972,404$ 5,549,996$ 235,908$ 2,385,867$ 11,144,175$ 8,758,308$ 20,685,803$ 42.3% 2,339,157$ 1,005,839$

1 40 T ra vi s H ei ght s E le me nt ar y S ch oo l P K- 5 1 938 3 .2 9 64 ,4 51$ 2,480,760$ 3,445,212$ 3,035,427$ 505,213$ 1,545,119$ 8,530,971$ 6,985,852$ 19,096,715$ 36.6% 1,471,609$ 991,804$

1 41 W al nu t C re ek E le me nt ar y S ch oo l K -6 1 961 1 1. 5 3 78 ,3 61$ 1,157,572$ 1,535,934$ 2,650,418$ 199,636$ 10,090$ 4,396,078$ 4,385,988$ 28,685,677$ 15.3% -$ 1,064,371$

175 Widen Elementary School PK-5 1986 10.7 344,749$ 519,889$ 864,638$ 2,387,370$ 207,421$ 244,825$ 3,704,253$ 3,459,428$ 26,737,543$ 12.9% -$ 1,026,980$

166 William s Elem ent ar y S cho ol PK-5 1976 14.0 207,027$ 3,996,735$ 4,203,762$ 3,314,316$ 634,239$ 2,107,462$ 10,259,778$ 8,123,194$ 22,031,262$ 36.9% 2,037,080$ 1,806,830$

157 Winn Elementary School PK-5 1970 10.0 449,115$ 758,666$ 1,207,781$ 2,895,852$ 360,778$ 6,696,886$ 11,161,297$ 4,464,411$ 19,839,796$ 22.5% 6,617,626$ 1,369,856$

152 W ooldr idge Elementa ry School K-5 1969 11.6 681,037$ 1,779,983$ 2,461,020$ 3,258,538$ 345,503$ 3,072$ 6,068,132$ 6,065,060$ 26,329,413$ 23.0% -$ 961,821$

144 Woot en El ementa ry School PK-5 1955 6.7 1,154,161$ 3,089,669$ 4,243,830$ 6,189,133$ 541,732$ 1,429,495$ 12,404,189$ 10,974,694$ 21,453,872$ 51.2% 1,380,857$ 1,403,037$

145 Zavala Elementary School PK-6 1937 3.4 874,332$ 410,359$ 1,284,691$ 5,062,642$ 414,056$ 19,700$ 6,781,088$ 6,761,389$ 20,624,524$ 32.8% -$ 1,032,634$

146 Zilker Elementary School PK-6 1950 11.8 895,527$ 1,978,488$ 2,874,015$ 6,699,936$ 776,182$ 2,565,129$ 12,915,262$ 10,350,133$ 18,351,848$ 56.4% 2,409,599$ 1,023,970$

 

Page 199

AISD School/Facility FCI Summary Total minus NC

Priorities 1-5 and Some ADA

No. Campus Name

Grades

Se rve d Age Site Prior ity 1 Prior ity 2

Total Priority

1 a nd 2 P ri ori ty 3 P ri ori ty 4 P ri or ity 5

Total Facility

Condition Cost

FCI Related

Facility Cost

Total

Replacement

Cost FCI

Functional

Equity

Educational

Adequacy

Middle Schools

059 Bailey Middle School 6-8 1993 41.3 718,590$ 2,307,324$ 3,025,915$ 4,249,984$ 1,260,797$ 175,348$ 8,712,044$ 8,538,264$ 52,022,435$ 16.4% -$ 2,483,427$

054 Bedichek Middle School 6-8 1972 23.3 6,051,876$ 3,947,712$ 9,999,588$ 4,289,394$ 1,517,014$ 13,820,241$ 29,626,237$ 15,805,996$ 51,604,343$ 30.6% 13,761,948$ 2,467,186$

046 Burnet Middle School 6-8 1961 23.7 696,528$ 7,228,821$ 7,925,349$ 8,242,121$ 1,461,392$ 1,228,083$ 18,856,946$ 17,628,862$ 51,140,088$ 34.5% 1,167,871$ 2,786,054$

057 Covington Middle School 6-8 1986 21.3 961,398$ 3,791,641$ 4,753,039$ 5,457,787$ 679,240$ 1,960,490$ 12,850,556$ 10,890,066$ 58,357,322$ 18.7% 1,633,542$ 2,218,938$

055 Dobie Middle School 6-8 1973 20.2 819,317$ 1,032,156$ 1,851,474$ 3,993,260$ 1,153,996$ 6,327,599$ 13,326,328$ 6,998,729$ 46,067,662$ 15.2% 6,294,500$ 2,605,739$

043 Fulmore Middle School 6-8 1911 9.8 1,675,047$ 7,905,746$ 9,580,793$ 11,125,201$ 1,520,831$ 353,775$ 22,580,600$ 22,226,825$ 54,800,107$ 40.6% -$ 1,873,471$

056 Garcia Middle School 6-8 2008 41.3 341,779$ 375,320$ 717,098$ 1,477,213$ 256,690$ -$ 2,451,001$ 2,451,001$ 52,634,348$ 4.7% -$ 1,785,189$

062 Gorzycki Middle School 6-8 2009 14.2 309,464$ 330,542$ 640,006$ 1,551,469$ 435,269$ -$ 2,626,743$ 2,626,743$ 57,473,012$ 4.6% -$ 1,948,774$

044 Kealing Middle School 6-8 1986 13.2 375,942$ 4,974,961$ 5,350,903$ 5,384,570$ 962,232$ 464,321$ 12,162,026$ 11,697,705$ 62,920,315$ 18.6% -$ 2,797,674$

045 Lamar Middle School 6-8 1955 14.3 868,115$ 2,862,857$ 3,730,973$ 3,240,381$ 1,109,337$ 19,344$ 8,100,034$ 7,963,458$ 41,245,693$ 19.3% -$ 2,294,389$

051 Martin Middle School 6-8 1966 9 9 529 628$ 6 008 583$ 6 538 211$ 4 037 673$ 630 629$ 3 297 183$ 14 503 696$ 11 206 513$ 38 873 997$ 28 8% 3 222 769$ 1 488 156$

EXHIBIT "B"

Page 202: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 202/317

051 Martin Middle School 6 8 1966 9.9 529,628$ 6,008,583$ 6,538,211$ 4,037,673$ 630,629$ 3,297,183$ 14,503,696$ 11,206,513$ 38,873,997$ 28.8% 3,222,769$ 1,488,156$

058 Mendez Middle School 6-8 1987 20.7 1,080,210$ 4,069,741$ 5,149,951$ 3,162,498$ 903,869$ 1,830,512$ 11,046,831$ 9,216,319$ 61,291,493$ 15.0% 1,701,214$ 2,294,128$

052 Murchison Middle School 6-8 1967 26.2 485,127$ 1,623,549$ 2,108,676$ 5,951,701$ 1,040,012$ 8,153,256$ 17,253,644$ 9,100,388$ 45,706,537$ 19.9% 7,989,851$ 1,754,965$

047 O. Henry Middle School 6-8 1953 13.8 287,063$ 788,273$ 1,075,336$ 4,249,201$ 368,706$ 3,270,833$ 8,964,076$ 5,693,243$ 42,714,090$ 13.3% 3,236,248$ 1,604,680$

061 Paredes Middle School 6-8 2000 78.2 639,397$ 655,597$ 1,294,994$ 2,788,004$ 1,505,034$ 274,674$ 5,862,705$ 5,588,032$ 50,694,496$ 11.0% -$ 3,031,743$

048 Pearce Middle School 6-8 1958 14.8 797,160$ 1,469,168$ 2,266,328$ 3,870,033$ 437,683$ 797,883$ 7,371,927$ 6,574,044$ 43,914,998$ 15.0% 770,887$ 1,421,448$

028 Ann Richards School 6-10 1958 15.3 1,751,415$ 2,490,074$ 4,241,489$ 10,459,899$ 775,306$ 126,188$ 15,602,883$ 15,476,695$ 45,071,376$ 34.3% -$ 1,975,612$

060 Small Middle School 6-8 1999 36.5 354,444$ 1,045,835$ 1,400,279$ 1,980,661$ 354,205$ 162,029$ 3,897,174$ 3,735,145$ 54,088,993$ 6.9% -$ 1,928,150$

053 Webb Middle School 6-8 1961 15.6 420,533$ 3,515,438$ 3,935,971$ 3,080,033$ 1,413,498$ 733,661$ 9,163,164$ 8,429,502$ 42,628,637$ 19.8% 703,954$ 2,101,392$

High Schools

017 Akins High School 9-12 2000 57.7 954,259$ 1,208,558$ 2,162,817$ 3,966,511$ 1,452,488$ 134,171$ 7,715,986$ 7,581,815$ 115,209,011$ 6.6% -$ 4,294,809$

009 Anderson High School 9-12 1973 38.8 883,879$ 7,269,324$ 8,153,203$ 9,335,056$ 1,959,665$ 8,421,936$ 27,869,861$ 27,743,960$ 100,442,692$ 27.6% 8,296,036$ 5,596,292$

002 Austin High School 9-12 1975 44.3 1,821,769$ 8,599,187$ 10,420,955$ 17,067,949$ 4,155,102$ 8,187,414$ 39,831,421$ 31,644,007$ 101,704,101$ 31.1% 8,019,994$ 4,786,572$

013 Bowie High School 9-12 1988 66.0 1,142,743$ 13,619,484$ 14,762,227$ 14,517,730$ 15,147,412$ 884,595$ 45,311,964$ 44,427,369$ 141,414,289$ 31.4% -$ 16,682,721$

008 Crockett High School 9-12 1969 39.5 1,822,148$ 10,610,065$ 12,432,213$ 19,394,213$ 3,011,592$ 186,183$ 35,024,201$ 34,838,018$ 111,743,044$ 31.2% -$ 3,899,330$

0 19 E as ts id e M em or ia l H ig h S ch oo ls ( EM HS JC ) 9 -1 2 1 96 0 2 7. 6 3 ,5 10 ,9 42$ 12,123,425$ 15,634,366$ 7,266,111$ 650,888$ 213,544$ 23,764,910$ 23,551,366$ 87,276,402$ 27.0% -$ 2,370,779$

015 Garza Inde pe ndence High Scho ol 11-12 1939 3.1 528,781$ 925,712$ 1,454,494$ 1,791,072$ 516,483$ 198,632$ 3,960,682$ 3,762,050$ 17,523,392$ 21.5% -$ 1,160,890$

029 International High School 9-10 -$ -$ -$ -$ -$ -$ -$ -$ -$ 0.0% -$ -$

014 Johnson (LBJ) High School 9-12 1974 41.4 1,082,734$ 3,932,853$ 5,015,587$ 7,240,361$ 1,922,200$ 96,326$ 14,274,474$ 14,178,148$ 98,621,982$ 14.4% -$ 3,610,445$

004 Lanier High School 9-12 1966 28.5 1,328,937$ 4,526,958$ 5,855,895$ 12,659,556$ 1,639,563$ 176,389$ 20,331,402$ 20,155,013$ 91,315,888$ 22.1% -$ 3,798,556$

018 LASA 9-12 -$ -$ -$ -$ -$ -$ -$ -$ -$ 0.0% -$ -$

005 McCallum High School 9-12 1953 31.1 1,149,580$ 3,763,557$ 4,913,137$ 10,864,608$ 1,362,340$ 2,583,395$ 19,723,479$ 17,140,084$ 83,866,651$ 20.4% 2,352,452$ 3,347,251$

006 Reagan High School 9-12 1965 31.8 1,208,310$ 865,508$ 2,073,817$ 12,941,528$ 3,120,501$ 348,003$ 18,483,850$ 18,135,847$ 81,643,031$ 22.2% -$ 5,067,540$

007 Travis High School 9-12 1953 34.8 1,049,482$ 1,617,099$ 2,666,581$ 24,320,432$ 1,903,928$ 870,745$ 29,761,687$ 28,890,942$ 95,250,042$ 30.3% 685,951$ 3,901,369$

Other Facilities

852 Clifton Center Alt. Ed. 1977 7.8 255,304$ 1,789,699$ 2,045,003$ 2,557,341$ 752,437$ 36,615$ 5,391,397$ 5,354,782$ 13,110,071$ 40.8% -$ 1,163,512$

012 Ridgeview ALC 6-12 1953 1 9.8 594,690$ 1,052,657$ 1,647,347$ 7,759,365$ 1,468,980$ 32,018$ 10,907,709$ 10,875,692$ 31,629,925$ 34.4% -$ 843,199$

251 Rosedale School Alt. Ed. 1939 4.9 492,433$ 462,750$ 955,183$ 3,490,585$ 251,739$ 68,255$ 4,765,762$ 4,697,506$ 14,472,614$ 32.5% -$ 777,226$

252 Baker Center 1911 4.8 282,216$ 1,676,261$ 1,958,477$ 1,224,224$ -$ 202,910$ 3,385,610$ 3,182,700$ 18,483,157$ 17.2% -$ -$

951 Burger Athletic Complex 1977 48.1 1,189,463$ 7,099,714$ 8,289,176$ 3,529,618$ 35,546$ 42,012$ 11,896,352$ 11,854,340$ 50,681,646$ 23.4% -$ -$

941 Carruth Administration Center 1991 2.8 180,247$ 903,444$ 1,083,691$ 5,448,615$ 269,285$ -$ 6,801,590$ 6,801,590$ 37,598,528$ 18.1% -$ -$

922 Central Warehouse 1983 18.7 268,665$ 404,270$ 672,935$ 725,905$ -$ 11,195$ 1,410,034$ 1,398,840$ 27,023,496$ 5.2% -$ -$

949 Delco Activity Center 2003 44.1 259,623$ 205,193$ 464,817$ 170,579$ 10,355$ -$ 645,750$ 645,750$ 16,919,044$ 3.8% -$ -$

948 House Park 1936 11.1 137,227$ 70,034$ 207,260$ 730,632$ -$ 157,489$ 1,095,381$ 915,722$ 8,999,133$ 10.2% -$ -$

281 Nelson Field 1963 20.1 422,773$ -$ 422,773$ 1,663,288$ -$ 91,966$ 2,178,027$ 2,086,061$ 16,557,338$ 12.6% -$ -$

959 Nelson Field Bus Terminal 1995 6.6 70,197$ 81,921$ 152,119$ 58,564$ 61,039$ 24,167$ 295,889$ 271,722$ 4,105,030$ 6.6% -$ -$

950 Noack Sports Complex 2004 11.2 126,224$ -$ 126,224$ -$ -$ -$ 126,224$ 126,224$ 906,929$ 13.9% -$ -$

942 Pleasant Hill Annex 1936 2.0 270,019$ 180,761$ 450,779$ 2,381,648$ 94,588$ -$ 2,927,015$ 2,927,015$ 7,228,209$ 40.5% -$ -$

960 Saegert Transportation 1975 10.6 128,439$ 185,122$ 313,561$ 1,456,374$ 172,306$ 28,659$ 1,970,900$ 1,942,241$ 7,983,889$ 24.3% -$ -$

962 Se rvice Ce nter - Building & Grounds 1991 16.7 170,528$ 209,015$ 379,543$ 1,102,379$ 44,245$ 135,726$ 1,661,892$ 1,526,167$ 15,239,037$ 10.0% -$ 15,999$

Total 77,451,146$ 242,076,008$ 319,527,153$ 0 522,702,751$ 88,789,541$ 144,246,781$ 1,075,266,227$ 0 938,928,480$ 4,112,139,818$ 22.8% 130,776,864$ 184,824,729$

 

Page 200

 

A list of the FCIs for all AISD campuses and their replacement cost is shown in the following table.

S S / i i C S

EXHIBIT "B"

Page 203: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 203/317

AISD School/Facility FCI Summary

No. Campus Name Total Area

Total Facility

Condition Cost

FCI Related

Facility Cost

Total Replacement

Cost FCI

Pre-K 

131 Lucy Read Pre-K School 73,860  2,355,781$ 2,346,311$ 21,971,173$ 10.7%

Elementary Schools

101 Allison Elementary School 69,106  4,089,675$ 4,079,387$ 20,556,998$ 19.8%

102 Andrews Elementary School 69,128  7,599,425$ 6,064,356$ 20,563,542$ 29.5%

103 Barton Hills Elementary School 49,043  4,894,150$ 4,879,804$ 14,588,847$ 33.4%

104 Becker Elementary School 62,742  7,036,234$ 6,917,872$ 18,663,896$ 37.1%

105 Blackshear Elementary School 70,726  7,349,617$ 7,291,599$ 21,038,900$ 34.7%

106 Blanton Elementary School 81,033  5,068,277$ 5,009,131$ 24,104,928$ 20.8%

107 Brentwood Elementary School 65,963  5,994,554$ 4,551,938$ 19,622,049$ 23.2%

108 Brooke Elementary School 56,140  5,477,387$ 5,439,501$ 16,699,995$ 32.6%

109 Brown Elementary School 58,523  8,933,788$ 6,267,791$ 17,408,867$ 36.0%

110 Bryker Woods Elementary School 45,197  4,636,795$ 4,592,141$ 13,444,775$ 34.2%

111 Campbell Elementary School 63,329  4,294,266$ 3,916,911$ 18,838,511$ 20.8%

112 Casis Elementary School 91,735  4,800,432$ 4,739,853$ 27,288,458$ 17.4%

113 Cunningham Elementary School 77,744  12,674,635$ 9,122,729$ 23,126,547$ 39.4%

114 Dawson Elementary School 60,695  6,110,749$ 4,870,418$ 18,054,973$ 27.0%

116 Govalle Elementary School 77,638  11,910,197$ 8,328,341$ 23,095,017$ 36.1%

117 Gullett Elementary School 51,352  8,464,128$ 4,645,259$ 15,275,706$ 30.4%

118 Harris Elementary School 66,818  4,751,949$ 4,725,627$ 19,876,385$ 23.8%

119 Highland Park Elementary School 67,766  10,584,925$ 8,342,957$ 20,158,386$ 41.4%

120 Joslin Elementary School 52,506  8,466,116$ 6,889,953$ 15,618,987$ 44.1%

121 Lee Elementary School 47,033  5,737,368$ 5,700,693$ 13,990,931$ 40.7%

122 Maplewood Elementary School 54,606  7,376,745$ 5,936,739$ 16,243,675$ 36.5%

123 Mathews Elementary School 45,182  6,508,124$ 4,275,795$ 13,440,313$ 31.8%

124 Metz Elementary School 64,977  5,914,131$ 5,701,058$ 19,328,741$ 29.5%

AUSTIN INDEPENDENT SCHOOL DISTRICT

District-Wide Facility Master Plan

EXHIBIT "B"

Page 204: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 204/317

Appendix B Facility Capacity Charts and

Population Updates 

 

Page 202

LOC Elementary

Permanent

Capacity

2010

Enrollment

% of Perm.

Capacity

by Enroll.

2009-10

Population

% of Perm.

Capacity

by Pop.

Classroom

Count

Special

Rooms

(ES Only)

Average

Students

per 

Classroom

Efficiency

Factor 

Classroom

Capacity

Café Area

(SF)

4.77 SF per 

student

Capacity

based on

Café Size

Café /

Classroom

Gym Area

(SF)

3.41 SF per 

student

Capacity

based on

Gym Size

Gym /

Classroom

Library

Area (SF)

3.98 SF per 

student

Capacity

based on

Library Size

Library /

Classroom

142 Allan 673 379 56% 357 53% 42 6 22 85% 673 5,483 4.77 1 ,1 49 1 71 % 6,160 3.41 1 ,8 06 2 68 % 6,704 3.98 1 ,6 85 2 50 %

101 Allison 486 543 112% 536 110% 30 4 22 85% 486 3,513 4.77 736 151% 2,972 3.41 871 179% 3,636 3.98 914 188%

102 Andrews 486 717 147% 604 124% 31 5 22 85% 486 3,361 4.77 705 145% 3,192 3.41 936 192% 2,217 3.98 557 115%

187 Baldwin 669 508 76% 488 73% 38 6 22 95% 669 4,507 4.77 945 141% 3,183 3.41 933 140% 3,598 3.98 904 135%

182 Baranoff 794 876 110% 881 111% 44 6 22 95% 794 3,845 4.77 806 102% 2,878 3.41 844 106% 2,850 3.98 716 90%

149 Barrington 556 996 179% 909 163% 41 6 22 85% 655 2,574 4.77 540 82% 2,558 3.41 750 115% 2,642 3.98 664 101%

103 Barton Hills 251 386 154% 184 73% 14 2 22 95% 251 2,707 4.77 567 226% 2,329 3.41 683 272% 2,834 3.98 712 284%

104 Becker 524 208 40% 214 4 1% 33 5 22 85% 524 3,337 4.77 700 134% 3,403 3.41 998 191% 2,116 3.98 532 102%

105 Blackshear 598 244 41% 255 43% 37 5 22 85% 598 3,117 4.77 653 109% 3,054 3.41 896 150% 2,246 3.98 564 94%

106 Blanton 636 591 93% 667 105% 40 6 22 85% 636 3,052 4.77 640 101% 2,531 3.41 742 117% 2,723 3.98 684 108%

185 Blazier 598 775 130% 827 138% 38 6 22 85% 598 5,258 4.77 1,102 184% 3,203 3.41 939 157% 3,480 3.98 874 146%

170 Boone 752 501 67% 496 6 6% 42 6 22 95% 752 4,052 4.77 850 113% 2,887 3.41 847 113% 3,384 3.98 850 113%

107 Brentwood 585 495 85% 419 72% 33 5 22 95% 585 2,468 4.77 517 88% 2,447 3.41 718 123% 3,078 3.98 773 132%

Classroom Capacity

Cafeteria = 4,200 SF / 880 Students

4.77 SF per Student

Gym = 3,000 SF / 880 Students

3.41 SF per Student

Library = 3,500 SF / 880 Students

3.98 SF per Student

EXHIBIT "B"

Page 205: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 205/317

108 Brooke 430 439 102% 449 104% 27 4 22 85% 430 2,363 4.77 495 115% 2,328 3.41 683 159% 2,743 3.98 689 160%

109 Brown 468 519 111% 480 103% 29 4 22 85% 468 3,944 4.77 827 177% 2,426 3.41 712 152% 3,139 3.98 789 169%

110 Bryker Woods 272 404 149% 283 104% 16 3 22 95% 272 2,296 4.77 481 177% 2,987 3.41 876 322% 2,307 3.98 580 213%

111 Campbell 524 360 69% 377 72% 33 5 22 85% 524 4,129 4.77 866 165% 3,030 3.41 889 170% 2,777 3.98 698 133%

173 Casey 711 669 94% 652 9 2% 44 6 22 85% 711 4,425 4.77 928 131% 3,055 3.41 896 126% 2,757 3.98 693 97%

112 Casis 669 825 123% 729 109% 38 6 22 95% 669 3,962 4.77 831 124% 2,588 3.41 759 113% 3,736 3.98 939 140%

184 Clayton 836 867 104% 734 88% 47 7 22 95% 836 4,282 4.77 898 107% 3,025 3.41 887 106% 3,576 3.98 898 107%

161 Cook 561 901 161% 1,173 209% 35 5 22 85% 561 3,242 4.77 680 121% 2,365 3.41 694 124% 3,375 3.98 848 151%

183 Cowan 669 783 117% 678 101% 37 5 22 95% 669 4,060 4.77 851 127% 2,985 3.41 875 131% 2,968 3.98 746 111%

113 Cunningham 627 512 82% 632 101% 35 5 22 95% 627 3,363 4.77 705 112% 2,518 3.41 738 118% 3,091 3.98 777 124%

179 Davis 731 683 93% 675 92% 41 6 22 95% 731 3,995 4.77 837 114% 3,047 3.41 894 122% 2,848 3.98 716 98%

114 Dawson 505 331 6 6% 279 55% 32 5 22 85% 505 2,470 4.77 518 103% 2,338 3.41 686 136% 2,121 3.98 533 106%

154 Doss 543 768 141% 679 125% 30 4 22 95% 543 4,623 4.77 969 178% 3,027 3.41 888 163% 2,925 3.98 735 135%

176 Galindo 711 704 99% 715 101% 44 6 22 85% 711 4,287 4.77 899 126% 3,041 3.41 892 125% 3,545 3.98 891 125%

116 Govalle 598 415 69% 450 75% 37 5 22 85% 598 3,570 4.77 749 125% 2,301 3.41 675 113% 2,225 3.98 559 93%

159 Graham 598 761 127% 759 127% 38 6 22 85% 598 4,280 4.77 897 150% 3,217 3.41 943 158% 3,068 3.98 771 129%

117 Gullett 418 541 129% 340 81% 24 4 22 95% 418 2,195 4.77 460 110% 2,401 3.41 704 168% 2,434 3.98 612 146%

118 Harris 542 758 140% 793 146% 34 5 22 85% 542 3,408 4.77 714 132% 2,267 3.41 665 123% 2,594 3.98 652 120%

163 Hart 711 898 126% 865 122% 44 6 22 85% 711 3,667 4.77 769 108% 3,040 3.41 892 125% 2,848 3.98 716 101%

119 Highland Park 585 662 113% 567 97% 33 5 22 95% 585 2,469 4.77 518 88% 2,514 3.41 737 126% 1,951 3.98 490 84%

155 Hill 627 732 117% 677 108% 35 5 22 95% 627 2,723 4.77 571 91% 2,456 3.41 720 115% 3,357 3.98 844 135%

162 Houston 692 915 132% 911 132% 43 6 22 85% 692 4,951 4.77 1 ,0 38 1 50 % 3,483 3.41 1 ,0 21 1 48 % 3,645 3.98 916 132%

178 Jordan 655 833 127% 672 103% 41 6 22 85% 655 4,159 4.77 872 133% 2,997 3.41 879 134% 2,807 3.98 705 108%

120 Joslin 374 363 97% 314 84% 24 4 22 85% 374 3,595 4.77 754 202% 2,375 3.41 696 186% 2,080 3.98 523 140%

180 Kiker 752 933 124% 866 115% 42 6 22 95% 752 3,779 4.77 792 105% 3,211 3.41 942 125% 2,782 3.98 699 93%

172 Kocurek 673 660 98% 676 100% 42 6 22 85% 673 4,292 4.77 900 134% 2,962 3.41 869 129% 3,561 3.98 895 133%168 Langford 692 834 121% 914 132% 43 6 22 85% 692 2,881 4.77 604 87% 2,579 3.41 756 109% 2,519 3.98 633 91%

121 Lee 418 428 102% 293 70% 24 4 22 95% 418 2,059 4.77 432 103% 2,238 3.41 656 157% 2,647 3.98 665 159%

160 Linder 542 892 164% 906 167% 34 5 22 85% 542 2,738 4.77 574 106% 2,507 3.41 735 136% 2,322 3.98 584 108%

122 Maplewood 355 406 114% 302 85% 20 3 22 95% 355 2,470 4.77 518 146% 2,447 3.41 718 202% 1,941 3.98 488 137%

123 Mathews 397 405 102% 299 75% 23 4 22 95% 397 1,906 4.77 400 101% 2,377 3.41 697 176% 2,278 3.98 572 144%

165 McBee 580 765 132% 1,026 177% 36 5 22 85% 580 5,127 4.77 1 ,0 75 1 85 % 3,045 3.41 893 154% 2,852 3.98 717 124%

147 Menchaca 606 686 113% 702 116% 34 5 22 95% 606 3,572 4.77 749 124% 2,501 3.41 734 121% 2,442 3.98 614 101%

124 Metz 542 498 92% 481 89% 34 5 22 85% 542 4,045 4.77 848 156% 3,013 3.41 884 163% 2,816 3.98 708 130%

181 Mills 794 928 117% 860 108% 44 6 22 95% 794 3,759 4.77 788 99% 3,052 3.41 895 113% 2,747 3.98 690 87%

150 Norman 486 333 6 8% 380 78% 30 4 22 85% 486 2,876 4.77 603 124% 2,259 3.41 662 136% 2,647 3.98 665 137%

148 Oak Hill 773 772 100% 783 101% 43 6 22 95% 773 4,567 4.77 957 124% 3,393 3.41 995 129% 3,330 3.98 837 108%

125 Oak Springs 411 274 67% 336 82% 26 4 22 85% 411 2,086 4.77 437 106% 2,985 3.41 875 213% 2,130 3.98 535 130%

156 Odom 542 658 121% 740 136% 34 5 22 85% 542 2,643 4.77 554 102% 2,421 3.41 710 131% 2,877 3.98 723 133%

126 Ortega 374 296 79% 263 70% 24 4 22 85% 374 2,734 4.77 573 153% 2,323 3.41 681 182% 1,468 3.98 369 99%

189 Overton 617 668 108% 904 146% 39 6 22 85% 617 4,148 4.77 870 141% 7,853 3.41 2 ,3 03 3 73 % 3,560 3.98 894 145%

171 Palm 673 606 90% 687 102% 42 6 22 85% 673 4,189 4.77 878 130% 3,075 3.41 902 134% 3,757 3.98 944 140%

143 Patton 773 914 118% 894 116% 43 6 22 95% 773 4,849 4.77 1 ,0 17 1 31 % 3,067 3.41 899 116% 3,542 3.98 890 115%

128 Pease 293 256 87% 0 0% 17 3 22 95% 293 1,307 4.77 274 94% 2,995 3.41 878 300% 1,468 3.98 369 126%

129 Pecan Springs 486 532 109% 520 107% 30 4 22 85% 486 3,220 4.77 675 139% 2,412 3.41 707 146% 2,986 3.98 750 154%

190 Perez 598 886 148% 864 144% 37 5 22 85% 598 4,158 4.77 872 146% 3,295 3.41 966 161% 3,467 3.98 871 146%

164 Pickle 617 740 120% 618 100% 39 6 22 85% 617 4,363 4.77 915 148% 9,153 3.41 2 ,6 84 4 35 % 2,882 3.98 724 117%

151 Pillow 522 653 125% 617 118% 29 4 22 95% 522 2,761 4.77 579 111% 3,069 3.41 900 172% 2,282 3.98 573 110%

130 Pleasant Hill 524 619 118% 662 126% 33 5 22 85% 524 3,991 4.77 837 160% 3,022 3.41 886 169% 3,546 3.98 891 170%131 Read Pre-K 393 509 129% 0 0% 23 - 18 95% 393 2,982 4.77 625 159% NA 3.41 NA NA 2,148 3.98 540 137%

132 Reilly 318 296 93% 342 108% 20 3 22 85% 318 2,287 4.77 479 151% 2,398 3.41 703 221% 1,637 3.98 411 129%

133 Ridgetop 206 219 106% 123 60% 13 2 22 85% 206 2,309 4.77 484 235% 2,336 3.41 685 333% 1,762 3.98 443 215%

 

Page 203

174 Rodriguez 711 910 1 28% 1,044 1 47% 44 6 22 85% 711 3,714 4.77 779 110% 3,056 3.41 896 126% 2,818 3.98 708 100%

127 Sanchez 580 585 101% 564 97% 36 5 22 85% 580 2,959 4.77 620 107% 2,399 3.41 704 121% 3,028 3.98 761 131%

139 Sims 355 277 78% 366 103% 22 3 22 85% 355 2,599 4.77 545 153% 2,484 3.41 728 205% 2,625 3.98 660 186%

136 St. Elmo 411 304 74% 407 99% 26 4 22 85% 411 2,825 4.77 592 144% 2,259 3.41 662 161% 3,149 3.98 791 192%

138 Summitt 731 854 117% 572 78% 41 6 22 95% 731 3,683 4.77 772 106% 3,064 3.41 898 123% 4,017 3.98 1 ,0 09 1 38 %

158 Sunset Valley 561 451 80% 494 88% 35 5 22 85% 561 2,987 4.77 626 112% 2,376 3.41 697 124% 2,952 3.98 742 132%

140 Travis Heights 486 537 110% 556 114% 31 5 22 85% 486 2,992 4.77 627 129% 2,812 3.41 825 170% 1,962 3.98 493 101%

141 Walnut Creek 655 916 140% 918 140% 41 6 22 85% 655 4,721 4.77 990 151% 2,638 3.41 773 118% 3,706 3.98 931 142%

175 Widen 673 769 114% 834 124% 42 6 22 85% 673 3,851 4.77 807 120% 3,051 3.41 895 133% 3,363 3.98 845 126%

166 Williams 561 642 114% 728 130% 35 5 22 85% 561 3,040 4.77 637 114% 2,500 3.41 733 131% 2,923 3.98 734 131%

157 Winn 524 463 88% 601 115% 33 5 22 85% 524 2,565 4.77 538 103% 2,322 3.41 681 130% 2,348 3.98 590 113%

152 Wooldridge 524 878 1 68% 1,096 209% 33 5 22 85% 524 4,120 4.77 864 165% 2,580 3.41 757 145% 2,319 3.98 583 111%

144 Wooten 468 695 149% 740 158% 29 4 22 85% 468 3,534 4.77 741 158% 2,534 3.41 743 159% 3,036 3.98 763 163%

145 Zavala 580 407 7 0% 339 58% 36 5 22 85% 580 2,618 4.77 549 95% 2,740 3.41 804 139% 2,714 3.98 682 118%

146 Zilker 460 522 114% 329 7 2% 26 4 22 95% 460 2,894 4.77 607 132% 2,217 3.41 650 141% 2,703 3.98 679 148%

44,905 4 8,738 47,366

ClassroomCapacity

Cafeteria = 4,500 SF / 1,100 Students

4 10 SF per Student

Gym = 13,400 SF / 1,100 Students

12 18 SF per Student

Library = 4,800 SF / 1,100 Students

4 36 SF per Student

EXHIBIT "B"

Page 206: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 206/317

LOC Middle

Permanent

Capacity

2010

Enrollment

% of Perm.

Capacity

by Enroll.

2009-10

Population

% of Perm.

Capacity

by Pop.

Classroom

Count

Special

Rooms

(ES Only)

Average

Students

per 

Classroom

Efficiency

Factor 

Classroom

Capacity

Café Area

(SF)

4.10 SF per 

student

Capacity

based on

Café Size

Café /

Classroom

Gym Area

(SF)

12.18 SF

per 

student

Capacity

based on

Gym Size

Gym /

Classroom

Library

Area (SF)

4.36 SF per 

student

Capacity

based on

Library Size

Library /

Classroom

59 Bailey 1,176 1,041 89% 997 85% 56 0 28 75% 1,176 4,752 4.10 1,159 99% 13,668 12.18 1,122 95% 4,013 4.36 920 78%

54 Bedichek 941 1,054 112% 1,171 124% 48 0 28 70% 941 6,348 4.10 1,548 165% 11,555 12.18 949 101% 3,657 4.36 839 89%

46 Burnet 1,039 998 96% 1,163 112% 53 0 28 70% 1,039 5,765 4.10 1,406 135% 11,877 12.18 975 94% 3,243 4.36 744 72%

57 Covington 1,125 805 72% 922 82% 63 0 28 75% 1 ,323 4,461 4.10 1,088 82% 13,935 12.18 1,144 86% 4,044 4.36 928 70%

55 Dobie 902 630 70% 709 79% 46 0 28 70% 902 4,790 4.10 1,168 130% 11,388 12.18 935 104% 3,553 4.36 815 90%

43 Fulmore 1,078 995 92% 898 83% 55 0 28 70% 1,078 5,452 4.10 1,330 123% 13,196 12.18 1,083 101% 4,127 4.36 947 88%

56 Garcia 1,215 658 54% 801 66% 62 0 28 70% 1,215 5,220 4.10 1,273 105% 15,986 12.18 1,312 108% 4,666 4.36 1,070 88%

62 Gorzycki 1,323 963 73% 943 71% 63 0 28 75% 1,323 4,669 4.10 1,139 86% 15,396 12.18 1,264 96% 5,616 4.36 1,288 97%

44 Kealing 1,333 1,233 93% 563 42% 80 0 28 70% 1,568 4,433 4.10 1,081 69% 12,344 12.18 1,013 65% 4,499 4.36 1,032 66%

45 Lamar 1,008 604 60% 554 55% 48 0 28 75% 1,008 6,725 4.10 1,640 163% 10,575 12.18 868 86% 3,665 4.36 841 83%

51 Martin 804 639 80% 1,070 133% 41 0 28 70% 804 4,022 4.10 981 122% 11,740 12.18 964 120% 2,983 4.36 684 85%

58 Mendez 1,215 890 73% 1,224 1 01% 62 0 28 70% 1,215 4,501 4.10 1,098 90% 13,699 12.18 1,125 93% 4,044 4.36 928 76%

52 Murchison 1,113 1,281 115% 1,187 107% 53 0 28 75% 1,113 4,879 4.10 1,190 107% 11,857 12.18 974 87% 3,413 4.36 783 70%

47 O. Henry 945 1,026 109% 764 81% 45 0 28 75% 945 5,199 4.10 1,268 134% 10,628 12.18 873 92% 3,147 4.36 722 76%

61 Paredes 1,156 930 80% 1,123 97% 59 0 28 70% 1 ,156 5,953 4.10 1,452 126% 12,775 12.18 1,049 91% 2,798 4.36 642 55%

48 Pearce 1,078 329 31% 683 63% 55 0 28 70% 1,078 5,057 4.10 1,234 114% 13,147 12.18 1,079 100% 4,293 4.36 985 91%

28 Richards YWL 924 528 57% 0 0% 44 0 28 75% 924 5,272 4.10 1,286 139% 11,751 12.18 965 104% 5,046 4.36 1 ,1 57 1 25 %

60 Small 1,239 959 77% 873 70% 59 0 28 75% 1,239 6,244 4.10 1,523 123% 13,899 12.18 1,141 92% 3,142 4.36 721 58%

53 Webb 804 591 74% 692 86% 41 0 28 70% 804 4,348 4.10 1,061 132% 12,023 12.18 987 123% 4,399 4.36 1 ,0 09 1 26 %

20,417 1 6,154 16,337

LOC High

Permanent

Capacity

2010

Enrollment

% of Perm.

Capacity

by Enroll.

2009-10

Population

% of Perm.

Capacity

by Pop.

Classroom

Count

Special

Rooms

(ES Only)

Average

Students

per 

Classroom

Efficiency

Factor 

Classroom

Capacity

Café Area

(SF)

3.75 SF per 

student

School

Capacity

based on

Café Size

Café /

Classroom

Gym Area

(SF)

8.63 SF per 

student

School

Capacity

based on

Gym Size

Gym /

Classroom

Library

Area (SF)

3.50 SF per 

student

School

Capacity

based on

Library Size

Library /

Classroom

17 Akins 2,394 2,720 114% 3,076 128% 114 0 28 75% 2 ,394 1 0,9 35 3 .7 5 2 ,9 16 1 22 % 2 1,4 71 8 .6 3 2 ,4 88 1 04 % 8,371 3.50 2 ,3 92 1 00 %

9 Anderson 2,017 2,089 104% 1,912 95% 113 0 28 75% 2,373 8,178 3.75 2,181 92% 1 7,0 68 8 .6 3 1,978 83% 9,864 3.50 2 ,8 18 1 19 %

2 Austin 2,205 2,337 1 06% 1,964 89% 105 0 28 75% 2,205 1 0,0 74 3 .7 5 2 ,6 86 1 22 % 1 7,4 88 8 .6 3 2,026 92% 5,977 3.50 1,708 77%

13 Bowie 2,535 2,876 113% 2,594 102% 142 0 28 75% 2,982 9,200 3.75 2,453 82% 2 2,0 36 8 .6 3 2,553 86% 9,862 3.50 2,818 94%

8 Crockett 2,163 1,686 78% 1,927 89% 103 0 28 75% 2,163 8,955 3.75 2 ,3 88 1 10 % 1 7,0 50 8 .6 3 1,976 91% 7,671 3.50 2 ,1 92 1 01 %

19/20/29

EMHSJC /

International 1,548 894 58% 1,310 85% 79 0 28 70% 1,548 8,952 3.75 2 ,3 87 1 54 % 1 6,4 19 8 .6 3 1 ,9 03 1 23 % 6,106 3.50 1 ,7 45 1 13 %

15 Garza 321 260 81% 0 0% 18 0 28 75% 378 1,834 3.75 489 129% 2,282 8.63 264 70% 1,223 3.50 349 92%

4 Lanier 1,627 1,624 1 00% 2,037 1 25% 83 0 28 70% 1,627 1 3,5 13 3 .7 5 3 ,6 03 2 21 % 2 3,4 65 8 .6 3 2 ,7 19 1 67 % 7,677 3.50 2 ,1 94 1 35 %

14/18 LBJ / LASA 1,842 1,881 102% 1,110 60% 94 0 28 70% 1,842 8,026 3.75 2 ,1 40 1 16 % 1 8,9 36 8 .6 3 2 ,1 94 1 19 % 8,856 3.50 2 ,5 30 1 37 %

5 McCallum 1,596 1,824 114% 1,343 84% 76 0 28 75% 1,596 6,244 3.75 1 ,6 65 1 04 % 1 5,7 65 8 .6 3 1 ,8 27 1 14 % 6,981 3.50 1 ,9 94 1 25 %

6 Reagan 1,588 901 57% 1,597 101% 81 0 28 70% 1 ,588 8,600 3.75 2 ,2 93 1 44 % 2 2,1 80 8 .6 3 2 ,5 70 1 62 % 6,226 3.50 1 ,7 79 1 12 %

7 Travis 1,862 1,420 76% 1,994 1 07% 95 0 28 70% 1,862 9,462 3.75 2 ,5 23 1 36 % 1 4,8 70 8 .6 3 1,723 93% 7,017 3.50 2 ,0 05 1 08 %

21,698 2 0,512 20,864

Classroom Capacity

Cafeteria = 9,000 SF / 2,400 Students

3.75 SF per Student

Gym = 20,720 SF / 2,400 Students

8.63 SF per Student

Library = 8,400 SF / 2,400 Students

3.50 SF per Student

Classroom Capacity 4.10 SF per Student 12.18 SF per Student 4.36 SF per Student

 

Page 204

LOC Elementary

Permanent

Capacity

2010

Enrollment

% of Perm.

Capacity

by Enroll.

2010-11

Population

% of Perm.

Capacity

by Pop.

142 Allan 673 379 56% 354 53%

101 Allison 486 543 112% 585 120%

EXHIBIT "B"

Page 207: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 207/317

102 Andrews 486 717 147% 692 142%187 Baldwin 669 508 76% 557 83%

182 Baranoff 794 876 110% 891 112%

149 Barrington 556 996 179% 955 172%

103 Barton Hills 251 386 154% 203 81%

104 Becker 524 208 40% 226 43%

105 Blackshear 598 244 41% 288 48%

106 Blanton 636 591 93% 630 99%

185 Blazier 598 775 130% 896 150%

170 Boone 752 501 67% 478 64%

107 Brentwood 585 495 85% 456 78%

108 Brooke 430 439 102% 441 103%

109 Brown 468 519 111% 525 112%

110 Bryker Woods 272 404 149% 312 115%

111 Campbell 524 360 69% 367 70%

173 Casey 711 669 94% 763 107%112 Casis 669 825 123% 731 109%

184 Clayton 836 867 104% 837 100%

161 Cook 561 901 161% 1,252 223%

183 Cowan 669 783 117% 707 106%

113 Cunningham 627 512 82% 573 91%

179 Davis 731 683 93% 666 91%

114 Dawson 505 331 66% 276 55%

154 Doss 543 768 141% 728 134%

165 McBee 580 765 132% 1,031 178%

147 Menchaca 606 686 113% 685 113%

124 Metz 542 498 92% 477 88%

181 Mills 794 928 117% 831 105%

150 Norman 486 333 68% 376 77%

EXHIBIT "B"

Page 208: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 208/317

150 Norman 486 333 68% 376 77%

148 Oak Hill 773 772 100% 820 106%125 Oak Springs 411 274 67% 293 71%

156 Odom 542 658 121% 706 130%

126 Ortega 374 296 79% 266 71%

189 Overton 617 668 108% 948 154%

171 Palm 673 606 90% 637 95%

143 Patton 773 914 118% 908 117%

128 Pease 293 256 87% 0 0%

129 Pecan Springs 486 532 109% 490 101%

190 Perez 598 886 148% 945 158%

164 Pickle 617 740 120% 737 119%

151 Pillow 522 653 125% 651 125%

130 Pleasant Hill 524 619 118% 631 121%

131 Read Pre-K 393 509 129% 0 0%

132 Reilly 318 296 93% 357 112%

133 Ridgetop 206 219 106% 128 62%

174 Rodriguez 711 910 128% 1,045 147%

127 Sanchez 580 585 101% 584 101%

139 Sims 355 277 78% 343 97%

136 St. Elmo 411 304 74% 369 90%

138 Summitt 731 854 117% 623 85%

158 Sunset Valley 561 451 80% 483 86%

140 Travis Heights 486 537 110% 548 113%141 Walnut Creek 655 916 140% 936 143%

LOC Middle

Permanent

Capacity

2010

Enrollment

% of Perm.

Capacity

by Enroll.

2010-11

Population

% of Perm.

Capacity

by Pop.

EXHIBIT "B"

Page 209: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 209/317

59 Bailey 1,176 1,041 89% 979 83%54 Bedichek 941 1,054 112% 1,219 130%

46 Burnet 1,039 998 96% 1,170 113%

57 Covington 1,125 805 72% 905 80%

55 Dobie 902 630 70% 719 80%

43 Fulmore 1,078 995 92% 850 79%

56 Garcia 1,215 658 54% 829 68%

62 Gorzycki 1,323 963 73% 989 75%

44 Kealing 1,333 1,233 93% 541 41%

45 Lamar 1,008 604 60% 583 58%

51 Martin 804 639 80% 1,056 131%

58 Mendez 1,215 890 73% 1,266 104%

52 Murchison 1,113 1,281 115% 1,171 105%

47 O. Henry 945 1,026 109% 804 85%

61 Paredes 1,156 930 80% 1,165 101%

48 Pearce 1,078 329 31% 712 66%28 Richards YWL 924 528 57% 0 0%

60 Small 1,239 959 77% 876 71%

53 Webb 804 591 74% 731 91%

20,417 16,154 16,565

LOC High

Permanent

Capacity

2010

Enrollment

% of Perm.

Capacity

by Enroll

2010-11

Population

% of Perm.

Capacity

by Pop

Page 210: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 210/317

May 13 & 14, 2010

EXHIBIT "B"

Page 211: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 211/317

AUSTIN ISDFacility Master PlanVisioning Workshop

Acknowledgements 

Cuningham Group Architecture P.A., as a consultant to DeJONG-RICHTER, prepared this document with

EXHIBIT "B"

Page 212: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 212/317

the support and assistance of the following Facility Master Plan Vision Workshop participants:

John Alawneh AISD - TechnologyTony Arnold City of Austin – Parks & RecreationJohn Blazier Business Partner Kathrin Brewer Austin Partners in EducationBill Caritij AISD - Chief AccountabilityMeria Carstarphen AISD - Superintendent

Nan Clayton Former AISD Board Member Ariel Cloud AISD – Asst. Superintendent ElementaryNicole Conley-Abram AISD - CFOTommy Cowan Business Partner Paul Cruz Chief of SchoolsAshton Cumberbatch Community Seton HospitalElizabeth Dickey AISD Special EducationBill De Dufour AISD - Technology

Richard Frazier AISD – Teacher / Task Force Chair Janna Griffin Asst. Supt. Office - ElementaryJanis Guerrero AISD – Community RelationsBergeron Harris AISD – Asst. Supt. Middle SchoolsJanna Lilly AISD – Special EducationViviana Lopez AISD – Curriculum/Special ProjectsEliza May CommunityJanet Mitchell Community – Task Force Chair 

Chris Moore City of Austin – Child SafetyJ i P t E l Childh d

AUSTIN ISD  Facility Master Plan Visioning Workshop 

Table of Contents

EXHIBIT "B"

Page 213: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 213/317

Introduction

Day OneA. Greatest HopesB. Provocation I: Sir Ken RobinsonC. Issues & Assets 

D. Provocation II: School of One

E. I See…We See… F. Facility Master Plan Vision StatementG. Provocation III: Environment MattersH. Values: AISD Strategic Plan 2010-2015 ReviewI. Story Time 

Day TwoA. ReflectionsB. Provocation III: John A. JohnsonC. Facility Principles 

AppendicesA. Day One Presentation

Facility Master Plan Visioning Workshop AUSTIN ISD 

Introduction 

This document is the result of a Facility Master Plan Visioning Workshop held May 13th & 14th, 2010 with

EXHIBIT "B"

Page 214: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 214/317

participants from the Austin Independent School District and the community. The purpose of this workshopwas to create a Facility Master Plan Vision Statement and Facility Principles.

The purpose of a Facility Master Plan is to create a clear and compelling vision of the future for AISD,aligning facilities with learning. A Facility Master Plan Vision Statement creates a filter by which futuredecisions can be made and Facility Principles create over arching ideas about what‟s important for allschools in AISD.

The process used during the Visioning Workshop was interactive and included “Provocations” and smalland whole group work. The following is a summary of our work during both days.

AUSTIN ISD  Facility Master Plan Visioning Workshop 

Greatest Hopes:Day one started with participants sharing their Greatest Hopes for the Facility Master Planning process.Below are some of the hopes shared by participants:

EXHIBIT "B"

Page 215: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 215/317

Facility Master Plan Visioning Workshop AUSTIN ISD 

Provocation I: Sir Ken Robinson: Do Schools Kill Creativity?http://www.ted.com/talks/lang/eng/ken_robinson_says_schools_kill_creativity.html 

Reactions to the video included the following:

EXHIBIT "B"

Page 216: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 216/317

Reactions to the video included the following:  Learning occurs in many ways – public education focuses on academic achievement  Career/Vocational Education is not emphasized but some children want – we need to provide the right

programs for all children  The system is structurally set up to fail some children – there are ethnocentric, gender, and cultural

differences we need to consider   Everyone learns differently  Focus on where students can be successful through application  Plan for the future but not at the expense of today  There is a knowing/doing gap in education – establish the courage to do what we know is right – “thou shalt”

…accountability   We continue to build boxes for people to teach in that look the same – we need more flexible, collaborative

spaces  We need to respond to changes in the world; we need to be agile and our environment affects us  The challenge is that we have given critical responsibility to one group of adults: teachers; we need to

consider the role of parents and the community to create creative thinkers. Open possibilities for kids tolearn from and in whole world – engage the community

AUSTIN ISD  Facility Master Plan Visioning Workshop 

Issues & Assets We discussed and prioritized Issues and Assets in Austin ISD. This was a way to find out what wasimportant to those present and what they thought were key to the success of a Facilities Master Plan. As is

EXHIBIT "B"

Page 217: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 217/317

noted below on the sheets the key issues identified were:  Equity of facilities and resources across the district  Efficient use of resources throughout the community  Partnering  Future flexibility for teaching in the future  Competition and school choices (Middle class participates in public schools but they have other 

choices)  School boundaries

Facility Master Plan Visioning Workshop AUSTIN ISD 

Provocation II:  School of One http://schools.nyc.gov/community/innovation/SchoolofOne/default.htm 

The group watched a video on the School of One a program that started the summer of 2009 in New York

EXHIBIT "B"

Page 218: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 218/317

The group watched a video on the School of One, a program that started the summer of 2009, in New YorkCity.

From the above website:

“The mission of School of One is to provide students with personalized, effective, and dynamic classroominstruction so that teachers have more time to focus on the quality of their instruction.To achieve this mission, School of One re-imagines the traditional classroom model. Instead of one teacher 

and 25-30 students in a classroom, each student participates in multiple instructional modalities, including acombination of teacher-led instruction, one-on-one tutoring, independent learning, and work with virtualtutors.

To organize this type of learning, each student receives a unique daily schedule based on his or her academic strengths and needs. As a result, students within the same school or even the same classroomcan receive profoundly different instruction as each student‟s schedule is tailored to the skills they need andthe ways they best learn. Teachers acquire data about student achievement each day and then adapt their 

live instructional lessons accordingly

By leveraging technology to play a more essential role in planning instruction, teachers have more time tofocus on doing what they do best - delivering quality instruction and ensuring that all students learn. ” 

AUSTIN ISD  Facility Master Plan Visioning Workshop 

Activity I:  I See…We See… 

“Vision is the art of seeing the invisible” Jonathan Swift  

EXHIBIT "B"

Page 219: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 219/317

To start the visioning process we asked participants to „imagine it‟s 10 years out, the AISD Facility Master Plan has given the district amazing learning places that reflect the community and help the districtaccomplish its mission. People visit because its facilities are so successful in accomplishing the goals of the District. Imagine you‟re giving someone a tour – what do you see?‟ 

Individually participants created I See statements:  One-on-one time with teachers

  Entire staff focused and engaged with kids  Teachers focused on teaching the kids and not other issues  Schools are the pride of the community and the first choice of middle class families

  Large yet flexible spaces built to fit our growing population  Repurposed spaces that are vintage yet functional for the community  All facilities are beautifully maintained and are supportive of the instructional programs

  All schools are painted in bright colors – place of exciting learning  A dramatically reduced number of schools, yet a mix of small, medium, and large facilities  50 years later the space is still current (or can be)

  Public and private, city and school district co-location of offices, classrooms, theaters, and meeting areas  Art facilities which involve all our students and the world class Austin arts community in a learning partnership  Shared facilities with the city Zachary Scott Theater, Long Center, AT&T, IBM, CAN. ACC – classroom days around

and within the city  Students integrated within the community, downtown, capitol, tech companies, Whole Foods; “what do you do days” 

  Students a large part of the day as interns and apprentices  Schools have clear feeder patterns and each feeder pattern has a special focus  Engaged, enthusiastic students that want to be there. Eager to explain their love for learning.

  Loud sounds from playing and team problems solving

  Quiet places for reading and silent learning contemplation Team sports, yoga, and meditation

Facility Master Plan Visioning Workshop AUSTIN ISD 

  Schools that welcome visitors and are responsive to visitors  Classrooms that are interactive include technology but also instructionally interactive – kids engaged with each other 

and teacher   All students have internet access at home

EXHIBIT "B"

Page 220: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 220/317

  Staff, students and parents can readily access results and academic plans  Students have exactly the information they need in the best format  Realization of the promise of “instructional TV” to help teachers with complex, real world concepts such velocity,

acceleration, gravity, history of Middle Eastern areas, areas on curves, environmental science, poetry etc…   Virtual lab for HS students to work on course credits. Teachers as side facilitators.  As I walk through the facility I see a number of distant learning centers where students and teachers participating in a

collaborative learning process. These rooms have state of the art technology.  State of the art facilities on each campus and two district-wide performing art centers

  Students attend neighborhood schools as best opportunity

  Classroom instruction that accommodates different student learning styles and provides support and enrichment basedon student learning needs

  Stimulating and inviting learning environments that are fun to be in  Inviting/welcoming face to the facility  Parents working with students throughout the school  Spaces for collaboration between teachers, parents and students  Parents present, actively engaged, knowing learning goals of students  Space for community/parents to be engaged

  Outside area is an extension of the learning environment

  Students learning in flexible indoor and outdoor spaces  Gardens, fountains and trails instead of carpet and grass  Active learning  Classrooms that make use of indoor and outdoor settings for learning  Students moving and active in the learning process

  Students actively engaged in their learning  Classrooms which comfortably hold 30 students in a variety of ways  Students working in small groups collaboratively

  I see building design geared towards multi -sensory student engagement  A clean, well maintained visually appealing school for every student Tables instead of desks

AUSTIN ISD  Facility Master Plan Visioning Workshop 

  Social skills training as part the degree program (such as mediation training)  Flex schedules for students in high school  Young children given the time and opportunity to learn through play  Access to all resources within a school for every student

EXHIBIT "B"

Page 221: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 221/317

  Curriculum that is differentiated to fit individuals needs and flexible schedules to allow the best use of time  Secondary classrooms that allow for small group work (not just rows of chairs)  A flower bed at the entrance of school, there are trees that have been pruned, and doors have been painted recently

and rooms are brightly painted, there are posters on the walls along with student work. The facilities reflect attention todetail

  As we enter the library, there is a bank of computers and students working in small groups accessing databases fromaround the world. The students are engaged and the noise level is amazingly semi quiet.

  Technology driven learning in every classroom in AISD facility

  Language development academy, producing fluent 2nd and 3rd language proficiency

  Fine arts integrated with academics integrated with social learning  Music academy generating music professionals, singers, etc.

  Spaces that are student/teacher friendly  Teachers interacting with students  Community advocate centers/service for students and family members

  Learning centers for 0 to 4-year olds  All students actively involved in learning  Collaboration between AISD and ACC that produces HS graduates interested in graduation with certificates in medical

technology, nursing, construction, etc… 

  Central headquarters reduced in physical size, in more compact, effective structure  Substantial revenue generated from space use that can be reinvested into important programming  Private and corporate donation to AISD foundation in excess of $50 million  Number-one rated HS in the country in Austin due to technology or live music/jazz, band or other with an awesome

facility/stages, media rooms, etc… 

I See Wordle

www.wordle.net 

Facility Master Plan Visioning Workshop AUSTIN ISD 

In small groups participants then shared these I See… statements and created We See… statements.Listed below are the We see… statements worked on by participants in small groups. These became thebasis of the Vision Statement.

EXHIBIT "B"

Page 222: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 222/317

We see…..   An overall environment that is both encouraging and engaging  Purposeful, functional, modular facilities that serve all students needs  Facilities “co-purposed” for student and community usage   Teachers totally focused on education and innovation

Students in a variety of learning environments with technology support, integrated to ensure development

of individual learning styles and goals, supported by community partnerships on an ongoing basis (24/7)

Facilities that are inviting, welcoming, flexible enough to accommodate and support a variety of instructionalarrangements and incorporates:

  instructional technology  family and community access to information  teacher access to information and resources

  Facilities with dedicated spaces to foster and engage parents/community  Facilities that use the outdoors and indoors in ways that are environmentally responsible and

allows for learning to take place in a variety of ways  Facilities that engage with the community to provide extended learning opportunities both within

the school walls and beyond  Classrooms large enough to allow for flex grouping and active hands-on learning  A variety of multi-use areas  Facilities where technology is integrated in every space and accessible to all students and staff 

  Spaces that allow for differentiated instruction and flexible school day

Page 223: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 223/317

Facility Master Plan Visioning Workshop AUSTIN ISD 

Facility Master Plan Vision Statement 

EXHIBIT "B"

Page 224: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 224/317

The purpose of a vision statement is to guide the entire process, help set priorities, align resources againstpriorities and facilitate an efficient decision making process. The following vision statement was created byparticipants from the work done together:

All AISD schools inspire high student achievement and commoncommunity goals through inviting, accessible, and efficient facilities that

integrate technology and sustainability.

Revised Version:

All AISD schools will inspire high student achievementand support common community goals through equitable,

inviting facilities that integrate technology and are

optimally used, accessible, sustainable, and meet highest

educational adequacy standards.

AUSTIN ISD  Facility Master Plan Visioning Workshop 

Provocation III:  Environment Matters “The only true voyage of discovery consists not of visiting new places, but seeing with new eyes.” Voltaire

EXHIBIT "B"

Page 225: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 225/317

As a part of the process of thinking about the future of Austin schools, the group looked at learning styles,the learning environment and current examples of what other districts are doing with their facilities. Beloware examples of what was discussed. The presentation is included in the May 13th presentation in theappendix of this document.

Facility Master Plan Visioning Workshop AUSTIN ISD 

Values Building on the work that has already been done in the District we reviewed the Austin ISD Strategic Planand expanded on the Values contained in the Plan:

EXHIBIT "B"

Page 226: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 226/317

AISD Strategic Plan 2010-2015:

Mission (What We Do)In partnership with parents and our community, AISD exists to provide a comprehensive educationalexperience that is high quality, challenging, and inspires all students to make a positive contribution tosociety.

Vision (Where We Want to Be)AISD will be nationally recognized as an outstanding school district, instilling a passion for life-long learningin all students.

Goals (What We Want to Accomplish)  Goal 1: All students will perform at or above grade level.  Goal 2: Achievement gaps among all student groups will be eliminated.  Goal 3: All students will graduate ready for college, career, and life in a globally competitive economy.

  Goal 4: All schools will meet or exceed state accouintability standards, and the district will meet federalstandards and exceed state standards.

Strategies (How We Will Achieve Our Goals)  Provide a high-quality, well-rounded educational experience to all students that is rigorous, culturally

relevant, healthful, and engaging.  Build strong relationships with students, families, and the community to increase trust and shared

responsibility.

  Ensure that every classroom has a high-quality, effective educator, supported by high-quality, effectiveadministrators and support staff

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 227: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 227/317

Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"

Page 228: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 228/317

AUSTIN ISD  Facility Master Plan Visioning Workshop 

Story Time As a way to think more about how learning will happen in the future and what role the facilities play,participants were asked to work in small groups and answer the following question:

EXHIBIT "B"

Page 229: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 229/317

Imagine it is 2020 and AISD has met its strategic plan goals for 2015 and has addressed many of the keyfacility needs as defined in the Facility Master Plan of 2010.

Imagine you are (a student, a community member, a teacher, a staff member) Describe your typical day inan AISD school – what does your day look like?

1. What are you doing? What is the process of learning and what are the outcomes or expectations?

2. Who are you with? How is your day organized?3. What is your environment like? Where are you and how do you feel?4. What makes AISD a special place to learn?

Facility Master Plan Visioning Workshop AUSTIN ISD 

Day Two: ReflectionsWhile Day One was about creating a Facility Master Plan Vision Statement, Day Two of the workshopwas about creating Facility Principles. Facility Principles create over arching ideas about what‟s

EXHIBIT "B"

Page 230: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 230/317

important for all schools in AISD.

To start off Day Two the group reflected on Day One and on a video assigned as homework:Dave Eggers‟ Wish: Once Upon a School. http://www.ted.com/talks/lang/eng/dave_eggers_makes_his_ted_prize_wish_once_upon_a_school.html 

AUSTIN ISD  Facility Master Plan Visioning Workshop 

Provocation IV: John A. JohnsonFrom the KnowledgeWorks website: http://www.kwfdn.org/resource_library/_resources/sacc_video_guide.asp 

"Schools as Centers of Community: John A. Johnson Achievement Plus Elementary School” is a video

EXHIBIT "B"

Page 231: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 231/317

y ycase study and discussion guide that assists local leaders and residents in creating constructive,meaningful dialogue on the importance of good school design and ways schools can become centersof their communities. KnowledgeWorks Foundation partnered with the American ArchitecturalFoundation to create the guide and video.

Video link:http://www.archfoundation.org/aaf/gsbd/Videos.SCC.htm 

Facility Master Plan Visioning Workshop AUSTIN ISD 

Facility PrinciplesStarting with the Austin ISD 2010-2015 Strategic Plan Strategies, participants worked in small groups todefine Facility Principles. Facility Principles are overarching ideas about what‟s important for all schools inthe Austin Independent School District.

EXHIBIT "B"

Page 232: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 232/317

p

For each of the Strategies groups defined what this meant for facilities. So, for example, if the Austin ISD iscommitted to an engaging/healthy experience for all students, this means what in terms of facilities.

AUSTIN ISD  Facility Master Plan Visioning Workshop 

Facility Principles 

The Austin Independent School District is committed to  An engaging/healthy experience for all students …

EXHIBIT "B"

Page 233: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 233/317

This means… 

•  All schools will have a space identified to engage parents and be responsive to student needs(learning/language/cultural/socioeconomic)

•  All schools will have spaces dedicated to active learning and diverse learning styles

•  All schools will be equipped to provide technology resources in classrooms and other learningareas

•  Create and maintain clean and attractive grounds that encourage physical activities•  Provide safe entry and exit for cyclists, walkers, skateboarders, etc.

•  Develop spaces that promote social and recreational interaction

•  Common areas for active, hands-on group activities

•  Coordinate and cooperate with other entities (YMCA, YWCA, Parks & Recreation) to share and/or build new facilities (pools, gyms, parks)

•  All schools will have good indoor air quality, climate control, and day-lighting

•  Our facilities will support high quality, rigorous, well rounded learning

Facility Master Plan Visioning Workshop AUSTIN ISD 

Facility Principles 

The Austin Independent School District is committed to Strong relationships with students/families/community …

EXHIBIT "B"

Page 234: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 234/317

This means… •  Community hubs for services and programs

•  Flexible spaces and hours to accommodate changes in learning styles, instructional deliverysupported by technological resources for students, families and communities

•  Facilities to provide learning spaces that support student collaboration, teamwork and relationshipbuilding

AUSTIN ISD  Facility Master Plan Visioning Workshop 

Facility Principles 

The Austin Independent School District is committed to Supporting and engaging high quality effective staff …

EXHIBIT "B"

Page 235: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 235/317

This means… •  AISD facility decisions promote long-term value

•  AISD facilities should be equitable and adequate across the district

•  AISD staff and community must have input into facility decisions to ensure adequate resources(examples: space, storage, technology, outlets)

  AISD facilities to provide high quality professional development spaces•  AISD facilities must provide an appropriate environment for staff effectiveness (example: HVAC,

light, acoustics, security)

•  AISD facilities must include adequate, flexible-use core facilities (library, gym, cafeteria)

•  AISD staff must have appropriate access to various spaces to meet student needs of a high qualityrigorous educational experience

Facility Master Plan Visioning Workshop AUSTIN ISD 

Facility Principles 

The Austin Independent School District is committed to Aligning resources with priorities…

EXHIBIT "B"

Page 236: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 236/317

This means… •  Leverage Austin public and private resources for more effective and efficient use of existing and

new facilities by:

•  Revisit efficiency study

•  Align decisions with fiscal impact statement

  “CAN” concept (Community Action Network) to engage various public entities (e.g. UT, ACC,Travis County, Seton, St. David‟s, etc…) for purpose of repurposing facilities including charters andco-location

•  Must at least break even or generate revenue

•  Strategy for maintenance and operations to support facilities and address deferred, routine, andpreventative maintenance

•  Develop detailed capital plan schedule/report that includes budget/actuals/completion dates and M& O impact by project

•  CAN concept must be integrated into bond planning process to address shared facilities and amore comprehensive set of services

•  Develop strategic partnerships to obtain private donations /endowments in excess of $50 million  

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 237: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 237/317

Facility Master Plan Visioning Workshop AUSTIN ISD 

Appendices

Contained on the following pages are the presentations from both days.

EXHIBIT "B"

Page 238: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 238/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 239: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 239/317

Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"

Page 240: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 240/317

Page 241: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 241/317

Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"

Page 242: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 242/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 243: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 243/317

Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"

Page 244: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 244/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 245: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 245/317

Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"

Page 246: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 246/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 247: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 247/317

Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"

Page 248: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 248/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 249: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 249/317

Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"

Page 250: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 250/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 251: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 251/317

Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"

Page 252: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 252/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 253: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 253/317

Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"

Page 254: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 254/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 255: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 255/317

Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"

Page 256: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 256/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 257: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 257/317

Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"

Page 258: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 258/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 259: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 259/317

Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"

Page 260: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 260/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 261: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 261/317

Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"

Page 262: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 262/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 263: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 263/317

Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"

Page 264: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 264/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 265: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 265/317

Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"

Page 266: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 266/317

Page 267: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 267/317

Facility Master Plan Visioning Workshop AUSTIN ISD EXHIBIT "B"

Page 268: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 268/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 269: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 269/317

Facility Master Plan Visioning Workshop AUSTIN ISD 

EXHIBIT "B"

Page 270: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 270/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 271: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 271/317

Facility Master Plan Visioning Workshop AUSTIN ISD 

EXHIBIT "B"

Page 272: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 272/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 273: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 273/317

Facility Master Plan Visioning Workshop AUSTIN ISD 

EXHIBIT "B"

Page 274: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 274/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 275: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 275/317

Facility Master Plan Visioning Workshop AUSTIN ISD 

EXHIBIT "B"

Page 276: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 276/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 277: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 277/317

Facility Master Plan Visioning Workshop AUSTIN ISD 

EXHIBIT "B"

Page 278: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 278/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 279: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 279/317

Facility Master Plan Visioning Workshop AUSTIN ISD 

EXHIBIT "B"

Page 280: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 280/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 281: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 281/317

Page 282: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 282/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 283: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 283/317

Facility Master Plan Visioning Workshop AUSTIN ISD 

EXHIBIT "B"

Page 284: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 284/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 285: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 285/317

Facility Master Plan Visioning Workshop AUSTIN ISD 

EXHIBIT "B"

Page 286: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 286/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 287: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 287/317

Facility Master Plan Visioning Workshop AUSTIN ISD 

EXHIBIT "B"

Page 288: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 288/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 289: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 289/317

Facility Master Plan Visioning Workshop AUSTIN ISD 

EXHIBIT "B"

Page 290: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 290/317

AUSTIN ISD  Facility Master Plan Visioning Workshop 

Photos taken during the Workshop

EXHIBIT "B"

Page 291: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 291/317

Facility Master Plan Visioning Workshop AUSTIN ISD 

EXHIBIT "B"

Page 292: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 292/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 293: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 293/317

Facility Master Plan Visioning Workshop AUSTIN ISD 

EXHIBIT "B"

Page 294: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 294/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 295: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 295/317

Facility Master Plan Visioning Workshop AUSTIN ISD 

EXHIBIT "B"

Page 296: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 296/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 297: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 297/317

Facility Master Plan Visioning Workshop AUSTIN ISD 

EXHIBIT "B"

Page 298: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 298/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 299: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 299/317

Facility Master Plan Visioning Workshop AUSTIN ISD 

EXHIBIT "B"

Page 300: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 300/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 301: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 301/317

Facility Master Plan Visioning Workshop AUSTIN ISD 

EXHIBIT "B"

Page 302: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 302/317

AUSTIN ISD  Facility Master Plan Visioning Workshop EXHIBIT "B"

Page 303: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 303/317

Facility Master Plan Visioning Workshop AUSTIN ISD 

EXHIBIT "B"

Page 304: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 304/317

AUSTIN INDEPENDENT SCHOOL DISTRICT

District-Wide Facility Master Plan

EXHIBIT "B"

Page 305: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 305/317

Appendices D, E, and F

Appendix D: Community Dialogue #1 Results

Appendix E: Community Dialogue #2 Results

Appendix F: Community Meeting #3 Results

Due to the volume of these reports, see the following link to access this information:

http://rcpt.yousendit.com/1042147173/d50a3fb54a75365c932c5df95adbd0c4 

 

Page 303

AUSTIN INDEPENDENT SCHOOL DISTRICT

District-Wide Facility Master Plan

EXHIBIT "B"

Page 306: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 306/317

Appendix G

Summary of Facility Options Discussed by the FMPTF

 

Page 304

0.1

Cut all bus service for magnet schools and signature

programs $1,994,516

0.2

Redraw boundaries for the entire district with the

greatest weight on vertical alignmentUnknown Unknown $0

0 4

Move International HS from Eastside HS to ALC. Relocate

ALC students to Blackshear ES. Move Blachsear ES

t d t t Z l ES k $0 $0

NOTE: Highlighted op tions were p resented at the Com munity Mee tings held on January 12 & 13, 2011

DescriptionOption M&O Savings

Cost

Avoidance

Future Bond

Impact

EXHIBIT "B"

Page 307: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 307/317

0.4 students to Zavala ES Unknown $0 $0

0.5

Repurpose Allan ES as a Pre-K thru 8 and move Allison ES

attendance area middle school students from Martin MS

to Allan Pre-K-8 Unknown $0 $0

0.6

Repurpose Blackshear ES to a Pre-K - 8 school, and Oak Springs ES as a Pre-K - 6th, move middle school students

from these attendance zones from Kealing MS Unknown $0 $0

0.7

Repurpose Campbell ES as a Pre-K -8th school and move

middle school students from Kealing MS to Campbell Pre-

K-8th Unknown $0 $0

0.8

Repurpose Brentwood ES as a Pre-K-6th school, move

sixth grade students in this attendance zone from Lamar 

MS to Brentwood PreK-6 School Unknown $0 $0

0.9

Repurpose Zavala ES to a Pre-K-8th school and move

middle school students from Martin MS to the new school Unknown $0 $0

0.10

Add a sixth grade class to Metz ES, Govalle ES, Ortega ES,

Norman ES, and Sims ES, move sixth grade students from

Martin MS and Garcia MS. Unknown $0 $0

Assuming all changes in options 0 5 through 0 10 are

NOTE: Highlighted op tions were p resented at the Com munity Mee tings held on January 12 & 13, 2011

DescriptionOption M&O Savings

Cost

Avoidance

Future Bond

Impact

0.18

Build a new middle school - Southeast (land funded from

previous bond) $0 $0 $55,700,000

0.19

Build a new high school - South (land funded from

previous bond)$0 $0 $106,600,000

0.20 School for Young Men

EXHIBIT "B"

Page 308: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 308/317

0.21

Global option to remove 6th grade from all elementary

schools when room is available in middle schools

1.1

Consolidate Reilly ES and Ridgetop ES at a new school

built on the Reilly ES site $2,076,204 $7,734,391 $24,000,000

1.2 Reassign students from Brown ES to Reilly ES $0 $0 $0

2.1Move a portion of student population from Cowan ES toBoone ES ($72,607) $0 $0

2.2

Close Joslin ES and move students to Sunset Valley ES

and Boone ES $1,259,273 $8,466,116 $0

2.2A

Close Joslin ES and move students to Sunset Valley ES.

Move a portion of Sunset Valley ES students to Boone ES $1,259,273 $8,466,116 $0

2.2 B

Close Joslin ES and move students to Sunset Valley ES.

Move a portion of Sunset Valley ES students to Boone ES

and Cunningham ES. Adjust boundaries between

Cowan ES and Boone ES. $1,266,595 $8,466,116 $0

2.2 C

Close Joslin ES and move students to Sunset Valley ES.

Move a portion of Sunset Valley ES students to Boone ES

and Cunningham ES. $1,266,595 $8,466,116 $0

2 2 D

Close Joslin ES and move students to Sunset Valley ES.

Move a portion of Sunset Valley ES students to Boone ES

d C i h ES $1 276 967 $8 466 116 $0

NOTE: Highlighted op tions were p resented at the Com munity Mee tings held on January 12 & 13, 2011

DescriptionOption M&O Savings

Cost

Avoidance

Future Bond

Impact

3.4 Adjust boundaries for Maplewood ES and Campbell ES $0 $0 $0

3.5Close Oak Springs ES and Ortega ES and consolidatestudents into Blackshear ES, Sims ES, and Norman ES $2,300,842 $10,308,022 $0

3.6 Close Pease ES $712,296 $7,302,501 $0

EXHIBIT "B"

Page 309: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 309/317

3.7

Close Govalle ES and Oak Springs ES and move students

to Allan ES, Zavala ES, and Blackshear ES $2,510,507 $16,136,129 $0

3.8

Repurpose Blackshear ES as a Hutson-Tillotson

demonstration school, training site for future teachers $0 $0 $0

3.9 A

Close Brooke ES and move students to Allan ES andZavala ES. Adjust boundary between Allan ES and

Norman ES. $1,301,382 $5,477,387 $0

3.9 B1 Close Ortega ES and move students to Govalle ES. $1,153,873 $6,082,090 $0

3.9 B2

Close Oak Springs ES and move students to Blackshear 

ES. $1,146,969 $4,225,932 $0

3.9 C

Close Sanchez ES and move students north of Town Laketo Zavala ES and Metz ES. Adjust boundaries between

Zavala ES and Linder ES. Build a new 800-student

elementary south of Town Lake to receive students from

Sanchez ES, Metz ES and Travis Heights ES. $1,556,924 $9,424,688

* included in

Option 0.17

3.12

Close Allan ES and repurpose as a middle school for 

Young Men, repurpose Martin MS as a middle school for 

Young Women. Reassign Allan ES students to Govalle ES,

Ortega ES and Norman ES $12,203 $0 $15,389,258

NOTE: Highlighted op tions were p resented at the Com munity Mee tings held on January 12 & 13, 2011

DescriptionOption M&O Savings

Cost

Avoidance

Future Bond

Impact

4.4B

Close Barton Hills ES and Zilker ES and move students to

Becker ES and Dawson ES. $2,266,637 $17,543,935 $0

4.5

Close Barton Hills ES and Becker ES and move students

into Zilker ES and Dawson ES $2,207,301 $11,930,384 $0

4.6

Close Barton Hills ES and Joslin ES and move students into

Zilker ES and Dawson ES $2,367,541 $13,360,266 $0

EXHIBIT "B"

Page 310: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 310/317

4.7

Close Barton Hills ES and reassign students to Zilker ES and

close Becker ES and reassgin students to Dawson ES $2,207,301 $11,930,384 $0

4.8

Reassign a portion of Linder ES to Travis Heights ES and

reassign a portion of Travis Heights ES to Becker ES $0 $0 $0

5.1

Do not accept transfers into Bryker Woods ES, Casis ES,

Gullett ES, and Highland Park ES $0 $0 $0

5.2

Discontinue the option to offer 6th grade at Bryker 

Woods ES $0 $0 $0

5.3

Adjust boundaries between Bryker Woods ES, Gullett ES,

and Brentwood ES $0 $0 $0

5.4

Build new school and adjust boundaries for Highland

Park ES, Doss ES, and Hill ES $0 $0 $25,200,000

5.5 Adjust boundaries between Mathews ES and Casis ES $0 $0 $0

6.1

Adjust boundaries between Norman ES, Overton ES, and

Ortega ES ($1,220) $0 $0

6.3

Add Pre-K center to Winn ES to provide relief for Andrews

ES, Pecan Springs ES, Jordan ES and Overton ES Unknown $0 $0

M K li MS t t M ti MS M

NOTE: Highlighted op tions were p resented at the Com munity Mee tings held on January 12 & 13, 2011

DescriptionOption M&O Savings

Cost

Avoidance

Future Bond

Impact

8.4

Close Webb MS and repurpose school as a School for 

Young Men ($98,844) $0 $0

9.1

Reassign a portion of Bedichek MS population to

Covington MS($28,677) $0 $0

9.2

Adjust boundary between Bedichek MS and Covington

MS ($234,298) $0 $0

EXHIBIT "B"

Page 311: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 311/317

10.1 Adjust boundary between Reagan HS and McCallum HS $0 $0 $0

10.2

Improve programming at Reagan HS by providing cross-

training and mentoring with McCallum staff. Provide

nurturing environment to draw students back into

Reagan HS. $0 $0 $0

10.3

Give Reagan HS students the option to attend

specialized signature programs at McCallum HS with

transportation provided. $0 $0

10.4 Close Eastside HS and consolidate into Reagan HS ($539,373) $0 $0

10.5

Close Reagan HS and CAC, repurpose Reagan HS as

administrative center  $0 $0 $0

10.6

Close Reagan HS and repurpose as Junior College /

ACC Partner  $0 $0 $0

11.1

Identify surplus portables and build new elementary

school in the next bond $0 $0 $0

11.2

Repurpose Langford ES as a Pre-K center and adjust

boundaries with adjacent schools $0 $0 $0

12 1

Close Dobie MS and repurpose as elementary school to

provide relief for Hart ES, Graham ES, Walnut Creek ES

and Barrington ES. Reassign Dobie MS students to Webb

MS d P MS ($437 477) $0 $0

NOTE: Highlighted op tions were p resented at the Com munity Mee tings held on January 12 & 13, 2011

DescriptionOption M&O Savings

Cost

Avoidance

Future Bond

Impact

12.7

Repurpose Garcia MS as a 4 - 8 school and reassign a

portion of the population (Sims ES and Norman ES

attendance areas) to Pearce MS. Reassign Overton ESand Jordan ES 4 - 5 grade to new Garcia 4 - 8.

13 1

Adjust boundaries between Maplewood ES and

Campbell ES $0 $0 $0

EXHIBIT "B"

Page 312: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 312/317

13.1 Campbell ES $0 $0 $0

13.2

Build new elementary school in Mueller to relieve

overcrowding at Andrews ES, Harris ES, and Blanton ES ($58,093) $0 $24,000,000

13.3 Adjust boundaries between Andrews ES and Winn ES ($84,811) $0 $0

13.4

Build a Pre-K center to relieve Andrews ES, Winn ES,

Blanton ES, Pecan Springs ES, and Blanton ES $0 $0 $21,600,000

14.1 Build a new school west of Clayton ES $0 $0 $25,200,000

14.2

Adjust boundaries between Mills ES, Kiker ES, Cowan ES,

and Boone ES ($6,120) $0 $0

14.3 Add a K-8th grade school in southwest area Unknown $0

14.4 Adjust boundaries between Clayton ES and Baldwin ES $0 $0 $014.5 Repurpose Boone ES as a PK - 8 school $0 $0 $0

15.1

Repurpose Casey ES as a Pre-K Center and adjust

boundaries between Williams ES, Menchaca ES, Casey

ES, Odom ES, and Pleasant Hill ES $0 $0 $0

15.2

Build Pre-K center in the Williams ES attendance zone to

relieve Williams ES, Casey ES, Menchaca ES, Odom ES,

and Pleasant Hill ES $0 $0 $21,600,000

C t t d dd t t

AUSTIN INDEPENDENT SCHOOL DISTRICT

District-Wide Facility Master Plan

EXHIBIT "B"

Page 313: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 313/317

Appendix H 

Glossary 

 

Page 311

District-wide Facility Master Plan

Glossary of Terms –  Update 02/15/2011 Glossary

The following is a list of definitions of known abbreviations

and terms used throughout the District-wide Facility

Master Plan Report.

ADA - Americans with Disabilities Act; addresses

modifications of facilities to ensure access for persons

with disabilities.

Attendance Zone –  The geographical area from which

students are assigned a school to attend.

Capital Cost Avoidance – Buying less, or buying nothing

at all, to improve a permanent structure or aspect of a

property.

Capital Improvement - The addition or restoration of a

permanent structure or some aspect of a property that

will either enhance the property’s overall value or 

increase its useful life.

Closure - A school that is no longer open to students.

Cohort - A specific group of students established for 

EXHIBIT "B"

Page 314: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 314/317

i

g

Bond Program –  The capital improvement efforts

associated with funding generated from a local voter-

approved tax levy for capital spending.

Building - A structure that houses children or equipment

on a school site or campus.

CAC - Carruth Administration Center; AISD’s 

administrative headquarters complex.

CAC –  Campus Advisory Council; a campus level

advisory council, required by state law, that addresses

the concerns of school communities.

Campus - A campus is a site where one or more

schools/buildings is/are located. For example, anelementary school can share a site with a middle school;

therefore, it is considered a campus.

monitoring purposes, particularly over time.

Consolidation - When a school is closed, its student

population will be combined with another student

population in another facility.

Core Spaces - Large areas within a building that areutilized by most students throughout the school day, i.e.,

cafeteria, gymnasium, library.

Deficiency - A construction deficiency is an item or 

condition that is considered sub-standard or does not

meet current standards or building codes.

Educational Adequacy - An assessment of a facility to

evaluate how well the campus is equipped to deliver the

instructional program. For example, does the facility

have the standard types of technology within the

classroom that a teacher requires for the current

curriculum? Is there the proper amount of white board

 

Page 312

District-wide Facility Master Plan

Glossary of Terms –  Update 02/15/2011 space in the classroom? Is there the correct number of

lab stations in a science room and do they have the

proper equipment?

Educational Specifications - Document that describes

the current standards for program areas, equipment

needs, technology needs, square footage, and special

considerations for a new school.

Enrollment - The number of students attending a school.

Facility Condition Assessment - An evaluation of a school

Impervious Cover - Any type of surface that will not allow

rainfall or runoff to soak into the ground (e.g. pavement

or buildings). Local ordinance may limit impervious cover 

in developments for environmental protection or runoff

control purposes.

In Migration  –  Students attending a school that live

outside of that school’s attendance zone.

M&O  –  Maintenance and Operations; school funding

that pays for day-to-day administrative and operational

costs.

EXHIBIT "B"

Page 315: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 315/317

ii

facility that identifies current building and building system

deficiencies.

FCI - Facility Condition Index; an indicator of a facilities

condition obtained by dividing the repair costs by the

replacement cost of the same building.

FF&E - Furniture, Fixtures, and Equipment; the moveable

equipment that is used by the occupants inside a facility.

Generally includes furniture and computers.

Functional Equity -  Comparison of identified core areas

and other specialized classroom space and the level at

which they meet the AISD educational specification

standards.

GIS - Geographic Information System; an automated

system for referencing geocoded data, e.g., a database

of addresses for students enrolled in a school system.

HVAC - Heating, Ventilation, and Air Conditioning.

costs.

Open Enrollment –  A policy or practice that allows

students to attend other AISD outside their assigned

attendance area zone. 

Operating Cost -  Costs associated with operating a

school facility including administration, custodial and

maintenance supplies and staffing, and food service.

Out Migration - Students leaving their attendance zones

to attend another school in the district.

Over-enrolled - A school enrollment that is greater than

105% of permanent capacity. 

Over-utilized - A school enrollment that is greater than

105% of permanent capacity. 

Permanent Capacity - The number of students a school

can accommodate within its permanent building(s). See

pages 182-183 for additional information.

 

Page 313

District-wide Facility Master Plan

Glossary of Terms –  Update 02/15/2011 Portable/Temporary Building - A building designed and

built to be movable rather than as a permanent

structure. A typical portable building in AISD contains

two classrooms.

Priority - A categorization of building deficiencies,

defined as follows.

Priority 1: currently critical (immediate need, i.e., firesafety systems)

Priority 2: potentially critical (to be corrected within one

i j HVAC i t it t )

Signature Program –  A specialized curriculum

implemented in a vertical team to enhance the vertical

team’s instructional program. 

Soft Costs - Generally refers to a collection of costs

added to the construction costs and may include items

like professional fees, construction testing and permitting,

contingencies, or administrative costs.

Site - Geographical location of a school’s building[s].

SQL - Structured Query Language; a form of database

EXHIBIT "B"

Page 316: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan

http://slidepdf.com/reader/full/austin-isd-recommended-facility-master-plan 316/317

iii

year, i.e., major HVAC equipment, security systems)

Priority 3: necessary/not yet critical (1-2 years, i.e., sitelighting, sanitation sewer, educational adequacy)

Priority 4: recommended (3-5 years, i.e., finishes,

educational adequacy)

Priority 5: does not meet current code/standards

/grandfathered (i.e., functional equity, 3rd tier ADA)

School Choice - Refers to a policy or practice that allows

parents and students to attend schools outside their 

assigned attendance zones for specific program

offerings or for reasons permitted in the District’s transfer 

policy.

School Zone Population - The number of AISD students

living within the attendance zone of a school.

that allows the analysis of data by sorting it into

categories.

TAS – Texas Accessibility Standards; standards set by the

TDLR (Texas Department of Licensing and Regulation) for 

accessibility to public buildings and facilities, places of

public accommodation, and commercial facilities, by

individuals with disabilities.

Teaching Space - A room or designated area where

classes or instruction are held.

TBD - To be determined.

Title 1 - Funding provided by the federal government for 

schools with high percentages of students who qualify for 

free and reduced lunch. The funding must supplement

existing funding provided by the school district for 

curriculum, instruction, and related services.

 

Page 314

District-wide Facility Master Plan

Glossary of Terms –  Update 02/15/2011 Under-enrolled - A school enrollment that is less than 85%

of permanent capacity. 

Under-utilized - A school enrollment that is less than 85%

of permanent capacity. 

Utilization Factor - The enrollment of a school divided by

its permanent capacity, also known as percent of

permanent capacity.

Vertical Team - A group of campuses consisting of a high

school and its feeder middle and elementary schools.

EXHIBIT "B"

Page 317: Austin ISD Recommended Facility Master Plan

8/7/2019 Austin ISD Recommended Facility Master Plan