Mayo Renewable Power IPPC Licence Application Attachment No. A A - 1 of 4 February 2012 ATTACHMENT No. A NON- TECHNICAL SUMMARY TABLE OF CONTENTS A.1. Installation and its Activities .................................................................................. 2 A.2. Raw and Auxilliary Materials ................................................................................ 2 A.3. Sources of Emissions from the Installation ........................................................... 2 A.4. Emissions to Waters ................................................................................................ 3 A.5. Environmental Conditions of the Site of the Installation .................................... 3 A.6. Nature and Quantities of Forseeable Emissions from the Installation............... 3 A.7. Technology and Techniques for Preventing and Reducing Emissions ............... 4 A.8. Measures for the prevention and Recovery of Waste .......................................... 4 A.9. Further Measures to Comply with General Basic Principles of the Operator .. 4 A.10. Normal Operating Hours ....................................................................................... 4 For inspection purposes only. Consent of copyright owner required for any other use. EPA Export 11-02-2012:04:06:03

Upload: others

Post on 14-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ATTACHMENT No. A NON- TECHNICAL SUMMARY TABLE OF … · Mayo Renewable Power IPPC Licence Application Attachment No. A A - 2 of 4 February 2012 A.1. Installation and its Activities

Mayo Renewable Power IPPC Licence Application Attachment No. A

A - 1 of 4 February 2012

ATTACHMENT No. A

NON- TECHNICAL SUMMARY

TABLE OF CONTENTS

A.1.  Installation and its Activities .................................................................................. 2 

A.2.  Raw and Auxilliary Materials ................................................................................ 2 

A.3.  Sources of Emissions from the Installation ........................................................... 2 

A.4.  Emissions to Waters ................................................................................................ 3 

A.5.  Environmental Conditions of the Site of the Installation .................................... 3 

A.6.  Nature and Quantities of Forseeable Emissions from the Installation ............... 3 

A.7.  Technology and Techniques for Preventing and Reducing Emissions ............... 4 

A.8.  Measures for the prevention and Recovery of Waste .......................................... 4 

A.9.  Further Measures to Comply with General Basic Principles of the Operator .. 4 

A.10.  Normal Operating Hours ....................................................................................... 4 

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 11-02-2012:04:06:03

Page 2: ATTACHMENT No. A NON- TECHNICAL SUMMARY TABLE OF … · Mayo Renewable Power IPPC Licence Application Attachment No. A A - 2 of 4 February 2012 A.1. Installation and its Activities

Mayo Renewable Power IPPC Licence Application Attachment No. A

A - 2 of 4 February 2012

A.1. Installation and its Activities

Mayo Renewable Power Limited is proposing to construct and own a new nominal 50 MWe Combined Heat and Power (CHP) Plant at the Killala Business Park, Killala, County Mayo. The site location is shown in Figure A.1. The long term aim of this proposal is to provide an extremely high efficiency CHP plant. The predominant fuel for the project will be wood biomass (renewable) with oil making up the remainder at a minimum of 4% of the total fuel amount. The plant will produce significantly lower CO2 emissions than a modern gas-fired power station. The key structures of the Mayo Renewable Power Ltd development will include the following: Boiler House and main stack Turbine House Water Treatment Plant Fire fighting pump house Fuel Tanks Auxiliary Transformer Generator Step-Up Transformer Back-up generator

The site layout and activity maps are shown in Figures A.2-A.4.

A.2. Raw and Auxilliary Materials

Mayo Renewable Power Ltd will generate steam use a fuel mix of mesquite, spruce, willow and 4% fuel oil to fuel a stoker grate boiler. Biofuel will be delivered by conveyor from the neighbouring Dalkia Ltd biofuel production facility. 344 m3 Type 2 fuel oil will be stored in tanks on the site. Key processes taking place on site are power generation in the turbine building, incoming raw water treatment, wastewater treatment, re-use of flue gas heat using a condensing economiser and storage of ash prior to re-use off site. Warm water will be delivered from the plant to the neighbouring Dalkia Ltd biofuel production facility and boiler ash will be sold in a commercial arrangement for use as forestry fertiliser.

A.3. Sources of Emissions from the Installation

A.3.1 Sources of Atmospheric Emissions

The main boiler emission point from the facility is the boiler stack. Vents and valves in the plant are considered minor emission points.

A.3.2 Sources of Water Emissions

Surface water run-off from roofs and roadways within the site will be discharged to a private sewer on a neighbouring biofuel facility site.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 11-02-2012:04:06:03

Page 3: ATTACHMENT No. A NON- TECHNICAL SUMMARY TABLE OF … · Mayo Renewable Power IPPC Licence Application Attachment No. A A - 2 of 4 February 2012 A.1. Installation and its Activities

Mayo Renewable Power IPPC Licence Application Attachment No. A

A - 3 of 4 February 2012

A.3.3 Noise Emissions

Baseline noise monitoring was undertaken for the facility, along with modelling of noise impacts at the nearest sensitive receptors. Cladding installed in the boiler and turbine building will abate noise emissions from internal equipment. It is not anticipated there will be any discernable noise impact at sensitive receptors associated with the Mayo Renewable Power facility.

A.4. Emissions to Waters

Surface water will pass through a private sewer, silt trap, petrol interceptor and detention basin prior to discharge to the Mullafarry Stream. Process waste water will be discharged without treatment to a storage reservoir and for dust supression at a woodchip pile contained within the neighbouring Fuel Processing Facility. No emissions to surface water or municipal sewer connection are planned.

A.5.

A.6. Environmental Conditions of the Site of the Installation

There are no ecological designated areas in the vicinity of the Mayo Renewable Power Ltd site. The activity is not carried out on any natural habitats designated in accordance with legislation, or located such that it is liable to have an adverse effect on such natural habitats.

A.7. Nature and Quantities of Forseeable Emissions from the Installation

The emissions from the Mayo Renewable Power Ltd facility will not result in significant environmental pollution as required by relevant legislation.

A.7.1 Air Emissions

Emissions from the boiler stack were modelled using a screening model to determine the atmospheric impact on the surrounding area. Predicted concentrations of all pollutants reach a maximum of 36% of the air quality standards. This impact will not have a significant impact on the atmospheric environment.

A.7.2 Noise Emissions

Baseline noise monitoring was undertaken for this application, along with modelling of noise impacts at the nearest sensitive receptors. Cladding installed in the boiler and turbine building will abate noise emissions from internal equipment. It is not anticipated there will be any discernable noise impact at sensitive receptors associated with the Mayo Renewable Power facility.

A.7.3 Water Emissions

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 11-02-2012:04:06:03

Page 4: ATTACHMENT No. A NON- TECHNICAL SUMMARY TABLE OF … · Mayo Renewable Power IPPC Licence Application Attachment No. A A - 2 of 4 February 2012 A.1. Installation and its Activities

Mayo Renewable Power IPPC Licence Application Attachment No. A

A - 4 of 4 February 2012

There will be no emissions to surface waters or public sewer from the proposed development. Surface water will be discharged to a private sewer in a neighbouring biofuel facility for treatment. Process water will be treated prior to delivery through a private sewer for treatment in the neighbouring biofuel facility. Sanitary wastewater will be delivered by private sewer for treatment in a package treatment plant and a percolation area.

A.8. Technology and Techniques for Preventing and Reducing Emissions

Mayo Renewable Power Ltd will make a considerable investment in BAT based technologies. The proposed Selective Non- Catalytic Reduction NOx abatement system complies with European Standards for Best Available Techniques.

A.9. Measures for the prevention and Recovery of Waste

All wastes arising at the Mayo Renewable Power Ltd facility will be removed by authorised waste collection permit holders. Wastes arising at the plant from power generation, maintenance and other typical sources will be classified in consultation with waste collectors, the European Waste Catalogue and relevant waste legislation. Hazardous waste streams will be collected, segregated and transported off-site by specialist waste management companies for appropriate treatment, recycling and/or disposal. Mayo Renewable Power Ltd endeavours to minimise and recover wastes where possible. Where this is not feasible collection recycling or disposal of waste is undertaken using authorised waste collection permit holders and licensed waste facilities to minimise any environmental impact.

A.10. Further Measures to Comply with General Basic Principles of the Operator

The site will be operated in accordance with the Dalkia Environmental Manual and an ISO 14001: 2004 accredited Environmental Management System (EMS).

A.11. Normal Operating Hours

The proposed development will operate 24 hours per day, 7 days per week for circa 8,100 hours per annum. There will be a total of 19 people employed by Mayo Renewable Power when the plant becomes operational. Staff members will work over three shifts as follows:

06:00 – 14:00 14:00 – 22:00 22:00 – 06:00

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 11-02-2012:04:06:03

Page 5: ATTACHMENT No. A NON- TECHNICAL SUMMARY TABLE OF … · Mayo Renewable Power IPPC Licence Application Attachment No. A A - 2 of 4 February 2012 A.1. Installation and its Activities

Site:

E = 120594

N = 327865

Job No

Drawing Status

Discipline

Scale at A4

Drawing No Issue

Drawing Title

Job Title

Do not scale © Arup

A4

Date

February 2012

Ordnance Survey Ireland Licence No. EN0002812 © Government of Ireland

000 PL1327873-70

1:50,000

Planning

Environmental

Figure: A1

Site Location

Mayo Renewable Power Ltd.

IPPC Licence Application

Arup, 50 Ringsend Road

Dublin 4

Tel +353(0)1 233 4455 Fax +353(0)1 668 3169

www.arup.ie

N

1000 2000 Metres0

Scale 1:50,000

500

Created using CADplot http://www.oasys-software.com/cadplot/

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 11-02-2012:04:06:03

Page 6: ATTACHMENT No. A NON- TECHNICAL SUMMARY TABLE OF … · Mayo Renewable Power IPPC Licence Application Attachment No. A A - 2 of 4 February 2012 A.1. Installation and its Activities

A3 A

1

B C D E F G

2

3

4

5

6

Job No

Drawing Status

Discipline

Scale at A3

Drawing No Issue

Drawing Title

Job Title

Client

Issue Date By Chkd Appd

Do not scale © Arup

Ordnance Survey Ireland Licence No. EN0002812 © Government of Ireland

Date

February 2012

000 PL1327873-70

1:1,000

Planning

Environmental

Figure: A2

Site Layout

IPPC Licence Application

Mayo Renewable Power Ltd.

Killala

Co. Mayo

\\dubnts03\D

ublin_Jobs\D

7800-D

7899\D

7873\4. Internal P

roject D

ata\4-02 D

raw

ings\4-02-6 E

nvironm

ental\IP

PC

\A

-02___S

ite Layout.dw

g 3 F

eb 2012 12:34:42

Arup, 50 Ringsend Road

Dublin 2

Tel +353(0)1 233 4455 Fax +353(0)1 668 3169

www.arup.ie

50 Metres2050

Scale 1:1000

10

N

Notes:

1. All coordinates relative to Irish national grid.

Created using CADplot http://www.oasys-software.com/cadplot/

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 11-02-2012:04:06:03

Page 7: ATTACHMENT No. A NON- TECHNICAL SUMMARY TABLE OF … · Mayo Renewable Power IPPC Licence Application Attachment No. A A - 2 of 4 February 2012 A.1. Installation and its Activities

03

02

0110

07

08

09

04

06

05

03

11

A3 A

1

B C D E F G

2

3

4

5

6

Job No

Drawing Status

Discipline

Scale at A3

Drawing No Issue

Drawing Title

Job Title

Client

Issue Date By Chkd Appd

Do not scale © Arup

Ordnance Survey Ireland Licence No. EN0002812 © Government of Ireland

Date

February 2012

000 PL1327873-70

1:1,000

Planning

Environmental

Figure: A3

Activity Map

IPPC Licence Application

Mayo Renewable Power Ltd.

Killala

Co. Mayo

J:\D

7800-D

7899\D

7873\4. Internal P

roject D

ata\4-02 D

raw

ings\4-02-6 E

nvironm

ental\IP

PC

\A

-03___A

ctivity M

ap.dw

g 3 F

eb 2012 10:43:08

Arup, 50 Ringsend Road

Dublin 2

Tel +353(0)1 233 4455 Fax +353(0)1 668 3169

www.arup.ie

50 Metres2050

Scale 1:1000

10

N

Legend:

1. Turbine House

2. Boiler House

3. Water Treatment Plant

4. Main Stack

5. Fire Water Storage Tank

6. Bunded Fuel Tanks

7. Generator Step-Up Transformer

8. Auxiliary Transformer

9. Back-Up Generator

10. Demineralised Water Storage

Tank

11. Urea Tank

Notes:

1. All coordinates relative to Irish national grid.

Created using CADplot http://www.oasys-software.com/cadplot/

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 11-02-2012:04:06:03

Page 8: ATTACHMENT No. A NON- TECHNICAL SUMMARY TABLE OF … · Mayo Renewable Power IPPC Licence Application Attachment No. A A - 2 of 4 February 2012 A.1. Installation and its Activities

01

02

03

04

05

06

090807

10

121311

15

14

17

16

18

19

20

21

22

23

24

25

26 27

34

3637

31

35

35

30

29

28

32

33

A3 A

1

B C D E F G

2

3

4

5

6

Job No

Drawing Status

Discipline

Scale at A3

Drawing No Issue

Drawing Title

Job Title

Client

Issue Date By Chkd Appd

Do not scale © Arup

Ordnance Survey Ireland Licence No. EN0002812 © Government of Ireland

Date

February 2012

000 PL1327873-70

NTS

Planning

Environmental

Figure: A4

Activity Within Buildings

IPPC Licence Application

Mayo Renewable Power Ltd.

Killala

Co. Mayo

J:\D

7800-D

7899\D

7873\4. Internal P

roject D

ata\4-02 D

raw

ings\4-02-6 E

nvironm

ental\IP

PC

\A

-04___A

ctivity M

ap B

ldg.dw

g 3 F

eb 2012 10:42:56

Arup, 50 Ringsend Road

Dublin 2

Tel +353(0)1 233 4455 Fax +353(0)1 668 3169

www.arup.ie

N

Boiler House:

28. Electrostatic Precipitator

29. Steam Drum

30. ID Fan

31. Flue Gas Condenser

32. Main Stack

33. Boiler

34. Econimiser

35. Stairwell

36. SNCR

37. Air Preheater

Turbine House:

1. Control Room

2. Conference Room

3. Operations Office

4. Staff Welfare

5. Maintenance Shop

6. Store Room

7. Aux Cooling Water Surge Tank

8. Aux Cooling Water Pump

9. Aux Cooling Water Heat Exchanger

10. Lubrication Oil Coolers

11. Generator

12. Steam Turbine

13. Condenser

14. Gland Condenser

15. Condensate Pumps

16. Air Receiver

17. Filter Dryer Skid

18. Air Compressor

19. Boiler Emergency Cooling Pump A

20. HP. FW. HTR. No 1 - 4

21. PT1 GSU Transformer

22. 13.8 kV Switchgear

23. PT2 Auxiliary Transformer

24. Stand-by Diesel Generator

25. 6.6 kV Switchgear

26. PT3 Auxiliary Transformer

27. 400V Switchgear

Created using CADplot http://www.oasys-software.com/cadplot/

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 11-02-2012:04:06:03