atmge/24 symposium - international civil aviation … meetings seminars … ·  · 2017-10-10•...

51
ATMGE/24 SYMPOSIUM 27-Sep-2017

Upload: vuonghuong

Post on 22-Mar-2018

218 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

ATMGE/24 SYMPOSIUM

27-Sep-2017

Page 2: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 2

• European CPDLC Mandate • Deploying a Data Link System • Data Link Evolution • Roadmap • SESAR 2020 • Airtel

Contents

Page 3: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2016 Page 3

EU CPDLC MANDATE

Page 4: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 4

• At the Single Sky Committee (SSC) Meeting 55, which took place on 14/15 Jan 2015, the SSC passed a favourable opinion on the proposed amendments to Regulation (EC) 29/2009 (DLS-IR). The regulation 2015/310 which amends Regulation 29/2009 has now been published and is available from the European Commission web site.

• The important date changes to Regulation (EC) 29/2009 in a simplified form are:

– The amended regulation will be applicable as from 05 Feb 2018

– All ANSPs should be ready by 05 Feb 2018 – All aircraft should be equipped by 05 Feb 2020

(there is no longer a distinction between forward fit and retrofit)

Link to Reference Documents

European CPDLC Mandate

Page 5: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 5

• EUROCONTROL Specification on Data Link Services (EUROCONTROL-SPEC-0116) is the primary document

• Complements the Implementing Rule (EC 29/2009) • It applies to all ATN/VDL 2 Data Link Equipment

– Aircraft communication and display systems, including an ATN Router and an ATN End System

– VDL 2 Airborne Radios – VDL 2 Ground Radios and Stations – ATN Air-Ground and Ground-Ground Routers – ATC Ground Centre communication and display systems, including

an ATN End System – Ground Data Recording equipment

• Defines detailed requirements, explanatory materials and conformity assessment materials providing means of compliance (MOC) associated with the DLS implementing rule

Eurocontrol Specification

Page 6: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 6

CPDLC Implementation

Page 7: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 7

Eurocontrol Specification

Page 8: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 8

• The use of VDLM2 air/ground Data Link as an enabler for CPDLC Mandate has encountered implementation issues.

European CPDLC Mandate Status

Page 9: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2016 Page 9

DEPLOYING A DATA LINK SYSTEM

Page 10: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 10

• Deploying a Data Link requires careful planning for an Air Navigation Service Provider (ANSP):

– the new system components (ATN Routers, DL-FEPs) must

be integrated with existing systems;

– ATN Network and VDL stations must be deployed and/or contracts with CSP must be established

– functional, system and interoperability testing must be performed before going live;

– and the Controllers must be trained.

• It requires careful planning and coordination as several actors and systems are involved.

Deploying a Data Link System

Page 11: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 11

Data Link Components

ATN A/G Router

ATN G/G Router

ANSP ATN Router

FDPS

AGDLS/ DL-FEP/DLS

Airborne Router

Airborne Router

ATN Network

ATC Centre

VDL2 Network

Page 12: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 12

Deployment of three components

A. Procurement and/or upgrade ATC Centre for CPDLC/ATN B. Procurement of AGDLS/DL-FEP and ANSP ATN Router C. Procurement of ATN Network and VDL M2 Ground Stations

– Directly – Service provided by Communication Service Providers

The procurement and/or deployment of ATC components (ATC Centre, AGDLS) is not dependant on the provision of ATN/VDL network.

Data Link Deployment

Page 13: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2016 Page 13

DATA LINK EVOLUTION

Page 14: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 14

• VDLM2 – Low-bandwidth air/ground Data Link – Aircraft equipage currently is VDLM2 – EU Mandate requires VDLM2 coverage – VDLM2 shares AOC/ATC traffic in one single channel – En-route and airport data in one single channel

• Recovery Plan – VDL Multi-Frequency with dedicated en-route frequency

when required – AOC data to other sub-networks

• Other candidates for ATC sub-network – Satellite (ESA Iris Precursor, …) – SESAR 2020 is looking at LDACS, AeroMACS and satellite

Sub-networks

Page 15: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 15

Data Link Components

Page 16: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 16

• A/G datalink: 3 Key Components – Physical Links – Networks – Applications/Services

A/G Data Links

Page 17: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2016 Page 17

Multi link concept

Existing Systems (VDL2)

Airport surface: AeroMACS

General terrestrial: LDACS

Satellite: Oceanic + Continental

Multilink

Concept

Page 18: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 18

A/G Data Links: Networks

Page 19: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 19

• ATN using IP instead of OSI Protocols • Need to distinguish Standardisation of ATN/IPS

(agreement and development required specifications) from Implementation of ATN/IPS (deployment of required infrastructure).

• Standardization of IPS • ICAO WG-I (2016-2020) • AEEC IPS Safety Services (2016-2019)

• Implementation. • 2-5 years after standardization completed.

• R&D Projects • SESAR-2020 • CleanSky2 • ESA - Iris

ATN/IPS

Page 20: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 20

• ATN/IPS shall be designed to support next steps communication requirements, with a long term duration/perspective (e.g. ATN-B3)

• ATN/IPS systems/equipment shall be designed to support data exchanges over future efficient (high speed) A/G subnetworks (AeroMACS, LDACS, SATCOM)

• Ground ATN/IPS infrastructure shall accommodate ATN/OSI avionics ATN B1 & B2 developed for Europe

• Airborne ATN/IPS architecture and systems shall be fully secured and comply with the Security Regulation and associated requirements

• ATN/IPS is based on IP Protocols

ATN/IPS General Requirements

Page 21: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 21

• ATN-B1 Applications – With European CPDLC Mandate Profile

• ATN-B2 Applications – Standards available

• ATN-B3 Applications – Future applications (Beyond 2028-2030)

A/G Data link: Applications

Page 22: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 22

• Standards – ED-228A/DO-350A, Safety and Performance Standard for Baseline

2 ATS Data Communications (Baseline 2 SPR Standard) – ED-229A/DO-351A, Interoperability Requirements Standard for

Baseline 2 ATS Data Communications (Baseline 2 Interop Standard)

– ED-230A/DO-352A, Interoperability Requirements Standard for Baseline 2 ATS Data Communications, FANS 1/A Accommodation (FANS 1/A - ATS Baseline 2 Interop Standard),

– ED-231A/DO-353A, Interoperability Requirements Standard for Baseline 2 ATS Data Communications, ATN Baseline 1 Accommodation (ATN Baseline 1 - Baseline 2 Interop Standard).

• ATN-B2 Rev A – April 2016

A/G Data link: Applications

Page 23: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 23

• Data Link Initiation (DLIC) • ATC Communications Management (ACM) • Clearance Request and Delivery (CRD) • ATC Microphone Check (AMC) • Departure Clearance (DCL) • Data Link Taxi (D-TAXI) • Information Exchange and Reporting (IER) • Position Reporting (PR) • 4-Dimensional Trajectory Data Link (4DTRAD) • In-Trail Procedure (ITP) • Interval Management (IM) • Oceanic Clearance Delivery (OCL) • Dynamic Required Navigation Performance (DRNP)

ATN-B2 Overview

Page 24: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 24

• Reuse of existing deployed physical links and networks

• Transition Considerations – Aircraft

• Monolingual Aircraft (B1 or B2) • Bilingual Aircraft (B1 and B2)

– Ground • CPDLC Mandate (B1) • SESAR Demonstrations (B2 only) • Operational Deployment (B2 with B1 accommodation)

ATN-B2

Page 25: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2016 Page 25

DATA LINK ROADMAP

Page 26: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 26

SESAR FCI Roadmap

IOC

2018

ICAO Block 1/2 Block 2/3Block 0/1

IOC

2028

Transition

Co-existence

Long-term Satcom

(class A)

AeroMACSInitial AeroMACS

LDACSTransition

Co-existence

Transition

Co-existence

Iridium-Next/Inmars at-SBB (Class B)

SatComcompliant with AMS(R)S SARPs (Annex10-vol III - Nov.2007)Iridium system

Classic Aero (Inmarsat; MTSAT)

FCI

Long- termToday/Short-term Mid-term

Full 4D Business Trajectories

ATN-B3/IP

Initial 4DTrajectories &

Airport Services

Initial Data LinkEn-route services

FANS & ATN-B1/OSI FANS & ATN-B2/OSI

Transition Co-existence

VDL M2/MFVDL M2

IOC – Initial Operational Capability

Page 27: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 27

FAA Roadmap

Page 28: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 28

• Different approaches due to commercial and technical considerations

Avionics Roadmaps

Page 29: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2016 Page 29

SESAR 2020

Page 30: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 30

Single European Sky ATM Research

SESAR 2020

This project has received funding from the SESAR Joint Undertaking under the European Union’s Horizon 2020 research and innovation programme under grant agreement 731818

.

Page 31: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 31

• Airtel was member of SESAR 1 • Airtel is member of SESAR 2020 as NATMIG • North European ATM Industry Group (NATMIG)

– consortium • Airtel ATN of Ireland, • Saab of Sweden and • SINTEF of Norway.

– The consortium was founded in 2007 with the purpose of creating a stakeholder body to participate in SESAR.

– NATMIG will run projects valued at approximately €20 Million as part of SESAR 2020

SESAR 2020

Page 32: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2016 Page 32

PJ14 Future communication links

Page 33: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2016 Page 33

PJ14 Multi link concept

Existing Systems (VDL2)

Airport surface: AeroMACS

General terrestrial: LDACS

Satellite: Oceanic + Continental

Multilink

Concept

Page 34: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 34

• SESAR 2020 Industrial Research • EECNS (Essential and Efficient Communication

Navigation and Surveillance Integrated System)

• Purpose – The PJ 14 CNS aims to specify and develop the future

Technologies coming from the Communication, Navigation and Surveillance domains in order to support and manage the Operational Services, like the 4D Trajectory Management, in the future ATM System.

• Communication solution – PJ14.02.01 LDACS – PJ14.02.02 Satellite – PJ14.02.04 Future Communications Infrastructure – PJ14.02.06 AeroMACS

PJ14 Overview

Page 35: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 35

• Solution PJ.14-02-01: FCI Future Terrestrial Data Link has the objective to develop and standardize the candidate future terrestrial data link system LDACS. – support the development and standardization of the

LDACS technology. – contribute to the development of a harmonized global

standard. – develop and verify a fully functional LDACS prototype and

assess the impact on other systems. – The prototype will be integrated into an FCI validation

platform (with other links)

PJ14.02.01 LDACS

Page 36: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 36

• Solution PJ.14-02-02: Future Satellite Communications data link is focused on the near and long satellite data link technologies for both continental and oceanic regions. – Compliance with ATS B2 – Development of technical specifications and validation

procedures for Long Term SATCOM (class A SatCom) – Intermediate step of the i4D based on ESA Iris Precursor

solution (Class B) – Technical validation of satellite Air-Ground Datalink for

Long Term SATCOM integrated in the FCI (ATS B3, ATN/ IPS, multilink)

– Standardization at global level (ICAO, EUROCAE) of proposed solution for Long Term SATCOM;

– Coordination with ESA Iris Programme and the reuse and consolidation of the ESA Iris programme prototypes where possible

PJ14.02.02 Satellite

Page 37: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 37

• Solution PJ14-02-06: Completion of AeroMACS Development – Integrate and verify the AeroMACS Data Link with ATN

services, both at ground and on-board. – Initially ATN/OSI will be considered, while ATN/IPS will be

verified subsequently, in line with the ICAO roadmap. – The AeroMACS A/G datalink will also be integrated with the

multilink environment, – Definition and potential implementation handover from

AeroMACS to VDLM2 during take-off, and vice-versa during landing.

– The Network and Security System requirements will be finalised, also in relation to multilink.

– A digital voice communications solution over AeroMACS (VoIP) will be finalised and verified.

– The solution will also support the standardization process.

PJ14.02.06 AeroMACS

Page 38: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 38

• Solution PJ.14-02-04: – FCI Network Technologies (ground deployment) – develop and standardise the FCI elements that integrate

all the future terrestrial data link systems • LDACS (PJ14-02-01), • Satellite Communications (SatCom) (PJ14-02-01) • AeroMACS (PJ14-02-06)

– this solution will address transversal topics • security, • safety, • civil-military interoperability with • ground/ground communications networks.

– The solution will demonstrate multi-link to a mobile end system (e.g. airplane) by means of LDACS, AeroMACS, and SATCOM data links.

PJ14.02.04 Future Communications Infrastructure

Page 39: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2016 Page 39

PJ31

Page 40: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 40

• SESAR 2020 Very Large Scale Demonstration (VLD)

• Purpose – Demonstrate ATM benefits through the use of downlink 4D

trajectory data in ground systems.

• Objectives – Airborne industry will demonstrate for the first time, a

certified airborne unit capable of downlinking ADS-C EPP data

– ANSP and ground industry are building pre operational systems platforms capable of receiving and processing ADS-C data including EPP (Extended projected profiles)

– Demonstration of Operational Benefits of Initial trajectory Information (EPP)

PJ31 Overview

Page 41: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 41

PJ31 Overview

Page 42: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 42

PJ31 Revenue flights

Page 43: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 43

PJ31 ADS-C Contract

Page 44: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2016 Page 44

AIRTEL We are ready to guide ANSPs to

meet the CPDLC mandate successfully

Page 45: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 45

• Products — Operational products — Test systems — VDL Monitoring systems

• Adaptable

— Each ANSP has specific requirements and Airtel adapts to meet these needs

• Proven technology — 13 European ANSP use our software — Over 2,000 aircraft are equipped by Airtel — Integrated with all major system integrators

• Experience — Working in Data Link since its inception in ATC — Key member of ELSA consortium report

• Ready for the future

— Partner in ESA Iris Precursor and Iris Evolution to provide CPDLC ATC using satellite network

— SESAR 2020 member participating in PJ14 new sub-network and network technologies and future ATN B2 applications

Airtel The Data Link Experts

Page 46: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 46

ATN A/G Router

ATN G/G Router

ANSP ATN Router

FDPS

AGDLS/ DL-FEP/DLS

Airborne Router

Airborne Router

ATN Network

ATC Centre

VDL2 Network

Operational Data Link Products

Page 47: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 47

Validating CPDLC deployment

ANSP ATN Router

FDPS

AGDLS/ DL-FEP/DLS

ATC Centre

ATN A/G Router

ATN G/G Router

Airborne Router

Airborne Router

ATN Network

Ground Validation Suite

Page 48: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 48

Validating CPDLC deployment

ANSP ATN Router

FDPS

AGDLS/ DL-FEP/DLS

ATC Centre

Ground Validation Suite

• Ground Validation Test Systems provide testing means that require less actors and systems.

• Simulation of up to 1,000 aircraft

• Early detection of interop problems

• Independent Validation

• Easy setup

• No coordination required with CSP or Avionics

• Large emulations

• Testing of valid and invalid scenarios

• Shadowing of operational scenarios

Ground Validation Suite

Page 49: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 49

Monitoring VDL Deployments

ATN A/G Router

ATN G/G Router

ANSP ATN Router

FDPS

AGDLS/ DL-FEP/DLS

Airborne Router

Airborne Router

ATN Network

ATC Centre

VDL2 Network

Mobile Test Platform

Page 50: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 50

European ANSP Customers

Page 51: ATMGE/24 SYMPOSIUM - International Civil Aviation … Meetings Seminars … ·  · 2017-10-10• ATC Communications Management ... Information (EPP) PJ31 Overview ... —Over 2,000

© Airtel ATN 2017 Page 51

We are ready to guide ANSPs to deploy CPDLC

Contact: Frank O’Connor

CEO

Email: [email protected]

Telephone: +353 1 284 28 21

Questions?