PROJECTED Cost and Plan for Athletics Renovations to Lee Barnes’ Stadium, Lower LHHS Field, and Thunderbolt

Upload: jaime-festa-daigle

Post on 27-Jan-2017

172 views

Category:

Education


0 download

TRANSCRIPT

Page 1: Athletic Plan Update

PROJECTED Cost and Plan for Athletics

Renovations to Lee Barnes’ Stadium, Lower LHHS Field, and Thunderbolt

Page 2: Athletic Plan Update

Lee Barnes’ Stadium Needs•Lighting upgrade and relocation•All weather track•Field turf•Seating•Concession and restrooms

Page 3: Athletic Plan Update

Lower Field Needs• Completion of multi-use field

▫Additional baseball, softball, track, discus, and football/soccer practice field

• Lighting for additional field• Concession, training room and restrooms• Field turf for main baseball and softball

field• Softball backstop and perimeter fencing • Paved parking lot• Dug out renovations

Page 4: Athletic Plan Update

Lower Field Example

Page 5: Athletic Plan Update

Why Field Turf•Time of use•Reduction of water usage•Cost effective with maintenance•Safety

Page 6: Athletic Plan Update

FIELD DURABILITY:

•GRASS•60 hrs x 26 weeks x 10 yrs= 15,600 hrs

•FIELD TURF•100 hrs x 48 weeks x 10 yrs= 48,000 hrs

Page 7: Athletic Plan Update

Natural Grass Field TurfBase: $280,000 $280,000Materials: $220,000 (cost of sod) $400,000Maintenance: $52,500 X 10 yrs.(annual cost for herbicides, $5,000 x 10 yrs.pesticides, re-sodding, water, mowing)Total: $1,025,000 $730,000

COST COMPARISON FOR ONE FIELD

Page 8: Athletic Plan Update

Annual Maintenance Cost• GRASS FIELD TURF• Mowing Equipment 7,068 • Labor ($20 per hr) 6,000 1,000• Clipping Removal 2,861 • Fertilization 4,856 • Over seeding 466 • Coring 2,848 • Topdressing 9,565 • Thatch Removal 185 • Monitor Irrigation 846 • Equip. Depreciation & Fuel 3,500 1,500• Water Cost 5,400 •  Re-Striping Field Lines GRASS FIELD TURF• Labor 5,800 1,000• Material 3,105 1,500• TOTAL ANNUAL COST: 52,500 5,000

•  

Page 9: Athletic Plan Update

COST OF OPTIONSGRASS FIELD TURF• PROJECT ESTIMATE

$1,912,596• (just the multi field

developed)• Annual Maintenance Cost

52,500• Actual water cost with out over

seeding $50,600 • Projected water cost with over

seeding $75,000• 10 year cost: • With out over seeding

$2,938,596• Over seeding $3,182,596

• PROJECT ESTIMATE $2,440,448

• Annual Maintenance Cost 5,000

• Projected water cost minimal • 10 year cost : $2,490,448

Page 10: Athletic Plan Update

• An independent, three-year study of competitive college football showed that when compared to natural grass the FieldTurf system leads to:

• 20% Fewer Muscle Strains / Tears• 12% Fewer Concussions20% Fewer Ligament Tears• 24% less High Ankle Sprains• 20% Fewer Severe Injuries• 23% Fewer Injuries on 4-8+ Year Old Surface

• An independent, five-year safety study of competitive high school football showed that when compared to natural grass the FieldTurf system leads to:

• 44% Fewer Concussion Injuries Combined• 43 % Fewer ACL Injuries Combined • 25% Less Time Lost to Long-Term Injuries (Lasting 22+ Days)• 16% Less Time Lost to Short-Term Injuries (Lasting 1-2 Days)

• A Woman's Collegiate Soccer Study concluded less severe and total injuries occurred on FieldTurf compared to Natural Grass.

• In regards to incidence of injury:• 22% Fewer Total Injuries• 7% Fewer Substantial Injuries• 2% Fewer Severe Injuries• In regards to head and knee trauma:• 12% Fewer Concussions• 18% Lower ACL and Associated Tissue Trauma Combined

Page 11: Athletic Plan Update

Lighting •Budget estimate from Qualite Sports

Lighting for all lighting needed: ▫Lee Barnes’ Stadium $85,00O▫Lower Field $90,000

•Break down of items on bid sheet from Qualite:

•TOTAL $175,000

Page 12: Athletic Plan Update

Track Surface and Installation •Budget estimate from Renner Sports

Surface▫8 Lane estimate $300,000

•TOTAL $300,000

Page 13: Athletic Plan Update

Turf for Lee Barnes’ Stadium•Budget estimate from Field Turf:

▫Site Engineering and Design $230,400▫Turf and Install $380,000

•TOTAL $610,400

Page 14: Athletic Plan Update

Seating for Lee Barnes’ Stadium•Home and Visitor Renovation

▫1500 capacity for each; 3,000 seat capacity ▫10 HC Seating ▫Current codes including railings per side

•Budget estimate from Tomahawk ▫Seating $356,000▫Press box $30,000▫Shipping and install $50,000

•TOTAL $436,800

Page 15: Athletic Plan Update

Concession, Restrooms and Storage for Lee Barnes’ Stadium •Budget Estimate $100,000

Page 16: Athletic Plan Update

Lower Field• Main Baseball Field

• Site Engineering and Design $336,000• Turf $399,000

• Main Softball Field• Site Engineering and Design $116,000

• Turf $137,000

• Multi-Use• Site Engineering and Design $230,000

• Turf $380,000

• TOTAL $1,599,150

Page 17: Athletic Plan Update

Lower Field Bleachers•Main Baseball $24,050•Main Softball $24,050•SEC Baseball $9,099•SEC Softball $9,099• Install $15,000

TOTAL $81,298

Page 18: Athletic Plan Update

Bleacher Example

Page 19: Athletic Plan Update

Fencing / Paving / Misc•Lower field perimeter •Softball and SEC field backstops •Track Discus fencing and ring •Parking lot paving $200,000 (est)•Softball field scoreboard $10,000 (est)•Baseball, Softball, Lee Barnes’ PA Sound

System $60,000 (est)•New Dugouts $100,000 (est)

Page 20: Athletic Plan Update

Lower Field Concession, Training, and Restrooms•Budget Estimate $100,000

Page 21: Athletic Plan Update

Dugout and Discus Ring Example

Page 22: Athletic Plan Update

Thunderbolt Track and Field•Site Engineering and Design $230,400•Turf $380,000•Track $300,000

•TOTAL $910,000

Page 23: Athletic Plan Update

Thunderbolt Example

Page 24: Athletic Plan Update

Long Term Projection •Budget Estimate for Renovation and

Resurface $661352

Page 25: Athletic Plan Update

PROJECT TOTALS• LIGHTING $175,000• TRACK $300,000• TURF LEE BARNES STADIUM $610,400• LEE BARNES SEATING $436,800• LEE BARNES CONSESSION/RESTROOM/STORAGE

$100,000• LOWER FIELD CONSESSION/RESTROOM/STOARGE

$100,000• LOWER FIELD TURF $1,599,150• LOWER FIELD BLEACHERS $81,298• THUNDERBOLT TRACK AND FIELD $910,000• LF FENCING PARKING LOT PAVING $370,000• UP KEEP YEAR 10-15 $661,352• PROJECT ESTIMATE $5,344,000