asta powerproject v11 - technical...

4
Discover more at www.astadev.com INTERFACE Word wrapping within spreadsheet cells with each cell having Save and Open in a Microsoft Project (xml) Best in class Date Zone for the bar chart. On-screen scale Up to 10 lines with many different entries Completely extensible data structure with ‘User every object. String, Integer, Float, Date and Bolean PROJECT MANAGEMENT FEATURES TECHNICAL INFORMATION Asta Powerproject Familiar interface; Microsoft Office 2010 menu and ribbon Other inserted files and OLE objects compliant management Classic spreadsheet and bar chart (Gantt) Password security and speeds up work changed by dragging with up to 3 different horizontal scales. Defined Fields’ and ‘User Defined Tables’ on you edit. Changes applied immediately. Globally edit many items at one time Comprehensive unlimited Undo and Redo even past a save Interface with external applications or data. Send emails panning Unique Project View allows easy manipulation, assignment Vertical shading on plan Many Wizards for easy control The depth and colour of task, resource and cost bars can be affected to add extra dimensions to plans chart itself) for true WYSIWYG display and printing its own font and appearance format, Primavera P3 (.P3b) and Primavera XER. Windows Explorer style interface for hierarchical library Intelligent date grid lines i.e. week start, week ending Intuitive ‘drag & drop’ assignment of resources, codes, etc. Many standard templates and reports included (e.g. fiscal numbering, day of the week, years + months, etc.) supported Microsoft Visual Basic for Applications. on specific events. Automate regular operations working environment Unique ‘diagonal’ scrolling facility. Top left to bottom right All features can be turned On/Off (including the bar Create formulae to display user-definable information in spreadsheet first task on a selected bar into view. Go-To date control and Find task facilities. Go-To can bring the Floating (modeless) or dockable dialogs that stay on screen as Automatic data recovery Zoom control and Microsoft Intellimouse support for scrolling & Date picker for easy date selection Time units from Seconds to Years Working units and Elapsed time User defined units, e.g. Shifts Create tasks by drawing or typing Bulk entry for similar and recurring tasks Tasks remember the time unit at creation Edit and multi-edit with Toolbars including maths functions Spell Checker (Microsoft Office dictionaries) Go-To can bring the first task on the selected bar into view Manages over 150,000 tasks (hardware dependent) Text annotations and tokens View-based fully editable view of filtered and sorted data Includes the Industry Standard macro language

Upload: duongthuy

Post on 08-May-2018

229 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Asta Powerproject V11 - Technical Specificationastapowerproject.net/wp-content/uploads/2015/07/APP-FS-1202-V12... · Asta Powerproject Familiar interface; Microsoft Office 2010 menu

Discover more at www.astadev.com

INTERFACE

• •

• •

• Word wrapping within spreadsheet cells with each cell having • Save and Open in a Microsoft Project (xml)

Best in class Date Zone for the bar chart. On-screen scale

Up to 10 lines with many different entries

Completely extensible data structure with ‘User

every object. String, Integer, Float, Date and Bolean

• •

• •

• •

• •

• •

PROJECT MANAGEMENT FEATURES

TECHNICAL INFORMATION Asta Powerproject

Familiar interface; Microsoft Office 2010 menu and ribbon Other inserted files and OLE objects compliant

management

Classic spreadsheet and bar chart (Gantt) Password security

and speeds up work

changed by dragging with up to 3 different horizontal scales. Defined Fields’ and ‘User Defined Tables’ on

you edit. Changes applied immediately. Globally edit many items at one time

• •

Comprehensive unlimited Undo and Redo even past a save Interface with external applications or data. Send emails

panning

Unique Project View allows easy manipulation, assignment Vertical shading on plan

Many Wizards for easy control The depth and colour of task, resource and cost bars can be affected to add extra dimensions to plans

chart itself) for true WYSIWYG display and printing

its own font and appearance format, Primavera P3 (.P3b) and Primavera XER.

Windows Explorer style interface for hierarchical library Intelligent date grid lines i.e. week start, week ending • •

Intuitive ‘drag & drop’ assignment of resources, codes, etc. Many standard templates and reports included • •

(e.g. fiscal numbering, day of the week, years + months, etc.) supported

Microsoft Visual Basic for Applications.

on specific events. Automate regular operations

• • working environment

• •

• •

• •

Unique ‘diagonal’ scrolling facility. Top left to bottom right All features can be turned On/Off (including the bar

Create formulae to display user-definable information in spreadsheet

first task on a selected bar into view.Go-To date control and Find task facilities. Go-To can bring the

• •

Floating (modeless) or dockable dialogs that stay on screen as Automatic data recovery

Zoom control and Microsoft Intellimouse support for scrolling & Date picker for easy date selection

Time units from Seconds to Years

Working units and Elapsed time

User defined units, e.g. Shifts

Create tasks by drawing or typing

Bulk entry for similar and recurring tasks

Tasks remember the time unit at creation

Edit and multi-edit with Toolbars including maths functions

Spell Checker (Microsoft Office dictionaries) • Go-To can bring the first task on the selected bar into view

Manages over 150,000 tasks (hardware dependent) Text annotations and tokens • •

• •

View-based fully editable view of filtered and sorted data Includes the Industry Standard macro language

Page 2: Asta Powerproject V11 - Technical Specificationastapowerproject.net/wp-content/uploads/2015/07/APP-FS-1202-V12... · Asta Powerproject Familiar interface; Microsoft Office 2010 menu

TECHNICAL INFORMATION

Discover more at www.astapowerproject.net

PROJECT MANAGEMENT FEATURES •

Lead/Lag values. Lead/Lag links can be drawn

Multiple critical paths if required Multiple links between tasks allowed

• Multiple tasks per line (which can overlap) and task per line mode for compatibility with other products.

SS link uses the predecessor calendar and a FF link the successor

• Single click milestone creation. Start & end milestone types

Hide Non-Driving links

calendar. Plans can have a folding calendar to focus on

• •

• • Categories and can be displayed/hidden.

• Links can be interrogated. The task at • A single task can be selected and its predecessor

• Extensive task constraints can be established Start On, • Projects (and parts of projects) can be

• •

• within projects to protect important dates and reduce excess

• •

Asta Powerproject

‘chased’ in this mode

‘Push’ links as well as normal ‘pull’ behaviour Vertical links as curved, if required

directly onto the plan

Comprehensive calendar control. All working conditions Batch link entry

Start On or After, Start On or Before, Finish On, rescheduled (critical path analysis).

Links can be created via a column, a mouse, a dialogue boxor a tool button

Non-working time identified by ‘necking’ Deleting a task re-links connected tasks

working time

Finish On or Before, Finish On or After, Work-Between

Backward and forward scheduling supported

alternative logical schemes can be interrupted at some point before the finish

the ‘ other end’ of a link can be brought into view and successor tasks identified further logic can be

• Tasks can have notes All link types supported FS, SS, FF & SF with

Tasks can be set to ALAP or ASAP Links can be drawn to maintain offsets between tasks

accommodated. Any task or resource can have any • •

Link categories can be omitted from a reschedule for Interruptible tasks where work can start earlier and •

of the task

float

Buffer tasks, also known as 'contingency tasks', can be use Split Tasks

Unique, Line of Balance histograms to optimise resources through

can work at a time to accelerate completion of project project including immediate setting of number of workforces that

Use task Work and a work rate to set duration of task without adding resources

Progress tasks by task work done•

Hide selected tasks Filter and sort tasks by code, date, resource etc.

Links between tasks on same line supported Links can be grouped by appearance category.

Tasks can be summarised into Task and resource 'Coding' via unlimied hierachical code hierarchical work breakdown structure libraries that give colour coding (WBS) of any complexity

Negative float can be generated

Customisable Work Breakdown Structure

Move/copy/delete affects all subordinate tasks. All Links can be created between Summary tasks all Subordinate details rolled-up to Summary level

Page 3: Asta Powerproject V11 - Technical Specificationastapowerproject.net/wp-content/uploads/2015/07/APP-FS-1202-V12... · Asta Powerproject Familiar interface; Microsoft Office 2010 menu

Discover more at www.astapowerproject.net

PROJECT MANAGEMENT FEATURES

Excellent editing capabilities. Single task, row and multiples copy, move and amend. Special right click-drag

Highlight tasks and library entries to ‘Book-Out’ sections of a project for local/off-line editing. ‘Book-Out’ status Read Only, Read-Write, Read-Write-Delete

with all original details retained. Full comparison and •

Identification work done by a specific period to

period, EVA per period etc– not just actual start + actual end, but how you got there with gaps between

GRAPHICS

• •

• •

• OLE Embedding from any registered program. Insert a linked or embedded MS Excel® spreadsheet or MS Word® document icon. Edit either in place or within the referenced

• Graphical surrounds to your output—Borders easily created with the included PowerDraw. Guarantee that logos, text etc are not changed. Far more than headers

• •

• •

RESOURCE MANAGEMENT

Asta Powerproject TECHNICAL INFORMATION

scenarios rather than historical information

Baseline data can be seen on separate rows. Special Excellent progress features. Actual dates and values can ’Revert to’ option for storing and recovering ‘What-If’ be entered

supported ‘Book-In’ changes to update central plan command

variances. Items can be edited and limited data added exactly model the actuals per period – Actual Cost per

Out-of-sequence progress supported Jagged progress line highlights problem areas • •

Display all available tokens to left, right and middle of tasksLinks can be created from Hammock tasks. Hammock tasks supported. Full editing and roll-ups. Progress value roll-up on summarized tasks •

View based with named Views. A view has a filter, sort Multiple completed sections can be replaced by order, spreadsheet table and project scope. Fully editable continuous progress appearance

on Gantt chart

Display part critical highlighting on taskstasks (multiple resume dates)

annotations also supported

Import BMP, WMF, EMF, JPG and GIF graphics Preview with Toolbar to affect image on screen

Project data can be referenced from within text annotations so Save regular collection of settings to a Print Profile for

Assign an SQL filter to an annotation to trigger an event

programme and footers. Border preview on selection

Rich Text Format, multi-line annotations with mixed Output quality is fully WYSIWYG and recognised

that values reflect current information. Functions within text easy recall and 2-step printing

output with graphics if required for intranet extranet/internet publishing

Superb preview with toolbar to affext image on screen•

Unlimited number of comprehensive task level Baselines Unique ‘Progress Periods’ with date and colour

resources supported Permanent (labour & plant), and consumable (material), type Allocate same resource many times

Resource libraries can be organised as a hierarchy of skill/ Resource ‘bars’ can optionally show each resource types. Resource Assignment Groups also supported assignment on the bar chart

fonts and appearances. Attach to tasks so that they move as the best there is. Multi-page output, each within a with the tasks, or leave at a point. Group annotations by Border. Many scaling aspects ensure you get what you

to explain symbols, etc. Print just a date range to focus on what you want

Export HTML, BMP, JPG, EMF and clipboard graphics Save Views, Branches and Projects as HTML

category to display or hide what you want easily and quickly. Many optional legends

• •

Page 4: Asta Powerproject V11 - Technical Specificationastapowerproject.net/wp-content/uploads/2015/07/APP-FS-1202-V12... · Asta Powerproject Familiar interface; Microsoft Office 2010 menu

TECHNICAL INFORMATION

Discover more at www.astapowerproject.net

• Various resource modelling methods including effort and work • Resource Levelling. Define date range, specify resources

resource usage. Resource assignments can be split,

• Resource Breakdown Structure View (RBS) shows the tasks • Resource allocations can be individually progressed.

• •

• Resource Assignment View identifies which resource, with a

COST MANAGEMENT

• • graphs. Baseline data included on graphs. Graphs

• Resources can have costs and income rates for different pay & • Cost allocations can be individually progressed. Cost

by changes to library rates

• Cost libraries can be organised as a hierarchy of Cost Centres. • Earned Value Analysis (EVA) data Available (ACWP,

• Cost ‘bars’ can optionally show each cost/income assignment • Multi-Currency support $, £, € etc. Define own currencies and fixed exchange rates between any of them. Currency of entry retained. Any spreadsheet column can display values in any currency. •

HARDWARE REQUIREMENTS

• MULTI USER OPTION

Asta Powerproject

RESOURCE MANAGEMENT

driven task durations. Resource Toolbar facilitates rapid editing and priority for levelling. Extend end date or balance

by assignment of ‘Demand’ resources (PM) and Resource histograms. Tasks contributing to resource

certain skill, has available time. Full resource editing facilities

Project Manager/Resource Manager dialogue facilitated Navigable, definable graphs. Skill and individual

satisfying with ‘Scheduled’ resource allocations (RM) over assignment easily identified in editable view. Baseline data included on graphs. Graphs extensible by formulae. Single click copy

assigned to each resource in a structured and editable view Effort % complete value available

stretched and have minimum resource levels defined

Cost and Income assignment for true cash flow Navigable, definable Graphs. Group and individual cost

extensible by formulae. Single click copy

charge rates complete value available. Actual costs are not affected

on the bar chart

Allocate the same cost centre many times ACWS etc)

Cost Breakdown Structure View (CBS). Grouped cost allocations identified and summarised on editable view

Windows® XP, Windows Vista, Windows 7. Operating Systems Microsoft®

space. SVGA recommendedMinimum P400+ processor, 512+ Mbv RAM, 250 Mb disk

PROJECTS ANALYTICS INC

E: [email protected] T: 1-800-931-1582