ast checklists

16
7/23/2019 AST Checklists http://slidepdf.com/reader/full/ast-checklists 1/16 STI SP001 AST Record OWNER INFORMATION FACILITY INFORMATION INSTALLER INFORMATION Name Name Name Number and Street Number and Street Number and Street City, State, Zip Code City, State, Zip Code City, State, Zip Code . TANK ID SPECIFICATION: Design: UL SWRI Horizonta !erti"a Re"tanguar   #$I %t&er   Un'no(n )anu*a"turer: Contents: Constru"tion Date: Last Repair+Re"onstru"tion Date: Dimensions: Capa"ity: Last C&ange o* Seri"e Date: Con stru "tion : -ar e Stee Cat&o di"a y $ro te "ted C& e"' on e: #. /a ani " or -. Imp ressed Current0 Date Instaed: 111111111111111  Coated Stee Con"rete $asti"+2ibergass %t&er  D ou b e3 -o tt om D ou b e3 Wa L in ed D at e I ns ta ed : 1 11 11 11 11 11 11 11 Containment: 4art&en Di'e Stee Di'e Con"rete Synt&eti" Liner %t&er CRD): Date Instaed: 5ype: Reease $reention -arrier: Date Instaed: 5ype:  #S5 INS$4C5I%N S5#ND#RD 6 S4$54)-4R 7866 C%$9RI/H5 7866 Stee 5an' Institute

Upload: gary-woodside

Post on 13-Apr-2018

288 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: AST Checklists

7/23/2019 AST Checklists

http://slidepdf.com/reader/full/ast-checklists 1/16

STI SP001 AST Record

OWNER INFORMATION FACILITY INFORMATION INSTALLER INFORMATION

Name Name Name

Number and Street Number and Street Number and Street

City, State, Zip Code City, State, Zip Code City, State, Zip Code

.

TANK ID

SPECIFICATION:

Design: UL SWRI Horizonta !erti"a Re"tanguar  

 #$I %t&er  

 Un'no(n

)anu*a"turer: Contents: Constru"tion Date: Last Repair+Re"onstru"tion Date:

Dimensions: Capa"ity: Last C&ange o* Seri"e Date:

Constru"tion : -are Stee Cat&odi"a y $ro te"ted C&e"' one: #. /a ani" or -. Impressed Current0 Date Instaed: 111111111111111 

 Coated Stee Con"rete $asti"+2ibergass %t&er  

 Doube3-ottom Doube3Wa Lined Date Instaed: 111111111111111 

Containment: 4art&en Di'e Stee Di'e Con"rete Synt&eti" Liner %t&er  

CRD):  Date Instaed: 5ype:

Reease $reention -arrier:  Date Instaed: 5ype:

 #S5 INS$4C5I%N S5#ND#RD 6 S4$54)-4R 7866

C%$9RI/H5 7866 Stee 5an' Institute

Page 2: AST Checklists

7/23/2019 AST Checklists

http://slidepdf.com/reader/full/ast-checklists 2/16

TANK ID

SPECIFICATION:

Design: UL SWRI Horizonta !erti"a Re"tanguar  

 #$I %t&er  

 Un'no(n

)anu*a"turer: Contents: Constru"tion Date: Last Repair+Re"onstru"tion Date:

Dimensions: Capa"ity: Last C&ange o* Seri"e Date:

Constru"tion : -are Stee Cat&odi"a y $ro te"ted C&e"' one: #. /a ani" or -. Impressed Current0 Date Instaed: 111111111111111 

 Coated Stee Con"rete $asti"+2ibergass %t&er  

 Doube3-ottom Doube3Wa Lined Date Instaed: 111111111111111 

Containment: 4art&en Di'e Stee Di'e Con"rete Synt&eti" Liner %t&er  

CRD):  Date Instaed: 5ype:

Reease $reention -arrier:  Date Instaed: 5ype:

TANK ID

SPECIFICATION:

Design: UL SWRI Horizonta !erti"a Re"tanguar  

 #$I

 Un'no(n %t&er

)anu*a"turer: Contents: Constru"tion Date: Last Repair+Re"onstru"tion Date:

Dimensions: Capa"ity: Last C&ange o* Seri"e Date:

Constru"tion : -are Stee Cat&odi"a y $ro te"ted C&e"' one: #. /a ani" or -. Impressed Current0 Date Instaed: 111111111111111 

 Coated Stee Con"rete $asti"+2ibergass %t&er  

 Doube3-ottom Doube3Wa Lined Date Instaed: 111111111111111 

Containment: 4art&en Di'e Stee Di'e Con"rete Synt&eti" Liner %t&er  

CRD):  Date Instaed: 5ype:

Reease $reention -arrier:  Date Instaed: 5ype:

 #S5 INS$4C5I%N S5#ND#RD 7 S4$54)-4R 7866

C%$9RI/H5 7866 Stee 5an' Institute

Page 3: AST Checklists

7/23/2019 AST Checklists

http://slidepdf.com/reader/full/ast-checklists 3/16

TANK ID

SPECIFICATION:

Design: UL SWRI Horizonta !erti"a Re"tanguar  

 #$I

 Un'no(n %t&er

)anu*a"turer: Contents: Constru"tion Date: Last Repair+Re"onstru"tion Date:

Dimensions: Capa"ity: Last C&ange o* Seri"e Date:

Constru"tion : -are Stee Cat&odi"a y $ro te"ted C&e"' one: #. /a ani" or -. Impressed Current0 Date Instaed: 111111111111111 

 Coated Stee Con"rete $asti"+2ibergass %t&er  

 Doube3-ottom Doube3Wa Lined Date Instaed: 111111111111111 

Containment: 4art&en Di'e Stee Di'e Con"rete Synt&eti" Liner %t&er  

CRD):  Date Instaed: 5ype:

Reease $reention -arrier:  Date Instaed: 5ype:

TANK ID

SPECIFICATION:

Design: UL SWRI Horizonta !erti"a Re"tanguar  

 #$I

 Un'no(n %t&er

)anu*a"turer: Contents: Constru"tion Date: Last Repair+Re"onstru"tion Date:

Dimensions: Capa"ity: Last C&ange o* Seri"e Date:

Constru"tion : -are Stee Cat&odi"a y $ro te"ted C&e"' one: #. /a ani" or -. Impressed Current0 Date Instaed: 111111111111111 

 Coated Stee Con"rete $asti"+2ibergass %t&er  

 Doube3-ottom Doube3Wa Lined Date Instaed: 111111111111111 

Containment: 4art&en Di'e Stee Di'e Con"rete Synt&eti" Liner %t&er  

CRD):  Date Instaed: 5ype:

 #S5 INS$4C5I%N S5#ND#RD ; S4$54)-4R 7866

C%$9RI/H5 7866 Stee 5an' Institute

Page 4: AST Checklists

7/23/2019 AST Checklists

http://slidepdf.com/reader/full/ast-checklists 4/16

Reease $reention -arrier:  Date Instaed: 5ype:

 #S5 INS$4C5I%N S5#ND#RD < S4$54)-4R 7866

C%$9RI/H5 7866 Stee 5an' Institute

Page 5: AST Checklists

7/23/2019 AST Checklists

http://slidepdf.com/reader/full/ast-checklists 5/16

STI SP001 Monthly In!ect"on Chec#l"t

$ener%l In!ect"on In&or'%t"on:

Inspe"tion Date: Retain Unti Date: ;= mont&s *rom inspe"tion date0

 

$rior Inspe"tion Date: Inspe"tor Name:

5an's Inspe"ted ID >?s0:

In!ect"on $("d%nce:

2or e@uipment not in"uded in t&is Standard, *oo( t&e manu*a"turer re"ommended inspe"tion+testing s"&edues and pro"edures.

5&e periodi" #S5 Inspe"tion is intended *or monitoring t&e eAterna #S5 "ondition and its "ontainment stru"ture. 5&is isua inspe"tion does not re@uire a Certi*ied

Inspe"tor. It s&a be per*ormed by an o(ner?s inspe"tor (&o is *amiiar (it& t&e site and "an identi*y "&anges and deeoping probems. Upon dis"oery o* (ater in t&e primary tan', se"ondary "ontainment area, intersti"e, or spi "ontainer, remoe prompty or ta'e ot&er "orre"tie a"tion. -e*ore

dis"&arge to t&e enironment, inspe"t t&e i@uid *or reguated produ"ts or ot&er "ontaminants and disposed o* it propery. B0 designates an item in a non3"on*orman"e status. 5&is indi"ates t&at a"tion is re@uired to address a probem.

Non3"on*orming items important to tan' or "ontainment integrity re@uire eauation by an engineer eAperien"ed in #S5 design, a Certi*ied Inspe"tor, or a tan'

manu*a"turer (&o (i determine t&e "orre"tie a"tion. Note t&e non3"on*orman"e and "orresponding "orre"tie a"tion in t&e "omment se"tion.

Retain t&e "ompeted "&e"'ists *or ;= mont&s. In the e)ent o& e)ere *e%ther +no*, "ce, *"nd tor'- or '%"nten%nce +(ch % !%"nt"n.- th%t co(ld %&&ect the o!er%t"on o& cr"t"c%l co'!onent

+nor'%l %nd e'er.ency )ent, )%l)e-, %n "n!ect"on o& thee co'!onent " re/("red % oon % the e/("!'ent " %&ely %cce"le %&ter the e)ent

Ite' T%# St%t( Co''ent

10 T%n# Cont%"n'ent6.6 Containment

stru"tureC&e"' *or (ater,debris, "ra"'s or *ire&azard

9esB No

N+#

6.7 $rimary tan' C&e"' *or (ater 9esB No

6.; Containmentdrain aes

%perabe and in a"osed position

9es NoB

N+#

6.< $at&(ays and

entry

Cear and

gates+doorsoperabe

9es NoB

N+#

20 Le%# Detect"on7.6 5an' !isibe signs o*

ea'age9esB No

7.7 Se"ondaryContainment

!isibe signs o*ea'age *rom tan'into se"ondary"ontainment

9esB No

7.; Surroundingsoi

!isibe signs o*ea'age

9esB No

N+#

 #S5 INS$4C5I%N S5#ND#RD S4$54)-4R 7866

C%$9RI/H5 7866 Stee 5an' Institute

Page 6: AST Checklists

7/23/2019 AST Checklists

http://slidepdf.com/reader/full/ast-checklists 6/16

Ite' T%# St%t( Co''ent7.< Intersti"e !isibe signs o*

ea'age9esB No

N+#

30 T%n# E/("!'ent

;.6 !aes a. C&e"' *or ea's. 9esB No

N+#

b. 5an' drain aesmust be 'ept o"'ed.

9esB No

N+#

;.7 Spi

"ontainmentboAes on *ipipe

a. Inspe"t *or debris,

residue, and (aterin t&e boA andremoe.

9esB No N+#

b. Drain aes mustbe operabe and"osed.

9esB No N+#

;.; Li@uid eee@uipment

a. -ot& isua andme"&ani"a dei"esmust be inspe"ted*or p&ysi"a damage.

9es NoB N+#

b. C&e"' t&at t&edei"e is easiyreadabe

9es NoB N+#

;.< %er*ie@uipment

a. I* e@uipped (it& atest button,a"tiate t&e audibe&orn or ig&t to"on*irm operation.5&is "oud bebattery po(ered.Repa"e t&e batteryi* needed

9es NoB N+#

b. I* oer*i ae ise@uipped (it& ame"&ani"a testme"&anism, a"tuate

t&e me"&anism to"on*irm operation.

9es NoB N+#

;. $iping"onne"tions

C&e"' *or ea's,"orrosion anddamage

9esB No

40 T%n# Att%ch'ent %nd A!!(rten%nce<.6 Ladder and

pat*ormstru"ture

Se"ure (it& no signo* seere "orrosionor damageE

9es NoB

N+#

50 Other Cond"t"on

 #S5 INS$4C5I%N S5#ND#RD = S4$54)-4R 7866

C%$9RI/H5 7866 Stee 5an' Institute

Page 7: AST Checklists

7/23/2019 AST Checklists

http://slidepdf.com/reader/full/ast-checklists 7/16

Ite' T%# St%t( Co''ent.6 #re t&ere ot&er "onditions t&at s&oud

be addressed *or "ontinued sa*eoperation or t&at may a**e"t t&e site spipreention panE

9esB No

 #S5 INS$4C5I%N S5#ND#RD F S4$54)-4R 7866

C%$9RI/H5 7866 Stee 5an' Institute

Page 8: AST Checklists

7/23/2019 AST Checklists

http://slidepdf.com/reader/full/ast-checklists 8/16

Add"t"on%l Co''ent:

 #S5 INS$4C5I%N S5#ND#RD G S4$54)-4R 7866

C%$9RI/H5 7866 Stee 5an' Institute

Page 9: AST Checklists

7/23/2019 AST Checklists

http://slidepdf.com/reader/full/ast-checklists 9/16

STI SP001 Ann(%l In!ect"on Chec#l"t

$ener%l In!ect"on In&or'%t"on:

Inspe"tion Date: Retain Unti Date: ;= mont&s *rom inspe"tion date0

 

$rior Inspe"tion Date: Inspe"tor Name:

5an's Inspe"ted ID >?s0:

In!ect"on $("d%nce:

2or e@uipment not in"uded in t&is Standard, *oo( t&e manu*a"turer re"ommended inspe"tion+testing s"&edues and pro"edures.

5&e periodi" #S5 Inspe"tion is intended *or monitoring t&e eAterna #S5 "ondition and its "ontainment stru"ture. 5&is isua inspe"tion does not re@uire a Certi*ied

Inspe"tor. It s&a be per*ormed by an o(ner?s inspe"tor (&o is *amiiar (it& t&e site and "an identi*y "&anges and deeoping probems. Remoe prompty upon dis"oery standing (ater or i@uid in t&e primary tan', se"ondary "ontainment area, intersti"e, or spi "ontainer. -e*ore dis"&arge to t&e

enironment, inspe"t t&e i@uid *or reguated produ"ts or ot&er "ontaminants and disposed o* it propery. In order to "ompy (it& 4$# S$CC Spi $reention, Contro and Countermeasure0 rues, a *a"iity must reguary test i@uid ee sensing dei"es to ensure proper

operation <8 C2R 667.G"0G000. B0 designates an item in a non3"on*orman"e status. 5&is indi"ates t&at a"tion is re@uired to address a probem.

Non3"on*orming items important to tan' or "ontainment integrity re@uire eauation by an engineer eAperien"ed in #S5 design, a Certi*ied Inspe"tor, or a tan'manu*a"turer (&o (i determine t&e "orre"tie a"tion. Note t&e non3"on*orman"e and "orresponding "orre"tie a"tion in t&e "omment se"tion.

Retain t&e "ompeted "&e"'ists *or ;= mont&s.

Compete t&is "&e"'ist on an annua basis suppementa to t&e o(ner mont&y3per*ormed inspe"tion "&e"'ists.

Note: I& % ch%n.e h% occ(rred to the t%n# yte' or cont%"n'ent th%t '%y %&&ect the SPCC !l%n, the cond"t"on ho(ld e e)%l(%ted %.%"nt the c(rrent

!l%n re/("re'ent y % Pro&e"on%l En."neer #no*led.e%le "n SPCC de)elo!'ent %nd "'!le'ent%t"on

Ite' T%# St%t( Co''ent

10 T%n# Cont%"n'ent

6.6 Containmentstru"ture

C&e"' *or:

• Hoes or "ra"'s in

"ontainment (a

or *oor • Was&out

• Liner degradation

• Corrosion

• Lea'age

• $aint *aiure

• 5an' setting

9esB No

N+#

20 T%n# Fo(nd%t"on %nd S(!!ort7.6 2oundation Settement or

*oundation (as&outE9esB No

 #S5 INS$4C5I%N S5#ND#RD S4$54)-4R 7866

C%$9RI/H5 7866 Stee 5an' Institute

Page 10: AST Checklists

7/23/2019 AST Checklists

http://slidepdf.com/reader/full/ast-checklists 10/16

Ite' T%# St%t( Co''ent7.7 Con"rete pad

or ring (aCra"'ing or spaingE 9esB No

N+#

7.; Supports C&e"' *or "orrosion,paint *aiure, et".

9esB No

N+#

7.< Waterdrainage

Water drains a(ay*rom tan'E

9es NoB

N+#

7. 5an'grounding

Strap se"ured and ingood "onditionE

9es NoB

N+#

30 C%thod"c Protect"on

;.6 /aani""at&odi"prote"tionsystem

Con*irm system is*un"tiona, in"udest&e (ire "onne"tions*or gaani" systems

9es NoB

N+#

;.7 Impressed"urrentsystem

a. Inspe"t t&eoperationa"omponents po(ers(it"&, meters, andaarms0.

9es NoB

N+#

b. Re"ord &our meter,

ammeter andotmeter readings.

9es NoB N+#

40 T%n# Shell, 6e%d, Roo& <.6 Coating C&e"' *or "oating

*aiure9esB No

<.7 Stee"ondition

C&e"' *or:

• Dents

• -u"'ing

• -uging

• Corrosion

• Cra"'ing

9esB No

<.; Roo* sope C&e"' *or o( pointsand standing (ater 

9esB No

N+#

50 T%n# E/("!'ent.6 !ents !eri*y t&at "omponents

are moing *reey andent passage(ays arenot obstru"ted *or:

• 4mergen"y ent

"oers

• $ressure+a"uum

ent poppets

• %t&er moing ent

9esB No

 #S5 INS$4C5I%N S5#ND#RD 68 S4$54)-4R 7866

C%$9RI/H5 7866 Stee 5an' Institute

Page 11: AST Checklists

7/23/2019 AST Checklists

http://slidepdf.com/reader/full/ast-checklists 11/16

Ite' T%# St%t( Co''ent"omponents

.7 !aes C&e"' t&e "ondition o*a aes *or ea's,"orrosion anddamage.

9esB No

.7.6 #nti3sip&on,"&e"' andgate aes

Cy"e t&e ae openand "osed and "&e"'*or proper operation.

9es NoB

N+#

.7.7 $ressurereguatorae

C&e"' *or properoperation. Note t&att&ere may be sma,6+< in"& drain pugs int&e bottom o* t&e aet&at are not isibe byoo'ing *rom aboeony0

9es NoB

N+#

.7.; 4Apansionreie* ae

C&e"' t&at t&e ae isin t&e properorientation. Note t&at*ue must be

dis"&arged ba"' to t&etan' ia a separatepipe or tubing.0

9es NoB

N+#

.7.< Soenoidaes

Cy"e po(er to aeto "&e"' operation.4e"tri"a soenoids"an be eri*ied byistening to t&e punger opening and "osing. I* no audibe"on*irmation, t&e aes&oud be inspe"ted*or t&e presen"e and

operation o* t&epunger.0

9es NoB

N+#

.7. 2ire ands&ear aes

a. )anuay "y"e t&eae to ensure"omponents aremoing *reey and t&att&e ae &ande oreer &as "earan"e toao( ae to "ose"ompetey.

9es NoB N+#

b. !aes must not be(ired in open position.

9es NoB N+#

 #S5 INS$4C5I%N S5#ND#RD 66 S4$54)-4R 7866

C%$9RI/H5 7866 Stee 5an' Institute

Page 12: AST Checklists

7/23/2019 AST Checklists

http://slidepdf.com/reader/full/ast-checklists 12/16

Ite' T%# St%t( Co''ent". )a'e sure *usibeeement is in pa"eand "orre"typositioned.

9es NoB N+#

d. -e sure test portsare seaed (it& puga*ter testing is"ompete and no

temporary test *iAtureor "omponent remains"onne"ted to ae.

9es NoB N+#

.; Interstitiaea' dete"tione@uipment

C&e"' "ondition o*e@uipment, in"uding:

• 5&e (indo( is

"ean and "ear insig&t ea' gauges.

• 5&e (ire

"onne"tions o*ee"troni" gauges*or tig&tness and"orrosion

•  #"tiate t&e testbutton, i*appi"abe.

9es NoB

N+#

.< Spi"ontainmentboAes on *ipipe

a. I* "orrosion,damage, or (ear &as"ompromised t&eabiity o* t&e unit toper*orm spi"ontainment *un"tions,repa"e t&e unit.

9esB No N+#

b. Inspe"t t&e"onne"tions to t&e #S5 *or tig&tness, as

(e as t&e bots,nuts, (as&ers *or"ondition and repa"ei* ne"essary.

9esB No N+#

". Drain aes mustbe operabe and"osed

9esB No N+#

. Strainer a. C&e"' t&at t&estrainer is "ean and ingood "ondition.

9es NoB N+#

 #S5 INS$4C5I%N S5#ND#RD 67 S4$54)-4R 7866

C%$9RI/H5 7866 Stee 5an' Institute

Page 13: AST Checklists

7/23/2019 AST Checklists

http://slidepdf.com/reader/full/ast-checklists 13/16

Ite' T%# St%t( Co''ent. Strainer b. #""ess strainer

bas'et and "&e"' "apand gas'et sea as(e as bots.

9es NoB N+#

.= 2iter a. C&e"' t&at t&e *iteris in good "onditionand is (it&in t&emanu*a"turer?s

eApe"ted seri"e i*e.Repa"e, i* ne"essary.

9es NoB

N+#

b. C&e"' *or ea's andde"reased *ue *o(

9es NoB N+#

.F 2amearrestors

2oo( manu*a"turer?sinstru"tions. C&e"' *or"orrosion andbo"'age o* airpassages.

9esB  NoN+#

.G Lea' dete"tor *orsubmersibepump

systems

5est a""ording tomanu*a"turersinstru"tions andaut&ority &aing

 Jurisdi"tion #HK0.!eri*y ea' dete"torsare suited andpropery instaed *oraboeground use.

9es NoB

N+#

. Li@uid eee@uipment

a. Has e@uipmentbeen tested to ensureproper operationE

9es NoB

N+#

b. Does e@uipmentoperate as re@uiredE

9es NoB

N+#

". 2oo(manu*a"turer?sinstru"tions

9es NoB

N+#

.68 %er*ie@uipment a. 2oo(manu*a"turer?sinstru"tions andreguatoryre@uirements *orinspe"tion and*un"tionaityeri*i"ation.

9es NoB

N+#

b. Con*irm dei"e issuited *or aboeground use by t&emanu*a"turer 

9es NoB

N+#

 #S5 INS$4C5I%N S5#ND#RD 6; S4$54)-4R 7866

C%$9RI/H5 7866 Stee 5an' Institute

Page 14: AST Checklists

7/23/2019 AST Checklists

http://slidepdf.com/reader/full/ast-checklists 14/16

Ite' T%# St%t( Co''ent70 In(l%ted T%n#

=.6 Insuation C&e"' "ondition o*insuation *or:

•)issing se"tions

• #reas o* moisture

•)od

•Damage

9esB  No N+#

=.7 Insuation"oer or Ja"'et

C&e"' *or damage t&at(i ao( (aterintrusion

9esB No N+#

80 M"cell%neo(

F.6 4e"tri"a(iring and boAes

 #re t&ey in good"onditionE

9es NoB N+#

F.7 Labes andtags

4nsure t&at a abesand tags are inta"t andreadabe.

9es NoB N+#

 Add"t"on%l Co''ent:

 #S5 INS$4C5I%N S5#ND#RD 6< S4$54)-4R 7866

C%$9RI/H5 7866 Stee 5an' Institute

Page 15: AST Checklists

7/23/2019 AST Checklists

http://slidepdf.com/reader/full/ast-checklists 15/16

STI SP001 Port%le Cont%"ner Monthly In!ect"on Chec#l"t

$ener%l In!ect"on In&or'%t"on:

Inspe"tion Date: Retain Unti Date: ;= mont&s *rom inspe"tion date0

 

$rior Inspe"tion Date: Inspe"tor Name:

Containers Inspe"ted ID >?s0:

In!ect"on $("d%nce:

2or e@uipment not in"uded in t&is Standard, *oo( t&e manu*a"turer re"ommended inspe"tion+testing s"&edues and pro"edures. 5&e periodi" #S5 Inspe"tion is intended *or monitoring t&e eAterna #S5 "ondition and its "ontainment stru"ture. 5&is isua inspe"tion does not re@uire a Certi*ied

Inspe"tor. It s&a be per*ormed by an o(ner?s inspe"tor (&o is *amiiar (it& t&e site and "an identi*y "&anges and deeoping probems.  B0 designates an item in a non3"on*orman"e status. 5&is indi"ates t&at a"tion is re@uired to address a probem.

Non3"on*orming items important to tan' or "ontainment integrity re@uire eauation by an engineer eAperien"ed in #S5 design, a Certi*ied Inspe"tor, or a tan'

manu*a"turer (&o (i determine t&e "orre"tie a"tion. Note t&e non3"on*orman"e and "orresponding "orre"tie a"tion in t&e "omment se"tion.

Retain t&e "ompeted "&e"'ists *or ;= mont&s.

 

Ite' Are%: Are%: Are%: Are%:

10 AST Cont%"n'ent9Stor%.e Are%

6.6 #S5s (it&in designatedstorage areaE

9es NoB 9es NoB 9es NoB 9es NoB

6.7 Debris, spis, or ot&er *ire&azards in "ontainmentor storage areaE

9esB No 9esB No 9esB No 9esB No

6.; Water in outdoorse"ondary "ontainmentE

9esB No 9esB No 9esB No 9esB No

6.< Drain aes operabeand in a "osed

positionE

9es NoB 9esB No 9esB No 9esB No

6. 4gress pat&(ays "earand gates+doorsoperabeE

9es NoB 9esB No 9esB No 9esB No

 #S5 INS$4C5I%N S5#ND#RD 6 S4$54)-4R 7866

C%$9RI/H5 7866 Stee 5an' Institute

Page 16: AST Checklists

7/23/2019 AST Checklists

http://slidepdf.com/reader/full/ast-checklists 16/16

Ite' Are%: Are%: Are%: Are%:

20 Le%# Detect"on

7.6 !isibe signs o*ea'age around t&e"ontainer orstorage areaE

9esB No 9esB No 9esB No 9esB No

30 Cont%"ner

;.8 Noti"eabe "ontainerdistortions, bu"'ing,denting or bugingE

9esB No 9esB No 9esB No 9esB No

Co''ent:

 #S5 INS$4C5I%N S5#ND#RD 6= S4$54)-4R 7866

C%$9RI/H5 7866 Stee 5an' Institute