WSCSewerageAMP2018/19 V1.1June20181
AssetManagementPlanforSewerage2018/19
ThisdocumentformspartofCouncil’sResourcingStrategy.
ItisupdatedannuallytosupportCouncil’sOperationalPlan.
DocumentRevisionStatus
Version Date Description
1.0 June2018 Draftfordiscussion
1.1 June2018 FinaldraftforCouncilconsideration
ThisversionisapprovedforCouncilconsiderationby:
BrendanHayes
DirectorEnvironmentalServices
RajuRanjit
DirectorEngineeringServices
DateofapprovalbyCouncil(ornoteasdraft):
DRAFT
WSCSewerageAMP2018/19 V1.1June20182
TableofContents
1. ExecutiveSummary..........................................................................................................31.1ContextandPurposeofthisAMP................................................................................................31.2BestPracticeManagementofWaterSupplyandSewerageFramework....................................4
2. OperationalPrograms(Maintenance)..............................................................................62.1OperationPlan.............................................................................................................................6
2.1.1AssetRegister.......................................................................................................................62.1.2OperationalAnalysis+PerformanceRequirementsandConstraints...................................72.1.3SystemOperatingRules+FacilityOperatingProcedures.....................................................72.1.4DueDiligence,LicensingandReportingunderPoEOAct.....................................................72.1.5TradeWaste..........................................................................................................................8
2.2MaintenancePlan........................................................................................................................82.2.1ScheduledMaintenance.......................................................................................................82.2.2BreakdownMaintenance.....................................................................................................9
2.3PerformanceReporting................................................................................................................9
3. CapitalWorksPrograms(Renew/Upgrade/NewAssets+Disposals).............................103.1GrenfellSewageTreatmentPlant..............................................................................................103.2GrenfellSewerageReticulation..................................................................................................103.3GrenfellEffluentReuse..............................................................................................................113.4SewerageServicesforVillages...................................................................................................11
4. RiskManagement...........................................................................................................124.1ReportingonInfrastructureRenewalBacklogand‘Required’Maintenance............................12
5. AssetRegisterandAccounting.......................................................................................14
6. AssetHierarchy..............................................................................................................15
7. FinancialPlan..................................................................................................................15
8. Standards,SpecificationsandReferenceDocuments....................................................15
Appendix1–DescriptionofExistingSewerageSystem.........................................................16
Appendix2–KeyIWCMIssuesRelatedtoSewerage............................................................18
Appendix3–AdoptedLevelsofService(PerformanceTargets)...........................................19
Appendix4–LatestPerformanceMonitoringReport...........................................................20
Appendix5–CompliancewithBestPracticeFramework......................................................21
Appendix6–CustomerServicePlanforSewerageService...................................................22
WSCSewerageAMP2018/19 V1.1June20183
1. ExecutiveSummaryCouncilisresponsiblefortheseweragesysteminGrenfellincluding33kmofreticulationmainsandonesewagetreatmentplant.Themains(pipesandmanholes)makeupthebulkofthereplacementcostofthesystem(almost$9M),althoughtheexistingtreatmentplant(valuedataround$3.5M)issoontobereplacedwithamodernplantthatcantreateffluenttofarhigherstandards(estimatedcostaround$9M)toenablemoreeffectivereuseofourwaterresources.
AdescriptionoftheseweragesystemisincludedinAppendix1.
IfCouncilistodeliversustainablebestvaluefromtheseassets,itiscriticalthatthenewsewagetreatmentplantdesignisoptimised(consideringcapitalandoperatingcosts,easeofoperation)andlikewisethatrenewalofmainsisoptimised(reliningpipeswheretherearerecurringproblemstoreducemaintenancecostsandimpactsofsewageoverflowsontheenvironmentandcommunity).
ThisAMPhasbeenpreparedtosatisfytherequirementsoftheNSWGovernment’sBestPracticeManagementofWaterandSewerageFramework,outlinedbelow.
1.1ContextandPurposeofthisAMP
CouncilhasadoptedasystematicapproachtoprioritisingitslimitedresourcesacrossallitsactivitiesviatheIntegratedPlanningandReporting(IPR)Framework,establishedundertheNSWLocalGovernmentAct.
ServiceDashboards(partofCouncil’sDeliveryProgram)presenta‘bigpicturesummary’highlightingissuesofconcernwiththevalueCouncilcanprovidenowandinfuturewithitsavailableresources.
ThesecondpageoftheDashboardssummarisestheinfrastructuresupportingtheserviceandthenidentifiesthemainprogramareasCouncilundertakestoprovidethisvaluetothecommunity,includingbudgets(alignedwiththeLongTermFinancialPlan)andperformancemeasuresforeach(i.e.theadoptedPerformanceTargetsaswellasmeasuresofotheractivities).
ThisAMPthenprovidesthedetailbehindeachoftheprograms,whichareclassifiedaseither:• ‘operational’(ongoingactivitieslikecleaning,maintenanceandrepairs,mowinggrass)or• ‘capital’(one-offactivitiestobuildnew,upgradedorrenewedassets).
ThismoredetailedanalysisintheAMPinformsthe‘bigpicturesummary’ofkeyconcernsonpage1oftheDashboardsaswellassupportinginformationrelatingtoinfrastructureassetreporting.
Insummary,theprimarypurposeofthisAMPistosupportCouncil’sdecision-makingaboutitsactivitiesrelatingtosewerageassetsbyclarifyingthecurrentsituationanddocumentingitsfutureprograms(actionsintheDeliveryProgramandOperationalPlan)inasimplemanner.
ServicenameShort descriptionKeyobjectivesfromCSP (acrossall QBLthemes)Valuenow
Performance Sustainability Risk/Resilience
Value10years
Performance Sustainability Risk/Resilience
Emerging issues:beyond10yearsCommunitysurvey Gap Consensus
Sub-service1 1.2 High
Sub-service2 -0.3 Low
Investment(proportion oftotalCouncil)
Operations(maint.+ops)
Capital(renew+new)
Depreciation AssetValue
Summaryofthekeyissues
Summaryofthekeyissues
0 1 2 3 4 5
Importance Satisfaction
0 1 2 3 4 5
Importance Satisfaction0 1 2 3 4 5
Importance Satisfaction
0 1 2 3 4 5
Importance Satisfaction
ServiceNameInfrastructure
Assetcategories,replacementvalues,consumption ratio(age),renewal ratio,capitalratio(newassets),highresidualriskbacklog
OperationalProgramsProgramPrioritiesProgram1 Priorities ResponsibilityProgram2 Priorities Responsibility4 yearBudget Revenue ExpenditureProgram 1Program2PerformanceMeasures andTargets
Capital ProjectsProject SelectionCriteria(informs priority list)Project area1 Criteria ResponsibilityProjectarea2 Criteria Responsibility4 yearBudget Revenue ExpenditureProjectarea1Projectarea2PerformanceMeasures andTargets
ReferenceDocumentsStrategicplans,policies,operationalplans,etc.
701SealedPavement
701kmSealedSurface
144kmKerbandGutter
474kmUnsealedRoads
148Concrete/Steel Bridges
11Timber Bridges
73kmFootpaths
OtherTransport Assets
Stormwater Drainage
Concernswithvaluedeliverednowandinfuture
(informedbyAMP)
Project $
A 100
B 50
C 75
Year1: 225
Projectsincapitalprograms(+commentary&analysis)
Project $
A 100
B 50
C 75
Year1: 225
D 125
E 80
Year 2: 205
Detailsofassetmaintenanceprograms
Supportinginformationforinfrastructurereporting
ASSETMANAGEMENTPLANSERVICEDASHBOARDS(DeliveryProgram)
WSCSewerageAMP2018/19 V1.1June20184
Council’soverallobjectiveistodeliversustainablebestvalue(assetoutinthePolicyofthatname).
1.2BestPracticeManagementofWaterSupplyandSewerageFramework
TheNSWBestPracticeManagementforWaterSupplyandSewerage(BPM)Frameworkisthekeydriverforreformofplanningandmanagementandforcontinuingperformanceimprovementforlocalwaterutilities.Itisalsoapre-requisiteforaccesstosomegrantfundingprograms.
Thepeakplanningdocumentsarethe30-yearIntegratedWaterCycleManagement(IWCM)StrategyandStrategicBusinessPlans(SBP)forWaterSupplyandSewerage.Theseareproducedonan8-yearcycle4yearsapart,withthelatestdocumenttakingprecedence.
GiventhattheIWCMStrategyissupposedtoconsiderallurbanwaterissues(watersupply,sewerageandstormwater)andCouncilisonlyresponsibleforsewerageandstormwaterthereisaneedtocoordinatewithotherentitiesregardingpreparationoftheIWCMStrategy.
CentralTablelandsWaterCountyCouncil(anentitypartownedbyWeddin,BlaneyandCabonneShireCouncils)supplieswatertoGrenfell,QuandiallaandBimbi.CowraShireCouncilsupplieswatertoGreenthorpeandBumbaldry.
ACTION4.2intheImprovementPlanintheResourcingStrategyis:
LiaisewithCentralTablelandsWater(andpotentiallyCowraShireCouncil)aboutthepreparationofanIntegratedWaterCycleManagementStrategy.
BoththeIWCMStrategyandSBPmustincludea30-yearFinancialPlanorLongTermFinancialPlan(FP)and30-yearTotalAssetManagementPlan(AMP),1whichmustbeupdatedannually.2
CouncilhasadoptedanewapproachtocompliancewiththeBPMFrameworkinthecontextoftheIntegratedPlanningandReportingFramework(section1.1).ThekeydifferenceisthattheFPandAMParedistinct,stand-alonedocumentsintheResourcingStrategy,asshownbelow:
1AsperChecklistsfortheIWCMStrategyandSBP,NSWOfficeofWater(July2014).2AsperAppendixH‘StreamliningoftheNSWbest-practicemanagementframework’in2015-16NSWWaterSupplyandSeweragePerformanceMonitoringReport(May2017),NSWOfficeofWater.
StrategicBusinessPlan
AnnualReport*
OperationalPlan
DeliveryProgram
CommunityStrategicPlan
AssetMgmt.Plan(30years)LevelsofService
LongTermFinancialPlan(30years)
TypicalResidentialBill
IntegratedWaterCycleManagementStrategy(30years)• Keywater&sewerageissues(significantriskoffailureto
meetstatutoryrequirementsorlevelofservice)
• Options,feasibilityandtriplebottomlineranking(social,
environmental&economic)ofoverall‘scenarios’
• AdoptedIWCMScenario:bestvalueformoney
Resourcing Strategy*
CustomerServicePlan• areasserviced
• pricingandregulation
• waterconservation
• droughtmanagement
• drinkingwatermgmt.system
• environmentalmanagement
• OperatingEnvironment*
• ServiceDelivery*
• BestPracticeManagement*
*Review4yearlywithnew
DeliveryProgram(actionsin
ImprovementPlaninRS)
WorkforceMgmt.Plan(4years)
*IncludesCouncilImprovementActionPlan
*includeswater&sewerage
performancereporting
WSCSewerageAMP2018/19 V1.1June20185
Thisapproachisintendedtosimplifythedocumentation,ensuringstrategiesdrivingactivitiesinCouncil’sseweragebusiness(intheDeliveryProgram)areclearandup-to-date.Italsointegrateswhole-of-councilissueslikeworkforcemanagementandcommunityengagement.
AnotherkeyreasonforthisapproachisthatCouncilhasrecognisedtheneedtofocuson‘keyissues’coveredbytheIWCMStrategyinthe8yearsbetweenformalrevisions.Currentissuesandproposedsolutions,whichinformactionsinCouncil’sOperationalPlan,aresummarisedinAppendix2.
ThekeyconcepttonoteistheframeworkaboveisthattheTypicalResidentialBillintheFPiswhatgeneratesrevenuestofundactivitiesintheAMPtodeliverLevelsofService(LoS)adoptedbyCouncil.Appendix3includesCouncil’sadoptedPerformanceTargets,or‘LoS’forsewerage.
AkeypartoftheBPMFrameworkisperformancereporting.Council’slatestresultsfromtheNSWWaterandSeweragePerformanceMonitoringReportisinAppendix4.ThisshowsthatCounciliscurrently78%compliant.Issuesidentifiedinclude:
• StrategicBusinessPlaninplace,butover4yearsold• Lackofappropriatenon-residentialchargesforsewerage• Lackofappropriatetradewastefeesandcharges.
ACTION4.1intheImprovementPlanintheResourcingStrategyis:
ReviewStrategicBusinessPlan,AssetManagementPlanandFinancialPlanforSewerageBusinessinlightofGrenfellSewageTreatmentPlantbeinggrantfunded(explorepotentialtorampupfundingformainsrelining,rehabilitatingmanholesandinvestigatesewertovillages)
ACTION4.3intheImprovementPlanintheResourcingStrategyis:
DevelopTradeWastePolicy,establishagreements(bestpracticemanagementrequirement)
AtablesummarisingkeyelementsofanIWCMStrategyandSBP,andrequirementsundertheBPMFramework,areincludedinAppendix5.ThisincludesdetailsofhowCouncil’ssimplifieddocumentationsatisfiestheserequirements.
AkeypartoftheSBPistheCustomerServicePlanforSewerage.ThisisincludedinAppendix6.WhiletheBPMFrameworkrequiresthatthisonlyneedstobeupdatedaspartoftheSBPonceevery8years,CouncilhasrecognisedtheneedtoreviewthiswitheachOperationalPlan(alongwiththerestoftheAMP)andcompletelyreviseitevery4yearsalongwiththeDeliveryProgram.
WSCSewerageAMP2018/19 V1.1June20186
2. OperationalPrograms(Maintenance)OperationalprogramsintheServiceDashboardforSewerageandStormwater(theDeliveryProgram)havetwokeyelements:3
• Operation–operatingtheseweragesystem(treatment)toensurethatCouncil’sadoptedperformancetargets(Appendix1)areachievedattheminimumlong-termcost,andthattheimpactofanybreakdownsoroutagesisminimised
• Maintenance–maintainingindividualsub-systems,facilitiesandcomponentstoensuretheactualoutputs,reliabilityandavailability(asspecifiedintheOperationsPlan)areachievedinthemostcost-effectivemanner
Thesediscussedinthefollowingsections,whichechotheBestPracticeManagementGuidelines.
Asummaryofcurrentandprojectedoperationalcostsassociatedwithsewerageisinsection7.
2.1OperationPlan
ThefigurebelowshowsthekeyelementsoftheOperationPlanandhowthisrelatestootherelementsofthisAssetManagementPlan.
2.1.1AssetRegister
ThefoundationoftheOperationsPlanistheAssetRegister.Thisrecordsattributesofallinfrastructureassetsintheseweragesystem,includingthecurrentconditionandcapacity.
Councilhasrecognisedtheneedtoimproveitsassetregister(andkeepitup-to-dateinfuture)inordertobetterunderstandcurrentperformanceconstraintsinthenetworkandalsotoimprovebothscheduledandbreakdownmaintenanceprograms(section2.2).
AkeystepinthisisaddingutilitiesincludingtheseweragesystemtoCouncil’smappingsystem.
CouncilalsoneedstoundertakeCCTVinspectionofmainsandinspectionofmanholestoidentifyandprioritisesectionsforrenewal/relining(section3.2).
3TheCodeofAccountingPracticeprescribesinfrastructurereportingrequirements(SpecialSchedule7)intheoppositeway:‘operations’arepartof‘maintenance’,thoughmanyoperationsaren’tactuallymaintenance.
PerformanceRequirementsandConstraints(forsub-systemsandfacilities)
OperationalAnalysis
AssetRegister
PerformanceTargets(‘levelsofservice’)
Servicetobedelivered (Appendix1)e.g.quality,capacityandreliability
Assetsutilisedincl.conditionandcapacity
e.g.allowablefrequencyanddurationofoutages
SystemOperatingRules*(fornormalconditionsandsub-systembreakdown)
Howtooperatethesystemasawholeandindividualfacilitiesmosteffectively
Capabilityofsystemtoachievetargets
FacilityOperatingProcedures*(fornormalconditionsandcomponentbreakdown)
MaintenancePlan CapitalPlan
*includesduediligencerequirementsunderNSWProtectionoftheEnvironmentOperationsAct,1997
Scheduledandbreakdownmaintenanceactivitiestoensureactualoutputs,reliabilityandavailabilityofindividualsub-systems,facilitiesandcomponentsmeetsperformancerequirements
Rehabilitation,renewal,upgradeandnewassets(aswellasdisposalofoldassets)toachieveperformancetargetsandmeetfutureneeds
OperationPlan
WSCSewerageAMP2018/19 V1.1June20187
ACTION7.7intheImprovementPlanintheResourcingStrategyis:
AddutilitiestoCouncil’smappinglayer,undertakeCCTVinspectionsofmainsandinspectionofmanholestoidentifyandprioritisesectionsforrenewal/relining
2.1.2OperationalAnalysis+PerformanceRequirementsandConstraints
AnOperationalAnalysisisineffectacompleteinvestigationoftheadequacyofCouncil’sseweragesystemtomeetpresentandfutureneeds.ItdetermineswhetherthesystemiscapableofeconomicallymeetingCouncil’sperformancetargets.
Inadditionto‘finetuning’operations,theOperationalAnalysisprovidesessentialinputstothemaintenance(section2.2)andcapitalworksplans(section3)bydeterminingperformancerequirementsandconstraints(outputs,reliabilityandavailability)fortheindividualsub-systemsandfacilitiesmakinguptheseweragesystem.
Wheretheexistingsystemisinadequate,orwhereassetsarefoundtobeapproachingcapacityorreachingtheendoftheireconomiclife,theoutputwillincludeacapitalworksprogram.
Thetwokeycapabilityandperformanceissueswiththecurrentsystemare:
• thecapabilityofthesewagetreatmentplantwhichismeetingcurrentlicenceconditions,butproduceseffluenttolowerqualitythanmoremodernplants(bettereffluentqualityishighlydesirablegivenitisreused)–itsrenewalisbeingplannedatpresent(section3.1)and
• theconditionoftheolderpartsofthereticulation,whichisaproblembothduetothenumberofpipeblockages(chokes),butalsoduetothevolumeofinfiltrationtothesystem:wetweatherflowsatthesewagetreatmentplantare8-10timesdryweatherflows(whichmeansthattheplanthastotreatfarmoresewage–thiscostsextraandalsoreducestheeffectivenessofthetreatmentsystem,althoughthequalityofeffluentisstillwithinguidelines–oftenduetotheeffectsofdilutionaswellastreatment)–increasinginvestmentinreliningpipesaswellasrehabilitationofmanholesisdiscussedinsection3.2.
Anotherreasonforthehighwetweatherflowsisillegalconnections(ofstormwatertotheseweragesystem)andotherissueswithservicessuchaslowgullytrapsthatletinsurfacewater.Councilisundertakingaprogramofsmoketestingandotheractionstoaddressthis.
2.1.3SystemOperatingRules+FacilityOperatingProcedures
SystemOperatingRulessetoutthemosteffectivewaytheseweragesystemasawholeistobeoperatedundernormalconditionsandintheeventofabreakdown.TheaimistoachieveCouncil’sperformancetargetsattheminimumlong-termcost.
FacilityOperatingProceduressubsequentlysetoutthewayindividualfacilities(particularlythesewagetreatmentplant)aretobeoperatedinthecontextofthesystemoperatingrules,againundernormalconditionsandintheeventofacomponentbreakdown.
Councilhasundertakenlimiteddevelopmentofsuchdocumentationinthepast,howevertheimportanceofsuchdocumentationisacknowledgedasafundamentalriskmanagementstrategy,particularlygivenissueswithattractingandretainingappropriatelyqualifiedandexperiencedstaff.
Facilityoperatingproceduresandappropriatestafftrainingwillbespecifiedasanessentialdeliverableunderthecontractforthenewtreatmentplant.
2.1.4DueDiligence,LicensingandReportingunderPoEOAct
TheNSWProtectionoftheEnvironmentOperationsAct1997(POEO)providessubstantialliabilityintheeventofenvironmentalharm(section119).DueDiligenceshouldbeincorporatedintheOperationPlansinceitisoneofthefewdefencesavailabletobothindividualsandcorporationsundertheAct.
WSCSewerageAMP2018/19 V1.1June20188
DueDiligenceimpliesthateffortsshouldbemadetoanticipatehazardswhichmayharmtheenvironmentandtakeallfeasiblestepstoprevent,controlandmitigatethepotentialoftheiroccurrence.
ThesewagetreatmentplantisrequiredtohaveEnvironmentalProtectionLicences(EPL)whichisadministeredbytheNSWEnvironmentalProtectionAuthority(EPA)undertheProtectionoftheEnvironmentOperationsAct1997.AnEPLallowsabusinesstooperateaslongasitadherestocertainconditionswhicharestipulatedineachlicence.TheEPLnumberfortheplantis1732.
Section153AoftheProtectionoftheEnvironmentOperationsAct1997requiresalicenceholdertoprepareaPollutionIncidentResponseManagementPlans(PIRMP)forthissite,whichCouncilhasdone.ThisisavailableonCouncil’swebsite,althoughitisdueforreview.Anewplanwillbepreparedaspartoftheconstructionofthenewplant.
Itisalsoalegislativerequirementthatwaterqualityandvolumetricmonitoringdataispublishedforthesesites.WaterqualitydataisavailableonCouncil’swebsite(althoughthelatestresultsneedtobeadded)andvolumetricdataisreportedregularlyinCouncilbusinesspapers.
2.1.5TradeWaste
Tradewaste(foodsolidsaswellasgreaseandoils)cancauseblockagesintheseweragereticulation(pipes)andcreateproblemswithtreatmentprocesses.
Managingtradewasteincreasesthecostsoftheseweragesystemforallusers,andsotradewastechargesareanappropriatewaytoaddressthis.TheyarealsoarequirementoftheBestPracticeFramework(section1.2).
WhileCouncilhasintroducedtradewastechargesandmostbusinessesproducingtradewaste(takeaways,restaurants,etc.)havegreasetrapsinstalledtominimisetheamountdischargedtothesewer,thereiscurrentlynoTradeWastePolicyoragreementsinplace.ThesearealsoarequirementoftheBestPracticeFramework,anditisimportantthatCounciladdressthis.
ACTION4.3intheImprovementPlanintheResourcingStrategyis:
DevelopTradeWastePolicy,establishagreements(bestpracticemanagementrequirement)
2.2MaintenancePlan
ThepurposeoftheMaintenancePlanistoensurethattheactualoutputs,reliabilityandavailabilityoftheindividualsub-systems,facilitiesandcomponentsasspecifiedintheOperationPlanareachievedinthemostcost-effectivemanner.
Maintenanceisgenerallyplannedoneitherascheduledorbreakdownbasis,discussedbelow.
2.2.1ScheduledMaintenance
Scheduled(alsoknownasproactive,plannedorpreventative)maintenancehelpsavoidunexpectedfailures.Itisusedforcriticalitemswhereabreakdownwouldbecostlyandwouldcausesignificantinterruptionstothesewerageservicee.g.mechanicalandelectricalequipmentatthesewagetreatmentplant(pumpsandmotorsinparticular)mustrunreliablyatalltimesasthereislimitedcapacitytoholdflowsbeforethereisanoverflowtotheenvironment.
Scheduledmaintenanceiseitherfixed-timeorcondition-based.
Fixed-timemaintenanceisundertakenatpre-determinedintervalsinaccordancewithtechnicalmanuals,specificationsormanufacturerrecommendations(e.g.acarservicedevery10,000km).
Condition-basedmaintenanceisinformedbyconditioninspectionsandassessments,withmaintenancetasksbeinginitiatedoncetheconditionofacomponentreachesapre-definedtriggerpoint(e.g.toppingupoilinacarwhenthelevelgetsbelowacertainlevelonthegauge).
Condition-basedmaintenancemaybeassimpleaspaintingsomethingbeforeitbeginstorust,orascomplexasreplacingbearingsinamotorwhenavibrationanalysisindicatessubstantial
WSCSewerageAMP2018/19 V1.1June20189
deterioration.Italsohelpstogeneratedataaboutdepreciationrates,whichinformspredictionofservicelifeofcomponentsandtheoptimumtimeforrefurbishmentorreplacement.
Currently,thereareonlyonepumprequiredtooperatethesewagetreatmentplant,andastandbyisavailable.Thepumpsaremaintainedasrequired,socurrentpracticesareadequate.
Provisionofmaintenancescheduleswillbeanimportantdeliverableforthecontractforbuildingthenewsewagetreatmentplant,whichisfarmoresophisticatedintermsofmechanicalandelectricalequipment.
2.2.2BreakdownMaintenance
Breakdown(alsoknownasreactive,unplannedorcorrective)maintenanceshouldbereservedforlesscriticalcomponents,forsituationswherescheduledmaintenanceisnotpossibleorwhereremedialactioncanbetakenquicklywithminimaldisruptiontoservices.
Councilhasabackuppumpforthesewagetreatmentplant,aswellasabackupgeneratorintheeventofapoweroutage.Sparesaregenerallyavailableforotheritems,sobreakdownsarewellcovered.
Inadditiontobreakdownmaintenanceatthesewagetreatmentplant,theotherkeyareaisinclearingofchokesinseweragepipes.ItisnotablethataccordingtoperformancemonitoringdatafromNSWGovernmentin2014/15(thelatestavailabledata),WeddinShireCouncilhadthesecondhighestincidenceofsewerchokes(blockages)inNSWper100kmofmain.4
Thetotalblockages(around209per100km)wasaboutdoublethatreportedinthe2013StrategicBusinessPlan(30-40intotalorabout95-120per100kmofmains).
Thisneedstobeinvestigatedfurtherintermsoftheaccuracyofreporting,buthighlightsapotentialneedforfurtherinvestmentinrelining(section3.2)asthislevelofbreakdownsisofconcern.
2.3PerformanceReporting
CouncilreportsextensivelyontheoperationalperformanceofitssewerageschemeinannualreturnstoNSWOfficeofWater.AsummaryofthelatestperformancereportisprovidedinAppendix4.Notablemeasuresinclude:
• Numberofchokes(blockages)perkmofmain• Percentageoftreatedeffluentthatwascompliantwithlicenceconditions• Operatingcostperproperty• Administrationandmanagementcost• Economicrealrateofreturn
Councilalsoreportsonthe‘backlog’and‘maintenance’figuresforitsinfrastructureasdiscussedinsection4.1.
4https://www.industry.nsw.gov.au/__data/assets/pdf_file/0020/147440/2015-16-nsw-water-supply-and-sewerage-performance-monitoring-report.pdf(page52)
WSCSewerageAMP2018/19 V1.1June201810
3. CapitalWorksPrograms(Renew/Upgrade/NewAssets+Disposals)TheServiceDashboardforSewerageandStormwatersummarisesCouncil’smaincapitalworksprogramsrelatingtothesewerageservice.Therearereallyonlytwomainonesbeing:
• sewagetreatment• seweragemains
ThisAMPprovidesthedetailbehindthesecapitalprogramsincludingadiscussionofthecurrentinfrastructure,issuesofconcern,considerationsforfuturebudgetsandperformancemeasures.
Itisimportanttorecognisethatthelevelofdetailinthisframeworkwillimproveovertime.
ACTION9.5intheImprovementPlanintheResourcingStrategyis:
Annualreviewofcapitalworksprogramsincludingpriorityprojects,budgets,fundingtoachieveperformancetargetsforrenewal,prioritiesforupgraded/newassets,longertermoutlook(includeinup-to-dateAssetManagementPlan).
3.1GrenfellSewageTreatmentPlant
Theexistingsewagetreatmentplantwasconstructedin1940.Itincludesprimary,secondaryandtertiarytreatmentofsewageandisabletomeetcurrentlicenceconditions,apartfromoccasionalnon-complianceduetothevolumeofwet-weatherflows(note:qualityisnotanissue).
WhileCouncil’scurrentplans(inthe2013StrategicBusinessPlan)hadproposedtofundtherenewaloftheplantin2029for$5.7M(in2013dollars)bycashreservesanda$2Mloan,agrantfromInvestmentNSWfor$8.8M(98%fundingoncurrentestimatesfortheplant)meansthatthisprojectisabletobebroughtforward.
Thenewplantwillhavebettereffluentquality,whichisimportantgiventhelevelofreuse,andwillalsohaveincreasedcapacity.Detailedplanningiscurrentlybeingundertaken,withtendersforconstructionexpectedtobesoughtin2019/20.
ItisimportantthatCouncilnowreviewitsfinancialplan(inthe2013StrategicBusinessPlan)totakeaccountofthegrantandtheincreasedoperatingexpensesthatwillcomewiththenewplant(thisisACTION4.1intheImprovementPlan).Ofparticularnoteistheopportunitytoincreasefundingforsomeoftheotherprioritiesidentifiedbelow.
Therearenomajorworksrequiredtokeeptheoldplantoperationaluntilthenewoneisbuilt.
Akeyissuewiththeexistingplant,whichwillremainanissuewiththenewone,isthelevelofinfiltrationinthesystem(highlightedinsection2.1.2).Thisneedstobeaddressedviaincreasedinvestmentinpiperelining(section3.2)andaddressingproblemswithservicesbyidentifyingillegalconnectionsofstormwatertotheseweragesystem(viasmoketesting)andotherproblemssuchaslowgullytrapsthatdrainsurfacewater..
3.2GrenfellSewerageReticulation
AllofGrenfell’sseweragesystemisgravitypipes,i.e.therearenopumpstationswithrisingmains.
Themajority(27.5ofthe33km)ofseweragereticulation(pipesandmanholes)wasbuiltin1942.Afurther2.5kmwasbuiltin1969.
Furtherextensionsin1998and2004ofaround3kmserviceHenryLawsonEstate.
Theolderpipeisvitreousclay,whichisgenerallyregardedtohaveaservicelifeof90years.Thismeanstheusefullifeofthesepipeswillexpireinaround2032(althoughtheactualusefulservicelifeofindividualpipeswillbeshorterorlongerthanthisaverage).
Theactualperformanceofthenetworkconfirmsthisestimate,withtheincidenceofsewerchokes(blockagesduetotreerootintrusion,brokenordroppedpipes)risingandWeddinShireCouncilreportingthesecondhighestnumberofsewerblockagesinthestate(refersection2.2.2).
WSCSewerageAMP2018/19 V1.1June201811
Councilhasrecognisedtheissueandbeguninvestinginreliningofthesepipessomeyearsago,witharound5kmofpipesbeingrelinedsince2009.Council’s2018/19budgetincludes$200,000forthisworkalthough$100,000ofthisiscarriedoverasitwasnotspentlastyear.
Thecurrentfinancialplan(inthe2013StrategicBusinessPlan)allocates$100,000p.a.(in2013dollars)torelining,butthismaynotbesufficientgiventheextentofproblemsandthefactthatCouncilhasnotspentthisfullamountinrecentyears.
ReliningworksareprocuredunderajointcontractarrangedbyCENTROC,whichmeanstheratesobtainedarequitecompetitive.Dependingontheextentofproblems,theneedforadditionalwork(e.g.servicejunctions)andsizeofthepipe$200,000willcoverreliningof1-1.5kmofpipe.
Councilalsoneedstoinvestinrehabilitationofmanholes(accesschambers)asmanyoftheseareinpoorcondition.Theseareanothersourceofinfiltrationinwetweather.ItisinCouncil’sinteresttoseektoreducetheadditionalinflowasthiswatermustthenpassthroughthetreatmentplant(addingtooperationalexpenseslikepower).
Giventhehighnumberofchokes,theopportunitypresentedbythesewagetreatmentplantbeingfundedbyagrantandthegrowingneedforreliningoftheoldpartsofthereticulationnetwork,Councilhasrecognisedtheneedtoreviewfundingallocationtorelining.ThisispartofACTION4.1intheImprovementPlanintheResourcingStrategy(referencedinsection1.2).
Basedontheassetregister,basicallyall12and15”pipeshavebeenCCTVinspectedalthoughnotall9”pipeshavebeenandveryfew6”pipesthathaven’tthenbeenrelined.CCTVinspectionsneedtobeprioritisedbasedonpipesizeaswellashistoryofproblems,proximitytowaterways,etc.
Thereisalsoprovisioninthefinancialplaninthe2013StrategicBusinessPlanfor$10,000every2yearsforsewermainextensions.Thisshouldbereviewed.
3.3GrenfellEffluentReuse
Currently,thereisaneffluentreusesysteminoperationthatisusedtoirrigateseveralparksandHenryLawsonOval.Thesystemisoldandbothpipesandpumpsneedreplacingwithinthenext5years.
Improvingthequalityofthiseffluentisoneofthedriversofreplacingthesewagetreatmentplant(section3.1).Thenewplantwillincludeconstructionofaneweffluentreusesystem.
3.4SewerageServicesforVillages
Allvillagesareonseptictanks–whichhaveanumberofissuesassociatedwithfailureoftheonsitesystem,egressofeffluentoffsiteandmaintenanceofthesystems.
The2013StrategicBusinessPlanforSewerageServicesincludedprovisiontoprovidesewerageservicestoQuandialla(population320)andGreenethorpe(population220)in2030-31atacostof$200,000each–althoughthisisconsideredinsufficienttocovertheseprojects.Carabagal(population214)alsoneedstobeconsidered.
Thedelayincommencingtheseprojectswasnotedasbeingprimarilyduetotheneedtoprioritisefundingtootherissuessuchasthetreatmentplant,buttheremaybeanopportunitytobringthisforward(whichshouldbeconsideredinthecontextofaction4.1above),particularlyiftherearegrantsavailabletohelpfundsuchworks–whichthereareatthemoment.ItmaybethatCouncilsimplyscopesuptheworksoitis‘shovelready’foragrantatthisstage.
WSCSewerageAMP2018/19 V1.1June201812
4. RiskManagementAsdiscussedinsection4.3oftheResourcingStrategy,riskisoneofCouncil’sprimaryconsiderationswhenitisformulatingitsactivitiesintheDeliveryProgramsoastodeliver‘sustainablebestvalue’.
ThetablebelowsummariseskeyrisksandtreatmentplansCouncilhasinplacetomanagethese.
Risk TreatmentMethod
Releaseofrawsewagetotheenvironment
PollutionincidentresponsemanagementplandevelopedforGrenfellsewagetreatmentplant.
Chokescleared,pipesrelinedtoreduceblockagesinfuture.
Exposureofusersofparksandreservestopathogensfromeffluentreusescheme
Effluentqualitytesting,soiltestingonparksandfields
LackofqualifiedandexperiencedTreatmentPlantOperators
Trainingprograminplace,backupavailablewithintheorganisationandinneighbouringcouncils
Intermsofidentifying‘criticalassets’(assetshavingthepotentialtosignificantlyimpactontheorganisation’sobjectives),thekeyonesarethesewagetreatmentplantandlargertrunkmainscarryingthebulkofflowsinthetown.
Thescheduledmaintenanceprogramthatisproposedtobedevelopedforthenewplant(section2.2.1)willbeinformedbyassetcriticalitysovitalpumps,motors,etc.willbegivenmorefocuscommensuratewiththehigherrisk.Currentmaintenanceisconsideredadequate.
CCTVinspectionshavebeenundertakenonlargersizepipesasaprioritytoidentifytheneedforreliningworksherefirst(all12and15”pipes,althoughnotall9”pipeshaveyetbeeninspected–thishasbeenrecognisedasapriority).
4.1ReportingonInfrastructureRenewalBacklogand‘Required’Maintenance
Asdiscussedinsection4.4oftheResourcingStrategy,Councilhasadoptedarisk-basedapproachtoreportingoninfrastructuremaintenanceandrenewalbackloginSpecialSchedule7ofCouncil’sAnnualFinancialStatements(thesearealsokeyFitfortheFuturemeasures).
ItisimportanttonotethatthisdoesnotmeanthatCouncilisthereforeproviding‘sustainablebestvalue’,onlythatitisadequatelymanagingrisksassociatedwiththenetwork.Decisionsabouttheactivitiesthatwilldeliversustainablebestvaluearemadeinthecontextofsections2and3,whereCouncilprioritisesitsresourcestoparticularprogramareas.
Thefollowingassetsareidentifiedashavingahigherlevelofriskthatrequiresrenewaltoresolve.Notethatonlythoserequiring‘immediateaction’willbereportedasbacklog(theotherissueswillhelpinformdecisionsaboutfundinginsection3).
AssetatRisk WhatCanHappen?
RiskRating
UnfundedRisk(Renewal)Treatment
CosttoTreat($)
ResidualRiskRating
Noneidentified
Thefollowingmaintenanceprogramshavebeenidentifiedasbeingunder-fundedtotheextentthattheremay,potentially,bemaintenancedefectswithahigherlevelofriskidentifiedbutinsufficientfundstoaddresstheissue:
WSCSewerageAMP2018/19 V1.1June201813
AssetatRisk WhatCanHappen?
RiskRating
UnfundedRisk(Maintenance)Treatment
CosttoTreat($)
ResidualRiskRating
Noneidentified
Arisk-basedreviewofrenewalandmaintenanceofassetsonthisbasiswillbeundertakenasat30Juneeachyear.Wheretherewereinsufficientfundstomanageriskstoanacceptablelevel–wheretherewererisksassessedasrequiringimmediateaction(ratherthanprogrammingforactioninfuture)underCouncil’sRiskManagementPolicyandFramework–thefundingshortfallwillbereportedinSpecialSchedule7inrelationtothe‘costtobringtosatisfactory’(infrastructurerenewalbacklog)or‘required’(overandabove‘actual’)maintenanceasapplicable.
ACTION9.4intheImprovementPlanintheResourcingStrategyis:
Annualreviewofrisksassociatedwithmaintenanceandrenewalactivitiestoinform‘requiredmaintenance’and‘bringtosatisfactory’reportinginSpecialSchedule7;otherrisks(e.g.needforupgraded/newassets)alsoidentified;AMPupdatedifrequired.
Inadditiontothoserequirements,Councilwillalsoconsiderhigher-riskissuesassociatedwiththeneedtoupgradeorconstructnewassets(notethatthesearespecificallyexcludedfromthe‘backlog’reporting).Thefollowinghavebeenidentifiedatthistime:
AssetatRisk WhatCanHappen?
RiskRating
UnfundedUpgradeorNewAssetTreatment
CosttoTreat($)
ResidualRiskRating
Noneidentified
WSCSewerageAMP2018/19 V1.1June201814
5. AssetRegisterandAccountingAsdiscussedinsection4.1oftheResourcingStrategy,ifCouncil’soperatingrevenuesaresufficienttocovertheexpensesassociatedwithits‘daytoday’operatingactivities(discussedinsection2ofthisAMP)anditsdepreciationexpensesthenitisverylikelytobefinanciallysustainable.
Thisisbecausedepreciationisameasureoftheannualisedcostofowninganasset,calculatedbydividingitsreplacementcostbyitsservicelife.
Councilwillbeabletoaffordtorenewitsexistingassetsoverthelongtermifitisprojectingongoingoperatingsurpluses(i.e.operatingexpenses,includingdepreciation,exceedrevenues),evenifitneedstoborrowmoneytocoverashortfallincashatsomestageoverthelongterm.
Councilwillalsobeabletoaffordanyneworupgradedassetsif,whenthedepreciationoftheseassetsisaddedtooperatingexpensescurrentlyprojectedintheLongTermFinancialPlan(LTFP),Councilstillhasanongoingsurplus.
Allofthishighlightstheimportanceofanaccurateassetregister,whichnotonlyidentifiesallCouncilassets,buttheirvalueandcurrentcondition.Thisinformationisequallyimportanttoeffectivelyplananddeliveroperationalandcapitalprograms.
Italsohighlightstheimportanceofaccurateestimatesfordepreciation,andforaligninginformationintheLTFPandAMPs(e.g.ifpipeswillonlylast70yearsbutCouncilisdepreciatingthemover90yearsintheLTFP,therewillbeashortfallinfunds).
Onceworks(intheAMP)areactuallycarriedout,itisvitalthattheassetregisterisupdated(e.g.torecordthatanewassetwasbuilt).Thecostsoftheworkalsoneedtobecaptured(thiswillhelprefineestimatesforreplacementcostofsimilarassets).Thereisalsoanopportunitytoreviewtheactualservicelifeoftheassetthatwasrenewedorreplaced(tohelprefinedepreciationestimates).
ThefunctionalityofCouncil’scorporatefinancesystemisabarriertoimprovementshere.
ACTION7.1intheImprovementPlanintheResourcingStrategyis:
Captureassetrenewals,disposalsandadditionsfromcapitalworksprogram;reviewassumptions(valuation/servicelife)inthiscontextandanyotheravailableinformation(inspections,floods,etc.)
ACTION7.2intheImprovementPlanintheResourcingStrategyis:
Implementworksordersystemtocapturecapitalworks(detailsofassetscreated/disposed,costs)–afterGLrestructure(action1.3)
TheNSWOfficeofWaterpublishestheNSWReferenceRatesManualforValuationofWaterSupply,SewerageandStormwaterAssets(whichisupdatedannually).CouncilalsoparticipatesinCENTROCprogramsforjointvaluationofsewerageinfrastructure.Further,themaincapitalcoststhatinformvaluationsispiperelining,andthisiswellunderstood(beingacontractrate).
Thetablebelowsummarisescurrentconditiondataandproposedcollectionoffuturedata.Notethatthenextfullrevaluationof‘otherstructures’and‘depreciablelandimprovements’(whichcoversthemajorityofassetsinthisAMP)isduein2021.
AssetCategory CurrentConditionData(methodanddate,reportref.)
Confidencelevelindata
NextProposedDataCollection(methodanddate,reportref.)
Seweragetreatment
SewerageReticulation
AustralisAssetAdvisory,2017
In-house,agebased,2017
Medium
Medium
2022(byexternalvaluer,forrevaluation)
2022(inhouse,forrevaluation)
WSCSewerageAMP2018/19 V1.1June201815
6. AssetHierarchyAnassethierarchyisanimportantinputtoprioritisationofresourcesformaintenance,renewalandupgrades/newassetsinsomeassetclasses(e.g.roads)butislessusefulinrelationtosewerageassets.Effectively,thecriticalityofseweragereticulationisafunctionofthenumberofpropertiesservedandproximitytosensitiveareas(e.g.waterbodies)ifthereisanoverflow.
7. FinancialPlanAsdiscussedinsection3(ACTION4.1),thecurrentfinancialplaninthe2013StrategicBusinessPlanneedsreviewinthecontextofthegrantforthereplacementoftheGrenfellSewageTreatmentPlantandpotentialneedtofundotheractionssuchasmainsrelining,manholerehabilitationandprovisionofseweragetothevillages.Otherassumptionsintheplansuchasoperationalcostsforthenewplantandtheallowanceforsewermainextensionsshouldalsobereviewed.
Figuresinthetablebelowsummarisetheprogrambudgetsforoperations(section2)andcapitalworks(section3)relevanttosewerageassets.ThisistakenfromtheServiceDashboardforSewerageandStormwaterwhichreflectsCouncil’scurrentbudget.
Oncethefinancialplanforsewerageservicesisreviewed(asperaction4.1),thisshouldbeincludedinthisdocument.
8. Standards,SpecificationsandReferenceDocumentsVariousdocumentsrelatingtotheNSWBestPracticeManagementofWaterandSewerageFrameworkisavailableat:
https://www.industry.nsw.gov.au/water/water-utilities/best-practice-mgmt
PollutionIncidentResponseManagementPlanandEffluentQualityDataforWeddinSTP:
http://www.weddin.nsw.gov.au/environmental-services/sewage-treatment-plant
OPERATIONALPROGRAMS
2018/19 2019/20 2020/21 2021/22 2018/19 2019/20 2020/21 2021/22SewerageRates&Charges 541,375SewerageAdmin/Mgmt. 152,808SewerageMains 36,000SewageTreatment 106,000Sewerage-rates,staffcosts 31,730TOTALSEWERAGE 541,375 - - - 326,538 - - -
CAPITALPROGRAMS
2018/19 2019/20 2020/21 2021/22 2018/19 2019/20 2020/21 2021/22GrenfellSewageTreat.Plant 509,000 520,000SeweragePipes 250,000BetterPracticePolicies 10,000TOTALSEWERAGE 509,000 0 0 0 780,000 0 0 0
ProgramArea Revenue Expenditure(excl.Depreciation)
ProjectArea Revenue Expenditure
WSCSewerageAMP2018/19 V1.1June201816
Appendix1–DescriptionofExistingSewerageSystemSewageinGrenfelliscollectedvia33kmofgravitysewerreticulationandtransferred(withoutpumps)totheGrenfellSewageTreatmentPlant(STP),whichwasconstructedin1940.StormoverflowsfromthereticulationsystemdischargeintoEmuCreek.
TheGrenfellSTPhasacapacityof2500EPandprovidesprimary,secondaryandtertiarytreatment.BasedonCouncil’sannualreturns,theGrenfellSTPiscurrentlymeetingdischargequalityrequirements.TreatedeffluentisdischargedtoEmuCreekandtheremainderisreusedfortheirrigationofseveralparksandrecreationalareas.
Figurefrom2013StrategicBusinessPlan(reticulationisshownontheleft):
Amapofthereticulationnetworkisshownonthefollowingpage.
WSCSewerageAMP2018/19 V1.1June201817
WSCSewerageAMP2018/19 V1.1June201818
Appendix2–KeyIWCMIssuesRelatedtoSewerageUndertheBestPracticeManagement(BPM)ofWaterSupplyandSewerageFramework,a‘keyissue’isonewhereCouncilisunabletomeetitsperformancetargetsortomeetstatutoryrequirementsand/ortoincreasecapacitytoaddresstheneedsofnewdevelopment.
WhiletheBPMFrameworkonlyrequiresthosekeyissuesthathavenotbeendealtwithintheIntegratedWaterCycleManagementStrategytobeidentified,thetablebelowincludesallsuchissuessothatitisclearthoseissuesthatCouncilisaddressing,too.
KeyIssue Details CurrentStatus
ConditionandcapabilityofGrenfellSewageTreatmentPlant
Infrastructureisreachingtheendofitsusefullife.
Whileperformancemeetscurrentlicencerequirements,moremoderntreatmentprocessesareavailabletoimproveeffluentquality,whichisimportantasitisreusedonparksandsportinggrounds.
NewSTPinplanningphase
Tendersforconstructionareexpectedtobeadvertisedby2019/20
Conditionofseweragereticulation(pipesandmanholes)
Mostofthenetworkwasbuiltin1942andislikelytobereachingtheendofitsusefullifeinthenext15years.
Councilisreportingthatitisdealingwithasignificantnumberofsewerchokes(blockages),whichhighlightsthatthepipesareinpoorcondition.
Wetweatherinflowstothesewagetreatmentplantareveryhigh(8-10timesdryweatherflow),whichimpactstreatmentefficiencyandincreasescosts.
Areliningprogramisinplace,butitisperhapsnotsufficienttokeeppacewithdeterioration.
Littleinvestmentiscurrentlybeingmadetoaddressmanholesinpoorcondition.
Issueidentifiedandactionsinplacetoinvestigatefurther,includingconsideringtheoptionoframpingupreliningwork.
Issueofinvestingmoreinproblemmanholesalsobeinginvestigated.
Infiltrationfromothersources
Anothercontributortohighwetweatherinflowstosewagetreatmentplant.
Smoketestingbudgeted,althoughitneedstocontinue.
Sewerageservicesforvillages
ThevillagesofQuandialla,GreenethorpeandCarabagalareallservicedbyseptictanks.
Problemsincludefailureofonsitesystems,egressofeffluentoffsiteandmaintenanceofthesystems.
Thereisaneedtoundertakefurtherinvestigationofdesignissuesandcostsoftheseworkstoenablethemtobeconsideredinfinancialplans.
Ideally,Councilwouldhavethedesigns‘shovelready’foragrant.
Asnotedinsection1,CouncilneedstocoordinatewithCentralTablelandsWaterandCowraShireCouncilregardingthebroaderIWCMStrategy.
WSCSewerageAMP2018/19 V1.1June201819
Appendix3–AdoptedLevelsofService(PerformanceTargets)ThelevelsofservicebelowwereadoptedinCouncil’s2013StrategicBusinessPlan(pageix).
Asdiscussedinsection3.2,Counciliscurrentlyfindingasignificantlyhighernumberofchokes(mainblockagesandcollapses,‘category3systemfailures’below).
TheseperformancetargetsneedtobereviewedinthecontextofactionsinthisAMP.
WSCSewerageAMP2018/19 V1.1June201820
Appendix4–LatestPerformanceMonitoringReportTobeincluded.
WSCSewerageAMP2018/19 V1.1June201821
Appendix5–CompliancewithBestPracticeFrameworkAtabletobeincludedsummarisingkeyelementsofanIWCMStrategyandSBP,andrequirementsundertheBPMFrameworkaswellashowCouncil’ssimplifieddocumentationsatisfiestheserequirements.
WSCSewerageAMP2018/19 V1.1June201822
Appendix6–CustomerServicePlanforSewerageServiceUndertheBestPracticeManagementFramework,theCustomerServicePlanistobeincludedintheStrategicBusinessPlanforSewerage,whichmeansthe‘current’CustomerServicePlanistheonedatingfrom2013.AsidentifiedinthisAMP,thereareanumberofissuesneedingreviewincluding:
• Council’sabilitytomeetitsadoptedlevelsofservicerelatingtothenumberofblockages/chokes(sections2.2.2,3.2)
• Council’sapproachtotradewaste(refersection2.1.5)• Pricingfornon-residentialcustomerstocomplywithbestpracticeframework(asdiscussed
inthe2013StrategicBusinessPlan)• Actionswithregardstoavailabilityoftheservice,i.e.sewerageforvillages(section3.4)
ThestatusoftheseissueswillbeconsideredwhenthisAMPisupdatednextyear.ConsiderationwillbegiventoadoptinganewCustomerServicePlanatthattime.