WSC Sewerage AMP 2018/19 V1.1 June 2018 1 Asset Management Plan for Sewerage 2018/19 This document forms part of Council’s Resourcing Strategy. It is updated annually to support Council’s Operational Plan. Document Revision Status Version Date Description 1.0 June 2018 Draft for discussion 1.1 June 2018 Final draft for Council consideration This version is approved for Council consideration by: Brendan Hayes Director Environmental Services Raju Ranjit Director Engineering Services Date of approval by Council (or note as draft): DRAFT

Upload: others

Post on 25-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Asset Management Plan for Sewerage 2018/19 · 2018-11-18 · WSC Sewerage AMP 2018/19 4 V1.1 June 2018 Council’s overall objective is to deliver sustainable best value (as set out

WSCSewerageAMP2018/19 V1.1June20181

AssetManagementPlanforSewerage2018/19

ThisdocumentformspartofCouncil’sResourcingStrategy.

ItisupdatedannuallytosupportCouncil’sOperationalPlan.

DocumentRevisionStatus

Version Date Description

1.0 June2018 Draftfordiscussion

1.1 June2018 FinaldraftforCouncilconsideration

ThisversionisapprovedforCouncilconsiderationby:

BrendanHayes

DirectorEnvironmentalServices

RajuRanjit

DirectorEngineeringServices

DateofapprovalbyCouncil(ornoteasdraft):

DRAFT

Page 2: Asset Management Plan for Sewerage 2018/19 · 2018-11-18 · WSC Sewerage AMP 2018/19 4 V1.1 June 2018 Council’s overall objective is to deliver sustainable best value (as set out

WSCSewerageAMP2018/19 V1.1June20182

TableofContents

1. ExecutiveSummary..........................................................................................................31.1ContextandPurposeofthisAMP................................................................................................31.2BestPracticeManagementofWaterSupplyandSewerageFramework....................................4

2. OperationalPrograms(Maintenance)..............................................................................62.1OperationPlan.............................................................................................................................6

2.1.1AssetRegister.......................................................................................................................62.1.2OperationalAnalysis+PerformanceRequirementsandConstraints...................................72.1.3SystemOperatingRules+FacilityOperatingProcedures.....................................................72.1.4DueDiligence,LicensingandReportingunderPoEOAct.....................................................72.1.5TradeWaste..........................................................................................................................8

2.2MaintenancePlan........................................................................................................................82.2.1ScheduledMaintenance.......................................................................................................82.2.2BreakdownMaintenance.....................................................................................................9

2.3PerformanceReporting................................................................................................................9

3. CapitalWorksPrograms(Renew/Upgrade/NewAssets+Disposals).............................103.1GrenfellSewageTreatmentPlant..............................................................................................103.2GrenfellSewerageReticulation..................................................................................................103.3GrenfellEffluentReuse..............................................................................................................113.4SewerageServicesforVillages...................................................................................................11

4. RiskManagement...........................................................................................................124.1ReportingonInfrastructureRenewalBacklogand‘Required’Maintenance............................12

5. AssetRegisterandAccounting.......................................................................................14

6. AssetHierarchy..............................................................................................................15

7. FinancialPlan..................................................................................................................15

8. Standards,SpecificationsandReferenceDocuments....................................................15

Appendix1–DescriptionofExistingSewerageSystem.........................................................16

Appendix2–KeyIWCMIssuesRelatedtoSewerage............................................................18

Appendix3–AdoptedLevelsofService(PerformanceTargets)...........................................19

Appendix4–LatestPerformanceMonitoringReport...........................................................20

Appendix5–CompliancewithBestPracticeFramework......................................................21

Appendix6–CustomerServicePlanforSewerageService...................................................22

Page 3: Asset Management Plan for Sewerage 2018/19 · 2018-11-18 · WSC Sewerage AMP 2018/19 4 V1.1 June 2018 Council’s overall objective is to deliver sustainable best value (as set out

WSCSewerageAMP2018/19 V1.1June20183

1. ExecutiveSummaryCouncilisresponsiblefortheseweragesysteminGrenfellincluding33kmofreticulationmainsandonesewagetreatmentplant.Themains(pipesandmanholes)makeupthebulkofthereplacementcostofthesystem(almost$9M),althoughtheexistingtreatmentplant(valuedataround$3.5M)issoontobereplacedwithamodernplantthatcantreateffluenttofarhigherstandards(estimatedcostaround$9M)toenablemoreeffectivereuseofourwaterresources.

AdescriptionoftheseweragesystemisincludedinAppendix1.

IfCouncilistodeliversustainablebestvaluefromtheseassets,itiscriticalthatthenewsewagetreatmentplantdesignisoptimised(consideringcapitalandoperatingcosts,easeofoperation)andlikewisethatrenewalofmainsisoptimised(reliningpipeswheretherearerecurringproblemstoreducemaintenancecostsandimpactsofsewageoverflowsontheenvironmentandcommunity).

ThisAMPhasbeenpreparedtosatisfytherequirementsoftheNSWGovernment’sBestPracticeManagementofWaterandSewerageFramework,outlinedbelow.

1.1ContextandPurposeofthisAMP

CouncilhasadoptedasystematicapproachtoprioritisingitslimitedresourcesacrossallitsactivitiesviatheIntegratedPlanningandReporting(IPR)Framework,establishedundertheNSWLocalGovernmentAct.

ServiceDashboards(partofCouncil’sDeliveryProgram)presenta‘bigpicturesummary’highlightingissuesofconcernwiththevalueCouncilcanprovidenowandinfuturewithitsavailableresources.

ThesecondpageoftheDashboardssummarisestheinfrastructuresupportingtheserviceandthenidentifiesthemainprogramareasCouncilundertakestoprovidethisvaluetothecommunity,includingbudgets(alignedwiththeLongTermFinancialPlan)andperformancemeasuresforeach(i.e.theadoptedPerformanceTargetsaswellasmeasuresofotheractivities).

ThisAMPthenprovidesthedetailbehindeachoftheprograms,whichareclassifiedaseither:• ‘operational’(ongoingactivitieslikecleaning,maintenanceandrepairs,mowinggrass)or• ‘capital’(one-offactivitiestobuildnew,upgradedorrenewedassets).

ThismoredetailedanalysisintheAMPinformsthe‘bigpicturesummary’ofkeyconcernsonpage1oftheDashboardsaswellassupportinginformationrelatingtoinfrastructureassetreporting.

Insummary,theprimarypurposeofthisAMPistosupportCouncil’sdecision-makingaboutitsactivitiesrelatingtosewerageassetsbyclarifyingthecurrentsituationanddocumentingitsfutureprograms(actionsintheDeliveryProgramandOperationalPlan)inasimplemanner.

ServicenameShort descriptionKeyobjectivesfromCSP (acrossall QBLthemes)Valuenow

Performance Sustainability Risk/Resilience

Value10years

Performance Sustainability Risk/Resilience

Emerging issues:beyond10yearsCommunitysurvey Gap Consensus

Sub-service1 1.2 High

Sub-service2 -0.3 Low

Investment(proportion oftotalCouncil)

Operations(maint.+ops)

Capital(renew+new)

Depreciation AssetValue

Summaryofthekeyissues

Summaryofthekeyissues

0 1 2 3 4 5

Importance Satisfaction

0 1 2 3 4 5

Importance Satisfaction0 1 2 3 4 5

Importance Satisfaction

0 1 2 3 4 5

Importance Satisfaction

ServiceNameInfrastructure

Assetcategories,replacementvalues,consumption ratio(age),renewal ratio,capitalratio(newassets),highresidualriskbacklog

OperationalProgramsProgramPrioritiesProgram1 Priorities ResponsibilityProgram2 Priorities Responsibility4 yearBudget Revenue ExpenditureProgram 1Program2PerformanceMeasures andTargets

Capital ProjectsProject SelectionCriteria(informs priority list)Project area1 Criteria ResponsibilityProjectarea2 Criteria Responsibility4 yearBudget Revenue ExpenditureProjectarea1Projectarea2PerformanceMeasures andTargets

ReferenceDocumentsStrategicplans,policies,operationalplans,etc.

701SealedPavement

701kmSealedSurface

144kmKerbandGutter

474kmUnsealedRoads

148Concrete/Steel Bridges

11Timber Bridges

73kmFootpaths

OtherTransport Assets

Stormwater Drainage

Concernswithvaluedeliverednowandinfuture

(informedbyAMP)

Project $

A 100

B 50

C 75

Year1: 225

Projectsincapitalprograms(+commentary&analysis)

Project $

A 100

B 50

C 75

Year1: 225

D 125

E 80

Year 2: 205

Detailsofassetmaintenanceprograms

Supportinginformationforinfrastructurereporting

ASSETMANAGEMENTPLANSERVICEDASHBOARDS(DeliveryProgram)

Page 4: Asset Management Plan for Sewerage 2018/19 · 2018-11-18 · WSC Sewerage AMP 2018/19 4 V1.1 June 2018 Council’s overall objective is to deliver sustainable best value (as set out

WSCSewerageAMP2018/19 V1.1June20184

Council’soverallobjectiveistodeliversustainablebestvalue(assetoutinthePolicyofthatname).

1.2BestPracticeManagementofWaterSupplyandSewerageFramework

TheNSWBestPracticeManagementforWaterSupplyandSewerage(BPM)Frameworkisthekeydriverforreformofplanningandmanagementandforcontinuingperformanceimprovementforlocalwaterutilities.Itisalsoapre-requisiteforaccesstosomegrantfundingprograms.

Thepeakplanningdocumentsarethe30-yearIntegratedWaterCycleManagement(IWCM)StrategyandStrategicBusinessPlans(SBP)forWaterSupplyandSewerage.Theseareproducedonan8-yearcycle4yearsapart,withthelatestdocumenttakingprecedence.

GiventhattheIWCMStrategyissupposedtoconsiderallurbanwaterissues(watersupply,sewerageandstormwater)andCouncilisonlyresponsibleforsewerageandstormwaterthereisaneedtocoordinatewithotherentitiesregardingpreparationoftheIWCMStrategy.

CentralTablelandsWaterCountyCouncil(anentitypartownedbyWeddin,BlaneyandCabonneShireCouncils)supplieswatertoGrenfell,QuandiallaandBimbi.CowraShireCouncilsupplieswatertoGreenthorpeandBumbaldry.

ACTION4.2intheImprovementPlanintheResourcingStrategyis:

LiaisewithCentralTablelandsWater(andpotentiallyCowraShireCouncil)aboutthepreparationofanIntegratedWaterCycleManagementStrategy.

BoththeIWCMStrategyandSBPmustincludea30-yearFinancialPlanorLongTermFinancialPlan(FP)and30-yearTotalAssetManagementPlan(AMP),1whichmustbeupdatedannually.2

CouncilhasadoptedanewapproachtocompliancewiththeBPMFrameworkinthecontextoftheIntegratedPlanningandReportingFramework(section1.1).ThekeydifferenceisthattheFPandAMParedistinct,stand-alonedocumentsintheResourcingStrategy,asshownbelow:

1AsperChecklistsfortheIWCMStrategyandSBP,NSWOfficeofWater(July2014).2AsperAppendixH‘StreamliningoftheNSWbest-practicemanagementframework’in2015-16NSWWaterSupplyandSeweragePerformanceMonitoringReport(May2017),NSWOfficeofWater.

StrategicBusinessPlan

AnnualReport*

OperationalPlan

DeliveryProgram

CommunityStrategicPlan

AssetMgmt.Plan(30years)LevelsofService

LongTermFinancialPlan(30years)

TypicalResidentialBill

IntegratedWaterCycleManagementStrategy(30years)• Keywater&sewerageissues(significantriskoffailureto

meetstatutoryrequirementsorlevelofservice)

• Options,feasibilityandtriplebottomlineranking(social,

environmental&economic)ofoverall‘scenarios’

• AdoptedIWCMScenario:bestvalueformoney

Resourcing Strategy*

CustomerServicePlan• areasserviced

• pricingandregulation

• waterconservation

• droughtmanagement

• drinkingwatermgmt.system

• environmentalmanagement

• OperatingEnvironment*

• ServiceDelivery*

• BestPracticeManagement*

*Review4yearlywithnew

DeliveryProgram(actionsin

ImprovementPlaninRS)

WorkforceMgmt.Plan(4years)

*IncludesCouncilImprovementActionPlan

*includeswater&sewerage

performancereporting

Page 5: Asset Management Plan for Sewerage 2018/19 · 2018-11-18 · WSC Sewerage AMP 2018/19 4 V1.1 June 2018 Council’s overall objective is to deliver sustainable best value (as set out

WSCSewerageAMP2018/19 V1.1June20185

Thisapproachisintendedtosimplifythedocumentation,ensuringstrategiesdrivingactivitiesinCouncil’sseweragebusiness(intheDeliveryProgram)areclearandup-to-date.Italsointegrateswhole-of-councilissueslikeworkforcemanagementandcommunityengagement.

AnotherkeyreasonforthisapproachisthatCouncilhasrecognisedtheneedtofocuson‘keyissues’coveredbytheIWCMStrategyinthe8yearsbetweenformalrevisions.Currentissuesandproposedsolutions,whichinformactionsinCouncil’sOperationalPlan,aresummarisedinAppendix2.

ThekeyconcepttonoteistheframeworkaboveisthattheTypicalResidentialBillintheFPiswhatgeneratesrevenuestofundactivitiesintheAMPtodeliverLevelsofService(LoS)adoptedbyCouncil.Appendix3includesCouncil’sadoptedPerformanceTargets,or‘LoS’forsewerage.

AkeypartoftheBPMFrameworkisperformancereporting.Council’slatestresultsfromtheNSWWaterandSeweragePerformanceMonitoringReportisinAppendix4.ThisshowsthatCounciliscurrently78%compliant.Issuesidentifiedinclude:

• StrategicBusinessPlaninplace,butover4yearsold• Lackofappropriatenon-residentialchargesforsewerage• Lackofappropriatetradewastefeesandcharges.

ACTION4.1intheImprovementPlanintheResourcingStrategyis:

ReviewStrategicBusinessPlan,AssetManagementPlanandFinancialPlanforSewerageBusinessinlightofGrenfellSewageTreatmentPlantbeinggrantfunded(explorepotentialtorampupfundingformainsrelining,rehabilitatingmanholesandinvestigatesewertovillages)

ACTION4.3intheImprovementPlanintheResourcingStrategyis:

DevelopTradeWastePolicy,establishagreements(bestpracticemanagementrequirement)

AtablesummarisingkeyelementsofanIWCMStrategyandSBP,andrequirementsundertheBPMFramework,areincludedinAppendix5.ThisincludesdetailsofhowCouncil’ssimplifieddocumentationsatisfiestheserequirements.

AkeypartoftheSBPistheCustomerServicePlanforSewerage.ThisisincludedinAppendix6.WhiletheBPMFrameworkrequiresthatthisonlyneedstobeupdatedaspartoftheSBPonceevery8years,CouncilhasrecognisedtheneedtoreviewthiswitheachOperationalPlan(alongwiththerestoftheAMP)andcompletelyreviseitevery4yearsalongwiththeDeliveryProgram.

Page 6: Asset Management Plan for Sewerage 2018/19 · 2018-11-18 · WSC Sewerage AMP 2018/19 4 V1.1 June 2018 Council’s overall objective is to deliver sustainable best value (as set out

WSCSewerageAMP2018/19 V1.1June20186

2. OperationalPrograms(Maintenance)OperationalprogramsintheServiceDashboardforSewerageandStormwater(theDeliveryProgram)havetwokeyelements:3

• Operation–operatingtheseweragesystem(treatment)toensurethatCouncil’sadoptedperformancetargets(Appendix1)areachievedattheminimumlong-termcost,andthattheimpactofanybreakdownsoroutagesisminimised

• Maintenance–maintainingindividualsub-systems,facilitiesandcomponentstoensuretheactualoutputs,reliabilityandavailability(asspecifiedintheOperationsPlan)areachievedinthemostcost-effectivemanner

Thesediscussedinthefollowingsections,whichechotheBestPracticeManagementGuidelines.

Asummaryofcurrentandprojectedoperationalcostsassociatedwithsewerageisinsection7.

2.1OperationPlan

ThefigurebelowshowsthekeyelementsoftheOperationPlanandhowthisrelatestootherelementsofthisAssetManagementPlan.

2.1.1AssetRegister

ThefoundationoftheOperationsPlanistheAssetRegister.Thisrecordsattributesofallinfrastructureassetsintheseweragesystem,includingthecurrentconditionandcapacity.

Councilhasrecognisedtheneedtoimproveitsassetregister(andkeepitup-to-dateinfuture)inordertobetterunderstandcurrentperformanceconstraintsinthenetworkandalsotoimprovebothscheduledandbreakdownmaintenanceprograms(section2.2).

AkeystepinthisisaddingutilitiesincludingtheseweragesystemtoCouncil’smappingsystem.

CouncilalsoneedstoundertakeCCTVinspectionofmainsandinspectionofmanholestoidentifyandprioritisesectionsforrenewal/relining(section3.2).

3TheCodeofAccountingPracticeprescribesinfrastructurereportingrequirements(SpecialSchedule7)intheoppositeway:‘operations’arepartof‘maintenance’,thoughmanyoperationsaren’tactuallymaintenance.

PerformanceRequirementsandConstraints(forsub-systemsandfacilities)

OperationalAnalysis

AssetRegister

PerformanceTargets(‘levelsofservice’)

Servicetobedelivered (Appendix1)e.g.quality,capacityandreliability

Assetsutilisedincl.conditionandcapacity

e.g.allowablefrequencyanddurationofoutages

SystemOperatingRules*(fornormalconditionsandsub-systembreakdown)

Howtooperatethesystemasawholeandindividualfacilitiesmosteffectively

Capabilityofsystemtoachievetargets

FacilityOperatingProcedures*(fornormalconditionsandcomponentbreakdown)

MaintenancePlan CapitalPlan

*includesduediligencerequirementsunderNSWProtectionoftheEnvironmentOperationsAct,1997

Scheduledandbreakdownmaintenanceactivitiestoensureactualoutputs,reliabilityandavailabilityofindividualsub-systems,facilitiesandcomponentsmeetsperformancerequirements

Rehabilitation,renewal,upgradeandnewassets(aswellasdisposalofoldassets)toachieveperformancetargetsandmeetfutureneeds

OperationPlan

Page 7: Asset Management Plan for Sewerage 2018/19 · 2018-11-18 · WSC Sewerage AMP 2018/19 4 V1.1 June 2018 Council’s overall objective is to deliver sustainable best value (as set out

WSCSewerageAMP2018/19 V1.1June20187

ACTION7.7intheImprovementPlanintheResourcingStrategyis:

AddutilitiestoCouncil’smappinglayer,undertakeCCTVinspectionsofmainsandinspectionofmanholestoidentifyandprioritisesectionsforrenewal/relining

2.1.2OperationalAnalysis+PerformanceRequirementsandConstraints

AnOperationalAnalysisisineffectacompleteinvestigationoftheadequacyofCouncil’sseweragesystemtomeetpresentandfutureneeds.ItdetermineswhetherthesystemiscapableofeconomicallymeetingCouncil’sperformancetargets.

Inadditionto‘finetuning’operations,theOperationalAnalysisprovidesessentialinputstothemaintenance(section2.2)andcapitalworksplans(section3)bydeterminingperformancerequirementsandconstraints(outputs,reliabilityandavailability)fortheindividualsub-systemsandfacilitiesmakinguptheseweragesystem.

Wheretheexistingsystemisinadequate,orwhereassetsarefoundtobeapproachingcapacityorreachingtheendoftheireconomiclife,theoutputwillincludeacapitalworksprogram.

Thetwokeycapabilityandperformanceissueswiththecurrentsystemare:

• thecapabilityofthesewagetreatmentplantwhichismeetingcurrentlicenceconditions,butproduceseffluenttolowerqualitythanmoremodernplants(bettereffluentqualityishighlydesirablegivenitisreused)–itsrenewalisbeingplannedatpresent(section3.1)and

• theconditionoftheolderpartsofthereticulation,whichisaproblembothduetothenumberofpipeblockages(chokes),butalsoduetothevolumeofinfiltrationtothesystem:wetweatherflowsatthesewagetreatmentplantare8-10timesdryweatherflows(whichmeansthattheplanthastotreatfarmoresewage–thiscostsextraandalsoreducestheeffectivenessofthetreatmentsystem,althoughthequalityofeffluentisstillwithinguidelines–oftenduetotheeffectsofdilutionaswellastreatment)–increasinginvestmentinreliningpipesaswellasrehabilitationofmanholesisdiscussedinsection3.2.

Anotherreasonforthehighwetweatherflowsisillegalconnections(ofstormwatertotheseweragesystem)andotherissueswithservicessuchaslowgullytrapsthatletinsurfacewater.Councilisundertakingaprogramofsmoketestingandotheractionstoaddressthis.

2.1.3SystemOperatingRules+FacilityOperatingProcedures

SystemOperatingRulessetoutthemosteffectivewaytheseweragesystemasawholeistobeoperatedundernormalconditionsandintheeventofabreakdown.TheaimistoachieveCouncil’sperformancetargetsattheminimumlong-termcost.

FacilityOperatingProceduressubsequentlysetoutthewayindividualfacilities(particularlythesewagetreatmentplant)aretobeoperatedinthecontextofthesystemoperatingrules,againundernormalconditionsandintheeventofacomponentbreakdown.

Councilhasundertakenlimiteddevelopmentofsuchdocumentationinthepast,howevertheimportanceofsuchdocumentationisacknowledgedasafundamentalriskmanagementstrategy,particularlygivenissueswithattractingandretainingappropriatelyqualifiedandexperiencedstaff.

Facilityoperatingproceduresandappropriatestafftrainingwillbespecifiedasanessentialdeliverableunderthecontractforthenewtreatmentplant.

2.1.4DueDiligence,LicensingandReportingunderPoEOAct

TheNSWProtectionoftheEnvironmentOperationsAct1997(POEO)providessubstantialliabilityintheeventofenvironmentalharm(section119).DueDiligenceshouldbeincorporatedintheOperationPlansinceitisoneofthefewdefencesavailabletobothindividualsandcorporationsundertheAct.

Page 8: Asset Management Plan for Sewerage 2018/19 · 2018-11-18 · WSC Sewerage AMP 2018/19 4 V1.1 June 2018 Council’s overall objective is to deliver sustainable best value (as set out

WSCSewerageAMP2018/19 V1.1June20188

DueDiligenceimpliesthateffortsshouldbemadetoanticipatehazardswhichmayharmtheenvironmentandtakeallfeasiblestepstoprevent,controlandmitigatethepotentialoftheiroccurrence.

ThesewagetreatmentplantisrequiredtohaveEnvironmentalProtectionLicences(EPL)whichisadministeredbytheNSWEnvironmentalProtectionAuthority(EPA)undertheProtectionoftheEnvironmentOperationsAct1997.AnEPLallowsabusinesstooperateaslongasitadherestocertainconditionswhicharestipulatedineachlicence.TheEPLnumberfortheplantis1732.

Section153AoftheProtectionoftheEnvironmentOperationsAct1997requiresalicenceholdertoprepareaPollutionIncidentResponseManagementPlans(PIRMP)forthissite,whichCouncilhasdone.ThisisavailableonCouncil’swebsite,althoughitisdueforreview.Anewplanwillbepreparedaspartoftheconstructionofthenewplant.

Itisalsoalegislativerequirementthatwaterqualityandvolumetricmonitoringdataispublishedforthesesites.WaterqualitydataisavailableonCouncil’swebsite(althoughthelatestresultsneedtobeadded)andvolumetricdataisreportedregularlyinCouncilbusinesspapers.

2.1.5TradeWaste

Tradewaste(foodsolidsaswellasgreaseandoils)cancauseblockagesintheseweragereticulation(pipes)andcreateproblemswithtreatmentprocesses.

Managingtradewasteincreasesthecostsoftheseweragesystemforallusers,andsotradewastechargesareanappropriatewaytoaddressthis.TheyarealsoarequirementoftheBestPracticeFramework(section1.2).

WhileCouncilhasintroducedtradewastechargesandmostbusinessesproducingtradewaste(takeaways,restaurants,etc.)havegreasetrapsinstalledtominimisetheamountdischargedtothesewer,thereiscurrentlynoTradeWastePolicyoragreementsinplace.ThesearealsoarequirementoftheBestPracticeFramework,anditisimportantthatCounciladdressthis.

ACTION4.3intheImprovementPlanintheResourcingStrategyis:

DevelopTradeWastePolicy,establishagreements(bestpracticemanagementrequirement)

2.2MaintenancePlan

ThepurposeoftheMaintenancePlanistoensurethattheactualoutputs,reliabilityandavailabilityoftheindividualsub-systems,facilitiesandcomponentsasspecifiedintheOperationPlanareachievedinthemostcost-effectivemanner.

Maintenanceisgenerallyplannedoneitherascheduledorbreakdownbasis,discussedbelow.

2.2.1ScheduledMaintenance

Scheduled(alsoknownasproactive,plannedorpreventative)maintenancehelpsavoidunexpectedfailures.Itisusedforcriticalitemswhereabreakdownwouldbecostlyandwouldcausesignificantinterruptionstothesewerageservicee.g.mechanicalandelectricalequipmentatthesewagetreatmentplant(pumpsandmotorsinparticular)mustrunreliablyatalltimesasthereislimitedcapacitytoholdflowsbeforethereisanoverflowtotheenvironment.

Scheduledmaintenanceiseitherfixed-timeorcondition-based.

Fixed-timemaintenanceisundertakenatpre-determinedintervalsinaccordancewithtechnicalmanuals,specificationsormanufacturerrecommendations(e.g.acarservicedevery10,000km).

Condition-basedmaintenanceisinformedbyconditioninspectionsandassessments,withmaintenancetasksbeinginitiatedoncetheconditionofacomponentreachesapre-definedtriggerpoint(e.g.toppingupoilinacarwhenthelevelgetsbelowacertainlevelonthegauge).

Condition-basedmaintenancemaybeassimpleaspaintingsomethingbeforeitbeginstorust,orascomplexasreplacingbearingsinamotorwhenavibrationanalysisindicatessubstantial

Page 9: Asset Management Plan for Sewerage 2018/19 · 2018-11-18 · WSC Sewerage AMP 2018/19 4 V1.1 June 2018 Council’s overall objective is to deliver sustainable best value (as set out

WSCSewerageAMP2018/19 V1.1June20189

deterioration.Italsohelpstogeneratedataaboutdepreciationrates,whichinformspredictionofservicelifeofcomponentsandtheoptimumtimeforrefurbishmentorreplacement.

Currently,thereareonlyonepumprequiredtooperatethesewagetreatmentplant,andastandbyisavailable.Thepumpsaremaintainedasrequired,socurrentpracticesareadequate.

Provisionofmaintenancescheduleswillbeanimportantdeliverableforthecontractforbuildingthenewsewagetreatmentplant,whichisfarmoresophisticatedintermsofmechanicalandelectricalequipment.

2.2.2BreakdownMaintenance

Breakdown(alsoknownasreactive,unplannedorcorrective)maintenanceshouldbereservedforlesscriticalcomponents,forsituationswherescheduledmaintenanceisnotpossibleorwhereremedialactioncanbetakenquicklywithminimaldisruptiontoservices.

Councilhasabackuppumpforthesewagetreatmentplant,aswellasabackupgeneratorintheeventofapoweroutage.Sparesaregenerallyavailableforotheritems,sobreakdownsarewellcovered.

Inadditiontobreakdownmaintenanceatthesewagetreatmentplant,theotherkeyareaisinclearingofchokesinseweragepipes.ItisnotablethataccordingtoperformancemonitoringdatafromNSWGovernmentin2014/15(thelatestavailabledata),WeddinShireCouncilhadthesecondhighestincidenceofsewerchokes(blockages)inNSWper100kmofmain.4

Thetotalblockages(around209per100km)wasaboutdoublethatreportedinthe2013StrategicBusinessPlan(30-40intotalorabout95-120per100kmofmains).

Thisneedstobeinvestigatedfurtherintermsoftheaccuracyofreporting,buthighlightsapotentialneedforfurtherinvestmentinrelining(section3.2)asthislevelofbreakdownsisofconcern.

2.3PerformanceReporting

CouncilreportsextensivelyontheoperationalperformanceofitssewerageschemeinannualreturnstoNSWOfficeofWater.AsummaryofthelatestperformancereportisprovidedinAppendix4.Notablemeasuresinclude:

• Numberofchokes(blockages)perkmofmain• Percentageoftreatedeffluentthatwascompliantwithlicenceconditions• Operatingcostperproperty• Administrationandmanagementcost• Economicrealrateofreturn

Councilalsoreportsonthe‘backlog’and‘maintenance’figuresforitsinfrastructureasdiscussedinsection4.1.

4https://www.industry.nsw.gov.au/__data/assets/pdf_file/0020/147440/2015-16-nsw-water-supply-and-sewerage-performance-monitoring-report.pdf(page52)

Page 10: Asset Management Plan for Sewerage 2018/19 · 2018-11-18 · WSC Sewerage AMP 2018/19 4 V1.1 June 2018 Council’s overall objective is to deliver sustainable best value (as set out

WSCSewerageAMP2018/19 V1.1June201810

3. CapitalWorksPrograms(Renew/Upgrade/NewAssets+Disposals)TheServiceDashboardforSewerageandStormwatersummarisesCouncil’smaincapitalworksprogramsrelatingtothesewerageservice.Therearereallyonlytwomainonesbeing:

• sewagetreatment• seweragemains

ThisAMPprovidesthedetailbehindthesecapitalprogramsincludingadiscussionofthecurrentinfrastructure,issuesofconcern,considerationsforfuturebudgetsandperformancemeasures.

Itisimportanttorecognisethatthelevelofdetailinthisframeworkwillimproveovertime.

ACTION9.5intheImprovementPlanintheResourcingStrategyis:

Annualreviewofcapitalworksprogramsincludingpriorityprojects,budgets,fundingtoachieveperformancetargetsforrenewal,prioritiesforupgraded/newassets,longertermoutlook(includeinup-to-dateAssetManagementPlan).

3.1GrenfellSewageTreatmentPlant

Theexistingsewagetreatmentplantwasconstructedin1940.Itincludesprimary,secondaryandtertiarytreatmentofsewageandisabletomeetcurrentlicenceconditions,apartfromoccasionalnon-complianceduetothevolumeofwet-weatherflows(note:qualityisnotanissue).

WhileCouncil’scurrentplans(inthe2013StrategicBusinessPlan)hadproposedtofundtherenewaloftheplantin2029for$5.7M(in2013dollars)bycashreservesanda$2Mloan,agrantfromInvestmentNSWfor$8.8M(98%fundingoncurrentestimatesfortheplant)meansthatthisprojectisabletobebroughtforward.

Thenewplantwillhavebettereffluentquality,whichisimportantgiventhelevelofreuse,andwillalsohaveincreasedcapacity.Detailedplanningiscurrentlybeingundertaken,withtendersforconstructionexpectedtobesoughtin2019/20.

ItisimportantthatCouncilnowreviewitsfinancialplan(inthe2013StrategicBusinessPlan)totakeaccountofthegrantandtheincreasedoperatingexpensesthatwillcomewiththenewplant(thisisACTION4.1intheImprovementPlan).Ofparticularnoteistheopportunitytoincreasefundingforsomeoftheotherprioritiesidentifiedbelow.

Therearenomajorworksrequiredtokeeptheoldplantoperationaluntilthenewoneisbuilt.

Akeyissuewiththeexistingplant,whichwillremainanissuewiththenewone,isthelevelofinfiltrationinthesystem(highlightedinsection2.1.2).Thisneedstobeaddressedviaincreasedinvestmentinpiperelining(section3.2)andaddressingproblemswithservicesbyidentifyingillegalconnectionsofstormwatertotheseweragesystem(viasmoketesting)andotherproblemssuchaslowgullytrapsthatdrainsurfacewater..

3.2GrenfellSewerageReticulation

AllofGrenfell’sseweragesystemisgravitypipes,i.e.therearenopumpstationswithrisingmains.

Themajority(27.5ofthe33km)ofseweragereticulation(pipesandmanholes)wasbuiltin1942.Afurther2.5kmwasbuiltin1969.

Furtherextensionsin1998and2004ofaround3kmserviceHenryLawsonEstate.

Theolderpipeisvitreousclay,whichisgenerallyregardedtohaveaservicelifeof90years.Thismeanstheusefullifeofthesepipeswillexpireinaround2032(althoughtheactualusefulservicelifeofindividualpipeswillbeshorterorlongerthanthisaverage).

Theactualperformanceofthenetworkconfirmsthisestimate,withtheincidenceofsewerchokes(blockagesduetotreerootintrusion,brokenordroppedpipes)risingandWeddinShireCouncilreportingthesecondhighestnumberofsewerblockagesinthestate(refersection2.2.2).

Page 11: Asset Management Plan for Sewerage 2018/19 · 2018-11-18 · WSC Sewerage AMP 2018/19 4 V1.1 June 2018 Council’s overall objective is to deliver sustainable best value (as set out

WSCSewerageAMP2018/19 V1.1June201811

Councilhasrecognisedtheissueandbeguninvestinginreliningofthesepipessomeyearsago,witharound5kmofpipesbeingrelinedsince2009.Council’s2018/19budgetincludes$200,000forthisworkalthough$100,000ofthisiscarriedoverasitwasnotspentlastyear.

Thecurrentfinancialplan(inthe2013StrategicBusinessPlan)allocates$100,000p.a.(in2013dollars)torelining,butthismaynotbesufficientgiventheextentofproblemsandthefactthatCouncilhasnotspentthisfullamountinrecentyears.

ReliningworksareprocuredunderajointcontractarrangedbyCENTROC,whichmeanstheratesobtainedarequitecompetitive.Dependingontheextentofproblems,theneedforadditionalwork(e.g.servicejunctions)andsizeofthepipe$200,000willcoverreliningof1-1.5kmofpipe.

Councilalsoneedstoinvestinrehabilitationofmanholes(accesschambers)asmanyoftheseareinpoorcondition.Theseareanothersourceofinfiltrationinwetweather.ItisinCouncil’sinteresttoseektoreducetheadditionalinflowasthiswatermustthenpassthroughthetreatmentplant(addingtooperationalexpenseslikepower).

Giventhehighnumberofchokes,theopportunitypresentedbythesewagetreatmentplantbeingfundedbyagrantandthegrowingneedforreliningoftheoldpartsofthereticulationnetwork,Councilhasrecognisedtheneedtoreviewfundingallocationtorelining.ThisispartofACTION4.1intheImprovementPlanintheResourcingStrategy(referencedinsection1.2).

Basedontheassetregister,basicallyall12and15”pipeshavebeenCCTVinspectedalthoughnotall9”pipeshavebeenandveryfew6”pipesthathaven’tthenbeenrelined.CCTVinspectionsneedtobeprioritisedbasedonpipesizeaswellashistoryofproblems,proximitytowaterways,etc.

Thereisalsoprovisioninthefinancialplaninthe2013StrategicBusinessPlanfor$10,000every2yearsforsewermainextensions.Thisshouldbereviewed.

3.3GrenfellEffluentReuse

Currently,thereisaneffluentreusesysteminoperationthatisusedtoirrigateseveralparksandHenryLawsonOval.Thesystemisoldandbothpipesandpumpsneedreplacingwithinthenext5years.

Improvingthequalityofthiseffluentisoneofthedriversofreplacingthesewagetreatmentplant(section3.1).Thenewplantwillincludeconstructionofaneweffluentreusesystem.

3.4SewerageServicesforVillages

Allvillagesareonseptictanks–whichhaveanumberofissuesassociatedwithfailureoftheonsitesystem,egressofeffluentoffsiteandmaintenanceofthesystems.

The2013StrategicBusinessPlanforSewerageServicesincludedprovisiontoprovidesewerageservicestoQuandialla(population320)andGreenethorpe(population220)in2030-31atacostof$200,000each–althoughthisisconsideredinsufficienttocovertheseprojects.Carabagal(population214)alsoneedstobeconsidered.

Thedelayincommencingtheseprojectswasnotedasbeingprimarilyduetotheneedtoprioritisefundingtootherissuessuchasthetreatmentplant,buttheremaybeanopportunitytobringthisforward(whichshouldbeconsideredinthecontextofaction4.1above),particularlyiftherearegrantsavailabletohelpfundsuchworks–whichthereareatthemoment.ItmaybethatCouncilsimplyscopesuptheworksoitis‘shovelready’foragrantatthisstage.

Page 12: Asset Management Plan for Sewerage 2018/19 · 2018-11-18 · WSC Sewerage AMP 2018/19 4 V1.1 June 2018 Council’s overall objective is to deliver sustainable best value (as set out

WSCSewerageAMP2018/19 V1.1June201812

4. RiskManagementAsdiscussedinsection4.3oftheResourcingStrategy,riskisoneofCouncil’sprimaryconsiderationswhenitisformulatingitsactivitiesintheDeliveryProgramsoastodeliver‘sustainablebestvalue’.

ThetablebelowsummariseskeyrisksandtreatmentplansCouncilhasinplacetomanagethese.

Risk TreatmentMethod

Releaseofrawsewagetotheenvironment

PollutionincidentresponsemanagementplandevelopedforGrenfellsewagetreatmentplant.

Chokescleared,pipesrelinedtoreduceblockagesinfuture.

Exposureofusersofparksandreservestopathogensfromeffluentreusescheme

Effluentqualitytesting,soiltestingonparksandfields

LackofqualifiedandexperiencedTreatmentPlantOperators

Trainingprograminplace,backupavailablewithintheorganisationandinneighbouringcouncils

Intermsofidentifying‘criticalassets’(assetshavingthepotentialtosignificantlyimpactontheorganisation’sobjectives),thekeyonesarethesewagetreatmentplantandlargertrunkmainscarryingthebulkofflowsinthetown.

Thescheduledmaintenanceprogramthatisproposedtobedevelopedforthenewplant(section2.2.1)willbeinformedbyassetcriticalitysovitalpumps,motors,etc.willbegivenmorefocuscommensuratewiththehigherrisk.Currentmaintenanceisconsideredadequate.

CCTVinspectionshavebeenundertakenonlargersizepipesasaprioritytoidentifytheneedforreliningworksherefirst(all12and15”pipes,althoughnotall9”pipeshaveyetbeeninspected–thishasbeenrecognisedasapriority).

4.1ReportingonInfrastructureRenewalBacklogand‘Required’Maintenance

Asdiscussedinsection4.4oftheResourcingStrategy,Councilhasadoptedarisk-basedapproachtoreportingoninfrastructuremaintenanceandrenewalbackloginSpecialSchedule7ofCouncil’sAnnualFinancialStatements(thesearealsokeyFitfortheFuturemeasures).

ItisimportanttonotethatthisdoesnotmeanthatCouncilisthereforeproviding‘sustainablebestvalue’,onlythatitisadequatelymanagingrisksassociatedwiththenetwork.Decisionsabouttheactivitiesthatwilldeliversustainablebestvaluearemadeinthecontextofsections2and3,whereCouncilprioritisesitsresourcestoparticularprogramareas.

Thefollowingassetsareidentifiedashavingahigherlevelofriskthatrequiresrenewaltoresolve.Notethatonlythoserequiring‘immediateaction’willbereportedasbacklog(theotherissueswillhelpinformdecisionsaboutfundinginsection3).

AssetatRisk WhatCanHappen?

RiskRating

UnfundedRisk(Renewal)Treatment

CosttoTreat($)

ResidualRiskRating

Noneidentified

Thefollowingmaintenanceprogramshavebeenidentifiedasbeingunder-fundedtotheextentthattheremay,potentially,bemaintenancedefectswithahigherlevelofriskidentifiedbutinsufficientfundstoaddresstheissue:

Page 13: Asset Management Plan for Sewerage 2018/19 · 2018-11-18 · WSC Sewerage AMP 2018/19 4 V1.1 June 2018 Council’s overall objective is to deliver sustainable best value (as set out

WSCSewerageAMP2018/19 V1.1June201813

AssetatRisk WhatCanHappen?

RiskRating

UnfundedRisk(Maintenance)Treatment

CosttoTreat($)

ResidualRiskRating

Noneidentified

Arisk-basedreviewofrenewalandmaintenanceofassetsonthisbasiswillbeundertakenasat30Juneeachyear.Wheretherewereinsufficientfundstomanageriskstoanacceptablelevel–wheretherewererisksassessedasrequiringimmediateaction(ratherthanprogrammingforactioninfuture)underCouncil’sRiskManagementPolicyandFramework–thefundingshortfallwillbereportedinSpecialSchedule7inrelationtothe‘costtobringtosatisfactory’(infrastructurerenewalbacklog)or‘required’(overandabove‘actual’)maintenanceasapplicable.

ACTION9.4intheImprovementPlanintheResourcingStrategyis:

Annualreviewofrisksassociatedwithmaintenanceandrenewalactivitiestoinform‘requiredmaintenance’and‘bringtosatisfactory’reportinginSpecialSchedule7;otherrisks(e.g.needforupgraded/newassets)alsoidentified;AMPupdatedifrequired.

Inadditiontothoserequirements,Councilwillalsoconsiderhigher-riskissuesassociatedwiththeneedtoupgradeorconstructnewassets(notethatthesearespecificallyexcludedfromthe‘backlog’reporting).Thefollowinghavebeenidentifiedatthistime:

AssetatRisk WhatCanHappen?

RiskRating

UnfundedUpgradeorNewAssetTreatment

CosttoTreat($)

ResidualRiskRating

Noneidentified

Page 14: Asset Management Plan for Sewerage 2018/19 · 2018-11-18 · WSC Sewerage AMP 2018/19 4 V1.1 June 2018 Council’s overall objective is to deliver sustainable best value (as set out

WSCSewerageAMP2018/19 V1.1June201814

5. AssetRegisterandAccountingAsdiscussedinsection4.1oftheResourcingStrategy,ifCouncil’soperatingrevenuesaresufficienttocovertheexpensesassociatedwithits‘daytoday’operatingactivities(discussedinsection2ofthisAMP)anditsdepreciationexpensesthenitisverylikelytobefinanciallysustainable.

Thisisbecausedepreciationisameasureoftheannualisedcostofowninganasset,calculatedbydividingitsreplacementcostbyitsservicelife.

Councilwillbeabletoaffordtorenewitsexistingassetsoverthelongtermifitisprojectingongoingoperatingsurpluses(i.e.operatingexpenses,includingdepreciation,exceedrevenues),evenifitneedstoborrowmoneytocoverashortfallincashatsomestageoverthelongterm.

Councilwillalsobeabletoaffordanyneworupgradedassetsif,whenthedepreciationoftheseassetsisaddedtooperatingexpensescurrentlyprojectedintheLongTermFinancialPlan(LTFP),Councilstillhasanongoingsurplus.

Allofthishighlightstheimportanceofanaccurateassetregister,whichnotonlyidentifiesallCouncilassets,buttheirvalueandcurrentcondition.Thisinformationisequallyimportanttoeffectivelyplananddeliveroperationalandcapitalprograms.

Italsohighlightstheimportanceofaccurateestimatesfordepreciation,andforaligninginformationintheLTFPandAMPs(e.g.ifpipeswillonlylast70yearsbutCouncilisdepreciatingthemover90yearsintheLTFP,therewillbeashortfallinfunds).

Onceworks(intheAMP)areactuallycarriedout,itisvitalthattheassetregisterisupdated(e.g.torecordthatanewassetwasbuilt).Thecostsoftheworkalsoneedtobecaptured(thiswillhelprefineestimatesforreplacementcostofsimilarassets).Thereisalsoanopportunitytoreviewtheactualservicelifeoftheassetthatwasrenewedorreplaced(tohelprefinedepreciationestimates).

ThefunctionalityofCouncil’scorporatefinancesystemisabarriertoimprovementshere.

ACTION7.1intheImprovementPlanintheResourcingStrategyis:

Captureassetrenewals,disposalsandadditionsfromcapitalworksprogram;reviewassumptions(valuation/servicelife)inthiscontextandanyotheravailableinformation(inspections,floods,etc.)

ACTION7.2intheImprovementPlanintheResourcingStrategyis:

Implementworksordersystemtocapturecapitalworks(detailsofassetscreated/disposed,costs)–afterGLrestructure(action1.3)

TheNSWOfficeofWaterpublishestheNSWReferenceRatesManualforValuationofWaterSupply,SewerageandStormwaterAssets(whichisupdatedannually).CouncilalsoparticipatesinCENTROCprogramsforjointvaluationofsewerageinfrastructure.Further,themaincapitalcoststhatinformvaluationsispiperelining,andthisiswellunderstood(beingacontractrate).

Thetablebelowsummarisescurrentconditiondataandproposedcollectionoffuturedata.Notethatthenextfullrevaluationof‘otherstructures’and‘depreciablelandimprovements’(whichcoversthemajorityofassetsinthisAMP)isduein2021.

AssetCategory CurrentConditionData(methodanddate,reportref.)

Confidencelevelindata

NextProposedDataCollection(methodanddate,reportref.)

Seweragetreatment

SewerageReticulation

AustralisAssetAdvisory,2017

In-house,agebased,2017

Medium

Medium

2022(byexternalvaluer,forrevaluation)

2022(inhouse,forrevaluation)

Page 15: Asset Management Plan for Sewerage 2018/19 · 2018-11-18 · WSC Sewerage AMP 2018/19 4 V1.1 June 2018 Council’s overall objective is to deliver sustainable best value (as set out

WSCSewerageAMP2018/19 V1.1June201815

6. AssetHierarchyAnassethierarchyisanimportantinputtoprioritisationofresourcesformaintenance,renewalandupgrades/newassetsinsomeassetclasses(e.g.roads)butislessusefulinrelationtosewerageassets.Effectively,thecriticalityofseweragereticulationisafunctionofthenumberofpropertiesservedandproximitytosensitiveareas(e.g.waterbodies)ifthereisanoverflow.

7. FinancialPlanAsdiscussedinsection3(ACTION4.1),thecurrentfinancialplaninthe2013StrategicBusinessPlanneedsreviewinthecontextofthegrantforthereplacementoftheGrenfellSewageTreatmentPlantandpotentialneedtofundotheractionssuchasmainsrelining,manholerehabilitationandprovisionofseweragetothevillages.Otherassumptionsintheplansuchasoperationalcostsforthenewplantandtheallowanceforsewermainextensionsshouldalsobereviewed.

Figuresinthetablebelowsummarisetheprogrambudgetsforoperations(section2)andcapitalworks(section3)relevanttosewerageassets.ThisistakenfromtheServiceDashboardforSewerageandStormwaterwhichreflectsCouncil’scurrentbudget.

Oncethefinancialplanforsewerageservicesisreviewed(asperaction4.1),thisshouldbeincludedinthisdocument.

8. Standards,SpecificationsandReferenceDocumentsVariousdocumentsrelatingtotheNSWBestPracticeManagementofWaterandSewerageFrameworkisavailableat:

https://www.industry.nsw.gov.au/water/water-utilities/best-practice-mgmt

PollutionIncidentResponseManagementPlanandEffluentQualityDataforWeddinSTP:

http://www.weddin.nsw.gov.au/environmental-services/sewage-treatment-plant

OPERATIONALPROGRAMS

2018/19 2019/20 2020/21 2021/22 2018/19 2019/20 2020/21 2021/22SewerageRates&Charges 541,375SewerageAdmin/Mgmt. 152,808SewerageMains 36,000SewageTreatment 106,000Sewerage-rates,staffcosts 31,730TOTALSEWERAGE 541,375 - - - 326,538 - - -

CAPITALPROGRAMS

2018/19 2019/20 2020/21 2021/22 2018/19 2019/20 2020/21 2021/22GrenfellSewageTreat.Plant 509,000 520,000SeweragePipes 250,000BetterPracticePolicies 10,000TOTALSEWERAGE 509,000 0 0 0 780,000 0 0 0

ProgramArea Revenue Expenditure(excl.Depreciation)

ProjectArea Revenue Expenditure

Page 16: Asset Management Plan for Sewerage 2018/19 · 2018-11-18 · WSC Sewerage AMP 2018/19 4 V1.1 June 2018 Council’s overall objective is to deliver sustainable best value (as set out

WSCSewerageAMP2018/19 V1.1June201816

Appendix1–DescriptionofExistingSewerageSystemSewageinGrenfelliscollectedvia33kmofgravitysewerreticulationandtransferred(withoutpumps)totheGrenfellSewageTreatmentPlant(STP),whichwasconstructedin1940.StormoverflowsfromthereticulationsystemdischargeintoEmuCreek.

TheGrenfellSTPhasacapacityof2500EPandprovidesprimary,secondaryandtertiarytreatment.BasedonCouncil’sannualreturns,theGrenfellSTPiscurrentlymeetingdischargequalityrequirements.TreatedeffluentisdischargedtoEmuCreekandtheremainderisreusedfortheirrigationofseveralparksandrecreationalareas.

Figurefrom2013StrategicBusinessPlan(reticulationisshownontheleft):

Amapofthereticulationnetworkisshownonthefollowingpage.

Page 17: Asset Management Plan for Sewerage 2018/19 · 2018-11-18 · WSC Sewerage AMP 2018/19 4 V1.1 June 2018 Council’s overall objective is to deliver sustainable best value (as set out

WSCSewerageAMP2018/19 V1.1June201817

Page 18: Asset Management Plan for Sewerage 2018/19 · 2018-11-18 · WSC Sewerage AMP 2018/19 4 V1.1 June 2018 Council’s overall objective is to deliver sustainable best value (as set out

WSCSewerageAMP2018/19 V1.1June201818

Appendix2–KeyIWCMIssuesRelatedtoSewerageUndertheBestPracticeManagement(BPM)ofWaterSupplyandSewerageFramework,a‘keyissue’isonewhereCouncilisunabletomeetitsperformancetargetsortomeetstatutoryrequirementsand/ortoincreasecapacitytoaddresstheneedsofnewdevelopment.

WhiletheBPMFrameworkonlyrequiresthosekeyissuesthathavenotbeendealtwithintheIntegratedWaterCycleManagementStrategytobeidentified,thetablebelowincludesallsuchissuessothatitisclearthoseissuesthatCouncilisaddressing,too.

KeyIssue Details CurrentStatus

ConditionandcapabilityofGrenfellSewageTreatmentPlant

Infrastructureisreachingtheendofitsusefullife.

Whileperformancemeetscurrentlicencerequirements,moremoderntreatmentprocessesareavailabletoimproveeffluentquality,whichisimportantasitisreusedonparksandsportinggrounds.

NewSTPinplanningphase

Tendersforconstructionareexpectedtobeadvertisedby2019/20

Conditionofseweragereticulation(pipesandmanholes)

Mostofthenetworkwasbuiltin1942andislikelytobereachingtheendofitsusefullifeinthenext15years.

Councilisreportingthatitisdealingwithasignificantnumberofsewerchokes(blockages),whichhighlightsthatthepipesareinpoorcondition.

Wetweatherinflowstothesewagetreatmentplantareveryhigh(8-10timesdryweatherflow),whichimpactstreatmentefficiencyandincreasescosts.

Areliningprogramisinplace,butitisperhapsnotsufficienttokeeppacewithdeterioration.

Littleinvestmentiscurrentlybeingmadetoaddressmanholesinpoorcondition.

Issueidentifiedandactionsinplacetoinvestigatefurther,includingconsideringtheoptionoframpingupreliningwork.

Issueofinvestingmoreinproblemmanholesalsobeinginvestigated.

Infiltrationfromothersources

Anothercontributortohighwetweatherinflowstosewagetreatmentplant.

Smoketestingbudgeted,althoughitneedstocontinue.

Sewerageservicesforvillages

ThevillagesofQuandialla,GreenethorpeandCarabagalareallservicedbyseptictanks.

Problemsincludefailureofonsitesystems,egressofeffluentoffsiteandmaintenanceofthesystems.

Thereisaneedtoundertakefurtherinvestigationofdesignissuesandcostsoftheseworkstoenablethemtobeconsideredinfinancialplans.

Ideally,Councilwouldhavethedesigns‘shovelready’foragrant.

Asnotedinsection1,CouncilneedstocoordinatewithCentralTablelandsWaterandCowraShireCouncilregardingthebroaderIWCMStrategy.

Page 19: Asset Management Plan for Sewerage 2018/19 · 2018-11-18 · WSC Sewerage AMP 2018/19 4 V1.1 June 2018 Council’s overall objective is to deliver sustainable best value (as set out

WSCSewerageAMP2018/19 V1.1June201819

Appendix3–AdoptedLevelsofService(PerformanceTargets)ThelevelsofservicebelowwereadoptedinCouncil’s2013StrategicBusinessPlan(pageix).

Asdiscussedinsection3.2,Counciliscurrentlyfindingasignificantlyhighernumberofchokes(mainblockagesandcollapses,‘category3systemfailures’below).

TheseperformancetargetsneedtobereviewedinthecontextofactionsinthisAMP.

Page 20: Asset Management Plan for Sewerage 2018/19 · 2018-11-18 · WSC Sewerage AMP 2018/19 4 V1.1 June 2018 Council’s overall objective is to deliver sustainable best value (as set out

WSCSewerageAMP2018/19 V1.1June201820

Appendix4–LatestPerformanceMonitoringReportTobeincluded.

Page 21: Asset Management Plan for Sewerage 2018/19 · 2018-11-18 · WSC Sewerage AMP 2018/19 4 V1.1 June 2018 Council’s overall objective is to deliver sustainable best value (as set out

WSCSewerageAMP2018/19 V1.1June201821

Appendix5–CompliancewithBestPracticeFrameworkAtabletobeincludedsummarisingkeyelementsofanIWCMStrategyandSBP,andrequirementsundertheBPMFrameworkaswellashowCouncil’ssimplifieddocumentationsatisfiestheserequirements.

Page 22: Asset Management Plan for Sewerage 2018/19 · 2018-11-18 · WSC Sewerage AMP 2018/19 4 V1.1 June 2018 Council’s overall objective is to deliver sustainable best value (as set out

WSCSewerageAMP2018/19 V1.1June201822

Appendix6–CustomerServicePlanforSewerageServiceUndertheBestPracticeManagementFramework,theCustomerServicePlanistobeincludedintheStrategicBusinessPlanforSewerage,whichmeansthe‘current’CustomerServicePlanistheonedatingfrom2013.AsidentifiedinthisAMP,thereareanumberofissuesneedingreviewincluding:

• Council’sabilitytomeetitsadoptedlevelsofservicerelatingtothenumberofblockages/chokes(sections2.2.2,3.2)

• Council’sapproachtotradewaste(refersection2.1.5)• Pricingfornon-residentialcustomerstocomplywithbestpracticeframework(asdiscussed

inthe2013StrategicBusinessPlan)• Actionswithregardstoavailabilityoftheservice,i.e.sewerageforvillages(section3.4)

ThestatusoftheseissueswillbeconsideredwhenthisAMPisupdatednextyear.ConsiderationwillbegiventoadoptinganewCustomerServicePlanatthattime.