Page 1: Asset DB Workflow Manual - Xerox

Version 4.8.1

MARCH 2021

Asset DB Workflow User Manual

Page 2: Asset DB Workflow Manual - Xerox

© 2021 Xerox Corporation. All rights reserved. Xerox® is a trademark of Xerox Corporation in the United States and/or other countries. BRXXXXX

Other company trademarks are also acknowledged.

Document Version: 1.0 (April 2021).

Page 3: Asset DB Workflow Manual - Xerox

Workflow User Manual

- i - Asset DB v4.6

Contents

1 GETTING STARTED .................................................................................................... 1

1.1 Creating a New Workflow .......................................................................................... 1

1.2 Importing a Workflow Project ..................................................................................... 2

1.3 Opening an Existing Project and associated Workflow ............................................. 2

1.4 Organising Workflow Projects ................................................................................... 2

2 WORKFLOW OVERVIEW............................................................................................ 4

3 THE FLOWCHART VIEW ............................................................................................ 4

3.1 Workflow Details ........................................................................................................ 5

3.2 Adding New Steps to the Workflow ........................................................................... 6

3.3 Adding and Changing Information to the Workflow steps ......................................... 8

3.4 Adding Symbols in Workflow ................................................................................... 11

3.5 Linking Steps in Workflow........................................................................................ 14

3.6 Inserting Steps to existing structures in Workflow ................................................... 14

3.7 Deleting Steps in Workflow ...................................................................................... 15

3.8 Exporting a Flowchart .............................................................................................. 16

3.9 Exporting Workflow Data ......................................................................................... 16

4 THE MACRO VIEW .................................................................................................... 17

4.1 The Cogs ................................................................................................................. 18

4.2 Choosing what to Display in Macro View ................................................................ 19

4.3 Exporting Macro View .............................................................................................. 20

5 THE CURRENT STATE TAB ..................................................................................... 20

5.1 Workflow in the Current State tab ............................................................................ 20

5.2 The Workflow Petals ................................................................................................ 21

6 GENERAL ................................................................................................................... 22

6.1 Display Options ........................................................................................................ 22

6.2 Navigating in the Flowchart and Macro Views ........................................................ 23

6.3 Setting a Workflow project as Complete ................................................................. 25

6.4 Activating the Workflow licence ............................................................................... 25

Page 4: Asset DB Workflow Manual - Xerox

Workflow User Manual

- 1 - Asset DB v4.8.1

1 Getting Started There are four ways to start working on a Workflow in Asset DB. You can create a new Workflow

for an existing project, import a project via data import, open an existing project or synchronise an

existing project with Asset DB Cloud. Please refer to the Auditor manual in order to learn more

about Asset DB Cloud.

1.1 Creating a New Workflow

To create a new Workflow, first either create a new Asset DB project or open an existing one then

select Workflow > Add Workflow as shown in Figure 1.

Figure 1. Add new Workflow

A new Workflow tab will be displayed to the right of the Data Preparation tab as shown in Figure

2.

Figure 2. Overview of new Workflow

Once a new Workflow has been created via the menu in the top bar, you can add further

Workflows to the project by using the button in the Organisation Console in the top right

corner.

Page 5: Asset DB Workflow Manual - Xerox

Workflow User Manual

- 2 - Asset DB v4.8.1

1.2 Importing a Workflow Project

If an Asset DB project file with Workflow has been supplied, it is imported by selecting File >

Import > Project1 and navigating to the supplied file. Asset DB project files have the extension

“.atd”. Importing the project will automatically import any associated Workflows.

Figure 3. Import Project with Workflow

Note: As for any project in Asset DB, Import Project should only be used for loading new or

backup project files rather than each time the application is used. For day to day use of an

existing project, use Open Project instead.

1.3 Opening an Existing Project and associated Workflow

To open an existing project with a Workflow, select File > Open or click the Open Project button

at the top left. This will open a dialogue box which contains a list of available projects. Select the

desired project from the list and click OK to open.

1.4 Organising Workflow Projects

An Asset DB project can have multiple Workflows associated with it. The organisation console in

the top right corner of the workspace shows all Workflows which have been created for the

project. To navigate between the different Workflow projects simply click on the desired Workflow

in the Organisation Console (see Figure 4 below).

Workflows can be added, duplicated or deleted using the buttons in the tool bar at the top of the

Organisation Console.

1 Import of .atd files is not available with all licence types

Page 6: Asset DB Workflow Manual - Xerox

Workflow User Manual

- 3 - Asset DB v4.8.1

Figure 4. Workflow organisation console

The same functions are available in the top menu as displayed in Figure 5 below:

Figure 5. Workflow section in top menu

A duplicated Workflow is automatically added to the same project. This saves time as particular

features do not need to be created multiple times.

Duplicate Workflow

Add new Workflow

Delete Workflow

Page 7: Asset DB Workflow Manual - Xerox

Workflow User Manual

- 4 - Asset DB v4.8.1

2 Workflow Overview The centre section of the Workflow tab has two main views; the Flowchart View and the Macro

View. The Flowchart View shows each step of each mapped process while the Macro View

summarises Workflow strings in the form of a cog wheel to give a clearer overview of the

situation.

3 The Flowchart View Within the Flowchart View key characteristics of the Workflow can be entered in the Details panel,

on the left of the workspace. Steps and symbols are added to the Workflow via the Tool Console.

In addition, the Workflow Navigation panel in the bottom right corner allows any user to easily pan

to the Workflow section of interest while zoomed in.

Figure 6. Workspace Overview: Flowchart view

Details Console Organisation Console

Workflow Navigation

Flowchart view Zoom Control

Steps and

Symbols

Page 8: Asset DB Workflow Manual - Xerox

Workflow User Manual

- 5 - Asset DB v4.8.1

3.1 Workflow Details

The left panel provides space for all necessary information regarding the Workflow, such as

Workflow name, business function, project completion status, a description and entry and exit

criteria.

Lists of Systems and Documents used in the process being mapped can also be captured and

used throughout the process mapping procedure. An additional field is available to capture the

different processes to be identified.

The colour representation of the Workflow in the Organisation Console can also be changed in

this area.

Figure 7. Workflow details

These details, including the Workflow name, can be accessed by moving the bar down. They can

be amended at any time by selecting the Workflow in the Organisation Console, modifying the

field in the Details fields and then clicking Update.

Page 9: Asset DB Workflow Manual - Xerox

Workflow User Manual

- 6 - Asset DB v4.8.1

3.2 Adding New Steps to the Workflow

Workflows are made up of a sequence of Steps and Symbols that represent actions within the

process. The Asset DB Workflow module provides a number of pre-designed steps in the Tool

Console.

A tooltip explaining what step type each icon represents can be seen by hovering over the icon.

Figure 8. The Tool Console

New steps are added to the Workflow in three different ways:

a. Double-clicking on the step in the Tool Console, the new step will then be placed in the

Flowchart view of the Workflow tab and will be automatically linked to the last step in the

current flowchart.

b. Left-clicking on the step so that it is “glued” to the cursor and then clicking again in the

desired location on the Flowchart view. Steps added in this way will not be automatically

linked to any other steps.

c. Copying Existing steps via the Workflow menu in the top bar or via right-clicking on the

mouse cursor and selecting “Copy Step”. A duplicated step can be pasted into the

Flowchart view by selecting “Paste Step” via the Workflow menu in the top bar or via right

mouse click.

Linking of steps is covered further in section 3.5.

Once the step has been added to the Flowchart the Details panel will update to show a number of

tabs of information that can be entered for that step type. The fields of information to be entered

and therefore the tabs in the details panel will change depending on the step chosen. Details on

adding and changing information in this panel can be found in section 3.3

Page 10: Asset DB Workflow Manual - Xerox

Workflow User Manual

- 7 - Asset DB v4.8.1

Each step will be automatically given a unique identifier which cannot be changed manually. The

unique identifier is displayed in the Step Details under the Default tab, as well as under the step

icon in the Flowchart.

Figure 9. Add steps to the Flowchart

Each Step that is added to the Flowchart will have a coloured border to signify the category of

Step. Standard symbols have a blue border, Wait Steps will have an orange border and

Transit and External Steps have a grey border to represent that they are external

processes.

Figure 10 below shows each of the default step types.

Unique Identifier

Page 11: Asset DB Workflow Manual - Xerox

Workflow User Manual

- 8 - Asset DB v4.8.1

Figure 10. Colour range of available steps in the Flowchart field

Steps that have not been linked to another Step (see section 3.5) can be moved by simply

hovering over it until the mouse becomes a Size All cursor . Then left-click on the symbol and

drag the step to a different position in the flowchart.

3.3 Adding and Changing Information to the Workflow steps

As mentioned in section 3.2 various pieces of information can be added to the steps. This is done

via the Details Console which is located in the top left corner.

To add or change data for a step simply select the step in the Flowchart. A description of the data

to be entered into each field can be shown by selecting the question mark button next to each

field.

1. The Default tab contains fields regarding the key details of a Step, such as a description,

the name of the owner2, the duration of the step and any documents or systems involved.

To save any information entered or changed click the Update button.

2 To add an owner to a step, users must have been mapped in the Current State of the project.

Page 12: Asset DB Workflow Manual - Xerox

Workflow User Manual

- 9 - Asset DB v4.8.1

2. The Participants tab is used to add information about the people or groups of people who

are involved in this process3. Click on the Edit button in theParticipants tab in order to

add users or user groups.

Figure 11. Adding users and user groups to a step

3. The Costs tab contains fields to which Labour, Material, Service and Other Costs can be

added by selecting the button as shown in Figure 12. To delete costs, select the bin

symbol .

3 In order to add participant information to a Step, users must have been mapped in the Current

State tab.

Page 13: Asset DB Workflow Manual - Xerox

Workflow User Manual

- 10 - Asset DB v4.8.1

Figure 12. Adding or deleting costs in the Costs tab

4. The Assets tab is available for certain steps, such as Print or Copy. It is possible to add

project assets to this step or to remove them if necessary by using the button and then

selecting or deselecting assets from the list.

Figure 13. Adding or removing assets to a step in Workflow

5. The Analysis tab allows the user to determine whether a step forms part of the shortest,

typical or longest path of the flowchart. It is possible to select more than one option here.

In addition, the step can be marked as Customer, Business or Non- Value Add in the

Analysis tab. This selection will then add an additional border to the step to represent its

Value-Add status:

• Not applicable – no additional border

• Customer Value Add – Green additional border

• Business Value Add – Orange additional border

• Non-Value Add – Red additional border

The default setting is “Not applicable” and can be modified on an individual basis.

Page 14: Asset DB Workflow Manual - Xerox

Workflow User Manual

- 11 - Asset DB v4.8.1

Figure 14. Selecting “Typical path”, “longest path” and “Value Add: Customer” in Workflow

3.4 Adding Symbols in Workflow

Symbols are used to signify indicate the start and end of the flowchart as well as any breaks in

the flowchart. Click on the Symbols tab in the bottom left corner to review the available elements

in a Workflow project.

Figure 15. Available symbols in Workflow

Page 15: Asset DB Workflow Manual - Xerox

Workflow User Manual

- 12 - Asset DB v4.8.1

There are currently five different symbols available: The first ones mark the start and the end

of a project. Like for the steps, a description and notes can be added to these symbols. It is

possible to add more than one connector to exit a step. This is shown in the screenshot below:

Figure 16. More than one connector is allowed to exit a step

Symbols for Go-to and Label are also available.

They are added in the same way as the different Step icons explained in section 3.2.

Users can select the Go-to and Label symbols to break up a longer linear chain and to re-arrange

a workflow as in Figure 17 below.

Page 16: Asset DB Workflow Manual - Xerox

Workflow User Manual

- 13 - Asset DB v4.8.1

Figure 17. Breaking up a linear workflow into smaller parts

In order to re-arrange a longer chain and to break it down into smaller parts, a Go-to symbol at

the end of a chain can be added. In a second step a “Label is placed at the top of a new part.

Both parts are connected by dragging the mouse cursor from the Go-to symbol to the Label.

The last icon in the Symbols tab, which consists of three dots as illustrated underneath the

‘Meeeting’ step in Figure 17, allows the user to add information about any interview that was used

to create the Workflow. This symbol can be added to any individual step if appropriate.

It’s possible to add a description and notes, for example a link to the existing interview.

Page 17: Asset DB Workflow Manual - Xerox

Workflow User Manual

- 14 - Asset DB v4.8.1

3.5 Linking Steps in Workflow

Steps can be linked in the flowchart in several ways: The first one is to hover over the centre of

an icon in the flowchart. The mouse will change from the pointer to a hand and the selected step

will get a pink outline. In this mode you will be able to drag new lines between the different step

icons.

.

Figure 18. Dragging a line from one step to another.

A connection between two steps performed by the same user will be black. Where a handover

occurs (a change of user) this will have a red arrow. Any step after the Decision step will be

dashed.

It is also possible to add details to the connector. After two steps have been connected, the label

for this connector can be edited in the upper left field of the Workflow workspace. If any existing

connectors need to be edited the users canthe user can single double click on the connector and

add additional information to the label. Figure 19 below illustrates this:

Figure 19. Adding information to a Workflow step connector.

3.6 Inserting Steps to existing structures in Workflow

Click and drag an unconnected step onto a connector line (the connector will turn blue) in order to

place it in between the two existing steps.

Page 18: Asset DB Workflow Manual - Xerox

Workflow User Manual

- 15 - Asset DB v4.8.1

Figure 20. Dragging a step between two existing steps

3.7 Deleting Steps in Workflow

There are three ways to delete individual steps from a Workflow project. Once a step has been

added to a Flowchart, the Delete Steps symbol in the top bar becomes available.

A Delete Step option will also become available in the Workflow menu as shown in Figure 21.

Figure 21. Deleting individual steps in Workflow from the top bar

The final way is to right-click on an existing step and to select Delete Workflow.

Page 19: Asset DB Workflow Manual - Xerox

Workflow User Manual

- 16 - Asset DB v4.8.1

Figure 22. Deleting individual steps with right-click

3.8 Exporting a Flowchart

To export a Flowchart select Workflow > Export Flowchart. This will enable you to export a PNG

image.

Figure 23. Exporting a Flowchart from the top bar

Alternatively, right-click anywhere on the workspace and select Export Flowchart. This will also

export the entirety of the Flowchart for the Workflow selected in PNG format.

Figure 24. Exporting a Flowchart by right-clicking the mouse

3.9 Exporting Workflow Data

It is also possible to export Workflow data as an Excel file by selecting Workflow > Export >

Export Workflow Data. Each Workflow field is a column header with each step of the Workflow in

a separate row.

Page 20: Asset DB Workflow Manual - Xerox

Workflow User Manual

- 17 - Asset DB v4.8.1

Figure 25. Exporting Workflow Data in Excel

4 The Macro View The second view in the Workflow tab is the Macro view. It is represented by a cog to the right of

the Flowchart symbol. The Macro view can be used as a review tool: It helps identifying cost-

intensive processes and provides an overview of the different processes that are associated to

individuals or groups.

Figure 26. Workspace Overview: Macro view

Processes that are linked to an individual user or a user group are displayed in a vertical order. A

black arrow connects two different processes. Dashed arrows appear after each decision step. A

red arrow indicates a change of owner. All owners of a process are arranged from left to right.

It is possible to navigate within the Macro view via the Workflow Navigation panel in the bottom

right corner. The zoom is available via the mouse and touchpad, and via the zoom function in the

top right corner. Use of the Navigation panel is explored in further detail in section 6.2.

Organisation Console

Workflow Navigation

Macro View

Workflow Details

Zoom

Page 21: Asset DB Workflow Manual - Xerox

Workflow User Manual

- 18 - Asset DB v4.8.1

4.1 The Cogs

The cogs bundle Workflow strings made up of several steps into one Cog. The first number in the

top left corner is the unique number assigned to the cog. The second number on the top right

corner refers to the number of steps involved in this section of the Workflow. The name of the cog

which is displayed in its centre can be changed by double-clicking on in. This is described further

down in this section. The numbers in the lower corners of the cogs show the costs and duration

of the section of process represented.

The cogs are linked by arrows indicating either a change of owner or a change of department,

depending on the view selected. Please refer to section 4.2 for more information regarding the

various options of a Macro view.

Figure 27. The Cog

You can access the more complete version of the information summarised

by the cog in two ways -either by double-clicking on it or by right-clicking and selecting Show Cog

Sequence.

This will open the Cog Details dialogue box. Here you can view the Workflow steps represented

by the cog with their connectors. A legend located on the right-hand side gives the names of all

the steps involved next to their symbols. You can change the name of a cog by entering it into the

Cog Name field at the bottom of the dialogue box. Click Update in order to apply the changes as

shown in Figure 28.

Page 22: Asset DB Workflow Manual - Xerox

Workflow User Manual

- 19 - Asset DB v4.8.1

Figure 28. The Cog Details View

4.2 Choosing what to Display in Macro View

There are different options which determine how the cogs are organised in the Macro View. Click

on the button to display the list.

Figure 29. Macro View Options

The two handover options determine what sequence of steps make up each cog. Choosing

“Handovers by owner” means that consecutive steps by the same owner will be grouped together

into a cog, while “Handovers by department” means that the steps will be grouped by department.

Change Your Cog

Name Here

Page 23: Asset DB Workflow Manual - Xerox

Workflow User Manual

- 20 - Asset DB v4.8.1

In order to have meaningful groupings in these views it is necessary that steps be assigned to

owners and that these owners belong to a department in the Current State (they have the

Department field filled in). Please refer to section 3.2 for more information regarding the owner of

a process. For more information regarding the departments please refer to the Asset DB Auditor

manual.

Where a Workflow is large and has many parallel paths it can be clearer to view them a few at a

time instead of all at once. This can be done by selecting to view just the Typical Paths, the

Shortest Paths, the Longest Paths, Paths 1 or Paths 2. For any cogs to be displayed in any view

other than “All Paths”, path details must have been added to the Analysis tab for each step of the

Workflow.

4.3 Exporting Macro View

In order to export the Macro view select Workflow > Export > Export Macro Process View. This

will export the Macro View as a PNG image file, see Figure 30 below. The exported image will

show all the cogs in the Workflow regardless of any specific Macro View Options previously

selected.

Figure 30. Exporting the Macro View

5 The Current State Tab

5.1 Workflow in the Current State tab

In order to see Workflow elements in the Current State tab the processes need to have been

linked to mapped users or user groups by setting owners for the steps.

The display options can be changed by following the instructions in section 6.1.

Page 24: Asset DB Workflow Manual - Xerox

Workflow User Manual

- 21 - Asset DB v4.8.1

As a default setting, all Workflows are set as visible in the Current State. This can be changed via

the Filter option in the Current State tab. It is possible to select all Workflows, to select individual

ones or to de-select all Workflows. The same filter can be set for the different paths that have

been added with the Workflow steps. This is illustrated in the following Figure 31.

Figure 31. Filtering Workflows and Paths in the Current State

5.2 The Workflow Petals

Selecting a plotted person or person group in the Current State View displays their associated

Workflow activities in the form of Workflow Petals.

The Workflow petals provide various pieces of Workflow related information directly in the Current

State tab.

The different petals show the amount of time the user has spent on Workflow processes, how

many Workflows they are involved in, the number of steps they carry out, the total costs

associated with those steps and the number of documents involved. Users who interact in the

course of a Workflow process are connected by a line. A fine line indicates a unilateral interaction

while a thicker line indicates a bilateral one. Hovering over a user or group shows the direction of

the information stream in the form of an animated dotted line.

Page 25: Asset DB Workflow Manual - Xerox

Workflow User Manual

- 22 - Asset DB v4.8.1

Figure 32. The Workflow Petals and Information Stream

Please refer to section 6.1 for how to change the colours and how to switch the animations on or

off.

6 General

6.1 Display Options

The display options for the Workflow petals in the Current State can be amended by selecting

Options > Display Options and then going to the Workflow tab. Here all options can be changed

as shown in Figure 33 below. Among others, it is possible to decide if handovers, animations and

asset links should be displayed and whether the colour displaying handovers should change. The

default colour is purple and orange for handovers but it can be changed to any other colour

available in Asset DB. Moreover, it is possible to select different colours for the handovers, asset

links, and the petals background and foreground.

Page 26: Asset DB Workflow Manual - Xerox

Workflow User Manual

- 23 - Asset DB v4.8.1

Figure 33. Overview: Default display options for Workflow

6.2 Navigating in the Flowchart and Macro Views

Some Workflow projects tend to be rather large. Therefore the outline window in the bottom right

corner will help you to navigate within the Flowchart and Macro views.

Users can click within the blue frame and the mouse will change into a Size All cursor . It is

now possible to drag the blue frame to a different area in order to view it.

Page 27: Asset DB Workflow Manual - Xerox

Workflow User Manual

- 24 - Asset DB v4.8.1

Figure 34. Navigating in the Flowchart view

The same functionality is available in the Macro view, as shown in Figure 35 below.

Figure 35. Navigating in the Macro view

Page 28: Asset DB Workflow Manual - Xerox

Workflow User Manual

- 25 - Asset DB v4.8.1

It is also possible to zoom in and out by using the Navigation window. Hover over the bottom right

corner of the blue frame so that the mouse changes into a pointing hand cursor . Click and

drag the corner of the frame in or out to enlarge or minimize the Flowchart or Macro views.

6.3 Setting a Workflow project as Complete

When Workflows are created, they have a symbol showing a white triangle in an orange circle to

the right of their names. In order to set a Workflow process as complete and update this triangle

symbol, one can select the Flowchart view and then select the Workflow from the list in the right-

hand panel (see Figure 36 below).

Figure 36. Reviewing the status of a Workflow project

It is now possible to navigate to the Workflow Details panel on the left side of the screen and to

tick the box saying Complete. Once you click Update, the triangle symbol next to the Workflow

name will change to a green tick, as displayed in Figure 37.

Figure 37. Setting a Workflow project as Complete

6.4 Activating the Workflow licence

Before activating your Workflow licence, you must have activated your Auditor, Analyst or

Architect licence using the Asset DB Online Licencing System (OLS).

In the top menu of Asset DB, go to Help > Licensing > Activate. Then copy the serial number in

the pop-up window by clicking the “…” button. Do not close the window.

Paste the serial number into an email and send it to your Support Team requesting a Workflow

licence. When you receive your response back from the team, copy your licence key from the

email. Return to Asset DB. If you still have the Activate pop-up open, go to Help > Licensing >

Activate. Paste the licence key (using CTRL+V) into the Asset DB pop-up window and click OK.

This will activate your Workflow licence.