Northumberland County Council

Managing Morpeth’s Transport

Assessment of Telford Bridge Junction Options – Final Report

Sept 2013

Phil Jones Associates Ltd The Innovation Centre

1 Devon Way Birmingham B31 2TS

t: 0121 222 5422 philjonesassociates.co.uk

Page 2: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –
Page 3: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

Assessment of Telford Bridge Junction Options – Final Report

Northumberland County Council Managing Morpeth’s Transport

Version Control and Approval

Version Date Main Contributors Issued by Approved by

A - Draft 1/7/2013 Ian Sanders, John Lynk Phil Jones Phil Jones

B – Draft 2 11/7/2103 Ian Sanders, Phil Jones Phil Jones Phil Jones

Final 30/09/2013 Ian Sanders Phil Jones Phil Jones

Prepared for

Northumberland County Council

County Hall

Morpeth

Northumberland

NE61 2EF

Page 4: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

Contents

Section Page

1 Introduction 1

1.1 Context Error! Bookmark not defined.

1.2 Background to the study 1

1.3 Aims of the report 2

2 Summary of surveys 4

2.1 Traffic Counts 4

2.2 Journey Time Data 6

2.3 Origin Destination Surveys 11

3 Road Safety 14

3.1 Introduction 14

3.2 Assessment 14

4 Telford Bridge Junction – Potential Options 16

4.1 Introduction 16

4.2 Option Review 16

4.3 Future changes to the traffic flows in Morpeth 17

5 Conclusions and Recommendations 18

5.1 Short term 18

5.2 Long term 19

Page 5: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

Assessment of Telford Bridge Junction Options – Final Report

Northumberland County Council Managing Morpeth’s Transport

Appendices

Appendix

Appendix A Workshop Report

Appendix B Summary of Traffic Data

Appendix C Journey Time Data

Appendix D Origin Destination Surveys

Appendix E Vehicle Tracking for the Signals

Appendix F Proposed mini-roundabout

Page 6: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –
Page 7: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

1. Introduction

Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options – Final Report

1 Introduction

1.1 The Study

1.1.1 This report provides a summary of the work carried out by Phil Jones Associates (PJA) in relation

to the movement of traffic (including pedestrians, cyclists and public transport) through Morpeth

Town Centre, and specifically the operation of the junction on the northern side of Telford Bridge.

That junction was previously a mini-roundabout, and was changed to traffic signal control in the

Spring of 2012.

1.1.2 Phil Jones Associates has carried out numerous visits to the town since commencing the study late

in 2012. These have included meetings with particular interest groups and officers and members

of the County and Town Councils, and holding a workshop in March 2013 which considered issues

in the round. We have also carried out observations on the operation of the Bridge Street traffic

signals and how this interacts with other movements through and to the town centre.

1.1.3 Our work has led us to conclude that there is a case for the reinstatement of a mini-roundabout

layout at the key junction at the northern end of Telford Bridge, which is currently controlled by

traffic signals. We therefore recommend that a trial of such a layout should now be carried out,

following which the Highway Authority will be better able to decide on the long-term layout.

1.2 Background to the study

1.2.1 Significant concerns were raised by the public and other stakeholders following the replacement

of the mini-roundabout markings with traffic signals at the junction of Telford Bridge, Damside

and Bridge Street in the centre of Morpeth in April 2012.

1.2.2 These works were funded by a developer, Dransfield Properties, who was required to satisfy a

planning condition attached to the granting of planning permission for a new supermarket at

Lower Stanners. The analysis and design of the signals was carried out by AECOM, as consultants

to Dransfield, and was reviewed technically by officers at Northumberland County Council.

1.2.3 The principal concerns raised by the public in connection with the traffic signals were:

Increased delays to motor traffic, leading to increased flows on more minor routes around the

town centre;

The tightness of the junction layout for large vehicles, causing them to overrun footways and

come into conflict with street furniture;

The perceived increased risk of collisions;

Increased delays to pedestrians at the associated signal crossings;

Page 8: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

1. Introduction

Managing Morpeth’s Transport 2 Northumberland County Council Assessment of Telford Bridge Junction Options – Final Report

The negative effect of the traffic signals on the street scene at this important gateway to the

town centre;

The adverse effect of the traffic signals on retailers and other businesses in the centre.

1.2.4 PJA’s brief was to conduct an independent review of the operation of the junction and the local

transport networks serving the town. The terms of reference of the study are as follows:

To engage with and involve people and groups in the town who are vocal in their views and feel

that their voices are not being properly heard;

To examine and agree what the traffic and movement network in Morpeth should and

shouldn’t provide to its users, be they motorists, pedestrians, cyclists or delivery vehicles, and

express these commonly held views through a hierarchy of users and a series of agreed

objectives for the town’s transport network;

To examine the current transport system in Morpeth and see where these objectives are failing;

and critically

To assess a full range of options for altering the transport network in Morpeth in the

immediate term, in the medium term (the period between the superstore opening and the

bypass being completed) and the long term (once the bypass is opened).

1.2.5 The reference to the bypass is to the Morpeth Northern Bypass, which is currently due for

commencement in Autumn 2015.

1.3 Aims of the report

1.3.1 The aims of this report are to review the present situation, and to recommend a series of actions.

Therefore, this report covers the following areas;

Summary and review of the data that has been collected – traffic volumes, journey time and

origin-destination surveys;

The operation of the existing traffic signals

Options for alternative layouts

Recommendations for the layout of the Telford Bridge junction for both the short and long-

term.

Page 9: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

1. Introduction

Northumberland County Council 3 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options – Final Report

1.3.2 In drawing our conclusions and recommendations, we have had regard to the outcomes of the

March 2013 Workshop, which sought to answer the following questions:

What should be the overall aims and specific objectives for transport in Morpeth?

What are the present problems and what is working well?

What will be the effect of planned changes on Morpeth’s transport networks?

What options should be considered for improving Morpeth’s transport networks?

1.3.3 The report of the workshop is included in Appendix A. The discussions went well beyond simply

the Telford Bridge junction; potential actions considered included some large projects such as

new road links and changes to the town centre traffic management regime. The assessment of

this type of intervention would require a more comprehensive transport assessment which is

beyond the scope of our instructions at this time.

1.3.4 However, we have sought to reflect the views expressed at the workshop in making this

assessment of the options for the junction. In particular, in answer to the first question (ie ‘what

does success look like?’), the following points were made:

Some traffic congestion at peak times is inevitable but it should be predictable.

It is better for traffic to flow evenly and slowly than in a stop-start manner

The appearance of the town centre is very important to the local economy

Page 10: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

2. Summary of surveys

Managing Morpeth’s Transport 4 Northumberland County Council Assessment of Telford Bridge Junction Options – Final Report

2 Summary of surveys

2.1 Traffic Counts

2.1.1 Automatic Traffic Count data for a number of key links around the town centre (pre-and post the

junction scheme) has been provided by NCC and are summarised on the diagram included as

Appendix B. The analysis shows the following trends:

Traffic volumes on Telford Bridge have reduced following the introduction of the traffic signals.

12 hour flows were reduced by 16% northbound and 10% southbound compared to the most

recent pre signals data from 2011. Northbound flows have fallen by some 18% in the morning

peak and 25% in the afternoon peak, and around 15% over 24 hours (all weekdays). The

reduction in southbound flow is lower, but still amounts to 10% over 24 hours.

There was some increase in traffic flows in the post-signals situation at St Mary’s Field, which is

the most likely diversion route from the A197 to the town centre, via Curly Kews and Oldgate.

The 12 hour flows increased by 34% northbound and 26% southbound.

2.1.2 Traffic data for the PM peak is also provided in the AECOM Transport Assessment of April 2010.

This indicates that PM peak traffic flows in 2009 were higher than in the post-signals situation.

The overall reduction in PM peak hour flow from 2009 to 2012 is 22% Northbound and 8%

Southbound.

2.1.3 Data on town centre flows are also given in the AECOM Report of Surveys, prepared for

Northumberland CC as part of the modelling work for the Northern Bypass. This data, which is

from October 2007, shows similar traffic flows across Telford Bridge to those measured in 2009

and 2011.

2.1.4 Figure 2-1 below summarises the change in traffic flows at Telford Bridge over time.

Page 11: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

2. Summary of surveys

Northumberland County Council 5 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options – Final Report

Figure 2-1: Telford Bridge Traffic Flows

2.1.5 This data shows that traffic flows were reasonably consistent between 2007 and 2011, albeit with

a slight decline, but that has been a more significant reduction in traffic flow on Telford Bridge

since the traffic signals were installed in 2012. Given that the junction is operating at capacity in

the peak hours, this indicates that the signals are coping less well with traffic demands than the

previous mini-roundabout layout.

2.1.6 Although there may be some impact on the non-strategic route via Curly Kews, the additional

flow is relatively small in absolute terms, and is less than the reduction in traffic on Telford Bridge.

Overall there has therefore been a reduction in traffic flows across the River Wansbeck.

19721866

1661

2029 20801940

1655

2007 2009 2011 2012

Telford Bridge 2 Way Traffic Flows

AM Peak PM Peak

Page 12: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

2. Summary of surveys

Managing Morpeth’s Transport 6 Northumberland County Council Assessment of Telford Bridge Junction Options – Final Report

2.2 Journey Time Data

2.2.1 Northumberland County Council commissioned a series of journey time surveys in May and

August 2013, in order to establish the current level of congestion across the town. As part of the

preparatory work for the Northern Bypass Scheme in 2007, 2008 and 2009, AECOM (as

consultants to the County Council) also undertook extensive surveys for a number of routes.

2.2.2 These sets of data provide the basis for a comparison of the level of congestion with the previous

mini-roundabout and present traffic signals layouts at the Telford Bridge junction. As noted

above, traffic flows at Telford Bridge during the period before the installation of the signals were

reasonably consistent.

2.2.3 The data for the 2013 Journey Time surveys are included as Appendix C. It should be noted that

the two sets of surveys differ in detail in terms of the routes taken and the manner of recording,

and therefore a direct comparison of the journey time data is not possible and some interpolation

has been necessary.

2.2.4 The May 2013 surveys consisted of three routes, both carried out in the northbound and

southbound directions, as shown on Figure 2.2;

Route 1 – A192/A196 roundabout, via Castle Bank to A197 Dark Lane (through Morpeth Town

Centre);

Route 2- B6524/A197 junction via Castle Bank to A192 Bridge Street (through Morpeth Town

Centre);

Route 3- St Marys Field/A197 junction, Church Walk, Curley Kews

2.2.5 Additional surveys were carried out for Routes 1 and 3 in August 2013 to provide additional

information on the journey times.

Page 13: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

2. Summary of surveys

Northumberland County Council 7 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options – Final Report

Figure 2-2: Journey Time Routes, 2013

Page 14: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

2. Summary of surveys

Managing Morpeth’s Transport 8 Northumberland County Council Assessment of Telford Bridge Junction Options – Final Report

2.2.6 The AECOM survey routes are shown below.

Figure 2-3: AECOM 2007-9 Journey Time Survey Routes

Page 15: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

2. Summary of surveys

Northumberland County Council 9 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options – Final Report

2.2.7 To enable a direct comparison of sections of the route with the previous AECOM surveys, the

times taken to travel between the following Journey Time Nodes, as shown on Figure 2.2, were

considered;

From 3 to 2 –B6254/A197 northbound to Mafeking Roundabout;

From 2 to 5 – Mafeking northbound to Bridge Street/Oldgate/Newgate Roundabout;

From 4 to 2 – A192/A196 Roundabout northbound to Mafeking Roundabout;

From 6 to 1 – Dark Lane/Howard Road southbound to Bridge Street/Damside Junction.

2.2.8 The 2013 survey results are for the AM peak period 07:00 to 09:00, and the PM peak period 16:00

to 18:00. The exact times of the 2007-9 surveys are unknown, as they are only referred to as AM

and PM peaks, but it is expected that they would have been similar.

Table 2-1: Comparison of Journey Times for the AM Peak, 2007 and 2013 surveys

Time (seconds)

3 to 2 Time (seconds)

2 to 5 Time (seconds)

4 to 2 Time (seconds)

6 to 1

Surveys Average Min Max Average Min Max Average Min Max Average Min Max

2007 Surveys 85 57 153 105 69 155 154 78 371 49 35 75

2013 May Surveys 153 105 400 136 85 200 170 120 275 109 60 270

2013 Aug Surveys n/a n/a n/a n/a n/a n/a 96 94 398 n/a n/a n/a

Change 2007 to May 2013 68 48 247 30 16 45 16 42 -96 60 25 195

Table 2-2: Comparison of Journey Times for the PM Peak, 2007 and 2013 surveys

Time (seconds)

3 to 2 Time (seconds)

2 to 5 Time (seconds)

4 to 2 Time (seconds)

6 to 1

Surveys Average Min Max Average Min Max Average Min Max Average Min Max

2007 Surveys 122 70 370 152 51 419 79 61 117 57 44 63

2013 May Surveys 196 120 390 232 210 260 168 155 185 124 70 295

2013 Aug Surveys n/a n/a n/a n/a n/a n/a 158 94 398 n/a n/a n/a

Change 2007 to May 2013 74 50 20 80 159

-159 89 94 68 68 26 232

Page 16: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

2. Summary of surveys

Managing Morpeth’s Transport 10 Northumberland County Council Assessment of Telford Bridge Junction Options – Final Report

2.2.9 The results show that the average journey time has increased from 2007-9 to May 2013 on all of

the routes (although there two routes where there was a decline in the maximum delay that was

recorded by one particular survey run).

2.2.10 The data for August 2013 only covers one of the routes considered. It shows that delays reduced

in the morning peak but increased in the evening peak, compared to 2007-9, but given that this is

during a school holiday period, the results are unlikely to be representative of normal conditions.

2.2.11 This data analysis indicates that the signals have not improved the average traffic delays at

junction, as was expected, but have generally made the situation worse, even though there has

been a reduction in traffic flow through the junction. This is a significant finding which has

implications for the decision whether or not to retain the existing traffic signal layout.

Page 17: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

2. Summary of surveys

Northumberland County Council 11 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options – Final Report

2.3 Origin Destination Surveys

2.3.1 Northumberland County Council also conducted an origin-destination survey in 2013, with the AM

peak survey carried out on the 7th June, and the PM peak survey on the 24th May.

2.3.2 The locations of the five survey stations are shown on Figure 2.3 below, with the summary results

for the AM and PM peak periods in Tables 2.3 and 2.4 below. The full results are included as

Appendix D.

Figure 2-2: Location of sites for the Origin-Destination surveys in Morpeth

Page 18: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

2. Summary of surveys

Managing Morpeth’s Transport 12 Northumberland County Council Assessment of Telford Bridge Junction Options – Final Report

Table 2-3: Origin Destination Data for Morpeth, May 2013, AM Peak (07:00 – 09:00)

Destination 1 2 3 4 5 Total

Total Origin Site 1 A197 (Sun Inn) 0 510 111 18 63 702

Site 2 A192 (Shields Road) 653 0 87 24 328 1092

Site 3 Whorral Bank 398 192 0 95 301 986

Site 4 Oldgate 79 97 126 0 147 449

Site 5 Newgate Street 160 291 185 46 0 682

Total 1290 1090 509 183 839 3911

Table 2-4: Origin Destination Data for Morpeth, May 2013, PM Peak (15:00 – 17:00)

Destination 1 2 3 4 5 Total

Total Origin Site 1 A197 (Sun Inn) 0 103 219 34 108 464

Site 2 A192 (Shields Road) 640 0 112 38 263 1053

Site 3 Whorral Bank 216 65 0 111 230 622

Site 4 Oldgate 46 53 141 0 123 363

Site 5 Newgate Street 96 72 217 59 0 444

Total 998 293 689 242 724 2946

2.3.3 It is important to note that the surveys only show the matched registrations for through

movements passing across two of the five sites. Therefore, the volume of traffic parking or

remaining within the town centre for the peak periods is not identified, and therefore, this is only

a partial registration matching survey.

2.3.4 The results demonstrate the following patterns for through-traffic for the morning peak period;

A predominant movement is from Site 1 to Site 2 (A197 South to Shields Road), accounting for

73% of all matched vehicles approaching from the A197 South;

A predominant movement from Site 2 to Site 1 (Shields Road to the A197 South), accounting

for 60% of all traffic approaching from Shields Road;

A high volume of through-traffic approaching from Site 3 (Whorral Bank), with 40% travelling

south through to Site 1 and 31% northbound through Newgate Street;

A lower total of through movements from Sites 4 and 5, with a spread of through movements

in all directions.

Page 19: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

2. Summary of surveys

Northumberland County Council 13 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options – Final Report

2.3.5 For the evening peak period, there are total of just under 3000 matched movements, compared

to nearly 4000 for the morning 2-hour period. The following patterns for the PM peak are shown;

There are only 100 vehicles matched from Site 1 to Site 2, and therefore the high volume of

traffic in the morning peak from 2 to 1 is not transposed (reversed) for the evening peak home

trip;

36% of the matched movements are arriving from Site 2 (Shields Road), with the majority

turning left to Site 1 (A197 south) and not through the town;

2.3.6 It could be argued that a significant level of the through traffic recorded in the surveys may be

removed in the future as a result of the Morpeth Northern Bypass. The County Council’s

consultants AECOM previously modelled the predicted effect of the planned Northern Bypass,

which will link the A1 and the A197 (due for completion in 2015), together with the additional

development.

2.3.7 The modelling predicts that although the bypass will itself relieve traffic in the town centre by

around 20%, traffic generated by planned developments has the potential to leave the town no

better off in traffic terms than at present, assuming that the travel choices of the new and existing

residents are the same as now. Investment in walking, cycling and public transport would have

the potential to mitigate any impact, however.

Page 20: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

3. Road Safety

Managing Morpeth’s Transport 14 Northumberland County Council Assessment of Telford Bridge Junction Options – Final Report

3 Road Safety

3.1 Introduction

3.1.1 In the earlier sections of this report we assessed the impact of the traffic signals on congestion.

We now assess the signals with regard to the concerns expressed over road safety and have also

looked at the safety record of the previous mini-roundabout layout.

3.2 Assessment

3.2.1 It is understood that there have been a number of vehicle strikes on traffic signs and other street

furniture at the signalled junction, including signal heads, and we have witnessed occasions when

large vehicles making the right turn from Telford Bridge to Damside have failed to make the turn

and had to reverse.

3.2.2 We have not been made aware of any casualties arising from these collisions, however, and we

understand that the Police are not greatly concerned over road safety at the junction.

3.2.3 The tracking of the signal layout has been reviewed by PJA, and the results are included as

Appendix E.

3.2.4 This shows that while it is possible for long articulated and other large vehicles to negotiate the

signals successfully, the space is tight and there is little room for error. If a vehicle turns earlier

than it should it is possible that the rear end of the vehicle would overrun the kerb. This would

potentially place a pedestrian at some risk, although the likelihood of this occurring is small.

Nevertheless, the consequences of such an event could be serious.

3.2.5 We also note that the introduction of the signals has increased the waiting time for pedestrians at

the signal-controlled crossings on Dam Street and Bridge Street, as they now operate with the

longer traffic signal cycle rather than as stand-alone Pelicans. This has reduced pedestrian

amenity and could lead to more people crossing the carriageway on the red man.

3.2.6 We have reviewed the accident record of the former mini roundabout and have found it to be

good, considering the high volume of traffic that uses the junction, with only two recorded

personal injury accidents in the 5 year period up to 2011, neither of which involved a pedestrian

or cyclist.

3.2.7 In conclusion, there appears to be a persistent problem with large vehicles at the traffic signals

striking street furniture, and while it is unlikely that this will cause personal injury, this cannot be

ruled out. It is clearly an undesirable situation which has only arisen since the change to the

junction layout.

Page 21: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

3. Road Safety

Northumberland County Council 15 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options – Final Report

3.2.8 There is also some potential for the bodies of large vehicles to overhang the edge of the footway

if drivers misjudge the turn, and while the risk of a pedestrian being struck is low, the

consequences could be severe. Pedestrians may also be more at risk at the crossings due to the

longer cycle times.

3.2.9 The previous mini-roundabout had a good accident record and we therefore conclude that while

the new signals are not likely to give rise to large numbers of personal injury accidents, on balance

there will have been a slight reduction in road safety with the new junction.

Page 22: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

4. Telford Bridge Junction – Potential Options

Managing Morpeth’s Transport 16 Northumberland County Council Assessment of Telford Bridge Junction Options – Final Report

4 Telford Bridge Junction – Potential Options

4.1 Introduction

4.1.1 There are a number of options for the layout and operation of the Telford Bridge junction, based

on the traffic management arrangements in the town centre remaining unchanged;

1 Retain the traffic signals, but with better coordination with the separate signal-controlled

crossing at Goose Hill

2 Reinstating a mini-roundabout

3 A more comprehensive “shared space” scheme

4.1.2 Other options have been identified, including the reduction in conflicts at the junction by making

Bridge Street one-way, but their assessment would require more extensive traffic modelling

which is beyond the scope of our present instructions.

4.2 Option Review

4.2.1 Linking the existing signals to the Goose Hill crossing is expected to have some benefits in terms

of congestion. It is not possible to quantify this without further modelling work, but given the

significant increase in average delays that has taken place following the introduction of the

signals, we do not consider that this would have a major effect. It would also increase the delay

to pedestrians at the Goose Hill crossing, which would particularly affect children walking to and

from school, and would not reduce delay to pedestrians at the junction itself. The problems with

long vehicles would also remain.

4.2.2 Reinstating a mini-roundabout is expected to bring traffic benefits. The evidence of the AECOM

journey time runs is that there would be a reduction in traffic delay at peak times. Pedestrians

would also benefit from a shorter cycle time at the two stand-alone crossings, which could be

returned to “pelican” operation. Delays to all users outside the peaks would be very low.

4.2.3 There has been some carriageway widening carried out as part of the signalisation scheme which

means that a reinstated mini-roundabout would have a higher traffic capacity than the former

layout.

4.2.4 A drawing showing a reinstated mini-roundabout is included in Appendix F. We understand that

the highway authority has prepared more detailed proposals based on this layout, and that this

scheme could be built fairly quickly, and at a relatively low cost. The traffic signals are

demountable, and it should be possible to remove or haunch over the splitter islands in the

junction without undue difficulty.

Page 23: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

4. Telford Bridge Junction – Potential Options

Northumberland County Council 17 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options – Final Report

4.2.5 Although the mini-roundabout would improve the street scene at the junction, there would still

be some intrusion from the traffic signs and markings that would be required.

4.2.6 Changing the junction to a more informal priority, through the use of ‘shared space’ techniques,

would be a possibility in the longer term, if additional funding were to become available, and

subject to further detailed modelling and investigation. A study of shared space options is beyond

the scope of this current report, however.

4.3 Changes to the traffic flows in Morpeth

4.3.1 It is possible that the recent opening of the new Morrisons store on Dark Lane (relocated from

Corporation Yard) may have affected the traffic flows in the town. The Transport Assessment

prepared in support of the store predicted some increase in traffic, on the assumption that the

existing Morrisons was reopened. That is not expected to take place until later in the year,

however.

4.3.2 In the longer term, the completion of the northern bypass will significantly reduce traffic flows

through the town, including traffic travelling over the Telford Bridge and through the junction.

4.3.3 There may be some concerns that any change to the operation of the junction should be

postponed until both the new and old supermarkets are operational, so that their combined

traffic effects are known.

4.3.4 However, given that the traffic signals are subject to more congestion than the previous mini-

roundabout layout, any increase in traffic due to both stores being operational will only make the

situation worse. We therefore do not see this as a reason to hold off from making changes now.

Page 24: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

5. Conclusions and Recommendations

Managing Morpeth’s Transport 18 Northumberland County Council Assessment of Telford Bridge Junction Options – Final Report

5 Conclusions and Recommendations

5.1 Short term

5.1.1 The results of the data collection exercise show that peak hour traffic congestion in the town,

centred on the Telford Bridge junction and measured outside school holidays, has increased

following the introduction of the traffic signals; while at the same time the volume of traffic

passing over the bridge has reduced. This indicates that the signals have a lower traffic capacity

than the mini-roundabout junction that they replaced.

5.1.2 We have also noted that there are difficulties in accommodating large vehicles at the traffic

signals, which is resulting in regular damage to street furniture, including the signal heads

themselves. While we do not consider the risk of personal injury to be high, given the low traffic

speeds, this is clearly an undesirable situation.

5.1.3 It is therefore recommended that the traffic signals should be removed and replaced with a mini-

roundabout junction, initially as a trial, based on the design included in Appendix E. This trial

should include traffic flow and delay monitoring to assess how traffic queues and delays are

affected by the change in junction layout and control.

5.1.4 We believe that this change will better reflect the desired outcomes expressed at the March 2013

workshop, which were:

Some traffic congestion at peak times is inevitable but it should be predictable.

It is better for traffic to flow evenly and slowly than in a stop-start manner

The appearance of the town centre is very important to the local economy

5.1.5 The evidence indicates that the removal of the signals will be positive for all three of these aims.

5.1.6 There is no need to wait for the former Morrisons store to open before carrying out these works;

any further increase in traffic with both stores open would in turn have increased delays at the

traffic signal junction.

5.1.7 On the assumption that the trials show no major immediate adverse impact of reinstating the

mini-roundabout, we would suggest that the temporary layout remains in place for at least 6

months, which will hopefully mean that it also covers the reopening of the existing Morrisons

store, and any traffic impact that results from this. Traffic and delay surveys, repeating the

methodology used previously, should be carried out during the trial to provide a sound

comparison of the effect of the change.

Page 25: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

5. Conclusions and Recommendations

Northumberland County Council 19 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options – Final Report

5.1.8 We would also recommend that all of the sub-surface signals infrastructure should remain in

place during the trial, so that the signals could be easily reinstated if the temporary removal is not

judged to be a success.

5.2 Long term

5.2.1 Traffic flows are expected to be reduced in the town centre once the bypass is opened, although

they may increase again as development takes place, if there is not a shift away from private car

use.

5.2.2 Depending on the outcome of the mini-roundabout trial, we recommend that consideration is

given to a shared space-type solution at Telford Bridge in the longer and as funds permit, which

will significantly improve the visual quality of this key arrival space, as well as having the potential

to further reduce traffic delays and improve pedestrian amenity.

5.2.3 Other options could also be considered, however, in terms of the traffic management

arrangements across the town as a whole, which would also have implications for the form of the

junction and its approaches. These assessments would require further modelling, or could also be

the subject of further trials.

Page 26: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

Managing Morpeth’s Transport Northumberland County Council Assessment of Telford Bridge Junction Options – Final Report

Appendix A Workshop Report

Page 27: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

Northumberland County Council Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options – Final Report

Appendix B Summary of Traffic Data

Page 28: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

Managing Morpeth’s Transport Northumberland County Council Assessment of Telford Bridge Junction Options – Final Report

Appendix C Journey Time Data

Page 29: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

Northumberland County Council Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options – Final Report

Appendix D Origin Destination Surveys

Page 30: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

Managing Morpeth’s Transport Northumberland County Council Assessment of Telford Bridge Junction Options – Final Report

Appendix E Vehicle Tracking for the Signals

Page 31: Assessment of Telford Bridge Junction Options …...1. Introduction Northumberland County Council 1 Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options –

Northumberland County Council Managing Morpeth’s Transport Assessment of Telford Bridge Junction Options – Final Report

Appendix F Proposed mini-roundabout