Assembly Line Balancing
Jaime Joo
MBA 530 – Section 1
Brigham Young University
![Page 2: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/2.jpg)
Outline• What is Assembly Line Balancing?
• How can Assembly Line Balancing benefit your operations?
• Classic approach to ALB
• Let’s practice!
• ALB in the real world
• Conclusions
![Page 3: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/3.jpg)
What is Assembly Line Balancing (ALB)?
ALB is the procedure to assign tasks to workstations so that:
•Precedence relationship is complied with
•No workstation takes more than the cycle time to complete
•Operational idle time is minimized
![Page 4: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/4.jpg)
How can Assembly Line Balancing benefit your operations?
A balanced line:• Promotes one piece flow• Avoids excessive work load in some stages
(overburden)• Minimizes wastes (over-processing, inventory,
waiting, rework, transportation, motion)• Reduces variation
![Page 5: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/5.jpg)
Unbalanced Line
Work Station 1
Work Station 4
Work Station 3
Work Station 2
!? Zzz Zzz
10 sec 40 sec! 20 sec 15 sec
Overproduction!
Generates waste
Undesirable waiting
![Page 6: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/6.jpg)
Balanced Line
Work Station 1
Work Station 4
Work Station 3
Work Station 2
25 sec 25 sec 20 sec 15 sec
•Promotes one piece flow
•Avoids overburden
•Minimizes wastes
•Reduces variation
![Page 7: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/7.jpg)
Line Balancing prerequisitesPrior to balancing a line we must:
• Determine the required workstation cycle time (or TAKT time), matching the pace of the manufacturing process to customer demand
• Standardize the process
![Page 8: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/8.jpg)
Classic approach to ALB
Also known as SALBP* (Simple Assembly Line Balancing Problem), the classic approach to ALB is an heuristic process to optimize assembly lines simplifying the problem to a basic level of complexity
*Dubbed SALBP by Becker and Scholl (2004)
![Page 9: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/9.jpg)
Example The next table shows the tasks performed in a
production line. Our goal is to combine them into workstations. The assembly line operates 8 hours per day and the expected customer demand is 1000 units per day. Balance the line and calculate the efficiency and theoretical minimum number of workstations.
![Page 10: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/10.jpg)
Example (cont.)Task Task Time
(sec)Preceding Task
A 13 -
B 11 A
C 15 A
D 20 B
E 12 B
F 13 C
G 13 C
H 18 D, E
I 17 F, G
J 15 H, I
K 9 J
Total Time: 156
![Page 11: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/11.jpg)
Example (cont.)• Step 1: Draw a precedence diagram according to the given sequential relationship
K
9 sec
J
15 sec
I
17 sec
H
18 sec
G
13 sec
F
13 sec
E
12 sec
D
20 sec
C
15 sec
B
11 sec
A
13 sec
![Page 12: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/12.jpg)
Example (cont.)• Step 2: Determine Takt time or Workstation Cycle Time
C=Production time per day / Customer demand (or output per day)
C= 28800 sec (8 hours) / 1000 units = 28.8
• Step 3: Determine the theoretical number of workstations required
N= Total Task Time / Takt time
N= 156 / 28.8 = 5.42 (~6 workstations)
![Page 13: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/13.jpg)
Example (cont.)• Step 4: Define your assignment rules. For
this example our primary rule will be “number of following tasks” and the secondary rule will be “longest operation time”
![Page 14: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/14.jpg)
Example (cont.)• Step 5: Assign tasks to workstations following the assignment rules
and meeting precedence and cycle time requirements
To form Workstation 1:
A
13 sec B
C
Following tasks: 5
Following tasks: 5
11 sec
15 secLot: 15>11!
WS1: A+C=28 sec
Cycle Time met!
![Page 15: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/15.jpg)
Example (cont.)• Forming Workstation 2:
A
13 sec B
C
11 sec
15 sec
G
13 sec
F
13 sec
E
12 sec
D
20 sec
B+D>Cycle time!
LOT:_F&G>E
Arbitrarily choose F
WS2: Operation time=24 sec (<C)
![Page 16: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/16.jpg)
Example (cont.)• Following the same criteria we achieve our balancing with
7 workstations
Workstation Task Task TimeRemaining Unassigned Time
Feasible Remaining Tasks
Task withmost followers
Task withLOT
A 13 15.8 B, C B, C CC 15 0.8 -B 11 17.8 E, F, G E, F, G F, GF 13 4.8 -
3 D 20 8.8 -G 13 15.8 E E 12 3.8 -
5 H 18 10.8 -6 I 17 11.8 -
J 15 13.8 KK 9 4.8 -
1
2
4
7
![Page 17: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/17.jpg)
Example (cont.)• Step 6: Calculate Efficiency
– Efficiency= Total Task Time / (Actual number of workstations * Takt Time)
– Efficiency= 156 / (7*28.8) = 77%
How to interpret this efficiency?
Is this the best efficiency achievable?
![Page 18: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/18.jpg)
Let’s Practice• We have found a new market for our
product. This market is less demanding so we have decided not to include a particular feature, specifically the feature added by task I. As a consequence, task time in F drops to 5 seconds and task time in G drops to 8 seconds. Balance the line according to the other conditions.
![Page 19: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/19.jpg)
Let’s practice (cont.)Task Task Time
(sec)Preceding Task
A 13 -
B 11 A
C 15 A
D 20 B
E 12 B
F 13 5 C
G 13 8 C
H 18 D, E
I 17 F, G
J (new I) 15 H, F, G
K (new J) 9 I
Total Time: 156 126
![Page 20: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/20.jpg)
Let’s practice (cont.)• Let’s take some time to solve this new
problem. This time we will calculate keeping the primary and secondary rules as in the original problem.
![Page 21: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/21.jpg)
Let’s practice (solution)• Precedence diagram
J*
9 sec
I*
15 sec
H
18 sec
G
8 sec
F
5 sec
E
12 sec
D
C
15 sec
B
11 sec
A
13 sec
20 sec
*Previously J & K respectively
![Page 22: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/22.jpg)
Let’s practice (solution)• Takt time
C = 28,800 sec / 1000 units = 28.8
• Theoretical number of workstations
N = 126/28.8 = 4.38 (~5 workstations)
• Primary rule: number of following tasks
• Secondary rule: longest operation time
![Page 23: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/23.jpg)
Let’s practice (solution)• Following the rules and observing cycle time and precedence
we obtain:
Workstation Task Task TimeRemaining Unassigned Time
Feasible Remaining Tasks
Task withmost followers
Task withLOT
A 13 15.8 B, C BB 11 4.8 -C 15 13.8 E, F, G EE 12 1.8 -
3 D 20 8.8 -4 H 18 10.8
G 8 20.8 FF 5 15.8 II 15 0.8 -
6 J 9 19.8 -
1
2
5
![Page 24: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/24.jpg)
Let’s practice (solution)• Efficiency = 126/(6*28.8) = 73%
Challenge: Is this the best efficiency achievable? Try to solve with LOT as the primary rule and you will obtain a 5 workstations balance, increasing efficiency to 87%
![Page 25: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/25.jpg)
ALB in the real worldThe simple ALB problem approach is limited by some
constraints:
• Balance on existing and operating lines– Workstations have spatial constraints
– Some workstations cannot be eliminated
– Need to smooth workload among workstations
• Multiple operators per workstation– Different paces among operators, different lead times within the
same workstation
![Page 26: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/26.jpg)
ALB in the real world (cont.)• Operator spatial constraints
– Different workstation imposed working positions– More than one task to be performed in what should be the space for
one task
• Multiple Products– Coping with different products, some operations are needed for
some products but not for others– Some products can introduce “peak times” in some workstations
• Different task times performed in different shifts– Particularly when introducing new employees or workers with some
degree of incapacity
![Page 27: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/27.jpg)
Conclusion• Simply Assembly Line Balancing is a valid
method to optimize assembly lines. However, many variables found in real operating lines increase the complexity of the problem. More complex algorithms have been developed to solve the difficult task of balancing large scale industrial lines. Some of them are commercially available in software.
![Page 28: Assembly Line Balancing Jaime Joo MBA 530 – Section 1 Brigham Young University](https://reader035.vdocuments.mx/reader035/viewer/2022070415/56649ee85503460f94bf912a/html5/thumbnails/28.jpg)
References• F. Robert Jacobs & Richard B. Chase “Operations and
Supply Management, The Core” McGraw-Hill/Irwin First Edition
• Emanuel Falkenauer “Line Balancing in the real world” Optimal Design