asmary groupasmaryco.com/wp-content/themes/fahim/downloads/petro...asmary group field services co....
TRANSCRIPT
-
Asmary GroupField Services Co.
Petro Pardazesh Aria Kish (PPA) an independent petroleum technology and service corporation. Our mission is to give advice for the best use of available technologies and todevelop game changing solutions where potential is seen. Our ambition is to contribute to improved recovery of already recognized hydrocarbon resources and to enforce environmentally safe strategies for abandonment of wells.
Our Core Business Areas
- Production Optimization & Allocation Services- Early Phase Field Screening & Farm-in Studies- IOR/EOR Studies- Technology and Service Innovation- RCAL/ SCAL/ PVT Studies- Drilling & Well Technology- Software Development
A Petroleum Technology and Innovation Company providing Leading Edge
R&D, Consulting and Software Engineering Services
-
271
INTERNATIONAL FIELD DEVELOPMENT PROJECTSIOR & MDP CONTRACTS
-
Asmary GroupField Services Co.
TRACK RECORD & CLIENTS
PRODUCTION METERING, ALLOCATION & FLOW ASSURANCE
Expertise: Reservoir & Production Engineering, Flow Assurance, Multiphase, Flow, Production Systems, Metering & Allocation
- Daily fiscal, Field & Well Allocation- Early Phase Design of Metering & Allocation Systems- 3rd party verification & audit- Production Analysis & Back-Allocation- Modelling, Simulations, Workflow & Procedures- Uncertainty Analysis- Software Tool Development- Implementation & Operational Support
-
273
PPA SOFTWARE CAPABILITIES
Instrumentation Well Management
Metering philosophyInstrument qualification
Remote monitoringData management
Well modellingWell allocationOIL / GOR / WCOn-norm check
Well optimization / liftingWell flow assurance
KPI per wellWell intervention planning
Broad Suite of Licensed 3rd Party Software PRORES Proprietary Software
Schlumberger (Petrel, Eclipse)Roxar (RMS, Flowsim, MORE, Tempest)
Senergy (Interactive Petrophysics)Calsep (PVTsim)
SPT (OLGA Transient Flow Simulator)Petex (Prosper
Hampson-Russel (AVO & Inversion Analysis)
SENDRA (SCAL tool box)FARC (Production Allocation)
PETREL plug-insWeatherford Proprietary Software
Petroleum Engineering (WellFlo, PVTflex, PanSystem, MatBal, ReO, i-DO)
SOFTWARE TOOL BOX & EXPERTISE
-
Asmary GroupField Services Co.
SENDRA – MAXIMIZING VALUE OF CORE ANALYSIS DATA
-
275
HOW CAN WE SUPPORT IN MATURE FIELD DEVELOPMENT
GEOMECHANICS AND BOREHOLE STABILITY
Field & Area Development- Assessment of re-development and tie-in opportunities
Production Optimization & Flow Assurance- Artificial lift options to replace ESP- Production strategy & delay of water breakthrough- Mitigation of mineral scale (& asphaltene) precipitation- Production potential & reserves- Well clean-/start-up analysis & procedures- Stimulation & IOR potential- Production metering & allocation
Drilling, Completion & P&A- Re-completion & intervention options- Assessment of P&A solutions & costs
In-Situ Stresses• Regional data• Fracturing data• Breakouts• Leak-off tests• Caliper & image
log dataWell Design
• Depth• Azimuth• Inclination• Hole size• ECD, BHP• Mud chemistry
Rock Mechanical Data• Laboratory tests• Log-derived rock properties • Back analysis of offset well
caliper data
GeomechanicalModel
Petrophysical Data• Porosity• Permeability• Sonic velocity, Vp, Vs• Bulk Density• Saturations
Formation Data• Reservoir pressure• Depletion scheme• Fluid properties
-
Asmary GroupField Services Co.
Data and Consultancy Services
New Technologies
FALLs
1. Production Logging Services (Conventional and Advanced)2. Well Integrity Services (Cement Bond Logging, Casing Inspection, Noise Logging,
Temperature Logging)3. Reservoir Saturation Monitoring Services (C/O Logging, Pulsed Neutron Logging,
Behind casing Resistivity)4. Pipe Recovery Services (Mechanical, Explosive, Chemical)5. Perforating Services (Explosive, Gas Gun, Drilling Perforator)6. Mechanical and Plug Services
1. FALL (Fluid Assisted Liquid Loading)2. New Completion Method - ICD (Inflow Control Devices) - Swellable Packers
1. Solid Expandable Tubulars2. Multiphase Flow Metering3. Tracer Tests4. Water Shut Off Technologies - Mechanical - Chemical
FALLs in general are designed to foam the water in the tubing, therefore allowing the formation pressure to unload the fluid from the well. Natural gas bubbling through the water-column, produces foam which can help remove water from watered-up gas wells.
-
277
Wellhead
~100 m MD RKB
TD: ~ 4300m MD RKB
~6 m TVD/MD RKBSurface
20" Surface Casing
Rotary Table0,0 m TVD RKB
X-mass tree
~1500 m MD RKB
17 ½” Section13 3/8" Intermediate Casing
~2500 m MD RKB
12 ¼” Section / 9 5/8" Production Casing 70°
20°
0°
Asmary Fm.
Production Casing Swellable packer
Blank pipe
AICV integrated with screen
-
Asmary GroupField Services Co.
100 m TVD/MD RKB
20" Surface Casing
~ 1300 m MD RKB
17 ½” Section / 13 3/8" Intermediate Casing
3000 m TVD / MD RKB
8 1/2” Reservoir Section
5 ½” x 8½” Guide shoe
2200 m TVD / MD RKB
12 ¼” Section / 9 5/8" Production Casing
1°
Production packer @ ~2000 m
5 ½” Screen with ICD
Openhole swellable packer
5 ½” blank pipe
-
279
Complection Options for Two Reservoirs
SET Casing Patch Series
Ex. Connection
Fluid
String
Elastomer Seals
Ex. Pipe
Launcher
Ex. Pipe
Casing Damage
Ex. Cone
To patch & reinforce the damaged casing, to seal off the leaky or corroded section.
To seal off perforations for water shut-off or re-perforating new pay zones.
Suspending load≥450KN-2000KN.
Sealing pressure≥15MPa -35MPa, specially 70MPa plus
Work temperature is 120C, specially 170C, also 355C plus available for thermal production well
-
Asmary GroupField Services Co.
Applications of Tracers
Well to Well Test
1. Single well chemical tracer tests2. Inter-well tracer studies3. Full field matrix tracer studies4. Coring operation5. Fingerprinting produced water
Only Producer connected to the injector A via a fracture. There are no secondary fractures as only one signal is observed.
-
281
Water Flow Allocation Map
-
Asmary GroupField Services Co.
Disconnect water producing channels from the well
ThermaSet plug