areva np - aben.com.br

25
AREVA NP INAC 2017 October 23 rd 2017 André Salgado Brazil and South America

Upload: others

Post on 26-Oct-2021

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AREVA NP - aben.com.br

AREVA NPINAC 2017

October 23rd 2017

André Salgado – Brazil and South America

Page 2: AREVA NP - aben.com.br

INAC 2017 - AREVA

AREVA NP

AREVA NP business1

2Nuclear: answering new electricity market challenges

Agenda

Page 3: AREVA NP - aben.com.br

INAC 2017 - AREVA

AREVA NP

3

From Areva Group to Areva NP

New Areva

• Mining

• Front End

• Back End

AREVA NP

• Installed Base

• Components

• Instrumentation & Control

• Engineering & Design Authority

• Large Projects

• FUEL

• Installed Base

• Components

• Instrumentation & Control

• Engineering & Design Authority

• Large Projects

• FUEL

Page 4: AREVA NP - aben.com.br

INAC 2017 - AREVA

AREVA NP

Target Shareholder structure New NPJan/2018

New NP will be able to secure its long term development with the support of strategic shareholders whilst remaining an autonomous subsidiary

AREVA NP

NEW NP

• Majority shareholder French State• Listed on the French Stock Exchange

AREVA Inc New NP GmbH

NNP GmbH subsidiariesAREVA INC subsidiaries

Other subsidiaries

4

Page 5: AREVA NP - aben.com.br

INAC 2017 - AREVA

AREVA NP

AREVA NPReference supplier in the nuclear sector

• Annual revenue* of ~ 3.1 bn€

• Sales Portfolio of 12 bn€

• ~ 14 000 employees worldwide

• > 58 locations

• A diversified portfolio of customers

including worldwide leaders

on the energy market

• Capability to provide services to all

type of nuclear reactor technology

*Sales revenue contributive to AREVA group - Dec 31, 2016

Large Projects Installed Base Fuel Components I&C

Engineering & Design Authority

Activities

ROW

Page 6: AREVA NP - aben.com.br

INAC 2017 - AREVA

AREVA NP

AREVA NPWorldwide presence

Page 7: AREVA NP - aben.com.br

INAC 2017 - AREVA

AREVA NP

7

AREVA NPChallenges

OEM NSSS DESIGNER AND MANUFACTURER

Consolidate our position as OEM NSSS designer & manufacturer

In-service nuclear fleet• Propose innovative technologies and solutions

(fuel, I&C, services)

New builds• Adapt the offer to serve all potential markets

NSSS OEM

Equipment and technology supplier

#1EPR

VVER Hualong

ATMEA

To satisfy

customers and

partners

ABWR,…#2

OEM: Original Equipment Manufacturer

NSSS: Nuclear Steam Supply System

Page 8: AREVA NP - aben.com.br

INAC 2017 - AREVA

AREVA NP

8

Future IntegrityPerformance Passion

Safety

AREVA NPVision and Values

VALUES

High-performing people and technologies

for safe and competitive nuclear plants worldwide

VISION

Page 9: AREVA NP - aben.com.br

INAC 2017 - AREVA

AREVA NP

9

Ensure the professional skills of our employees and uphold

their engagement in a demanding and fulfilling work environment

Set the standard in terms of commercial and operational excellence,

both in manufacturing and in project execution, and ensure a high

level of safety

Offer innovative solutions and value-adding technologies that help

our customers achieve their safety, commercial and societal

objectives

AREVA NPMissions

Designer and supplier of Nuclear Steam Supply System and nuclear equipment, services and fuel for high levels of safety and performance

SCOPE

Page 10: AREVA NP - aben.com.br

INAC 2017 - AREVA

AREVA NP

Engineering & Design AuthorityDevelopment, design and licensing of NSSS and associated services

Large ProjectsManagement and execution of nuclear reactor New Build projects

Installed BaseMaintenance, engineering services for existing nuclear fleets and fleets under construction

FuelDevelopment, design, licensing and fabrication of fuel assemblies and core components for PWR,

BWR reactors, and research reactors. Development of zirconium products

ComponentsDesign and manufacture of heavy and mobile components for nuclear islands

Instrumentation & Control (I&C)Design and fabrication of safety I&C systems for the nuclear steam supply system

AREVA NP activities

BUSINESS UNITS

Page 11: AREVA NP - aben.com.br

INAC 2017 - AREVA

AREVA NP

11

AREVA NP in 2015-2016In-service NPPs

JAPAN

CHINA

- First delivery of M5TM alloy cladding tubes to

CNNC

- Safety Alliance program: contracts for passive

autocatalytic recombiner (PAR) systems and

venting systems

Supply and installation of new

vessel heads for Tihange 3 /

Doel 4 reactors

BELGIUM

Outage services contract for E.ON

reactors

GERMANY

Supply of passive autocatalytic recombiner (PAR) systems and Filtered Containment Venting Systems for the Japanese fleet

SOUTH AFRICA

Supply of steam generatorsfor Koeberg reactors

SWITZERLANDR&D contract for EATF fuel

(Enhanced Accident

Tolerant Fuel) with Gösgen

Contract with EDF for

maintenance activities over

10 years for Sizewell B

UNITED KINGDOM

• Contracts for Cyber Security engineering

services and expertise

• Forward-Alliance program: Multi-year contract

covering scheduled outages and maintenance

activities

• Development of new cavitation peening solution

to extend power plant service life

• New type of fuel for PWRs (GAIA) and BWRs

(ATRIUMTM)

USA

•Large-scale modernization with

replacement of steam generators

and modernization of I&C

•Launch of quality improvement plan

in the equipment manufacturing plants

FRANCE

Safety Alliance program: supply

contracts for venting systems for

Wolsong1 & 2 power plants

SOUTH KOREA

Safety Alliance program:

contracts for containment venting systems (Asco 1 & 2, Vandellos 2)

SPAIN

• Refueling Services

• Maintenance & Outage Services

• Long term spare parts supplies

• Digital I&C Solutions

• Emergency Power Supply (EPS)

• Safety Systems (FCVS, …)

• Fuel engineering and

component supplies

BRAZIL - ARGENTINA

Page 12: AREVA NP - aben.com.br

INAC 2017 - AREVA

AREVA NP

12

AREVA NP in 2015-2016New builds

CHINA

• Taishan 1: cold-run tests with RPV

closed and then open successfully

carried out

• Taishan 2: introduction of all steam

generators into the reactor building

and completion of primary loop

welding work

Hinkley Point C: signature of the

contracts for the construction of 2 EPR

reactors, led by EDF.

UK

FINLAND

Olkiluoto 3: on-site delivery of operational

I&C TXP cabinets, completion of their on-

site testing, and start of commissioning

tests on reactor

TURKEY

ATMEA1: completion of the detailed

generic Basic Design

INDIA

Jaitapur: contract with NPCIL for

basic design studies for an EPR

Flamanville 3: introducing RPV internals

into the reactor building, delivery of the

reactor vessel head to the site and

completion of mechanical assembly

work on the reactor coolant system

FRANCE

BRAZIL

Angra 3: equipment supply, engineering services, I&C.

Page 13: AREVA NP - aben.com.br

INAC 2017 - AREVA

AREVA NP

13

AREVA NP in Latin AmericaStrong history and partnerships

Support to the construction and commissioning of the NPPS;

Services expertise for all types of reactors all along;

ANGRA 1 & 2, Atucha 1&2, Embalse, :

• Specialized engineering;

• Maintenance expertise;

• Outage services.

AREVA NP IN LATIN AMERICA

FUEL

INSTALLED BASE AND I&C

A 40 years presence in South America;

Commercial Office in Rio de Janeiro ;

Operational presence on sites: Atucha and Angra.

OEM for ANGRA 2, ANGRA 3, ATUCHA 1 & 2;

Angra 3 : Engineering and Equipment Supply

Components supply

Manufacturing support

Design of Angra 2 fuel in collaboration with INB.Angra plant

Areva´s offices in LATAM

Page 14: AREVA NP - aben.com.br

INAC 2017 - AREVA

AREVA NPErection Supervision by

AREVA

Erection Supervision by Siemens

AG

Siemens AG as subcontractor of

AREVA

Brazilian Main Erection

Company

AREVA NP Involvement in Angra 3 Project

Present Industrial scheme and role

ELETRONUCLEAR

Overall Project Management and Supervisory Site Management

Design Supplies Civil Works Erection CommissioningDelegation of personnel

BMEC

Operational I&C

Electrical Part

Civil Part

Conventional

Island

Turboset

Nuclear

Island

Overall Plant

NSSS incl.

Safety I&C

BMEC

BMEC

BMEC

BMEC

BMEC

Civil Works

Contractor

Page 15: AREVA NP - aben.com.br

INAC 2017 - AREVA

AREVA NP

AREVA NP business1

2Nuclear: answering new electricity market challenges

Agenda

Page 16: AREVA NP - aben.com.br

INAC 2017 - AREVA

AREVA NP

2016: Energy Mix: Installed Capacity

Source: PDE 2026

Hydraulic60%

Nuclear2%

Photovoltaic0%

PCH4%

Oléo3%

Gás Natural8%

EOL7%

Diesel1%

Carvão2%

Biomass9%

Importada5%

Page 17: AREVA NP - aben.com.br

INAC 2017 - AREVA

AREVA NP

Brazil: Hydro to Thermal Transition

Brazil Storage Capacity (%) – Since 2008

Source: ONS

Brazil´s Electricity Generation (MWh) Mix: Growth of fossil and expensive Thermal

77%

19%

3% 1%

71%

24%

3% 2%

68%

26%

3%3%

62%30%

3%6%

20

12

20

13

20

14

20

15

20

16

66%

25%

2%7%

Page 18: AREVA NP - aben.com.br

INAC 2017 - AREVA

AREVA NP

Electricity Market: a challenge

World’s electricity consumption forecasts by region

2005 2016 2021 2026

Source: PDE 2026 - MME / EPE

430

516

609

741

Brazil´s electricity demandforecasts

Brazil´s electricity consumption will grow 44% until 2026, according PDE.

Additional 65 MW capacity in 10 years !

Page 19: AREVA NP - aben.com.br

INAC 2017 - AREVA

AREVA NP

Participations of the Production Sources

in the Energy Mix Evolutions

Source: PDE 2026

Page 20: AREVA NP - aben.com.br

INAC 2017 - AREVA

AREVA NP

Nuclear power allows security of the grid by covering baseload needs

Source: RTE 2015

20

Page 21: AREVA NP - aben.com.br

INAC 2017 - AREVA

AREVA NP

2017: Energy MixEnergy Generation as of 19/10/2017

Source: ONS

Hydro65%

Thermal23%

Eolica8%

Nuclear3%

Solar1%

Page 22: AREVA NP - aben.com.br

INAC 2017 - AREVA

AREVA NP

Nuclear a sustainable and...

...Effective energy ...for low land use

39,5%

22,5%

90%

0,0%

10,0%

20,0%

30,0%

40,0%

50,0%

60,0%

70,0%

80,0%

90,0%

100,0%

Wind Solar Nuclear

Nuclear

Source: NEI Data

The graph summarizes the approximate land required by wind andsolar technologies to match the electricity produced annually by a

1.000-MW nuclear plant

• In oposition to other renewable energy sources, nuclear does not depend on weather and register a muchhigher capacity factor that could compensate hydropower seasonality in Brazil;

• Compared to Solar and Wind, nuclear technologies use very few land and can be installed next to consumptioncenters.

Capacity factor (%)

Page 23: AREVA NP - aben.com.br

INAC 2017 - AREVA

AREVA NP

… Environmentally Friendly

COP 21 agreement

Limit increases in global average temperature

to 2°C until 2100

Brazil Engagement

43% reduction in 2030 vs 2005

More than a environmental necessity,

controlling CO2 emissions will also be an

economic one with the implementation of

the CO2 tax regulation

Brazil Emissions in 2015

1,6 Billions tons of CO2e

Brazil´s Target in 2030

1,15 Billions tons of

CO2eq

Page 24: AREVA NP - aben.com.br

INAC 2017 - AREVA

AREVA NP

Global and Local challenges for theelectricity sector

Security ofsupply

DiversityAffordable

prices

DistributedGeneration

Low CO2 emissions

FostersIndustrial and

Social development

Page 25: AREVA NP - aben.com.br

INAC 2017 - AREVA

AREVA NP

Thank you for your attention!

André [email protected]