The Boulevard
Hess
le R
oad
Hessle Road
The Green Line
The Green Line
Key
1 Siemens Academy 2 Community Centre and adult learning centre3 Primary school4 Community sports centre Old boulevard stadium
5 Community shops6 Green Tech and wind turbine research7 Light support, ‘green’ industry 8 St Andrews transport hub9 St andrews dock Tidal power research centre
10 Play ground
1
2
3
4
5
6
7
89
10
The Boulevard
Hess
le R
oad
Hessle Road
The Green Line
The Green Line
Key
1 Siemens Academy 2 Community Centre and adult learning centre3 Primary school4 Community sports centre Old boulevard stadium
5 Community shops6 Green Tech and wind turbine research7 Light support, ‘green’ industry 8 St Andrews transport hub9 St andrews dock Tidal power research centre
10 Play ground
Hull regeneration
Public Spaces
Private spaces
Mechanic
ally ve
ntilate
d
Daylight C
ontrol N
eeded
Natual D
aylig
ht C
ontro
l
Shade Tolera
ble
Natura
lly L
it
Task L
ig
htin
g
Soft
Lightin
g
Natu
ra
lly ve
ntil
ate
d
Red Heate
d In W
inte
r
Red Heate
d In W
inte
r
Management Offices
Staff facilities will come off the reception.containing offices, staffrooms,storage, a sickbay and toilets.
Classrooms
These spaces should be flexable so to allow the children using it to learn in a varieties of ways in groups or alone for a variety of subjects
Sports Hall
A multiuse hall utilised for a variety sports and events.
Changing rooms
changing rooms and showers for use by students
Reception
Reception will be the entry into the school for both the students and public. providing a means of contact to parents and the public.
Cafe
A multiuse cafe space for use by the com-munity
WCs
Toilets for staff and students seperate
WCs
Toilets for staff and public
Staff Room
Relaxing environ ment for use by the staff.
Staff Room
Relaxing environ ment for use by the staff.
Offices
Staff facilities will come off the reception.containing offices, staffrooms,storage, a sickbay and toilets.
Dinning Room
Linked to the sports hall so i can be used as an extention to the hall for events
Kitchen
Linked to the sports hall so i can be used as an extention to the hall for events with seperate external access for deliveries
Group learning
These learning areas will be open and flexible for use in group learning, conference and presentations
Library
A library and ICT facilities for use of both the public. the area will be light and open.
Consultation rooms
Private offeces for use by the community for advice and help
Activity rooms
these offices will be available for the local community for business meetings and events
Adult Study areas
These learning areas will be open and flexible for use in group learning, conference and presentations
Lecture rooms
These learning areas will be open and flexible for use in group learning, conference and presentations
Plant Room
For access to venilation and building systems for maintainance and governence
Reception
Reception will be the entry into the community centre and libary public.
School
Community
Centre
Program Schedual
Sam [email protected]: 07739316841
rchardThe
Second floorSite plan
Third floor
Fourth floor
Flats
Reasearch
Flats
Reasearch
Flats
Reasearch
rchardThe
Second floorSite plan
Third floor
Fourth floor
Flats
Reasearch
Flats
Reasearch
Flats
Reasearch
Sam [email protected]: 07739316841
rchardThe
Second floorSite plan
Third floor
Fourth floor
Flats
Reasearch
Flats
Reasearch
Flats
Reasearch
rchardThe
Second floorSite plan
Third floor
Fourth floor
Flats
Reasearch
Flats
Reasearch
Flats
Reasearch
Dining Room
Courtyard
WetRoom
W.C
C.UBOILER
Skipton House
STORE
STORE
34
Snookertable
Media room
Study
11
1
22
34
5
1
5
1
11
34
5
Skipton House
Drive
Drwg No
Scale Date
Project
Title
ASSOCIATESPITCHFORD DESIGN
CHARTERED ARCHITECTS
21 Victoria AvenueHarrogate HG1 5RD
T: 01423 529100F: 01423 529107
Proposed Plans, Section & Elevations
Skipton HouseSkipton on swale,Thirsk
For Mr & Mrs B. Stevens
Proposed Conversion of attached Barn at
SH/PL02
FEB 20091:1001:501:200
SECTION 1:50
WEST ELEVATION 1:50
NORTH ELEVATION 1:50
EAST ELEVATION 1:50
GROUND FLOOR PLAN 1:100
FIRST FLOOR PLAN 1:100
GATE ELEVATION 1:50
GATE PLAN 1:200
WEST ELEVATION WITH DOORS CLOSED 1:100
KEY:1. NEW TIMBER PAINTED DOUBLE GLAZED WINDOWS
GLAZING DETAILS & PROFILE TO BE AGREED.
2. NEW TIMBER DOUBLE GLAZED DOORS GLAZING DETAIL &SECTION PROFILE TO BE AGREED.
3. NATURAL SLATE ROOF COVERING SAMPLE TO BEPROVIDED PRIOR TO CONSTRUCTION.
4. CONSERVATION ROOFLIGHTS.
5. CAST IRON RAINWATER PIPES AND DOWNPIPES
EXISTING FLOOR TO BE STRENGTHEND ASNECESSARY - STRUCTURAL ENGINEER TOADVISE.
EXISTING GATE
EXISTING INTERNAL WALLS TO BE DRYLINED ANDINSULATED INCORPORATING NEW CHEMICALINJECTION DPC
NEW SUSPENDED TIMBERFLOOR DETAIL TBA.
ASSUMED OUTLINE OF EXISTINGFOUNDATIONS - TOBE CONFIRMED
NEW DOORS TOSEPERATE DETAIL
WALLS TO BE DRYLINED
NEW ROOF CONSTRUCTION &INSULATION TO MEET CURRENTBUILDING REGS
NEW SIDE GATE TOSEPERATE DETAIL
RE-BUILD GATE PILLARTO WIDEN ACCESS INTOEXISTING DRIVE
CARRY OUTMODIFICATIONS TOEXISTING BOUNDARYWALL FOR NEW WIDERACCESS GATES AS SHOWN
RE-USE BRICKS/ COPINGSTONE TO REBUILDPILLAR IN NEW POSITIONAS SHOWN . RE-HANGEXISTING GATE &PROVIDE NEWPERSONNEL GATE TOSAME DETAILS
EXISTING PILLAR A
APPROX POSITION OFNEW SEPTIC TANKCAPACITY & DETAILSTO BE AGREED
NEW SIDE ACCESS GATETO SAME DETAIL ASEXISTING GATE.
BOILER EXACT POSSITION TOBE AGREED
NEW DRAINAGE RUNS FOR NEWTOILETS ARE TO BE AGREED
EXISTING FLOOR TO BEREFURBISHED
EXISTING VIRTICAL BOARDEDDOORS TO BE RENEWED TOACT AS SHUTTERS FOR NEWDOUBLE DOORS
OBSCURE GLAZING TO BE USEDIN NEW WC PATTERN TBA
A
Dining Room
Courtyard
WetRoom
W.C
C.UBOILER
Skipton House
STORE
STORE
34
Snookertable
Media room
Study
11
1
22
34
5
1
5
1
11
34
5
Skipton House
Drive
Drwg No
Scale Date
Project
Title
ASSOCIATESPITCHFORD DESIGN
CHARTERED ARCHITECTS
21 Victoria AvenueHarrogate HG1 5RD
T: 01423 529100F: 01423 529107
Proposed Plans, Section & Elevations
Skipton HouseSkipton on swale,Thirsk
For Mr & Mrs B. Stevens
Proposed Conversion of attached Barn at
SH/PL02
FEB 20091:1001:501:200
SECTION 1:50
WEST ELEVATION 1:50
NORTH ELEVATION 1:50
EAST ELEVATION 1:50
GROUND FLOOR PLAN 1:100
FIRST FLOOR PLAN 1:100
GATE ELEVATION 1:50
GATE PLAN 1:200
WEST ELEVATION WITH DOORS CLOSED 1:100
KEY:1. NEW TIMBER PAINTED DOUBLE GLAZED WINDOWS
GLAZING DETAILS & PROFILE TO BE AGREED.
2. NEW TIMBER DOUBLE GLAZED DOORS GLAZING DETAIL &SECTION PROFILE TO BE AGREED.
3. NATURAL SLATE ROOF COVERING SAMPLE TO BEPROVIDED PRIOR TO CONSTRUCTION.
4. CONSERVATION ROOFLIGHTS.
5. CAST IRON RAINWATER PIPES AND DOWNPIPES
EXISTING FLOOR TO BE STRENGTHEND ASNECESSARY - STRUCTURAL ENGINEER TOADVISE.
EXISTING GATE
EXISTING INTERNAL WALLS TO BE DRYLINED ANDINSULATED INCORPORATING NEW CHEMICALINJECTION DPC
NEW SUSPENDED TIMBERFLOOR DETAIL TBA.
ASSUMED OUTLINE OF EXISTINGFOUNDATIONS - TOBE CONFIRMED
NEW DOORS TOSEPERATE DETAIL
WALLS TO BE DRYLINED
NEW ROOF CONSTRUCTION &INSULATION TO MEET CURRENTBUILDING REGS
NEW SIDE GATE TOSEPERATE DETAIL
RE-BUILD GATE PILLARTO WIDEN ACCESS INTOEXISTING DRIVE
CARRY OUTMODIFICATIONS TOEXISTING BOUNDARYWALL FOR NEW WIDERACCESS GATES AS SHOWN
RE-USE BRICKS/ COPINGSTONE TO REBUILDPILLAR IN NEW POSITIONAS SHOWN . RE-HANGEXISTING GATE &PROVIDE NEWPERSONNEL GATE TOSAME DETAILS
EXISTING PILLAR A
APPROX POSITION OFNEW SEPTIC TANKCAPACITY & DETAILSTO BE AGREED
NEW SIDE ACCESS GATETO SAME DETAIL ASEXISTING GATE.
BOILER EXACT POSSITION TOBE AGREED
NEW DRAINAGE RUNS FOR NEWTOILETS ARE TO BE AGREED
EXISTING FLOOR TO BEREFURBISHED
EXISTING VIRTICAL BOARDEDDOORS TO BE RENEWED TOACT AS SHUTTERS FOR NEWDOUBLE DOORS
OBSCURE GLAZING TO BE USEDIN NEW WC PATTERN TBA
A
PROPOSED GROUND FLOOR PLAN
LIVING ROOM
STUDY
PROPOSED FIRST FLOOR PLAN / PART ROOF LAYOUT
CONSERVATORY
ENT. HALL
UTILITY
WC KITCHEN
EN-SUITE
BED 2
BATH
BED 1
BED 4
BED 3
PROPOSED ROOF PLAN
WINDOWS / DOORS
New glazed doors to be in pilkington k insulated glass (4-16-4) toughened inaccordance with Doc N of the current building regs.
All new glazing to new windows are to be in Pilkington K insulated glass(4-16-4) to conform to current building regulations.All new windows are to provide background trickle ventilation at a rate of8000mm2, through 16 mm slot within the head of the window.Vents to be complete with mesh inset to prevent against ingress of insects.Vents to comply with the requirements of Part F1 of the building regs. Newopening lights to be 1/20th of the floor area.
Provide and fix new purpose made windows, style to be agreed. Allironmongery is to be agreed with client.First floor bedroom window is to allow escape provisionin accordance with current building regs (Part B Fire safety)Window to be at least 450 x 750 mm clear opening area.Bottom of opening to be no more than 1100mm above FFL
DECORATIONS
All new woodwork generally to be decorated using 1 ct primer,1 u/ct and 2 top cts gloss finish, colour white to match exstg.Newly plastered walls and ceilings are to receive 1 mist ct and 2 topcts vinyl matt emulsion, colour tba
PLASTERING
Provide and fix new 12.5mm p/board and skim plaster ceilings to newextension on each floor. New ceiling joists size to be 150 x 50 mm
All new blockwork walls are to receive 13mm two ct plaster and skim finish.Alternatively use dot and dab p/board and skim plaster finish.Bathroom to receive foil backed p/board to new stud walls
JOINERY
Provide and fix new sw skirtings to all new walls size and profile to matchexstg. All new doors, linings and architraves etc are to match exstg in styleand profile
PLUMBING / HEATING
Plumbing sub-contractor to assess condition of exstg heating system andensure capacity of exstg system for additional radiators. Provide additionalinformation to HBC if requested by building control.Supply and install new rads connected into exstg heating system.Rads sized to suit new room and are to match the exstg withThermostatic valves,Extension to heating system is to be designed and completed by specialistcontractor to comply with current (April 2006) Building Regulations Part L1
EN-SUITE SHOWER ROOM
New en-suite bathroom to have mechanical extract to give a rate of not lessthan 15 litres / sec operated by light switch control and timer overun.Basin to have 75mm re-sealing bottle trap with 32mm dia waste.Contractor to provide for all new hot and cold water connections.All pipework is to be carefully and correctly installed in accordancewith Part H of the approved documents for sanitaryware pipework.All plumbing and waste conections are to be carried out by approvedsub-contractor. Contractor to allow for supply and fixing new shower, WC,Basins, accessories etc. Allow for fixing client supply floor and wall tiling (fullheight) spec to be agreed.
DRAINAGE
Drainage runs and invert levels are to be accurately located on site to ensurethe drainage layout as indicated is feasible.Allow for all connections to the exstg foul drainage layout to accommodatenew plumbing layout.Minimum falls to be 1:60 for 100mm drains and 1:80 for 150mm drains.Where new drains connect into exstg the invert levels are to be checked priorto connection and approved by building control.Where drains pass through external walls they are to be lintolled as necessary.All drains are to be laid on sand bed and surrounded within pea gravel. Allground disturbed by these works is to be made good upon completion.All redundant manholes and drainage runs are to be removed anddisconnected.
RAINWATER GOODS
Provide and fix 100mm dia half round gutter screw fixed into the fascia boardwith specialist fixings and stop ends where required. All laid to falls, colourblack to match exstg.
ELECTRICS
Supply and fix new electrics as indicated. All downlights are to satisfy Parts B, E and Lof the building regs and are to be installed by a competent electrical contractor inaccordance with current IEE regulations.All electrical work is to be carefully installed to ensure compliance with the provisions ofbuilding regs Part P (electrical safety) to be designed, installed, inspected and tested bya qualified electrician being registered with an DCLG recognised competent person 'selfcertification scheme'Upon satisfactory completion of the works the building control officer is to be providedwith a copy of an appropriate BS 7671 electrical installation certificate issued by theelectrical contractor
Contractor to allow for new electrical installation within new extension on both floors.Position of sockets and switches to be agreed with client prior to installation. Newen-suite shower room to have mechanical extract ducted to outside air.Provide mains wired smoke detection at each level in positions shown on the proposedplans. Detectors to be interlinked and fitted in accordance with building controlrequirements.
CONC. STRIP FOOTINGS - DEPTHTO SUIT LOCAL GROUNDCONDITIONS AND TO LABUILDING INSPECTOR APPROVAL
LEAN MIX CONC. CAVITY FILLCLASS A BLOCKWORK BELOWGROUND LEVEL
GROUND FLOORNew floor to comprise 150 mm float finish, with perimeter expansion & contraction joints & reinforcement in accordance withStructural Eng. instructions & details. Kingspan Thermafloor TF73 composite insulation to achieve U value 0.22 w/m2k Conc. Slab todry out fully before any insulation is laid, level slab with Sand blinding as required, to ensure composite insulation & T & G bonded Bd.is continuously supported, TF73 to be laid strictly in accordance with manufactures instructions. Conc. Slab on 1200 gauge visqueendpm (lapped into damp proofing system at wall perimeter) on sand blinding on 150mm well compacted hardcore base. Provide edgeperimeter insulation to prevent cold bridging and ensure wall insulation overlaps the floor insulation by 200mm
First floor to comprise 195x47mm swd treated and tanalised C16 floor joists at 400 mm ctrs. Provide 100mm sound deadening quilt(Rockwool RW2 or similar approved) between joists.Provide and fix 22mm t&g swd floorboards to new extension to match exstg. (Ensure floor levels are consistent with the exstg house).Double up floor joists under new timber stud walls.
New roof construction to comprise roof slates / Tiles to match exstg on 38x25mm swd pre- treated tanalised battens fixed throughsarking breathable membrane over new swd pre-treated Rafters in accordance with structural engineers details.Note: Horizontal lap between runs of sarking membrane to be sealed using with 75mm wide double sided acrylic adhesive tape.Provide eaves ventilation tray and fascia grill unit nailed to the fascia board to give continuous 25mm air gap. Adjust & connect newroof into exg. Roof, rpair & make good. Ensure cross ventilation is maintained with new and existing roofand complies with current building regs document Part F (ventilation)
Supply and lay 300mm rockwool glassfibre roof insulation quilt between and over new ceiling joists all to achieve U value of 0.16w/m2k.
New steel beams over inaccordance with structuralengineers details
New timber post to supporthip, valley and ridge
New hi
p raft
er
New valley
New ridge board
New roof built up off exstgrafters
Extg
hip
All new rafters 50x150 C16 @600ctrs
svp
rwp
rwp
span ofjoists
span ofjoists
A
A
B B
Wall to be removed / beam oversubject to S.E. requirements
rad
rad
rad
rad
rad
rad
rad
Heating to Kitchen areato be agreed with client
B.I.G.
svp
Kitchen units indicative only
extg manhole
rwp
Hatched area denotes extg timber floor tobe removed and new concrete floor laid asspecified
New bay window in extg wall with newbeams over and new foundation slab inaccordance with Structural Engineersdetails
Contractor to make good all external areasdisturbed by the works and repair anydamaged areas
Extg roof
Extg roof
Contractor to allow for thesupply and fitting of alllight fittings and switchesto clients requirements
rwp
New timber roof construction as noted.For rafter sizes refer to Structural Enginneers details
Minimum periods of fire resistance toelements of structure to be 1/2 hour.
New inner wall to be 100mm solid concrete ( 7n/mm)strength built off new steel beam, 2ct plaster finish eachside, p.c. reinforced cocnrete lintols over door opening min150mm end bearing.
11
Timber post to StructuralEngineers detail
Provide eaves ventilationas noted
100mm blockwork wall,plaster both sides
Wallplate secured to wall top using galvanised mildsteel holding down straps ( min section 30 x 5mm) @1200 cts fixed down wall min 3 block courses. Fitalso roof holding down straps @ max 1200 ctssecuring rafters and wallplate
Insulation asnoted
Extg svp to beremove, blank offdrain.
Build in new external walls abuttingroofs, cavity trays, flashings andsoakers fixed in accordance with LeadAssociation details / recommendations
Provide and fix cavitytray @ roof abutmentand all leadn flashingsas required.
SD
HD
L 1
O/Sidelight
D/S
D/S
D/S
D/S
D/SD/S
D/S D/S
D/SD/S
P
P
sd
rad
Roof to single storey extension is to be covered in sheetmarine ply board fixed in accordance with structuralengineers details and recommendations.
Supply and install new en-suitr bathroom(colour white) spec tba. Form tiled shelf andside panels each end of bath. Provide all newhot and cold water supplies and wasteoutlets. Provide and fix tiled floor on electricu/floor heating on flexible adhesive on 6mmmarmox board securely fixed to exstg.
New SVP within recess, providetiled shelf over, vent todischarge min 900mm abovewindow head and to outside air.Make modifications to roof asnecessary to accommodate svp
Form new door opening, rc lintolover. New door, linings andarchitraves. Make good to allareas disturbed
Supply and install chrome towelladder radiator (1000x600) withchrome pipe and fixings
Exstg door to be removed andinfill opening in swd framework,p/board and skim plaster finish.Infill void with sound deadeningquilt
Supply and install newsanitaryware (colour white)spec tba. Form tiled shelf andside panels . Allow for all newh&c water connections and allwsste outlets
Contractor to allow for trimmingexstg floor joists withinbathroom to allow for new soilpipe from wc
Note: Contractor to allow for allnew doors (swd panelled),linings, architraves and skirtingsthroughout
W/GF/01
W/GF/02
W/GF/03
W/GF/04
W/GF/05
W/FF/01
W/FF/02
W/FF/03
W/FF/04
W/FF/05
W/FF/06
W/FF/07W/FF/08
rad
New roof to main extension tocomprise Redland Rosemary tiles(or simila approved) to matchexstg, minimum pitch 35 deg,fixed in accordance withmanufacturers instructions andrecommendations
New roof construction to singlestorey extension to be RedlandMini Stonewold concrete slate orsimilar approved, colourterracotta, minimum roof pitch17.5 deg at 100mm headlap on38x25mm swd pre-treatedtanalised battens fixed throughbreathable membrane over new175x50mm swd pre-treated raftersin accordance with structuralengineers details. Provide eavesventilation tray and fascia grill unitnailed to fascia board to givecontinuous 25mm air gap
New
dra
inag
e ru
n
New big and drainage run toconnect into exstg
New big and drainage run toconnect into exstg
rwp
rwp
New rw outlets to connect into newsoakaway (min 5m away from house) ifdeemed practical and if ground conditionsare suitable. This is to be discussed with LAbuilding control officer upon excavation
Rev A March 2008Rainwater drainage to soakawaysRoof tile spec / roof pitch added (HBC)Drainage alterations
rev A
New rw outlets to connect into newsoakaway (min 5m away from house) ifdeemed practical and if ground conditionsare suitable. This is to be discussed with LAbuilding control officer upon excavation