arc 2615 log sheets file_tanwoantyng0312725(clear version)

9

Upload: tan-woan-tyng

Post on 05-Oct-2015

8 views

Category:

Documents


0 download

DESCRIPTION

Log Sheets File

TRANSCRIPT

  • LOG SHEET -WEEK 1

    Company Name Student

    Supervising Architect Stu.No

    Project 1

    Site Location

    Project 2

    Site Location

    Project 3

    Site Location

    Stages

    Mon Tues Wed Thurs Fri Sat Sun

    Schematic Design

    Sketching, 3D modeling and

    Rendering 7.5 7.5 7.5

    Prepare presentation drawings

    Aware of site conditions: Site

    Visit, Study and Measure

    Prepare preliminary project

    evaluations, programs and

    feasibility studies OTHER:

    Permit Application

    Aware of different local

    authorities

    Observe OR Assess regulatory

    context: Building By-law, Set

    back, Fire escape requirement Establish requirements for, and

    co-ordinate, specialists

    Participate in permit application

    OTHER:

    Contract Documentation

    Prepare architectural drawings

    with regard to location,building

    elements, finishes, fittings and Participate or co-ordinate

    meetings with consultants

    Establish requirements for, and

    co-ordinate, consultants,

    specialists, product suppliers Prepare for tender documents

    OR participate in the process 8.0 7.5

    OTHER:

    Contract Administration

    Aware of OR observe a

    standard form of construction

    contractOTHER:

    Total: 8.0 7.5 7.5 7.5 7.5 0.0 38.0

    NOTE:

    Lunch Break should be excluded from this Log Sheets file.

    Public Holiday please insert 'PH' in the 'grey box'.

    A valid reason or explanation is require for any absenteeism. Please write in the 'remark' blank below.

    Remark:

    Taman Dato' Chellam-RMMJ

    DC Architects Tan Woan Tyng

    Ar. Wong Chee Kin 0312725

    2 storey 'Townhouse' 20' x 70'

    Semi D S4

    Taman Adda Heights

    DAY

    You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)

    Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5etcYou might involve multiple stages per day, record the hour/hours accordingly

    Do not record Saturday and Sunday if is not applicable to you

    Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file

    ARC2625 Log Sheet-WK1 Page 11

  • LOG SHEET -WEEK 1

    Company Name Student

    Supervising Architect Stu.No

    Project 1

    Site Location

    Project 2

    Site Location

    Project 3

    Site Location

    Stages

    Mon Tues Wed Thurs Fri Sat Sun

    Schematic Design

    Sketching, 3D modeling and

    Rendering 8.0 8.0 4.0 1.0

    Prepare presentation drawings

    Aware of site conditions: Site

    Visit, Study and Measure 5.0 2.0

    Prepare preliminary project

    evaluations, programs and

    feasibility studies

    1.5

    OTHER:

    3.5

    Permit Application

    Aware of different local

    authorities

    Observe OR Assess regulatory

    context: Building By-law, Set

    back, Fire escape requirement Establish requirements for, and

    co-ordinate, specialists

    Participate in permit application

    OTHER:

    Contract Documentation

    Prepare architectural drawings

    with regard to location,building

    elements, finishes, fittings and Participate or co-ordinate

    meetings with consultants 1.0

    Establish requirements for, and

    co-ordinate, consultants,

    specialists, product suppliers

    4.0

    Prepare for tender documents

    OR participate in the process

    OTHER:

    Contract Administration

    Aware of OR observe a

    standard form of construction

    contract

    1.0

    OTHER:

    Total: 8.0 8.0 7.5 8.0 7.5 0.0 39.0

    NOTE:

    Lunch Break should be excluded from this Log Sheets file.

    Public Holiday please insert 'PH' in the 'grey box'.

    A valid reason or explanation is require for any absenteeism. Please write in the 'remark' blank below.

    Remark:

    Taman Adda

    DC Architects Tan Woan Tyng

    Ar. Wong Chee Kin 0312725

    Phase 7-3 storey semi-detached house (S1 & S2)

    CCM & SM

    Taman Nusa Duta & Taman Skudai Indah

    Phase 7- 2 storey cluster house

    Taman Adda

    DAY

    You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)

    Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5etcYou might involve multiple stages per day, record the hour/hours accordingly

    Do not record Saturday and Sunday if is not applicable to you

    Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file

    ARC2625 Log Sheet-WK2 Page 11

  • LOG SHEET -WEEK 1

    Company Name Student

    Supervising Architect Stu.No

    Project 1

    Site Location

    Project 2

    Site Location

    Project 3

    Site Location

    Stages

    Mon Tues Wed Thurs Fri Sat Sun

    Schematic Design

    Sketching, 3D modeling and

    Rendering

    Prepare presentation drawings

    7.5 7.5 4.5

    Aware of site conditions: Site

    Visit, Study and Measure

    Prepare preliminary project

    evaluations, programs and

    feasibility studies

    3.5

    OTHER:

    Permit Application

    Aware of different local

    authorities

    Observe OR Assess regulatory

    context: Building By-law, Set

    back, Fire escape requirement

    4.5

    Establish requirements for, and

    co-ordinate, specialists 7.5

    Participate in permit application

    OTHER:

    Contract Documentation

    Prepare architectural drawings

    with regard to location,building

    elements, finishes, fittings and

    3.5

    Participate or co-ordinate

    meetings with consultants

    Establish requirements for, and

    co-ordinate, consultants,

    specialists, product suppliers Prepare for tender documents

    OR participate in the process

    OTHER:

    Contract Administration

    Aware of OR observe a

    standard form of construction

    contractOTHER:

    Total: 7.5 7.5 8.0 7.5 8.0 0.0 38.5

    NOTE:

    Lunch Break should be excluded from this Log Sheets file.

    Public Holiday please insert 'PH' in the 'grey box'.

    A valid reason or explanation is require for any absenteeism. Please write in the 'remark' blank below.

    Remark:

    Senibong Cove

    DC Architects Tan Woan Tyng

    Ar. Wong Chee Kin 0312725

    Senibong Cove Clubhouse

    Senibong B5B6

    Senibong Cove

    DAY

    You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)

    Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5etcYou might involve multiple stages per day, record the hour/hours accordingly

    Do not record Saturday and Sunday if is not applicable to you

    Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file

    ARC2625 Log Sheet-WK3 Page 11

  • LOG SHEET -WEEK 1

    Company Name Student

    Supervising Architect Stu.No

    Project 1

    Site Location

    Project 2

    Site Location

    Project 3

    Site Location

    Stages

    Mon Tues Wed Thurs Fri Sat Sun

    Schematic Design

    Sketching, 3D modeling and

    Rendering 3.5 4.0 6.0

    Prepare presentation drawings

    7.5

    Aware of site conditions: Site

    Visit, Study and Measure

    Prepare preliminary project

    evaluations, programs and

    feasibility studies

    1.5 3.5 2.0

    OTHER: Planning of spaces

    and producing practical plans. 7.5

    Permit Application

    Aware of different local

    authorities 1.5

    Observe OR Assess regulatory

    context: Building By-law, Set

    back, Fire escape requirement Establish requirements for, and

    co-ordinate, specialists

    Participate in permit application

    1.5

    OTHER:

    Contract Documentation

    Prepare architectural drawings

    with regard to location,building

    elements, finishes, fittings and Participate or co-ordinate

    meetings with consultants

    Establish requirements for, and

    co-ordinate, consultants,

    specialists, product suppliers Prepare for tender documents

    OR participate in the process

    OTHER:

    Contract Administration

    Aware of OR observe a

    standard form of construction

    contract

    0.5 0.5

    OTHER:

    Total: 7.5 8.0 8.0 8.5 7.5 0.0 39.5

    NOTE:

    Lunch Break should be excluded from this Log Sheets file.

    Public Holiday please insert 'PH' in the 'grey box'.

    A valid reason or explanation is require for any absenteeism. Please write in the 'remark' blank below.

    Remark:

    Senibong Cove

    DC Architects Tan Woan Tyng

    Ar. Wong Chee Kin 0312725

    Senibong Cove Clubhouse

    Type A-Cluster

    Skudai Indah 2

    DAY

    You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)

    Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5etcYou might involve multiple stages per day, record the hour/hours accordingly

    Do not record Saturday and Sunday if is not applicable to you

    Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file

    ARC2625 Log Sheet-WK4 Page 11

  • LOG SHEET -WEEK 1

    Company Name Student

    Supervising Architect Stu.No

    Project 1

    Site Location

    Project 2

    Site Location

    Project 3

    Site Location

    Stages

    Mon Tues Wed Thurs Fri Sat Sun

    Schematic Design

    Sketching, 3D modeling and

    Rendering PH 4.0

    Prepare presentation drawings

    PH

    Aware of site conditions: Site

    Visit, Study and Measure PH

    Prepare preliminary project

    evaluations, programs and

    feasibility studies

    PH 0.5

    Planning Semi-Detached House

    3.5 PH 7.5 4.5 3.5

    Permit Application

    Aware of different local

    authorities PH

    Observe OR Assess regulatory

    context: Building By-law, Set

    back, Fire escape requirement

    4.0 PH

    Establish requirements for, and

    co-ordinate, specialists PH

    Participate in permit application

    PH

    OTHER:

    PH

    Contract Documentation

    Prepare architectural drawings

    with regard to location,building

    elements, finishes, fittings and

    PH

    Participate or co-ordinate

    meetings with consultants PH

    Establish requirements for, and

    co-ordinate, consultants,

    specialists, product suppliers

    PH

    Prepare for tender documents

    OR participate in the process PH 3.5

    OTHER:

    PH

    Contract Administration

    Aware of OR observe a

    standard form of construction

    contract

    PH

    OTHER:

    PH

    Total: 7.5 0.0 8.0 8.0 7.5 0.0 31.0

    NOTE:

    Lunch Break should be excluded from this Log Sheets file.

    Public Holiday please insert 'PH' in the 'grey box'.

    A valid reason or explanation is require for any absenteeism. Please write in the 'remark' blank below.

    Remark:

    Mount Austin

    DC Architects Tan Woan Tyng

    Ar. Wong Chee Kin 0312725

    IJM Sales Office

    DAY

    You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)

    Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5etcYou might involve multiple stages per day, record the hour/hours accordingly

    Do not record Saturday and Sunday if is not applicable to you

    Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file

    ARC2625 Log Sheet-WK5 Page 11

  • LOG SHEET -WEEK 1

    Company Name Student

    Supervising Architect Stu.No

    Project 1

    Site Location

    Project 2

    Site Location

    Project 3

    Site Location

    Stages

    Mon Tues Wed Thurs Fri Sat Sun

    Schematic Design

    Sketching, 3D modeling and

    Rendering 4.0 3.0

    Prepare presentation drawings

    6.5 4.0 7.5 4.5

    Aware of site conditions: Site

    Visit, Study and Measure

    Prepare preliminary project

    evaluations, programs and

    feasibility studies

    1.0 3.5

    Designing simple plans.

    3.5

    Permit Application

    Aware of different local

    authorities

    Observe OR Assess regulatory

    context: Building By-law, Set

    back, Fire escape requirement

    0.5

    Establish requirements for, and

    co-ordinate, specialists

    Participate in permit application

    OTHER:

    Contract Documentation

    Prepare architectural drawings

    with regard to location,building

    elements, finishes, fittings and Participate or co-ordinate

    meetings with consultants

    Establish requirements for, and

    co-ordinate, consultants,

    specialists, product suppliers Prepare for tender documents

    OR participate in the process

    OTHER:

    Contract Administration

    Aware of OR observe a

    standard form of construction

    contractOTHER:

    Total: 7.5 8.0 7.5 7.5 7.5 0.0 38.0

    NOTE:

    Lunch Break should be excluded from this Log Sheets file.

    Public Holiday please insert 'PH' in the 'grey box'.

    A valid reason or explanation is require for any absenteeism. Please write in the 'remark' blank below.

    Remark:

    Taman Adda

    DC Architects Tan Woan Tyng

    Ar. Wong Chee Kin 0312725

    Type S-Park View, Type S1, Type S2

    IJM Sales Gallery

    Taman Mount Austin

    DAY

    You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)

    Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5etcYou might involve multiple stages per day, record the hour/hours accordingly

    Do not record Saturday and Sunday if is not applicable to you

    Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file

    ARC2625 Log Sheet-WK6 Page 11

  • LOG SHEET -WEEK 1

    Company Name Student

    Supervising Architect Stu.No

    Project 1

    Site Location

    Project 2

    Site Location

    Project 3

    Site Location

    Stages

    Mon Tues Wed Thurs Fri Sat Sun

    Schematic Design

    Sketching, 3D modeling and

    Rendering 0.5

    Prepare presentation drawings

    6.5 7.5 6.5 7.5 6.5

    Aware of site conditions: Site

    Visit, Study and Measure

    Prepare preliminary project

    evaluations, programs and

    feasibility studies

    0.5

    OTHER:

    Permit Application

    Aware of different local

    authorities

    Observe OR Assess regulatory

    context: Building By-law, Set

    back, Fire escape requirement

    1.5 0.5 1.0

    Establish requirements for, and

    co-ordinate, specialists

    Participate in permit application

    OTHER:

    Contract Documentation

    Prepare architectural drawings

    with regard to location,building

    elements, finishes, fittings and Participate or co-ordinate

    meetings with consultants

    Establish requirements for, and

    co-ordinate, consultants,

    specialists, product suppliers Prepare for tender documents

    OR participate in the process

    OTHER:

    Contract Administration

    Aware of OR observe a

    standard form of construction

    contractOTHER:

    Total: 8.5 7.5 7.5 7.5 7.5 0.0 38.5

    NOTE:

    Lunch Break should be excluded from this Log Sheets file.

    Public Holiday please insert 'PH' in the 'grey box'.

    A valid reason or explanation is require for any absenteeism. Please write in the 'remark' blank below.

    Remark:

    Taman Adda (Phase 7)

    DC Architect Tan Woan Tyng

    Ar. Wong Chee Kin 0312725

    Type S1-Type S2-Type S-Type LG

    DAY

    You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)

    Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5etcYou might involve multiple stages per day, record the hour/hours accordingly

    Do not record Saturday and Sunday if is not applicable to you

    Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file

    ARC2625 Log Sheet-WK7 Page 11

  • LOG SHEET -WEEK 1

    Company Name Student

    Supervising Architect Stu.No

    Project 1

    Site Location

    Project 2

    Site Location

    Project 3

    Site Location

    Stages

    Mon Tues Wed Thurs Fri Sat Sun

    Schematic Design

    Sketching, 3D modeling and

    Rendering

    Prepare presentation drawings

    7.5 4.5 7.5 7.5

    Aware of site conditions: Site

    Visit, Study and Measure

    Prepare preliminary project

    evaluations, programs and

    feasibility studies

    0.5 3.5

    OTHER:

    Permit Application

    Aware of different local

    authorities

    Observe OR Assess regulatory

    context: Building By-law, Set

    back, Fire escape requirement

    3.5

    Establish requirements for, and

    co-ordinate, specialists

    Participate in permit application

    OTHER:

    Contract Documentation

    Prepare architectural drawings

    with regard to location,building

    elements, finishes, fittings and

    3.5 0.5

    Participate or co-ordinate

    meetings with consultants

    Establish requirements for, and

    co-ordinate, consultants,

    specialists, product suppliers Prepare for tender documents

    OR participate in the process

    OTHER:

    Contract Administration

    Aware of OR observe a

    standard form of construction

    contractOTHER:

    Total: 8.0 8.0 7.5 7.5 7.5 0.0 38.5

    NOTE:

    Lunch Break should be excluded from this Log Sheets file.

    Public Holiday please insert 'PH' in the 'grey box'.

    A valid reason or explanation is require for any absenteeism. Please write in the 'remark' blank below.

    Remark:

    Taman Adda (Phase 7)

    DC Architect Tan Woan Tyng

    Ar. Wong Chee Kin 0312725

    Type S1-Type S2-Type S-Type LG

    DAY

    You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)

    Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5etcYou might involve multiple stages per day, record the hour/hours accordingly

    Do not record Saturday and Sunday if is not applicable to you

    Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file

    ARC2625 Log Sheet-WK8 Page 11