1007 7 th Street, 7 th Floor – Sacramento, CA – 95814 – (916) 874-7606 April 7, 2009 To: Interested Parties and Project Neighbors From: Stein Buer, Executive Director Re: Natomas Levee Improvement Program (NLIP): Contract 3980 - Natomas Cross Canal South Levee Phase 2 and Sacramento River East Levee Phase 1 (Reach 1) Construction Update This memorandum is part of a series of notifications you will receive on construction activities for the Natomas Cross Canal (NCC) South Levee Phase 2 and Sacramento River East Levee Phase 1 (Reach 1) levee improvements. The NCC South Levee Phase 2 improvements will include the construction of a cutoff wall in the NCC south levee, from the end of the wall completed in 2008 eastward to the Pleasant Grove Creek Canal, and then raising and widening the entire levee. The Sacramento River East Levee Phase 1 (Reach 1) work will include construction of a cutoff wall and an adjacent setback levee along the northern-most 3900 feet of the levee. The contract for this work is anticipated to be awarded at the April 16, 2009 SAFCA Board meeting. Upon award, the contractor will begin to prepare the site and mobilize equipment and labor on or around May 1, 2009. Work on Contract 4032 - Sacramento River East Levee Phase 1B (Reaches 2- 4B) is expected to begin in mid to late May of 2009. Upon selection of the contractor, and prior to performing this work, additional construction information will be mailed directly to you that will further explain what level of activity you can expect, including haul routes and work hours. Neighbors of the project can also expect important information regarding pre- construction activity relating to the temporary relocation of utility poles and lines. These relocations are required to be undertaken before the construction of any levee improvements. SAFCA is working with the utility companies, PG&E and AT&T, to ensure that the pole relocations are performed in a manner that avoids or minimizes power and telephone service disruptions. Proposed utility pole relocations will include the installation of temporary wood poles along the landside (east side) of the Garden Highway. Power lines will be fed from the temporary poles on the landside to the waterside homes via existing service

Upload: hoangkien

Post on 21-Aug-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

1007 7th

Street, 7th

Floor – Sacramento, CA – 95814 – (916) 874-7606

April 7, 2009 To: Interested Parties and Project Neighbors From: Stein Buer, Executive Director Re: Natomas Levee Improvement Program (NLIP): Contract 3980 - Natomas

Cross Canal South Levee Phase 2 and Sacramento River East Levee Phase 1 (Reach 1) Construction Update

This memorandum is part of a series of notifications you will receive on construction activities for the Natomas Cross Canal (NCC) South Levee Phase 2 and Sacramento River East Levee Phase 1 (Reach 1) levee improvements. The NCC South Levee Phase 2 improvements will include the construction of a cutoff wall in the NCC south levee, from the end of the wall completed in 2008 eastward to the Pleasant Grove Creek Canal, and then raising and widening the entire levee. The Sacramento River East Levee Phase 1 (Reach 1) work will include construction of a cutoff wall and an adjacent setback levee along the northern-most 3900 feet of the levee. The contract for this work is anticipated to be awarded at the April 16, 2009 SAFCA Board meeting. Upon award, the contractor will begin to prepare the site and mobilize equipment and labor on or around May 1, 2009. Work on Contract 4032 - Sacramento River East Levee Phase 1B (Reaches 2-4B) is expected to begin in mid to late May of 2009. Upon selection of the contractor, and prior to performing this work, additional construction information will be mailed directly to you that will further explain what level of activity you can expect, including haul routes and work hours. Neighbors of the project can also expect important information regarding pre-construction activity relating to the temporary relocation of utility poles and lines. These relocations are required to be undertaken before the construction of any levee improvements. SAFCA is working with the utility companies, PG&E and AT&T, to ensure that the pole relocations are performed in a manner that avoids or minimizes power and telephone service disruptions. Proposed utility pole relocations will include the installation of temporary wood poles along the landside (east side) of the Garden Highway. Power lines will be fed from the temporary poles on the landside to the waterside homes via existing service

1007 7th

Street, 7th

Floor – Sacramento, CA – 95814 – (916) 874-7606

NLIP Construction Update April 7, 2009 Page 2 hookups, whether they are overhead or under the Garden Highway. Once the construction of the levee embankment is completed, the temporary wood poles will be replaced with permanent metal poles along the new drainage swale between the new adjacent levee and the Garden Highway. SAFCA does not anticipate the need for any new power poles on the waterside of the Garden Highway at this time. Once a temporary and permanent pole relocation plan is approved by the utility provider, SAFCA will make it available for your review. In addition, prior to any power service interruptions during the relocation process, SAFCA and the utility provider will let you know in advance what the anticipated activity and power outage schedule will be. Detailed information about the project, including the Environmental Impact Report and Environmental Impact Statement, is available on SAFCA’s web site at www.safca.org. Click on the link “Natomas Levee Improvement Program” located under “Current Construction Projects”. Again, you may anticipate additional project construction updates coming to you via direct mail, email, or posted on the SAFCA website. If you have questions or comments, to please call Jay Davis or Barbara Gualco from Gualco Consulting at (916) 351-0600 or email [email protected]. Attachment: Construction Phasing Map

")

")

")

")

")

")

")

") ")

")

NATOM

AS CRO

SS CANAL

PLE

AS

AN

T G

RO

VE

CR

EE

K C

AN

AL

NA

TO

MA

S E

AS

T M

AIN

DR

AIN

AG

E C

AN

AL

SA

CR

AM

EN

TO

RIV

ER

AMERICAN RIVER

UPPER GGS / DRAINAGE CANAL (SREL 1B)

UPPER ELKHORNIRRIGATION CANAL (SREL 1B)

PRICHARD LAKE PUMPING PLANT(NTP: June 30, 2009)

LOWERELKHORNIRRIGATIONCANAL(SREL 2A)

1

2

3

4

5

6 7

1

2

3

4A

4B

5A

5B

6A

7

8

9B

10

11A

11B

12A

13

14

15

16

1718A 19A

19B20

18B

PUMPING PLANT 2(NTP: April 30, 2010)

6B

NA

TO

MA

S E

AS

T M

AIN

DR

AIN

AG

E C

AN

AL

9A

12B

"S

NEMDCSTORMWATER

PUMPINGSTATION

WESTDRAINAGE

CANAL(NTP: 2012)

Sankey RoadSankey Road

Riego RoadRiego Road

Elverta Road Elverta Road

Elkhorn Blvd

Elkhorn Blvd

Del Paso Rd

San Juan RdSan Juan Rd

El C

entro

Rd

Po

we

rlin

e R

dP

ow

erl

ine

Rd

·|}þ70

·|}þ99

·|}þ99

·|}þ99

§̈¦5

SacramentoInternational

Airport(SMF)

Nor

thga

te B

lvd

§̈¦80

Trux

el R

d

Howsley Road

5

1

2

3

6

BrookfieldBorrow Site

East SidePotential Borrow Site

sTeal Bend Golf Course

Airport NorthBorrow Sites

Fisherman's LakePotential Borrow Site

4

§̈¦5

WoodlandCorridor

Binford /DeYoungHorangic

Bianchi!

!

!

WoodlandCorridor

!

!

Nor th

D

rain

ag

e C

ana

l

ElkhornReservoir

!

RIVERSIDECANAL

BennettPumpingPlant

NorthernPumpingPlant

Hwy 99ClosureStructure

Dhaliwal

Hants

!

LOWERGGS / DRAINAGE CANAL (SREL 2A)

ELKHORN PUMPING PLANT

RIVERSIDEPUMPINGPLANT

PUMPING PLANT 3

WoodlandCorridor

PUMPINGPLANTS 1A & 1B

PUMPING PLANT 5

!

ElkhornSouth

!

I-5Borrow

!

Planting Area(Cummings)!

Planting Area(Lausevic)

!

Airp

ort W

est D

itch

Jacobs Slough

!

NCC

2

SR

EL 3

NE

MD

C N

orth

SR

EL 2B

NE

MD

C S

ou

th

SR

EL

1B

SR

EL

4

NC

C 1

SR

EL 1

NCC

1B

ARN L

PG

CC

SR

EL

1B

SR

EL 2

B

SR

EL

2

B

SREL 3

SR

EL

3

SREL 4

NE

MD

C S

ou

th

NE

MD

C N

or t h

PG

CC

NCC 2

NC

C 2

Legend

Construction Phase(Notice to Proceed Date)

NCC 1 (completed)

NCC 1B (completed)

NCC 2

SREL 1 (April 13, 2009)

NCC 3 (Feb. 28, 2011)

SREL 1B (May 11, 2009)

SREL 2A (August 1, 2009)

SREL 2B (March 29, 2010)

SREL 3 (May 31, 2010)

SREL 4 (March 28, 2011)

Riverside Canal (April 12, 2010)

PGCC (Feb. 28, 2011)

NEMDC North (Feb. 28, 2011)

NEMDC South (Feb. 28, 2011)

American River (March 28, 2011)

200-year Improvements

in 2012-2013

Borrow Site

CONSTRUCTION PHASING MAPNatomas Levee Improvement Program

April 3, 2009

. 0 1.50.5 1

Miles

U:\m

itra

\NL

IP\m

ap

s\m

xds\c

onstr

uction

_p

ha

sin

g_

04

030

9_

11x1

7.m

xd

A

pril 3

, 2

009

Relocations:

SREL Reaches 1-4A

Tree Removal: Jan - Apr 2009 Utilities (PG&E): June - Sept 2009

SREL Reaches 4B-9B Utilities: Aug - Sept 2009

SREL Reaches 10-15 Utilities: Aug - Dec 2009

SREL Reaches 16-20

Utilities: Mar - June 2010

SUBJECT TOCHANGE