Presentation OverviewI. Regulatory Drivers

a. Bay Area Implementationb. Bay Area Stormwater Management Agencies

AssociationII. Reissued Tentative Order

a. Existing Permitb. History of MRPc. Current TO MRP Timelined. Proposed MRP Term and Annual Reportinge. MRP Section Layout

III. Review of Section C.2: Municipal Operationsa. Overview of C.3 Green Projects b. Overview of IDCA provisionc. Overview of Pesticides Toxicity Control provisiond. Overview of Trash provision

IV. Next Stepsa. May 13 Public Hearingb. Plan for MRP adoption

Page 3: April 23, 2009 Elisa Wilfong Contra Costa Clean Water Program

I. Regulatory Drivers

Federal Clean Water Act 1972 National Pollutant Discharge Elimination Program

(NPDES) Permit Program for “Point Sources” 1987 Amendments & Section 402(p)

○ Added Municipal, Industrial, and Construction Discharges○ USEPA Promulgates Phase 1 Stormwater Rules (November

1990)

State Water Code Porter-Cologne Act Basin Plans State Water Resources Control Board (SWRCB) and its Nine (9)

Regional Water Quality Control Boards (RWQCBs) administer the federal NPDES stormwater permit program○ Individual Permits○ Area Wide Permits○ General Permits

Page 4: April 23, 2009 Elisa Wilfong Contra Costa Clean Water Program

Bay Area Implementation

Santa Clara Valley Urban Runoff Pollution Prevention Program 1990, 1995, 2001

Alameda Countywide Clean Water Program 1991, 1996, 2003

Contra Costa Clean Water Program 1993, 1999

San Mateo Countywide Stormwater Pollution Prevention Program 1993, 1999

Fairfield-Suisun Urban Runoff Management Program 1995, 2003

Vallejo Sanitation and Flood Control District 1999

Page 5: April 23, 2009 Elisa Wilfong Contra Costa Clean Water Program

Bay Area Stormwater Management Agencies Association (BASMAA) Established in 1991

Now a Consortium of Eight (8) Stormwater ProgramsMore than 90 agencies, including 79 cities/towns

and 6 counties

Memorandum of Understanding

PromotesInformation Sharing and CooperationCost Sharing through Regional ImplementationAdvocacy for Common Interests

Page 6: April 23, 2009 Elisa Wilfong Contra Costa Clean Water Program
Page 7: April 23, 2009 Elisa Wilfong Contra Costa Clean Water Program

Existing Permit

1. SFB Order No. 99-058: 7/99 – 7/04 Amendments

○ Order No. R2-2003-0022 (Provision C.3)○ Order No. R2-2004-0059 (BayKeeper Suit)○ Order No. R2-2004-0061 (BayKeeper Suit)

2. CV Order No. 5-00-120: 6/00 – 6/05

Both Permits Administratively Extended Pending Issuance of the MRP

Page 8: April 23, 2009 Elisa Wilfong Contra Costa Clean Water Program

History of MRP 10/04: RWQCB/BASMAA Initiate Formal MRP Discussions 6/05: BASMAA/RWQCB Develop MRP Goals & Process 10/05: MRP Work Groups Begin Meetings (BASMAA, RWQCB, NGO) through April 2006 11/05: RWQCB Unilaterally Changes Process & Timeline 5/06: BASMAA/NGO Steering Committee Representatives Agree Process Unproductive 5/06: RWQCB Releases Revised Process & Timeline 8/06: RWQCB Releases “MRP Unresolved Issues”, Comments Due August 25, 2006 8/06: RWQCB Revises Deadline September 6, 2006 9/06: BASMAA Submits Preliminary Comments by September 6, 2007 Deadline 9/06: BASMAA Submits September 22, 2006 “Draft Performance Standards Tables” for all MRP

Components 10/06: RWQCB releases October 13, 2006 “Working Draft MRP”, Comments by November 8, 2006 11/06: BASMAA Submits Comments by November 8, 2006 Deadline 11/06: RWQCB Holds Two Stakeholder Meetings on MRP (i.e., September 15 & 20, 2006 12/06: BASMAA Submits Additional Comments on December 7, 2006 as Requested at November 20,

2006 Meeting 12/06: RWQCB Calls Ad Hoc Trash Work Group Meeting 3/07: RWQCB Hearing Provides “Status Report” and Allows Public Testimony, BASMAA Delivers

Presentation 5/07: RWQCB Releases May 15, 2007 “Administrative Draft Municipal Regional Permit”, Comments

Due June 22, 2007, Later Extended to July 13, 2007 6/07: BASMAA Meets with RWQCB (i.e., 5th, 8th, 18th, 19th) to Review May 15, 2007 Administrative

Draft MRP 12/07: RWQCB Releases December 4, 2007 TO MRP, Comments Due February 29, 2008 12/07: RWQCB Releases Revised TO MRP on December 14, 2007, Includes TO MRP Fact Sheet

(76 pages) and Errata Sheet for the Tentative Order Distributed on December 4, 2007. 4/08: Public Hearing on March 11, 2008 2/09: Reissued Tentative Order

Page 9: April 23, 2009 Elisa Wilfong Contra Costa Clean Water Program

Current TO MRP Timeline

February 11, 2009: RWQCB Distributes Reissued TO MRPComment due date April 3, 2009Public Hearing (Oral Testimony) Conducted

on May 13, 2009Target Adoption July 1, 2009

Page 10: April 23, 2009 Elisa Wilfong Contra Costa Clean Water Program

Proposed MRP Term and Annual Reporting Permit Term

Permit Year 1: July 1, 2009 – June 30, 2010Permit Year 2: July 1, 2010 – June 30, 2011Permit Year 3: July 1, 2011 – June 30, 2012Permit Year 4: July 1, 2012 – June 30, 2013Permit Year 5: July 1, 2013 – June 30, 2014

Annual ReportsDue September 15th

First report due September 15, 2010 for FY 2009/2010

Annual Report Form will be developed by the Permittees by April 1, 2010.

Page 11: April 23, 2009 Elisa Wilfong Contra Costa Clean Water Program

MRP Section Layout Findings A. Discharge Prohibitions B. Receiving Water Limitations C.1 Provisions C.2 Municipal Operations C.3 New Development and Redevelopment C.5 Illicit Discharge Detection and Elimination C.4 Industrial and Commercial Site Controls C.6 Construction Site Controls C.7 Public Information and Outreach C.8 Water Quality Monitoring C.9 Pesticide Toxicity Control C.10 Trash Reduction C.11 Mercury Controls C.12 PCB Controls C.13 Copper Controls C.14 Polybrominated Diphenyl Ethers (PBDE), Legacy Pesticides and

Selenium C.15 Exempted and Conditionally Exempted Discharges C.16-21 Administrative details of the permit Appendix I and Attachment A-L

Page 12: April 23, 2009 Elisa Wilfong Contra Costa Clean Water Program

C.2: Municipal Operations

Page 13: April 23, 2009 Elisa Wilfong Contra Costa Clean Water Program

C.2.a Street and Road Maintenance

Permittees shall implement BMPs for asphalt/concrete removal, cutting, installation and repair (all street and road repair and/or maintenance sites) to avoid discharges to storm drain. Use the CASQA Handbook for municipal operations. Use BASMAA’s Blueprint for a Clean Bay for construction

remains, spills and leaks.

C.2.b Sidewalk/Plaza Maintenance and Pavement Washing

Permittees shall implement the BMPs included in the BASMAA mobile surface cleaner program.

Page 14: April 23, 2009 Elisa Wilfong Contra Costa Clean Water Program

C.2.c Bridge and Structure Maintenance and Graffiti Removal

Permittees shall implement appropriate BMPs to prevent polluted stormwater and non-stormwater discharge from bridges and structural maintenance activities from entering the storm drain.

C.2.d Stormwater Pump Stations Prevent the discharge of water with low dissolved oxygen (DO) from pump

stations and explore the use of pump stations for trash capture. Establish inventory of all pump stations. Inspect and collect DO data from all pump stations twice a year

between July and October, starting in 2010. If DO levels are <3 mg/L, corrective actions need to be taken until DO

levels are proven to be risen by increased monitoring (two weekly samples >3mg/L).

Inspect pumps within 24 hrs of large storm events with monitoring perimeters.

Page 15: April 23, 2009 Elisa Wilfong Contra Costa Clean Water Program

C.2.e Rural Public Works Construction and Maintenance

Permittees shall develop and implement BMPs for erosion and sediment control during construction and maintenance of rural roads by April 1, 2010.

C.2.d Corporation Yard BMP Implementation

Permittees shall prepare, implement, and maintain a site specific SWPPP.

Each SWPPP shall incorporate all BMPs in the Caltrans Storm Water Quality Handbook Maintenance Staff Guide, May 2003.

This provision only applies to yards that are not filed as NOI facilities.

Routinely inspect yards, plumb vehicle and equipment wash areas to the sanitary sewer, contain outdoor storage areas with a berm and/or roof.

Page 16: April 23, 2009 Elisa Wilfong Contra Costa Clean Water Program

C.3.b.iii Green Street Pilot Projects

Permittees shall cumulatively complete 10 pilot green streets projects that incorporate LID techniques.Projects shall contain stormwater storage for

reuse, enhance livability, create greenways, include max. parking areas, and provide pedestrian and bicycle access.

All projects completed by July 1, 2013.

Page 17: April 23, 2009 Elisa Wilfong Contra Costa Clean Water Program

C.5 Illicit Discharge Detection and Elimination

Legal authority to prohibit and control illicit discharges.

Develop/implement ERP (includes timely correction of violations in 10 business days or rationale for longer time).

Central contact point and response to spill complaints.

Control of mobile sources through a program. Collection system screening (routine surveys for

illicit discharges and illegal dumping). Keep a log of discharges and complaints (include a

detailed record of each incident).

Page 18: April 23, 2009 Elisa Wilfong Contra Costa Clean Water Program

C.9 Pesticides Toxicity Control

Adopt a IPM policy or ordinance (by July 1, 2010). Establish written standard operating procedures for

pesticide use that implements the IPM policy or ordinance.

All municipal employees who apply pesticides need to be trained in IPM.

All contracted applicators need to be IPM-certified by July 1, 2010.

Track and participate in pesticide regulatory processes and interface with County Ag. Commissioners (can be regional).

Conduct point of purchase outreach to consumers and outreach to pest control operators (PCOs).

Page 19: April 23, 2009 Elisa Wilfong Contra Costa Clean Water Program

C.10 Trash Reduction

Install trash capture devices on catchment areas equal to 30% of Retail/Wholesale Commercial Land (ABAG land use statistics) by July 1, 2013.

Identify at least one trash hot spot per 30,000 population or per 100 acres of Retail/Wholesale Commercial Land Area, whichever is greater (select by Feb. 1, 2010).

Achieve Trash Action Level (TAL) by July 1, 2012, which is 100 pieces of trash per 100 ft assessment reach and no visual impact from trash within the assessment reach.

Can receive 10% credit for booms and sea curtains and reduce capture area by 20% for bans and enforcement laws for litter reduction.

Assess trash hot stops twice a year (beginning and end of the dry season).

Develop a long term plan to prevent trash impacts on beneficial uses by 2024 (submit in 2013 report).

Page 20: April 23, 2009 Elisa Wilfong Contra Costa Clean Water Program

Trash Capture Devices

Design○ Any device or series of devices that trap all

particles retained by 5mm mesh screen○ Hydraulic design treatment capacity of not less

than the peak flow rate resulting from a one-year, one-hour storm in the storm drain catchment area draining to the device

Exemption to Installing Devices○ Small City Exemption: <12,000 and <40 acres

Retail/Wholesale Commercial Land Area

Page 21: April 23, 2009 Elisa Wilfong Contra Costa Clean Water Program

Trash Assessments

Hot Spot Assessment Trash assessments include a map, a score using the

SCVURPPP Urban RTA (Rapid Trash Assessment) Method and photo documentation (includes four photographs)

At least one initial assessment of each selected hot spot in late summer 2009

2x/yr/hot spot at the beginning (May) and ending (September ) of the dry season, including prescribed photo documentation

Page 22: April 23, 2009 Elisa Wilfong Contra Costa Clean Water Program

Trash Reporting February 1, 2010: propose trash hot spots to Water Board,

complete with assessment, photos and map for each. 2010 AR: report the results of the assessments of the hot spots

(compare with the TAL). 2011 AR: report the results again for hot spots and report steps

towards installing full capture devices. 2012 AR: report the results again for hot spots and report whether

the TAL has been achieved at the hot spots (if not achieved then report additional actions to achieve goal). Report design, locations and funding for full trash capture device installation.

2013 AR: report the results again for hot spots and report compliance with the full trash capture device installation requirements (including documentation of annual vol. of trash collected). The long-term plan for trash abatement shall be submitted this year.

Page 23: April 23, 2009 Elisa Wilfong Contra Costa Clean Water Program
Page 24: April 23, 2009 Elisa Wilfong Contra Costa Clean Water Program

May 13 Public Hearing

BASMAA continual suggestions for revisions on sections of the permit.

BASMAA’s suggestion of giving the Co-permittees the goal and the Co-permittees decide the means.

The challenge of maintaining implementation flexibility and accountability with the new permit.

Page 25: April 23, 2009 Elisa Wilfong Contra Costa Clean Water Program

MRP Adoption

Proposed adoption date of July 1, 2009. Limited response to comments for last

TO. Limited time for Permittees to discuss

possible changes to permit before adoption date.

Page 26: April 23, 2009 Elisa Wilfong Contra Costa Clean Water Program

Questions