applications for daa data beyond transformer load management
TRANSCRIPT
-
7/30/2019 Applications for DAA Data Beyond Transformer Load Management
1/14
Applications For DAA DataBeyond Transformer Load
Management
Presented by: Donald J. Kane P.E.
Asset Systems Program Manager
Connecticut Light & Power
October 19, 2010
-
7/30/2019 Applications for DAA Data Beyond Transformer Load Management
2/14
CL&P A subsidiary ofNortheast Utilities
-
7/30/2019 Applications for DAA Data Beyond Transformer Load Management
3/14
CL&P
4 Divisions
13 Districts
235 Substations
1,085 FeedersMGY, UGY, and DeltaVoltages from 2.4kv to34.5kv
40 Circuit
Owners plus 6staff engineers
-
7/30/2019 Applications for DAA Data Beyond Transformer Load Management
4/14
2003 Review several TLM products,
including ITRONs DAO/DAA
2004 ITRON selected, plans for
implementation begin (late 2005 start)
2007 Implemented DAA (without On-Demand), and trained 40 users by ITRON
at NUhalf day sessions.
2009 Updated with 2008 Summer loads.
DAA Implementation History
-
7/30/2019 Applications for DAA Data Beyond Transformer Load Management
5/14
General Issues and ChallengesData Source Changes
New CS system implemented in 2009
New MDM implementation ongoing (2011 completion)
GIS Details and Error CorrectionTransformer sizes and phasing
Customer to Transformer ConnectivityUsing OMS for this relationship presently
Plans to use GIS eventuallySome difficulties maintaining accuracy
Feeding the BeastAHuge amounts of data, even without smartmeters
ANo concrete plans for on demand updates yet
-
7/30/2019 Applications for DAA Data Beyond Transformer Load Management
6/14
Transformer Load ManagementFind overloaded transformers before they fail
Too many false positives-big problem
Looking for ways to minimize false positivesDatafeed for Loadflow Applications
Estimate errors not as big a problem
Just need to weed out extreme errors (very large load estimates)
Much better to use than connected KVA
Operations/New Service ReferenceCasual or emergency transformer load lookup
For transformer trip/failure-Reset or replace/upgrade?
For new service-Place on existing transformer or upgrade size?
Distribution PlanningASignificant load additions Can upstream devices handle the load? Whatphase to use?
AOverload checks for major devices (S/S transformers, step transformers,regulators, reclosers, etc)
A
Substation meter error checking
Potential Applications for DAA Results
-
7/30/2019 Applications for DAA Data Beyond Transformer Load Management
7/14
Load Estimates from
DAA in loadflow models
-
7/30/2019 Applications for DAA Data Beyond Transformer Load Management
8/14
Web Tool to manage follow-up work from
identifying overloaded transformers.
-
7/30/2019 Applications for DAA Data Beyond Transformer Load Management
9/14
Also used to look up transformer loads for routine or emergency queries.
-
7/30/2019 Applications for DAA Data Beyond Transformer Load Management
10/14
and to verify/correct customer to transformer connectivity
-
7/30/2019 Applications for DAA Data Beyond Transformer Load Management
11/14
Check % loading and
customer counts onupstream devices to
determine potential
problems for new load
connections.
-
7/30/2019 Applications for DAA Data Beyond Transformer Load Management
12/14
Check phase balance on
upstream devices, forselection of what phase to
use for new single phase
loads.
-
7/30/2019 Applications for DAA Data Beyond Transformer Load Management
13/14
Measured load (from station meter) diverges from
predicted model - indicates a possible switching
event where this substation bank picked up some
load.
-
7/30/2019 Applications for DAA Data Beyond Transformer Load Management
14/14
A view of the chart from another substation nearby
indicates a matching divergence between the
measured load and the predicted profile