appendix a scope - city of knox › files › meetingsspc › 2015_spc_11_au… · appendix a...
TRANSCRIPT
APPENDIX A SERVICE SCOPE 2015-16: INTEGRATED STORMWATER MANAGEMENT (DS3536785) Page 1 of 11
Service: Integrated Stormwater Management Director: Ian Bell, Director Engineering & Infrastructure Manager: David Yeouart, Manager Community Infrastructure
SERVICE ASSESSMENT QUESTIONS This Service Assessment will aim to answer the following key questions:
1. What is the role of Council in this service?
2. What is the strategic intent of this service?
3. What is the best service model for this service into the future?
4. What are the most appropriate areas of focus and the associated service levels
required for this service?
In accordance with the Council Plan, all Service Analyses will consider planning, where
relevant, for an ageing population; and providing a range of programs, services and
partnerships which aim to build connections between people and reduce social isolation.
INTRODUCTION
Metropolitan Melbourne has a two-tiered system for managing stormwater.
Melbourne Water, as the responsible drainage authority under the Water Act 1989, is
responsible for all main drains, retarding basins, waterways and catchments (above 60Ha)
on a regional scale.
Council has responsibility for the management of stormwater at the local or precinct level
(generally catchments below 60Ha).
To this end, Council manages urban stormwater runoff, which is essentially, the water from
a rainfall event which is not absorbed into the ground and needs to be captured and
directed safely through a combination of pits, pipes, retarding basins, water sensitive
structures, harvesting tanks and overland flow paths.
Council’s stormwater network (as at 2014) is a combination of:
1,167 kms pipes;
36,181 pits;
4 retarding basins;
10 stormwater treatment wetlands;
20 rain garden systems;
over 100 rainwater tanks;
9 stormwater harvesting schemes;
Overland flow networks;
38 sporting reserves, and
793 hectares of public open space.
SCOPE
APPENDIX A
APPENDIX A SERVICE SCOPE 2015-16: INTEGRATED STORMWATER MANAGEMENT (DS3536785) Page 2 of 11
Recent changes to State policy and water legislation, looks to place an increasing onus on
councils to pursue an integrated approach to stormwater, in order to build resilience in an
ever-changing climate and achieve better liveability outcomes for communities.
The concept of Integrated Water Management is internationally accepted as the approach
to managing water resources in the most efficient, equitable and sustainable manner.
Predictability of water supply and storms is an uncertain science. Shifting rainfall trends,
general weather conditions, timing and duration of seasonal changes all contribute to this
a level of uncertainty.
Similarly, the presence of water in both quantity and quality is affected by climate
variability, resulting in more intense/frequent storms, higher summer temperatures and
extended dry periods.
This Scope addresses how Council currently delivers the integrated stormwater
management service and considers how Council will meet the growing challenge to
improve liveability standards, achieve long term sustainability and build Knox’s water
resilience within unpredictable cycles of flood and drought.
Role of Council under Delegated Powers Council manages stormwater runoff under the provisions of:
The Planning and Environment Act 1987, which informs the Victorian Planning
Provisions, Local Planning Policy Frameworks and the Planning Scheme;
Clause 56.07-4 (Water Sensitive Urban Design) of the Victorian Planning Provisions,
which is a key to planning and development regulations surrounding stormwater
quality and quantity;
The Water Act 1989 (although the Act gives no recognition of Local Government
Authorities being responsible drainage authorities or water regulators);
The Environment Protection Act 1970 and associated State Environment Protection
Policies (subordinate legislation) particularly, Waters of Victoria 1988 and Schedule
F6, Waters of Port Phillip Bay 2003, that govern the protection of waterway
environments from the impacts of urban stormwater runoff;
The National Construction Code (BCA Vol 1, Vic 1.6) which informs the Planning
Scheme and Special Building Overlay, which governs conditions on floor levels in
flood affected areas; and
The Building Regulations 2006, in particular, Regulation 802 for Flood Areas;
Regulation 806 for Designated Land or Works; and Regulation 310 for Building Over
Easements (which is shared with the jurisdictional retail authority, South East Water).
Collaborative partnerships with community, businesses, Melbourne Water, South East
Water, the Department of Human Services, the Stormwater Industry Association, the
Municipal Association of Victoria, the Environment Protection Authority of Victoria, the
Department of Planning and Community Development, the Department of Environment,
Land, Water and Planning, the Cooperative Research Centre for Water Sensitive Cities
and key universities (namely, Monash and Melbourne) are pursued and maintained.
APPENDIX A SERVICE SCOPE 2015-16: INTEGRATED STORMWATER MANAGEMENT (DS3536785) Page 3 of 11
Legal and Statutory Obligations Municipal councils have a range of responsibilities which impact on surface water,
including the planning and approval of sustainable land use, domestic wastewater
management, urban stormwater and where relevant, floodplain management.
Municipal councils are required to ensure that land use planning decisions and approvals
consider the capability of land to sustain the use; that stormwater and domestic
wastewater management is improved and where relevant, that sediment runoff from
unsealed roads is reduced (Victorian Government Gazette, June 2003).
Significant storm events, localised flooding and increased stormwater runoff are leading to
substantial social, economic and environmental consequences for local and state
authorities.
Such events have resulted in significant damage to properties, local environments, and
disruption to members of the community and businesses – in conjunction with substantial
economic costs and potential health risks. These issues have also drawn the attention of
all levels of government – particularly regarding their respective regulatory responsibilities.
Further, given the broader consequences of these events, the management of flooding
and the associated risks has also drawn the attention of the State Auditor General.
As with many of Melbourne’s municipalities, Council faces a number of major stormwater
issues and is working through investigation and consultation with relevant stakeholders
and affected residents, with a view to providing design solutions that are appropriate and
affordable.
Council should be able to demonstrate that it is fulfilling its obligations as a responsible
drainage authority and is able to respond effectively in the management of stormwater and
its drainage assets.
To this end, legal advice provided by Council’s insurers has stated that:
‘Knox is now on notice to act reasonably and not recklessly in relation to possible, and
reasonable, flood remedial works and possible reallocation of resources to flood mitigation,
so as to ensure future (insurance) coverage.’
CURRENT SERVICE MODEL
Integrated Stormwater Service Snapshot Service budget 2014-15: Income
Expenditure
Net
Operational Budget
($13,430)
$616,243
$602,813
Service EFTs: 5.0 EFT
APPENDIX A SERVICE SCOPE 2015-16: INTEGRATED STORMWATER MANAGEMENT (DS3536785) Page 4 of 11
Currently, the Integrated Stormwater Management Service is predominantly provided by
an in-house service delivery model comprising five (5) staff in the Stormwater Unit, within
the Community Infrastructure Department and supported by external consultants, where
further specialist input or expertise is required.
The model has been in place for approximately two (2) years and was established in
response to a growing demand for service and asset planning – for both Council and
privately owned land and infrastructure.
Service Delivery Lifecycle Model
The provision of integrated stormwater management services for Knox City Council, as
with most asset-based services, accords with the service delivery model as shown in
Council’s Asset Management Policy 2013 (see Figure 1).
This model articulates the key service phases for the provision, management and
maintenance of assets in an integrated manner to meet high quality service outcomes for
greater community benefit.
Figure 1: Service Delivery Lifecycle Model
The Stormwater Unit is the major provider of integrated stormwater management from
service formulation, to service establishment and asset design solutions incorporating
strategic stormwater management.
This team is supported by the Project Delivery Unit (Asset Design and Creation), the
Works Unit (Asset Maintenance) and the Construction Unit (Asset Renewal).
APPENDIX A SERVICE SCOPE 2015-16: INTEGRATED STORMWATER MANAGEMENT (DS3536785) Page 5 of 11
Strategically, the integrated stormwater service seeks to deliver levels of service based on
a degree of acceptable risk (i.e. protecting internal floor levels from flood); affordability of
the service provided and degree of community benefit, all of which require adaptability to
changing external policy and legislative drivers; population growth; climate variability (e.g.
increasing frequency of intense storms to extended drought) and urban intensification,
adding further pressure on existing infrastructure assets.
The budget currently provides for an in-house business model of 5.0 EFT comprising of
civil engineers, environmental engineers and scientists, providing direct services, technical
advice, internal consultancies and project management.
In doing so, the service seeks to:
Provide cost-effective, integrated solutions that achieve multiple community benefits,
including the protection of waterway health and sustainable use of water;
Reduce flood risk and ensure protection of human life and property;
Influence urban development outcomes, through planning mechanisms, to build water
resilience without compromising existing infrastructure performance, and
Provide solutions that are innovative and responsive to changes in legislative
requirements, policy development, population growth, urban intensification, and
changing climatic conditions.
The Service’s current activities and functions extend across a number of key areas:
Statutory Planning Support – This function incorporates the provision of technical advice
for planning and building referrals; drainage information requests; pre-planning
development and subdivisional advice on stormwater requirements.
The municipality is experiencing an increased rate of infill and brown field subdivisional
development which is adding further demands on Council resources (time) and increased
pressure on existing infrastructure.
Local Drainage Investigations – This function incorporates investigations in response to
reactive local flooding complaints and referrals for action from the Operations Department,
following maintenance works.
Investigations also extend to the administration of Council’s General Provisions Local Law
36 (Drainage of Properties) for private dispute cases. This process includes site
assessments, documented evidence trails, correspondence and legal documentation for
court or insurance assessments.
Asset Design and Creation – This function incorporates the provision of catchment
analyses, investigations and concept (functional) designs for stormwater related capital
projects.
APPENDIX A SERVICE SCOPE 2015-16: INTEGRATED STORMWATER MANAGEMENT (DS3536785) Page 6 of 11
This includes the development of best practice stormwater management solutions
incorporating Water Sensitive Urban Design (WSUD) and Integrated Water Cycle
Management (IWCM) in collaboration with industry partners, researchers and local and
state government sectors.
The service also contributes to master planning processes and design improvements for
passive and active open space assets, sites of biological significance and council facilities
where there are water related issues to be considered.
Asset Maintenance and Renewal – This function incorporates the provision of expertise
and design solutions to support the Parks, Works and Construction units in the
maintenance and renewal of specialised stormwater assets.
This includes conducting rolling audits of WSUD Assets to assess asset condition and
functional performance, which in turn informs priorities for the 5 year WSUD Renewals
Program.
The service also provides renewal designs, contract supervision and project management
for delivery of WSUD Renewal capital works.
Strategic Planning – this function incorporates the provision of technical advice into the
development of structure plans for activity centres, planning instruments and overlays
(Land Subject to Inundation, Special Building Overlays), revision comment to local
planning policies, the MSS and Planning Scheme.
The planning scheme is the fundamental mechanism by which development can be
controlled to avoid creating or exacerbating flooding problems. Growth within Knox is
predominantly infill development or consolidation.
The Knox Stormwater Drainage Strategy 2004 identified areas in the drainage network
where problems have occurred and are likely to occur. The Strategy noted that
development growth in areas throughout Knox may lead to a higher expectation for high
serviceability from the drainage system; including additional minimum standards for new
development.
It should be noted that, external consultants and contractors support the Integrated
Stormwater Management Service on an ‘as needs’ basis for specific projects. For
example, legal advice is often required, particularly where there are disputes regarding
onus or responsibility or where damage occurred as a consequence of local flooding.
The full delivery of the service is provided in cooperation with other Council services,
largely within the Planning, Operations and Community Infrastructure Departments (i.e.
Biodiversity, Project Delivery, Facilities and Open Space & Landscape Units). The
integrated stormwater service also seeks input from others such as, Strategic Planning,
Local Laws, Risk and Governance.
APPENDIX A SERVICE SCOPE 2015-16: INTEGRATED STORMWATER MANAGEMENT (DS3536785) Page 7 of 11
Equally, the nominated service areas draw on technical expertise from the Stormwater
Unit in order to meet their service levels and further other project outcomes (strategically
and operationally).
Given the current activities of the service, the wider service provision and emerging
drivers, strategic changes in service and relationships may well be necessary.
SERVICE ASSESSMENT
Strategic Intent The Integrated Stormwater Management service largely operates in a dynamic
environment; coping with natural events (i.e. storms), private building developments and
changes in legislation, all of which are beyond the control of the service.
However, the strategic intent of the service is to ensure the City of Knox is able to manage
this environment and effectively transition into a water sensitive city which is safe, resilient,
liveable and sustainable.
A demonstration of this strategic effort is outlined in Appendix A.2 – Logic Map: Integrated
Stormwater Management Services.
To this end, Knox City Council is an active contributor on the Victorian Consortium of
Councils, working with local government professionals across Australia and researchers
from the Cooperative Research Centre for Water Sensitive Cities in a nine (9) year
partnership to transition the City into becoming water sensitive.
In doing so, Knox needs to be mindful of the pressures of a growing Melbourne population;
the sensitivities experienced by vulnerable members of its community during times of
climate extremes (storms and heat stress impacts on the elderly, ailing and young) and
maintain a level of responsiveness that is appropriate to future climatic variations.
Figure 2 below represents the journey Knox is on to achieve a transition from a ‘water
supply city’ to a ‘water sensitive city’ in an effort to secure our community’s water future.
APPENDIX A SERVICE SCOPE 2015-16: INTEGRATED STORMWATER MANAGEMENT (DS3536785) Page 8 of 11
Figure 2: Liveability and the City-State Continuum for Urban Water Management (Brown et al., 2009)
Council has maintained its commitment to leadership in integrated stormwater
management by adopting innovative approaches, largely through water sensitive urban
design - designing, planning and constructing assets that:
are more sensitive to water;
relieve pressure on existing infrastructure networks;
retain and treat water within catchments (land areas) that it falls;
provide a cooling effect to combat urban heat island effects on human well-being;
advance Knox’s water security and resilience;
reconnect the community with local waterways;
provide greater streetscape appeal and urban amenity;
protect ecological health of urban waterways from urban impacts;
are responsive to an increasing population and changing climate challenges; and
adds value and an improved quality of life for its community.
Current Service Levels Council’s existing infrastructure stock was generally built or acquired in a concentrated
period of urban expansion from the 1950’s to 1980’s. During this time, little or no analysis
was done to determine the appropriateness of this infrastructure to respond to a growing
city or how best to sustain this asset base.
Natural overland flow paths have incrementally been lost to development, drainage
easements, containing formal, piped drains are more access constrained and areas of
previously undeveloped land continue to diminish. This raises concerns with respect to two
(2) main areas of risk associated with the management of drainage assets - risk of failure
and service risk.
APPENDIX A SERVICE SCOPE 2015-16: INTEGRATED STORMWATER MANAGEMENT (DS3536785) Page 9 of 11
The service is reliant upon accurate infrastructure data in order to consider and manage
the future provision and performance of the stormwater drainage network.
Currently, there is a significant service gap in the provision of data reflecting drainage
asset condition, extent and location of assets.
Council has recently funded Stage 1 of a flood mapping and modelling study, which covers
four (4) sub catchments in the Blind Creek Catchment. Funding for Stage 2 is currently
under consideration, as part of the 2015/16 budget.
Given indicators received from Stage 1, a number of discrepancies have manifest
themselves in asset locations and asset quantities, when compared with current data.
The completion of the staged flood mapping and modelling study for the forty-nine (49)
sub-catchments within Knox will provide accurate asset condition and location details to
inform better decision making around stormwater design solutions; improve planning and
development conditions and improve management, renewal and financial planning of the
network.
The flood mapping and modelling study will also provide better indicators of areas subject
to flooding under various conditions and it is anticipated that Council will make this
information public.
The integrated stormwater management service needs to be adaptable and responsive to
changing expectations in the water sector and shifts in governmental policy. The future
service needs to seek integrated ways of providing essential stormwater protection
services without compromising other landscape and community values.
Traditional flood mitigation measures aim at moving water efficiently downstream by
increasing the capacity of the pipe network. While this approach is effective at solving
localised issues, it has the potential to create greater problems further downstream,
including flooding and the pollution of receiving waters (i.e. local waterways and
downstream Bay environments) by transporting urban pollutant loads in stormwater runoff.
The option to optimise local flood protection, by increasing pipe size, is often limited due to
the nature of urban development densities, the capacity for creeks and waterways to deal
with the resulting discharge and the expense of the infrastructure provision.
Consequently, Council can no longer rely solely on traditional means of stormwater
disposal. Industry drivers demonstrate the need to look at stormwater as a resource, to be
managed sustainably to service water supply demands; recognising its quantity and quality
will vary over time.
Council’s ability to adapt its approach – to collect and use this resource to respond
successfully in times of shortage, dispose of it safely in times of surplus and consistently
manage its effective use locally lends itself to building the City’s resilience.
APPENDIX A SERVICE SCOPE 2015-16: INTEGRATED STORMWATER MANAGEMENT (DS3536785) Page 10 of 11
Flood mitigation solutions need to achieve a broad range of community benefits beyond
the traditional risk related factors. Solutions need to incorporate water quality outcomes in
response to State Government targets; provide biodiversity enhancements at the local
scale; deliver passive and active recreational opportunities, deliver interactive spaces for
people to connect positively with water and progressively evolve into valued landscape
features.
This Service Analysis will provide the opportunity to:
better identify the range of water-related challenges facing the city;
review and analyse existing service levels of the integrated stormwater service;
review and improve assessment frameworks to inform priority decision making;
ensure Council is able to respond strategically to changing political and regulatory
dynamics;
improve Council’s understanding of the community’s expectations in the provision of
the service;
ensure that Council is supporting the community in accordance with its legal
obligations;
assess the resource implications of delivering the service to agreed or expected levels;
identify the technical capacity of the service to respond to expectations and deliver on
outcomes, and
assess the ability for statutory and strategic planning mechanisms to assist in service
delivery.
Adaptive Future Service Model To facilitate the effective implementation of a strategic and practical approach to
sustainable, integrated water management in Knox, as it transitions to a water sensitive
city state, Council will need to:
Increase use of alternate water sources, such as stormwater, to reduce reliance on
potable water and reduce stormwater runoff;
Manage peak flows (flood risks) caused by climatic changes and intense storms;
Improve stormwater quality associated with urban pollutant loads;
Establish diversion systems which allow flood forming flows to be stored offline for
later release (or alternate use);
Reduce pressures on stormwater infrastructure through new planning conditions to
manage changes in land use, urban intensification and population growth;
Adopt new technologies to retain stormwater close to its source and integrating
infrastructure solutions that contribute to landscape and recreational values;
Enhance liveability standards of the municipality;
Increase the resilience of the municipality’s ecosystems, community, businesses and
facilities to future change, and
positively affect the knowledge, capacity and engagement of the community to
empower personal action.
APPENDIX A SERVICE SCOPE 2015-16: INTEGRATED STORMWATER MANAGEMENT (DS3536785) Page 11 of 11
REFERENCES
1. Water Sensitive Urban Design and Stormwater Management Strategy 2010
2. Drainage Asset Management Plan 2010
3. Flood Management Plan 2012
4. Water Sensitive Urban Design Policy and Procedures 2012
5. Asset Management Policy 2013
6. Strategic Asset Management Plan 2003 – 2013
7. Stormwater Drainage Strategy 2004
8. Memorandum to Councillors – Membership of the Cooperative Research Centre for
Water Sensitive Cities, June 2011
9. Sustainable Water Use Plan 2008
10. Stormwater Management Plan 2001
11. Planning and Environment Act 1987
12. Victorian Planning Provisions, Clause 56.07-4 (Water Sensitive Urban Design)
13. Water Act 1989
14. Environment Protection Act 1970
15. State Environment Protection Policy - Waters of Victoria 1988 & Schedule F6 -
Waters of Port Phillip Bay 2003
16. National Construction Code (BCA Vol 1, Vic 1.6)
17. Building Regulations 2006 (Regulation 802 for Flood Areas; Regulation 806 for
Designated Land or Works; Regulation 310 for Building Over Easements)
APPENDICES
1. Service Profile – Integrated Water Management (December 2012)
2. Logic Map – Integrated Stormwater Management Services – Transitioning to a Water
Sensitive City State
3. Councillor Briefing – Key Feedback Points from Service Plan Scope Presentation (July
2015)
APPENDIX A-1 SERVICE PROFILE: INTEGRATED STORMWATER MANAGEMENT (DECEMBER 2012) Page 1 of 3
Service 12: Integrated Water Management
Director: Dr Ian Bell, Director Engineering & Infrastructure
Manager: David Yeouart, Manager Community Infrastructure
BRIEF DESCRIPTION OF THE SERVICE
This service provides technical and strategic advice and drainage advice/drainage services
related to developer and resident enquiries and the provision of integrated water management.
Integrated Water Management (IWM) seeks to change the impact of urban development on the
natural water cycle, by managing the urban water cycle as a whole, resulting in a more efficient
use of resources - providing not only economic benefits but also improved social and
environmental outcomes. This incorporates an understanding both of the natural, pre-
development water balance and the post-development water balance – which is an important
step toward reducing the adverse impacts of storm water on the health and well being of the
community and in limiting urban impacts on the natural water cycle.
The delivery of the outcomes of the service is supported by other teams within the department
(e.g. Project delivery, Facilities) including capital works renewal, parks maintenance and works
maintenance.
Council Plan Outcome: Sustainable Natural Environment; Healthy Connected Communities;
Active Communities; Dynamic Services & Facilities; Attractive and Vibrant Places; Leading
Organisations.
Service Outcomes:
The community is safeguarded against local flooding.
Safe and fit for purpose municipal drainage system.
Optimising public health and safety in regard to storm water and drainage.
Storm water is a valued and well used resource (quantity).
Clean waterways (Quality).
The fluctuating quantities and quality of stormwater is well managed and distributed.
ACTIVITIES
12.1 Water Quantity: Consists of strategic planning for water management, customer service
internally and externally, and delivery of water management works to manage the quantity of
storm water within the municipality.
Outcomes: Identification and delivery of strategic drainage projects; better integration of
water quantity drainage in structure plans; and an increase in developers integrating water
quantity management principles into their projects. Communication of information and advice
in regard to drainage management regulations and standards. Minimised affect of flash
flooding on habitable businesses and buildings.
12.2 Water Quality: Consists of strategic planning for water management, customer service
internally and externally, and delivery of water management works to manage the quality of
storm water within the municipality.
APPENDIX A-1
APPENDIX A-1 SERVICE PROFILE: INTEGRATED STORMWATER MANAGEMENT (DECEMBER 2012) Page 2 of 3
Outcomes: Identification and delivery of strategic water quality drainage projects; improved
alignment of water quality drainage projects with Melbourne Water; better integration of water
quality drainage in structure plans; and an increase in developers integrating water quality
management principles into their projects. Cleaner waterways; improved creek flows and
reduced demands on formal drainage pipe networks.
Key current or future issues:
Key current outputs and or deliverables:
Planning referrals 350 per annum
Customers requests (Email, letter, customer service, phone) 500-600 per annum
Council reports (average) 4 per annum
Extreme weather events associated with varying climate conditions. The prevalence and
severity of extreme weather events is increasing, with the subsequent impact on private and
public property. This has highlighted issues of overland flow paths, particularly with older
residential areas where overland flow paths were not incorporated in sub-division planning.
With population growth and increased development, including development in areas with
aging infrastructure, there is increasing pressure on Council to upgrade infrastructure and
better manage development. This will be a significant resource burden for Council.
Identification of overland flow paths – based on current data and evidence - and the
incorporating of flow paths into Council’s Planning Scheme.
The needs and expectations in the community are changing due to the wet weather changes
experienced over the last couple of years. Residents want the conditions that are causing
greater levels of flooding to be fixed to avoid damage to property.
There is additional risk to public health when local flooding occurs.
Financial Profile
Activity Expenditure Income Net
Water Quality $252,834.17 $252,834.17
Water Quantity $442,682.83 $442,682.83
Total $695,517 $695,517
Additional Costs
Activity Expenditure
Buildings maintenance $ 35,918
Capital works renewal $2,069,936
Parks $ 47,515
Works Maintenance $1,399,275
Total Net Cost: $3,552,6441
1 Note that the total cost won’t align exactly with the Departmental Budget of the service. This is because overhead
costs have been removed and measured in their own Service Profiles and costs of buildings, parks and capital works renewals have been added. For full information about costings and assumptions used, see the Introduction section to Service Planning.
APPENDIX A-1 SERVICE PROFILE: INTEGRATED STORMWATER MANAGEMENT (DECEMBER 2012) Page 3 of 3
Staff Profile
Primary Job Family EFT
Perm
EFT
Temp
End date
(if temp)
Hours per
week Role
Coordinator (Engineer) 1.0 38
Engineer 3.8 144.4
Student Engineer 1 38
Total available EFT and Hours 5.8 220.4
AP
PEN
DIX
A-2
LO
GIC
MA
P –
INTE
GR
ATE
D S
TOR
MW
ATE
R M
AN
AG
EMEN
T
Pag
e 1
of
1
APPE
ND
IX A
-2
APPENDIX A-3 KEY FEEDBACK POINTS (JULY 2015) Page 1 of 1
Key Points Raised at 1 July by Councillors at Issues Briefing:
Investigate options for a better return on investment.
Investigate potential for developers to pay for drainage upgrades, related to their
development.
Investigate the cost of current risk.
o What is the cost of Council’s insurance?
o What is the cost of drainage related claims?
Investigate funding partnerships with Melbourne Water.
Investigate the current service model (with focus upon planning referrals).
APPENDIX A-3
APPENDIX B SERVICE SCOPE 2015-16: HEALTH SERVICES (DS3494077) Page 1 of 8
Service: Health Services Director: Angelo Kourambas, Director City Development Manager: Steven Dickson, Manager City Safety and Health
SERVICE ASSESSMENT QUESTIONS This Service Assessment will aim to answer the following key questions:
1. What should be the strategic intent of the service?
2. What should the role of Council be for this service?
3. What should be the service model for this service?
4. What service activities, and to what level should this service deliver?
In accordance with the Council Plan, all Service Analyses will consider planning, where
relevant, for an ageing population; and providing a range of programs, services and
partnerships which aim to build connections between people and reduce social isolation.
INTRODUCTION
Healthy and Connected Communities is a key aspiration of Knox City Plan 2013 – 2017.
The City Plan identifies these aspirations in a municipality where its population is ageing
and where there is foreseen business and residential growth.
Local Government Act 1989 requires Council to advocate and promote proposals which
are in the best interests of the local community through it exercising, performing and
discharging duties, functions and powers under relevant acts and local laws. The Public
Health and Wellbeing Act 2008 (PHWA), one of these relevant acts, was enacted to
‘promote and protect health and wellbeing’.
Aligned to the PHWA sits the Victorian Public Health and Wellbeing Plan 2011 – 2015
(VPHWP), which states that service providers ‘continue to protect the health of Victorians
and that the risks to health from communicable diseases, food safety and environmental
hazards require sustained efforts and constant vigilance in the face of new and emerging
challenges.’
The VPHWP also identifies the huge burden that escalating rates of chronic disease place
on Victoria’s community and identifies lifestyle behaviours such as promoting healthy
eating, controlling tobacco use and reducing injury prevention as three of many
contributing factors to overall population wellbeing.
SCOPE
APPENDIX B
APPENDIX B SERVICE SCOPE 2015-16: HEALTH SERVICES (DS3494077) Page 2 of 8
The Knox Community Health and Wellbeing Strategy 2013 -2017 supports the PHWA
purpose in that it aims to enhance health and wellbeing in Knox. The Strategy identifies
personal health and wellbeing and personal health and community safety as two of its
drivers.
The above State and Local frameworks provide direction for the delivery of Council’s
health services. The service is delegated a number of functions under various Acts that
collectively aims to protect and promote public health and wellbeing in Knox.
The following diagram shows the key functions of the current service that aim to achieve
the above mentioned goals. Each function plays an important role in protecting the health
of the local community. However not all functions are legislated requirements and service
levels for some can be varied by Council. The service analysis will focus on functions that
are not mandated or where Council has discretion on the service levels.
Delivery of Health Services within Knox
This Service Scope describes the current service model, identifies the key challenges and
opportunities the service needs to address and outlines the key areas that the service
analysis should focus on.
Immunisation services that reduce vaccine preventable disease
Provision of suitable living standards within prescribed accommodation settings such as rooming houses and caravan parks
Integrated health initiatives that aspire to curb the incidence of chronic disease. e.g.- tobacco use and healthy eating
Knox City Plan 2013-2017
Programs to ensure access to safe food and reduce the
incidence of food poisoning
Programs to ensure safe beauty and body art practices
Services that eliminate/ reduce the incidences of public health risks, such as pollution to air (including noise), land and water
Programs that ensure the safe installation and use of domestic wastewater systems.
APPENDIX B SERVICE SCOPE 2015-16: HEALTH SERVICES (DS3494077) Page 3 of 8
CURRENT SERVICE MODEL
Service Snapshot Service budget 2014/2015: Income
Expenditure
Net
($701,750)
$1,502,675
$800,925
Service EFTs: 14.15
This Service is currently delivered by 24 staff (11.85 EFT, supported by 2.3 EFT
administration staff). Currently the service consists of a Coordinator, seven Environmental
Health Officers (EHO), a Student EHO, one Environmental Health Technician (EHT) and
eleven Immunisation Nurses, who are employed either on a permanent part time or casual
basis.
A suite of Victorian legislation collectively gives a service framework which provides
education, regulation and enforcement within Knox. While some activities may be
discretionary, the majority of service delivery is mandatory and prescribed in legislation.
The following lists articulate both mandatory and discretionary service tasks.
Minimum Mandatory Service Levels Annual inspection of high risk food premises: hospitals, nursing homes, child care
facilities, aged care facilities, restaurants, take away premises, delicatessen
supermarkets and food manufacturers that do not have stand alone specialist quality
assurance programs, school canteens, sporting clubs and Knox registered mobile and
temporary premises not inspected elsewhere.
Obtain food samples from Knox food premises as per Victorian Government Gazette.
Recall foods from Knox food premises and settings that may pose a consumer health
risk.
Investigate all consumer noise requests and requests where activities undertaken
within Knox may compromise health and wellbeing.
Provide immunisation services to children living or being educated in Knox.
Annual inspection of prescribed accommodation premises.
Issue permits to install and use domestic wastewater systems
Registration and inspection of beauty and body art industries
Emergency Service response
Discretionary Services Conduct tobacco education visits and tobacco test purchasing activities
Conduct health promotion and education activities. (Asbestos Awareness Week,
spreading healthy eating messages, including use of demonstration kitchen at Knox
festivals and at targeted community settings)
Provide health related feedback on Planning Applications
APPENDIX B SERVICE SCOPE 2015-16: HEALTH SERVICES (DS3494077) Page 4 of 8
Annual assessment of high risk food premises that have specialist quality management
systems
Inspection of Knox registered temporary and mobile stalls inspected previously at other
events or in other municipalities
Swimming pool water quality assessments at public pools
SERVICE ASSESSMENT
Role of Council The role of Council in the delivery of this service is highly regulated. Council is delegated
authority to register and renew licenses for businesses gazetted under the Food Act 1984,
Public Health and Wellbeing Act 2008, Residential Tenancies Act 1997 and Environment
Protection Act 1970.
The Food Act further mandates Council to conduct assessments, inspections, initiate food
recalls and procure food samples for analysis.
The Public Health and Wellbeing Act mandates that the service provides immunisation
services, investigate all customer complaints where a situation may pose a public health
risk and be prepared to mitigate the potential adverse health impacts associated with
emergency situations. The service currently maintains both Council’s Heatwave and
Influenza Pandemic Plans.
The Environment Protection Act specifically authorises the service provider to investigate
residential noise emissions that may adversely affect other residences. The service
currently has neither the authority under this Act or the expertise to remedy complex
matters regarding emissions from commercial and industrial premises. Such matters are
referred to the Environment Protection Authority for investigation and remedy. The review
will consider if Council should in the future, engage such expertise to meet community
demand.
The service also approves the installation and use of domestic wastewater systems under
the Environment Protection Act. While this function currently sits with this service, this
function could also sit with other areas of council.
The Service Analysis will confirm Council’s legislative and regulatory responsibilities under
the various Acts and determine the service model and service activity levels in order for
Council to fulfil its role.
Strategic Intent
The Knox City Plan 2013 – 2017 vision aspires to be a City where its community is able to
enjoy good health and wellbeing at all life stages by mitigating the impact of lifestyle risks
minimising risks to public health.
APPENDIX B SERVICE SCOPE 2015-16: HEALTH SERVICES (DS3494077) Page 5 of 8
This service aligns to the City Plan in that it aims to protect and mitigate adverse health
outcomes through:
Monitoring, surveillance and enforcement activities that are aimed at controlling the
spread of infectious disease including food borne disease.
Immunisation services which protects the community against vaccine preventable
disease.
Delivery of health promotion and education services, including tobacco control, healthy
eating initiatives and preparation for potential emergencies which aims to change
community behaviour towards improved health outcomes.
Provision of expert advice on preventative health related matters.
Monitoring, surveillance and enforcement activities that protect and/or mitigate adverse
community outcomes, including emergency situations.
Key current or future issues
An increase of the aged population in Knox. This cohort is more susceptible to disease.
An increasing culture of eating out and the purchase of take away foods will result in an
increase of registered food premises requiring inspection.
An increase in housing density which is likely to impact on the number of residential
noise requests for investigation received. (There has been a current 30% increase in
noise related complaints when compared to 2010).
The addition of new secondary schools and growth in student numbers (eg St Andrews
College) will require immunisation service increases to those currently being provided.
Knox has also had an increasing number of culturally and linguistically diverse (CALD)
food premises proprietors who have limited English language skills and therefore
require increased communication needs, skills etc.
Changes in enforcement (e.g. power of entry) and the centralisation of registrations
(Streatrader) equates to some gained and lost work for the service.
Hairdressers, from 1 March 2016, will be exempt from annual registration; which will
equate to an approximate loss of $10K in future annual income and reduction in human
response requirements.
Training and development of staff is required each time there is a change in legislation.
State expectations can be difficult to meet – e.g. required to conduct additional
secondary school catch up immunisation and ongoing review of Heat Wave Plan.
Service Model
There can be many approaches to the delivery of this service. The analysis will need to
consider proactive versus reactive service approaches and where the service should
balance the moderation of its activities between education and enforcement. Further to
this, the analysis will need to consider what future role should this service have in the
prevention health space? Like Knox, most Council’s provide this service in-house while a
small number have contracted the service to an external private provider. The analysis will
also look at these alternative service models to determine the most effective and efficient
model for Knox and opportunities for greater cost recovery from fees and fines.
APPENDIX B SERVICE SCOPE 2015-16: HEALTH SERVICES (DS3494077) Page 6 of 8
The list of matters and questions articulated below outlines the key areas that the analysis
will cover and provide recommendation for Council’s consideration.
The service model review will consider the following:
Service Provision Key Questions
Safe Food
The Service, which is authorised to register food premises,
currently undertakes non mandatory inspections of food
premises covered by a third party audit framework.
Should the Service
continue to inspect these
premises?
Council currently charges gazetted commercial operators a
fee for registration and ongoing legislative surveillance to
offset service delivery costs. Further to this, businesses that
require additional resource because they pose ongoing
consumer risk are charged additional fees on a full cost
recovery basis. Community groups, who sell food from
mobile and temporary premises at settings such as fetes and
festivals, are not currently charged any service fees.
Should community groups
be charged a fee for
services provided?
Known and unknown future residential and commercial
developments may result in increases in the total number of
registered food businesses.
How ought these additional
requirements be
resourced?
Safe Beauty and Body Art Practices
From 2016, Hairdressers, although requiring initial PHWA
registration and initial assessment, will be exempted from
mandatory recurring registration and surveillance
requirements.
With the State defining this
premise class as low risk
should ongoing inspections
be scheduled?
With known and unknown future residential and commercial
developments anticipated, rises in beauty and body art
industries requiring registration and surveillance are
anticipated. It is not anticipated that this increase will offset
losses incurred by hairdresser reform above explained.
Should these additional
activities be resourced? If
so, how?
Immunisation Services
Commonwealth and State agencies currently subsidise the
delivery of immunisation services to children living and being
educated in Knox. This service currently includes up to ten
infant sessions per month and an annual school based
immunisation program. The program is currently about fifty
per cent subsidised. In addition to this, the service delivers a
corporate program on a full cost recovery basis.
Is there scope to reduce
and/or streamline
immunisation services?
The mitigation of all public health risks within Council’s
jurisdiction, including emergency situations, is currently
funded from rate funds. The PHWA requires that all requests
are investigated to determine and remedy adverse health
impacts.
Should there be a
hierarchy of complaints and
should Council not get
involved in some
requests/complaints?
APPENDIX B SERVICE SCOPE 2015-16: HEALTH SERVICES (DS3494077) Page 7 of 8
Service Provision Key Questions
Mitigating Public Health Risk
An increase in aged care facilities are likely to contribute in
increases in municipal gastro intestinal outbreaks in such
settings.
Should these additional
activities be resourced? If
so, how?
Residential noise complaints received are approaching 300
per annum; up from 231 complaints received in 2010.
Proposed increases in medium and high density housing is
likely to result in further increases in noise requests received.
Should these additional
activities be resourced? If
so, how?
Asbestos related complaints, linked to the demolition and
removal of household materials in Knox, are increasing.
Although this work generally falls outside the scope of a
health service, community expectations relative to
responsiveness and outcomes regarding this concern are
high.
What ongoing role does the
health service have in
asbestos related matters?
Responsiveness to increases in community requests in
general. Noise and airborne pollution requests have
increased over thirty per cent, when compared to 2010 totals.
Should these additional
activities be resourced? If
so, how.
Integrated Health Initiatives
The Department of Health and Human Services through the
MAV currently subsidise some Public Health and Wellbeing
Strategy initiatives. An example of this is the smoking
education and surveillance work conducted.
Should the service have an
ongoing role in the delivery
of these initiatives?
The service currently delivers initiatives that encourage the
consumption of safe and nutritious foods, with presence at
Knox festivals and community settings.
What future involvement, if
any ought the service have
in the prevention health
area?
Ancillary Public Services
The service currently provides gratis general public services
on health related matters. These services includes provision
of the sharps container replacement and sharps disposal
service, sourcing archived immunisation information for
clients seeking to meet employment needs, sourcing
archived domestic wastewater information and site visits to
discuss proposed food premise development.
Should gratis service
delivery continue or should
a service fee be struck for
these services?
Red tape reduction is a key State strategic objective How could Council reduce
red tape?
It is proposed that the Service Analysis investigate the range of options available and
compare them for effectiveness and efficiency, as well as against cost/benefits, bottom
line, social impact and community preference.
Service Levels
Health Service currently has a range of service levels and these will be explored as part of
the service analysis.
APPENDIX B SERVICE SCOPE 2015-16: HEALTH SERVICES (DS3494077) Page 8 of 8
REFERENCES
1. Department of Health 2011, Victorian Public Health and Wellbeing Plan 2011- 2015,
viewed 20 April 2015, http://docs.health.vic.gov.au/docs/doc/Victorian-Public-Health-
and-Wellbeing-Plan-2011-2015
2. Environment Protection Act 1970 (Vic)
3. Food Act 1984 (Vic)
4. Knox City Council (2013), Knox City Plan 2013 – 2017- Incorporating Knox Council
Plan, Melbourne
5. Local Government Act 1989 (Vic)
6. Public Health and Wellbeing Act 2008 (Vic)
7. Residential Tenancies Act 2007(Vic)
APPENDICES
1. Service Profile: Health Services (December 2012)
1
APPENDIX B-1 SERVICE PROFILE: HEALTH SERVICES (DECEMBER 2012) Page 1 of 3
Service 4: Health Services
Director: Angelo Kourambas, Director Development Manager: Steven Dickson, Manager City Safety and Health
Brief Description of Service
This service aims to mitigate adverse community health outcomes through:
Monitoring, surveillance and enforcement activities that are aimed at controlling thespread of infectious disease including food borne disease.
Immunisation services which protects the community against vaccine preventabledisease.
Delivery of health promotion and education services, including tobacco control andemergency management which aims to change community behaviour towards improvedhealth outcomes.
Provision of expert advice on preventative health related matters.
Service Outcomes:
Mitigation of Infectious Diseases
The provision of safe and healthy food
Control of disease due to waste water treatment systems
Decrease in vaccine preventable disease for individuals
Prevention of further contagious outbreaks
Less pollution, noise and emissions
No selling of tobacco to minors
Activities
4.1 Planned Legislative Surveillance: Includes approximately 1490 per annum inspections and approvals of registered food premises, hairdressers, tattooists and beauticians rooming houses, caravan parks; 817 per annum complaint investigations, advice and ongoing monitoring of domestic waste water; complaint investigations of commercial emissions; advice and investigations relating to domestic and commercial noise; tobacco program; and investigations and actions related to disease outbreaks.
Outcomes: Prevention of overcrowding, ensuring adequate capacity to escape in case of fires, compliance with ratios of showers and cooking facilities, safe and healthy food, protection from leakage from waste water treatment systems, protection of waterways from leaking waste water treatment systems, effective identification of sources of contagious diseases, effective clean-ups of contagious diseases, effective isolation of infected individuals, appropriate referrals to the EPA in cases of harmful commercial emissions, reduction in noise louder than background noise, and retail and eating houses are up to date with tobacco legislation.
4.2 Legislative Enforcement: Enforcement of relevant legislation including the Food Act;
Public Health & Wellbeing Act; Tobacco Act; Residential Tenancies Act; the Environment Protection Act and the Knox General Provisions Local Law.
Outcomes: Prevention of overcrowding, ensuring adequate capacity to escape in case of fires, compliance with ratios of showers and cooking facilities, safe and healthy food, protection from leakage from waste water treatment systems, protection of waterways from leaking waste water treatment systems, effective identification of sources of contagious diseases, effective clean-ups of contagious diseases, effective isolation of
APPENDIX B-1
2
APPENDIX B-1 SERVICE PROFILE: HEALTH SERVICES (DECEMBER 2012) Page 2 of 3
infected individuals, appropriate referrals to the EPA in cases of harmful commercial emissions, reduction in noise louder than background noise, and retail and eating houses are up to date with tobacco legislation.
4.3 Immunisation Program: Provision of immunisation to children across 13 schools, to the
public at 10 sessions per month, and to 15 corporates (full fee recovery) per annum. The service administers over 10,000 vaccine does to the Knox community per annum.
Outcomes: Increased knowledge of the effectiveness of vaccines, increase in the appropriate use of vaccines, resulting in a community reduction in infectious disease.
4.4 Health Promotion and Education: Consists of education sessions and attendance at
community festivals and events. Outcomes: Increased levels of awareness of health issues, services and options; increased positive behaviours in relation to the range of services covered by Health Services.
Corporate Responsibilities: Includes the range of tasks that are required to run a service, including: planning, staff management, training, OHS, budgeting, advocacy (internal and external), and collaboration (internal and external).
Key current or future issues: The aged population are more prone to disease and this population cohort is increasing
within Knox. With the increasing culture of eating out, more inspections are needed nowthan in the past. The increase in density of housing in activity centres will have an impacton noise investigations (there has been a 30% increase in noise related complaints over thelast four years). The addition of new secondary schools and growth in student numbers (egSt Andrews College) will also mean an increase in the immunisation service currently beingprovided. Knox has also had an increase in culturally and linguistically diverse (CALD) retailowners who could have limited English language skills and therefore require increasedcommunication needs, skills etc.
Changes in enforcement (e.g. power of entry) and the centralisation of registrationsequates to some gained and lost work for the service. Low risk businesses will be exemptfrom registration, which will equate to approx $10K loss of income. Local policy has animpact around housing and food (due to unclear State framework). Training anddevelopment of staff is required each time there is a change in legislation. Stateexpectations can be difficult to meet – e.g. the secondary school immunisation review andHeat Wave Plan.
Financial Profile
Activity Expenditure Income Net
Planned Legislative Surveillance $674,781.76 -$456,924 $217,857.76 Legislative Enforcement $263,541.09 -$3,500 $260,041.09 Immunisation $280,358.96 -$119,988 $160,370.96 Health Promotion and Education $81,943.19 $81,943.19
TOTALS $1,300,625 -$580,412 $720,213
Total net cost: $720,2131
1 Note that the total cost won’t align exactly with the Departmental Budget of the service. This is because
overhead costs have been removed and measured in their own Service Profiles, and costs of buildings, parks and capital works renewals may have been added where appropriate. For full information about costings and assumptions used, see the Introduction section to Service Planning.
3
APPENDIX B-1 SERVICE PROFILE: HEALTH SERVICES (DECEMBER 2012) Page 3 of 3
Staff Profile
Primary Job Family EFT
Perm
EFT
Temp
End date
(if temp)
Hours per
week Role
Coordinator 1.00 38.00 Coordinator Health Services
Environmental Health Officer 6.00 228.00 2 X Team Leaders and 4 Area EHO
Administration 2.52 0.40 19 October
2012 96.00 Administration Support
Program Manager 1.00 38.00 Health Promotion Initiatives & Events
Regulatory Officer 1.00 38.00 Regulatory Compliance
Nurse 0.55 21.00 Immunisation Nurse
Nurse Casual Reviewed
yearly Immunisation Nurse
144.40
Total available EFT and Hours
12.07 0.40 603.40
APPENDIX C SERVICE SCOPE 2015-16: LEISURE SERVICE (DS3454839) Page 1 of 8
Service: Leisure Service Director: Kerry Stubbings, Director Community Services Manager: Peter Gore, Manager Youth, Leisure & Cultural Services
SERVICE ASSESSMENT QUESTIONS This Service Assessment will aim to answer the following key questions:
1. What should the role of Council be for this service?
2. What should be the strategic intent of Council’s Leisure Service in the future?
3. What is the most appropriate service model/s for Council’s Leisure Service?
4. What should Council’s service levels be across the various activities in the future?
In accordance with the Council Plan, all Service Analyses will consider planning, where
relevant, for an ageing population; and providing a range of programs, services and
partnerships which aim to build connections between people and reduce social isolation.
INTRODUCTION
The Leisure Service allows residents to be involved in a wide range of activities such as
unstructured pursuits like walking and bike riding or to participate in social or competitive
sport. It aims to encourage people to be more physically active and socially connected,
whether their leisure time is part of their daily routine and regardless of personal
circumstances.
Council’s Leisure Service is delivered through a team consisting of thirty staff (14.47 EFT)
based at the Civic Centre, Rowville Community Centre and Knox Regional Netball Centre.
The key activity areas delivered by the service include: facility and contract management,
leisure planning and grants, sporting club liaison and allocation, capital works, club
education/learning, policy and service standards development, club development and
support of unstructured recreation. Council’s Parks Services and Facilities are the primary
support for the service. Over the past 10 years the service has experienced significant
change through the development of additional activities and facilities, growing needs and
the resourcing required to provide services for the community.
The team is part of the Youth, Leisure and Cultural Services Department and the
Community Services Directorate.
The Scope document outlines the current service model for the Leisure Service as well as
the initial Service Assessment. The initial Service Assessment has had input from team
members, management and executive and outlines the issues and opportunities that will
be considered as part of this review.
APPENDIX C
SCOPE
APPENDIX C SERVICE SCOPE 2015-16: LEISURE SERVICE (DS3454839) Page 2 of 8
The key issues and challenges that will be addressed in the Service analysis will include
adapting to changing needs of the community, opportunities to improve the delivery of
service through a service model assessment and assessing appropriate service levels
across the service activities.
Knox has 793 hectares of land that accommodates: 38 sporting reserves with 59 playing
fields; 37 sporting pavilions; 14 community tennis clubs with 75 courts; 208 play spaces;
and 70 kilometres of trails and bike paths.
The key users of the Service include:
Residents – through participation in organised sport or leisure activities; or as casual
users of our facilities or grounds.
Sporting Clubs – through their tenancy arrangements and also use of the facilities.
Personal Trainers – permits to use the grounds for their activities.
Sporting Associations – liaison with Council to enable scheduling of their competitions.
Schools – casual bookings for school usage and competitions.
Community groups – through tenancy arrangements
Other Units or Departments of Council – use of facilities for Festivals/Events i.e.
Stringybark Festival, Pets in the Park.
CURRENT SERVICE MODEL
Leisure Service Snapshot Service budget 2014/2015: Income
Expenditure
Net
$2,215,840M
$2,242,989M
$27,149
Service EFTs: 14.47
This service includes the management, operation and/or support for Council’s leisure
facilities including:
Two Council managed leisure centres;
11 externally managed facilities;
14 community managed and 10 public access tennis facilities;
One community managed hockey facility;
59 Council managed sports grounds and 37 pavilions.
Over the last year, the Leisure Service administered:
16 Leisure Minor Capital Works Grants;
Allocated Council managed sporting facilities to 97 community clubs or associations
(49 in Summer 2013/14 and 48 in Winter 2014);
Co-ordinated four Club Development Seminars and two additional specialised
workshop education sessions (e.g. Responsible Service of Alcohol);
Averaged a monthly attendance of over 100,000 visitations at the indoor leisure
facilities which includes Knox Leisureworks, Rowville Community Centre, Knox
Regional Netball Centre and the Knox Regional Sports Park; and
APPENDIX C SERVICE SCOPE 2015-16: LEISURE SERVICE (DS3454839) Page 3 of 8
Averaged a monthly attendance of over 1,300 visitations to the Knox Skate and BMX
Park.
The activities provided include:
Leisure Planning - Strategically planning for a wide range of active sport and leisure
activities for the short, medium and longer term; addressing user needs for facilities and
equipment; promoting and enabling co-location and sharing of facilities and resources;
planning for club financial and membership sustainability, and setting service standards.
Recreation Grants - Provision of grants to sporting clubs for the purposes of supporting
facility development and purchases of equipment.
Club Liaison and Allocations - Allocation of recreation grounds and facilities to clubs,
and communication of Council’s expectations, roles and responsibilities of Council and the
clubs/users. This includes regular contact with clubs to communicate about their
operations, initiatives, and their facilities; support for Council’s Recreation and Leisure
Liaison Group which advises Council on Recreation/Leisure issues.
Facility Improvements/Capital Works - Assessment of prioritised club needs to inform
Council’s capital works, planning & investment; communication and engagement with
clubs about new, renewal or upgrades to facilities or ancillaries, and internal liaison with
project managers of facility improvements.
Club Development Program - Provision of educational seminars and workshops for
sports clubs. Topics include legislative responsibilities (OH&S, responsible serving of
alcohol, etc) and a range of topics which cover how to maintain or build on the overall
sustainability of the club.
Community Managed Leisure Facilities - Council owned leisure facilities operated by
external operators (through contract), e.g. Knox Leisureworks to deliver sporting and
leisure programs, health services, education programs and occasional care for children.
Other facilities are managed through lease and licence agreements.
Indoor Leisure Centres - Council owned and managed leisure centres, which include
education programs, occasional child care, and venues for active recreation and leisure
activities, e.g. Rowville Community Centre.
Policy Development – Writing, reviewing and developing leisure policies which provide a
consistent approach to a matter or issue that forms the basis of a standard response from
Council to the community.
Unstructured Active Leisure – Planning and support for unstructured activities such as
Knox Skate and BMX Park, public sport courts, walking and bike trails.
The service model involves an in-house team including people with specialist expertise
and qualifications in leisure and recreation. It should also be noted that external
consultants and contractors support the planning services on an as needs basis and for
APPENDIX C SERVICE SCOPE 2015-16: LEISURE SERVICE (DS3454839) Page 4 of 8
specific projects. The current service model also requires partnerships and the contribution
of volunteers in the community.
The following diagram provides an overview of the key linkages between the Leisure
Service and the other Council Services, which form one element of the service model.
Diagram of the current service model internal Council relationships.
SERVICE ASSESSMENT
Role of Council Council’s role includes supporting sporting clubs and associations to effectively provide a
Leisure Service through their programs and services. Other roles of Council include the
provision of community infrastructure, maintenance, asset replacement and upgrade
(capital works) of community sport and leisure facilities including buildings and sports
grounds.
Council’s role in the management of the Leisure Service includes strategic planning, policy
development, direct management and contract management of leisure centres and advice
to support the effective provision of a range of quality sporting and leisure activities and
facilities within the municipality. The service works with and educates sporting and leisure
groups to support their sustainability and to build healthy, active communities.
Coordination of three Council committees also falls within the Leisure Service
responsibilities.
Leisure Service
Parks Service
Administration
Finance
Human Resources
IT
Communications
Project Delivery
Works Services & construction
Joint Initiatives
Community Strengthening
Community Safety
Community Access and Equity
Healthy Together Knox
Facilities Service
Information
Assets
Social Policy and Planning
Open Space & Landscape
Design
Traffic and Transport
Statutory Requirements
Local Laws
Health Services
Governance/Property
Waste Management
APPENDIX C SERVICE SCOPE 2015-16: LEISURE SERVICE (DS3454839) Page 5 of 8
Council is the main provider of the Leisure Service, but other providers operate
commercial or community sites. These take the form of private pay for service gyms and
leisure centres as well as indoor centres. Not a great deal is known about the private
providers; however they are delivering leisure related service in the market place.
There are also community service organisations providing either low cost or no cost
services. Some of these target specific age groups or interest groups. i.e. walking groups,
church groups, etc.
The Knox Leisure Plan (2014-19) provides the foundation for the key principles and future
direction for the Leisure Service.
The Leisure Plan identifies the following principles to guide the planning and development
of the leisure service and facilities:
1. Council will continue to support a wide range of leisure and sport activities and groups
but will have an increased focus on ‘active lifestyle’ opportunities.
2. Council acknowledges that people get involved in sport and leisure for often-different
reasons and are looking for different options to cater for their lifestyle demands.
3. Council recognises it can help minimise, but not necessarily remove, barriers that
prevent people from being active.
4. Council plays a key role in the provision of leisure and sport facilities and
environments but requires support from other organisations and agencies to do this.
5. Council recognises that well-integrated service planning is necessary in order to
ensure all service requirements are identified and addressed, and service outcomes
optimised.
6. Council recognises that urban and natural environments should be well integrated if
the Council is to achieve the desired active lifestyle outcomes.
7. Council planning for facilities will:
- consider construction, sustainable design, ongoing maintenance and operating
costs;
- generally be planned, designed and managed in a way that optimises and
encourages use by the whole community, and effectively integrates indoor and
outdoor spaces;
- be planned and designed in accordance with defined service levels and the
Council’s Sporting Facility and Development Guidelines;
- generally focus on providing for ‘local’ and ‘municipal’ level needs over ‘regional’
level needs; and
- be planned and developed in conjunction with adjoining Councils if this achieves
favorable outcomes for Knox.
8. Council resources allocated to the leisure service and facilities will be in consideration
of leisure and other community service needs, as well as non-Council funding
opportunities.
Questions for the Service Analysis will include:
What role should Council play in providing the Leisure Service?
What is the best balance of roles to achieve Council’s goals as articulated in the
Council Plan and Leisure Plan?
Ensure the service analysis considers consistent processes, practices and
requirements for community sport and leisure groups.
APPENDIX C SERVICE SCOPE 2015-16: LEISURE SERVICE (DS3454839) Page 6 of 8
Strategic Intent Knox is home to a diverse range of community facilities that cater for the different leisure,
sport and physical activity needs of residents.
Council is directly responsible for the planning and management of many of these facilities
in conjunction with the community groups and sporting clubs that use them.
Council invests in leisure infrastructure, programs, and community groups because it
recognises the social health and wellbeing benefits derived through this investment.
The Knox Leisure Plan has identified the following key community and Council aspirations
for leisure:
An abundance of leisure opportunities for a community that wants to be active and
healthy;
Availability of places for playing, reflecting, competing, learning, having fun, or just
‘being’;
Activities that encourage positive individual and community values
Strong clubs and organisations that are well run and whose members are open and
welcoming;
Outdoor and indoor spaces that are inspiring, attractive and address the aspirations of
a modern and active community;
Community, government and private enterprise working together to provide leisure
opportunities;
People who want to support others and be supported to achieve common goals;
Leisure and sport providing economic opportunities ; Leisure opportunities for all levels of ability.
The Service Analysis will assess and respond to the following:
What activities will be most effective in delivering on the strategic intent of the service?
Is the purpose, function and sustainability of the service appropriate to address the
strategic intent?
APPENDIX C SERVICE SCOPE 2015-16: LEISURE SERVICE (DS3454839) Page 7 of 8
Service Model The initial analysis identified that the unique Service models and Service levels were two
areas, which needed some further exploration. Therefore some of the areas to be
investigated throughout the process include:
The large number of facilities and groups leading to high levels of support and lease
management requirements;
The growth of legislative and risk management issues;
Changes in leisure activities/market place/trends and community needs;
Changes in technology and professionalism of clubs and overall reporting
requirements;
Integration with other services and service providers; and
Increasing cost of providing and maintaining leisure facilities and infrastructure and
pressures on sites to be more flexible and meet community expectations.
The Leisure Service is delivered through a range of different service delivery mechanisms,
they include:
Direct Service Provision – In house staff management, such as the Rowville Community
Centre and the Knox Regional Netball Centre.
Contracted Service Provision – A service has been placed through a competitive
tendering process for its operation and management. The YMCA manages Knox Leisure
works on behalf of Council and provides a return to Council.
Lease and Licence Arrangements – Several sporting facilities within Knox are operated
through a lease or licence arrangement with a community or sporting group. Examples of
these include Knox Regional Sports Park, Knox Gymnastics, Winter and Summer sports,
Scouts, etc.
Committees of Management – There are a few sites where a Committee of Management
has been established to operate and manage Council assets. An example would be the
Knox Gardens and HV Jones Community Halls.
Volunteers – The majority of sporting and community groups operate through the use of
volunteers at all levels. Very few people within a club or community group are in paid roles.
The support and retention of volunteers to the service could be explored further.
The service analysis will ask:
What is the most appropriate service model/s to optimise the effectiveness and
efficiency of Council’s Leisure Service including maximising the integration with other
services?
What is the right model to retain and support volunteers?
What are the alternatives to the current service delivery methods, what impact would
these have on the effectiveness of the service and what would be recommended?
APPENDIX C SERVICE SCOPE 2015-16: LEISURE SERVICE (DS3454839) Page 8 of 8
Service Levels Council makes a significant investment in leisure and sport infrastructure. These assets
are valued at over $709 million. Council has overall responsibility for the management of
these sport and recreation assets (reserves, pavilions, etc). What are the appropriate
service levels to most efficiently and effectively support these assets now and into the
future?
The Leisure Plan 2014 – 19 provides information on participation and trends of various
sports and it also identifies a move to more unstructured activities into the future. What is
not covered in the Plan is proposed or recommended standards for the number of facilities
to be provided for a specific sport or linked to population numbers.
Similarly, while there is data on the numbers of people who attend Council leisure
programs or centres but we do not have data on what this figure should or could look like
in the future, nor do we know the optimal level it should be.
The Service provides a number of activities (p.3). The analysis will include an assessment
of the relative investment and service levels across those activities and an assessment of
any changes that should be considered. What are alternative service delivery methods,
what would be the advantages/disadvantages of these options and what would be
recommended?
The Service Analysis will assist in providing clarity on the priorities for the Leisure Service.
What should the service level be for each of the activities of the service?
How should the service prioritise proactive and reactive service delivery?
REFERENCES
1. Knox Leisure Plan (2014-2019)
2. Knox Sporting Reserve and Facility Development Guidelines (2011)
APPENDICES
1. Service Profile: Leisure Service (December 2012)
APPENDIX C-1 SERVICE PROFILE: LEISURE SERVICE (DECEMBER 2012) Page 1 of 4
Service 26: Leisure Services
Director: Kerry Stubbings, Director Community Services
Manager: Peter Gore, Manager Youth, Leisure and Cultural Services
Brief Description of Service
This service includes the management, operation and/or support for Council’s leisure facilities
including 2 Council managed leisure centres, 11 externally managed facilities, 17 community
managed and 10 public access tennis facilities, 1 community managed hockey facility and 59
council managed sports grounds. Over the last year Leisure Services administered 20 Recreation
Minor Capital Works Grants, allocated Council managed sporting facilities to 91 community
clubs or associations (51 in Summer 2012/13 and 40 in Winter 2012), coordinated five Club
Development Seminars and six additional specialised workshop education sessions (e.g.
Responsible Service of Alcohol) and averaged a monthly attendance of over 100,000 visitations
at the community managed facilities which includes Knox Leisureworks and the Knox Regional
Sports Park.
Council Plan Outcome: Healthy, Connected Communities, Culturally Rich and Active
Communities
Service Outcomes:
Sustainable sporting clubs.
Increased participation in club sport.
Increase in groups and individuals using unstructured infrastructure to recreate.
Increased community connectedness through recreation.
Improved health linked to physical activity and exercise.
Maximised use of recreation assets and minimised negative impacts on park users and
neighbours.
Activities
26.1 Leisure Planning: Strategically planning for a wide range of active recreation activities for
the short, medium and longer term; addressing user needs for facilities and equipment;
promoting and enabling co-location and sharing of facilities and resources; planning for club
financial and membership sustainability, and prioritising club needs.
Outcomes: Increased knowledge of participation trends in active recreation activities and
best practice in service delivery; increased knowledge of the current use capacity of grounds
and pavilions; planning which maximises outcomes for available funding including
identification of opportunities for multiple use; planning which considers the needs of the
community and maximises the sustainability of active recreation in the short and longer term,
and ensures grounds and pavilions are appropriate for sporting use.
26.2 Recreation Grants: Provision of grants to sporting clubs for the purposes of supporting
facility development and purchases of equipment.
Outcomes: Increases sustainability of clubs, and retains or increases the number of active
recreation participants.
APPENDIX C-1
APPENDIX C-1 SERVICE PROFILE: LEISURE SERVICE (DECEMBER 2012) Page 2 of 4
26.3 Seasonal Allocation: Allocation of recreation grounds and facilities to clubs, and
communication of Council’s expectations, roles and responsibilities of Council and the
clubs/users.
Outcomes: Fair and equitable distribution of grounds and facilities to clubs, increased
knowledge of the rights and responsibilities relating to access to Council’s grounds and
facilities, and maximise the use of Council’s grounds and facilities whilst minimising any
damage related to over-use.
26.4 Facility Improvements: Assessment of prioritised club needs to inform Council’s capital
works, planning & investment; communication and engagement with clubs about renewal or
upgrades to facilities or ancillaries, or new facilities or ancillaries, and internal liaison with
project managers of facility improvements.
Outcomes: Clubs have an increased knowledge of Council’s processes; clubs have an
increased engagement and level of satisfaction with facility improvements; delivered facility
improvements are in line with needs of sport/club; the facility improvements are delivered in
a timely and effective manner; and facility improvements maintain or improve active
recreation participation.
26.5 Club Development Program: Provision of educational seminars and workshops for sports
clubs. Topics include legislative responsibilities (OH&S, responsible serving of alcohol, etc) and a
range of topics which cover how to maintain or build on the overall sustainability of the club.
Outcomes: Sports clubs have increased knowledge in legislative responsibilities; improved
governance and risk management arrangements; increased knowledge in topics which help
sustain or grow club membership and/or participation; clubs sustain or grow club
membership and/or participation; increased capacity for clubs to deliver on their own
organisational objectives; and sustained or increased active recreation participation.
26.6 Community Managed Leisure Facilities: Council owned leisure facilities operated by
external operators (through contract), e.g.Knox Leisureworks to deliver sporting and leisure
programs, health services, education programs and occasional care for children.
Outcomes: Increased awareness and participation in the activities available in leisure
facilities, increased knowledge, skills and attitudes about the importance of healthy diet and
exercise, increased participation in active recreation.
26.7 Indoor Leisure Centres: Council owned and managed leisure centres which include
education programs, occasional child care, and venues for active recreation and leisure
activities.
Outcomes: Increased awareness and participation in the activities available in leisure
facilities; increased knowledge, skills and attitudes about the importance of healthy diet and
exercise; increased participation in active recreation.
26.8 Club/Group Liaison: Regular contact with clubs to communicate about their operations,
Council business, and their facilities; support for Council’s Recreation and Leisure Liaison Group
which advises Council on Recreation/Leisure issues.
Outcomes: Council has increased knowledge of the needs of clubs; clubs have increased
knowledge of Council’s expectations and processes; service delivery better meets the needs
of clubs and the community.
APPENDIX C-1 SERVICE PROFILE: LEISURE SERVICE (DECEMBER 2012) Page 3 of 4
Corporate Responsibilities: Includes the range of tasks that are required to run a service,
including: planning, staff management, training, OHS, budgeting, advocacy (internal and
external), and collaboration (internal and external).
Key current or future issues:
Growth of participation in active recreation:
Participation has grown in a number of sports (e.g. basketball, soccer). There is an increased
awareness of the health benefits of recreating; Knox’s sporting facilities are becoming increasingly
close to capacity. There is an increasing expectation that Council provides infrastructure (quality
and quantity of facilities) and an increasing expectation in levels of service (e.g. provision of
education). The community has also come to expect a higher standard of service delivery from
Council, e.g. managing condition of grounds to a high quality.
Council’s service delivery model provides for a significant number of leisure facilities to be managed
by external organisations. This necessitates careful contract management to ensure that quality and
safe outcomes are delivered to the community by third parties.
Examples of contracted facilities are: Knox Leisureworks, State Basketball Centre, Knox Regional
Soccer Centre, and Waterford Valley Golf Course.
Changing legislative, policy or other requirements of regulatory bodies or other tiers of
government are likely to impact on delivery and feasibility of the service:
There have been changes to childcare standards, Building Code Regulations, occupational health
and safety, and legislation governing volunteers. Some Council buildings do not meet the recently
changed (last 12 months) standards of the Building Code Australia. Council will incur costs to meet
the standards, e.g. disability access/changing rooms when undertaking major works, following
upgrade works to existing or new facilities. Through such improvements Council will be able to
improve access for the community to these sporting facilities.
Financial Profile
The following figures are based on 2012/13 budget
Activity Expenditure Income Net
Leisure Planning $106,192.88 $106,192.88
Recreation Grants $162,370.21 -$57,500 $104,870.21
Seasonal Allocation $41,057.30 -$287,426 -$246,368.70
Facility Improvements $103,173.77 $103,173.77
Club Development Program $29,035.20 $29,035.20
Community Managed Leisure Facilities $157,026.59 -$870,518 -$713,491.41
Indoor Leisure Facilities $942,956.38 -$647,945 $295,011.38
Club/Group Liaison $169,423.67 $169,423.67
Totals: $1,711,236 -$1,863,389 -$152,153
Additional Costs
Activity Expenditure
Buildings maintenance $1,364,258
Capital works renewal $1,467,130
Parks $ 846,666
Total $3,678,054
Total Net Cost: $3,525,9011
1 Note that the total cost won’t align exactly with the Departmental Budget of the service. This is because overhead
costs have been removed and measured in their own Service Profiles, and costs of buildings, parks and capital
works renewals may have been added. For full information about costings and assumptions used, see the
APPENDIX C-1 SERVICE PROFILE: LEISURE SERVICE (DECEMBER 2012) Page 4 of 4
Introduction section to Service Planning. Note that the total cost does not cover the cost of the bus itself, or its
maintenance. These costs will be analysed separately alongside other fleet costs. This is the 2012-13 budget. These
costs do not include corporate overheads.
Staff Profile
Primary Job Family EFT
Perm
EFT
Temp
End date
(if temp)
Hours per
week Role
Coordinator 1 38
Team Leaders 2 76
Leisure Services Officer 1 38
Administration 0.4 15.2
Project officer 0.2 7.6
Strategic Leisure Planner 0.5 19
Rowville Community Centre
Team Leader 0.75 28.5
Administration 1.52 57.76
Leisure programmer 0.44 16.72
Recreation officers 0.47 17.86
Duty officers 1 38
Child care workers 2.11 80.18
Knox Netball
Team Leader 0.25 9.5
Administration 1.47 55.86
Leisure programmer 0.22 8.36
Recreation officers 0.57 21.66
Duty officers 0.16 6.08
Child care workers 0.88 33.44
Total available EFT and
Hours 14.94 567.72
APPENDIX D SERVICE SCOPE 2015-16: COMMUNITY ACCESS & EQUITY (DS3476532) Page 1 of 8
Service: Community Access & Equity
Director: Kerry Stubbings, Director Community Services Manager: Kathy Parton, Manager Community Wellbeing
SERVICE ASSESSMENT QUESTIONS This Service Assessment will aim to answer the following key questions:
1. What should the role of Council be for this service?
2. What should be the strategic intent of the service?
3. What should be the service model for this service?
4. What service activities and service levels, should this service provide?
In accordance with the Council Plan, all Service Analyses will consider planning, where
relevant, for an ageing population; and providing a range of programs, services and
partnerships which aim to build connections between people and reduce social isolation.
INTRODUCTION
Council’s Community Access & Equity Service is primarily an in-house service, supported
by a small team consisting of four staff (3.5 EFT), as well as consultants on an as needs
basis and university students. The Service has a specific focus to support and advocate
for disadvantaged and marginalised population groups to foster an accessible, inclusive
and supportive Council and community. The Service provides specialist advice, programs
and activities to council departments, community organisations and community members
which are aligned to Council’s Vision and City Plan.
The Community Access & Equity Service is responsible for the development,
implementation, monitoring and evaluation of the Knox Multicultural Strategic Action Plan
and the Knox Access & Inclusion Plan for People with Disabilities, which is a legislative
requirement under the State Disability Act (2006).
Service planning provides an opportunity to review the current service model and ensure
that the service activities continue meet the needs of all stakeholders and are delivered in
an effective and efficient way.
The scope document outlines the current service model and provides a preliminary service
assessment of the existing service.
SCOPE
APPENDIX D
APPENDIX D SERVICE SCOPE 2015-16: COMMUNITY ACCESS & EQUITY (DS3476532) Page 2 of 8
CURRENT SERVICE MODEL
Community Access & Equity Service Snapshot
Service budget 2014/2015: Income
Expenditure
Net
($242,600)
$555,503
$312,903
Service EFTs: 4.5*
*NB. The 2014/15 service budget reflects an additional 1 EFT and income for a 3.5 year project which
finished in April 2015. Permanent EFT is 3.5.
Council’s Community Access & Equity Service is funded by Council (2.5 EFT) and
receives annual State Government grant funding for the MetroAccess role (1 EFT).
The current staff roles are:
Coordinator Community Access & Equity (1 EFT)
MetroAccess (1 EFT)
Community Development Officer - Access & Inclusion (1 EFT)
Multicultural Communities Officer (0.5 EFT)
The Community Access & Equity Service is underpinned by community development
principles which aim to build the capacity of the individual, groups and organisations that
they work with.
The Community Access & Equity Service utilises a range of roles to achieve the strategic
intent of the service including:
Partner – developing and maintaining formal and informal relationships and alliances
to achieve a common goal;
Provider – offering a range of services, programs and advice to individuals and
groups;
Planner – planning for services and activities which respond to current and future
needs and requirements; and
Advocate/influencer – raising awareness of State and Federal governments and
other stakeholders of the issues and needs of Knox residents and organisations, as
well as initiating or supporting campaigns for positive change.
The Service endeavours to ensure that all projects and programs delivered are evidence
based and measures are in place to evaluate program outcomes.
The outcomes identified in the current Service Profile for Council’s Community Access &
Equity Service are:
Improved ease of access for all to Council’s services and facilities;
Improved support for people with a disability to integrate into community
organisations, facilities, services and policies;
Improved capacity for people with a disability to advocate on behalf of their needs;
APPENDIX D SERVICE SCOPE 2015-16: COMMUNITY ACCESS & EQUITY (DS3476532) Page 3 of 8
Emergency Relief providers have improved ability to meet the needs of marginalised
and disadvantaged community members;
Increased skills & confidence and participation in community life for marginalised and
disadvantaged community members;
Increased community and social cohesion between all cultural groups;
Improvement in community organisations working together to support our local
Indigenous community;
Community and organisational facilities, services and policies to support the
Prevention of Violence Against Women; and
Increased understanding, engagement and participation within the Knox community
of newly emerging disadvantaged and marginalised communities.
Current activities The Community Access & Equity Service uses a range of activities to deliver the current
service. These include:
Skill development, training, mentoring advice and support – The Service delivers
programs, activities and specialist advice to build the capacity of council staff,
community organisations and communities;
Publications and resources – the service develops a number of publications and
resources which provide guidance, advice and information around on a number of
issues within the Community Access & Equity Service’s scope of focus;
Policy, processes and tools development – the Service is responsible for the
development of council policy and tools in relation to access and equity issues;
Partnership development – the Service is responsible for developing and
maintaining a wide range of local partnerships, as well as representing council on a
number of regional and state wide partnerships;
Community Action – the Service develops and delivers a wide range of programs,
activities and events that promote access and equity within the community;
Strategic Planning – the Service is responsible for the development,
implementation, monitoring and evaluation of strategic plans. The Service regularly
consults with council, community organisations and community members utilising a
variety of community engagement techniques. The Service provides advice to council
departments on a range of strategic planning issues; and
Advocacy – the Service supports Council to advocate to local, state and federal
government on issues that affect marginalised and disadvantaged communities.
A diagram of the current service model outlining activities and service outputs is presented
in Appendix 1.
APPENDIX D SERVICE SCOPE 2015-16: COMMUNITY ACCESS & EQUITY (DS3476532) Page 4 of 8
SERVICE ASSESSMENT
Role of Council The Community Access & Equity Service provides a range of activities including specialist
advice and program delivery to Council departments, community organisations and
community members to ensure that services and facilities within the municipality are
accessible and equitable to residents within the City of Knox.
The demographics within the City of Knox continue to change with there being a notable
increase in the number of people living in Knox who are from multicultural backgrounds.
The City of Knox also has the second largest and fastest growing Indigenous community
within the Eastern Region as well as a significant number of people with a disability, which
is likely to increase as the population ages.
The preliminary service assessment has identified there are potentially other organisations
which could provide components of the services currently delivered by the Community
Access & Equity Service. The assessment has also identified there is a significant value in
having in-house specialist knowledge and advice on hand. Preliminary analysis indicates
that outsourcing would be unlikely to provide a cost benefit to Council and has the
potential to reduce the responsiveness of internal services considering access and equity
in the planning and delivery of services.
The preliminary service assessment strongly identified the importance of the key role
Council has in leading and partnering with other organisations within the community to
ensure access and equity remains front of mind.
Strategic Intent The strategic intent of the Community Access & Equity Service is to provide activities
programs that support and advocate for disadvantaged and marginalised communities to
foster an accessible, inclusive and supportive Council and community. Through the
assessment of the current service model it was evident that the specific position
descriptions for staff within the Service has restricted the flexibility of the service to extend
beyond the current focus areas and be responsive to changing community needs. This has
impacted the Service’s ability to deliver on some service outcomes. Therefore a key
question for this review will focus on the Service’s strategic intent.
Below provides a snapshot of the strategic intent service assessment:
1. Legislative, Funding and Regulatory Environment
The Community Access & Equity Service is partially directed by the legislative or
regulatory environment and provides advice, guidance and support to internal
departments in relation to the Disability Discrimination Act and areas of the Building
Code pertaining to access. The Service is also responsible for overseeing the
development, implementation, monitoring and evaluation of Council’s Disability Action
Plan (Knox Access & Inclusion Plan for People with Disabilities), which is a
requirement for all Victorian Local Governments under the State Disability Act.
APPENDIX D SERVICE SCOPE 2015-16: COMMUNITY ACCESS & EQUITY (DS3476532) Page 5 of 8
The MetroAccess role which is funded through State Government has a number of
annual reporting requirements which must be adhered to, in line with the funding
agreement.
There have been a number of changes within the current policy environment both at a
State and Federal level that have the potential to impact the Community Access &
Equity Service. Two of note are:
The introduction of the National Disability Insurance Scheme (NDIS) specifically.
The framework for ‘tier two’ of the NDIS, titled ‘Information, Linkages and Capacity
Building’. The framework is very closely aligned to the current objectives of the
State Government ‘Community Capacity Building Program’ which funds
MetroAccess and early indications are that this function may form one element of
the future NDIS program. However, the detail of Information, Linkages and
Capacity Building is still under development.
The second is the increased interest and investment by both a State and Federal
government in the prevention of violence against women and their children. The
Community Access & Equity Service was the lead Council for the State
Government funded Outer East cluster project ‘Preventing Violence Against
Women in Our Communities’. Funding for this 3.5 year project concluded at the
end of April 2015. The Victorian State Government is currently conducting a Royal
Commission into Family Violence, with recommendations expected to be
presented in 18 months. Prevention of Violence Against Women is a key priority
for Council in the Council Plan, Community Health and Wellbeing Strategy, and
Community Safety Plan.
The service analysis provides the opportunity to explore Council’s participation in
State Government led programs including the expected responsibilities and
resource investment required of Council and the alignment of these programs with
Council’s strategic plans and priorities.
2. Needs
The demographic makeup of the City of Knox is changing. These changes mean that
there is a need for Council services to ensure they are responsive to shifts in how
services are being delivered. For example, the need for communication to be provided
in multicultural languages.
The past 12 months has seen an increase in the number of multicultural community
groups moving into the City of Knox and seeking facility meeting spaces. There has
been an increase of requests from internal services regarding support and advice in
relation to multicultural community members accessing services. Recently, there have
also been an increased number of reports of racism and discrimination within the Knox
community from the Knox Multicultural Advisory Committee and other community
members.
APPENDIX D SERVICE SCOPE 2015-16: COMMUNITY ACCESS & EQUITY (DS3476532) Page 6 of 8
3. Demands
The Multicultural Communities officer position was established in 2008 and is currently
0.5 EFT. As demand has increased within the multicultural area, it has been identified
that there is insufficient time to explore potential partnerships with other service
providers and to support the growing number of local multicultural community groups.
In response to this issue, Council has included provision for an additional 0.5 EFT for
this function in the Draft 2015-16 budget.
4. Cost versus Benefit
The Community Access & Equity Service largely relies on partnerships across Council
and within community to ensure that outcomes are delivered. Working in this way
ensures that maximum benefit is delivered within the existing budget.
However, the review does provide an opportunity to review existing program activities
to assess their benefit to Council and community organisations, based on the cost and
resources to deliver on the activity.
5. Alternative providers
The preliminary service assessment identified limited alternative providers of the
Community Access & Equity service.
The State Government informed Council that the MetroAccess program funding would
continue for the next three years, however in light of the close alignment between the
NDIS Information, Linkages and Capacity Building framework and Community Capacity
Building Program the marketplace might open up and new service providers may start
to engage with a focus on disability access.
6. Effectiveness – Best chance of success
Overall the Community Access & Equity Service is effective both in delivering on its
objectives and supporting departments across Council and community to embed
access and equity principles within their work practice. The effectiveness of the Service
is impacted by the effectiveness of internal business systems and processes e.g.
document management. It is proposed that the service analysis will further explore this
issue and identify opportunities for the improved effectiveness and efficiency of
relevant internal systems and processes.
7. Expertise
There is considered to be a cost benefit to Council having in-house expertise. The
Community Access & Equity Service has the skills, knowledge and experience to
provide specialist expertise to internal departments, community based organisations
and individuals that would otherwise be required to be purchased. The risk of not
having in-house expertise is that there is the possibility, particularly across Council that
advice will not be sought due to it being too costly and/or available in a timely, flexible
way. Providing the expertise assists departments across the organisation to meet
various service requirements thereby assisting them to meet best practice principles.
APPENDIX D SERVICE SCOPE 2015-16: COMMUNITY ACCESS & EQUITY (DS3476532) Page 7 of 8
8. Current success
Overall the Community Access & Equity Service is tracking well based on community
feedback and the monitoring and evaluation of the action plans it supports. Some
activities have been identified that need to be reviewed based on increasing demand in
particular areas and limited flexibility of existing resources. This will be an issue to be
explored within the service review to assist in identifying future service levels.
Service Model The service assessment identified some key areas that need to be explored further in the
analysis stage of this service planning review to ensure that the Community Access &
Equity Service is operating in such a way to ensure efficient, effective and relevant service
delivery into the future.
The key areas for further exploration are:
The balance of service activities being provided to internal departments, external
organisations and community members. Preliminary assessment has identified a
majority of the service’s time is currently directed towards Council services. While the
provision of internal advice and support does lead to positive community outcomes,
there may be a more efficient or effective way to achieve this.
The preliminary service assessment highlighted there is currently a heavy focus on
activities that support people with a disability. The current split between the
MetroAccess officer and Access & Inclusion officer roles comprises:
The MetroAccess role has a community focus, working with community
organisations and community members.
The Access & Inclusion role has a council focus, and is responsible for the
delivery of corporate Access & Inclusion training to all staff, facilitation of the
Knox Disability Advisory Committee and development and implementation of
the Access & Inclusion Plan.
In a number of other Victorian councils the MetroAccess officer is responsible for
both Council and community issues relating to disability. There is an opportunity to
explore further the focus of these roles through the service analysis.
The Indigenous portfolio also sits within the Access & Inclusion officer role. One of
the current deliverables is the annual Sorry Day Flag raising event. Over the past
four years the service has had to buy in support to deliver the event. The resources
required to deliver one-off events restricts the capacity to support community needs
identified from the local Indigenous community. Current investigations are underway
to explore the transition of this event from a Community Access & Equity service
event to a civic event. It is proposed this transition would include changed
responsibility for managing this service activity including a review of the research
required to support the event. This will be further explored as part of the Service
Analysis.
APPENDIX D SERVICE SCOPE 2015-16: COMMUNITY ACCESS & EQUITY (DS3476532) Page 8 of 8
Service Levels There are no legislative service level standards associated with the Community Access &
Equity Service. As mentioned the assessment did identify a need to review the relative
allocation of resources to internal departments, external organisations and community
members.
The preliminary service assessment did identify that there has been an increase in
requests for support and advice from multicultural groups within Knox. Currently due to the
allocated EFT it can be difficult to appropriately meet this demand. This will be addressed
if the final 2015-16 budget includes the proposed 0.5 increase to the Multicultural
Communities Officer position.
There has also been an increase in the number of non-Indigenous community members
and community organisations contacting Council for advice and information regarding local
Indigenous culture.
The assessment of service levels and service activities will be a focus of the service
review, this will include assessment of current roles and the relative allocation of resources
to support current and future community needs.
APPENDICES
1. Service Profile: Community Access & Equity (2013)
2. Community Access & Equity Current Service Activities & Outputs 2014/15
APPENDIX D-1 SERVICE PROFILE: COMMUNITY ACCESS & EQUITY (2013) Page 1 of 4
Service 17: Community Access & Equity
Director: Kerry Stubbings, Director Community Services
Manager: Kathy Parton, Manager Community Wellbeing
Brief Description of Service
This service provides programs that support and advocate for disadvantaged and marginalised
communities to foster an accessible, inclusive and supportive Council and community. The
service provides both program based service delivery and development roles that are aligned to
Council’s Vision.
Council Plan Outcome: Healthy connected communities
Service Outcomes:
Improved ease of access for all to Council’s services and facilities.
Improved support for people with a disability integrated into community organisations,
facilities, services and policies.
Improved capacity for people with a disability to advocate on their needs.
Emergency Relief providers have improved ability to meet the needs of marginalised and
disadvantaged community members.
Skills & confidence to participate in community life increases for marginalised and
disadvantaged community members.
Improved levels of community tolerance of other cultures.
Improvement in community organisations working together to support our local
indigenous community.
Community and organisational facilities, services and policies support the Prevention of
Violence Against Women.
Increased understanding, engagement and participation within the Knox community of
newly emerging disadvantaged and marginalised communities.
Activities
17.1 Disability: A number of programs make up disability community development, including:
advocacy training; skill development and the development of policy; tools processes, and
partnerships. All of these aim to increase the capacity of Council and community groups and
organisations in Knox to support people with a disability. Includes the State Government funded
program, “MetroAccess”.
Outcomes: People with a disability experience increased knowledge, and skills in advocacy;
agencies/services for the community encourage participation in events, projects and
services; the community has a greater understanding and support for people with a
disability; agencies have a greater understanding of how to deliver services which support
people with a disability; increased opportunities for collaboration between Council and other
services; and between services agencies.
APPENDIX D-1
APPENDIX D-1 SERVICE PROFILE: COMMUNITY ACCESS & EQUITY (2013) Page 2 of 4
17.2 Multicultural: The Multicultural activity enables strengthening of community engagement
with multicultural people through effective communication and information, creating
opportunities that build and support social cohesion and implementing initiatives that assist
skilled migrants. The activity also includes enhancing service planning, development, increased
service responsiveness to the needs of migrants and refugees and advocates on issues that
impact migrants and refugees.
Outcomes: Increased collaboration between multicultural groups; broader community is
engaged with multicultural community and events; increased understanding of values,
issues and aspirations for local multicultural community members.
17.3 Indigenous: The indigenous activity aims to advance engagement with the indigenous
community and indigenous organisations to strengthen the inclusion and opportunities for
indigenous people in Knox and to promote respect for Indigenous heritage.
Outcomes: Increased understanding of values, issues and aspirations of local indigenous
community; broader community becomes engaged with indigenous community and events;
increased collaboration between agencies supporting indigenous populations; increased
knowledge and skills of agencies supporting indigenous populations.
17.4 Emergency Relief and Community Food Access: Provides community meals funding to
Not for Profit community groups ($20,000 per annum) to supply free meals to disadvantaged
members of the Knox community; supports development of community gardens; coordinates
the facilitation of training to Emergency Relief providers to assist them to meet the needs of
complex clients; and works with 20 Emergency Relief providers to identify service gaps and seek
external funding.
Outcomes: NFP community groups provide free meals to community members;
marginalised and disadvantaged community members have access to nutritional meals;
residents use community gardens and have access to cheap nutritious food; Emergency
Relief providers have increased capacity to help complex clients access their services;
Emergency Relief providers seek external funding to enhance service delivery; Emergency
Relief providers provide more effective service delivery.
17.5 Preventing Violence Against Women: This State Government funded initiative focuses on
the Outer East of Melbourne and is led by Knox City Council through policy, skill development,
and partnership approaches. It aims to reduce the level of violence against women in our city.
Over 3,000 people have signed the Knox Accord related to Prevention of Violence Against
Women.
Outcomes: Community organisations and Council are delivering strategies to reduce
violence against women; Council and other local organisations are working in collaboration
to prevent violence against women.
17.6 Access & Equity: This activity aims to ensure all people have fair and equal access to
services and opportunities within the community. Provision of advice, support, mentoring and
skill development to Council staff; development of policies, processes and tools to advance
achievement of community access and equity; development and management of cross
organisational partnerships; awareness raising campaigns, to support Council to align its efforts
with the goals of access and equity.
APPENDIX D-1 SERVICE PROFILE: COMMUNITY ACCESS & EQUITY (2013) Page 3 of 4
Outcomes: Council is implementing effective access and equity policies and practices
through its services and operations; members of the community experience and support
accessible and equitable access to services and opportunities in the municipality.
Corporate Responsibilities: Includes the range of tasks that are required to run a service,
including: planning, staff management, training, OHS, budgeting, advocacy (internal and
external), and collaboration (internal and external).
Key current or future issues:
There are changes occurring to the population and key user groups:
According to Census data Knox has an increase in those identifying themselves as indigenous
(second highest in Eastern Region). It has been difficult to engage with this part of the
population and new engagement strategies are required.
An increase in ageing population has resulted in an increase in people with disabilities. Knox
also has seen an increase in children with autism.
There have been increases in different multicultural individuals and groups residing and
establishing in Knox. Social issues including lack of community tolerance, violence against
women, poverty and limited food access continue to be present; some indigenous or
multicultural groups have been commuting to other municipalities for services as Knox has
inadequate resources to support them.
Changing legislative, policy regulations and are likely to have a significant impact on
delivery :
The changing legislation impacts policy issues across the board. Changed Federal and State
government policy will have an increasingly greater impact on Council services (e.g. National
Disability Insurance Scheme). There are greater expectations that public bodies will act in
inclusive, non-discriminatory ways. As programs and services do not meet community
expectations local governments can be pressured to take on new roles. This places pressure
on Council and the community. This requires an investment in advocacy to other levels of
government.
There is increasing recognition of Local Government as a service provider in areas not seen
before, e.g. preventing violence against women; health promotion. A change in
understanding and new skill development is required. New partnerships need to be created.
This may mean changing relationships and different ways of working or different
approaches. An increase in cross Council partnerships has occurred to enable a focus on sub-
regions and regions.
This is expected to ensure a consistent approach to service delivery across the region
however navigating organisational differences could impact service delivery.
Facilities:
Further investment is required to have fit for purpose, accessible facilities. Council currently
has a number of facilities that do not provide full disability access to our community.
Council’s Capital Works Program includes addressing disability access, but the scope of
investment is constrained by competing priorities.
APPENDIX D-1 SERVICE PROFILE: COMMUNITY ACCESS & EQUITY (2013) Page 4 of 4
Financial Profile
Activity Expenditure Income Net
Disability Community Development
includes (MetroAccess)
*State Government funded $119,440.71 -$130,618 -$11,177.29
Multicultural $24,736.90 $24,736.90
Indigenous $52,715.78 $52,715.78
Emergency Relief and Community Food
Access $35,387.17 $35,387.17
Temporary
Preventing Violence Against Women
( 2011-2014)
*State Government funded $172,682.55 -$222,781 -$50,098.45
Access and Equity $184,486.88 $184,486.88
TOTALS: $589,450 -$353,399 $236,051
Total Net Cost: $236,0501
Staff Profile
Primary Job Family EFT
Perm
EFT
Temp
End date
(if temp)
Hours per
week Role
Coordinator 1 38
MetroAccess * 1 38
Community development/diversity 0.5 19
Community development/access
and inclusion 1 38
Project Coordinator
* (Temp 3 years) 1 38
Total available EFT and Hours 4.5 171
*State Government funding (both recurrent and temporary) supports EFT to deliver these two
programs – MetroAccess and Prevention of Violence Against Women.
1 Note that the total cost doesn’t align exactly with the Departmental Budget of the service. This is because
overhead costs have been removed and measured in their own Service Profiles and costs of buildings, parks and capital works renewals may have been added. For full information about costings and assumptions used, see the Service Scope Introduction section (page 2). This is the 2012-13 budget.
AP
PEN
DIX
D-2
C
OM
MU
NIT
Y A
CC
ESS
& E
QU
ITY
CU
RR
ENT
SER
VIC
E A
CTI
VIT
IES
& O
UTP
UTS
20
14
/15
(D
S35
19
67
7)
Pag
e 1
of
3
Com
mun
ity A
cces
s &
Equ
ity C
urre
nt S
ervi
ce A
ctiv
ities
& O
utpu
ts 2
014/
15
The
Com
munit
y A
cces
s &
Eq
uit
y s
ervic
e w
ork
s in
par
tner
ship
wit
h d
epar
tmen
ts a
cross
counci
l, c
om
mu
nit
y o
rgan
isat
ion
s an
d c
om
mu
nit
y m
em
ber
s to
del
iver
a ra
nge
of
serv
ice
acti
vit
ies.
Wh
o w
e
wo
rk w
ith
C
ou
nci
l D
ep
art
me
nts
C
om
mu
nit
y O
rga
nis
ati
on
s C
om
mu
nit
y M
em
be
rs
Ser
vice
Act
ivit
ies
Sk
ill
de
ve
lop
me
nt,
tra
inin
g,
me
nto
rin
g,
ad
vic
e &
sup
po
rt
Pu
bli
cati
on
s &
Re
sou
rce
s
Po
licy
,
pro
cess
es
&
too
ls
de
ve
lop
me
nt
Pa
rtn
ers
hip
De
ve
lop
me
nt
&
Pa
rtic
ipa
tio
n
Co
mm
un
ity
Act
ion
Str
ate
gic
Pla
nn
ing
,
Mo
nit
ori
ng
&
Ev
alu
ati
on
Ad
vo
cacy
Key
Ser
vice
Ou
tpu
ts
Co
rpo
rate
Acc
ess
& I
ncl
usi
on
Tra
inin
g
Gu
ide
to S
ervic
es
for
Peo
ple
wit
h a
Dis
abil
ity
Annual
retr
ofi
ttin
g
allo
cati
on
(Cap
ital
Work
s)
Knox
Mult
icult
ura
l
Advis
ory
Com
mit
tee
(lea
d)
Co
mm
un
ity
Mea
ls F
und
ing
Pro
gra
m
Kn
ox
Mu
ltic
ult
ura
l
Str
ateg
ic A
ctio
n
Pla
n 2
01
2-2
01
7
Ch
angin
g P
lace
s
Lea
din
g C
han
ge
Tra
inin
g f
or
peo
ple
wit
h a
dis
abil
ity a
nd
thei
r ca
rers
Mis
sed B
usi
nes
s:
Ho
w t
o a
ttra
ct
mo
re c
ust
om
ers
by p
rovid
ing
bet
ter
acce
ss t
o
yo
ur
busi
nes
s
Knox
Ack
now
ledgem
en
t of
Tra
dit
ional
Ow
ner
s P
oli
cy
Knox D
isab
ilit
y
Advis
ory
Com
mit
tee
(lea
d)
An
nu
al S
orr
y
Day
Fla
g R
aisi
ng
Cer
emo
ny
Kn
ox
Acc
ess
&
Incl
usi
on
Pla
n f
or
Peo
ple
wit
h a
Dis
abil
ity 2
01
1-
20
15
Acc
essi
ble
Ho
usi
ng
Key
po
pu
lati
on
gro
up
s &
focu
s
are
as
Mu
ltic
ult
ura
l
Co
mm
un
itie
s
Pe
op
le w
ith
a
Dis
ab
ilit
y a
nd
th
eir
Ca
rers
Ind
ige
no
us
Co
mm
un
ity
P
rev
en
tio
n o
f V
iole
nce
Ag
ain
st W
om
en
S
oci
al
Eq
uit
y
APPE
ND
IX D
-2
AP
PEN
DIX
D-2
C
OM
MU
NIT
Y A
CC
ESS
& E
QU
ITY
CU
RR
ENT
SER
VIC
E A
CTI
VIT
IES
& O
UTP
UTS
20
14
/15
(D
S35
19
67
7)
Pag
e 2
of
3
Ser
vice
Act
ivit
ies
Sk
ill
de
ve
lop
me
nt,
tra
inin
g,
me
nto
rin
g,
ad
vic
e &
sup
po
rt
Pu
bli
cati
on
s &
Re
sou
rce
s
Po
licy
,
pro
cess
es
&
too
ls
de
ve
lop
me
nt
Pa
rtn
ers
hip
De
ve
lop
me
nt
&
Pa
rtic
ipa
tio
n
Co
mm
un
ity
Act
ion
Str
ate
gic
Pla
nn
ing
,
Mo
nit
ori
ng
&
Ev
alu
ati
on
Ad
vo
cacy
Ad
vic
e to
in
tern
al
dep
artm
ent
on
a
ran
ge
of
acce
ss
and
eq
uit
y i
ssu
es
Peo
ple
Fir
st:
Su
pp
ort
ing t
he
Incl
usi
on o
f
Peo
ple
wit
h
Dis
abil
itie
s
Acc
ess
to t
he
Buil
t
Envir
onm
ent
Poli
cy
Knox D
isab
ilit
y
Issu
es N
etw
ork
(lea
d)
Inte
rnat
ion
al D
ay
for
Peo
ple
wit
h a
Dis
abil
ity
(in
corp
ora
ted
into
Kn
ox
Car
ols
by
Can
dle
ligh
t)
Pre
ven
tin
g
Vio
lence
Agai
nst
Wo
men
Act
ion
Pla
n 2
01
5
Acc
essi
ble
Pu
bli
c
Tra
nsp
ort
Tar
get
ed A
cces
s
and
In
clu
sion
Tra
inin
g f
or
dep
artm
ents
an
d
team
s
Kn
ox
Mu
ltic
ult
ura
l
Co
mm
unit
y
Dir
ecto
ry
Acc
ess
Guid
elin
es f
or
Com
munit
y
Buil
din
gs,
Open
Spac
e an
d P
rivat
e
–R
esid
enti
al
MA
V P
reven
ting
Vio
lence
Agai
nst
Wom
en N
etw
ork
(par
tici
pan
t)
An
nu
al H
arm
on
y
Day
Tav
ern
Co
mm
un
ity
En
gag
em
ent
Acc
essi
ble
Bu
sin
esse
s
Kn
ox f
or
Ever
yone
–
Fac
ebook p
age
Eas
tern
Reg
ion
Met
roA
cces
s
Net
work
(par
tici
pan
t)
Th
e L
ock
er
Ro
om
Pro
ject
Ser
vic
e m
app
ing
Incr
easi
ng t
he
cap
acit
y o
f
com
mu
nit
y
org
anis
atio
ns
to
be
incl
usi
ve
Mu
ltic
ult
ura
l
eNew
slet
ter
Eas
tern
Reg
ion
Set
tlem
ent
Com
mit
tee
(par
tici
pan
t)
16 D
ays
of
Act
ivis
m
Cam
pai
gn
Incr
easi
ng t
he
cap
acit
y o
f
Co
un
cil
poli
cies
,
pro
gra
ms,
faci
liti
es a
nd
even
ts t
o b
e
acce
ssib
le a
nd
incl
usi
ve
AP
PEN
DIX
D-2
C
OM
MU
NIT
Y A
CC
ESS
& E
QU
ITY
CU
RR
ENT
SER
VIC
E A
CTI
VIT
IES
& O
UTP
UTS
20
14
/15
(D
S35
19
67
7)
Pag
e 3
of
3
Ser
vice
Act
ivit
ies
Sk
ill
de
ve
lop
me
nt,
tra
inin
g,
me
nto
rin
g,
ad
vic
e &
sup
po
rt
Pu
bli
cati
on
s &
Re
sou
rce
s
Po
licy
,
pro
cess
es
&
too
ls
de
ve
lop
me
nt
Pa
rtn
ers
hip
De
ve
lop
me
nt
&
Pa
rtic
ipa
tio
n
Co
mm
un
ity
Act
ion
Str
ate
gic
Pla
nn
ing
,
Mo
nit
ori
ng
&
Ev
alu
ati
on
Ad
vo
cacy
Dis
abil
ity
eNew
slet
ter
S
tate
-wid
e L
oca
l
Gover
nm
ent
Gen
der
Equit
y
Net
work
(par
tici
pan
t)
Rac
ism
. It
sto
ps
wit
h m
e
Cam
pai
gn
In
dig
eno
us
Rec
ogn
itio
n a
nd
Rec
on
cili
atio
n
Men
’s a
nd
wo
men
’s F
amil
y
Vio
lence
Hel
p
Car
ds
O
ute
r E
ast
Indig
enous
Loca
l
Are
a N
etw
ork
(par
tici
pan
t)
NA
IDO
C W
eek
Hu
man
rig
hts
an
d
legal
rig
hts
of
peo
ple
wit
h
dis
abil
itie
s,
mu
ltic
ult
ura
l
com
mu
nit
ies
and
wo
men
Toget
her
for
Equal
ity a
nd
Res
pec
t
Lea
der
ship
Gro
up
(par
tici
pan
t)
Gen
der
Equ
ity
MA
V D
isab
ilit
y
Pla
nner
s N
etw
ork
(par
tici
pan
t)
Knox E
mer
gen
cy
Rel
ief
Net
work
(par
tici
pan
t)
Knox P
ledge
Par
tner
ship
(par
tici
pan
t)
APPENDIX E SERVICE SCOPE 2015-16: COMMUNITY STRENGTHENING (DS3520423) Page 1 of 8
Service: Community Strengthening
Director: Kerry Stubbings, Director Community Services Manager: Kathy Parton, Manager Community Wellbeing
SERVICE ASSESSMENT QUESTIONS
This Service Assessment will aim to answer the following key questions:
1. What should the role of Council be for the Community Strengthening Service?
2. What should be the strategic intent of the Community Strengthening Service?
3. What should be the service model for Community Strengthening?
4. What service activities and service levels should this service provide?
In accordance with the Council Plan, all Service Analyses will consider planning, where
relevant, for an ageing population; and providing a range of programs, services and
partnerships which aim to build connections between people and reduce social isolation.
INTRODUCTION
Council’s Community Strengthening Service comprises a small team consisting of five staff
(2.92 EFT) and consultancy support on an as needs basis. The service provides support
and resources to not-for profit (NFP) community groups operating within Knox and also
working within Council to facilitate internal and external community-focused relationships
to support community activity and civic participation.
The Service provides direct activities to the Knox community including the delivery of two
community grants programs and a community skills program targeted to local NFP
community groups. The Service also provides a planning and internal advocacy role for
cross organisational approaches to support community groups through other programs.
The Service provides facility management and service advocacy support to the community
organisations operating from the 21 Council facilities which are supported by Council’s
Community Wellbeing Department.
The Service also has a role in identifying changing needs in the community and exploring
avenues for Council to respond as appropriate. The preliminary service assessment
highlights the role of the Community Strengthening Service in addressing some of the key
challenges identified in the City Plan and supports Council’s role in providing the service
and the broad principles of the service intent. It has also identified some limitations in the
current service delivery model, particularly in view of changing community group
dynamics, community expectations and population change.
SCOPE
APPENDIX E
APPENDIX E SERVICE SCOPE 2015-16: COMMUNITY STRENGTHENING (DS3520423) Page 2 of 8
Community Strengthening is currently responsible for the coordination of implementation
of four Council Plan Strategies to achieve the following Council Plan Strategic objectives:
to more actively support community groups with governance, administration and
management practices;
ensure adequate community engagement occurs in all key Council projects; and
strengthen the effectiveness and efficiency of Council processes and systems for
managing Council’s volunteers.
Service planning provides a timely opportunity for Community Strengthening to review its
service intent and service model to ensure service activities continue to meet community
expectations and are delivered in the most efficient and effective way.
CURRENT SERVICE MODEL
Community Strengthening Service Snapshot
Service budget 2014/2015: Income
Expenditure
Net
$0
$1,331,280*
(*includes $938,140 community grants to be allocated)
$1,331,280
Service EFTs: 2.92
The Community Strengthening Service is fully funded by Council and is supported by the
following:
1 Coordinator Community Strengthening (1 EFT);
1 Community Development Officer (0.8 EFT) (currently job share);
1 Community Resourcing Officer (0.8 EFT); and
1 Community Development Program Support Officer (0.32).
The Community Strengthening Service is provided through the following activities with the
outputs below:
Community Advice, Support and Information for Not For Profit (NFP)community groups – information (e-bulletin, mail outs), advice (particularly in
relation to Council services and processes), referral and facilitation of skill & resource
sharing;
Community Skills Development – 8-10 training and information sessions offered
each year covering topics such as strategic planning, fundraising and grant writing,
governance;
Grants Programs – two distinct grants programs funding annual one-off community
projects/activities and fixed term funding targeted to support operational costs of
specific priority Knox-wide services;
APPENDIX E SERVICE SCOPE 2015-16: COMMUNITY STRENGTHENING (DS3520423) Page 3 of 8
Facility Management and Service Advocacy – advocacy and support for NFP
community group tenancies in relevant Council buildings, supported by Council’s
Community Wellbeing Department to ensure optimal use of facilities and facilitate
shared tenancy arrangements;
Community Facilitation and Engagement – work directly within neighbourhoods to
encourage and assist communities to plan and implement their own priorities,
creating networking opportunities for NFPs to develop relationships and share skills
place based initiatives; and
Supporting Council’s Community Engagement Facilitation – Support and
facilitation of Council’s Communities of Practice network, Community Engagement
Advocates network to ensure cross organisational sharing of information, capacity
building expertise and problem solving in relation to improving Council’s approach to
community engagement.
The delivery of community grants programs, the community skills program and facility
management and service advocacy are discrete activities. Each of these activities
provides an interface with a broad range of community groups and community members
on a regular basis. The interaction provided through these activities informs and enhances
Council community support, community facilitation and engagement activity, and also
facilitates the delivery of advice, support and information activity, both internally and
externally (see diagram below):
The roles undertaken by the service to deliver these activities and achieve the service
outputs include:
Provider (e.g. resources, grants, skills sessions to community groups)
Administrator (e.g. grants process including Council’s Advisory Committee support)
Planner (e.g. resource allocation, program coordination, strategic support for
community groups)
Facilitator (e.g. internal and external networks, meetings and relationships)
Information broker (e.g. internal and external)
Agent for change (e.g. in relation to community group operations, relationships and
partnerships)
Community Facilitation and Engagement
Community Advice, Support & Information
Facility
Management
& Service
Advocacy
Council Grants
Programs
Community
Skill
Development
Supporting Council’s
Community Engagement
Facilitation
Supporting Council’s
Community Engagement
Facilitation
APPENDIX E SERVICE SCOPE 2015-16: COMMUNITY STRENGTHENING (DS3520423) Page 4 of 8
Advocate (e.g. on behalf of services operating within Council facilities; on behalf of
other services that are addressing emerging community issues)
SERVICE ASSESSMENT
Role of Council Knox City Council has clearly articulated objectives in the City Plan 2013-2017 in relation
to supporting NFP community groups and community strengthening. It is well recognised
that community organisations play an important role in building and maintaining a
cohesive, healthy, vibrant and resilient society.
More than 800 community organisations operating in Knox are an invaluable foundation for
social interaction, community connectedness and local service delivery. These existing
community groups, in conjunction with the changing composition and dynamics of the
Knox population, indicate a clear role for Council in continuing to provide information,
support and resources to the evolving community.
The provision of community grants programs by local government is a common service
activity. It provides a means of support and resourcing for local community activities and
facilitates local community development.
The Community Strengthening Service provides a specialist community resourcing role for
Council in relation to the administration, monitoring and evaluation of a substantial annual
grants budget ($969,000). This role ensures responsibilities for transparency,
accountability and contemporary best practice in local government grant making.
Preliminary assessment has identified that there may be administrative components of the
grants program that could be centralised. This could improve effectiveness of this service
activity by enabling a greater focus on community development outcomes and community
group support.
Similarly, many local Councils in Victoria offer a varying range of skill sessions and training
for both community groups and individuals to support community participation and the
effective operation of local community organisations. While some of these skills/training
and/or information sessions could be provided by other organisations, recent interviews
with other potential training services in Knox have supported Council’s municipal role in
providing a suite of sessions that cover core principles required for good community group
governance.
The role of Council in providing general support for community groups, particularly as a
broker of information, facilitation of networking and partnership opportunities and
facilitating the optimal utilisation and sharing of community facilities is likely to become
more critical. This is already evident due to the increasing complexity of legislative and
financial environment for community groups, as well as rapidly changing technology and
changing community expectations.
APPENDIX E SERVICE SCOPE 2015-16: COMMUNITY STRENGTHENING (DS3520423) Page 5 of 8
Through the service analysis, the ongoing relevance of Council’s role in supporting
community groups will be examined.
Strategic Intent The current Service purpose is to create a stronger Knox community by supporting
existing Knox NFP community groups to be active, sustainable and resilient, and to
support the development of new groups as appropriate to meet changing community
needs.
The Community Strengthening service contributes to the following City Plan Themes:
Healthy, Connected Communities;
Culturally Rich and Active Communities; and
Democratic and Engaged Communities.
Community Strengthening activities are underpinned by asset based community
development principles – that is the understanding that there are existing skills, resources
and capacity in the community that can be developed to flourish and sustain local activity –
and recognition of the social value of civic participation in all its forms.
The anticipated service outcomes are:
A diverse range of viable community based organisations providing participation
opportunities for Knox residents to connect with their local community;
Increased capacity of NFP community groups to confidently self govern and fulfil their
own organisational objectives in a complex environment;
A community that is well informed about Council activities and is able to participate in
Council’s decision making processes; and
Increased opportunities for partnership between community organisations and also
with Council to achieve common objectives.
The principles of community development imply a substantive focus on proactive
engagement with communities to identify and encourage opportunities for partnerships,
collaboration and the sharing of skills, ideas and resources. The service analysis provides
the opportunity to explore and review the most contemporary approach to community
development in an era of social and demographic change, as being experience in Knox.
Service Model The Community Strengthening service is primarily an ‘in-house’ service model including
consultancy support on an as needs basis. The service focuses on support for Not for
Profit community groups operating in Knox and Council services to advance community
relationships that support community activity and ensure participation.
The support and resourcing activities that the Community Strengthening service provides
are primarily focused on the delivery of two major community grants programs (Community
Development Fund and Community Operational Funding); the Community Skills program
for all Knox community groups; and facility management and service advocacy associated
with twenty Council facilities supported by Council’s Community Wellbeing Department.
APPENDIX E SERVICE SCOPE 2015-16: COMMUNITY STRENGTHENING (DS3520423) Page 6 of 8
These programs operate in parallel with the other organisational targeted community skills
and grants programs eg Ward contingency and minor capital recreation grants and arts
grants. Liaison and engagement occurs across the managing Department to minimise
duplication and optimising efficiencies.
These activities have become increasingly administratively complex to meet increased
external and internal standards of accountability for Council resources and expectations of
information management and data control. The service’s ability to meet these
organisational and community requirements and expectations and be effective is impacted
by the effectiveness of Council’s internal business systems and processes e.g. document
management. It is proposed that the service analysis will explore further this issue and
indentify opportunities for improved integrated support systems particularly for the grants
programs and facility management activities.
Community Strengthening also provides general and specialised advice, support and communication to the NFP sector in Knox, and offers community facilitation, mentoring and network building to promote community partnerships and build local community capacity and group sustainability. This activity is also provided for Council’s internal organisation to ensure other Council services keep up to date with trends and initiatives (e.g. volunteering, social enterprises) that may be of relevance to the Knox community.
Community Strengthening convenes cross-organisational networks in relation to
community engagement (Community Engagement Advocates) and community group
liaison (Communities of Practice). With increasing complexity of internal and external
challenges, the importance of networking to facilitate dialogue and awareness is expected
to increase.
Community Strengthening is currently responsible for the implementation of five Council
Plan Strategies.
Engage with local community groups to identify how Council can best support their
effectiveness including an undertaking a review to identify any opportunity to
streamline or simplify Council systems to support their efficiency.
Implement the new funding agreement and approach to delivering Council’s Volunteer
Resource Centre service model.
Review existing skills programs for community groups, as well as opportunities for skill
sharing and mentoring between groups within Knox.
Review Council’s Community Engagement Policy, project planning and approval
methodology to ensure community engagement opportunities are incorporate into key
community projects.
Develop a policy and procedures for the management of volunteers working within
Council services and programs.
These Council Plan Actions focus on volunteer resource services, skill development and
training, including skill sharing and mentoring opportunities, engagement with community
groups to understand potential solutions to support their effectiveness and the review and
simplification of Council systems that impact community groups.
APPENDIX E SERVICE SCOPE 2015-16: COMMUNITY STRENGTHENING (DS3520423) Page 7 of 8
The preliminary service assessment has advised the need for further exploration of the
impacts of the current service model in enabling the delivery of community outcomes and
opportunities for further integration of the service activities with other Council and/or
community delivered service activities and programs.
Service Levels There are no legislative service level standards associated with the Community
Strengthening Service.
The Community Strengthening Service is currently ensuring purposeful annual
engagement and various levels of support to a conservative estimate of 150 community
groups, in addition to contact with up to 800 groups through more widely circulated mail
outs and e-bulletins.
The Service currently responds to requests for assistance and advice, generally in the
context of delivering the three community resourcing activities (Community Grants
programs, Community Skills Program and Service and Facility Advocacy).
It is envisaged that there will be increasing demand from community groups and
individuals for assistance to navigate complex administrative systems (Council’s and those
of other organisations), to problem solve resource and service challenges, and to
negotiate or implement change and address governance issues.
Given the significant role that volunteers play in the composition of community groups and
community activities, it is anticipated that evidence of the changing nature of volunteers
and their expectations will also increase demand for assistance from the Community
Strengthening service into the future.
In relation to identifying changing needs, it is relevant to understand that Community
Strengthening activities have provided generic support to a diverse range of NFP
community groups in Knox, as distinct from specific cohort support (i.e. youth/ sport/
cultural/seniors). One of the identified strengths of Knox is the volume and connection
between local community based organisations, many of which have been established and
operating for many decades. With the ageing of longstanding members and their
committees, there will be increasing pressure on the sustainability of many groups and a
need for changing models of operation to accommodate changing demographics, lack of
traditional volunteer resources and the increasing burden of regulation.
The several new ‘greenfield’ communities planned to be created in Knox over the next
decade indicate the need for greater focus on community development activities that
assists in building new communities rather than solely supporting existing ones.
Increasing population densities in specific areas of Knox will present new opportunities
and changing dynamics that is likely to require exploration and development of new
models of community infrastructure, in ongoing collaboration with other relevant Council
services.
APPENDIX E SERVICE SCOPE 2015-16: COMMUNITY STRENGTHENING (DS3520423) Page 8 of 8
The review will enable an opportunity to review the existing resources, activities and
service levels necessary to support Council and this community focused service in a
changing environment.
REFERENCES
1. Knox City Council (2014) Community Operational Funding Policy
2. Knox City Council (2013) Community Development Fund Policy
APPENDICES
1. Service Profile: Community Strengthening (2013)
APPENDIX E-1 SERVICE PROFILE: COMMUNITY STRENGTHENING (2013) Page 1 of 3
Service Name: Community Strengthening
Director: Kerry Stubbings, Director Community Services
Manager: Kathy Parton, Manager Community Wellbeing
Brief Description of Service
This service aims to create stronger community through: building organisational and community capacity, developing and nurturing partnerships, and creating connections. This is achieved through the delivery of a range of programs which focus on supporting and resourcing Not for Profit (NFPs) community groups. The team has an internal and external focus.
The Service and Facility Planner located in the Social Policy and Planning Team plans for the future needs of Community Wellbeing Facilities for NFPs which supports the Facility Management role within the Community Strengthening Team.
Council Plan Outcome: Healthy connected communities
Service Outcomes:
Healthy, sustainable NFPs.
Increased capacity for NFPs to deliver their own organisational objectives.
Community better informed and make better contributions to council’s decision makingprocesses.
Increase in community decision-making.
Activities
General Support for NFPs: Networking opportunities for NFPs, advice and support, communications.
Outcomes: Encourages NFPs to develop relationships and learn skills from each other, become more integrated in their service delivery, and have less duplication of services.
Community Skill Development for NFPs: Training for Not-For-Profits in a range of organisational skills such as strategic planning and seeking funding.
Outcomes: Increased skills and knowledge and capacity for survival for at risk NFPs. NFPs are kept up to date with Government Policy changes, increased knowledge in planning and effective ways to apply for funding.
Grants Scheme: Two grants schemes provide funding to support NFPs to deliver services and projects delivering on Council’s or their own objectives.
Outcomes: Ensures a targeted response to community needs and ensures essential services are delivered in Knox.
Facility Management: Interfaces between Council and NFPs using Council’s Community Wellbeing buildings to ensure greatest capacity usage.
Outcomes: Provision of appropriate facilities for NFPs ensures that NFPs are supported and financially viable.
Community Facilitation: Work directly with neighbourhoods to empower them to plan for their own community priorities.
APPENDIX E-1
APPENDIX E-1 SERVICE PROFILE: COMMUNITY STRENGTHENING (2013) Page 2 of 3
Outcomes: An increase in neighbourhood committees or informal community groups to plan, seek partnerships and/or funding to deliver community projects to support their community.
Community Engagement: Community Engagement Advocates group (internal) and a Community Engagement Policy.
Outcomes: Increased organisational awareness of upcoming projects, increased consistency in approach to engagement, partnerships and decreased duplication of engagement activities, leading to an informed community which helps inform Council’s decision-making.
Corporate Responsibilities: Includes the range of tasks that are required to run a service, including: planning, staff management, training, OHS, budgeting, advocacy (internal and external), and collaboration (internal and external). .
Key current or future issues: Needs and expectations of user groups are changing. – Has changed somewhat:
Statutory obligations of N.F.P’s are increasing. These complex needs are placing a strain on theirprograms/services. E.g. Neighbourhood Houses are responding to complex social needs such asproblem gambling and have had to change their focus to accredited learning ('learning local') due toTAFE cuts. This places a higher expectation on Council to assist NFPs navigate and respond to morecomplexity.
Facilities - Fit for purpose, accessible for intended user groups- Facilities are regularlyavailable- Facilities require reasonable investment to be fit for purpose – Some investmentrequired:Variety of issues for facilities, e.g. disability access, ageing facilities, services outgrowing the facilities(e.g. not enough parking), etc. NFPs may have to look elsewhere for accommodation.
Somewhat improved technology required for effective and appropriate delivery of service. -Some reliance on technology:Requesting SmartyGrants Management System which would provide a more efficient way ofdelivering the grants programs. Also require software to capture corporate knowledge fromcommunity engagement activities this would result in more efficient and better plannedengagement.
Financial Profile
Activity Expenditure Income Net
General Support for Not-For-Profit $42,172 $42,172 Community Skill development for Not-For-Profits
$29,700 $29,700
Grants Scheme $1,001,052 -$6,401 $994,652 Facility Management $35,840 $35,840 Community Facilitation $10,870 $10,870 Community Engagement $23,649 $23,649 Corporate Responsibilities $117,628 $117,628
Additional Costs
Activity Expenditure
Buildings maintenance $274,747 Capital works renewal $7,106 Parks $47,515
Total cost: $1,583,8791
1 Note that the total cost doesn’t align exactly with the Departmental Budget of the service. This is because
overhead costs have been removed and measured in their own Service Profiles, and costs of buildings, parks and
APPENDIX E-1 SERVICE PROFILE: COMMUNITY STRENGTHENING (2013) Page 3 of 3
Staff Profile
Primary Job Family EFT Perm
EFT Temp
End date (if temp)
Hours per week
Role
Program Manager 1.6 60.8
Community Development Officer, Community Resourcing Officer - Grants
Coordinator 1 38 Coordinator Community Strengthening
Administration 0.32 12 Admin/Grants Support Officer
Total available EFT and Hours 2.92 110.8
capital works renewals have been added. For full information about costings and assumptions used, see the Service Scope Introduction section to Service Planning.
APPENDIX F SERVICE SCOPE 2015-16: ECONOMIC DEVELOPMENT (DS3511251) Page 1 of 8
Service: Economic Development
Director: Angelo Kourambas, Director City Development Manager: Kim Rawlings, Manager City Futures
SERVICE ASSESSMENT QUESTIONS
This Service Assessment will aim to answer the following key questions:
1. What should be the role of Council in this service?
2. Is the current Strategic intent contemporary? (Acknowledging that a recent review and
realignment of the service intent and strategic priorities has been undertaken with the
Economic Development Committee.)
3. Is the current service model contemporary?
4. What service activities and levels of activity should the service deliver?
In accordance with the Council Plan, all Service Analyses will consider planning, where
relevant, for an ageing population; and providing a range of programs, services and
partnerships which aim to build connections between people and reduce social isolation.
INTRODUCTION
The Economic Development Service is part of the City Futures Department within the City
Development Directorate. The service works in an integrated manner and aims to realise
Knox’s potential as a ‘prosperous and advancing economy’, as identified in the Knox
Vision and City Plan 2013-2017, Theme 2. It provides an integrated approach to
information, advice and action to encourage private and public sector investment that will
increase business establishment and growth; retain and support existing business, lift
productivity; create prosperity and boost employment within the Knox economy.
The service develops and implements initiatives defined in Council’s Knox Economic
Development Strategy 2008 – 2018 (KEDS) and assists Council to achieve its Local
Government Act objectives to promote appropriate business and employment
opportunities in the city.
The service aims to:
1. Support and develop businessesThe service informs and supports businesses and residents wanting to start a business
within Knox through information (e.g. local economic data and government programs)
provided via the Knox Business Direct website, biennial Knox Business Life newsletter,
weekly e-Bulletins and business visits and engagement.
APPENDIX F
SCOPE
APPENDIX F SERVICE SCOPE 2015-16: ECONOMIC DEVELOPMENT (DS3511251) Page 2 of 8
The service provides assistance with business development through a comprehensive
range of formal and informal business education and training opportunities to help start
and grow local businesses. The service also connects Knox businesses with each other
through various events such as the annual Knox Business Conference and the Women on
the Go Business Forum.
2. Promote Knox as an attractive business and investment locationThe service promotes Knox as a key business and investment location via the ‘Opportunity
Knox’ prospectus, targeted website information, and through personal contact with private
and government investment and property agencies. An investment facilitation service is
also provided.
3. Enhance Council’s understanding of contemporary business and economicdrivers
To keep ahead of the curve, the Economic Development Service undertakes research on
the local and broader economic conditions, current performance and future prospects,
including market changes, economic trends, skills and innovation.
4. Develop Council’s economic development policies and strategiesThe service uses information about the economic drivers affecting the City to develop well
informed Council strategies and a contemporary Economic Development service.
5. Partner with local, state and federal stakeholdersThe service partners with regional groups that promote and support development at the
regional level and provide flow-on benefits to Knox. Similarly, the service develops
strategic relationships with business and other key stakeholders such as State and
Federal government departments, industry associations and educators as well as
internally across other Council services.
A review of the KEDS in 2014 found that significant progress and implementation has
been achieved, drawing on best practice approaches for delivering a contemporary
economic development service. Service highlights previously reported to Council from July
2014 to May 2015 include investment facilitation, in which 19 investment facilitation
services were provided to property developers, new businesses to Knox and the eastern
regional office of the Department of Economic Development, Jobs, Transport and
Resources (DEDJTR); 18 seminars and workshops with 247 participants – partnership
with the Victorian Government through Small Business Victoria; and 27 business visits and
participation in 24 business events with greater than 90 business contact opportunities.1
1 The service regularly reports data to Council on the Business and Economic Development Service. They are arranged
under the focus areas for the service, identified in Figure 1. Appendix 2 provides a snapshot of this activity.
APPENDIX F SERVICE SCOPE 2015-16: ECONOMIC DEVELOPMENT (DS3511251) Page 3 of 8
CURRENT SERVICE MODEL
Economic Development Service Snapshot Service budget 2014/2015: Income
Expenditure
Net
($31,650)
$ 541,525
$ 509,875
Service EFTs: 3.4
The service is guided by the following principles (refer Figure 1):
Economic Prosperity;
Business Resilience;
Capacity building; and
Collaboration and partnerships
These principles underpin the Economic Development Service to help create, attract,
retain and expand businesses and the local economy.
The service is predominantly delivered in-house through a small team. Consultants are
used where necessary for specialised skills and resources. The service operates in
partnership with others as a ‘one-stop-shop’ for all business and economic related matters
within Knox, including providing advice on developments, plans, strategies, and
Government policies and initiatives.
As part of the recent mid-term review of Council’s ten year Economic Development
Strategy 2008-2018 (KEDS) the following four key strategic focus areas and roles were
identified by Council’s Economic Development Committee and were endorsed by Council
in August 2014:
Figure 1: Current service model principles, focus areas and key activities (endorsed by Council August 2014)
Understanding our Local Economy and Business Community – Research and analysis of economic data and the conduct of business visits to improve our knowledge of the aspirations and challenges of local business and promote Council's business support services.
Growing our Local Economy – Attract new and additional investment to Knox, expand existing
businesses, and identify new business and investment opportunities. Enhancement of
business, skills, jobs and investment in Knox and the region is also achieved through participation
in partnerships and regional initiatives.
Support our Businesses – Provide business education, events and opportunities for networking through skills development and access to expertise and support. Provide a range of maketing and communication tools and resources.
Enabling Prosperous Places – Work in an integrated manner within City Futures
department and with Council’s Place Program in areas of strategic importance such as
Employment Precincts. Provide a connector service to business, the community and Council.
Service Principles:
Economic Prosperity Business Resilience Capacity Building
Collaboration and partnerships
APPENDIX F SERVICE SCOPE 2015-16: ECONOMIC DEVELOPMENT (DS3511251) Page 4 of 8
SERVICE ASSESSMENT
In August 2014, Council completed a mid-term comprehensive review and audit of the
KEDS. Council noted that significant progress has been achieved but a revision was
necessary to make the strategy more strategically focused in response to today’s context
and achievable. This is now underway via the new Knox Integrated City Strategy project.
Role of Council The Local Government Act, at Section 3C, specifies (inter alia) that:
“...a Council must have regard to the following facilitating objectives—
(a) to promote the social, economic and environmental viability and sustainability of
the municipal district;
(d) to promote appropriate business and employment opportunities; ...”
The Planning and Environment Amendment (General) Act 2013 also makes it mandatory
for a responsible authority to consider:
“...any significant social effects and economic effects which the responsible authority considers the use or development may have.”
The Knox Long Term Financial Forecast and Rating Strategy 2015-16 (LTFF) sets out the
rate schedule for properties in Knox. Council currently charges a differential rate for
commercial and industrial properties and articulates the following objective relevant to the
Economic Development service;
“To ensure that all rateable land makes an equitable financial contribution to the cost of
carrying out the functions of Council, including the...enhancement of the economic viability
of the commercial and industrial sector through targeted programs and projects; and
encouragement of employment opportunities; and promotion of economic development...”2
The LTFF also states that:
“Council has a commitment to positioning Knox as an important Commercial/Industrial
Centre in the Eastern metropolitan region. This objective includes an ongoing, significant
investment in place management to improve the functionality and appearance of activity
centres, together with general economic development promotion and facilitation activities,
and through the creation of business opportunities by the activation of precincts. The
industrial and commercial businesses of Knox are expected to be beneficiaries of this
ongoing significant investment by Council.”
Knox City Council has 3,295 industrial properties (contributing 11% of the total rates) and
2,427 commercial properties (contributing 13% of the total rates) attracting a differential
which is 60% above the residential rate. These properties are businesses providing
employment opportunities.3
2 Knox Long Term Financial Forecast and Rating Strategy 2014-15 to 2018-19
3 Knox Long Term Financial Forecast and Rating Strategy 2014-15 to 2018-19
APPENDIX F SERVICE SCOPE 2015-16: ECONOMIC DEVELOPMENT (DS3511251) Page 5 of 8
As noted above, the service currently has four key areas of focus and activity:
Understanding our local economy and business community;
Supporting our businesses;
Growing our local economy; and
Enabling prosperous places.
The roles performed by the service to deliver these activities include:
Provider: e.g. of information, data, business education and events.
Facilitator: e.g. of major projects, development, contacts, business networks and
collaborations, partnerships, etc.
Advocate: e.g. for investment attraction, economic infrastructure, skills enhancement,
planning and promotion of strategic places in Knox, etc.
In determining Council’s role going forward with regard to this service, the Analysis will seek to confirm Council’s recent direction around its roles in this service; analyse if the current service activities and levels of activities are effectively meeting Council’s legislative objectives and those articulated in the LTFF; and identify where any efficiency and effectiveness improvements can be made. Council has also recently taken a more integrated planning approach with greater emphasis and integration of the economic, natural, social and built environments in planning, decision-making and action with the recent development of the Integrated City Strategy to integrate Economic Development Sustainable Environment and Community Health and Wellbeing Strategies. In this context and as the organisation moves into a more integrated approach consideration of strengthening further integration of aspects of the service such as research, data and analysis will be considered from an organisational perspective.
Strategic Intent The Local Government Act provides direction for Councils to be involved in local economic
development, but does not specify responsibilities. Council provides the direction for the
Economic Development Service through the City Vision, City Plan, Council Plan and Knox
Economic Development Strategy 2008-2018 (KEDS).
The service delivers programs and initiatives that help deliver the clearly articulated
“Prosperous, Advancing Economy” aspiration for the future city as set out in the ‘Knox
Vision: Our City our Future’, and outlined in further detail in the ‘Knox City Plan 2013-2017,
Theme 2’.
The current Strategic Intent of the Service is to provide an integrated approach to
information, advice and action to encourage private and public sector investment that will
increase business establishment and growth; retain and support existing business, lift
productivity; create prosperity and boost employment within the Knox economy.
The service does this through the delivery of an Economic Development program
designed around the following four key strategic areas of focus as determined by Council’s
Economic Development Committee; Understanding our Local Economy and Business
Community; Supporting our Businesses; Growing our Local Economy; Enabling
Prosperous Places.
APPENDIX F SERVICE SCOPE 2015-16: ECONOMIC DEVELOPMENT (DS3511251) Page 6 of 8
In determining the strategic intent for the service going forward the Service Analysis will
look at this current strategic intent, determine if it is still appropriate and explore whether
the current set of activities the service is aligned to effectively and efficiently respond to the
City Vision and City Plan.4
Service Model The service is currently delivered in-house by a small team of 3.4 staff within the City
Futures Department. The service occasionally uses consultants to provide technical or
specialist information/data or modelling.
The service has strong regional relationships and delivers outcomes through regional
partnerships with both other Local Governments and State Government; many initiatives
are jointly funded and delivered through these mechanisms.
The service has legislative, strategic and financial objectives it responds to as articulated
above. The service seeks to do this through the delivery of a range of activities, programs
and initiatives aimed at servicing the business community in Knox. The analysis will
undertake a ‘return on investment’ analysis of the impact of service activities in achieving
these objectives.
Service Levels – Effectiveness and Efficiency The service currently delivers a range of services which are commonly offered by
Economic Development services in Local Government. The Analysis will explore the range
of these activities, benchmark them with other relevant Councils, consider the method of
delivery and determine whether they will continue to meet the objectives of the service.
The level of service required in the area of business and economic development is driven
by factors such as:
Contemporary best practice in economic development;
Local business needs and aspirations;
Impacts of globalisation and economic change;
Business transition in response to the above factor (especially within the local
manufacturing sector);
Rising levels of unemployment in Knox over the past 5 quarters;
Rising expectations around business and investment attraction;
Requirements of Council to appropriately address economic aspects across other
services; and
Increased focus on integrated service delivery and a triple bottom line approach to
strategy, policy and major initiatives delivered by Council.
Increased requirement to collaborate and deliver regionally, particularly relevant when
seeking State or Federal funding.
4 The Knox Integrated Strategy is currently being developed. The service analysis will need to respond to this once
finalised later in 2015.
APPENDIX F SERVICE SCOPE 2015-16: ECONOMIC DEVELOPMENT (DS3511251) Page 7 of 8
The Analysis will consider the effectiveness and efficiency of the current service in the
context of the above issues and drivers and make recommendations to enable it to adapt,
change and respond as necessary. The analysis will explore options to maximise synergies between the economic development service and the place program service (without losing the place programs triple bottom line focus). Consideration will be given to opportunities within the service for greater ‘user pays’
including the investigation of fee-for-service charges for investment facilitation and
prioritisation of economic data. An increase in the cost to attend Council events where this
is not controlled by sponsors (e.g. State and Federal Government) could also be
considered.
REFERENCES
1. Local Government Act 1989 (Vic)
2. The Planning and Environment Amendment (General) Act 2013
3. Knox City Plan 2013-2017
4. Knox City: Our Vision, Our Future 2013-17
5. Knox Economic Development Strategy 2008 – 2018
6. Economic Development Strategy midterm review (SPC 26/8/14)
7. Business and Economic Development Service Snapshot (various reports)
8. Annual Activities Report (Economic Development Committee) (various reports)
9. A Communications Plan for the Knox Business and Economic Development Services
2014
10. SROI Network, A Guide to Social Return on Investment, 2012.
11. Knox Long Term Financial Forecast and Rating Strategy 2014-15 to 2018-19
APPENDICES
1. Service Profile: Economic Development (December 2012)
2. Business and Economic Development Service (BEDS) Measuring our Success: A
Snapshot of Selected Initiatives (1 July to 31 December 2014)
APPENDIX F-1 SERVICE PROFILE: ECONOMIC DEVELOPMENT SERVICE (DECEMBER 2012) Page 1 of 3
Service 2: Economic Development Director: Angelo Kourambas, Director City Development Manager: Kim Rawlings, Manager City Futures
Brief Description of Service
This service aims to realise Knox’s potential as a prosperous and modern economy. It provides an integrated approach to information, advice and action to encourage private and public sector investment that will increase business establishment and growth; lift productivity; create prosperity and boost employment within the Knox economy.
The service informs and supports businesses within Knox by providing education and assistance with business development; attraction and facilitation of investment; connecting Knox businesses with each other or in groups; and highlighting opportunities that may exist within government funding programs. The service also develops and implements initiatives defined in Council’s Knox Economic Development Strategy 2008 – 2018 and assist Council achieve its Local Government Act objectives to promote appropriate business and employment opportunities in the city.
Council Plan Outcome: A prosperous modern economy
Service Outcomes:
Businesses have capacity to make informed decisions
New businesses have confidence to establish in Knox
Existing businesses have confidence to expand local operations
Increased business and stronger local supply chains achieved by collaboration between local businesses
Expanded investment levels and local employment opportunities in Knox
Activities
2.1 Investment attraction: Promotion of Knox as a key business and investment location via Opportunity Knox prospectus, targeted website information, personal contact with private and government investment and property agencies.
Outcomes: Increased level of enquiry about Knox as a preferred location for investment, and resultant increases in new construction and business establishment.
2.2 Business relations Visits by Council representatives to engage with Knox businesses to understand their aspirations and needs. Encourage ongoing use of Knox business support and economic development initiatives and other Council programs.
Outcomes: Council gains better appreciation of business needs and aspirations; business awareness of Council’s economic development service is improved; trusting relationships are built between business and Council; increased collaborative planning for local economy is enhanced; the take up of business support programs is boosted; and the creation, attraction, retention and expansion of existing and potential Knox businesses.
2.3 Business education and events: A comprehensive range of formal and informal training opportunities are offered and facilitated, such as seminars and workshops designed to help improve the performance and potential of local businesses. Delivery of flagship events such as the annual Prosperous Modern Economy Conference, Eastern Womens’ Business Forum and specific business networks.
APPENDIX F-1
APPENDIX F-1 SERVICE PROFILE: ECONOMIC DEVELOPMENT SERVICE (DECEMBER 2012) Page 2 of 3
Outcomes: Enhanced business skills, strong and innovative businesses, effective collaboration amongst businesses and with Council, and an improved business culture of continuous learning and improvement.
2.4 Information and service promotion: Preparation and distribution of business support and economic development information via Knox Business Direct website, Knox Business Life newsletter and Weekly E-Bulletins. Promotion of Council’s business support and economic development activities
Outcomes: Increased distribution of business support and investment attraction information, greater awareness and use of the business and economic development service, higher participation in and satisfaction with business seminars and major events, and new businesses and investors responding to opportunities in Knox
2.5 Development facilitation service: Coordinated facilitation assistance, where necessary, with Council approvals required for key investment and development projects in Knox.
Outcomes: More effective approval of complex investment and development projects and increase in Knox’s reputation as a high quality business and investment location.
2.6 Economic research and analysis: Desktop and other types of research on the local and broader economic conditions, current performance and future prospects, including market changes, economic trends, skills and innovation. The Rowville Rail Economic Impact Study was a major project focus during 2011/12.
Outcomes: Well informed Council strategies and service delivery in Economic Development Program; greater awareness of economic conditions impacting on local business and the economy; better decision-making by local businesses and Council; and investors, businesses and community can access required economic information.
2.7 Regional partnerships: Involvement in partnerships between Council and regional groupings that promote and support development at the regional level and provide flow-on benefits to Knox.
Outcomes: Establishment of partnerships between Councils, universities, research facilities and others; active engagement with Melbourne South East Regional Economic Development Group, (MSE), South East Melbourne Innovation Precinct (SEMIP), and Melbourne East RDA Committee; increased implementation of initiatives at the regional level; and increased resilience of regional, and therefore local, economy.
2.8 Local alliances: Strategic relationships at the local level – externally with business, other key stakeholders , State and Federal government departments, as well as across other Council services.
Outcomes: Establishment of active alliances with business, relevant government agencies, Swinburne University, KIOSC and Learn Local to expand workforce skill levels; increased implementation of initiatives to support resilience of the local economy; and integrated strategic Council initiatives in business and economic development, sustainability, health and well being, community development, and youth services.
Corporate Responsibilities: Includes the range of tasks that are required to run a service, including: planning, staff management, training, OHS, budgeting, advocacy (internal and external), and collaboration (internal and external).
APPENDIX F-1 SERVICE PROFILE: ECONOMIC DEVELOPMENT SERVICE (DECEMBER 2012) Page 3 of 3
Key current or future issues:
The Global Financial Crisis and its aftermath have created increased challenges and needs amongst
Knox businesses. Council has been promoting its business and investment facilitation service and as businesses have become more aware of the service, demand and participation have increased.
Financial Profile
Activity Expenditure Income Net
Business Relations $55,836.11 $55,836.11 Business Education and Events $132,894.82 $132,894.82 Information and Service Promotion $119,110.27 $119,110.27 Development Facilitation Service $28,462.20 $28,462.20 Economic Research and Analysis $200,155.72 $200,155.72 Investment Attraction $22,528.98 $22,528.98 Regional Partnerships $51,122.03 $51,122.03 Local Alliances $49,082.87 $49,082.87
TOTALS $659,193 $659,193
Total net cost: $659,193
5
Staff Profile (as at 30/6/2012)
Primary Job Family EFT
Perm EFT
Temp End date (if temp)
Hours per week
Role
Coordinator 1
38.0 Economic Development Coordinator
Program Manager 1
38.0 Senior Program Mgr, Eco Dev
Project Manager 0.6
22.8 Project Manager, Eco Dev
Total available EFT and Hours
2.6
98.8
5 Note that the total cost won’t align exactly with the Departmental Budget of the service. This is because overhead
costs have been removed and measured in their own Service Profiles, and costs of buildings, parks and capital works renewals have been added where appropriate. For full information about costings and assumptions used, see the Introduction section to Service Planning. 2
Includes a once-off $120,000 for the Rowville Rail Impact Study.
APPENDIX F-2 MEASURING OUR SUCCESS: A SNAPSHOT OF SELECTED INITATIVES Page 1 of 9 2014-15 FINANCIAL YEAR (1 JUL-31 DEC 2014)
BUSINESS AND ECONOMIC DEVELOPMENT SERVICE (BEDS)
Measuring our Success: A Snapshot of Selected Initiatives
2014/15 FINANCIAL YEAR (1 July to 31 December)
Understanding our Local Economy and Business Community “Research and analysis of economic data and the conduct of business visits to improve our knowledge
of the aspirations and challenges of local business”
(a) Mid-term Review of the Knox Economic Development Strategy
Council endorsed the Mid-term Review of the Knox Economic Development Strategy Report on 26 August
2014 including the proposed framework for the interim Business and Economic Development Services
Program.
Preparation of the Integrated City Strategy is now underway and anticipated to be reported to Council
before end of June 2015. This Integrated Strategy will replace the Economic Development Strategy 2008-
2018 and ensure alignment with Councils new vision and City Plan.
(b) A Communications Plan for the Knox Business and Economic Development Service
The document provides an integrated and planned approach to communication activities and
engagement opportunities. A number of improvements are in progress including:
The Opportunity Knox Business website banner updated replacing Knox Business Direct;
Service brand statement, “Opportunity Knox – providing services to help create and grow
business and the local economy” and individual service messages developed;
Brand awareness with Council sponsoring the Small Technologies Cluster “Event in the
Tent” on 11 December, 2014; and
continually reviewing and updating information on Opportunity Knox Business website.
(c) Business Engagement and Visits
For the first half of 2014-2015, 19 business visits were conducted to better understand general business
conditions and opportunities for business skills development, collaboration and general awareness of
Council’s Business and Economic Development Service.
Economic Development Officers also participated and engaged with businesses at 18 business events
such as Healthy Together Knox breakfasts, Swinburne Industry Open Day, Knox Economic Development
Strategy Mid Term review, National Science Week, Small Technology Cluster networking events and
Corporate National Tree Days.
APPENDIX F-2
APPENDIX F-2 MEASURING OUR SUCCESS: A SNAPSHOT OF SELECTED INITATIVES Page 2 of 9 2014-15 FINANCIAL YEAR (1 JUL-31 DEC 2014)
(d) Business Success Stories
Knox City Council has developed 16 case studies of local businesses that
tells their story and how Council’s Business and Economic Development
Service has provided services to help create or grow their business.
The case studies provide a background about the business, challenges,
the use of Council and Government Services, and hints and tips from the
Business Owner/Manager. The case studies appear on the Opportunity
Knox Website www.knoxbusinessdirect.com.au under the Highlighting
Business Success tab, with some being distributed within our e-bulletin.
(high clicks have been recorded against the business showcases).
Supporting our Business “Providing Business Education and Events and opportunities for business networking”
(a) Knox Business Education and Events Program
Discussions with relevant Government Agencies (Small Business Victoria and the Department of
Economic Development, Jobs, Transport and Resources) Knox runs one of the most successful Business
Education and Events program in Melbourne.
Council’s Business Education program is delivered in collaboration with Government Agencies and
Education Providers such as Small Business Victoria and Learn Local to provide an extensive program
aimed at growing local business through skills development and technology transfer.
a. Small Business Victoria (SBV) Partnership program
The SBV Workshop and Seminars program has been running at Knox since 2007. It offers a choice
of 22 heavily subsidised different training programs aimed at assisting SME’s to commence,
develop and grow their business.
Businesses are surveyed at the conclusion of each seminar and workshop to understand the
immediate value to business. A further survey is conducted annually to understand how
businesses have applied the knowledge learnt from the program back to their business. The
survey informs Councils annual Business Education and Events evaluation report and the
following year’s program.
For the period 1 July 2014 to 31 December 2014 we have hosted 8 Seminars and Workshops
with 104 participants registered
Of those particants who completed the annual survey an average:
98% agreed that the event/s provided the information they needed; and
98% rated the event/s as good to excellent.
APPENDIX F-2 MEASURING OUR SUCCESS: A SNAPSHOT OF SELECTED INITATIVES Page 3 of 9 2014-15 FINANCIAL YEAR (1 JUL-31 DEC 2014)
b. Small Business Mentoring program
The Small Business Clinic Program is a service provided to small business operators. The service
offers businesses an opportunity to gain advice from an experienced mentor that assists them in
setting up a business, or assistance for established businesses to work through an issue they are
dealing with. The program is free to participants with Council covering the cost of the sessions.
Businesses are surveyed at the conclusion of the Small Business Mentoring session to understand
the immediate value to business. A further survey is conducted annually to understand how
businesses have applied the knowledge learnt from the session back to their business. The
survey informs Councils annual Business Education and Events evaluation report and the
following year’s program.
For the period July – Dec 2014, 20 individual clinics were made available for businesses
located within Knox with a confirmed take up of 16,
Survey results indicate that participants:
Were satisfied with the mentor as well as the quality of the mentoring session.
Felt the session had assisted them to improve a number of aspects of their business
such as Viability, Profitability, Business Growth, Customer Satisfaction, Marketing and
Promotion, Time Management, Business Planning, Employing People and Quality of
internal processes. However the survey does not ask how this was determine by the
business.
c. Digital Enterprise Program
The Australian Government Digital Enterprise program provides free group training and face-
to-face support for small-to-medium enterprises and not-for-profit organisations to help
improve the way you do business and deliver services online
6 Seminars where hosted by Knox Council in partnership with Darebin Business Enterprise
Centre to showcase the value of the NBN and doing business online.
92% of participants indicated the training was useful and easy to understand. As a result
of the training 100% of participants indicated they had an increased understanding of the
benefits of engaging online and where more confident to do so.
d. Group Training Programs
Knox has been accessing the Victorian Government’s Grow Your Business grant funding to run
Group programs that meet the local business community needs for more than 10 years. The
Group Program consists of a subsidised workshop for groups of 5 - 15 participating businesses,
organised on a sectoral or regional basis, with a particular business development focus.
Examples include: diagnostics, business planning, finance, or marketing exports. The Group
Program also involves a component of ‘one on one’ time between the business and consultant.
This individual time should be approximately 6-8 hours, making the total program time 20-23
hours per business.
Council have been approved to auspice a Group Program which will commence with ION Group
in February 2015. The Program theme is “Decisions that Drive Profits”. Participating business
will have the opportunity and support needed to implement positive changes and consolidate
improvements as the program progresses.
APPENDIX F-2 MEASURING OUR SUCCESS: A SNAPSHOT OF SELECTED INITATIVES Page 4 of 9 2014-15 FINANCIAL YEAR (1 JUL-31 DEC 2014)
e. Eastern Women on the Go (EWOG) Business Forum & Expo
Knox City Council, Maroondah City Council, Yarra Ranges Council and the Bendigo Bank have
been partnering to run ‘Women on the Go’ Business Forum and Mini Expo since 2009. This
annual event incorporates a Mini Expo and Business Forum
106 bookings reaching venue capacity where taken in 2014 (5% increase on 2013)
40 Expo stands booked with 100% attendance on the day
of those participants who completed the survey:
98% indicated the event was ‘Excellent, ‘Good’ or had met their expectations
98%% were either ‘very satisfied’ or ‘satisfied’ with the content
100% would recommend the event to a business associate
f. New Programs
Council’s Economic Development Team have been working with INNOVIC and VECCI to expand
our program offering in 2015. INNOVIC is a not for profit organisation that’s assists innovators
each year, to turn new ideas, inventions and innovations into viable products and new
businesses. They offer a wide range of services, free seminars and innovation resources to help
business with their idea, invention or innovation through all stages of commercialisation. Two
INNOVIC Programs have been scheduled for March and April.
(b) Marketing and Communications
a. e-Bulletin
More than 3,600 businesses registered on the Opportunity Knox website rely on Council’s regular
e-Bulletins to learn about relevant Council projects, events and services, relevant legislative
changes and other government programs.
42 e -bulletins (up 71% on first half 2013-2014) have
been published to an average of 3594 recipients (up
1% on 2013-2014). Average readership (based on
number of opened e-bulletins) is 18%. *American
membership based organisation, IT Services Marketing
Association suggests that an open rate of between 10%
and 20% is a good average range for B2B companies.
Twenty nine percent of people attending a Knox
Business Education and Events program heard about
the event through Council’s business e-bulletin. This is
followed by 15%, 12% and 11% hearing about the
event through the Knox City Council website, word of
mouth or the Business Victoria website respectively.
APPENDIX F-2 MEASURING OUR SUCCESS Page 5 of 9
b. Knox Business Life
The publication showcases local business success stories, informs
business of relevant Council projects, events and services, advises
business of changes to legislation that may impact their business
and of other government programs aimed at growing business.
Council currently produces two of these publications per year (May
and November) which is distributed to more than 6,000 businesses.
c. Opportunity Knox Business website, www.knoxbusinessdirect.com.au (OKB)
OKB provides information advice and action on the business
and economic development service.
More than 5,800 Knox businesses registered on the OKB
online business directory.
When comparing the same periods for 2014/15 with
2013/14 financial years respectively :
more than 17,423 visits to OKB during 2014/15 (up
25%)
returning visitors remains consistent at 25 to 26%
of all visits to OKB.
almost 30% of visits to KBD were by a
mobile/tablet devices such as mobile phone, iPad
or iPod (up 15%).
Growing our Local Economy “Attract new or additional investment to Knox, expand existing businesses, identify new business
and investment opportunities, participate in partnerships and regional initiatives”
(a) Investment Facilitation Service – CONFIDENTIAL
This service continues to respond to enquiries from property developers, new businesses to Knox and
the eastern regional office of the Department of Economic Development, Jobs, Transport and Resources
(DEDJTR).
Current projects include:
5/04/14 –
ongoing
SnoActive Pty Ltd Advice and assistance with location of site in Knox for construction of
synthetic, outdoor ski slope
28/05/14 –
3/07/14
Speedpanel Aust Pty Ltd Company relocating from Kilsyth to expand operations at 421 Dorset
Road, Bayswater.
Requested discussion on planning approval for B&W to premises.
2013/14 –
ongoing
Villa Maria Economic Development Team is providing a coordinated response
through the DFS for Stage 2 development of their Wantirna site.
2013/14 – Knox Hospital – Proposed expansion will make it the 2nd
largest private hospital in
APPENDIX F-2 MEASURING OUR SUCCESS Page 6 of 9
ongoing substantial expansion Victoria.
2013/14 –
ongoing
SDI Limited Preliminary discussion during 2013/2014 for multiple permit approvals to
cover minor anticipated works over 12-18 month period thus avoiding
need to individual applications.
26/06/14 –first enquiry for installation of courier parking bays at 5
Brunsdon St
16/06/14 Knox Ice Sports Centre Assist with site search
26/6/2014 The Remedy Group Advice on proposed relocation site at Stamford Business Park Rowville.
Planning approval for this site was not granted, subsequently the
business closed doors at existing location within Rowville.
5/8/14 -
ongoing
Togo Group Advice on potential and subsequent acquisition of Mountain High Centre
in Bayswater
6/08/14 Slade Developments Advice on development polices for White Street, Wantirna South
7/8/14 Dave Conner –
developer
Advice on 13 apartment development at 1 Jackson St, Wantirna South
27/08/14 Veyance Technologies Veyance Technologies has been sold by Goodyear to Continental.
Advice sought to complete a feasibility on consolidating to the Veyance
owned property.
Veyance has plans at various stages, with employees associated and real
estate needs, for example:
- DC warehouse, 15 Employees
- Raw Materials Store, 2 Employees
- Office, 20 employees
- Consolidate factory operation, 120 employees.
4/09/14 Pain Investments Property developer from Box Hill representing investors from China
interested in entering the Australian healthcare industry.
Enquiry regarding a 200 bed private hospital with service offering similar
to Knox Private, serving the local market (including emergency
department, day procedure) and a high end aged care facility (don't know
size yet) to cater primarily for elderly local Asian people.
29/10/14 Crown Civic Support with planning application
30/10/14 A.S. & N Joinery Support with planning application
31/10/14 Parmalat Preliminary discussion regarding Parmalats plans to grow their Rowville
operation in 2015 to include warehousing of the Lemnos and Jindi
products and extra growth in manufacturing particularly blow moulding
of bottles for the UHT product. The UHT manufacturing component of
Rowville operation has been bedded down over the last 12 months and
60% of production is exported.
31/10/14 InnerTelligence Relocation enquiry
8/12/14 APS Innovations APS Innovations has established a stand alone manufacturing business,
Sepal. Relocation of Sepal operation from Maroondah to Knox enquiry.
Premises secured in Knoxfield.
22/01/15 Melbourne Design
Studio
Assist with site search for Buddhist Cultural and Exhibition Centre
APPENDIX F-2 MEASURING OUR SUCCESS Page 7 of 9
(b) Regional Organisations
Knox City Council is an active member in the following regional organisations to help create and grow
business and the local economy:
a. South East Melbourne Innovation Precinct (SEMIP)
SEMIP continues to facilitate collaboration between
business, academic and research organisations in the
south and east of Melbourne.
SEMIP membership is the Cities of Greater Dandenong,
Kingston, Knox and Monash, (which effectively defines the
‘boundary’ of the Precinct), Monash University, CSIRO,
Australian Synchrotron, Melbourne Centre for Nanofabrication, Small Technologies Cluster, and the
Victorian Department of Economic Development, Jobs, Transport and Resources.
New Zealand Government’s commercialisation agency, Callaghan Innovation, visited Synchrotron,
STC and CSIRO and discussed shared interests over lunch with several SEMIP members .
Commencing 2015, meetings will now be held bi-monthly.
b. Melbourne East Regional Development Australia (MERDA)
Work with the Melbourne East RDA over the past six months has included the conduct of a Phase
One study on the Bayswater Industrial Precinct to determine its characteristics and challenges.
This has included a survey of 200 businesses to gather intelligence on their performance and
potential.
Development of a Regional Investment Attraction Strategy has also commenced following the
appointment of Dench McClean Carlson as consultants for the project.
c. Outer Eastern Local Learning and Employment Network (OELLEN)
Economic Development Officer Helen Ruddell is Knox City Council’s representative on the Board.
As a result of the partnership with the OELLEN:
Business Buddies (new initiative for Women on the Go event) offer six students from Knox
secondary school the opportunity to attend the Women on the Go in August with a
Business Mentor
Maintained an environment of information sharing and understanding the challenges and
opportunities in skills development, education and employment of youth.
Assisted to support KIOSC and Council at the Science, Technology, Engineering, and
Mathematics (STEM) festival in August.
(c) Partnership & Alliances
Knox City Council engages in the following partnerships and alliances to help create and grow business
and the local economy:
a. Swinburne University of Technology (SUT) Alliance Statement
The Statement provides a vehicle for promoting and achieving collaboration on some important
initiatives that will be a timely and mutual benefit to the Council and University.
Regular collaboration has:
APPENDIX F-2 MEASURING OUR SUCCESS Page 8 of 9
Connected SUT with DSDBI to collaborate on regional skills development initiatives;
Continued conversations on strategic opportunities such as Manufacturing, Health Care
and Social Assistance, Skills and Research and Information sharing.
Ensure Knox Council participated in the Swinburne University Industry Open Day held at
their Hawthorn campus on 2 December, 2014
b. KIOSC
The alliance has seen considerable collaboration between KIOSC and Council including:
200 senior school students from 10 local secondary schools had the opportunity to see
“careers in action” across the medical, environmental, energy, transport and technology
fields. Businesses including Thermo Fisher Scientific, Davey, Cummins and STC opened
their doors to students, taking them on a guided tour of their premises, and talking with
them about their day to day business and future career opportunities.
An evening event was attend by more than 150 parents, teachers, students and
representatives from business gathered in the KIOSC Pavilion to enjoy the Careers Expo.
During the 2014 calendar year 10,500 secondary school students participated in the KIOSC
Discovery Programs and 1,100 Taster Days were coordinated.
The new State Government have promised to provide $1million in operating funding to
support KIOSC over the next 3 years.
c. Industry Capability Network (ICN)
Knox Council is working with Industry Capability Network (ICN), Department of State
Development, Business and Innovation (DSDBI) and Healthscope to facilitate a Knox Private
Hospital Industry Supplier Forum being held on the 4 March.
The Forum will provide information about the Knox Private Hospital development in particular
the work packages associated with the contract awarded to Watpac for Stages 1 and 2. It will
outline possible opportunities for the supply of products, materials and or services, especially for
companies within Knox and adjoining municipalities.
Council’s REMPLAN economic modelling suggests an estimated 299 jobs will be created through
direct, industrial and consumption effects as a result of the $45million investment for Stage 1 and
2 of the Knox Hospital expansion.
It is intended the run a similar Supplier Forum for the Westfield Redevelopment.
Knox Council is also working with ICN to make regional organisations including Knox
organisations aware of Councils tender opportunities for the provision of goods and/or services.
To date more than 18 tender opportunities for the supply of goods and/or services to Knox
Council have been made available on the ICN Regional Gateway portal and promoted on the
Opportunity Knox website and e-bulletins.
d. South East Melbourne Manufacturers Alliance (SEMMA)
The relationship with SEMMA has been strengthened with an inaugural meeting facilitated by
SEMMA with Knox, Dandenong, Monash, Kingston, Frankston, Cardinia and Casey Councils to
establish co-operation and collaboration.
Twelve percent of the SEMMA manufacturing membership are Knox based businesses. The
manufacturing sector is the largest employer in Knox (23%). It contributes 77% towards Knox’s
regional exports and 48% towards Knox’s economic output (Output data represents the gross revenue generated by businesses/organisations in each of the industry sectors in a
defined region. Gross revenue is also referred to as total sales or total income).
APPENDIX F-2 MEASURING OUR SUCCESS Page 9 of 9
Enabling Prosperous Places “Work under Council’s Place Program and in areas of strategic importance such as Employment
Precincts”
(a) Bayswater Industrial Precinct Review (joint project with Maroondah and Yarra Ranges
and Eastern RDA)
Seven focus areas are being further considered as achievements for the short term:
Consolidate and promote ‘good news stories’ to businesses within the precinct;
Alignment of planning rules, zoning for future employment hubs, and consistency of customer
service;
Improving the amenity of industrial precincts;
Sophistication of Supply Chains;
Local Industrial Procurement;
Precinct Improvement Program Roadmap; and
Regional Industry Advisory Group.
To advance these areas of focus work has commenced to formulate a ‘Strategic Directions
Plan/Roadmap’ for Phase 2 of this project. This is being undertaken by officers from participating
Councils however some consultant input may become necessary. It is expected that this work will be
completed by the end of March and pave the way for ongoing elements of the project.
(b) Wantirna Health Precinct
Wantirna Health Precinct has been identified as a State Significant Precinct in the final Plan Melbourne.
As a consequence Council with the assistance of Metro Planning Authority is embarking on a structure
Planning process. To assist this, a Strategic Directions and Opportunities paper has been prepared to
outline a process by which Council as the local planning authority can best maximise its influence and
ensure its objectives for the site/area are realised. Discussions with key stakeholders and agents such as
Metro Planning Authority, Dept of State Development, Business and Innovation, Eastern Health, Dept of
Health, VicRoads, and Knox Private Hospital have been conducted to scope the approach to the structure
planning of the Wantirna Health Precinct.
A discussion with EMT on the Strategic Directions Paper and a way forward was held on 22nd
August
2014. This was followed up with a discussion concerning the ‘scope’ of the undertaking on 18th
December 2014. EMT subsequently signed off on the Project Scope (which was prepared with the MPA)
for the next phase of this work. An Issues briefing is planned for Council in April/May once progress has
been made on the next phase of work.
(c) Renew Boronia
The Renew Knox Pilot Project tender was awarded in October 2014 to Renew Australia Pty Ltd. The
project has commenced with identifying empty shops and liaising with shop owners. An introductory
meeting with the consultants and Ward Councillors was held on 10 December 2014.
APPENDIX G SERVICE SCOPE 2015-16: PLACE PROGRAM SERVICE (DS3584518) Page 1 of 9
Service: Place Program Director: Angelo Kourambas, Director City Development Manager: Kim Rawlings, Manager City Futures SERVICE ASSESSMENT QUESTIONS
This Service Assessment will aim to answer the following key questions:
1. What should the strategic intent of the service be?
2. What should Council’s role in this service be in the future?
3. Is the current delivery model considered contemporary and the most effective and if not
what is?
4. What service activities define this model and what should the extent (level) of these
activities be?
In accordance with the Council Plan, all Service Analyses will consider planning, where
relevant, for an ageing population; and providing a range of programs, services and
partnerships which aim to build connections between people and reduce social isolation.
INTRODUCTION
The Place Program is part of an integrated approach delivered by the City Futures
Department to improving important places in Knox that involves the coordinated delivery
of social, economic and environmental programs. This involves harnessing the
knowledge, skills and resources from within Council, the community, and our partners in a
more integrated way to identify and secure the cross sector (public, private and not-for-
profit) investment required to deliver better places as outlined in Council’s Vision
Statement and City Plan. .
Put simply, the service is about building investment partnerships for the purpose of making
key places in Knox better whilst maximising the benefits from Council’s limited resources.
Whether it is dealing with significant economic and social decline (e.g. Bayswater);
responding to community concern about the state of Council’s infrastructure (e.g. Wantirna
Mall and Mountain Gate); or seeking to capitalise on strategic strengths and opportunities
(e.g. Wantirna Health Precinct and Upper Ferntree Gully), the Place Program is about
Council working in a more integrated way to address challenges and maximise
opportunities for the benefit of the present and future Knox community.
SCOPE
APPENDIX G
APPENDIX G SERVICE SCOPE 2015-16: PLACE PROGRAM SERVICE (DS3584518) Page 2 of 9
With increasing community expectations combined with changing demographics, and local
economic conditions, the challenge for Council is to ensure limited resources are targeted
to have the best and most effective impact. Since its inception in Bayswater in 2004, the
service is now being used to various degrees across a number of places (Bayswater,
Boronia, Ferntree Gully, Alchester Village, The Basin, Wantirna Health Precinct, Mountain Gate, Rowville and Upper Ferntree Gully) which presents considerable challenges for the service and Council.
Many services provided by Council and others agencies and stakeholders are important in
achieving the desired outcomes in particular locations. The Place Program coordinates a
broad range of Council activities as part of its integrated approach (e.g. Community
Strengthening, Integrated Water Management, Traffic & Transport, Economic
Development, Sustainable Futures, Parks Services, Capital Works etc). This coordination
function is not provided by any other form within or outside Council.
This Service Review will consider the role of Council and review the strategic intent, the service model and service levels of the Place Program. The main challenge and opportunity for the Place Program service is to effectively and efficiently deliver in an ever-changing social and economic environment and an increasingly constrained Council resource environment.
CURRENT SERVICE MODEL
Place Program Service Snapshot: Service budget 2014/2015: Income
Expenditure
Net
($0)
$ 424,216
$ 424,216
Service EFTs: 2.8
The Place Program is predominantly delivered in-house by a team of three officers.
Consultants are used where specialised skills and resources are required for specific
projects.
The principles that underpin this service are:
1. Activity Centres and Employment Precincts are the social and economic engine rooms
of Knox; they create a ‘sense of place’ and support local prosperity and liveability;
2. Integrated ‘place-led’ rather than ‘discipline-led’ service approaches deliver better and
sustainable social, economic and environmental community outcomes;
3. Engaged communities and stakeholders are more empowered and resilient and lead to
better and more sustainable outcomes; and
4. Coordinated and integrated planning and service delivery is more effective and efficient
for Council … you get bigger bang for your buck.
APPENDIX G SERVICE SCOPE 2015-16: PLACE PROGRAM SERVICE (DS3584518) Page 3 of 9
The core activity areas of the service are (see Figure 1):
1. Engaging the local community and key stakeholders – identifying, engaging with and
establishing key stakeholders and relationships (e.g. managing stakeholder/trader
issues during the Mountain Gate and Ferntree Gully Village streetscape upgrades).
2. ‘Place planning and strategy’– identifying issues/opportunities unique to each place
and building the place agenda and plan i.e. Structure Planning (e.g. developing the
structure plans for Ferntree Gully Village and Upper Ferntree Gully)
3. ‘Coordinating Implementation of priority actions’ – developing Implementation Plans,
business cases, project scoping, management and delivery (e.g. coordinating Council’s
approach to delivering the Ferntree Gully Village Town Square Masterplan and the
Streetscape Upgrade); and
4. ‘Evaluation and monitoring’–project evaluations and community feedback (e.g. the
Ferntree Gully Village Streetscape Upgrade Follow up Survey, March 2015)
Figure 1: Current service model principles and key activities
SERVICE ASSESSMENT
Council introduced a Place Management service model in 2004, which was and still is
recognised as a progressive approach. This model was used by Council to intervene in
activity centres with systemic and wide ranging issues by coordinating capital works,
business/ investment attraction and community development. This model was considered
the most effective to deliver on Council’s Vision and strategic objectives.
The program and service has continued to evolve and respond to changes in community
needs and expectations as articulated in the Knox Vision and City Plan and most recently,
in the new Integrated City Strategy.
Community Engagement
Relationship building, stakeholder management
Place planning and strategy
Structure Planning , masterplans
Program management and delivery
Implementation Plans, project scoping and delivery
Evaluation and monitoring
Community feedback
Service Principles
1. Activity Centers/Employment Precinctsare the social/economic engines
2. Integrated place led approaches deliverbetter triple bottom line outcomes
3. Engaged communities are moreempowered, resilient and lead to better
outcomes
4. Coordinated/Integrated planning anddelivery achieves bigger bang for your buck
APPENDIX G SERVICE SCOPE 2015-16: PLACE PROGRAM SERVICE (DS3584518) Page 4 of 9
A new Place Program including an updated list of future places for planning and
investment was endorsed by Council in September 2012. This was updated and
discussed by Council at February 2015 Issues Briefing.
The Place Program coordinates and facilitates activity in a location. Each location is at a
different stage of the place program cycle. The Place Program cycle is as follows:
Stage 1 Planning & Strategy
Stage 2 Implementation
Stage 3 Review & Assessment
The following list of locations are consistent with Council’s endorsed Place Program 2012-
2022 (25 September, 2012 Council Mtg) with the addition of the Burwood Highway
Corridor Place Program as reported to Council February 2015;
PLACE STAGE BRIEF DESCRIPTION
Bayswater
Employment
Precinct
Stage 1 To develop and implement a strategic investment
program for renewal of Bayswater Industrial precinct.
To review Bayswater Structure Plan (date not
determined).
Wantirna Health
Precinct
Stage 1 Scoping and Structure Plan preparation, commenced in
14/15 in partnership with Metropolitan Planning
Authority.
Rowville Stage 2 Structure Plan Implementation proposed to commence
2015/16 as per Rowville Plan Implementation Plan.
Mountain Gate Stage 2 Masterplan implementation – Capital upgrade 14-15
and15/16.
Boronia Stage 2/ Stage 3 Continuation of ‘Renew Boronia’ initiative (2015/16),
Structure Plan review proposed to commence 2016/17.
Upper Ferntree
Gully
Stage 1 Structure Plan preparation ongoing. Commenced in
2014/15. Due for completion end 2015. Implementation
to follow.
Burwood Highway
Corridor
Stage 1 Proposed to undertake the preparation and
implementation of a Strategic Plan (ie Structure Plan)
commencing 2016/17. The Burwood Highway corridor
presents a significant opportunity to enhance the
economic performance and character of the city as a
gateway to the foothills. Currently this corridor is blighted
with poor design and secondary activities.
Ferntree Gully
Village
Stage 2 Implementation of endorsed Structure Plan as per FTG
Village Implementation Plan (2017/18).
Scoresby Village Stage 1 Streetscape Masterplan planned for 15/16
Knoxfield Shops Stage 1 Streetscape Masterplan planned for 16/17
APPENDIX G SERVICE SCOPE 2015-16: PLACE PROGRAM SERVICE (DS3584518) Page 5 of 9
A critical component of effective place program delivery is to ensure that comprehensive
planning has taken place for a location. Without a comprehensive plan (i.e. structure
plan), it is difficult to undertake an integrated and coordinated approach to securing the
necessary investment and commitment from associated partners and the long term
financial forecasting of Council business required to deliver sustainable place futures.
Council now has a number of Structure Plans in place or underway for most of these
locations however many have outstanding action plans yet to deliver. The service has
been challenged by trying to deliver and implement completed structure plans and
associated actions plans while starting new plans at the same time in locations where they
don’t exist.
Some other challenges include but are not limited to:
A lack of recognised authority to coordinate cross organisational delivery in these
locations,
Historical focus on capital works as the primary output of the Program and therefore
a narrow understanding of the triple bottom line objectives of the service,
Reliance of traditional local government revenue generation/ investment solicitation
and delivery models
Role of Council Whilst there is no legislative requirement for Council to operate a Place Program Service
the provision of a model that ensures integration and value add solution is not unique to
Knox and is regarded as industry best practice. Further, the service directly supports
Council in demonstrating compliance with a number of legislative objectives and Council
policies.
The Local Government Act, at Section 3C, specifies (inter alia) that:
“...a Council must have regard to the following facilitating objectives—
(a) to promote the social, economic and environmental viability and sustainability of
the municipal district;
(d) to promote appropriate business and employment opportunities; ...”
The Planning and Environment Amendment (General) Act 2013 also makes it mandatory
for a responsible authority to consider:
“...any significant social effects and economic effects which the responsible authority
considers the use or development may have.”
The Knox Long Term Financial Forecast and Rating Strategy 2015-16 sets out the rate
schedule for properties in Knox. Council currently charges a differential rate for
commercial and industrial properties and articulates the following relevant objective to the
Place Program service:
“Council has a commitment to positioning Knox as an important Commercial/Industrial
Centre in the Eastern metropolitan region. This objective includes an ongoing, significant
investment in place management to improve the functionality and appearance of activity
centres, together with general economic development promotion and facilitation activities,
and through the creation of business opportunities by the activation of precincts. The
APPENDIX G SERVICE SCOPE 2015-16: PLACE PROGRAM SERVICE (DS3584518) Page 6 of 9
industrial and commercial businesses of Knox are expected to be beneficiaries of this
ongoing significant investment by Council”.
The analysis will investigate the extent to which the service assists Council to meets this objective. This the analysis will also explore options to maximise synergies between the place program service and economic development service (without losing the place programs triple bottom line focus).
Strategic Intent ‘Place-based delivery’ provides an effective mechanism for the delivery of local
government business. The Place Program is modelled on a ‘place-based’ approach and
seeks to maximise return on investment. The service improves the performance of
important places in Knox through a coordinated, integrated multi-disciplinary and multi-
stakeholder engagement approach. It involves harnessing the knowledge, skills and
resources from within Council,the community and key investment partners to deliver better
places as outlined in Council’s Vision Statement and City Plan. It is about making
important places in Knox better for the present and future Knox residents whilst
maximising the benefits from Council’s limited resources.
The Place Program’s current core approach includes two key areas:
1. Strategic PlanningThe service coordinates ‘strategic planning’ (such as structure plans) across Knox’s
industrial and commercial places, creating a clear vision of the future for each place in
collaboration with the community and key investors/partners. Strategies are formulated to
outline the investment and initiatives needed to deliver the changes required and to inform
relevant planning scheme amendments and other non-statutory implementation actions.
2. Capital Works/ Streetscape ImprovementsThe service coordinates and oversees the delivery of capital improvements in industrial
and commercial places to improve the look, feel and function of the public realm. These
improvements usually include elements such as street furniture, public lighting,
landscaping and the creation of community meeting and public places.
In determining the future strategic intent for this service the Service Analysis will investigate the types of projects and initiatives that the service currently delivers and their effectiveness in delivering on triple bottom line outcomes, and the possibility for alternative models/ activities/ and funding to ensure its approaches are effective in delivering triple bottom line outcomes. A key challenge for the service is to develop a ‘place-based’ delivery approach which, in a resource
constrained environment, seeks to coordinate the implementation of initiatives identified by the community and captured in the respective Structure Plans for each place. The analysis will also consider the service role in coordinating a place based approach to delivering the City Plan and the barriers and opportunities to achieving the desired outcomes of the service.
APPENDIX G SERVICE SCOPE 2015-16: PLACE PROGRAM SERVICE (DS3584518) Page 7 of 9
Service Model The service model consists of a small team that leads a process of integration with
stakeholders/ investors and the community to achieve both strategic and grass roots
outcomes.
This service sets out to plan for, and then deliver a broad range of complimentary
initiatives (usually outlined in an adopted Structure Plan) for each location, from complex
social initiatives (such as diversity of housing, building broad-band capability, or
establishing a community bank) to basic physical improvements. Figure 2 provides a
summary of the current Place Program service model.
Figure 2: Current service model
The Place Program service currently operates simultaneously across all these key activity
areas (community engagement, place planning and strategy, coordinating actions and
evaluation and monitoring) across various locations. Refer Appendix 2 and 3 for examples
of Place Program Information Sheets and the range of initiatives currently in progress.
The Place Program requires skills and knowledge in areas such as strategic planning,
advocacy, partnership building, project management, cross-sector (public, private and
NFP) knowledge, impact evaluation and assessment, capital raising and knowledge of
markets. Sourcing staff with this full suite of technical skills is next to impossible to do and
not desirable. Instead, staffing a Place Program typically focuses on securing people with
high level leadership experience who have the strategic abilities required to undertake a
systems-approach to planning, investment and delivery. The service currently outsources
necessary technical expertise as and when required.
APPENDIX G SERVICE SCOPE 2015-16: PLACE PROGRAM SERVICE (DS3584518) Page 8 of 9
The Service Analysis will provide options for where Council should focus its efforts, depending on where each place is at in the cycle to meet the service objectives (i.e. Upper Ferntree Gully is in the planning phase, Mountain Gate is in the implementation phase) as well as the potential for the service (in each place) to foster private sector investment and how best to leverage Councils own assets in key places including activity centres). The analysis will also include consideration of the necessary skills to do this.
The Service Analysis will explore the most effective and efficient delivery model for this service.
Service Levels The service provides a focussed approach to each place/location. It is integrated,
consultative, and evidenced based. It takes account of the history, community values and
aspirations, site constraints, skills in urban design and planning to develop a plan that will
optimise outcomes (short and long term) for the location.
The Place Program service levels in various locations are influenced by a range of factors including:
Council’s own priorities and investment interests;
Changing needs and community expectations;
The objectives and business alignment of potential investors;
Ageing population;
Improvements in and access to technology and information;
Shifts in lifestyle preferences, including housing choices;
Changing economic situations;
Changes in family structures and requirements;
Heightened environmental awareness;
Policy and legislative changes, such as the emerging Melbourne Metropolitan Strategy;
Employment issues and access; and
State and age of infrastructure.
Investigation into the impact of the service through both a ‘return on investment assessment’1 and an emerging approach to achieving desired social, environmental and economic impact through what is called ‘Impact Investment’2 will be explored and recommendations made for its ongoing application to the service if appropriate.
Many locations in Knox are also experiencing an increase in development pressure. The
locations prioritised for place management work have been based on those areas which
have been experiencing development pressure and are areas of importance from a social
and economic perspective for the Knox Community. The approach seeks to influence how
all stakeholders invest and operate in these places for the long term benefit of the location
and the community.
1 A Guide to Social Return on Investment, SROI Network, 2012.
2 Impact Investing (investment that intentionally creates positive social or environmental impact as well as a financial
return, and measures both), as a socially and environmentally ethical avenue to generate returns for Council.
APPENDIX G SERVICE SCOPE 2015-16: PLACE PROGRAM SERVICE (DS3584518) Page 9 of 9
The Service Analysis will consider the effectiveness and efficiency of the current service, range of activities in key locations in the context of the above issues and drivers, and make recommendations to strengthen the integrated approach to delivery of triple bottom line outcomes.
Conclusion The Service Analysis will consider the role of the service in the context of this changing
environment and in this context investigate the strategic intent, role of Council, and most
effective service model aligned to the strategic intent of the service.
REFERENCES
1. Knox City Plan 2013-17
2. Knox City: Our Vision, Our Future 2013-17
3. Place Program draft Implementation Plan Feb 2015
4. Place Program Draft Implementation plan Issue Briefing Report, Feb 2015
5. SROI Network, 2012, A Guide to Social Return on Investment.
6. The Local Government Act 1989 (Vic)
7. The Planning and Environment Amendment (General) Act 2013
8. Knox Economic Development Strategy 2008 – 2018
9. Knox Long Term Financial Forecast and Rating Strategy 2014-15 to 2018-19
APPENDICES
1. Service Profile: Place Program (December 2012)
2. Ferntree Gully Village Place Program Information Sheet
3. Rowville Place Program Information Sheet
APPENDIX G-1 SERVICE PROFILE: PLACE PROGRAM SERVICE (DECEMBER 2012) Page 1 of 3
Service 6: Place Program
Director: Angelo Kourambas, Director City Development Manager: Kim Rawlings, Manager City Futures
Brief Description of Service
This service aims to realise Knox’s vision for attractive and vibrant places (activity centres and employment notes). This service provides an integrated approach to build partnerships and ensure better social, environmental and economic outcomes are delivered in community hubs. This service sets out to both improve the amenity and neighbourhood character of the municipality and increase the capacity for the community to be resilient to change and work together to determine what is important in their Place.
Council Plan Outcome: Attractive and Vibrant Places
Service Outcomes:
Increase in local activity and connection in community hubs and the centres of communitylife.
Enhanced capacity for community and Council to develop effective solutions is improved
Strong partnerships with community and regional stakeholders which together delivereffective projects
Improved built form responses and civic pride in Knox
Activities
6.1 Municipal Place Program: Development of a ten year place program plan for the seven key locations endorsed by Council in September 2012.
Outcomes: Ensures a coordinated approach to program delivery across the municipality is achieved; and ensures greater awareness, foresight, and integration in Council business planning.
6.2 Advocacy, Partnerships, Support & Advice: Provision of information and influence on strategic issues associated with managing place within the organisation and to the community.
Outcomes: Increased community awareness and understanding of the Council’s role and capacity, establishment of ‘common ground’ between Council and the community for working together and program delivery, improved community leadership. Increased knowledge of best practice, shared advocacy and support for strategic initiatives, increased ‘increased capacity to do ‘more with less’.
6.3 Implementation of Strategic Initiatives: Program management and delivery of ‘triple bottom line’ projects which provide opportunities for community capacity building and investment to improve the health, environs and the economy of Knox. Examples include Stamford Park Development and the Wantirna Mall and Ferntree Gully Village streetscape improvement works. The program includes monitoring and evaluation.
Outcomes: Effective development of community partnerships and alliances, greater collaboration between internal staff and the external community to support achievement of initiatives and build awareness of the place program, ensure Knox’s contribution and investment in place is effective, and those key community locations involved in the program increase their resilience.
APPENDIX G-1
APPENDIX G-1 SERVICE PROFILE: PLACE PROGRAM SERVICE (DECEMBER 2012) Page 2 of 3
6.4 Data, Evidence and Research: Compilation of data which captures the state of the community’s wellbeing, economy, and environment, including emerging trends and best practice.
Outcomes: An effective evidence base for strategic decision making and validation of strategic directions.
6.5 Business Case Planning, Community Liaison & Facilitation for Capital Works Projects: Consists of liaison and facilitation with the community to identify the needs of a neighbourhood or area, establish the need for capital works, and develop business cases with, for, and by those communities which will stand to benefit and be most impacted by investment and development.
Outcomes: Effective development of community partnerships and alliances, effective development of business cases, ensure Knox’s contribution and investment in place is effective, and those key community locations involved in the program increase their resilience.
Corporate Responsibilities: Includes the range of tasks that are required to run a service, including: planning, staff management, training, OHS, budgeting, advocacy (internal and external), and collaboration (internal and external).
Key current or future issues: There has been population and demographic change into and out of areas within Knox and
there is increasing development pressure. The locations chosen for place management workhave been based on those areas which have been experiencing development pressure.
Needs and expectations of the community are changing due to people getting older;improvements in and access to technology and information; shifts in lifestyle preferences;changing economic situations; changes in family structures and requirements; and aheightened environmental awareness.
The Place Program is subject to all manner of policy and legislative changes, such as theemerging metropolitan strategy. Everything from issue-specific concerns aroundemployment and inward investment, through to the identification of locations as ‘activitycentres’ will influence how and where the Place Program is applied.
Limited funding opportunities seem to be reducing and have onerous application andreporting requirements.
It has been difficult in the past to source staff which have the full suite of skills and experiencerequired for place management.
APPENDIX G-1 SERVICE PROFILE: PLACE PROGRAM SERVICE (DECEMBER 2012) Page 3 of 3
Financial Profile
Activity Expenditure Income Net
Advocacy, Partnerships, Support & Advice $64,089.32 $64,089.32 Municipal Place Program $52,601.88 $52,601.88 Implementation of Strategic Initiatives $277,561.94 $277,561.94 Data, Evidence and Research $85,245.12 $85,245.12 Business Case Planning, Community Liaison & Facilitation for Capital Works Projects $87,491.75 $87,491.75
TOTALS $566,990 $566,990
Total Net Cost: $566,9903
Staff Profile
Primary Job Family EFT
Perm
EFT
Temp
End date
(if temp)
Hours per
week Role
Coordinator 1.0 38.0 Place Program Coordination
Landscape Architect/ Place Manager
1.0 38.0 Program Management/ delivery in specific location
Program Officer/ Place Manager
0.8 30.4 Program Management/ delivery in specific location
Total available EFT and Hours
2.8 106.4
3 Note that the total cost won’t align exactly with the Departmental Budget of the service. This is because overhead
costs have been removed and measured in their own Service Profiles, and costs of buildings, parks and capital works renewals may have been added where appropriate. For full information about costings and assumptions used, see the Introduction section to Service Planning.
This d
ocu
men
t provid
es a sum
mary o
f the curren
t Place Pro
gram
for Fern
tree Gu
lly Villag
e. In 2014, C
ou
ncil ad
op
ted
a structu
re plan
for the villag
e that so
ugh
t to en
able the
follo
win
g visio
n.
Ferntree G
ully V
illage w
ill beco
me a flo
urish
ing
centre th
at services the need
s of the local comm
unity. The built environm
ent w
ill sensitively reflect the ch
aracter of the su
rrou
ndin
g
landscap
e. The Villag
e will p
rovide h
ou
sing
that is resp
on
sive and
com
plem
ents the d
esired ch
aracter of the V
illage.
Ferntree G
ully V
illage w
ill be a p
lace that celeb
rates its un
iqu
e q
ualities w
hile em
bracin
g d
iversity and creativity. The train
statio
n w
ill beco
me a th
riving
transp
ort h
ub, accessib
le to all
users w
ith g
reat walkin
g, cycling
con
nectio
ns.
Health
y and active lifestyles w
ill be the easy ch
oice,
con
nectio
n to
natu
re and the en
joymen
t of view
s tow
ards the
Dand
eno
ng
Ran
ges an
integ
ral part o
f Villag
e life. Ferntree
Gu
lly residen
ts will b
e actively and w
illing
ly involved
in
po
sitive eng
agem
ent over the fu
ture o
f their Villag
e.
Key D
irection
s �
Co
nso
lidate retail and
other co
mm
ercial activities
�
Enco
urag
e a variety of retail o
ffer to m
eet the lo
cal need
s of the co
mm
un
ity (local co
nvenien
ce sh
op
pin
g, niche sh
op
s, etc)
�
Provide m
ore o
pp
ortu
nities fo
r ho
usin
g in
the V
illage
�
Provide o
pp
ortu
nities fo
r a diversity o
f ho
usin
g
types (ag
eing
po
pu
lation
, chan
gin
g h
ou
seho
ld
structu
res, afford
ability, ch
oice, etc)
�
Imp
lemen
t bu
ildin
g heigh
ts (8m) and
setbacks to
p
rotect view
s to the D
anden
on
g fo
oth
ills and retain
a lo
w-scale and
op
en feel
�
Cap
italise on
the existing
com
mu
nity services to
su
pp
ort the lo
cal com
mu
nity
�
Better u
tilise spaces fo
r com
mu
nity u
ses (tow
n
squ
are, markets, even
ts, etc)
�
Prom
ote b
etter integ
ration
of existin
g b
us and
train
services
Ferntree Gully Village
Place P
rog
ram C
ycle
Plan
nin
g P
hase
Imp
lemen
tation
Ph
aseR
eview P
hase
we are
here
Plac
e Pr
ogra
m
Info
rmat
ion
Shee
ts
Fern
tree
Gul
ly
Villa
ge
This
do
cum
ent
pro
vid
es a
su
mm
ary
of t
he
curr
ent
pri
ori
ties
for
Fern
tree
Gu
lly V
illag
e as
id
enti
fied
by
the
com
mu
nit
y an
d o
utl
ined
in
the
Stru
ctu
re P
lan
201
4. I
t w
ill b
e u
pd
ated
re
gu
larl
y to
cap
ture
pro
gre
ss a
nd c
han
ge.
The
Plac
e Pr
og
ram
dri
ves
the
on
go
ing
im
ple
men
tati
on
and
mo
nit
ori
ng
of l
oca
l p
lan
s, c
oo
rdin
atin
g v
ario
us
init
iati
ves,
pro
ject
s an
d a
ctio
ns
acro
ss t
he o
rgan
isat
ion
.
For
mo
re in
form
atio
n p
leas
e co
nta
ct t
he
Cit
y Fu
ture
s D
epar
tmen
t o
n 9
29
8 8
00
0.
Acc
ess
the
full
stru
ctu
re p
lan
at:
h
ttp
://w
ww
.kn
ox.
vic.
go
v.au
/ftg
villa
ge
July
201
5
DRA
FT
LAN
D U
SE P
LAN
NIN
G A
ND
DE
VE
LOP
ME
NT
1Pl
ann
ing
Sch
eme
Am
end
men
t to
Im
ple
men
t Pl
ann
ing
Co
ntr
ols
in
Acc
ord
ance
wit
h t
he S
tru
ctu
re P
lan
Co
mp
lete
d
2D
eliv
er a
Str
eets
cap
e M
aste
rpla
n
for
the
Vill
age
Co
mp
lete
d
3C
oo
rdin
ate
Futu
re U
ses
of
Vic
Trac
k La
ndIn
pro
gre
ss
4Es
tab
lish
a D
esig
n R
evie
w P
anel
fo
r R
edev
elo
pm
ent
Site
sIn
pro
gre
ss
5Pl
an fo
r an
exp
and
ed a
nd im
pro
ved
Pu
blic
Tra
nsp
ort
In
terc
han
ge
Futu
re
PU
BLI
C I
NF
RA
STR
UC
TUR
E
6R
evie
w a
nd U
pg
rad
e o
f Pu
blic
To
ilets
In p
rog
ress
7D
esig
n a
nd B
uild
Co
nn
ecti
vity
Im
pro
vem
ents
for
Ped
estr
ian
s an
d
Cyc
lists
In p
rog
ress
8St
reet
scap
e U
pg
rad
e in
th
ree
Loca
tio
ns
In p
rog
ress
9D
evel
op
imp
rove
d W
ayfin
din
gFu
ture
10C
oo
rdin
ate
Ro
ad a
nd A
dve
rtis
ing
Si
gn
age
wit
h S
take
ho
lder
sFu
ture
11A
dvo
cate
for
Imp
rove
men
ts to
Pu
blic
Tra
nsp
ort
Ser
vice
On
go
ing
12D
eliv
er I
mp
rove
d M
ain
ten
ance
of
Stre
etsc
ape
Infr
astr
uct
ure
On
go
ing
BU
SIN
ESS
& I
NV
EST
ME
NT
13C
oo
rdin
ate
and
Su
pp
ort
In
vest
men
t A
ttra
ctio
n, M
arke
tin
g,
and
Pro
mo
tio
n S
trat
egy
Futu
re
14C
oo
rdin
ate
Park
ing
Im
pro
vem
ents
w
ith
Car
Par
k O
wn
ers
On
go
ing
CO
MM
UN
ITY
BU
ILD
ING
& E
NG
AG
EM
EN
T
15Pr
om
ote
In
crea
sed
Use
of
Pub
lic S
pac
e I
n p
rog
ress
16En
gag
emen
t Pro
gra
m w
ith
D
evel
oper
s an
d L
ocal
Sta
keh
old
ers
to Im
pro
ve D
esig
n a
nd A
cces
sib
ility
of
New
Bu
ildin
gs
Futu
re
17A
dvo
cate
for
Ad
dit
ion
al F
acili
ties
an
d L
oca
tio
ns
for
Art
s &
Cu
ltu
reFu
ture
18C
oo
rdin
ate
Tem
po
rary
and
Pe
rman
ent
Loca
tio
n fo
r a
New
C
om
mu
nit
y H
ub
Futu
re
19Su
pp
ort a
nd E
ncou
rage
Loc
al
Com
mun
ity G
rou
ps
and
O
rgan
isat
ion
s th
rou
gh a
Pro
gra
m
of C
on
tin
uo
us
Eng
agem
ent
On
go
ing
Fern
tree
Gul
ly
Villa
ge
Cit
y P
lan
Th
emes
Ico
ns:
Hea
lth
y, C
on
nec
ted
Co
mm
un
itie
s
Pro
sper
ou
s, A
dva
nci
ng
Eco
no
my
Vib
ran
t an
d S
ust
ain
able
Bu
ilt a
nd N
atu
ral E
nvir
on
men
t
Cu
ltu
rally
Ric
h a
nd A
ctiv
e C
om
mu
nit
ies
Dem
ocr
atic
and
En
gag
ed C
om
mu
nit
ies
15
148
15
14
3314
5
15
8 8
6
No
te:
Futu
re p
roje
cts
are
sub
ject
to fu
rthe
r b
ud
get
co
nsi
der
atio
n fo
r fu
ndin
g
No
t al
l act
ivit
ies
can
be
loca
ted
on
a m
ap
DRA
FT
This d
ocu
men
t provid
es an u
pd
ate on
the pro
gress o
f the R
ow
ville Place Prog
ram. C
ou
ncil recen
tly ado
pted
the R
ow
ville Plan 2015, a p
lan fo
r the centre th
at seeks to en
able
the follo
win
g visio
n.
Ro
wville is a su
bu
rb in
transitio
n. A
s the last op
en areas
in R
ow
ville are bu
ilt ou
t with
ho
uses, p
op
ulatio
n g
row
th
is slow
ing
to alm
ost n
il. At the sam
e time, A
ustralia-w
ide
shifts to
ward
s smaller h
ou
seho
lds and
an o
lder p
op
ulatio
n
is chan
gin
g the w
ay we live and
the services we n
eed. A
ch
ang
ing
climate is ch
ang
ing
ho
w w
e use reso
urces and
in
teract with
ou
r natu
ral environ
men
t. As R
ow
ville transitio
ns
from
a perio
d o
f rapid
gro
wth
to o
ne o
f matu
rity, the imp
acts o
f these chan
ges are b
eing
felt differen
tly in R
ow
ville than
o
ther parts o
f Kn
ox.
The fund
amen
tal challen
ge in
plan
nin
g fo
r Ro
wville’s fu
ture
is ho
w to
balan
ce to very im
po
rtant co
mp
eting
aspiratio
ns
with
in o
ur co
mm
un
ity: the desire to
preserve the existin
g
character o
f ou
r neigh
bo
urh
oo
ds and
the ben
efits that co
me
with
increased
den
sity and d
iversity in ap
pro
priate lo
cation
s.
Key D
irection
s �
Protect the q
uite, leafy ch
aracter of R
ow
ville’s n
eighb
ou
rho
od
s
�
Increase d
ifferent h
ou
sing
cho
ices in a sm
aller A
ctivity Cen
tre
�
Enco
urag
e better tran
spo
rt cho
ices to co
mb
at co
ng
estion
�
Create a p
ub
lic ‘heart’ for R
ow
ville’s com
mu
nity
�
Sup
po
rt mo
re local o
ptio
ns fo
r sho
pp
ing,
din
ing
& en
tertainm
ent
�
Balan
ce services and su
pp
ort fo
r a ch
ang
ing
and ag
eing
po
pu
lation
�
Prom
ote su
stainab
le solu
tion
s to b
uild
ing
resilien
t infrastru
cture
�
Enab
le a greater vo
ice for the co
mm
un
ity in
futu
re plan
nin
g
Rowville
Place P
rog
ram C
ycle
Plan
nin
g P
hase
Imp
lemen
tation
Ph
aseR
eview P
hase
we are
here
Plac
e Pr
ogra
m
Info
rmat
ion
Shee
ts
Row
ville
This
do
cum
ent
pro
vid
es a
su
mm
ary
of t
he
curr
ent
pri
ori
ties
for
Ro
wvi
lle a
s id
enti
fied
by
the
com
mu
nit
y an
d o
utl
ined
in t
he R
ow
ville
Pl
an 2
015.
It
will
be
up
dat
ed r
egu
larl
y to
ca
ptu
re p
rog
ress
and
ch
ang
e.
The
Plac
e Pr
og
ram
dri
ves
the
on
go
ing
im
ple
men
tati
on
and
mo
nit
ori
ng
of l
oca
l p
lan
s, c
oo
rdin
atin
g v
ario
us
init
iati
ves,
p
roje
cts
and
act
ion
s ac
ross
the
org
anis
atio
n
and
wit
hin
the
co
mm
un
ity.
For
mo
re in
form
atio
n p
leas
e co
nta
ct t
he
Cit
y Fu
ture
s D
epar
tmen
t o
n 9
29
8 8
00
0.
Acc
ess
the
full
stru
ctu
re p
lan
at
h
ttp
://w
ww
.kn
ox.
vic.
go
v.au
/ro
wvi
llep
lan
/
July
201
5
DRA
FT
19
8
13
14
5 17
11
12
11
94
10204
3
21
15
7
8
24
6
16
LAN
D U
SE P
LAN
NIN
G A
ND
DE
VE
LOP
ME
NT
1R
ezo
ne
resi
den
tial
are
as t
hro
ugh
the
Kn
ox
Ho
usi
ng
Str
ateg
y an
d C
131
In p
rog
ress
2R
ezo
ne
1060
Stu
d R
oad
to r
esid
enti
al /
co
mm
un
ity
use
s th
rou
gh C
131
In p
rog
ress
3Se
t re
qu
irem
ents
for
the
futu
re r
edev
elo
pm
ent
of S
tud
Par
k Sh
op
pin
g C
entr
e an
d s
urr
ou
ndin
g
com
mer
cial
are
as v
ia D
PO12
in C
131
In p
rog
ress
4Se
t re
qu
irem
ents
for
the
app
rop
riat
e d
evel
op
men
t o
f Op
po
rtu
nit
y Si
tes
wit
h n
ew
bu
ilt fo
rm c
on
tro
ls v
ia D
DO
9 in
C13
1
In p
rog
ress
5Se
t re
qu
irem
ents
for
the
futu
re r
edev
elo
pm
ent
of K
ing
sto
n L
inks
Go
lf C
ou
rse
to r
esid
enti
al a
nd
com
mu
nit
y u
ses
via
a n
ew D
PO in
C14
2
In p
rog
ress
6Fa
cilit
ate
the
del
iver
y of
a b
est p
ract
ice
sust
aina
ble
re
sid
enti
al d
evel
opm
ent a
t Sta
mfo
rd P
ark
In p
rog
ress
7Fa
cilit
ate
dev
elo
pm
ent
of a
new
‘Mai
n S
tree
t’ p
reci
nct
alo
ng
Fu
lham
Ro
adFu
ture
PU
BLI
C I
NF
RA
STR
UC
TUR
E
8D
eliv
er r
efu
rbis
hed
His
tori
c H
om
este
ad, n
ew
wet
land
s, a
nd n
ew c
om
mu
nit
y o
pen
sp
ace
thro
ugh
the
Sta
mfo
rd P
ark
Mas
terp
lan
In p
rog
ress
9D
esig
n a
nd b
uild
inte
rsec
tio
n im
pro
vem
ents
to
the
Stu
d R
oad
Fro
nta
ge
Ro
ad fr
om
Ava
lon
Ro
ad
to L
akev
iew
Ave
nu
e
In p
rog
ress
10D
esig
n a
nd b
uild
Stu
d P
ark
Res
erve
Mas
terp
lan
an
d im
pro
vem
ents
In p
rog
ress
11D
esig
n a
nd b
uild
Ro
w a
nd A
rcad
ia R
eser
ve
Mas
terp
lan
s an
d im
pro
vem
ents
In
pro
gre
ss
12D
eliv
er p
layg
rou
nd r
enew
al a
t D
esch
amp
C
resc
ent
Res
erve
Futu
re
13C
oord
inat
e th
e d
esig
n a
nd c
onst
ruct
ion
of a
new
sh
ared
pat
h c
ross
ing
of t
he C
orh
anw
arra
bu
l Cre
ek
bet
wee
n S
tam
ford
Par
k an
d C
arib
bea
n G
ard
ens
Futu
re
14Fa
cilit
ate
a n
ew s
har
ed p
ath
co
nn
ecti
on
to
East
link
Trai
l via
Car
ibb
ean
Gar
den
s an
d/o
r K
ing
sto
n L
inks
Go
lf C
ou
rse
Futu
re
15A
dvo
cate
for
the
del
iver
y o
f new
bu
s in
terc
han
ge
at S
tud
Par
kFu
ture
16C
on
tin
ue
to a
dvo
cate
for
the
pro
po
sed
Ro
wvi
lle
Rai
l ext
ensi
on
to S
tud
Par
kO
n g
oin
g
BU
SIN
ESS
& I
NV
EST
ME
NT
17U
nder
take
Wel
ling
ton
Ro
ad E
con
om
ic C
orr
ido
r St
ud
yFu
ture
18U
pd
ate
the
Sco
resb
y-R
ow
ville
Em
plo
ymen
t Pr
ecin
ct P
olic
yFu
ture
CO
MM
UN
ITY
BU
ILD
ING
& E
NG
AG
EM
EN
T
19C
oo
rdin
ate
reve
get
atio
n p
rog
ram
alo
ng
C
orh
anw
arra
bu
l Cre
ek fr
om
Stu
d R
oad
to
Tayl
ors
Lan
e
In p
rog
ress
20
Und
erta
ke a
ser
vice
rev
iew
of t
he R
ow
ville
C
om
mu
nit
y C
entr
e Fu
ture
21
Faci
litat
e th
e d
eliv
ery
of a
n e
xpan
ded
Ro
wvi
lle
Lib
rary
at
Stu
d P
ark
Futu
re
22
Faci
litat
e th
e d
evel
op
men
t o
f new
res
iden
tial
ag
ed c
are
serv
ices
in R
ow
ville
Futu
re
23
Esta
blis
h a
‘Co
mm
un
ity
Lin
k’ o
r o
ther
new
ce
ntr
al p
oin
t o
f acc
ess
for
info
rmat
ion
on
C
ou
nci
l ser
vice
s an
d e
ven
ts in
Ro
wvi
lle
Futu
re
24
Co
nti
nu
e d
evel
op
men
t an
d d
eliv
ery
of t
he
Stri
ng
ybar
k Fe
stiv
alO
n g
oin
g
Cit
y P
lan
Th
emes
Ico
ns:
Hea
lth
y, C
on
nec
ted
Co
mm
un
itie
s
Pro
sper
ou
s, A
dva
nci
ng
Eco
no
my
Vib
ran
t an
d S
ust
ain
able
Bu
ilt a
nd N
atu
ral E
nvir
on
men
t
Cu
ltu
rally
Ric
h a
nd A
ctiv
e C
om
mu
nit
ies
Dem
ocr
atic
and
En
gag
ed C
om
mu
nit
ies
No
te:
Futu
re p
roje
cts
are
sub
ject
to fu
rthe
r b
ud
get
co
nsi
der
atio
n fo
r fu
ndin
g
No
t al
l act
ivit
ies
can
be
loca
ted
on
a m
ap
Row
ville D
RAFT
APPENDIX H SERVICE SCOPE 2014-15: CUSTOMER SERVICES (DS3501323) Page 1 of 6
Service:
Director: Manager:
Customer Service
Joanne Truman, Director Corporate Development
Kath Oakley, Manager Corporate Communications and
Customer Service
SERVICE ASSESSMENT QUESTIONS This Service Assessment will aim to answer the following key questions:
1. What should be the strategic intent of the service?
2. What should be the service model for this service?
3. What service levels should this service deliver?
In accordance with the Council Plan, all Service Analyses will consider planning, where
relevant, for an ageing population; and providing a range of programs, services and
partnerships which aim to build connections between people and reduce social isolation.
INTRODUCTION
Knox Council’s Customer Service team directly answers and responds to enquiries via a
frontline (or single) point of contact. It is a centralised, frontline customer contact approach
in line with best practice—providing a consistent, seamless service for residents.
Reviewing the current service allows Council to ensure it is meeting community
information and contact needs. It will assist the exploration and adoption of new and
emerging technologies to best meet residents’ and community members’ information and
contact needs over coming years.
This Service Planning Scope:
Describes the current service model
Articulates the challenges to be assessed
Outlines the areas of focus for study
CURRENT SERVICE MODEL
Customer Service - Service Snapshot Service budget 2014/2015: Income
Expenditure
Net
$0
$2.32M
$2.32M
Service EFTs: 23.56 (plus 0.5 Manager)
SCOPE
APPENDIX H
APPENDIX H SERVICE SCOPE 2014-15: CUSTOMER SERVICES (DS3501323) Page 2 of 6
Knox Council’s Customer Service function operates as a centralised point of contact for
customers to access Council. It comprises a 10-seat call centre, and a Customer Service
centre (at the Civic Centre) that supports all enquiries, and payments. The service is
extended via an outpost centre at the Stud Park Shopping Centre in Rowville.
The Manager of Corporate Communications and Customer Service has overall
responsibility for the strategic function of Customer Service, aligning it to Council’s Vision.
The Coordinator Customer Service leads the day-to-day operations, including staffing,
technology, systems, and customer complaints.
The Service Model provides a single point of contact for most enquiries, including all
services such as Local Laws, waste, rates payments, and enquiries. The service model is
designed to centralise the answers provided efficiently and with minimal difficulty for the
customer.
The Customer Service team answers, or directs services to respond to:
120,000 calls per annum (including via After Hours call management)
72,000 customer requests
32,400 in person visits (payments, requests, enquiries)
SERVICE ASSESSMENT
Strategic Intent
The strategic intent of the Customer Service function is to assist the organisation to
connect its services to the community and provide a central point of contact for the
community to access Council services.
• 1 Coordinator
• 2 Team Leaders
• 2.4 Support staff
•2 Technical Officers
•10-seat call centre
•7 Customer ServiceOfficers (daily agents)
•2 counter servicelocations (Civic Centreand Rowville)
•5 Customer ServiceOfficers (daily agents)
Counter Service
Call Centre Service
Team Leadership, Operations
and Support
Building and
Planning Counter
APPENDIX H SERVICE SCOPE 2014-15: CUSTOMER SERVICES (DS3501323) Page 3 of 6
The function’s strategic intent is still contemporary and remains relevant. The Service
Analysis will not focus significantly on a review of the strategic intent and its link to Council
Vision.
The Service Analysis will primarily focus on:
How the service model best delivers the strategic intent, and
What opportunities exist to increase its effectiveness and efficiency.
Service Model
Council has supported the centralised in-house service delivery model for over a decade
and has seen positive community satisfaction results with its Customer Service function
over that period. There are no emerging drivers that support a significant review of the
current service delivery model.
There are, however, a number of emerging issues and opportunities that would benefit
from further exploration as part of the Service Analysis that may result in Council choosing
to adjust or realign the service model for greater efficiency.
Despite a shift by some multi-national organisations towards outsourcing of their customer
service and customer contact functions, Knox Council continues to support local
information to, and contact with, its residents.
Multi channel service delivery
The community expects a greater level of customer-led and user-friendly, tailored
customer service. The organisation’s corporate systems are not yet capable of enabling a
fully customer-centric approach to customer service. This will be explored further in the
Service Analysis alongside opportunities for offering a multi-channel service experience1.
This could be delivered in conjunction with the Information Management Service Plan to
provide a renewed customer-centred website, supported by integrated business systems.
New technologies will be explored, also in conjunction with the IM Plan, to:
Provide more efficient transactions online
Improve efficiency of services by improved self-help transactions
Capitalise on emerging online and social media technologies to connect with
residents at the time of their choosing
More effective and better integrated customer request management tools and
systems.
1 A multi-channel service experience is a website that provides a ‘one-stop-shop’ approach to
communicating. It brings all key information into elements on the one page that makes for easier navigation and service, 24/7. This approach could be explored in conjunction with work being done by the Information Management team, and in its Service Analysis.
APPENDIX H SERVICE SCOPE 2014-15: CUSTOMER SERVICES (DS3501323) Page 4 of 6
In the past, Council has tended to design its services and programs in a way that suits
operational delivery to the community rather than identifying what and how the community
wish to access Council information. The role and use of technology in establishing greater
community connection from a customer experience perspective will form part of the
Service Analysis.
Council’s telecommunications service and systems are currently being upgraded. This
upgrade will increase the call-capacity of the customer contact centre and also provide
opportunity for email queue routing and web-chat as part of the customer service
experience. Whilst this will be implemented in mid-2015, the benefits of this activity will be
measurable and reported in the Service Analysis.
Internal and external demand
The responsibilities of the Customer Service team are twofold:
Liaising with internal departments to ensure information and service to the
community is accurate, and
Servicing the community’s and customers’ requests.
As the organisation continues to grow in breadth and complexity, so too does the demand
increase for Customer Service to serve as a support. This places ever-increasing
pressure on the resources of the function.
Call service/wait times
A recent example of expanding service support is the introduction of (On call) Hard Waste
Collection. The administration of the service was absorbed by the Customer Service
function, without full consideration of the impact on the service. This has resulted in an
increase of calls and an extension of call-service time.
The complexity of the customer requests being received by Customer Service is also
increasing, resulting in call delays and extended call-service/wait times. This impacts the
volume of calls that can be resolved and potentially customer satisfaction. Further
exploration of efficiencies and customer service practice will be examined as part of the
Service Analysis.
Managing peaks
The Service Analysis will explore the internal needs and demands of the organisation and
recommend opportunities and solutions for any efficiency gains. This would include
recommendations about the role of the team in further embedding Service Excellence
across the organisation. Sharing skills, and operating in a role modelling capacity that
promotes good practice across the organisation, will be examined and assessed. This will
enhance Council’s understanding of how to provide best integration across its services (ie.
making sure the left hand knows what the right hand is doing).
APPENDIX H SERVICE SCOPE 2014-15: CUSTOMER SERVICES (DS3501323) Page 5 of 6
The service is currently at capacity and not consistently meeting its performance
measures. Any additional internal or external service demands will have a significant
impact on the capacity to continue to deliver good service. During peak times, such as
when rate payment is due or in the occurrence of a significant storm event, the systems
required for the service to function are not performing efficiently and staff are reporting a
reduction in customer satisfaction. A better approach to managing peaks in service
demand will be explored in the Service Analysis.
Accessibility
Council has a legislative obligation to provide accessible services, or its services through a
range of accessible formats. The Customer Service function keeps abreast of its
accessibility requirements, but has often been restricted by technology barriers. The need
for the service to keep abreast with emerging technologies is essential, particularly when
the technology can provide solutions to a range of accessibility issues. The assessment
will include focus on leveraging business technology and information.
The Service Analysis will explore best practice in customer service accessibility and make
recommendations. As part of the Service Analysis, there will be an opportunity to
investigate the efficacy and practicality of the Rowville Customer Service Centre and look
at other opportunities for outpost service provision and the potential to increase
accessibility to Council customer services.
Service Levels
Council’s Customer Service is consistently regarded as a high performing function of
Council, having recorded the highest score for Customer Contact in the metropolitan
region on more than several occasions in recent years.
The Customer Service function constantly measures and monitors the performance and
service levels of the Customer Service function. The data collected by Customer Service is
reported monthly across the organisation and also support the Organisational Health
Indicators. The data collected measures the organisation’s service levels to the
community.
The type of statistics that are captured include call volumes, call classification (Line of
Business LOB), call wait time, call talk time, the Grade of Service (GOS), length of time it
takes for a customer call to be answered, number and type of enquiries (counter and web)
number and type of customer requests lodged in the CRS (Customer Request System).
Customers are also provided with the opportunity to rank and rate their customer
experience, and these results will be used in exploring service efficiency and customer
satisfaction as part of the Service Analysis. Council also participates in the annual
Community Satisfaction Survey, and Council’s Customer Service is reported in these
results.
APPENDIX H SERVICE SCOPE 2014-15: CUSTOMER SERVICES (DS3501323) Page 6 of 6
The Service Analysis provides an opportunity to review the current service levels to ensure
Council is supporting the community to their satisfaction without over or under servicing. It
would also provide an opportunity to investigate existing and future outpost services (eg.
Rowville, libraries).
Areas of focus will include:
Staffing levels linked with service provided
Quality of service measured overall, and for types of enquiries
Any resourcing implications on Council’s Customer Service function
APPENDICES
1. Service Profile: Customer Services (December 2012)
2. Service Snapshot: Customer Service (April 2015)
APPENDIX H-1 SERVICE PROFILE: CUSTOMER SERVICES (DECEMBER 2012) Page 1 of 3
Service 33: Customer Service Director: Jo Truman, Director Corporate Development Manager: Kath Oakley, Manager Corporate Communications and Customer Service
Brief Description of Service This service is designed to facilitate the delivery of a range of Council’s programs and services to the community via telephone and counter contact centre(s). The service supports the organisation to provide personalised, responsive customer service via all Council’s contact channels. The team provides guidance and support for all customer interactions and exists to support information and connection between Council and the community. Council Plan Outcome: Dynamic Service and Facilities
Service Outcomes:
Positive Council reputation.
Enhanced customer experience of Council.
Effective advice on planning and building in Knox.
Well informed community regarding council services.
Efficient management of complaints and requests.
Efficient management of payments.
Activities
33.1 Contact Centres: Council’s Contact Centre is dedicated to resolving phone enquiries and providing information to the community. The Contact Centre aims to resolve the majority of enquiries at the first point of contact and distribute customer enquiries across the organisation only when required. The contact centre: receives 125,000 calls per annum; receives 100,000 Customer requests per annum; resolves 80% of customer requests at the first point of contact; receives 35,000 in person requests; and receipts 51,000 transactions over the counter. The Contact Centre includes the Rowville Customer Service Centre and the provision of the emergency After Hours service for the community.
Outcomes: High grade of service for answering of phone calls by the Contact Centre in required timeframes. The referral of specialised enquiries to internal teams and best practice customer service to the community.
33.2 Cashiering: Provision of a cashiering and enquiry function allowing the community to pay for fees and charges and request community information. Processing of internal petty cash and postal cheque receipting.
Outcomes: Convenience of paying over the counter at Council customer service centres for community members who prefer this mode of payment; and effective and efficient payment process of petty cash for staff.
33.3 Planning & Building Counter: Answers queries and processes applications specifically relating to planning or building applications or related matters.
Outcomes: Increased knowledge of the community about planning or building matters, better quality applications, and more efficient service delivery.
APPENDIX H-1
APPENDIX H-1 SERVICE PROFILE: CUSTOMER SERVICES (DECEMBER 2012) Page 2 of 3
33.4 1st
Point Knowledge Management: The continual updating and development of Council’s Knowledge Management System (over 2000 web-based content pages) for storing and accessing information about all council services. The information allows customer service staff and the organisation to provide the community with the most up to date information about services and close calls off at the first point of contact. Outcomes: The Knowledge Management system is kept up-to-date and is comprehensive. Customer service team are able to maximise answering of queries at the first point of contact providing organisational efficiencies and increased customer satisfaction.
33.5 Service Relations Program: Enables the continued development of cross departmental relationships through the development of two-way relationships, mentoring and supportive two-way relations (internally); the program offers improved lines of communication and fosters an understanding of the day to day service challenges of all areas across council. Outcomes: Improved Customer Service Unit’s strategic and operational understanding of departments’ activities. Improved departmental understanding of the Customer Service Unit’s primary strategic and operational activities. Improved information for the Customer Service team to use in daily operations, and better outcomes for Council’s customers.
33.6 ‘Serving You Well’ Program: The Serving You Well program reinforces Knox’s shared approach to delivering reliable customer services across all areas within council. ‘Serving You Well’ is a shared commitment to achieving customer satisfaction and builds on Knox City Council’s community reputation for service excellence.
Outcomes: Improved management of customer contact and service requests across all council service areas. Enhanced quality of communication with customers, and improved accessibility and knowledge of service standards and complaints handling processes.
33.7 Systems infrastructure and service monitoring: Constant monitoring and development of systems and processes of the contact centre and counter service areas and providing feedback and implementing improvements for continuous improvement of service delivery.
Outcomes: Increased awareness of the key drivers for the efficiency of the service, increased capacity to respond to the needs of the community, and improved overall service delivery.
Key current or future issues: The Community are requesting more information and expect accountability. They want
24 hour access and want their enquiries resolved quickly. This change is continuing. The number of contact and engagement points for residents and customers is continually evolving.
The emerging and growing number of Cultural and Linguistically Diverse (CALD) groupsin the community is likely to require investment in systems and resources to meet their requirements over time.
APPENDIX H-1 SERVICE PROFILE: CUSTOMER SERVICES (DECEMBER 2012) Page 3 of 3
Financial Profile
Activity Expenditure Income Net
Contact Centres $198,493.94 $198,493.94 Cashiering $2,150.57 $2,150.57 Planning & Building Counter $1,117,732.62 $1,117,732.62 1
st Point Knowledge Management $1,153,370.71 $1,153,370.71
Service Relations Program $37,360.69 $37,360.69 ‘Serving You Well’ Program $148,207.28 $148,207.28 Systems infrastructure and service monitoring $18,728.20 $18,728.20 Corporate Responsibilities $198,493.94 $198,493.94
Total $2,676,044 $2,676,044
Total net cost: $2,676,0442
Staff Profile
Primary Job Family EFT
Perm EFT
Temp End date (if temp)
Hours per week
Role
Coordinator 1.00 Coordinator Customer Service
Customer Service Officer 19.59 1.00 18 May
2012 782.50
Customer Service Officers and Support staff
Technical Specialist 2.00 76.00 Team Leader, Customer Service Building & Planning
Total available EFT and Hours
22.59 1.00 858.50
2 Note that the total cost won’t align exactly with the Departmental Budget of the service. This is because overhead
costs have been removed and measured in their own Service Profiles, and costs of buildings, parks and capital works renewals may have been added where appropriate. For full information about costings and assumptions used, see the Introduction section to Service Planning.
APPENDIX H-2 SERVICE SNAPSHOT – CUSTOMER SERVICE (APRIL 2015) Page 1 of 1
APPENDIX H-2
APPENDIX I SERVICE SCOPE 2015-16: CORPORATE PLANNING & PERFORMANCE SERVICE (DS3534760) Page 1 of 7
Service: Corporate Planning and Performance Director: Joanne Truman, Director Corporate Development Manager: Kerryn Ellis, Manager Governance and Innovation
SERVICE ASSESSMENT QUESTIONS This Service Assessment will aim to answer the following key questions:
1. What should the strategic intent of this service be in a rapidly changing environment?
2. What should the service model be for this service in the future?
3. What service activities and levels of activity should this service deliver? Do any of the
service’s activities need to be adjusted given the answers to the above?
In accordance with the Council Plan, all Service Analyses will consider planning, where
relevant, for an ageing population; and providing a range of programs, services and
partnerships which aim to build connections between people and reduce social isolation.
INTRODUCTION
One of the key roles of local government – enshrined within the Local Government Act
1989 – is to plan for the future of its City and community. Councils do this by providing
leadership and good governance to deliver advocacy, services and programs, and
stewardship of the community’s assets and resources on the community’s behalf.
Corporate Planning and Performance (CP&P) is the key service that supports council to
fulfil this role, playing a leadership and guidance role in strategy development. The service
supports the organisation to plan and monitor its services, projects and activities, supports
Council to measure and report on outcomes to provide transparency and accountability to
the community, and ensure the sustainability of Council into the future.
This service review will provide an opportunity to reflect on the current strategic intent,
service model and the service levels of the CP&P service. The question of the role of
Council in this service is not relevant as Council is legislatively required to plan for the
future of its community. The CP&P service is key leader and facilitator that supports
Council to do this work.
The main challenge and opportunity for the CP&P service is to ensure it continues to
provide the skills and capacity for Council to plan effectively in a rapidly changing
operating environment. Increasingly there is a tension experienced between what is
happening externally (through changes in the federal, state and local political and
SCOPE
APPENDIX I
APPENDIX I SERVICE SCOPE 2015-16: CORPORATE PLANNING & PERFORMANCE SERVICE (DS3534760) Page 2 of 7
economic spheres) and internally (Council’s capacity to respond to change and plan for
the future). In dealing with these competing pressures, CP&P leads and guides Council
and the organisation to identify its priorities, determine its return on investment and adjust
the scale and scope of Council activities accordingly.
The role of CP&P has always been to plan effectively in relation to the local government
context Council operates within at a given time. However, with an increasingly changing
environment it is appropriate that the CP&P service re-imagines its strategic intent, what it
provides to the organisation, and how it is provided to ensure it remains contemporary,
relevant and suited to Council’s current and future operating context.
CURRENT SERVICE MODEL
Corporate Planning and Performance Service Snapshot Service revised budget 2014/2015: Income
Expenditure
Net
($0)
$856,013*
$856,013
Service EFTs: 4.7
* Please note these figures include the service planning budget of $194,000.
The Corporate Planning and Performance service is currently comprises two strongly
connected activities – Corporate Planning (1.7 EFT) and Service Planning (2 EFT) – and a
manager (1EFT) that oversees both.
The CP&P service is provided in-house by a small team. On occasion consultants are
brought in to provide specialist advice or conduct workshops or training for specific
activities for programs such as the development of the City Plan, business planning or
service planning, for example.
The functions of the Corporate Planning and Performance service are:
strategic planning – leadership of Council and the Executive Management Team’s
strategic planning process, to deliver the City Plan, Council Plan and Annual Plan.
corporate planning – centralised coordination of the business and resource planning
process.
service planning – supporting the delivery of the rolling four year schedule of service
reviews.
performance monitoring, evaluation and reporting – review and measurement of
the City Plan and Council Plan, regular monitoring and reporting on the progress of
Knox’s strategic plans and the organisation health, and production of the Annual
Report.
APPENDIX I SERVICE SCOPE 2015-16: CORPORATE PLANNING & PERFORMANCE SERVICE (DS3534760) Page 3 of 7
meeting legislative requirements – supporting the organisation to meet a number of
its legislative obligations including: development of the Council Plan; preparation of the
Annual Report; compliance with the Local Government Performance Reporting
Framework; and meeting the Best Value requirements of the Local Government Act
1989.
organisational improvement projects – leading and supporting the organisation in
various projects that deliver innovation and continuous improvement.
All of these functions support and enable Knox’s integrated planning framework (Figure 1).
Figure 1
The CP&P service leads the development of the Vision and City Plan (incorporating the
Council Plan). The Vision outlines what the future for Knox could and should look like.
The City Plan sets out what the City as a whole will do to achieve the aspirations for the
future and contains the Council Plan, which outlines the direction and priorities of Council
in response to the City Plan. All of the other strategic, corporate and service planning
documents and processes also contribute to the achievement of the Vision. CP&P leads
and supports the organisation to do all of this work in one way or another.
In turn, CP&P also provides a number of reports which monitor Council’s progress toward
the achievement of these plans and provides accountability to the community and
stakeholders. For example, the CP&P service delivers the Annual Report and the
Quarterly Performance Reports, and contributes in partnership with other teams to the
State of Knox Report.
APPENDIX I SERVICE SCOPE 2015-16: CORPORATE PLANNING & PERFORMANCE SERVICE (DS3534760) Page 4 of 7
SERVICE ASSESSMENT
The local government sector is currently facing a number of challenges such as:
a freeze on increases to grants commission funding;
the introduction of rate capping;
an environment of heightened risk, greater scrutiny and increasing legislative
requirements; and
increasing and more complex community needs and expectations.
The main challenge for CP&P is to determine how best to lead and support the
organisation to remain sustainable and to deliver on important community services and
outcomes, through an increasingly changing and somewhat uncertain environment.
Strategic Intent For many years, local government has been operating in an environment of continual
growth. With multiple revenue streams, including funding from other levels of government,
local government has been able to provide services that incrementally grow year on year,
in response to growth in community needs and expectations.
This environment of continual growth is currently being challenged. Operating in a broader
environment of financial restriction, and with recent changes in regulations and funding,
local government will no longer be able to respond as it previously has. For example, with
the imminent introduction of rate capping and a freeze on increases in grants commission
funding, Council will be required to plan in an environment of constraint rather than growth.
This will mean increased pressure on Council to prioritise its energy and investment to
provide the best possible outcomes for the community within limited resources.
Local government is also under increased scrutiny by state government and other
agencies, with the list of requirements in terms of risk management, compliance and
transparency rapidly growing. Council is now required to spend more of its time and
resources ensuring these obligations are met and protecting itself in an environment of
increasingly heightened risk. An example of such scrutiny is the introduction of the Local
Government Performance Reporting Framework (LGPRF). Reporting on this Framework
begins at the end of the 2014-15 financial year and requires every council to report on
numerous measures relating to service performance, financial performance, and
sustainability capacity. This information will be submitted to the state government and be
made publicly available. It has been foreshadowed that this Framework is likely to grow
over time with the number of measures likely to increase.
Services delivered by other agencies in Knox are experiencing similar pressures, and they
too may be forced to change their service delivery objectives, service model or service
levels. This may in turn have implications for Council’s business if it leaves a gap in
services provided to the community.
APPENDIX I SERVICE SCOPE 2015-16: CORPORATE PLANNING & PERFORMANCE SERVICE (DS3534760) Page 5 of 7
With the changing horizon, the organisation will require support to operate in this new
environment. It is timely to review how the CP&P service could better enable the
organisation to respond in a more agile way to what lies ahead. The Service Analysis will
provide the opportunity to explore what is needed and what this support could look like.
The current strategic intent of Corporate Planning and Performance is to provide
leadership, guidance and direction for the planned and measureable delivery of Council’s
Vision. The service outcomes CP&P deliver are:
develop a comprehensive and evidence based plan for the future of the City of Knox;
support the delivery of council services and projects that lead to the achievement of
council’s strategic objectives;
develop the understanding of the value of council services and projects through
regular monitoring and reporting;
enable the most efficient use of council resources (budget, assets and workforce) to
deliver services and projects that directly support delivery of council’s strategic
objectives; and
enable an open, transparent and accountable organisation.
The nature or type of support provided by CP&P may need to change to prepare and
enable other service areas to keep up with the pace of change. Council will need to set
clear priorities, make comparative choices in the services it provides to the community,
and be better able to plan for the future in a more flexible way. The future strategic intent
of this service could be more about building capacity, agility, innovation and foresight to
respond to change.
The Service Analysis will examine the strategic intent in light of the changing environment
in which local government will be operating in the near future. It is likely that this shifting
external environment will in turn require Council to re-focus and re-prioritise its areas of
investment on behalf of the City. CP&P will investigate whether the above strategic intent
is still appropriate, and if so, what needs to change to enable these outcomes.
Service Model
Some of the issues that may be addressed through Service Analysis with regard to the
CP&P Service Model are:
Legislative obligations
There are some substantial components of this service that are legislatively required, such
as the development of the Council Plan and Annual Report, as well as fulfilling the
requirements of the newly introduced Local Government Performance Reporting
Framework, and the long standing Best Value requirements of the Local Government Act
1989. Recently there has been increasing pressure and scrutiny from state government,
which means the legislative obligations for local government and for this service are
increasing. The service analysis will consider options to streamline preparation of
planning and reporting documents that are statutory in nature.
APPENDIX I SERVICE SCOPE 2015-16: CORPORATE PLANNING & PERFORMANCE SERVICE (DS3534760) Page 6 of 7
Good practice
Other aspects of the CP&P service would be considered good practice, for example,
Business and Resource Planning. This is centrally coordinated by CP&P and includes a
bidding process for both financial and human resources, which informs the budget process
and contributes to the achievement of Council Plan, City Plan and ultimately Knox’s Vision.
There are other aspects of the service which are de-centralised, for example the
development of various strategies and plans. CP&P provides guidance to the organisation
about process and good practice in this work rather than being content experts. The
service analysis will review and consider whether this component of the service is still
contemporary and relevant, and suggest any refinements if required.
Staffing/skills shortage
Over recent years it has become evident that it is challenging to recruit for experienced
corporate planning and service planning staff. There appears to be a finite source of
experienced people that are able to work in these fields due to the relatively small industry
and complex nature of local government.
As the structure of the CP&P service is split, with two teams working on corporate planning
and service planning activities largely independently, it creates a divide in resources for
the CP&P service. There are skill sets for both activities which are similar, yet as a
‘customer’, other areas of Council are required to speak to different team members for
differing needs. There may be an opportunity through the Service Analysis process to look
at how these teams may integrate better and even merge to provide one seamless
service, and also to consider how the team works in partnership with other teams in a
more integrated way to build capacity and internal ‘bench strength’.
Community interface
The CP&P service will need to consider its role with regard to the interface between
council and the community. The Service Analysis will need to explore appropriate methods
for engaging with the community around setting strategic direction. This may identify
different methods of engagement for both the corporate planning and service planning
activities, as well as different methods to the way in which other services engage with the
community.
The Service Analysis will look at the way in which the Corporate Planning and
Performance service is delivered and if these activities it delivers still contribute to the
outcomes it sets out to achieve.
Service Levels
In reviewing the Strategic Intent and the Service Model, the levels of service delivered by
Corporate Planning and Performance may also need to be adapted.
APPENDIX I SERVICE SCOPE 2015-16: CORPORATE PLANNING & PERFORMANCE SERVICE (DS3534760) Page 7 of 7
If there is a shift in the strategic intent, the service will need to look at doing things
differently. If it is identified that an increase in a particular area is required, some other
activities may need altering to ensure the priority activities receive the most focus.
The Service Analysis will also explore opportunities for improved effectiveness and
efficiencies. This may be done by looking at the processes and systems used within the
team providing this service or investigating better integration with other service areas.
Conclusion
As an internal service, Corporate Planning and Performance leads, guides and supports
the organisation to provide services to, and governance and advocacy for, the community.
It also enables Council to fulfil its role in planning for the future of the City. The question for
this service is not about whether Council is the most appropriate provider of this service.
The questions to be asked through the Service Analysis process will be about how this is
done, by focussing on the most appropriate strategic intent, service model and levels. In
an environment of change and constraint on resources, the Corporate Planning and
Performance service must ensure it is playing the right role to lead and support good
planning for the future is more critical than ever.
REFERENCES
There are a range of contemporary papers that provide evidence and commentary about
the changing state of local government. The following references provide an overview:
Local Government Act 1989, s1, s125, s132
Ross Dawson, ‘The future of local government’ – Keynote Speech, Local Government
Association of Tasmania Annual Conference 2014
Municipal Association of Victoria, various presentations – 2014 Future of Local
Government Summit
Centre for Organisation Development Pty Ltd, ‘Creating the Complex Adaptive
Organization: A Primer on Complex Adaptive Systems’
Future IQ Partners (January 2105), ‘Cities of the Future – Anticipating Trends and
Possibilities’
APPENDICES
1. Service Profile: Corporate Planning and Performance (December 2012)
1
APPENDIX I-1 SERVICE PROFILE: CORPORATE PLANNING & PERFORMANCE SERVICE (DECEMBER 2012) Page 1 of 3
Service 32: Corporate Planning and Performance
Director: Joanne Truman, Director Corporate Development
Manager: Kerryn Ellis, Manager Governance & Innovation
Brief Description of Service
This service provides leadership, guidance and direction for the planned and measurable delivery of
Council’s Vision. This is achieved through: strategic planning, corporate planning, service planning,
performance monitoring, evaluation and reporting, continuous improvement, and various other
organisational improvement projects.
Council Plan Outcome: A well governed and leading organisation.
Service Outcomes:
A comprehensive and evidence based plan for the future of the City of Knox.
Delivery of Council services and projects that directly support delivery of Council’s strategic
objectives.
The value of Council services and projects are understood through regular monitoring and
reporting.
Most efficient use of Council resources (budget, assets and workforce) to deliver services and
projects that directly support delivery of Council’s strategic objectives.
Open, transparent and accountable local government.
Activities
32.1 Vision Statement: The statement of Council and the community’s shared aspirations for the
future of the City, that is informed by evidence and community engagement. The Vision statement
informs and provides guidance to the broader strategic planning and resource allocation processes
of Council.
Outcomes: Increased understanding of the changes occurring in Knox’s environment,
increased understanding of the views and values of community members, and effective
strategic planning to guide the future of the City that is informed by evidence.
32.2 Council Plan: Council’s four year strategic plan for delivering on the Knox Vision. The Council
Plan sets the strategic objectives, strategies and high priority projects for the four year term of the
Council. In order to develop a Council Plan, a range of activities are conducted including
environmental scanning, planning workshops, and staff engagement via working groups.
Outcomes: Better understanding of Council business. Better strategic thinking about Council
services and the future of the city. Increased Councillor and staff involvement and ownership.
An effective plan for the city.
APPENDIX I-1
2
APPENDIX I-1 SERVICE PROFILE: CORPORATE PLANNING & PERFORMANCE SERVICE (DECEMBER 2012) Page 2 of 3
32.3 Annual Plan: The Annual Plan outlines Council’s priority activities for the coming twelve
month period, in order to deliver on the Vision and Council Plan, and informs the development of
the annual budget. In order to develop an Annual Plan, a range of activities are conducted
including coordination of new business cases, changes to business, development of performance
measures with managers, consultation with managers, and workshops with Councillors.
Outcomes: Ensures the Council Plan priorities are delivered. Connection of Annual Plan Key
Strategic Activities to Council Plan objectives. Effective assessment of delivery capabilities,
and better understanding of priorities for the next year. Satisfaction of legislative
requirements, with increased accountability to the community, and delivery of longer term
strategic objectives.
32.4 Business Planning: Delivers a coordinated and integrated business and resource planning
process, including budget, workforce, IT requirements and the capital program.
Outcomes: Increased staff capacity to plan effectively, ensuring alignment with Council’s
strategic objectives. Ensures the proposed service outcomes for each department are
informed by, and deliver on, the Vision, Council and Annual Plans; and ensures a department is
responsible for the delivery of the priorities of Council.
32.5 Data Collection and Management: State of Knox is a compilation of data which captures
the state of the community’s wellbeing, economy, and environment, including emerging trends, to
inform strategic planning for the future of Knox.
Outcomes: Increased understanding of the changes occurring in Knox’s environment, and the
views and values of community members; and more effective, evidence based strategic
planning to guide the future of the City.
32.6 Service Planning: Service planning aims to provide a framework for long term strategic
planning at a service level. Service planning will provide better information about future service
(internal and external) needs in order to better predict asset and workforce needs and inform the
Long Term Financial Strategy.
Outcomes: Services develop an enhanced understanding of their future direction, improved
prediction of required assets and workforce in the future. Better planning for the organisation,
leading to a more effective Long Term Financial Strategy.
32.7 Corporate Reporting: Annual Report, quarterly performance reporting on delivery of the
Annual Plan and organisation health, and monitoring of the achievement of the Council Plan.
Meeting the statutory obligations of Council to monitor and publicly report on Council
performance.
Outcomes: Meet Council’s statutory obligations to monitor performance and report on this
publicly. Better understanding the impact of Council’s services and projects in meeting the
strategic objectives of the Vision and Council Plan.
3
APPENDIX I-1 SERVICE PROFILE: CORPORATE PLANNING & PERFORMANCE SERVICE (DECEMBER 2012) Page 3 of 3
Key current or future issues:
Expectations of both internal and external customers are increasing. The development of an
organisational capacity strategy to address these needs is currently being formulated. This will ensure
Council has the skills, capacity and organisational infrastructure to best deliver on Council’s strategic
objectives into the future, and respond to community expectations.
Recent recommendations from the Victorian Auditor General’s Office (VAGO) are affecting the way the
Local Government Act will be applied, with reference to corporate planning and performance reporting
in particular. This will have implications for the ways in which Councils will develop and report on
Council Plans. A large body of work over the next few years will be required to satisfy the requirements
of VAGO.
There are currently significant challenges in reporting in relation to the Council Plan. The previous State
Government attempted to improve local government performance reporting through a project
delivered by the Essential Service Commission, however this work was abandoned after the last change
of government. Local Government Victoria is currently pursuing a similar project. Current direction for
Councils in Victoria is unclear regarding a consistent state-wide performance reporting approach. In the
absence of this, Knox will be working towards providing its own solutions, in line with VAGO’s audit.
Service Planning. With community needs and expectations changing in a time of overall limitation of
resources for delivery there is a requirement for Council to consider the scale, delivery mode and level of
services to be provided. This prioritisation will require ongoing investment and access to quality
information, greater community engagement and rigorous change management processes.
Financial Profile
Activity Expenditure Income Net
Council Plan $37,005.32 $37,005.32
Annual Plan $53,812.04 $53,812.04
Business Planning $65,642.68 $65,642.68
Data Collection and Management $43,102.07 $43,102.07
Vision $104,004.32 $104,004.32
Service Planning $162,641.99 $162,641.99
Corporate Reporting $68,701.57 $68,701.57
Totals $534,910 $534,910
Total net cost: $534,9101
Staff Profile
Primary Job Family EFT
Perm
EFT
Temp
End date
(if temp)
Hours
per
week
Role
Manager 1.0 38.0
Strategic Planner 3.7 140.6 Corporate Planner
Total available EFT and
Hours 4.7 178.6
1 Note that the total cost won’t align exactly with the Departmental Budget of the service. This is because overhead
costs have been removed and measured in their own Service Profiles, and costs of buildings, parks and capital works renewals may have been added where appropriate. For full information about costings and assumptions used, see the Introduction section to Service Planning.
APPENDIX J SERVICE SCOPE 2015-16: GOVERNANCE SERVICE (DS3536945) Page 1 of 7
Service: Governance Director: Joanne Truman, Director Corporate Development Manager: Kerryn Ellis, Manager Governance and Innovation
SERVICE ASSESSMENT QUESTIONS
This Service Assessment will aim to answer the following key questions:
1. What should the future strategic intent of this service be?
2. What is the role of Council in this service?
3. Is the current service model the most effective for the future?
4. Is a change in the service delivery model warranted to respond to emerging issues and
challenges?
In accordance with the Council Plan, all Service Analyses will consider planning, where
relevant, for an ageing population; and providing a range of programs, services and
partnerships which aim to build connections between people and reduce social isolation.
INTRODUCTION
The Local Government Act 1989 states that the role of council is ‘…to provide governance
and leadership for the local community through advocacy, decision making and action’ and
that the ‘…Council is responsible and accountable to the local community’ whilst ensuring
that Council’s resources are used efficiently and effectively.
Council’s Governance service develops and monitors key legal, governance, compliance
and ethical frameworks for decision makers and the organisation to ensure the
organisation is fully supported in meeting its obligations under the Local Government Act
and myriad other relevant legislation. The service works across the organisation to advise,
educate and build the capacity of Councillors and staff to promote and achieve good
governance in Council’s operations and more broadly, engage with the community to
encourage greater participation in local democracy.
The Governance Service delivers a range of key functions to the organisation which
include:
Council Meeting support
Delivery of the internal audit program and provision of support to Council’s Audit
Committee
SCOPE
APPENDIX J
APPENDIX J SERVICE SCOPE 2015-16: GOVERNANCE SERVICE (DS3536945) Page 2 of 7
Ensuring compliance with Privacy, Protected Disclosure and Freedom of Information
legislation through provision of advice and support to Councillors, Council staff and the
community
Delivery of Council elections
Delivery of the Councillor transition program immediately following elections, and
provision of ongoing support to Councillors
Administration and provision of support to the Ferntree Gully Cemetery Trust
Provision of support and policy and governance advice to the Mayor and Councillors,
and management of the office of the Mayor and Councillors
Delivery of the annual Civic Events program
Management of the suite of Council and Chief Executive delegations to officers
Development of Council’s various good governance frameworks, and delivery of
associated training, support and advice.
Whilst each of the functions listed above plays a critical role in the provision of
Governance services to the organisation, this service analysis will be limited in scope to
focus on those functions which are not heavily regulated, and therefore those over which
Council has greater discretion. As such, the functions of Internal Audit, Privacy, Protected
Disclosure and Freedom of Information compliance, and the conduct of Council Elections
and associated Councillor Transition are not proposed to be included in the service
analysis.
In addition to the functions outlined above, the Governance service also manages the
administration of the Ferntree Gully Cemetery Trust on behalf of Council. This involves
providing support and guidance to the Trust and Trust meetings, as well as providing
administrative support. The role of Council in this service will be analysed as part of the
service analysis process.
CURRENT SERVICE MODEL
Service Snapshot
Service budget 2014/2015: Income
Expenditure
Net
($1040)
$653,796
$652,7561
Service EFTs: 4.3 (includes a percentage of the Governance Manager
EFT)
The Governance Service oversees Council’s statutory processes associated with the
delivery of Council meetings, conduct of Council elections and any by-elections,
participation in electoral review process and implementation of any associated reforms,
maintenance of statutory registers and general legislative compliance. The service
supports a comprehensive governance framework, including the establishment of Council
1 Please note these figures include $95K for Council’s annual subscriptions to the MAV and VLGA. The
figures exclude Mayoral and Councillor allowances and training, and ward contingency funds. The service also has budget on a cyclical basis for Council elections, of approximately $600K every four years.
APPENDIX J SERVICE SCOPE 2015-16: GOVERNANCE SERVICE (DS3536945) Page 3 of 7
Committees, Council policies, Instruments of Delegation and the Appointment of
Authorised Officers. The service manages the civic functions program, including the
annual Australia Day Awards, Citizenship Ceremonies, and Mayoral and Councillor
functions, and coordination and catering for all meetings of Council. The service provides
organisational administrative services including the delivery of medium and large volume
print support to the organisation, and including provision of administrative support to the
office of the Mayor and Councillors. The governance service is also responsible for
managing all legislative and governance matters pertaining to the operations of the
Ferntree Gully Cemetery. A key element of the approach taken by the service is through
the provision of training and advice on governance matters to the CEO, Councillors,
Executive Management Team, Senior Managers and staff, particularly in relation to the
Local Government Act and other relevant legislation.
The current service model is predominantly delivered in-house through a small team of
staff directly employed by Council. The team delivering the governance service consists of
a coordinator, who is the key governance specialist at Council. The coordinator is
supported by governance and administrative staff, whose roles include preparation and
production of Council agendas, management of a print service with a number of
photocopiers across the organisation, support with management and delivery of several
key legislative functions such as the maintenance of statutory registers, and provision of
administrative support functions. One EFT is also allocated to managing the office and
provision of administrative support to the Mayor and Councillors. The service is led and
supported by the Manager who has responsibilities across several functions in addition to
the Governance service.
The provision of Governance services by the internal team is at times supplemented
through the use of external providers and specialists, for example the Victorian Electoral
Commission delivers Council elections through a contract arrangement with Council, and
specialist legal advice is sourced as required from time to time through Council’s solicitors.
The Ferntree Gully Cemetery is managed through the Cemetery Trust, which is a Special
Committee of Council. The day to day management of the cemetery is provided by the
Governance service that provides administrative support to the Trust, and the Knox Parks
service, which provide maintenance to the site. While the Trust pays Council an annual
fee for provision of parks services, the costs associated with the daily administration
function have been absorbed by the Governance service.
APPENDIX J SERVICE SCOPE 2015-16: GOVERNANCE SERVICE (DS3536945) Page 4 of 7
SERVICE ASSESSMENT
Role of Council
The Governance Service
As outlined above, one of the key requirements of Council’s role under the Local
Government Act is ‘…to provide governance and leadership for the local community
through advocacy, decision making and action’. As this is an inherent and legislative
role of Council, it is not proposed to further consider or review Council’s role in the
provision of the Governance service through the service analysis.
The Ferntree Gully Cemetery
The Ferntree Gully Cemetery was established in 1878 and historically the Cemetery
was operated by community Trustees from its formation in 1883 until 1982. In 1982
the then City of Knox was appointed as “Trustee” pursuant to section 3 (2) of the then
Cemeteries Act 1958. The Council appointed the Ferntree Gully Cemetery Trust
Special Committee on 8 December 1998 pursuant to Section 86 of the Local
Government Act 1989 to undertake the Trustees responsibilities under an Instrument
of Delegation.
The availability of graves was exhausted by 1984, and after extensive public
consultation, the Trust extended the Cemetery in 2002 and developed a new area
known as the Foothills. This extension brought medium term financial viability and
breathed new life into the Cemetery. During this time there has been significant
legislative change and restructuring of Cemetery Trusts across the State, with new
governance requirements introduced to all Cemeteries. This has increased the
workload of staff in managing the cemetery’s operations considerably. The strength of
the Ferntree Gully Cemetery under Council’s management has been its capacity to
preserve a compassionate approach with its clients and to maintain the respect and
dignity central to the conduct of a Cemetery.
By 2011 the Foothills area was taken up, and new graves are now again not available.
In 2013 the Trust undertook further expansion with the installation of ‘The Grove’ niche
walls offering a further 380 ashes interment positions and again prolonging the short to
medium term financial sustainability of the cemetery. Following the exhaustion of the
available graves within the Foothills section the services offered by Ferntree Gully
Cemetery Trust will be restricted to:
Burials in previously purchased graves;
Interment of ashes in existing graves and vaults; and
Installation of plaques.
Some minor services will also be available such as lift and repositioning in existing graves and exhumation for removal to other burial places. A limited number of graves will also become available as ‘owners’ relinquish their rights or the Trust resumes unexercised rights of interment that have passed 25 years’ tenure. While the Council and Trust has served the community well over many years, the medium term financial
APPENDIX J SERVICE SCOPE 2015-16: GOVERNANCE SERVICE (DS3536945) Page 5 of 7
viability of the cemetery may mean that the cemetery will require greater subsidy at some stage in future. It is proposed the service analysis analyses the role of Council in the provision of the cemetery service. It is noted that there is work already contained within the Cemetery’s business plan for 2015/2016 that will help consider and address the issues identified in this scope. As part of reviewing the role of Council in the cemetery, the service analysis will consider and reference work that already forms part of the cemetery’s business plan.
Strategic Intent
The Governance Service
The context for provision of Governance services in local government has changed
dramatically in recent years. Local government is increasingly under scrutiny by
federal and state government and other agencies, with the list of requirements in terms
of risk management, compliance and transparency rapidly growing. Council is now
required to spend more of its time and resources ensuring these obligations are met
and protecting itself in an environment of increasingly heightened risk. Examples
include the establishment of the Independent Broad-Based Anti-Corruption
Commission (IBAC), the role of the Victorian Ombudsman’s Office, and the heightened
focus on compliance with a range of legislation such as the Local Government Act,
Privacy and Data Protection Act and Protected Disclosure provisions. There is also far
greater community awareness and scrutiny of issues such as conflict of interest, and
decision making both at Council and under delegation. In addition to the broader
context and legislative change impacting upon local government, there have been
ongoing changes to the Local Government Act, resulting in increasing compliance
requirements which often result in greater complexity, and a need for more investment
in appropriate record keeping and training. In addition, the current state government is
proposing a complete review of the Act within the next few years.
In line with these changes, the demands on the Governance service have dramatically
increased in recent years. The Governance service plays the lead role in proactively
managing Council’s interests through the provision of support, training and advice to
staff and Councillors. The service also takes the lead in responding to complaints or
investigations that occur as a result of this changed environment, for example privacy
complaints or IBAC investigations. At the same time, the service continues to deliver
the more traditional functions associated with agenda preparation, production and
distribution, and provision of administrative functions. Workload has also increased in
these areas, for example through an increased number of Council, committee and
briefing meetings, and an increase in the support provided to users of Council’s
photocopying and print services.
In order to ensure that the interests of Council and the community are well served and risk is effectively managed in an increasingly complex environment, the Governance service will be required to more proactively plan for and respond to greater regulation and scrutiny and minimise governance risks. This could include taking a more proactive approach to education and building capacity within the organisation, building a stronger understanding of the role of Council and good governance practice within a
APPENDIX J SERVICE SCOPE 2015-16: GOVERNANCE SERVICE (DS3536945) Page 6 of 7
local government context, better managing legislative compliance, and minimising the risk of fraud and corruption, for example.
To date the additional responsibilities of the service have been absorbed within the
resources available to the service, and it has been assumed that the more traditional
elements of the service will continue to be delivered as well as the more contemporary
functions. The Service Analysis will consider the most appropriate contemporary
strategic intent of the service, and explore how the service can more proactively
address good governance as part of its core function. The service analysis will also
consider options for expanding Council’s internal capacity for provision of advice on
the application of the Local Government Act.
The Ferntree Gully Cemetery
It is not proposed to consider the strategic intent of the Ferntree Gully Cemetery
through this service analysis.
Service Model
The Governance Service
As outlined above, the service analysis will consider the most appropriate
contemporary strategic intent for the Governance service at Knox. A shift in strategic
intent may mean that elements of the service model need to change in order to free up
existing resources to be directed toward provision of a more proactive good
governance framework and program. In order to achieve this, the following areas will
be specifically explored:
A review of the processes and systems associated with agenda preparation and
management, to determine whether this can be done more efficiently, particularly
through the introduction and use of agenda management software and process
automation.
Currently, the Governance service is responsible for a number of Council’s larger
corporate printers, while the IT service is responsible for all other printers. The
Service Analysis will explore whether greater efficiencies and cost reductions could
be achieved through an integrated approach to printer management. The analysis
will also consider whether the provision of a corporate print service is still required.
Consideration of the opportunities for better use of technology for managing
meetings in a public environment, and whether this can improve both efficiency and
transparency.
The Ferntree Gully Cemetery
As outlined above, the day to day management of the cemetery is provided in
partnership by the Governance service who provide administrative support to the
Trust, and the Knox Parks service, who provide maintenance to the site. While the
trust pays Council an annual fee for the provision of parks services, the costs
associated with the daily administration function have been absorbed by the
Governance service, and do not fully reflect the true cost to Council of providing this
APPENDIX J SERVICE SCOPE 2015-16: GOVERNANCE SERVICE (DS3536945) Page 7 of 7
service. As such, the service model and associated costing structure may need
review in future to ensure it is financially sustainable.
Service Levels
The Governance Service
The service analysis will consider the most appropriate contemporary strategic intent
for the Governance service, and the best service delivery model for some elements of
service provision. The key question for the Governance service in determining
appropriate levels of service is to ascertain where to direct scarce resources to make
the greatest impact in managing risk and promoting good governance practice.
Consequently, the current levels of service provided to the organisation will be
reviewed in line with the future strategic intent of the service, to ensure limited
resources are deployed for the greatest impact.
The Ferntree Gully Cemetery
It is not proposed to consider the service levels of the Ferntree Gully Cemetery
through this service analysis.
REFERENCES
1. Local Government Act 1989
2. Municipal Association of Victoria, ‘Good Governance Guide’, 2012, available at
www.goodgovernanceguide.org.au
3. Department of Planning and Community Development, ‘Ensuring Unbiased Democratic
Council Decision Making’, 2013
4. Ross Dawson, ‘The future of local government’ – Keynote Speech, Local Government
Association of Tasmania Annual Conference 2014
5. Future IQ Partners, ‘Cities of the Future – Anticipating Trends and Possibilities’”, 2015
APPENDICES
1. Service Profile: Governance (December 2012)
1
APPENDIX J-1 SERVICE PROFILE: GOVERNANCE (DECEMBER 2012) Page 1 of 3
Service Profile 35: Governance
Director: Jo Truman, Director Corporate Development Manager: Kerryn Ellis, Manager Governance & Innovation
Brief Description of Service
This service provides key internal and external services to Councillors, staff and the community to facilitate a well governed organisation. This service has overall responsibility for legislative compliance, Councillor support and development, citizenship ceremonies and the maintenance of the Civic Centre meeting rooms.
Council Plan Outcomes: A well governed and leading organisation.
Service Outcomes:
processes and systems.
Activities
35.1 Management of the Internal Audit Program and the Audit Committee: Ensuring Council’s internal auditors are appointed and managed in accordance with their project scope and contractual requirements. Providing support to the Audit Committee, including agenda development and minute taking, and provision of appropriate organisation and specialist advice.
Outcomes: Council receives appropriate advice on the adequacy and robustness of financial and other organisational processes and systems, contributing to a well managed organisation with robust governance practices.
35.2 Civic Management & Hall Keeping: This function provides assistance to the Mayor and Councillors, and ensures Council’s meetings are held in rooms that are “fit for purpose”. This administrative service ensures all public meetings are held in accordance with expected customer service and community standards, and services room booking and set up for over 1900 events per annum.
Outcomes: Well managed and attended Council meetings, internal meetings and Civic Events, maximising utilisation of meeting facilities and delivered to expected community and commercial standards.
35.3 Privacy and Freedom of Information (FOI): Provides guidance to assist citizens in accessing Victorian government information, through the relevant legislative frameworks.
Outcomes: Council meets the legislative requirements with regard to Freedom of Information and Privacy legislation. Democracy, transparency and good governance are improved through appropriate disclosure processes.
35.4 Civic Events Program: Management and delivery of over 45 Citizenship Ceremonies and other civic events annually.
Outcomes: Well managed and attended Civic events and Citizenship ceremonies.
35.5 Council Elections: Ensures an efficient, effective and compliant election process for Council every four years.
Outcomes: Effective governance and democratic processes to ensure the community has appropriate representation and governance on local issues.
APPENDIX J-1
2
APPENDIX J-1 SERVICE PROFILE: GOVERNANCE (DECEMBER 2012) Page 2 of 3
35.6 Council Meetings Support & Preparation: Coordination and support of up to 45 Council Meetings per year, including provision of templates and guidelines for report writing, coordination and collation of reports and agendas, and efficient and effective running of Council Meetings.
Outcomes: Council meetings are supported effectively to meet legislative requirements and provide the Council and community with transparent processes for Council decision making.
35.7 Ferntree Gully Cemetery Trust Support: Responsible for managing all legislative and governance matters pertaining to the Ferntree Gully Cemetery Trust.
Outcomes: The cemetery maintains a sense of history and respect, while contributing to the community’s amenity.
35.8 Mayor and Councillor Support: Administrative and organisational support provided to the Mayor and Councillors.
Outcomes: Administrative support and organisational liaison provided to the Mayor of the day, and other Councillors as required.
35.9 Good Governance Practice: Provision of training and advice on governance to the CEO, Councillors, Executive Management Team, Senior Managers and staff as required – particularly in relation to the Local Government Act and other relevant legislation.
Outcomes: The organisation is well informed of good governance practices. Council is governed effectively. Delegations are managed to ensure appropriate levels of authority, and Council policies are maintained and reviewed on schedule.
35.10 Induction: Responsible for the induction of Councillors every four years, post-election. Outcomes: Mayor and Councillors are effectively provided with the knowledge and skills to undertake their range of legislative obligations.
3
APPENDIX J-1 SERVICE PROFILE: GOVERNANCE (DECEMBER 2012) Page 3 of 3
Key current or future issues: Ongoing changes to the Local Government Act with increasing compliance requirements which
often results in increased resources, training, record keeping and complexity.
Staff retention and maintaining the corporate knowledge base will present a future challenge, withan ageing workforce.
Increased awareness and knowledge of personal rights and Council responsibilities had led to anincreasing workload, with FOI and Privacy requests in particular.
There is a need to review the current administrative processes in relation to Council meetingadministration. The emergence of new technologies, environmental issues and changingcommunity expectations provide the opportunity for service improvements to be considered.
Financial Profile
Activity Expenditure Income Net
Audit Committee Management $143,610.74 $143,610.74
Civic Management & Hall Keeping $141,334.31 $141,334.31
Privacy and FOI $7,646.54 $7,646.54
Civic Events Program $233,377.84 $233,377.84
Council Elections $21,511.21 $21,511.21
Council Meetings Support & Preparation $266,897.71 $266,897.71
Ferntree Gully Cemetery Trust Support $83,423.86 $83,423.86
Governance Advice $35,517.38 $35,517.38
Training Sessions $17,727.42 $17,727.42
Induction $7,646.54 $7,646.54
Mayor and Councillor Support $539,485.46 $539,485.46
Corporate Responsibilities $143,610.74 $143,610.74
Total $1,641,790 $1,641,790
Total net cost: $1,498,1732
Staff Profile
Primary Job Family EFT Perm
End date (if temp)
Hours per week
Role
Governance Coordinator 1 38
Administrative staff 2 38
Mayor and Councillor support 1 38
Manager (percentage of time) 0.3 11.4
Total available EFT and Hours 4.3 125.4
2 Note that the total cost won’t align exactly with the Departmental Budget of the service. This is because
overhead costs have been removed and measured in their own Service Profiles, and costs of buildings, parks and capital works renewals have been added. For full information about costings and assumptions used, see the Introduction section to Service Planning. Further note that because 2011/2012 budget figures have been used, the cost of delivering the 2012 election and Councillor induction program is not reflected in this service profile.