appendix 2 automatic traffic and cycle counts

21
APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE COUNTS

Upload: others

Post on 04-Oct-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE COUNTS

APPENDIX 2

AUTOMATIC TRAFFIC AND CYCLE COUNTS

Page 2: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE COUNTS
Page 3: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE COUNTS

AUTOMATIC TRAFFIC AND CYCLE COUNTS Summary data for the following continuous ATC and ACC sites relevant to Tameside is shown in this Appendix. ATC Data is available in 2009 for: • Site 00801271/2 B6194 Lees Road, Hartshead • Site 00480041/2 A627 Ashton Road, Bardsley • Site 00890091/2 A635 Manchester Road, Ashton-U-Lyne • Site 00890331/2 A57 Woolley Lane, Hollingworth ACC Data is available in 2009 for: • Site 10870430 A57 Manchester Road, Denton (Cycle Path) Data is unavailable in 2009 for:

• Site 00002217 Turner Lane, Ashton-U-Lyne • Site 10870151 A560 Stockport Road, Gee Cross (Cycle Lane) • Site 10870441 A6017 Stockport Road, Haughton Green For each site the following graphs and tables are given:

• A graph showing 24-hour average daily traffic flows in 2009.

• A graph showing average weekday flows in 2009 by month.

• A graph showing annual average 24-hour weekday flows by year.

• Tables showing daily average flows for each direction in 2009.

• Tables showing monthly average flows for each direction in 2009.

• Graphs showing average hourly weekday, Saturday and Sunday flows in 2008 for each direction.

Page 4: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE COUNTS
Page 5: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE COUNTS

South Bound North Bound Two way

© GMTU 2010

Greater Manchester Transportation Unit Automatic Traffic Counter Data 2009

Site No: 00801271/2 B6194 Lees Road Hartshead Tameside

Fig.1 24-Hour Average Daily Traffic Flow 2009

0

2000

4000

6000

8000

10000

12000

14000

16000

Mon Tues Wed Thurs Fri Sat Sun

Veh

icle

s per

day

Fig.2 Average Weekday Traffic Flows 2009 (by month)

0

2000

4000

6000

8000

10000

12000

14000

16000

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Veh

icle

s per

day

Fig.3 Average Weekday Traffic Flows (by year)

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

20000

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Veh

icle

s per

day

Page 6: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE COUNTS

Mon Tues Wed Thurs Fri Sat Sun 5-day 7-day00 28 22 27 31 32 61 78 28 4001 16 11 12 15 16 40 48 14 2302 9 8 8 9 11 26 33 9 1503 11 10 10 9 12 22 26 10 1404 21 18 17 17 17 21 20 18 1905 63 65 62 68 68 38 22 65 5506 218 231 229 220 210 80 45 222 17607 529 547 540 538 522 129 63 535 41008 664 674 674 668 646 211 86 665 51809 352 377 369 368 363 289 163 366 32610 300 307 304 310 322 328 252 309 30311 304 325 313 318 336 379 292 319 32412 331 331 340 337 377 448 380 343 36313 349 362 373 360 419 438 388 373 38414 380 390 396 400 431 410 375 399 39715 434 453 452 457 516 404 357 462 43916 554 559 572 590 566 416 349 568 51517 546 578 568 576 520 364 247 558 48618 358 382 380 387 357 267 236 373 33819 237 253 267 280 268 224 194 261 24620 176 191 191 202 201 178 166 192 18621 147 153 147 160 156 134 124 153 14622 99 111 107 111 122 122 85 110 10823 49 49 56 59 90 98 49 61 64

TOTALS5101 5285 5281 5309 5375 4083 3188 5270 48031545 1598 1583 1574 1531 629 312 1566 12542098 2168 2178 2182 2401 2407 2044 2205 22101458 1519 1520 1553 1443 1047 832 1499 13396175 6407 6414 6490 6578 5127 4078 6413 5895

Jan Feb Mar Apr May June July Aug Sept Oct Nov DecWeekdays

12 hour 5213 5159 5353 5430 5337 5302 5098 4749 5242 5241 5300 546424 hour 6296 6320 6486 6604 6507 6533 6305 5892 6397 6346 6411 6613

Saturdays12 hour 3993 4054 4197 4183 4040 4009 4074 3750 3939 4195 4149 422224 hour 5009 5041 5211 5220 5127 5098 5248 4755 4947 5195 5161 5265

Sundays12 hour 3073 2983 3355 3240 3108 3313 3237 2947 3108 3186 3142 326924 hour 3875 3800 4255 4180 3998 4318 4245 3812 3998 4064 3964 4108

© GMTU 2010

Greater Manchester Transportation UnitAutomatic Traffic Counter Data 2009

Site No: 00801271 B6194 Lees Road Hartshead Tameside

South BoundAverage vehicle flows (excluding School Holidays, Bank Holidays, roadworks etc)

Hour starting

12 hour (0700-1900)

Average vehicle flows (excluding School Holidays (except August), Bank Holidays, roadworks etc)

am peak (0700-1000)off peak (1000-1600)pm peak (1600-1900)24 hour (0000-2400)

Fig.5 Average Hourly Traffic Flow 2009

0

100

200

300

400

500

600

700

800

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23Hour Starting

Vehi

cles

per

hou

r

Average weekday Average Saturday Average Sunday

Page 7: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE COUNTS

Mon Tues Wed Thurs Fri Sat Sun 5-day 7-day00 50 48 49 51 54 86 98 50 6201 37 29 31 33 33 63 76 33 4302 19 10 11 12 18 47 53 14 2403 14 10 10 9 15 38 43 12 2004 19 19 19 19 21 40 38 19 2505 56 54 54 57 52 35 30 55 4806 147 161 158 156 150 62 35 154 12407 437 454 449 446 438 119 59 445 34308 629 627 635 639 621 192 76 630 48809 385 391 400 390 380 260 149 389 33610 303 310 321 313 329 325 248 315 30711 323 335 339 343 357 399 327 339 34612 340 358 358 362 398 467 382 363 38113 359 370 377 372 440 472 405 384 39914 383 400 399 400 469 451 386 410 41315 516 524 527 540 600 412 356 541 49616 669 686 675 695 653 390 316 676 58317 663 696 698 676 571 346 261 661 55918 388 416 411 411 377 279 244 401 36119 263 288 297 300 294 242 219 288 27220 209 220 223 237 215 184 175 221 20921 170 181 179 197 171 146 146 180 17022 121 124 132 134 137 132 99 130 12623 72 76 85 90 112 113 71 87 88

TOTALS5395 5567 5589 5587 5633 4112 3209 5554 50121451 1472 1484 1475 1439 571 284 1464 11672224 2297 2321 2330 2593 2526 2104 2352 23421720 1798 1784 1782 1601 1015 821 1738 15036572 6787 6837 6882 6905 5300 4292 6797 6223

Jan Feb Mar Apr May June July Aug Sept Oct Nov DecWeekdays

12 hour 5427 5481 5568 5708 5777 5680 5407 4957 5479 5474 5561 572024 hour 6602 6680 6804 6998 7044 7017 6696 6187 6727 6684 6775 6947

Saturdays12 hour 4020 4057 4261 4254 4220 4033 3957 3805 4003 4211 4185 423524 hour 5151 5231 5437 5427 5418 5276 5221 4954 5166 5378 5361 5428

Sundays12 hour 3071 3018 3340 3355 3166 3310 3198 3037 3133 3171 3179 333824 hour 4076 4012 4443 4502 4243 4503 4366 4091 4221 4255 4190 4338

© GMTU 2010

Greater Manchester Transportation UnitAutomatic Traffic Counter Data 2009

Site No: 00801272 B6194 Lees Road Hartshead Tameside

North BoundAverage vehicle flows (excluding School Holidays, Bank Holidays, roadworks etc)

Hour starting

12 hour (0700-1900)

Average vehicle flows (excluding School Holidays (except August), Bank Holidays, roadworks etc)

am peak (0700-1000)off peak (1000-1600)pm peak (1600-1900)24 hour (0000-2400)

Fig.4 Average Hourly Traffic Flow 2009

0

100

200

300

400

500

600

700

800

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23Hour Starting

Vehi

cles

per

hou

r

Average weekday Average Saturday Average Sunday

Page 8: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE COUNTS
Page 9: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE COUNTS

South Bound North Bound Two way

© GMTU 2010

Greater Manchester Transportation Unit Automatic Traffic Counter Data 2009

Site No: 00480041/2 A627 Ashton Road Bardsley Oldham

Fig.1 24-Hour Average Daily Traffic Flow 2009

0

2000

4000

6000

8000

10000

12000

14000

16000

Mon Tues Wed Thurs Fri Sat Sun

Veh

icle

s per

day

Fig.2 Average Weekday Traffic Flows 2009 (by month)

0

2000

4000

6000

8000

10000

12000

14000

16000

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Veh

icle

s per

day

Fig.3 Average Weekday Traffic Flows (by year)

0

5000

10000

15000

20000

25000

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Veh

icle

s per

day

Page 10: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE COUNTS

Mon Tues Wed Thurs Fri Sat Sun 5-day 7-day00 41 34 35 36 42 81 97 38 5201 23 17 19 18 24 53 65 20 3102 13 12 13 12 18 38 45 14 2203 16 11 10 13 16 33 35 13 1904 20 19 17 19 20 27 28 19 2105 71 74 70 72 77 51 36 73 6406 200 215 208 213 195 81 66 206 16807 446 450 439 439 422 127 135 439 35108 521 528 535 534 533 239 212 530 44309 381 408 404 403 405 357 332 400 38410 375 386 383 384 394 444 462 384 40411 395 423 421 421 429 499 525 418 44512 456 457 448 445 478 573 539 457 48513 449 474 465 461 523 566 497 474 49114 471 473 484 482 522 530 460 486 48915 511 512 526 524 591 490 423 533 51116 662 651 670 676 642 471 375 660 59217 655 674 683 676 612 435 299 660 57618 440 464 478 465 461 343 277 462 41819 311 331 343 354 352 285 234 338 31620 234 254 258 260 267 233 182 255 24121 193 188 205 204 197 182 147 197 18822 126 131 141 141 150 141 98 138 13323 69 69 76 83 117 119 67 83 86

TOTALS5762 5900 5936 5910 6012 5074 4536 5903 55891348 1386 1378 1376 1360 723 679 1369 11782657 2725 2727 2717 2937 3102 2906 2752 28251757 1789 1831 1817 1715 1249 951 1782 15867079 7255 7331 7335 7487 6398 5636 7297 6930

Jan Feb Mar Apr May June July Aug Sept Oct Nov DecWeekdays

12 hour 5717 5819 5958 6173 6099 6095 5947 5607 5837 5662 5867 595424 hour 7012 7159 7324 7667 7540 7654 7492 7029 7206 6959 7228 7355

Saturdays12 hour 5087 5268 5141 5168 5093 4943 5227 4856 4988 4954 5106 -24 hour 6358 6562 6484 6530 6478 6337 6759 6156 6272 6198 6413 -

Sundays12 hour 4169 4379 4640 4803 4456 4677 4687 4545 4641 4601 4459 -24 hour 5206 5403 5782 6000 5583 5872 5981 5691 5741 5588 5487 -

© GMTU 2010

Greater Manchester Transportation UnitAutomatic Traffic Counter Data 2009

Site No: 00480041 A627 Ashton Road Bardsley Oldham

South BoundAverage vehicle flows (excluding School Holidays, Bank Holidays, roadworks etc)

Hour starting

12 hour (0700-1900)

Average vehicle flows (excluding School Holidays (except August), Bank Holidays, roadworks etc)

am peak (0700-1000)off peak (1000-1600)pm peak (1600-1900)24 hour (0000-2400)

Fig.5 Average Hourly Traffic Flow 2009

0

100

200

300

400

500

600

700

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23Hour Starting

Vehi

cles

per

hou

r

Average weekday Average Saturday Average Sunday

Page 11: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE COUNTS

Mon Tues Wed Thurs Fri Sat Sun 5-day 7-day00 49 45 45 49 56 91 106 49 6301 32 21 23 23 29 63 75 26 3802 17 13 13 14 17 42 53 15 2403 13 11 10 11 14 33 45 12 2004 17 18 17 17 19 29 51 18 2405 85 80 80 83 80 41 72 82 7406 187 198 207 198 179 76 108 194 16507 470 480 480 472 441 132 138 469 37308 610 623 616 629 605 212 192 617 49809 403 408 411 414 413 307 299 410 37910 350 366 364 371 377 389 362 366 36811 407 415 406 415 431 482 417 415 42512 445 447 441 444 480 561 483 451 47213 444 469 469 461 524 552 512 473 49014 451 474 460 463 503 541 479 470 48215 498 513 497 510 553 526 454 514 50716 571 575 580 581 548 497 401 571 53617 542 556 558 545 495 430 312 539 49118 373 417 422 419 399 337 285 406 37919 289 305 315 327 344 291 240 316 30220 246 248 258 268 285 255 199 261 25121 209 221 230 235 223 213 173 224 21522 142 139 159 159 170 160 115 154 14923 86 90 104 101 143 147 89 105 109

TOTALS5564 5743 5704 5724 5769 4966 4334 5701 54001483 1511 1507 1515 1459 651 629 1496 12502595 2684 2637 2664 2868 3051 2707 2689 27441486 1548 1560 1545 1442 1264 998 1516 14066936 7132 7165 7209 7328 6407 5660 7157 6834

Jan Feb Mar Apr May June July Aug Sept Oct Nov DecWeekdays

12 hour 5614 5697 5866 5899 5752 5730 5683 5459 5641 5473 5678 581524 hour 6984 7073 7298 7453 7229 7309 7176 6967 7097 6861 7131 7265

Saturdays12 hour 5046 5120 5066 5004 4929 4822 5042 5058 4873 4870 4981 -24 hour 6452 6508 6487 6511 6423 6338 6674 6509 6230 6208 6373 -

Sundays12 hour 4028 4235 4453 4528 4186 4444 4688 4274 4329 4281 4277 -24 hour 5171 5421 5794 5944 5528 5924 6269 5748 5680 5499 5470 -

© GMTU 2010

Greater Manchester Transportation UnitAutomatic Traffic Counter Data 2009

Site No: 00480042 A627 Ashton Road Bardsley Oldham

North BoundAverage vehicle flows (excluding School Holidays, Bank Holidays, roadworks etc)

Hour starting

12 hour (0700-1900)

Average vehicle flows (excluding School Holidays (except August), Bank Holidays, roadworks etc)

am peak (0700-1000)off peak (1000-1600)pm peak (1600-1900)24 hour (0000-2400)

Fig.4 Average Hourly Traffic Flow 2009

0

100

200

300

400

500

600

700

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23Hour Starting

Vehi

cles

per

hou

r

Average weekday Average Saturday Average Sunday

Page 12: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE COUNTS
Page 13: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE COUNTS

West Bound East Bound Two way

© GMTU 2010

Greater Manchester Transportation Unit Automatic Traffic Counter Data 2009

Site No: 00890091/2 A635 Manchester Road Ashton-U-Lyne Tameside

Fig.1 24-Hour Average Daily Traffic Flow 2009

0

5000

10000

15000

20000

25000

30000

35000

40000

Mon Tues Wed Thurs Fri Sat Sun

Veh

icle

s per

day

Fig.2 Average Weekday Traffic Flows 2009 (by month)

0

5000

10000

15000

20000

25000

30000

35000

40000

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Veh

icle

s per

day

Fig.3 Average Weekday Traffic Flows (by year)

0

5000

10000

15000

20000

25000

30000

35000

40000

45000

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Veh

icle

s per

day

Page 14: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE COUNTS

Mon Tues Wed Thurs Fri Sat Sun 5-day 7-day00 69 55 60 66 78 154 185 66 9501 46 37 40 43 51 114 138 43 6702 40 41 43 45 52 104 116 44 6303 40 40 37 36 48 83 93 40 5404 75 70 71 70 81 76 79 73 7505 206 210 217 212 209 107 94 211 17906 643 674 679 657 640 195 113 659 51407 1300 1319 1314 1308 1264 300 168 1301 99608 1198 1231 1214 1214 1169 458 225 1205 95809 988 1006 1021 1000 982 646 432 999 86810 850 843 890 861 881 810 750 865 84111 862 872 904 869 917 948 902 885 89612 886 892 923 894 966 1043 1011 912 94513 851 872 901 876 938 1075 996 888 93014 861 866 905 876 937 1009 905 889 90815 841 853 884 861 916 907 766 871 86116 944 955 1005 977 982 842 603 973 90117 977 1011 1039 1008 946 728 494 996 88618 769 812 855 818 815 610 455 814 73319 563 596 624 641 688 525 402 622 57720 406 423 429 458 475 399 317 438 41521 277 304 299 326 312 268 235 304 28922 186 198 217 221 235 238 168 211 20923 101 110 120 146 193 214 110 134 142

TOTALS11327 11532 11855 11562 11713 9376 7707 11598 10723

3486 3556 3549 3522 3415 1404 825 3505 28225151 5198 5407 5237 5555 5792 5330 5310 53812690 2778 2899 2803 2743 2180 1552 2783 2520

13979 14290 14691 14483 14775 11853 9757 14443 13402

Jan Feb Mar Apr May June July Aug Sept Oct Nov DecWeekdays

12 hour 11449 11510 11740 11918 11606 11500 11203 11106 11443 11580 11713 1183624 hour 14177 14294 14596 14877 14517 14434 14074 13922 14295 14366 14531 14752

Saturdays12 hour 9566 9855 9639 9763 9497 8584 7376 8618 9330 9669 9714 956324 hour 12040 12551 12149 12327 12076 10978 9712 11011 11801 12064 12114 12191

Sundays12 hour 7732 7770 7966 7748 7753 7104 6205 7053 7731 7985 8045 804124 hour 9675 9791 10090 9980 9821 9272 8043 9052 9779 9973 10004 10111

© GMTU 2010

Average vehicle flows (excluding School Holidays (except August), Bank Holidays, roadworks, football matches, football matches etc)

am peak (0700-1000)off peak (1000-1600)pm peak (1600-1900)24 hour (0000-2400)

West BoundAverage vehicle flows (excluding School Holidays, Bank Holidays, roadworks, football matches, football matches etc)

Hour starting

12 hour (0700-1900)

Greater Manchester Transportation UnitAutomatic Traffic Counter Data 2009

Site No: 00890091 A635 Manchester Road Ashton-U-Lyne Tameside

Fig.5 Average Hourly Traffic Flow 2009

0

200

400

600

800

1000

1200

1400

1600

1800

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23Hour Starting

Vehi

cles

per

hou

r

Average weekday Average Saturday Average Sunday

Page 15: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE COUNTS

Mon Tues Wed Thurs Fri Sat Sun 5-day 7-day00 120 102 109 121 141 255 289 119 16201 69 58 64 68 80 173 200 68 10202 41 43 43 50 57 128 156 47 7403 45 47 47 49 55 107 122 49 6704 78 73 74 73 80 86 91 76 7905 186 192 203 196 204 129 95 196 17206 547 574 585 571 549 240 146 565 45907 1186 1208 1218 1206 1180 359 187 1200 93508 1377 1422 1459 1438 1403 569 257 1420 113209 1072 1108 1131 1112 1118 773 452 1108 96710 977 1009 1019 1021 1055 934 705 1016 96011 1051 1077 1079 1070 1146 1093 921 1085 106212 1122 1129 1160 1165 1274 1216 1158 1170 117513 1186 1196 1239 1232 1340 1215 1218 1239 123214 1248 1283 1308 1286 1409 1185 1213 1307 127615 1445 1483 1509 1481 1575 1205 1173 1499 141016 1639 1643 1673 1628 1617 1184 1035 1640 148817 1607 1601 1627 1603 1444 1125 821 1576 140418 1269 1314 1322 1344 1234 936 696 1297 115919 849 930 946 976 954 754 570 931 85420 663 708 727 783 742 602 467 725 67021 484 529 543 600 545 441 365 540 50122 355 415 476 474 455 415 282 435 41023 201 227 265 265 374 382 219 266 276

TOTALS15179 15473 15744 15586 15795 11794 9836 15557 14200

3635 3738 3808 3756 3701 1701 896 3728 30347029 7177 7314 7255 7799 6848 6388 7316 71154515 4558 4622 4575 4295 3245 2552 4513 4051

18817 19371 19826 19812 20031 15506 12838 19574 18026

Jan Feb Mar Apr May June July Aug Sept Oct Nov DecWeekdays

12 hour 15437 15322 15668 15737 15435 15341 14979 14985 15626 15726 15710 1587024 hour 19317 19073 19588 19830 19441 19452 19072 18976 19710 19683 19802 20099

Saturdays12 hour 11856 12398 12071 11931 11740 11213 10720 11053 12002 12365 11916 1154624 hour 15550 16144 15625 15823 15507 14963 14535 14582 15591 15911 15541 15702

Sundays12 hour 9719 9690 10002 9677 9491 9442 9362 9115 10005 10278 10107 1014124 hour 12580 12502 13010 12781 12463 12604 12660 12024 13035 13182 13060 13241

© GMTU 2010

Average vehicle flows (excluding School Holidays (except August), Bank Holidays, roadworks, football matches, football matches etc)

am peak (0700-1000)off peak (1000-1600)pm peak (1600-1900)24 hour (0000-2400)

East BoundAverage vehicle flows (excluding School Holidays, Bank Holidays, roadworks, football matches, football matches etc)

Hour starting

12 hour (0700-1900)

Greater Manchester Transportation UnitAutomatic Traffic Counter Data 2009

Site No: 00890092 A635 Manchester Road Ashton-U-Lyne Tameside

Fig.4 Average Hourly Traffic Flow 2009

0

200

400

600

800

1000

1200

1400

1600

1800

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23Hour Starting

Vehi

cles

per

hou

r

Average weekday Average Saturday Average Sunday

Page 16: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE COUNTS
Page 17: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE COUNTS

West Bound East Bound Two way

© GMTU 2010

Greater Manchester Transportation Unit Automatic Traffic Counter Data 2009

Site No: 00890331/2 A57 Woolley Lane Hollingworth Tameside

Fig.1 24-Hour Average Daily Traffic Flow 2009

0

5000

10000

15000

20000

25000

30000

Mon Tues Wed Thurs Fri Sat Sun

Veh

icle

s per

day

Fig.2 Average Weekday Traffic Flows 2009 (by month)

0

5000

10000

15000

20000

25000

30000

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Veh

icle

s per

day

Fig.3 Average Weekday Traffic Flows (by year)

0

5000

10000

15000

20000

25000

30000

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Veh

icle

s per

day

Page 18: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE COUNTS

Mon Tues Wed Thurs Fri Sat Sun 5-day 7-day00 60 49 54 62 68 117 160 59 8101 30 27 27 28 33 71 98 29 4502 19 19 21 22 24 54 70 21 3303 31 31 30 29 32 53 59 31 3804 82 70 72 73 69 63 57 73 6905 245 245 235 243 228 119 77 239 19906 724 740 745 727 687 222 142 725 57007 869 896 902 919 933 350 200 904 72408 880 887 895 880 832 548 273 875 74209 739 763 763 768 768 717 474 760 71310 670 675 681 682 729 794 709 687 70611 670 677 682 699 735 822 783 693 72412 662 664 673 683 717 845 846 680 72713 672 664 673 708 750 820 816 693 72914 669 682 679 708 767 782 781 701 72415 662 672 680 692 757 741 751 693 70816 739 744 765 784 787 736 771 764 76117 787 816 837 824 770 748 726 807 78718 640 663 675 686 729 662 651 679 67219 491 531 533 560 624 519 534 548 54220 345 377 388 411 430 376 395 390 38921 280 280 286 321 295 276 291 292 29022 180 200 206 219 213 226 191 204 20523 88 104 115 121 175 213 113 121 133

TOTALS8659 8803 8905 9033 9274 8565 7781 8936 87172488 2546 2560 2567 2533 1615 947 2539 21794005 4034 4068 4172 4455 4804 4686 4147 43182166 2223 2277 2294 2286 2146 2148 2250 2220

11234 11476 11617 11849 12152 10874 9968 11668 11311

Jan Feb Mar Apr May June July Aug Sept Oct Nov DecWeekdays

12 hour 8827 8822 8790 8810 9035 9039 8897 9191 9072 9090 - -24 hour 11357 11373 11495 11651 11834 12000 11670 11888 11808 11775 - -

Saturdays12 hour 8603 8658 8324 8543 8239 8575 8309 8302 8837 8890 - -24 hour 10676 10787 10589 10953 10641 11068 10793 10481 11168 11118 - -

Sundays12 hour 7365 7499 7758 7833 7653 7868 7598 7500 8180 8021 - -24 hour 9159 9288 9968 10183 9846 10311 9910 9666 10480 10173 - -

© GMTU 2010

Greater Manchester Transportation UnitAutomatic Traffic Counter Data 2009

Site No: 00890331 A57 Woolley Lane Hollingworth Tameside

West BoundAverage vehicle flows (excluding School Holidays, Bank Holidays, roadworks etc)

Hour starting

12 hour (0700-1900)

Average vehicle flows (excluding School Holidays (except August), Bank Holidays, roadworks etc)

am peak (0700-1000)off peak (1000-1600)pm peak (1600-1900)24 hour (0000-2400)

Fig.5 Average Hourly Traffic Flow 2009

0

200

400

600

800

1000

1200

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23Hour Starting

Vehi

cles

per

hou

r

Average weekday Average Saturday Average Sunday

Page 19: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE COUNTS

Mon Tues Wed Thurs Fri Sat Sun 5-day 7-day00 85 69 79 87 97 174 212 83 11501 44 35 39 40 51 99 130 42 6302 23 24 25 23 31 72 95 25 4203 27 29 29 27 32 55 68 29 3804 44 46 49 47 49 46 46 47 4705 130 132 135 131 125 73 49 131 11106 356 358 361 366 350 146 80 358 28807 615 623 626 628 619 252 148 622 50208 712 723 726 731 742 434 242 727 61609 595 610 606 621 612 561 447 609 57910 609 598 611 623 632 684 631 615 62711 652 650 654 674 673 785 726 661 68812 681 672 696 700 715 830 828 693 73213 708 713 712 716 748 844 855 719 75714 725 729 713 743 782 839 833 738 76615 799 811 818 813 858 838 807 820 82116 932 930 927 925 948 864 786 932 90217 1039 1009 1011 1020 981 827 718 1012 94418 964 979 980 969 896 733 664 958 88419 722 744 765 785 749 629 596 753 71320 528 552 570 607 571 474 489 566 54221 433 476 452 499 426 360 392 457 43422 307 337 379 365 333 307 249 344 32523 156 181 211 209 261 279 157 204 208

TOTALS9031 9047 9080 9163 9206 8491 7685 9106 88181922 1956 1958 1980 1973 1247 837 1958 16974174 4173 4204 4269 4408 4820 4680 4246 43912935 2918 2918 2914 2825 2424 2168 2902 2730

11886 12030 12174 12349 12281 11205 10248 12145 11744

Jan Feb Mar Apr May June July Aug Sept Oct Nov DecWeekdays

12 hour 9120 8995 9143 8873 9104 9370 9151 8990 9078 9007 - -24 hour 11955 11877 12205 11993 12221 12672 12102 11913 12086 11993 - -

Saturdays12 hour 8545 8425 8379 8347 8738 8503 8413 8194 8523 8628 - -24 hour 11099 10976 11084 11141 11595 11422 11179 10910 11165 11338 - -

Sundays12 hour 7388 7441 7756 7734 7519 7986 7546 7348 7945 7638 - -24 hour 9596 9537 10380 10319 10083 10821 10276 9807 10607 10200 - -

© GMTU 2010

Greater Manchester Transportation UnitAutomatic Traffic Counter Data 2009

Site No: 00890332 A57 Woolley Lane Hollingworth Tameside

East BoundAverage vehicle flows (excluding School Holidays, Bank Holidays, roadworks etc)

Hour starting

12 hour (0700-1900)

Average vehicle flows (excluding School Holidays (except August), Bank Holidays, roadworks etc)

am peak (0700-1000)off peak (1000-1600)pm peak (1600-1900)24 hour (0000-2400)

Fig.4 Average Hourly Traffic Flow 2009

0

200

400

600

800

1000

1200

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23Hour Starting

Vehi

cles

per

hou

r

Average weekday Average Saturday Average Sunday

Page 20: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE COUNTS

Bank Holidays and School Holidays included

Both Directions

© GMTU 2010

Automatic Cycle Counter Data 2009Site No: 10870430 A57 Manchester Road (cycle lane) Denton Tameside

Greater Manchester Transportation Unit

Fig.1 24-Hour Average Daily Cycle Flow 2009

0

20

40

60

80

100

120

Mon Tues Wed Thurs Fri Sat Sun

Cyc

les p

er d

ay

Fig.2 Average Weekday Cycle Flows 2009 (by month)

0

20

40

60

80

100

120

140

160

Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec

Cyc

les p

er d

ay

Fig.3 Average Weekday Cycle Flows (by year)

0

20

40

60

80

100

120

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

Cyc

les p

er d

ay

Page 21: APPENDIX 2 AUTOMATIC TRAFFIC AND CYCLE COUNTS

Mon Tues Wed Thurs Fri Sat Sun 5-day 7-day00 0 0 0 0 0 0 0 0 001 0 0 0 0 0 0 0 0 002 0 0 0 0 0 0 0 0 003 0 0 0 0 0 0 0 0 004 1 1 1 1 1 1 1 1 105 3 3 3 3 2 2 1 3 206 7 8 8 7 6 2 1 7 607 17 21 19 18 15 2 1 18 1308 10 11 10 10 10 2 2 10 809 4 4 4 4 4 3 3 4 410 3 4 3 3 3 3 4 3 311 2 3 3 3 3 4 4 3 312 3 4 3 3 4 4 4 3 413 5 3 4 4 5 4 4 4 414 8 7 7 8 8 4 4 8 715 7 7 6 7 9 4 5 7 716 7 9 8 8 7 3 3 8 717 8 9 9 7 5 3 3 8 618 4 5 5 5 3 3 2 5 419 3 3 4 3 2 2 3 3 320 3 3 2 3 2 2 2 2 221 2 2 2 2 1 1 1 2 222 1 1 1 1 1 1 1 1 123 0 0 0 1 1 1 0 0 0

TOTALS80 85 82 81 76 39 39 81 6932 35 34 32 29 7 6 32 2528 27 26 29 32 23 24 28 2720 22 22 20 16 9 9 20 1799 106 103 100 92 50 49 100 86

Jan Feb Mar Apr May June July Aug Sept Oct Nov DecWeekdays

12 hour 64 64 81 80 78 111 94 85 107 96 74 4024 hour 76 79 100 100 98 136 122 112 131 115 89 50

Saturdays12 hour 21 28 32 43 43 48 58 43 54 46 37 1724 hour 27 40 43 56 54 58 80 57 67 59 47 21

Sundays12 hour 28 24 36 50 29 57 40 61 54 42 29 1724 hour 36 32 45 66 39 74 57 70 66 53 34 20

Average cycle flows (Bank Holidays and School Holidays included)

© GMTU 2010

am peak (0700-1000)off peak (1000-1600)pm peak (1600-1900)24 hour (0000-2400)

Both DirectionsAverage cycle flows (Bank Holidays and School Holidays included)

Hour starting

12 hour (0700-1900)

Greater Manchester Transportation Unit Automatic Cycle Counter Data 2009

Site No: 10870430 A57 Manchester Road (cycle lane) Denton Tameside

Fig.4 Average Hourly Cycle Flow 2009

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

20.0

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23Hour Starting

Cyc

les

per h

our

Average weekday Average Saturday Average Sunday