AO Assisting Organization
ASU Adminstrative Support Unit
CBFM Community Based Forest Management
CENRO Community Environment and Natural Resoources Office
CFDF Community Forest Development Fund
CIC CENRO Inspection Committee
CRMF Community Resource Management Framework
CSD Comprehensive Site Development
DOLE Department of Labor and Employment
ECOLINC Environmental Cooperation and Linkages
FSP Forestry Sector Project
GASALBO Gamut Ug Salingsing sa Bohol, Inc.
GIS Geographical Information System
GLEAN Grassroots Linkages for Environmental Action Network
ICM Inspection Chart Mapping
IEC Information, Education and Communication
JBIC Japan Bank for International Cooperation
LGU Local Government Unit
M & E Monitoring and Evaluation
OGA Other Government Agencies
PO Peoples Organization
RIFCOREM Rizal Federation for Coastal Resource Management, Inc.
SMP Survey, Mapping and Planning
SUSIMO Subproject Site Management Office
WFP Work and Financial Plan
LIST OF ACRONYMS
TABLE OF CONTENTS
Executive Summary ------------------------------------------------------------------ i
I. Subproject Description ----------------------------------------------------------- 1
1. Purpose/ Objectives
2. Subproject Scope and Dimension
II. Subproject Implementation --------------------------------------------------- 11
1. Organizations for Implementing
Subproject
2. Implementation Period
3. Subproject Cost
4. Comments on Performance of
AO, AP, PO, M&E, and Infra Contractors
5. Other Matters Relating to
Subproject Implementation
III. Action taken by the AO, AP, and PO Relating
To Recommendation(s) ------------------------------------------------------- 20
1. Recommendations made by the SUSIMO
2. Action Taken and Results
IV. Initial Operation and Maintenance
Of the Subproject Facilities ------------------------------------------------- 21
1. Present Condition of Facilities
2. Organization for Operation and Maintenance
3. Annual Budget or Actual Expenditure
For Operation and Maintenance (by year)
4. Maintenance Method
V. Benefits Derived from the Project -------------------------------------------- 29
1. Indirect Effects
VI. Conclusions and Recommendations -------------------------------------------- 31
LIST OF TABLES:
Table 1: Trainings Attended by the Peoples Organization --------------------- 33
Table 2: Subproject Performance ----------------------------------------------- 34
Table 3: Subproject Site Management Office Equipment --------------------- 35
Table 4: Trainings Attended by the SUSIMO ----------------------------------36
Table 5a: Coco land Farming Livelihood Project----------------------------------37
Table 5b: Crab Fattening Livelihood Project-------------------------------------38
Table 5c: Photo Copying Livelihood Project---------------------------------------39
Table 5d: Mud Boat Fishing Livelihood Project-----------------------------------40
Table 5e: Chain Saw Services Livelihood Project---------------------------------41
Table 5f: Planer Services Livelihood Project-------------------------------------42
Table 5g: Lending Livelihood Project----------------------------------------------43
Table 5h: Lending Livelihood Project----------------------------------------------44
Table 5i: Lending Livelihood Project-----------------------------------------------45
Table 5j: Sari-Sari Store Livelihood Project- ----------------------------------- 46
Table 5k: Crab Fattening Livelihood Project--------------------------------------47
Table 5l: Rice Mill Livelihood Project----------------------------------------------48
Table 5m: Danggit & Bangus Culture Livelihood Project--------------------------49
Table 6: Subproject Status Report----------------------------------------------50
Table 7: Community Organizing Cost Estimate Per Activity --------------------51
Table 8: Cost Estimate for Reforestation Per Activity-------------------------52
Table 9: Monitoring and Evaluation Cost Estimate Per Activity ---------------53
Table 10: Road Rehabilitation Infrastructure Project--------------------------54
Table 11: Annual Work and Financial Plan ----------------------------------------55
ANNEXES:
1. Organizational Charts
1a-1. GLEAN, Inc. (CO Contractor)---------------------------------------- 57
1a-2. ECOLINK, Inc. (CO - Replacement)----------------------------------58
1b. RIFCOREM (PO Contractor)--------------------------------------------59
1c. GASALBO, Inc. (M&E Contractor) -------------------------------------60
1d. JEADA Construction, Inc. (Infra Contractor)-------------------------61
1e. SUSIMO-----------------------------------------------------------------62
2. Pictures---------------------------------------------------------------------------63
3. CSD Accomplishment Map-------------------------------------------------------66
i
EXECUTIVE SUMMARY
The Community-based Forest Management Program (CBFMP) revolutionized
forest development and rehabilitation efforts of the government when it was
institutionalized by Executive Order No. 263 in 1995.
Before the adoption of CBFM approach, the sole motivating factor of contract
reforestation awardees was primarily financial gains. With the implementation
of the Forestry Sector Project (FSP) using the CBFM as its main strategy to
rehabilitate the fragile mangrove ecosystems, it empowered the beneficiary
communities economically, socially, technically and politically while transforming
them into environmentally responsible managers The tenurial right to manage
subproject sites alongside the various inputs from the Subproject deepened
their commitment to collaborate with other stakeholders in the implementation
of these subprojects.
Rizal Mangrove Rehabilitation Subproject is located in the tidal mudflats and
coastal waters of Mucielagos Bay within the municipalities of Rizal, Zamboanga
del Norte and Sapang Dalalga Mabini and Balinagao, Misamis Occidental. The
subproject covers parcels of inadequate stocked mangrove lands and open or
denuded areas interspersed along the coast.
The people’s organizations, Rizal Federation for the Coastal Resource
Management Inc. (RIFCOREM) was organized by Environmental Cooperation and
Linkages Inc from Sept.1, 2000 to Sept. 8, 2003. Under the Comprehensive Site
Development contract, the PO’s rehabilitated a total of 550 hectares of
mangrove and mudflats which were planted with bacauan or Rhizophora spp.
The CSD contract was implemented from January 2001 to June 2003 with a
total cost of Php 7.111 million. To assess the quality of established plantations
and the socio-economic impacts of the project, GASALBO, Inc. were contracted
to undertake Physical Validation and Institutional Project Benefit Assessment
on the area. Based on the latest evaluation, the overall weighted average survival
rate of the mangrove plantation was 90%.
To improve the accessibility of the barangay residents and marine products to
nearby markets, JAEDA Construction was contracted to rehabilitate the 0.8 km.
of farm to market road, which will be maintained by the Local Government Unit
of Rizal.
The project has provided regular employment not only to its members but also
to non-members of the PO’s. They participated in plantation establishment,
construction of infrastructure and livelihood projects. The latest socio-
institutional survey conducted by Green Shield Association revealed that the
average household annual income of the community members increased by 46 %
from PhP 76,652 to PhP 111, 911.
ii
The success of the project can be attributed to the unified efforts by the PO,
LGU and the SUSIMO. The environmental awareness of the community has
heightened to the extent that illegal cutting of mangrove and the conversion to
fishponds in the province has decreased.
1
SUBPROJECT COMPLETION REPORT
of
RIZAL MANGROVE REHABILITATION SUBPROJECT
Loan Agreement No. PH-P 135
Forestry Sector Project
I. SUBPROJECT DESCRIPTION
The Rizal Mangrove
Rehabilitation Subproject is
situated along the Murcielagos
Bay. It has an area of 550
hectares and covers 10 coastal
barangays of Nasipang, Sebaca,
Balubohan, Mabunao, and
Damasing in Rizal, Zamboanga del
Norte and extends to Barangay
Casul, Caluya of Sapang Dalaga
Mabini, Misom and Punta Sulong
of Baliangao, Misamis Occidental
in Region 10.
The Project site lies between the latitude of 8 34’ 7” to 8 39’ 42” and
longitude of 123 31’ 42” to 123 36’ 6”. It is bounded on the north by
alienable and disposable land; on the south by Murcielagos Bay; on the
east by the Municipality of Sibutad and on the west by the Municipality
of Baliangao, Misamis Occidental.
It falls under the fourth climatic type characterized as having more or
less even distribution of rainfall throughout the year.
1. Purpose/Objectives
A) Original
(1) To immediately rehabilitate the open/denuded mud flats which
serve as habitat of migratory birds and other wildlife;
(2) To instill community concern and responsibility for the protection
and maintenance of coastal areas and its resources;
2
(3) To intensify protection efforts in coastal areas, to prevent the
use of illegal and destructive collecting/harvesting techniques
that will further degrade the coastal ecology;
(4) To provide employment/additional livelihood opportunities for
coastal communities;
(5) To enlist the participation of the community in the proper
conservation of the mangrove forest in the area; and
(6) Provide legal access of the community to other resources found in
the area, which could be the basis for sustainable livelihood
projects.
B. Modification
1. Modified purpose/objectives (there was no modification made)
2. Subproject Scope and Dimension
A. Comparison of Original and Actual Scope and Dimensions.
A.1. Please check: There has been ( revision and/or modification or
no revision and/or modification) of the Subproject scope and
dimensions.
A.2. If “revision and/or modification”, please complete the Table.
ITEM Original Scope and
Dimensions (At the time
of appraisal/Planned)
Revised/Modified
(Actual)
1. REFORESTATION/
WATERSHED/CBFM
A. SMA
B. CO 1
Year 1 and 2
1,034.7 ha
Area: 550 ha
Schedule: Sept. 1, 2000-
Sept. 1, 2002
Activities:
o Information
Dissemination
o Organizational
Building & Social
Preparation
o Technical and
Social Training
o Empowerment &
1,034.7 ha
Area: 550 ha
Schedule: Sept. 1, 2000 –
September 8, 2003
o Information
Dissemination
o Organizational
Building & Social
Preparation
o Technical and Social
Training
o Empowerment &
3
C. CSD
1. SOIL EROSION
CONTROL/SOIL
WATERSHED
CONSERVATION
a. Infrastructure
b. Trail and
footpath
c. Riverbank
Stabilization
2. VEGETATIVE
MEASURES2
a. Agroforestry
b. Assisted Natural
Regeneration
c. Enrichment
Planting
d. Tree Plantation
d.1. Bamboo
d.2. Rattan
d.3. Mangrove
d.4. Plantation Sp.
e. Timber Stand
Improvement
3. INVENTORY
RESIDUAL
FOREST
4. INCOME
ENHANCEMENT
SUBPROJECT
Institutionalizatio
n
o Procurement of
Seeds
o Infrastructure
o M&E for billing
purposes
N/A
N/A
N/A
N/A
N/A
N/A
550.0 hectares
N/A
N/A
N/A
Institutionalization
o Procurement of Seeds
o Infrastructure
o M&E for billing
purposes
Extension Period: The
same activities in Year 1
and 2 were continued
N/A
N/A
N/A
N/A
N/A
N/A
550.0 hectares
N/A
N/A
N/A
4
5. INFRASTRUCTURE
a. Bunkhouse
b. Look-out tower
c. Graveled Trail
d. Office
D. INFRASTRUCTURE
Farm to Market Road
E. MONITORING &
EVALUATION
Physical Component
Socio-Institutional
Component
2 units
4 units
6 km.
N/A
N/A
2 units
14 units
N/A
1 unit
.81 Kilometer
Area: 550 ha
Schedule: December 23,
2002 to May 23, 2003
Activities:
o Verification of
boundaries, UTM
monuments and
block Corner Posts
o Seedling Production
Inventory/Analysis
o Survival Counting
with 20% sampling
intensity including
mapping of
developed areas
o Height and
diameter
measurement,
assessment of
overall health
appearance
o Physical inspection
of Infrastructure
o Project
Management Cost
and Report
preparation
Area: 550 ha
Schedule: December 23,
2002 to April 23, 2003
5
2. SUSIMO
o Equipment3
provided to the
Office
o Researches
conducted
o Trainings4
Attended
Activities:
o Courtesy Calls and
Pre-assessment
Meetings
o Data Collection and
Preliminary
Assessment
- Secondary Data
Gathering
- Primary Data
Gathering
o Preparation and
Presentation of
Draft Report
o Preparation and
Submission of Final
Report
3 units Boat/ Banca
3 units Motorcycle 1
unit Power Generator
1 unit Computer
1 unit Printer
1 unit UPS
1 unit GIS Maptitude
2 units GPS
2 units Handheld Radio
1 unit Base Radio
2 units Forester's Transit
1 unit Manual Typewriter
4 units Brunton Compass
2 units Steel Nylon Tape
2 units Diameter Tape
1 unit Planimeter
4 units Abney Hand Level
1 unit Rain Gauge
3 units Binocular 1 unit Lettering Set
N/A
- Orientation Seminar on
6
o Others
Mangrove Subproject
Implementation under FSP
- FSP Mangrove Action
Planning Workshop
Workshop on the
Implementation of Capital
Build-up System for
Community-Based Forest
Management Project
- FSP Year-end Physical
and Financial
Reconciliation Workshop
for CY 2001 Planning
Workshop
- FSP Mid-Year Physical
and Financial Assessment
and Action Planning
Workshop
- Hands-on Training on the
Application of Global
Positioning System (GPS)
Receiver
- Re-orientation Course of
Project Implementors of
Mangrove Subproject
Sites
- FSP Phase-out/ Phase-in
Planning Workshop
-FSP Action Planning
Workshop
- SUSIMO Office Building
1 Please Refer to Table 1 for the details on trainings attended by the POs 2 Table 2 for the details of the subproject performance in terms of area planted 3 Table 3 shows the details of the equipment provided to the SUSIMO 4 Please refer to Table 4 for the trainings attended by the SUSIMO
B. Reasons for Revision/Modification of scope and Dimensions
B.1. Where there has been “revision/modification” of the Subproject
scope and dimensions.
Please choose the reason(s) from the following list and check.
Revision of the superior plan (e.g. sector development plan, etc.)
7
Revision of the supply-and-demand estimate
Large fluctuation in the Subproject cost
Substantial revision of design due to the unforeseeable physical
condition at the time of the original design (e.g. poor soil
condition, etc.)
Natural disaster/unseasonable weather
Unusual circumstances beyond the control of the Executing
Agency
Structural and organizational problems of the agencies concerned
(e.g. lack of staff, inadequate coordination with other agencies,
etc.)
Availability of funds (e.g. lack of funds, use of contingency,
fluctuation of the exchange rate, etc.)
Unrealistic initial plan/Technical problems
Procurement problems
Performance of contractor/supplier
Performance of consultant
Change in construction period
Others
B.2. Detailed statement of reasons (with background)
Substantial revision of design due to the unforeseeable physical
condition at the time of the original design (e.g. poor soil
condition, etc.)
The original plan of the Subproject was to establish 932 hectares
based on the appraisal report. However, during the final inspection
made by the NFDO TA-Consultant, it was observed that open 382
hectares of mudflats area in the proposed site has been the
growth bed of sea grasses. Since the sea grasses can provide the
same environmental effect the mangrove gives, specifically in
enrichment of fishery resources, the proposed rehabilitation area
was reduced to 550 hectares to avoid disturbing the sea grasses
bed. With this shortfall of the area under the jurisdiction of
DENR Region nine (9), Subproject area was expanded to include
the coastal barangays of the Municipality of Sapang Dalaga and
Baliangao, Misamis Occidental of Region 10 maintaining the same
revised target.
C. Contribution of Subproject to Relevant (Sub) Sector(s)
C.1. (Sub) Sector(s) to which the Subproject belongs
Electric power and Gas Telecommunication Social services
(Multipurpose) Dams Telecommunications Watersupply
8
Power Plants Broadcasting Sewerage
Transmission lines Education
Distribution Systems Irrigation and Flood control Health
Gas Irrigation Tourism
Others Flood control others
Transportation Agriculture, Forestry and Fisheries
Roads Agriculture and Forestry
Bridges Fisheries
Railways
Airport Mining and Manufacturing
Ports Mining
Marine Transportation Manufacturing
Others
C.2. Original (At the time of appraisal/Planned)
Item Description
Comprehensive Site Development
(Flood Control)
Socio-Economic Development
(Social Services)
The rehabilitation of the coastal area for
Rizal Mangrove Subproject will eventually
protect the marine ecosystem providing
overall balance of the environment.
Aquatic resources stock will improve
since the mangrove areas will serve as
nesting and spawning ground for the
wildlife marine fauna species.
The improvement of the mangrove forest
cover will prevent the scouring of the
coastal area. It will serve as a buffer,
which protects the community from
strong winds and waves especially during
the occurrence of typhoons.
The Rizal Mangrove Subproject
envisioned to improve the socio-economic
condition of the community residing
within and the adjacent areas of the
Subproject. There will be an increase in
fish catch and more employment will be
generated.
It is also anticipated that the PO will
establish viable livelihood projects that
9
Land Tenure (CBFMA)
Environmental Awareness
(Education)
would support the sustainability of the
organization and the continuous
maintenance and protection of the
established mangrove plantations. These
income-generating activities will surely
increase the household income of the
involved communities.
Provision of CBFMA as a land tenure
instrument over the area will encourage
other communities and individual families
to participate in the continued
development and protection of the
mangrove area. The vested right will
create a sense of ownership over the
developments introduced in a particular
mangrove area.
The successful and sustained
rehabilitation of the mangrove areas will
promote environmental awareness among
direct/indirect beneficiaries of the
Subproject. The community will be
encouraged to continuously protect and
maintain the plantation, which will
redound to positive impacts on the
environment.
C.3. Present situation and outlook for the future
Item Description
Issuance of the Community Based
Forest Management Agreement
(CBFMA) as a Land Tenure Right
over the area.
The PO comprising 11 participating
barangays was already awarded with
the CBFMA with a total area of
1,034.70 hectares including the 550
hectares plantation established under
FSP.
This tenurial instrument provides the
PO, the right to sustainably continue
the development of the CBFM area and
its resources, especially the marine
resources.
10
Established viable livelihood
projects.5
Development of the Mangrove area
(Fisheries)
Employment Generation/ Increase
in Household Income
Rehabilitation of .8 km Farm to
Market road as infrastructure
component of the project.
(Road)
Through its formulated Community
Resource Management Framework
(CRMF), future undertakings/business
ventures considered by the
stakeholders of the project will be
implemented.
The PO has established viable livelihood
projects such as rice mill, mud crab
fattening, coconut plantation, among
others.
The established livelihood projects will
be further developed with subsidized
funding from their accumulated
Community Forest Development Fund
(CFDF) and share from retention fund.
The diversity of marine ecosystem and
the vegetative cover of the area were
improved with the mangrove
restoration. Yield of fishery and shells
harvest within the area increased.
The project provided employment to
the members of the participating
barangays through the Comprehensive
Site Development and the established
livelihood projects of the organization.
Further, individual members were also
able to establish their own businesses.
Still others were able to buy pump
boats, motorcycles, and home
appliances. Reconstruction of their nipa
huts to more stronger ones made of
concrete as well as children being sent
to school even up to college became
evident.
Rehabilitation of farm-to-market road
greatly helped the community in
transporting their marine products to
nearby market and barangays with ease.
It is expected that in the future the
LGU of Rizal will continuously improve
11
Awareness of the community in the
sustainable development.
(Education)
the newly rehabilitated farm-to-market
road to facilitate transport of goods to
nearby markets.
The Subproject area was once a dense
mangrove forest and provided economic
opportunities as well as environmental
benefits for the communities residing
in and around the area. However, the
cutting of mangrove trees for charcoal
making and conversion of the land into
fishponds led to its degraded condition.
With the community organizing
activities of the Subproject, the
communities were enlightened on the
importance of the mangrove area in
their lives. Development of the
degraded coastal area was easily
implemented. Maintenance and
protection activities were not only
focused within the established
plantations, but also within the
remaining mangrove forests. The
community with the support of the LGU
worked hand in hand to deter illegal
activities that may cause degradation
of the area. Certain policies and
regulations were formulated and
imposed by the LGU for the sustainable
development of the mangrove
ecosystem.
Please refer to Table 5 for the Livelihood project being implemented by the POs
II. SUBPROJECT IMPLEMENTATION
I. Organizations for Implementing Subproject
Function in the
Subproject
Implementation
Name of Organization Reasons for
Change (1) Original (2) Changed
1. SMA
By Admin
N/A
12
2. AO for CO
3. Assisting
Professional
4. People’s
Organization
5. M&E Contractor
6. Infrastructure
Contractor
Grassroots
Linkages for
Environmental
Action Network,
Inc. (GLEAN,
Inc.)
N/A
Rizal Federation
For Coastal
Resource
Management,
Inc.
(RIFCOREM,
Inc.)
Gamut Ug
Salingsing Sa
Bohol, Inc.
(GASALBO, Inc.)
JEADA
Construction
Environmental
Cooperation and
Linkages, Inc.
(ECOLINC)
N/A
N/A
N/A
N/A
Terminated
Please state:
1.1 Reasons for the change
Community Organizing
GLEAN, Inc. was terminated in April 2001 after a negative feedback
from the evaluation/validation conducted by the joint evaluating team
of CENRO, PENRO, SUSIMO and DENR-Regional office. GLEAN, Inc.
failed to comply with the terms and conditions stipulated in the
approved contract for community organizing activities during the six
months of its implementation period.
1.2 Problems arising, counter measures adopted and results
13
Community Organizing
The CO contractor encountered financial problems and just relied on
payments of billings to be able to sustain its activities that
consequently led to insufficient delivery of services to the PO. The
DENR top management terminated the contract of the first CO
contractor (GLEAN, Inc.) and re awarded another contract to a
qualified AO for the continuation of the CO activity. The remaining
CO activities were fully complied with by the new AO and such other
services for the PO duly accomplished.
Untoward human activities
It has been the practice of fishermen to cross over the plantation
during high tide. Their pump boats/ bancas cause destruction of some
mangrove propagules and hamper the growth of the plantation. The
PO strengthened its monitoring and protection activities and regularly
checked the condition of the perimeter fence surrounding the
plantations. Intensive monitoring by the PO was done and the
fishermen were properly guided on which route to take.
1.3 The latest organization chart (or equivalent) for the implementation
of the
Subproject is ( attached or not available).
The Organizational Chart are attached as Annex 1a, 1b, 1c, 1d, 1e, and
1f for Grassroots Linkages for Environmental Action Network, Inc.
(GLEAN, Inc.), Environmental Linkages and Cooperation, Inc.
(ECOLINC) (CO contractors), Rizal Federation for Coastal Resource
Management, Inc (RIFCOREM, Inc.) (PO), Gamut Ug SalingsingSa
Bohol, Inc. (GASALBO, Inc.) (M&E contractor), JEADA Construction
(Infra Contractor), and SUSIMO-Rizal Mangrove Rehabilitation
Subproject, respectively.
1.4 If the organizational chart (or equivalent) is not available, please
state the reason.
2. Implementation Period
A. Comparison of Original Schedule and Actual Period
Please fill in the following blanks with actual period for each item.
14
ITEM
ORIGINAL SCHEDULE
ACTUAL PERIOD
1) Contract for SMP
2) Contract of AO for
CO
3) Contract of PO for
CSD
4) Contract of NGO for
M&E
5) Contract of
Infrastructure
Component
Completion
(Completion of
Subproject)
N/A
September 1, 2000 to
September 1, 2002
January 2001 to
December 2003
December 23, 2002 to
May 23, 2003
November 2002- May
15, 2003
June 2003
N/A
September 1, 2000 to
September 8, 2003
January 2001 to June
2003
December 10, 2002 to
May 23, 2003
November 2002-
November 21, 2003
December 2003
Please refer to Table 6 for the Subproject Status report
Notes: Completion of the Subproject was defined as ( completion
ceremony or final disbursement or other than the above.
The completion date was scheduled for June 2003 (at the time of
appraisal) and is indicated (thus ) in the above Table.
B. Reasons for Delay or Early Completion
B.1. In case of delay or early completion, please choose the reason(s)
from the following list and check.
Change in scope/dimensions
Natural disaster/Unseasonable weather (e.g. earthquake, typhoon,
etc.)
Shortage of funds/Fluctuation of the exchange rate
Problems in procurement (propagules)
Inflation
Unusual circumstances beyond the control of the Executing Agency
15
Structural and organizational problems of the agencies concerned
(e.g. lack of staff, inadequate coordination with other agencies,
etc.)
Legislative matters
Unrealistic initial plan/Technical problems
Performance of contractor/supplier
Performance of consultant
Others
B.2. Reasons and background for delay or early completion
Performance of contractor/supplier
Community Organizing
The implementation of Community Organizing Component was not
conducted continuously because the first CO contract awarded to
GLEAN; Inc. was terminated due to their poor performance. After
the termination, the regional office experienced difficulty in re-
awarding the CO contract to a qualified NGO because most of those
interested to bid refused to accept the contract due to additional
barangays involved in the expansion area for development under
Region 10. The CO contract was awarded to ECOLINC after one (1)
year and four (4) months, The re-awarding was made on the latter
part of the project implementation.
Natural disaster/Unseasonable weather (e.g. earthquake, typhoon,
etc.)
Infrastructure Component
The completion of the infrastructure project was delayed due to
negative slippage brought about heavy rains, which greatly affected
the working operation of the contractor.
C. Remedial Action Taken in Each Case of Delay
Community Organizing
During the time when there was no Assisting Organization, the
SUSIMO personnel and staff through its Community Organizing and
Strengthening Unit (COSU) helped the PO in facilitating every
activity with regard to organizational management matters. They also
conducted several organizational and financial management
16
trainings/workshops for the PO until the new Assisting Organization
came in.
Infrastructure Component
To make use of the period when it was not possible to continue with
the infrastructure operation because of heavy rains, the ISTaf team,
site engineer, T.A. engineer and the contractor conducted several
meetings and formulated strategies that helped the contractor
finished the infrastructure at a given extension period without
additional funds.
3. Subproject Cost
A. Comparison of Original Estimated Cost and Actual Expenditure (by
Component)
Please refer to Tables 7,8, and 9 for the details on cost of CO, CSD, and M&E. List of infra
project with its corresponding cost is also attached as Table 10
B. Reasons for Difference between Original Estimated Cost and
Actual Expenditure….
B.1. If there is any difference between Table a.1 and Table a.2 in
Paragraph a, please choose the reason(s) from the following
list and check.
Item
Original Cost
(based on appraisal)
(in M pesos)
Actual Expenditures
(in M pesos)
Survey Mapping and
Planning
Community Organization
Comprehensive Site
Development
Monitoring
and Evaluation
Infrastructure Dev’t
Subproject Coordinating
Office
0.989999
7.111743
0.563150
2.041163
2.395780
0.659000
7.111743
0.563150
2.041163
2.395780
Grand Total 13.101835 12.770836
17
Increase in reconstruction cost arising from natural
disaster/unreasonable weather (e.g. earthquake, typhoon, etc.)
Increase or decrease arising from a change in construction
period
Increase or decrease arising from inflation
Increase or decrease arising from fluctuation in the
exchange rate
Increase or decrease arising from a change in the
scope/work volume of the Subproject
Decrease arising from keen competition in tender
Unusual circumstances beyond the control of the Executing
Agency
Unrealistic cost estimates/Technical problems
Others
B.2. Description of the detailed reason(s) and background
Unusual circumstances beyond the control of the Executing
Agency
Community Organizing
The amount intended for the activities under the contract of
GLEAN, Inc. was excluded in the total contract cost of the new
AO (ECOLINC), tapped by the DENR to continue the CO activities.
The intended amount was retained at the regional office.
B. Action taken in Case of Cost Overrun and Results (N/A)
D. Comparison of Original Estimated Expenditure and Actual
Expenditure (by Year)
Calendar
Year
Original Cost
(based on appraisal)
Actual Expenditures
2000
2001
2002
2003
0.328000
3.523840
2.803800
6.446195
0.328000
3.257840
4.081958
5.103037
Total 13.101835 12.770836 Please refer to Table 11 for the details on the Annual Work and Financial Plan..
18
4. Comments on Performance of Assisting Organizations (AOs),
Assisting Professionals (APs), Peoples Organizations (POs), M&E and
Infrastructure contractors.
Please describe the performance of each organization after checking
the item(s) in the relevant lists on which you have any comment.
A. Performance of Assisting Organizations & Assisting
Professionals (if any) Peoples Organizations, M&E and
Infrastructure contractors
A.1. Overall performance Design
Contract administration Construction
supervision
Expertise Staff qualifications
Coordinating ability Compliance with Contracts
Performance related to any other than the Subproject
scope, if any.
Others
Staff qualifications
Compliance with Contracts
Coordinating ability
A.2 Description (in detail)
Coordinating ability
Assisting Organization
The performance of the first CO contractor (GLEAN, Inc.),
was rated poor. The staff deployed in the area had
insufficient knowledge and skills and did not meet the
expected services needed by the PO. On the other hand, the
second Assisting Organization (ECOLINC), performed
satisfactorily in accomplishing all the activities stipulated in
the work and financial plan. The AO managed to
perform/implement the activities without additional cost
despite the expansion in Project coverage.
Overall performance established
People’s Organization – RIFCOREM, Inc.
The PO performed well in the development and maintenance of
the 550 hectares mangrove plantation with 90% survival rate
and has achieved the required DENR standard. The PO
established several livelihood projects and plans to implement
19
more that will facilitate the continuity of operations and
finance the protection and maintenance activities of their
established plantations.
Overall performance
Expertise
Monitoring and Evaluation Contractor
The contractor performed satisfactorily. They have completed
the planned activities on time in accordance with the approved
Work and Financial Plan.
Construction supervision
Compliance with Contracts
Infrastructure Component Contractor
It was observed that the performance of the contractor was
very poor. The contract duration was not strictly followed,
thus, the construction was not completed as scheduled.
5. Other matters relating to Subproject Implementation
Please choose the item(s) from the following list on which you have any
comment, check it (them), and describe it (them) with measure and
results in (B) below.
A. Technical Financial Institutional Economic
Social/Distributional Others
B. Description (in detail)
Financial
During the time of the first AO (GLEAN, Inc.), the contractor
encountered financial problems and just relied on the payments paid
by the DENR to enable them to operate. This resulted to inadequate
delivery of services to the PO. The DENR management terminated the
contract of the first CO contractor and re-awarded a new contract to
a qualified NGO. The remaining CO activities were fully accomplished
by the new AO. The expected services of the AO for the PO were
also accomplished enabling the PO to learn many things and thus
worked efficiently with regards to project management.
20
III. ACTION TAKEN BY THE AOs, APs and POs RELATING TO
RECOMMENDATION (S)
1. Recommendation(s) made by SUSIMO
SUSIMO check: This article is ( applicable. The recommendations are
given in Annex – I herewith or not applicable. There has been no
recommendation with regard to the Subproject).
2. Action Taken and Results
Issue/Recommendation Action Taken Results
1. During the initial
implementation of
livelihood project of the
PO, the SUSIMO
recommended to the PO
to change the Bangus and
Danggit Culture into Crab
fattening for it is more
feasible in the area and
less expensive compared
to Bangus and Danggit
Culture.
The PO adopted the
recommendation of the
SUSIMO and they
implemented crab
fattening as their
livelihood project at
Sitio Tahica, Sebaca,
Rizal, ZDN.
The crab-fattening
project is on-going
and as of December
2003 has
accumulated a net
income of PHP
4,000.00.
2. During the initial stage
of project
implementation, the PO
had insufficient
knowledge in terms of
CSD operation and
financial management of
the organization. The
SUSIMO suggested to
the AO that financial
training needs of the PO
should be prioritized and
the technical needs of
the PO in CSD operation
be provided by the
SUSIMO.
The AO facilitated
several trainings on
financial management
and organizational
management while on
the CSD technical
operation; the
SUSIMO with its
SDMU unit trained
their technical
counterparts from the
PO.
All required trainings
with regard to
financial and
technical management
of the PO were
provided both by the
AO and the SUSIMO.
Financial matters of
the PO were properly
recorded and
managed. The
technical capability
of the PO has
improved
considerably.
4. The SUSIMO advised
the PO to conduct regular
audit of their finances
The PO agreed and the
PO auditor conducted
regular auditing of
their finances.
Finances of the PO
were properly
recorded.
21
IV.INITIAL OPERATION AND MAINTENANCE OF SUBPROJECT
FACILITIES
1. Present Condition of Facilities
A.Please check: This article is ( applicable due to problem(s) or not
applicable. No particular problem has occurred since the initial operation
started). If there have been any problems, please check the relevant
space in the Table.
PO-RIFCOREM
Item Status Initial
Operation
Maintenance Managem
ent
Others
1.Gas Range
2.Refrigerator
3.Steel
Cabinet
4.Typewriter
5.Cross Cut
Saw
6.Tape
Measure
7.Camera
8.Xerox
Machine
9.Rice Miller
10. Boat
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
/
/
/
/
/
/
/
/
SUSIMO-RIZAL
Item Status Initial
Operation
Maintenance Manage
ment
Others
1.Boat/ Banca
2.Motorcycle
3.Power
Generator
Serviceable
Serviceable
Serviceable
/
/
22
5. Computer
6. Printer
7. UPS
8. GIS
Maptitude
9. GPS
10. Handheld
Radio
11. Base Radio
12. Forester's
Transit
13. Manual
Typewriter
14. Brunton
Compass
15. Steel Nylon
Tape
16. Diameter
Tape
17. Planimeter
18. Abney Hand
Level
19. Rain Gauge
20. Binocular
21.Lettering Set
22.SUSIMO
Office
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
Serviceable
/
/
/
/
/
B. Please check: The Problem(s) has arisen owing to the following
reason(s).
Technical Financial Institutional Economic
Social/Distributional Others
C. Description (in detail)
Technical
The PO and the SUSIMO encountered problems regarding technical
aspects of the equipment. Regular maintenance and repair were
necessary for their worn-out equipment. Similarly, efficiency of
motorcycles used by the SUSIMO were also affected by decrepitude.
Maintenance and repair of the vehicles were done more frequently.
23
Availability of Spare parts
The SUSIMO encountered problems in the repair of the base radio
because of the unavailability of the needed spare parts. Until now, the
base radio is non-serviceable because of lack of available spare parts.
D. Aspect of utilizing the Subproject facilities
For the SUSIMO
ITEM ORIGINAL PLAN
ACTUAL
OPERATION
1 Boat/Banca For the SUSIMO For the SUSIMO
2 Power Generator For the SUSIMO For the SUSIMO
3 Motorcycle For the SUSIMO For the SUSIMO
4 Computer For the SUSIMO For the SUSIMO
5 Printer For the SUSIMO For the SUSIMO
6 UPS For the SUSIMO For the SUSIMO
7 GIS For the SUSIMO CENRO-Dapitan
8 GPS For the SUSIMO For the SUSIMO
9 Handheld Radio For the SUSIMO For the SUSIMO
10 Base Radio For the SUSIMO For the SUSIMO
11 Forester’s Transit For the SUSIMO CENRO-Dapitan
12 Manual Typewriter For the SUSIMO For the SUSIMO
13 Brunton Compass For the SUSIMO For the SUSIMO
14 Steel Nylon Tape For the SUSIMO For the SUSIMO
15 Diameter Tape For the SUSIMO For the SUSIMO
16 Planimeter For the SUSIMO For the SUSIMO
17 Abney-Hand Level For the SUSIMO For the SUSIMO
18 Rain Gauge For the SUSIMO CENRO-Dipolog
19 Binocular For the SUSIMO For the SUSIMO
20 Lettering Set For the SUSIMO For the SUSIMO
21 SUSIMO Office For the SUSIMO For the SUSIMO
22 Life Jacket For the SUSIMO For the SUSIMO
23 Camera For the SUSIMO For the SUSIMO
24 Calculator For the SUSIMO For the SUSIMO
25 Office tables For the SUSIMO For the SUSIMO
26 Chairs For the SUSIMO For the SUSIMO
27 Flashlights For the SUSIMO For the SUSIMO
28 Petromax For the SUSIMO For the SUSIMO
24
29 Cellular Phone For the SUSIMO For the SUSIMO
30 Computer table For the SUSIMO For the SUSIMO
31 Refrigerator For the SUSIMO For the SUSIMO
32 Double Deck Bed For the SUSIMO For the SUSIMO
33 Water Dispenser For the SUSIMO For the SUSIMO
34 Tape Recorder For the SUSIMO For the SUSIMO
For the PO-RIFCOREM
ITEM ORIGINAL PLAN
ACTUAL
OPERATION
1 Gas Range For the PO For the PO
2 Refrigerator For the PO For the PO
3 Steel Cabinet For the PO For the PO
4 Typewriter For the PO For the PO
5 Cross Cut Saw For the PO For the PO
6 Measuring Tape For the PO For the PO
7 Camera For the PO For the PO
8 Xerox Machine For the PO For the PO
9 Rice Mill For the PO For the PO
10 Boat For the PO For the PO
2. Organization for Operation and Maintenance
A. Name of PO/ SUSIMO
A.1. Please give the name of PO and/or Body in charge of O/M.
PO: Rizal Federation for Coastal Resources Management Inc.
(RIFCOREM)
SUSIMO: Rizal Mangrove Rehabilitation Subproject Site
Management Office- Administrative Support Unit (ASU)
A.2. Please check:
The latest organization chart (or equivalent) for O/M of the
Subproject facilities is ( attached or not available).
A.3. If the organization chart (or equivalent) is not available, please state
the reason.
B. Number of staff/workers of the PO or Body for Operation and
Maintenance of Subproject Facilities.
25
PO: 6 Officers and 9 Board of Directors
SUSIMO: 7 Personnel
C. Please check and explain the following.
C.1. The number of staff is currently ( sufficient or insufficient).
If “Insufficient”, please describe your estimate of the optimum
number of staff and your plan for providing them.
C.2. Average employment period of the present staff
PO: 3 years
SUSIMO: 5 Years
C.3. Availability of training program to promote the vocational ability of
the staff, its contents and expected effects.
None
1. Annual Budget or Actual Expenditure for Operation and Maintenance
(By Year)
A. Original Expected Expenditure
SUSIMO
Item
Calendar year
Maintenance Operation Total
2001
2002
2003
0.512000
0.195000
0.212000
0.650000
0.336000
0.481780
1.162000
0.531000
0.693780
Total 0.919000 1.467780 2.386780
PO-RIFCOREM
Item
Calendar year
Maintenance Operation Total
2001
2002
2003
The PO did not
allot budget for
the operation
and maintenance
of their
facilities. The
budget was
provided as the
need arises.
Total
26
B.Actual and Currently Expected Expenditures
SUSIMO
Item
Calendar
year
Mainte-
nance Operation
Maintenance
& Operation
Total
for expanded portion
2001
Computer
Typewriter
Office
0.020700
0.012300
0.045000
0.020700
0.012300
0.045000
Subtotal 0.078000 0.078000
2002
Computer
Typewriter
Motorcycle
Boat/Banca
Office
0.009200
0.098500
0.021700
0.075300
0.014200
0.007600
0.065000
0.046200
0.055000
0.023400
0.007600
0.163500
0.067900
0.130300
Subtotal 0.204700 0.188000 0.392700
2003
Computer Typewriter
Motorcycle
Boat/Banca
Office
0.009200
0.023000
0.008000
0.002100
0.005000
0.055000
0.017800
0.067500
0.011300
0.005000
0.078000
0.025800
0.067500
Subtotal 0.040200 0.147400 0.187600
2004
0.100000
0.100000
Total 0.244900 0.413400 0.100000 0.758300
PO- RIFCOREM
Item
Calendar year
Mainte-
nance Operation
Maintenance &
Operation
(For expanded
portion)
Total
2001
Typewriter
Camera
Boat
0.021000
0.005500
0.025000
0.005000
0.006000
0.011000
0.026000
0.011500
0.036000
27
Subtotal 0.051500 0.022000 0.073500
2002
Typewriter
Camera
Boat
0.006000
0.006500
0.015000
0.006000
0.006500
0.015000
Subtotal 0.027500 0.027500
2003 Xerox Machine
Rice Miller
Typewriter
Camera
Handheld
Radio
Boat
0.021300
0.013700
0.011200
0.016400
0.007000
0.007500
0.004600
0.022300
0.032500
0.030100
0.007000
0.007500
0.004600
0.022300
Subtotal 0.035000 0.069000 0.104000
Total 0.205000
Note: Actual and currently expected expenditure for expansion, replacement
or any other improvement purposes
Please describe the basis for the above estimate and your financing plan
for the same.
No amount was given for the expanded portion of maintenance and
operation of facilities for the PO. Cost provided was based on actual
disbursement. In the case of SUSIMO, facilities were maintained
depending on the fund allocation downloaded by the NFDO. However, it
will be the responsibility of the concerned CENRO to oversee and
maintain these facilities when it will be turned over to their custody.
Maintenance could be sourced out from the DENR regular funds.
1. Maintenance Method
A. Content of Method
B. Frequency
C. Others, if any.
28
PO-RIFCOREM
Equipment/ Facility Method Frequency
1. Xerox Machine
Repair in case of
malfunctions
Replacement of toner
and ink
As the need arises
As the need arises
2. Handheld Radio
Repair in case of
system malfunctions
Replacement of busted
battery
As the need arises
As the need arises
3. Typewriter
Cleaning and
Lubrication
Ribbon Replacement
As the need arises
Once a Year
4. Boat
Cleaning and
Maintenance of Hull
Change oil
Replacement of
crossed joined/Bearing
Replacement of
Propeller Shaft and
Propeller Blade
Replacement of Busted
Sparkplug
Every week
Every three months
As the need arises
As the need arises
Every three months
29
SUSIMO
C. Others, if any
V. Benefits derived from the Subproject
1. Indirect Effects
A. Please choose and check the item(s), which are dealt with this Article
by you.
Technological transfer (e.g. application of technology used in the
Subproject to other similar projects and subprojects)
Employment creating (e.g. during construction, contribution to the
sector(s) after completion)
Equipment/ Facility Method Frequency
1. Motorcycle Replacement of
Sparkplug
Replacement of sprocket
Replacement and Repair
of Roller Chain
Replacement of
Connecting Rod,
Reboring of Cylinder,
Replacement of Piston
kit, and Refacing of
Camshaft
Replacement of Tire
Once a year
Once a year
Twice a year
As the need arises
As the need arises
2. Typewriter Replacement of roller
and cleaning
Every 2 months
3. Computer Replacement of ink
Bond paper supply
Every 2 months
Every 1 month
4. Boat/Banca Cleaning and
Maintenance of Hull
Change oil
Replacement of crossed
joined/ Bearing
Replacement of
Propeller Shaft and
Propeller Blade
Replacement of Busted
Sparkplug
Every week
Every three months
As the need arises
As the need arises
Every 2 months
30
Income-raising (e.g. income of the residents in the region)
Other intended or unintended effects on the relevant sector(s)
and/or the region concerned
B. Please give details for each of the item(s) you checked.
Employment Generation
During the implementation of the CSD, job opportunities were
opened to all participating communities especially the plantation
establishment and maintenance activities of the mangrove
subproject. With the Project, an employment of around 48, 289
man-days was generated, thus, reducing the unemployment
problem at the community level. As of now, employment generation
program of the PO is still ongoing. The established livelihood
project is also a potential source of employment even within family
level.
Income Raising
There was an increase in income of the project beneficiaries due
to employment opportunities during the Project as well as
livelihood implementation by the PO. At the time of appraisal, the
annual average household income of the community was
PHP76,652.00. After the project implementation, the annual
average household income increased to PHP 111,911.92 or
approximately 46% based on the final validation for Institutional
Project Benefit Assessment (IPBA) conducted by Green shield
Association. Indicators of socio-economic upliftment can be
observed in the community such as improvement of individual
houses, opportunities for their children to go to school and
continue up to college level, procurement of household
facilities/equipment and implementation of backyard livelihood
income generating projects of individual families.
31
VI. Conclusion and Recommendations
The overall implementation of Rizal Mangrove Rehabilitation Subproject
has formed endless experiences within the PO and adjacent communities.
Its positive socio-economic and environmental impacts had not only
shaped the minds and hearts of the people in rehabilitating their vast
mangrove areas but also had created a chain effect to other provinces of
the region.
The success of the subproject was also attributed by the dedication and
commitment of the SUSIMO personnel, LGUs and most especially the
Peoples Organization (RIFCOREM, Inc.). Without their concerted and
unified efforts, the goals of the subproject could never be achieved.
To sustain the operation of the Subproject and the PO, the
following are recommendations:
With the completion of the subproject, the concerned CENRO and
PENRO offices should monitor the PO. The PO should be reminded
to further intensify the Monitoring and Protection activities of
the subproject;
The PO must widen their linkages with other government and non-
government entities. This is necessary so that their association
will be able to avail of any assistance that is necessary for their
success;
The PO to coordinate with Local Government Unit of Rizal to
insure the good condition of the farm-market-road;
The DENR must ensure that staff of assisting organizations to
conduct community-organizing activities will deploy competent
staffs in the field level with the necessary knowledge and skills to
enhance the POs technical and social capabilities;
The inclusion of rigid training course and orientation for DENR
personnel for forthcoming similar mangrove rehabilitation
project/programs;
32
Technical Consultants should visit the project site often to
provide technical advice and recommendations on the proper
implementation of the project;
Rigorous screening of staff and a continuing staff development
program should be implemented to ensure a high level performance
of Subproject Management Office.
33
Forestry Sector Project
Loan No. Ph-P 135
Table 1.TRAININGS ATTENDED BY THE PEOPLES ORGANIZATION
TRAININGS TRAINORS
NO. OF
PARTICI-
PANTS
INCLUSIVE DATES
1. Initial Training on
CSD Operation
GLEAN, Inc. (AO) &
SUSIMO Staff
25 February 9-10, 2001
2. Capability Building GLEAN, Inc. (AO) 25 March 16-17, 2001
3. Basic Bookkeeping
Seminar
Federation Treasurer &
Day Care Teacher
9 6-Apr-01
4. 2nd CSD Training SUSIMO 70 1-Oct-01
5. Capability Building GLEAN, Inc. (AO) 25 23-Jun-01
6. Milkfish Culture BFAR (Province of
Zamboanga del Norte)
27 November 22, 2001
7. CBFMP Orientation REGION/PENRO/CENR
O and SUSIMO
Personnel
70 Jan. 31, 2001 &
February 1, 2002
8. CRMF/RUP/AWP
Workshop
Region and SUSIMO
personnel
35 June 20, 2002
9. Mud Crab Fattening BFAR-ZDN & MAO-
Rizal
28 October 30, 2002
10. PMES and Value
Formation
ECOLINC, Inc. (AO) and
DENR Region 10
personnel
31 March 8-9, 2003
11. Value of Mangrove
Conservation
ECOLINC, Inc. (AO) and
DENR Region 10
personnel
45 May 24-25, 2003
12. Officers Training
(Leadership Training)
ECOLINC, Inc. (AO) 22 10-Jun-03
13. Team Building ECOLINC, Inc. (AO) 22 8-Mar-03
14. Crab Fattening ECOLINC, Inc. (AO) and
DENR Region 10
personnel
22 26-May-03
15. CBFMP
Re-Orientation
ECOLINC, Inc. (AO) and
DENR Region 10
personnel
31 28-May-03
16. Mangrove
Conservation and
Protection
ECOLINC, Inc. (AO) and
Resource person from
Rizal Memorial State
College
25 June 8, 2003
34
FORESTRY SECTOR PROJECT
LOAN NO. PH-P 135
Table 2. SUBPROJECT PERFORMANCE
Year
Planted Component Species Planted
Area Planted
(hectares) Survival Rate
2001
REFO
Bacauan Babae/lalake
400.95
83%
2002
REFO
Bacauan Babae/lalake
149.05
85%
2003*
REFO
Bacauan Babae/lalake
550.00
90%
TOTAL 550.00 90.39%
Note: * Maintenance & Protection Activities
35
FORESTRY SECTOR PROJECT
LOAN NO. PH-P 135
Table 3. SUBPROJECT SITE MANAGEMENT OFFICE EQUIPMENTS
ITEM Specifications Qty Date/year
procured Cost (PhP)
1. Boat / Banca 1-small,
2- medium size
3 Year 2002 374,000.00
2. Motorcycle Honda MC, XL 125 Year 2002 252,825.84
3. Steel Cabinets Steel Cabinets 4 Year 2002 18,214.00
4. Computer HP Brio PC Intel
Pentium III 733
mhg
1 February 2, 2001 70,850.00
5. Printer HP DeskJet Model
849 C
1 April 27, 2001 5,811.52
6. UPS Gamatronic Compact
model 520VA
1 April 15, 2001 5,720.00
7. GIS Maptitude Comb. Of Software
& Geographic Data
1 March 28, 2001 44,460.00
8. GPS Global Positioning
Power
1 March 28, 2001 105,000.00
9. Handheld Radio VHF/FM COM model
IC-F3GT
2 January 12, 2001 29,933.28
10. Base Radio VHF/FM ICOM 1 Year 2002 64,789.92
11. Forester's Transit Surveying Compass,
Ushikita, model
S-27
2 May 21, 2001 65,680.00
12. Manual Typewriter Olivetti, 18 carriage 1 March 28, 2001 8,309.60
13. Brunton Compass Kataoka br., model
BCD-90
4 March 28, 2001 19,552.00
14. Steel Nylon Tape Tajima br. 1 April 23, 2001 2,700.00
15. Diameter Tape 2 March 29, 2001 1,330.00
16. Planimeter OSKK KOIZUMI 1 October 26, 2001 7,800.00
17. Abney Hand Level Model: OSK 17251 4 May 21, 2001 9,568.00
18. Rain Gauge Digital Rainwise 1 May 28, 2001 6,300.00
19. Binocular 3 Year 2002 12,168.00
20. Lettering Set Leroy set 1 Year 2002 4,992.00
36
Forestry Sector Project
Loan No. Ph-P 135
Table 4. TRAININGS ATTENDED BY THE SUSIMO
TRAININGS TRAINORS
NO. OF
PARTICI-
PANTS
INCLUSIVE
DATES
1. Orientation Seminar on
Mangrove Subproject
Implementation under FSP
NFDO, FSP-TA,
and RFDO
9 August 16-17, 2000
2. FSP Mangrove Action
Planning Workshop
NFDO, FSP-TA,
and RFDO
9 December 7-9,
2000
3. Workshop on the
Implementation of Capital
Build-up System for
Community-Based Forest
Management Project
DENR-R9,
Technical
Personnel
9 December 14, 2000
4. FSP Year-end Physical and
Financial Reconciliation
Workshop for CY 2001
Planning Workshop
NFDO, FSP-TA,
and RFDO
9 December 15-17,
2000
5. FSP Mid-Year Physical and
Financial Assessment and
Action Planning Workshop
NFDO, FSP-TA,
and RFDO
9 June 26-28, 2001
6. Hands-on Training on the
Application of Global
Positioning System (GPS)
NFDO, FSP-TA,
and RFDO
9 April 2-4, 2002
7. Re-orientation Course of
Project Implementors of
Mangrove Subproject
Sites
NFDO and FSP-
TA
9 April 19-22, 2002
8. FSP Phase-out/ Phase-in
Planning Workshop
NFDO and FSP-
TA
9 December 10-13,
2002
37
Forestry Sector Project
Loan No. Ph-P 135
Table 5a. Cocoland Farming LIVELIHOOD PROJECT
Name of Livelihood Project : Cocoland Farming
Implementor : RIFCOREM, Inc.
No. of Beneficiaries : 426
Amount of investment : PHp 380,000.00
Date of Feasibility Study : N/A
Date started : Sep. 12, 2003
Status : On-going
Net Income : Php 11, 200.00
CFDF : Php 700,000.00
Linkages Developed : N/A
38
Forestry Sector Project
Loan No. Ph-P 135
Table 5b.Crab Fattening LIVELIHOOD PROJECT
Name of Livelihood Project : Crab Fattening
Implementor : RIFCOREM, Inc.
No. of Beneficiaries : 426
Amount of investment : Php 12,961.00
Date of Feasibility Study : Nov-02
Date started : May-03
Status : On-going
Net Income : Php 800.00
CFDF : Php 700,000.00
Linkages Developed : BFAR
39
Forestry Sector Project
Loan No. Ph-P 135
Table 5c. Photo Copying LIVELIHOOD PROJECT
Name of Livelihood Project : Photo Copying Machine
Implementor : RIFCOREM, Inc.
No. of Beneficiaries : 426
Amount of investment : Php 63,522.00
Date of Feasibility Study : N/A
Date started : Sept. 8, 2003
Status : On-going
Net Income : Php 1,920.00
CFDF : Php 700,000.00
Linkages Developed : N/A
40
Forestry Sector Project
Loan No. Ph-P 135
Table 5d. Mud Boat Fishing LIVELIHOOD PROJECT
Name of Livelihood Project : Mud Boat Fishing
Implementor : RIFCOREM, Inc.
No. of Beneficiaries : 144
Amount of investment : Php 63,522.00
Date of Feasibility Study : N/A
Date started : Jan. 24, 2003
Status : On-going
Net Income : Php 8,974.44
CFDF : Php 700,000.00
Linkages Developed : N/A
41
Forestry Sector Project
Loan No. Ph-P 135
Table 5e. Chain Saw Services LIVELIHOOD PROJECT
Name of Livelihood Project : Chain Saw Services
Implementor : RIFCOREM, Inc. (SMDA)
No. of Beneficiaries : 144
Amount of investment : Php 39,000.00
Date of Feasibility Study : N/A
Date started : Mar. 13, 2003
Status : On-going
Net Income : Php 2,400.00
CFDF : Php 700,000.00
Name of Livelihood Project : Chain Saw Services
42
Forestry Sector Project
Loan No. Ph-P 135
Table 5f. Planer Services LIVELIHOOD PROJECT
Name of Livelihood Project : Planer Services
Implementor : RIFCOREM, Inc. (SMDA)
No. of Beneficiaries : 144
Amount of investment : Php 10,350.00
Date of Feasibility Study : N/A
Date started : Mar. 15, 2003
Status : On-going
Net Income : Php 800.00
CFDF : Php 700,000.00
Linkages Developed : N/A
43
Forestry Sector Project
Loan No. Ph-P 135
Table 5g. Lending LIVELIHOOD PROJECT
Name of Livelihood Project : Lending
Implementor : RIFCOREM, Inc. (BPORDM)
No. of Beneficiaries : 44
Amount of investment : Php 5,000.00
Date of Feasibility Study : N/A
Date started : Jun-03
Status : On-going
Net Income : Php 720.00
CFDF : Php 700,000.00
Linkages Developed : N/A
44
Forestry Sector Project
Loan No. Ph-P 135
Table 5h. Lending LIVELIHOOD PROJECT
Name of Livelihood Project : Lending
Implementor : RIFCOREM, Inc. (DEDO)
No. of Beneficiaries : 60
Amount of investment : Php 5,000.00
Date of Feasibility Study : N/A
Date started : Jun-03
Status : On-going
Net Income : Php 800.00
CFDF : Php 700,000.00
Linkages Developed : N/A
45
Forestry Sector Project
Loan No. Ph-P 135
Table 5i. Lending LIVELIHOOD PROJECT
Name of Livelihood Project : Lending
Implementor : RIFCOREM, Inc. (MMA)
No. of Beneficiaries : 60
Amount of investment : Php 17,000.00
Date of Feasibility Study : N/A
Date started : Jun-03
Status : On-going
Net Income :
CFDF : Php 700,000.00
Linkages Developed : N/A
46
Forestry Sector Project
Loan No. Ph-P 135
Table 5j. Sari-Sari Store LIVELIHOOD PROJECT
Name of Livelihood Project : Sari-Sari Store
Implementor : RIFCOREM, Inc. (CAFIMCO)
No. of Beneficiaries : 44
Amount of investment : Php 5,000.00
Date of Feasibility Study : N/A
Date started : Jun-03
Status : On-going
Net Income :
CFDF : Php 700,000.00
Linkages Developed : N/A
47
Forestry Sector Project
Loan No. Ph-P 135
Table 5k. Crab Fattening LIVELIHOOD PROJECT
Name of Livelihood Project : Crab Fattening
Implementor : RIFCOREM, Inc. (PUPLABI)
No. of Beneficiaries : 71
Amount of investment : Php 15,000.00
Date of Feasibility Study : N/A
Date started : Jun-03
Status : On-going
Net Income :
CFDF : Php 700,000.00
Linkages Developed : N/A
48
Forestry Sector Project
Loan No. Ph-P 135
Table 5l. Ricemill LIVELIHOOD PROJECT
Name of Livelihood Project : Ricemill
Implementor : RIFCOREM, Inc.
No. of Beneficiaries : 426
Amount of investment : Php 145,000.00
Date of Feasibility Study : N/A
Date started : Jan. 21, 2004
Status : On-going
Net Income : Php 4,100.00
CFDF : Php 700,000.00
Linkages Developed : N/A
49
Forestry Sector Project
Loan No. Ph-P 135
Table 5m. Danggit & Bangus Culture LIVELIHOOD PROJECT
Name of Livelihood Project : Danggit and Bangus Culture
Implementor : RIFCOREM, Inc.
No. of Beneficiaries : 426
Amount of investment : Php 69,468.00
Date of Feasibility Study : Dec-01
Date started : Jan-03
Status : Cancelled
Net Income :
CFDF : Php 700,000.00
Linkages Developed : BFAR
50
FORESTRY SECTOR PROJECT
LOAN NO. PH-P 135
Table 6. STATUS REPORT
Region
NAME/
LOCATION OF
THE
SUBPROJECT
PROJECT
AREA (ha)
PROJECT
COST
(Mil peso)
STATUS OF PROGRESS
(O:on going C: Completion)
SMP CO CSD M &
E INFRA
9 & 10
RIZAL Mangrove
Rehabilitation
Subproject
(Sebaca, Rizal,
Zamboanga Del
Norte)
550.00 10,375,056.37 C C C C C
51
FORESTRY SECTOR PROJECT
LOAN NO. PH-P 135
Table 7. COMMUNITY ORGANIZING Cost Estimate By Activity
ACTIVITIES TARGET UNIT of
MEASURE
UNIT
COST
TOTAL COST
1. Social Investigation
43,000.00
2. Information and
Education Campaign
67,000.00
3. Documentation
Process
4. Identification of
Possible CBFMA
51,000.00
5. Organizing
Activities
94,000.00
6. Community
Activities
172,095.00
7. PMC 231,905.00
TOTAL 659,000.00
52
FORESTRY SECTOR PROJECT
LOAN NO. PH-P 135
Table 8. Cost Estimate for REFORESTATION Per Activity
ACTIVITY Unit Of
Measure
TARGET
OUTPUT
UNIT
COST TOTAL COST
I. SEEDLING PRODUCTION
1. Procurement of Planting
Materials
a. Gathering has 550 2,502.50 1,376,372.69
b. Handling has 550 325.00 178,749.80
Sub-total 1,555,122.49
II. PLANTATION ESTABLISHMENT 48,675.40
1. Site preparation has 550 791.96 435,578.75
2. Alignment/Staking has 550 526.11 289,362.50
3. Hauling of Propagules has 550 102.27 56,250.00
4. Planting has 550 1,199.89 659,940.00
5.Survey, Delineation and
Mapping
has 550 610.49 335,770.00
Sub-total 1,825,576.65
III. MAINTENANCE & PROTECTION
1. Clearing and Removal of
Debris
Year 1 - 2 passes has 550 436.36 240,000.00
Year 2 - 4 passes has 550 2,323.42 1,277,880.00
Year 3 - 1 passes has 550 1,084.00 596,200.00
2. Replanting has 550 356.52 196,085.50
3. Patrol/Inspection has 550 390.29 214,659.30
4. Tools and materials has 550 58.42 32,130.90
Sub-total 2,524,824.80
IV. INFRASTRUCTURE
1. Bunkhouse units 550 314.55 173,000.00
2. Look-out Tower units 550 47.27 26,000.00
3. Office units 550 327.27 180,000.00
Sub-total 379,000.00
VI. ADMINISTRATION & SUPERVISION
1. First Year has 550 413.81 227,597.73
2. Second Year has 550 789.61 434,286.84
3. Third Year has 550 300.61 165,334.43
Sub-total 827,219.00
G R A N D T O T A L has 550.00 12,930.44 7,111,742.94
53
FORESTRY SECTOR PROJECT
LOAN NO. PH-P 135
Table 9. MONITORING & EVALUATION Cost Estimate Per Activity
ACTIVITIES Target
Output
Unit of
Measure Unit Cost Total Cost
PHYSICAL VALIDATION
1. Verification of boundaries,
UTM Monuments and Block
Corner Post
550 has 38.64 21,250.00
2. Seedling Production
Inventory/ Analysis
550 has 30.91 17,000.00
3. Survival Counting with 20%
Sampling Intensity including
mapping of developed areas
550 has 359.23 197,575.00
4. Height and Diameter
Measurement, Assessment of
Overall Health Appearance
550 has 46.36 25,500.00
5. Physical Inspection of
Infrastructure
550 has 61.82 34,000.00
6. Project Management Cost and
Report Preparation
550 has 96.05 52,825.00
SUBTOTAL 348,150.00
INSTITUTIONAL VALIDATION
1. Preliminary Activities
a. Courtesy Calls and Pre-
Assessment
3 Meetings 7,000.00 21,000.00
b. Data Collection and
Preliminary Assessment
b.1 Secondary Data
Gathering
1 Subproject 15,000.00 15,000.00
b.2 Primary Data Gathering 11 Barangays 8,000.00 88,000.00
c. Preparation and
Presentation of Draft
Report
1 Report 20,000.00 20,000.00
d. Preparation and
Submission of Final
Report
1 Report 15,000.00 15,000.00
2. Project Management Cost 1 Subproject 56,000.00 56,000.00
SUBTOTAL 215,000.00
GRANDTOTAL 550 has 1,023.91 563,150.00
54
Forestry Sector Project
Loan No. Ph-P 135
Table 10. Road Rehabilitation INFRASTRUCTURE PROJECT
Infrastructure Project : Rehabilitation of Farm to Market Road
Location : Suitio Tahica, Sebaca, Rizal, Zamboanga
del Norte
Contractor : JEADA Construction
Contract Cost : Php 2, 041,163.43
Contract Duration : 6 months
Effectivity of Notice to proceed : November 29, 2002
Expected Completion Date : May 15, 2003
Revised Completion Date : Extended up to November 2003
Date of MOA with LGU : Not yet turn-over to the LGU
(After Election)
Brief description : The infrastructure project of Rizal is the
Rehabilitation of Farm to Market Road
situated at Sitio-Tahica, Sebaca, Rizal with
a total contract cost of Php 2, 195, 000.00.
The Notice to Proceed was awarded to
JEADA Construction last November 2002
and supposedly it will end on May 15, 2003,
but due to negative slippage brought about
by unconditional weather, it was further
extended up to November 21, 2003 to
complete the project. By now, it was not
yet turn over to LGU-RIzal, but it is
tentatively schedule to be turned-over
after the election (May 2004).
55
Forestry Sector Project
Loan No. PH-P135
TABLE 11. ANNUAL WORK AND FINANCIAL PLAN
Unit Cost Total Cost Unit Cost Total Cost Target Budget Target Budget Target Budget Target Budget
I. REFORESTATION/WATERSHED/CBFM 19,465.56 10,706,055.37 18,863.74 10,375,056.37
A. SMP
B. CO 1,800.00 989,999.00 1,198.18 659,000.00 550.00 345,500.00 550.00 79,500.00
1. Old Sites
- Year 1
- Year 2
2. New Sites 1,800.00 989,999.00 1,198.18 659,000.00 550.00 345,500.00 550.00 79,500.00
- Year 1 628.18 345,500.00 144.55 79,500.00 550.00 345,500.00 550.00 79,500.00
- Year 2 1,171.82 644,499.00 1,053.64 579,500.00
C. CSD 12,930.44 7,111,742.94 12,930.44 7,111,742.94 550.00 2,335,340.37 400.95 2,335,340.34
1. Delineation, Landuse Survey & Mapping
2. Soil Erosion Control/SWC
a. Infrastructure
b. Trails and footpath
c. Plantation
c.1. Riverbank Protection
3. Vegetative Measures (Plantation Establishment) 12,930.44 7,111,742.94 12,930.44 7,111,742.94 550.00 2,335,340.37 400.95 2,335,340.34
a. Agroforestry
b. Assisted Natural Regeneration
c. Enrichment Planting
d. Tree Plantation 12,930.44 7,111,742.94 12,930.44 7,111,742.94 - - - - 550.00 2,335,340.37 400.95 2,335,340.34
d.1. Bamboo
d.1. Bamboo
d.2. Riverbank Protection
d.2. Rattan
d.3. Mangrove 12,930.44 7,111,742.94 12,930.44 7,111,742.94 550.00 2,335,340.37 400.95 2,335,340.34
d.4. Plantation Species
e. Timber Stand Improvement
4. Inventory Residual Forest
5. Income Enhancement Project
D. Infrastructure Component 2,041,163.43 2,041,163.43
E. Monitoring & Evaluation 1,023.91 563,150.00 1,023.91 563,150.00
- Year 1
- Year 2
2. SUSIMO 2,395,780.00 2,395,780.00 328,000.00 328,000.00 843,000.00 843,000.00
Equipment provided to the Office
Researches conducted
Trainings
GRAND TOTAL 23,821.52 13,101,835.37 23,219.70 12,770,836.37 328,000.00 328,000.00 3,523,840.37 3,257,840.34
ACTIVITIESPlanned Actual
2000
Planned Actual Planned Actual
2001
Forestry Sector Project
Loan No. PH-P135
TABLE 11. ANNUAL WORK AND FINANCIAL PLAN
I. REFORESTATION/WATERSHED/CBFM
A. SMP
B. CO
1. Old Sites
- Year 1
- Year 2
2. New Sites
- Year 1
- Year 2
C. CSD
1. Delineation, Landuse Survey & Mapping
2. Soil Erosion Control/SWC
a. Infrastructure
b. Trails and footpath
c. Plantation
c.1. Riverbank Protection
3. Vegetative Measures (Plantation Establishment)
a. Agroforestry
b. Assisted Natural Regeneration
c. Enrichment Planting
d. Tree Plantation
d.1. Bamboo
d.1. Bamboo
d.2. Riverbank Protection
d.2. Rattan
d.3. Mangrove
d.4. Plantation Species
e. Timber Stand Improvement
4. Inventory Residual Forest
5. Income Enhancement Project
D. Infrastructure Component
E. Monitoring & Evaluation
- Year 1
- Year 2
2. SUSIMO
Equipment provided to the Office
Researches conducted
Trainings
GRAND TOTAL
ACTIVITIES
Target Budget Target Budget Target Budget Target Budget Target Budget Target Budget
550.00 10,706,055.37 ### 10,375,056.37
550.00 244,000.00 - - 550.00 400,499.00 550.00 579,500.00 550.00 989,999.00 550.00 659,000.00
550.00 244,000.00 - - 550.00 400,499.00 550.00 579,500.00 550.00 989,999.00 550.00 659,000.00
550.00 345,500.00 550.00 79,500.00
550.00 244,000.00 550.00 400,499.00 550.00 579,500.00 550.00 644,499.00 550.00 579,500.00
550.00 2,028,800.08 550.00 3,550,958.24 550.00 2,747,602.49 550.00 1,225,444.36 550.00 7,111,742.94 550.00 7,111,742.94
-
550.00 2,028,800.08 550.00 3,550,958.24 550.00 2,747,602.49 550.00 1,225,444.36 550.00 7,111,742.94 550.00 7,111,742.94
-
550.00 2,028,800.08 550.00 3,550,958.24 550.00 2,747,602.49 550.00 1,225,444.36 550.00 7,111,742.94 550.00 7,111,742.94
550.00 2,028,800.08 550.00 3,550,958.24 550.00 2,747,602.49 550.00 1,225,444.36 550.00 7,111,742.94 550.00 7,111,742.94
0.80 2,041,163.43 0.80 2,041,163.43 0.80 2,041,163.43 0.80 2,041,163.43
550.00 563,150.00 550.00 563,150.00 550.00 563,150.00 550.00 563,150.00
550.00 563,150.00 550.00 563,150.00 550.00 563,150.00 550.00 563,150.00
531,000.00 531,000.00 693,780.00 693,780.00 2,395,780.00 2,395,780.00
2,803,800.08 4,081,958.24 6,446,194.92 5,103,037.79 550.00 13,101,835.37 ### 12,770,836.37
2002 2003Planned (TOTAL) Actual (TOTAL)
Planned Actual Planned Actual
57
Annex 1a-1
ORGANIZATIONAL STRUCTURE
Grassroots Linkages for Environmental
Action Network, Inc.(GLEAN)
(CO Contractor)
PROJECT MANAGER
Assistant Project Manager
Secretary
Bookkeeper
C.O. Supervisor
C.O. Worker C.O. Worker
Treasurer
Cashier
58
Annex 1a-2
ORGANIZATIONAL STRUCTURE
Environmental Cooperation and Linkages, Inc. (ECOLINK, Inc.) (CO Contractor-Replacement)
Board of Directors
President
Board Secretary
Board Treasurer
Internal Auditor
Administrative
Staff
Executive
Secretary
RESEARCH
IEC
EVALUATION
CO
LIVELIHOOD
NETWORKING
LINKAGES
SPECIAL
CONCERNS
59
Annex 1b
ORGANIZATIONAL STRUCTURE
Rizal Federation for Coastal Resource Management (RIFCOREM) (PO Contractor)
BOARD OF DIRECTORS
EXECUTIVE BODY
ADMINISTRATIVE
STAFF
Bookkeepers
PO Forester
COMMITTEES
Survey &
Delineation
Com.
Finance
Com.
Plantation
Com.
Grievance &
Conflict
Resolution
Com.
Propagules Quality
Control Com.
60
Annex 1c
ORGANIZATIONAL STRUCTURE
Gamut Ug Salingsing Sa Bohol, Inc. (GASALBO, Inc.) (M&E Contractor)
Operation Manager
Assistant Operation
Manager
Secretary
Auditor Treasurer
Project
Identification
and Selection
Unit
Organizing
Unit
Project
Supervision
Unit
Project
Monitoring
Unit
Office Staff
61
Annex 1d
ORGANIZATIONAL STRUCTURE
JEADA Constructions, Inc. (Infra Contractor)
PROJECT MANAGER
EQUIPMENT
SUPERVISOR
Quality
Control/Materials
Engineer
Project Safety
Engineer
Administrative
Officer Surveyor
Chief Mechanic
Construction
Foreman
Skilled/Semi-Skilled
Laborers/ Helpers
62
Annex 1e
ORGANIZATIONAL STRUCTURE
SUBPROJECT SITE MANAGEMENT OFFICE
(SUSIMO)
VBU-HEAD SDMU-HEAD
ASU-HEAD COSU-HEAD
ASU-STAFF COSU-STAFF
Subproject Management Officer
63
Close up of planted Bakawan at barangay Misom, Baliangao,
Misamis Occidental
POs conducting regular boat and foot patrol as one of the
activities for maintenance & protection of plantation.
POs doing fishnets for fish pens which is one of their livelihood
projects.
64
Mangrove plantation established by RIFCOREM at barangay Casul,
Sapang Dalaga, Misamis Occidental
A portion of Mangrove plantation located in Rizal Mangrove
Subproject
Portion of Rizal Mangrove Rehabilitation Subproject in barangay Misom,
Baliangao, Misamis Occidental
65
Mangrove plantation established by RIFCOREM at barangay Balubuhan,
Rizal, Zamboanga del Norte
Subproject Site Management Office of Rizal
Mangrove Subproject
Finished Farm-To-Market Road Infrastructure Project
in Rizal Mangrove Subproject
Parcel 1
Corner DISTANCE (meter)
1-2 N 13 ° 35 ' E 599.59
2-3 S 58 ° 27 ' E 1,119.69
3-4 S 76 ° 46 ' E 559.05
4-5 S 33 ° 52 ' W 1,091.35
5-6 N 54 ° 10 ' W 497.58
6-7 N 26 ° 16 ' W 267.75
7-1 N 45 ° 11 ' W 717.65
Reference point:
Corner 1:long-X 123 29 ' 52 "lat-Y 8 39 ' 32 "
Parcel 2
Corner DISTANCE (meter)
1-2 N 11 ° 37 ' W 509.83
2-3 S 83 ° 23 ' E 788.74
3-4 S 29 ° 42 ' E 332.69
4-5 N 65 ° 37 ' E 561.26
5-6 S 75 ° 1 ' E 489.75
6-7 N 55 ° 38 ' E 338.50
7-8 S 32 ° 60 ' E 57.11
8-9 S 60 ° 33 ' W 126.10
9-10 S 24 ° 30 ' W 414.84
10-11 S 90 ° 0 ' W 83.60
11-12 N 26 ° 10 ' W 157.11
12-13 N 75 ° 8 ' W 158.20
13-14 N 37 ° 15 ' W 75.00
14-15 S 53 ° 8 ' W 119.36
15-16 N 47 ° 1 ' W 146.96
16-17 S 44 ° 9 ' W 624.16
17-18 S 16 ° 54 ' W 136.50
18-19 S 85 ° 23 ' W 214.60
19-20 N 16 ° 20 ' W 109.52
20-21 N 5 ° 35 ' E 320.22
RIZAL MANGROVE REHABILITATION
SUBPROJECT
BEARING
BEARING
RIZAL MANGROVE REHABILITATION
SUBPROJECT
21-22 S 76 ° 20 ' W 182.05
22-23 N 16 ° 31 ' W 92.20
23-24 N 17 ° 36 ' E 212.97
24-25 N 29 ° 20 ' W 87.76
25-26 N 14 ° 9 ' W 684.15
26-27 S 8 ° 30 ' W 808.56
27-28 S 0 ° 0 ' W 207.70
28-1 S 87 ° 11 ' W 148.38
Reference point:
Corner 1:long-X 123 29 ' 50 "lat-Y 8 37 ' 46 "
Parcel 3
Corner DISTANCE (meter)
1-2 N 65 ° 21 ' E 126.09
2-3 S 35 ° 42 ' E 376.60
3-4 S 9 ° 1 ' W 396.59
4-5 S 37 ° 24 ' W 306.75
5-6 S 62 ° 48 ' E 134.13
6-7 N 58 ° 1 ' E 65.90
7-8 S 63 ° 44 ' E 122.90
8-9 S 90 ° 0 ' E 136.90
9-10 S 16 ° 51 ' E 129.77
10-11 S 59 ° 57 ' W 217.66
11-12 S 75 ° 27 ' W 222.12
12-13 S 17 ° 5 ' W 185.49
13-14 N 46 ° 49 ' W 310.79
14-15 N 10 ° 4 ' W 150.42
15-16 N 15 ° 48 ' E 131.47
16-17 N 31 ° 19 ' E 206.97
17-18 N 50 ° 21 ' E 217.18
18-19 N 17 ° 17 ' E 297.63
19-20 N 65 ° 44 ' W 104.87
20-21 N 18 ° 4 ' W 130.64
21-22 N 57 ° 26 ' E 31.21
22-1 N 37 ° 3 ' W 206.34
BEARING
RIZAL MANGROVE REHABILITATION
SUBPROJECT
Reference point:
Corner 1:long-X 123 31 ' 4 "lat-Y 8 37 ' 55 "
Parcel 4
Corner DISTANCE (meter)
1-2 N 0 ° 54 ' W 126.62
2-3 N 60 ° 48 ' W 102.30
3-4 N 34 ° 13 ' W 619.68
4-5 N 3 ° 34 ' W 135.06
5-6 N 49 ° 9 ' E 263.31
6-7 S 51 ° 52 ' E 540.79
7-8 S 32 ° 10 ' E 350.50
8-9 S 10 ° 24 ' E 367.14
9-10 S 73 ° 18 ' W 194.82
10-1 N 77 ° 57 ' W 248.17
Reference point:
Corner 1:long-X 123 31 ' 39 "lat-Y 8 37 ' 31 "
BEARING
RIZAL MANGROVE REHABILITATION
SUBPROJECT
Parcel 5
Corner DISTANCE (meter)
1-2 N 45 ° 21 ' W 242.05
2-3 N 1 ° 40 ' W 141.16
3-4 S 76 ° 42 ' E 505.24
4-5 N 60 ° 30 ' E 236.13
5-6 N 4 ° 35 ' W 104.03
6-7 N 25 ° 25 ' E 91.79
7-8 S 60 ° 38 ' E 114.18
8-9 S 8 ° 47 ' E 81.86
9-10 S 67 ° 51 ' E 120.93
10-11 S 28 ° 56 ' E 137.46
11-12 S 46 ° 21 ' W 186.44
12-13 S 62 ° 6 ' W 119.71
13-1 S 89 ° 1 ' W 601.89
Reference point:
Corner 1:long-X 123 31 ' 37 "lat-Y 8 38 ' 7 "
BEARING
RIZAL MANGROVE REHABILITATION
SUBPROJECT
Parcel 6
Corner DISTANCE (meter)
1-2 N 53 ° 33 ' W 326.71
2-3 N 18 ° 45 ' W 123.77
3-4 N 18 ° 11 ' E 238.31
4-5 N 23 ° 21 ' E 261.72
5-6 S 9 ° 6 ' E 787.90
6-7 N 45 ° 0 ' E 154.01
7-8 N 33 ° 7 ' E 142.43
8-9 S 23 ° 28 ' W 186.54
9-10 S 24 ° 6 ' W 359.89
10-11 S 53 ° 31 ' E 264.55
11-12 N 56 ° 10 ' E 214.28
12-13 S 41 ° 14 ' E 149.45
13-14 S 7 ° 14 ' W 259.57
14-15 S 78 ° 28 ' W 259.54
15-1 S 89 ° 57 ' W 101.90
Reference point:
Corner 1:long-X 123 32 ' 25 "lat-Y 8 35 ' 27 "
Parcel 7
Corner DISTANCE (meter)
1-2 N 31 ° 50 ' E 540.23
2-3 N 25 ° 42 ' E 385.23
3-4 N 50 ° 52 ' E 225.98
4-5 S 64 ° 54 ' E 107.99
5-6 S 40 ° 45 ' W 196.83
6-7 S 3 ° 46 ' E 244.03
7-8 S 33 ° 51 ' W 228.40
8-9 S 38 ° 35 ' W 420.89
9-1 N 87 ° 51 ' W 223.06
Reference point:
Corner 1:long-X 123 33 ' 31 "lat-Y 8 35 ' 23 "
BEARING
BEARING
RIZAL MANGROVE REHABILITATION
SUBPROJECT
Parcel 8
Corner DISTANCE (meter)
1-2 N 33 ° 31 ' E 353.35
2-3 S 66 ° 29 ' E 62.38
3-4 S 32 ° 44 ' W 356.97
4-1 N 62 ° 42 ' W 66.73
Reference point:
Corner 1:long-X 123 33 ' 30 "lat-Y 8 35 ' 23 "
Parcel 9
Corner DISTANCE (meter)
1-2 S 60 ° 8 ' E 61.46
2-3 S 29 ° 26 ' W 364.44
3-4 N 73 ° 22 ' W 53.44
4-5 N 23 ° 10 ' E 180.01
5-1 N 32 ° 25 ' E 198.08
Reference point:
Corner 1:long-X 123 33 ' 52 "lat-Y 8 35 ' 27 "
Parcel 10
Corner DISTANCE (meter)
1-2 N 1 ° 6 ' W 236.04
2-3 N 2 ° 30 ' E 285.77
3-4 N 87 ° 19 ' E 76.68
4-5 S 0 ° 15 ' W 521.50
5-1 S 87 ° 30 ' W 82.48
Reference point:
Corner 1:long-X 123 33 ' 40 "lat-Y 8 34 ' 21 "
BEARING
BEARING
BEARING
RIZAL MANGROVE REHABILITATION
SUBPROJECT
Parcel 11
Corner DISTANCE (meter)
1-2 S 78 ° 3 ' E 167.02
2-3 S 33 ° 10 ' E 127.59
3-4 S 2 ° 54 ' E 442.17
4-5 S 44 ° 48 ' W 99.07
5-6 S 81 ° 1 ' W 216.36
6-7 N 21 ° 34 ' W 170.01
7-8 N 0 ° 21 ' E 350.31
8-1 N 26 ° 18 ' E 199.33
Reference point:
Corner 1:long-X 123 33 ' 47 "lat-Y 8 34 ' 18 "
Parcel 12
Corner DISTANCE (meter)
1-2 N 38 ° 48 ' E 348.74
2-3 S 60 ° 31 ' E 298.10
3-4 S 72 ° 35 ' E 316.94
4-5 S 22 ° 43 ' W 566.24
5-1 N 48 ° 47 ' W 746.77
Reference point:
Corner 1:long-X 123 34 ' 53 "lat-Y 8 38 ' 9 "
Parcel 13
Corner DISTANCE (meter)
1-2 N 28 ° 57 ' E 81.60
2-3 S 66 ° 2 ' E 305.54
3-4 S 19 ° 14 ' W 78.91
4-1 N 66 ° 31 ' W 319.14
Reference point:
Corner 1:long-X 123 34 ' 58 "lat-Y 8 37 ' 48 "
BEARING
BEARING
BEARING
RIZAL MANGROVE REHABILITATION
SUBPROJECT
Parcel 14
Corner DISTANCE (meter)
1-2 N 54 ° 26 ' E 200.27
2-3 N 31 ° 41 ' W 129.85
3-4 N 50 ° 36 ' E 188.92
4-5 S 29 ° 49 ' E 123.68
5-6 S 50 ° 22 ' W 86.22
6-7 S 31 ° 27 ' E 137.26
7-8 S 57 ° 60 ' W 164.73
8-1 N 83 ° 16 ' W 168.86
Reference point:
Corner 1:long-X 123 35 ' 29 "lat-Y 8 37 ' 36 "
Parcel 15
Corner DISTANCE (meter)
1-2 N 35 ° 47 ' E 383.61
2-3 S 67 ° 59 ' E 478.95
3-4 S 41 ° 31 ' W 454.31
4-1 N 60 ° 24 ' W 422.31
Reference point:
Corner 1:long-X 123 34 ' 31 "lat-Y 8 37 ' 31 "
BEARING
BEARING
RIZAL MANGROVE REHABILITATION
SUBPROJECT
Parcel 16
Corner DISTANCE (meter)
1-2 N 47 ° 19 ' E 401.40
2-3 N 27 ° 59 ' E 293.73
3-4 S 63 ° 0 ' E 71.82
4-5 S 25 ° 4 ' W 440.48
5-6 S 50 ° 4 ' W 181.66
6-7 S 69 ° 6 ' W 135.72
7-1 N 34 ° 10 ' W 78.69
Reference point:
Corner 1:long-X 123 34 ' 44 "lat-Y 8 37 ' 17 "
Parcel 17
Corner DISTANCE (meter)
1-2 N 34 ° 32 ' E 389.66
2-3 S 63 ° 58 ' E 460.83
3-4 S 18 ° 33 ' W 458.75
4-5 N 47 ° 22 ' W 317.27
5-6 S 62 ° 47 ' W 70.84
6-7 N 31 ° 52 ' W 84.30
7-8 S 56 ° 20 ' W 75.94
8-1 N 39 ° 12 ' W 134.33
Reference point:
Corner 1:long-X 123 34 ' 53 "lat-Y 8 37 ' 12 "
BEARING
BEARING
RIZAL MANGROVE REHABILITATION
SUBPROJECT
Parcel 18
Corner DISTANCE (meter)
1-2 N 25 ° 20 ' W 280.47
2-3 N 2 ° 42 ' W 91.10
3-4 N 41 ° 14 ' W 190.27
4-5 N 21 ° 1 ' W 365.61
5-6 N 1 ° 10 ' W 350.77
6-7 S 25 ° 5 ' E 703.48
7-8 S 89 ° 1 ' E 432.16
8-9 S 26 ° 31 ' E 207.19
9-1 S 51 ° 12 ' W 558.14
Reference point:
Corner 1:long-X 123 36 ' 15 "lat-Y 8 37 ' 39 "
BEARING
RIZAL MANGROVE REHABILITATION
SUBPROJECT
Parcel 19
Corner DISTANCE (meter)
1-2 N 30 ° 9 ' W 453.25
2-3 N 4 ° 42 ' W 188.23
3-4 N 32 ° 16 ' E 313.17
4-5 N 5 ° 24 ' W 520.01
5-6 N 45 ° 37 ' W 264.19
6-7 N 44 ° 29 ' E 235.33
7-8 N 69 ° 4 ' E 170.67
8-9 S 12 ° 53 ' E 361.72
9-10 S 0 ° 37 ' E 252.41
10-11 S 44 ° 19 ' E 217.45
11-12 N 75 ° 34 ' E 154.47
12-13 N 17 ° 31 ' E 203.33
13-14 S 88 ° 40 ' E 150.24
14-15 S 9 ° 37 ' E 512.01
15-16 S 61 ° 57 ' W 424.68
16-17 N 54 ° 56 ' W 225.77
17-18 S 36 ° 4 ' W 223.54
18-19 S 18 ° 51 ' E 459.24
19-1 S 70 ° 12 ' W 159.11
Reference point:
Corner 1:long-X 123 36 ' 18 "lat-Y 8 38 ' 12 "
BEARING
This Subproject Completed Report was produced by the
National Forestation Development Office (NFDO)
through the valuable assistance and contribution from the
DENR, Region IX
PENRO, Dipolog
CENRO, Dapitan
and staff of the
Subproject Site Management Office (SUSIMO)-RIZAL