annual report 2016/2017 - dannhauser.gov.za ndh ar 2016... · annual report 2016/2017 dannhauser...
TRANSCRIPT
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 0
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 1
Contents LIST OF TABLES ............................................................................................................................................... 7 LIST OF FIGURES .............................................................................................................................................. 8 LIST OF MAPS.................................................................................................................................................... 8 LIST OF IMAGES ............................................................................................................................................... 9 LIST OF ACRONYMS ...................................................................................................................................... 10
CHAPTER 1: INTRODUCTION .................................................................................................... 11
MAYOR FOREWORD.................................................................................................................. 11
MUNICIPAL MANAGER FORWORD ........................................................................................... 12
THE ANNUAL REPORT PROCESS .............................................................................................................. 15 THE MUNICIPAL FINANCE MANAGEMENT ACT, NO 56 OF 2003: SECTION 121: (ANNUAL
REPORT OUTLINES) ..................................................................................................................................... 15
MUNICIPAL FUNCTIONS, POPULATION AND ENVIRONMENTAL OVERVIEW ............................ 17
1.1 VISION ........................................................................................................................................................ 17 1.2 MISSION ..................................................................................................................................................... 17 1.3 OVERVIEW OF DANNHAUSER MUNICIPALITY ............................................................................. 17 1.4 WARDS AND TRADITIONAL AUTHORITY ...................................................................................... 18 1.5 DEMOGRAPHIC PROFILE ..................................................................................................................... 18 1.6 POPULATION GROWTH / DECLINE .................................................................................................. 19 1.7 MULTIPLE DEPRIVATIONS INDEX .................................................................................................... 20 1.8 EMPLOYMENT / UNEMPLOYMENT RATE ....................................................................................... 20 1.9 HOUSEHOLD INCOME ........................................................................................................................... 21 1.10 GENERAL PERFORMANCE OF ECONOMIC SECTOR CONTRIBUTION - DANNHAUSER ... 21 1.11 CURRENT HOSUEHOLD STATUS ..................................................................................................... 22 1.11.1 FORMAL DWELLINGS ...................................................................................................................... 22 1.11.2 HOUSEHOLD ACCESS TO ELECTRICTY ...................................................................................... 23 1.11.3 ELECTRICITY FOR COOKING, HEATING AND LIGHTING...................................................... 23 1.11.4 HOUSEHOLD ACCESS TO WATER ................................................................................................ 24 1.11.5 HOUSEHOLD ACCESS TO SANITATION ...................................................................................... 25 1.11.6 HOUSEHOLD ACCESS TO REFUSE REMOVAL ........................................................................... 25 1.11.7 SOLID WASTE COLLECTION SCHEDULE.................................................................................... 26 1.12 EXPENDITURE FOR RURAL & TARRED ROADS .......................................................................... 26 1.13 COMMUNITY FACILITIES................................................................................................................... 27 1.14 HEALTH FACILITIES ........................................................................................................................... 27
CHAPTER 2: GOVERNANCE ..................................................................................................... 28
2.1 INTRODUCTION TO GOVERNANCE ................................................................................................... 28 2.2 COMPONENT A: POLITICAL AND ADMINISTRATIVE GOVERNANCE ..................................... 28 2.2.1 POLITICAL GOVERNANCE INTRODUCTION TO POLITICAL GOVERNANCE ..................... 28 DANNHAUSER LM COUNCILLORS .................................................................................................................. 29 DANNHAUSER LM EXECUTIVE COMMITTEE ................................................................................................ 29 2.3 COMPONENT B: GOVERNANCE OVERVIEW & COMMITTEES ................................................... 30 2.3.1 COUNCIL COMPOSITION ................................................................................................................... 30 2.3.2 GOVERNANCE COMMITTEES .......................................................................................................... 31 2.3.3 COMMITTEES TO ASSIST THE EXECUTIVE COMMITTEE ....................................................... 33 2.3.3.1 THE CORPORATE SERVICES PORTFOLIO COMMITTEE ........................................................................................... 33 2.3.3.2 THE FINANCIAL SERVICES PORTFOLIO COMMITTEE .............................................................................................. 33 2.3.3.3 THE ENGINEERING SERVICES PORTFOLIO COMMITTEE ........................................................................................ 33
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 2
2.3.3.4 THE COMMUNITY SERVICES PORTFOLIO COMMITTEE .......................................................................................... 33 2.3.3.5 THE PLANNING & LOCAL ECONOMIC DEVELOPMENT PORTFOLIO COMMITTEE ................................................. 33 2.4 PERFORMANCE & FINANCE AUDIT COMMITTEE ......................................................................... 35 2.5 POLITICAL DECISION-MAKING .......................................................................................................... 35 2.6 ADMINISTRATIVE GOVERNANCE ..................................................................................................... 36 INTRODUCTION TO ADMINISTRATIVE GOVERNANCE ............................................................................... 36 2.7 COMPONENT C: PUBLIC ACCOUNTABILITY AND PARTICIPATION ........................................ 36 2.7.1 OVERVIEW ............................................................................................................................................ 36 2.8 PROMOTION OF PUBLIC PARTICIPATION MECHANISMS ......................................................... 37 2.8.1 PUBLIC MEETINGS .............................................................................................................................. 37 2.8.1.1 COMMUNICATION, PARTICIPATION AND FORUMS ............................................................. 37 2.9 COMPONENT D: CORPORATE GOVERNANCE ................................................................................ 38 2.9.1 OVERVIEW OF CORPORATE GOVERNANCE ............................................................................... 38 2.9.2 FRAUD AND ANTI-CORRUPTION STRATEGY ............................................................................. 38 2.9.3 RISK MANAGEMENT COMMITTEE - MUNICIPALITY COMPLIANCE .................................... 38 2.9.4 INTERNAL AUDIT UNIT – MUNICIPALITY COMPLIANCE ....................................................... 39 2.9.5 AUDIT COMMITTEE – MUNICIPALITY COMPLIANCE .............................................................. 39 2.10 SUPPLY CHAIN MANAGEMENT ........................................................................................................ 40 2.10.1 OVERVIEW OF SUPPLY CHAIN MANAGEMENT (SCM) .......................................................... 40 2.11 RISK MANAGEMENT ........................................................................................................................... 40 2.11.1 RISK MANAGEMENT & PERFORMANCE MANAGEMENT ..................................................................... 40 2.11.2 MONITORING AND CONTRACT ADMINISTRATION .............................................................................. 40 2.12 BRIEF OVERVIEW OF THE DEVELOPMENT OF POLICIES DURING THE 2016/2017
FINANCIAL YEAR ........................................................................................................................................... 41 2.13 MUNICIPAL BY-LAW(S) ..................................................................................................................... 42 2.14 PUBLIC SAFETY – LAW ENFORCEMENT ....................................................................................... 42
CHAPTER 3 .............................................................................................................................. 43
SERVICE DELIVERY PERFORMANCE ....................................................................................... 43
FUNCTIONAL AREA SDBIP PER DELIVERY COMPONENTS ...................................................... 43
3.1 SERVICE DELIVERY ................................................................................................................................ 43 3.1.1 INDIGENT POLICY/SUPPORT (INCLUDING FREE BASIC SERVICES) .................................. 43 3.2 INTRODUCTION ANNUAL PERFORMANCE REPORT ................................................................... 44 3.3 HIGH LEVEL PERFORMANCE OF THE MUNICIPALITY FOR THE 2016/2017 FINANCIAL
YEAR .................................................................................................................................................................. 45 3.3.1 ASSESSMENT METHODOLOGY ....................................................................................................... 45 3.3.2 KEY PERFORMANCE INDICATORS COMPARISON 2015/2016 VS 2016/2017 ............... 45 3.4 BASIC SERVICE DELIVERY KEY PERFORMANCE INDICATORS – DANNHAUSER ................ 46 3.5 CAPITAL PROJECTS 2016/2017 – DANNHAUSER LOCAL MUNICIPALITY ........................... 46 3.6 GRAPHICAL REPRESENTATION OF ACHIEVEMENT, ALMOST ACHIEVED AND NON-ACHIEVEMENT – CAPITAL PROJECTS ..................................................................................................... 47 3.7 OPEFRATIONAL PROJECTS 2016/2017 – DANNHAUSER LOCAL MUNICIPALITY ............ 48 3.8 MEASURES UNDERTAKEN AS PER S46 OF THE MUNICIPAL SYSTEMS ACT TO IMPROVE
PERFORMANCE .............................................................................................................................................. 49 MEASURES UNDERTAKEN TO IMPROVE PERFORMANCE IN THE 2016/2017 FINANCIAL
YEAR .................................................................................................................................................................. 50 SECTION 1: FUNCTIONAL AREA SDBIP REPORTING PER BUSINESS UNIT ................................. 51 3.9 COMPONENT A: INFRASTRUCTURE SERVICES ............................................................................. 51 3.9.1 ACHIEVEMENTS WATER .................................................................................................................. 51 3.9.2 WATER QUALITY & COMPLIANCE DANNHAUSER – 2016/2017 ......................................... 52 3.9.2.1 WATER QUALITY PERFORMANCE – WWTP – 2016/2017 ...................................................................... 52 3.9.2.2 POTABLE WATER QUALITY – 2016/2017 .................................................................................................... 52
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 3
3.9.2.3 SANS 241:2011 PERFORMANCE INDICATORS (AMAJUBA WSA) – DANNHAUSER LOCAL
MUNICIPALITY .................................................................................................................................................................. 52 3.9.2.4 PLANNED WATER SUPPLY ACTIVITIES TO DANNHAUSER HOUSEHOLDS – AMAJUBA DISTRICT WATER SUPPLY
MASTER PLAN IMPLEMENTATION – 2016/2017 .............................................................................................................. 53 3.9.2.5 PROPOSED WATER INFRASTRUCTURE DEVELOPMENT IMPLEMENTED – DANNHAUSER LOCAL
MUNICIPALITY (AMAJUBA DISTRICT WATER SERVICE PLAN) ............................................................................. 54 3.9.2.6 SANITATION SERVICES ..................................................................................................................................... 54 3.9.2.7 SOLID WASTE MANAGEMENT ....................................................................................................................... 54 3.9.2.7.1 ACHIEVEMENTS 2016/2017 – SOLID WASTE MANAGEMENT .......................................................... 54 3.9.2.7.2 SOLID WASTE MANAGEMENT EQUIPMENT ...................................................................................................... 54 3.9.3 GRASS CUTTING .................................................................................................................................. 55 3.9.3.1 GRASS CUTTING SCHEDULE ............................................................................................................................ 55 3.9.3.2 NUMBER OF TIMES GRASS CUTTING OCCURS IN A MONTH ................................................................ 55 3.9.3.3 EQUIPMENT USED FOR GRASS CUTTING ................................................................................................... 55 3.9.4 ELECTRICITY ........................................................................................................................................ 56 3.9.4.1 CHALLENGES ....................................................................................................................................................... 56 3.9.4.2 PRIMARY NETWORK ......................................................................................................................................... 56 3.9.4.3 SECONDARY MAINTENANCE .......................................................................................................................... 57 3.9.4.4 ELECTRICITY FOR COOKING, HEATING AND LIGHTING – 2016/2017 ................................................. 57 3.9.5 ROADS .................................................................................................................................................... 57 3.9.5.1 INTRODUCTION TO ROAD TRANSPORT ...................................................................................................... 57 3.9.5.2 INTRODUCTION TO ROADS ............................................................................................................................ 58 3.9.5.3 CHALLENGES ROADS - 2016/2017 ................................................................................................................ 58 3.9.5.4 COUNTERMEASURES TO ADDRESS CHALLENGES .................................................................................... 58 3.9.6 TRANSPORTATION PLANNING ...................................................................................................... 59 3.9.6.1 INTRODUCTION TO TRANSPORTATION PLANNING ................................................................................ 59 3.9.6.2 ROAD TRANSPORTATION PLANNING OBJECTIVES .................................................................................. 59 3.9.6.3 STAKEHOLDERS .................................................................................................................................................. 59 3.9.6.4 STORM WATER ................................................................................................................................................... 59 3.9.6.5 FLEET MANAGEMENT .................................................................................................................... 59 3.9.6.5.1 INTRODUCTION TO FLEET MANAGEMENT ............................................................................................ 59 3.9.6.5.2 FLEET MANAGEMENT STRATEGIC OBJECTIVES: ................................................................................... 60 3.9.6.6 WASTE MANAGEMENT - LANDFILL SITE ................................................................................. 60 3.9.6.6.1 WASTE MANAGEMENT (DANNHAUSER LANDFILL SITE) .................................................................... 60 3.10 COMPONENT B: ECONOMIC DEVELOPMENT .............................................................................. 60 3.10.1 PLANNING ........................................................................................................................................... 61 3.10.1.1 INTRODUCTION TO PLANNING AND DEVELOPMENT .......................................................................... 61 3.10.2 LOCAL ECONOMIC DEVELOPMENT ............................................................................................ 61 3.10.2.1 INTRODUCTION TO LOCAL ECONOMIC DEVELOPMENT ..................................................................... 61 3.10.2.2 KEY CHALLENGES 2016/17 ........................................................................................................................... 61 3.10.2.3 KEY INTERVENTIONS 2016/17 ..................................................................................................................... 61 3.10.2.4 CATALYTIC PROJECTS IMPLEMENTED....................................................................................................... 62 3.10.2.5 EMPLOYMENT / UNEMPLOYMENT RATE ............................................................................. 62 3.10.2.5.1 EMPLOYENT BY SECTOR – DANNHAUSER 2016/17 .......................................................................... 62 3.10.2.6 ECONOMIC CONTRIBUTION BY SECTOR – DANNHAUSER 2016/17................................................. 63 3.10.2.7 JOBS CREATED THROUGH MUNICIPALITY ............................................................................................... 63 3.10.2.8 LOCAL ECONOMIC DEVELOPMENT OBJECTIVES – 2016/17 ............................................................... 63 3.10.2.9 BUILDING CONTROL & SIGNAGE ............................................................................................. 64 3.10.3 MARKET .............................................................................................................................................. 64 3.10.3.1 MARKET SERVICES .......................................................................................................................................... 64 3.10.4 HUMAN SETTLEMENTS .................................................................................................................. 65 3.10.4.1 INTRODUCTION ............................................................................................................................................... 65 3.10.4.2 SOME KEY OBJECTIVES OF THE HOUSING SECTOR PLAN .................................................................... 65 3.10.4.3 INFORMAL SETTLEMENT .............................................................................................................................. 65
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 4
3.10.5 PLANNING ........................................................................................................................................... 66 3.10.6 PROJECT IMPLEMENTATION ....................................................................................................... 66 3.10.7 HOUSING ADMINISTRATION ........................................................................................................ 66 3.11 COMPONENT C: COMMUNITY SERVICES ...................................................................................... 67 3.11.1 WASTE MANAGEMENT ................................................................................................................... 67 3.11.1.1 INTRODUCTION TO WASTE MANAGEMENT ........................................................................................... 67 3.11.2 COMMUNITY HALLS ........................................................................................................................ 67 3.11.2.1 ACTUAL COMMUNITY HALLS – 2016/2017 ..................................................................................................... 68 3.11.2.1.1 HALLS CONSTRUCTED IN 2016/17 ................................................................................................................. 68 3.11.2.1.2 BACKLOG OF HALLS BY 2016/17 .................................................................................................................... 68 3.11.3 CEMETERIES & CREMATORIA ...................................................................................................... 68 3.11.3.1 NUMBER OF CEMETERIES IN DANNHAUSER 2016/2017 ................................................................................. 68 3.11.3.1.2 CEMETERIES ACHIEVEMENTS IN 2016/2017 ................................................................................................ 68 3.11.4 ENVIRONMENTAL HEALTH .......................................................................................................... 69 3.11.5 TRAFFIC & PUBLIC SAFETY........................................................................................................... 69 3.11.6 DISASTER MANAGEMENT ............................................................................................................. 69 3.11.6.1 DISASTER RISK PROFILE – 2016/17 ............................................................................................................ 70 3.11.6.2 PRIORITY RISKS REQUIRING PREPAREDNESS – 2016/17 ..................................................................... 70 3.11.6.3 FUNDING PROVISION – 2016/17 ................................................................................................................ 70 3.11.6.4 RISK REDUCTION & PREVENTION – 2016/17 .......................................................................................... 70 3.11.6.5 DISASTER MANAGEMENT AS A SHARED FUNCTION ............................................................................ 71 3.11.6.6 ROLE OF DANNHAUSER MUNICIPALITY ................................................................................................... 71 3.11.6.7 PREPARATION .................................................................................................................................................. 71 3.11.6.8 RESPONSE AND RECOVERY .......................................................................................................................... 71 3.11.6.8.1 RESPONSE ...................................................................................................................................................... 71 3.11.6.8.2 RECOVERY ...................................................................................................................................................... 72 3.11.6.8.3 TRAINING AND AWARENESS .................................................................................................................... 72 3.11.6.8.4 DISASTER MANAGEMENT SWOT ANALYSIS ........................................................................................ 72 3.11.6.8.5 SERVICE STATISTICS FOR DISASTER MANAGEMENT ........................................................................ 72 3.11.7 SPORT & RECREATION ................................................................................................................... 73 3.11.7.1 SERVICE STATISTICS FOR SPORT AND RECREATION ............................................................................. 73 3.11.7.2 LIBRARY SERVICES ........................................................................................................................................... 73 3.12 INFORMATION & COMMUNICATION TECHNOLOGY SERVICES ............................................ 73 3.13 IT-SERVICES PROVIDED ......................................................................................................................................... 74 3.14 IT-INITIATIVES .......................................................................................................................................................... 74 3.15 LEGAL SERVICES .................................................................................................................................. 75 3.15.1 DELICTUAL COURT CLAIMS AND COURT INTERDICTS ............................................................................. 75 3.15.2 CRIMINAL PROSECUTIONS ............................................................................................................................... 75
CHAPTER 4 .............................................................................................................................. 76
ORGANISATIONAL DEVELOPMENT PERFORMANCE ............................................................... 76
4.1 INTRODUCTION TO ORGANIZATIONAL DEVELOPMENT PERFORMANCE .......................... 76 4.2 ALLOCATION/PLACEMENT PROCESS .............................................................................................. 76 4.2.1 EMPLOYEE TOTALS, FILLED & VACANCIES ................................................................................ 77 4.3 EMPLOYMENT EQUITY ......................................................................................................................... 77 4.4 WORK PLACE SKILLS PLAN ................................................................................................................. 78 4.5 VACANCY RATE ....................................................................................................................................... 78 4.6 CRITICAL POSTS ..................................................................................................................................... 78 4.7 HUMAN RESOURCES POLICIES ........................................................................................................... 79 4.8 HUMAN RESOURCES SERVICES .......................................................................................................... 80 4.9 FINALISATION OF NEW ORGANISATIONAL STRUCTURE: IN PREPARATION FOR
MIGRATION TO 2017/18 STRUCTURE .................................................................................................. 80 4.10 STAFF ALLOCATION/PLACEMENT PROCESS ON 2016/17 STRUCTURE ........................... 80
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 5
4.11 HUMAN RESOURCES - ORGANIZATIONAL DEVELOPMENT PERFORMANCE .................... 80 4.12 ADDRESSING ORGANISATIONAL DEVELOPMENT .................................................................... 80 4.13 INSTITUTIONAL ARRANGEMENTS ................................................................................................ 80 SWOT ANALYSIS – MUNICIPAL TRANSFORMATION AND INSTITUTIONAL DEVELOPMENT81
CHAPTER 5 .............................................................................................................................. 82
FINANCIAL PERFORMANCE ..................................................................................................... 82
5.1 COMPONENT D: FINANCIAL SERVICES ............................................................................................ 82 5.1.1 INDIGENTS (FREE BASIC SERVICES)............................................................................................. 82 5.2.1 FREE BASIC SERVICES DELIVERED – 2016/17 (INDIGENT REGISTER) ............................ 82 5.2.2 FINANCIAL SERVICES ........................................................................................................................ 82 5.2.2 DEBT COLLECTION ............................................................................................................................. 83 5.2.3 GRANT PERFORMANCE .................................................................................................................... 83 5.2.3.1 GRANTS AND SUBSIDIES ............................................................................................................... 83
TABLE.54: GRANTS/SUBSIDIES RECEIVED & EXPENDITURE .......................................................... 83
5.3 FINANCIAL HEALTH OVERVIEW ....................................................................................................... 84 5.3.1 REVENUE ............................................................................................................................................... 84 5.3.2 EXPENDITURE ..................................................................................................................................... 84 5.3.3 GRANTS AND SUBSIDIES .................................................................................................................. 84 5.3.4 EMPLOYEE RELATED COSTS (INCLUDING COUNCILLOR ALLOWANCES) ........................ 85 5.3.5 OPERATING INCOME ......................................................................................................................... 85 5.3.5.1 ACTUAL INCOME 2016/2017 VS 2015/2016 ................................................................................................... 86 5.3.6 MUNICIPAL EXPENDITURE, LOANS, LEASES AND INVESTMENTS ...................................... 86 5.3.6.1 EXPENDITURE ..................................................................................................................................................... 86 DANNHAUSER LOCAL MUNICIPALITY – OPERATING & CAPITAL BUDGETS ............................. 86 7.4.3.2 ACTUAL EXPENDITURE COMPARISON – 2015/16 VS 2016/17 (‘000 000) ................................................... 87 5.3.7 LOANS, LEASES AND INVESTMENTS ............................................................................................. 88
AS INDICATED IN TABLE.61 BELOW, DANNHAUSER MUNICIPALITY HAD NEITHER BANK OVERDRAFTS NOR LOANS NOR FINANCE LEASES FOR THE YEAR UNDER REVIEW AND THE PREVIOUS YEAR. ........................................................................................................................ 88
5.3.8 SUPPLY CHAIN MANAGEMENT....................................................................................................... 88 5.3.8.1 KEY FOCUS AREAS FOR 2016/2017 FINANCIAL YEAR ............................................................................. 88 5.3.8.1.1 MONITORING AND CONTRACT MANAGEMENT ................................................................................................ 89 5.3.8.2 SERVICE STATISTICS FOR SUPPLY CHAIN MANAGEMENT ................................................ 89 5.3.8.2.1 LONG TERM CONTRACTS AND PUBLIC PRIVATE PARTNERSHIPS .................................................... 89 5.3.8.2.2 PERFORMANCE MANAGEMENT OF CONTRACTS FOR THE PERIOD 1 JULY 2016 - 30
JUNE 2017 ........................................................................................................................................................ 89 5.3.8.2.2 MONTHLY REPORTS FOR THE PERIOD 1 JULY 2016 - 30 JUNE 2017 ......................... 90 5.3.8.2.3 SERVICE PROVIDER PERFORMANCE ASSESSMENT ......................................................... 90
CHAPTER 6 .............................................................................................................................. 93
AUDITOR GENERAL FINDINGS ................................................................................................. 93
6.1 AUDITOR GENERAL – PREVIOUS FINANCIAL YEARS .................................................................. 93 6.1.1 AUDITOR GENERAL REPORT 2014 / 2015 FINANCIAL YEAR .............................................. 93 6.1.2 AUDITOR GENERAL REPORT 2015 / 2016 FINANCIAL YEAR .............................................. 93 6.1.3 AUDITOR GENERAL REPORT 2016 / 2017 FINANCIAL YEAR .............................................. 94
CONCLUSION ............................................................................................................................. 95
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 6
CHAPTER 7 (ANNEXURE 1) .................................................................................................... 96
ORGANISATIONAL DEVELOPMENT PMS / SDBIP 2016/17 .................................................... 96
7.1 PERFORMANCE MANAGEMENT OVERVIEW AND PROCESS ..................................................... 96 7.2 THE SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN ......................................... 96 7.3 DANNHAUSER PERFORMANCE MANAGEMENT COMPLIANCE & CHECKLIST .................... 96 7.4 DEVELOPMENT STRATEGY ................................................................................................................. 97 7.5 ALIGNMENT WITH NATIONAL AND PROVINCIAL STRATEGIES ............................................. 97 7.6 LEGISLATIVE FRAMEWORK ON ANNUAL PERFORMANCE REPORT...................................... 97 7.7 BASIS FOR COMPILATION OF THIS PERFORMANCE REPORT ................................................. 98 7.8 OVERVIEW OF ORGANISATIONAL DEVELOPMENT PERFORMANCE..................................... 98 7.8.1 PERFORMANCE MANAGEMENT SYSTEM FRAMEWORK ........................................................................... 98 7.8.2 DEPARTMENTAL ROLES OF RESPONSIBILITIES ...................................................................... 99 7.8.3 DISTRICT INTER-GOVERNMENTAL RELATIONS ................................................................... 100 7.9 INTEGRATED DEVELOPMENT PLAN, PERFORMANCE MANAGEMENT SYSTEMS AND
BUDGET ALIGNMENT ................................................................................................................................ 101 7.10 PERFORMANCE AGAINST THE NATIONAL KEY PERFORMANCE INDICATORS ............ 103 7.11 PERFORMANCE AGAINST SIX (6) MUNICIPAL STRATEGIC KEY PERFORMANCE AREAS .......................................................................................................................................................................... 105 7.11.1 OVERALL PERFORMANCE PER MUNICIPAL KPA ................................................................................................... 105 7.12 KPA 1: MUNICIPAL INSTITUTIONAL TRANSFORMATION AND DEVELOPMENT –
ACTUAL ANNUAL OUTCOMES ................................................................................................................ 107 7.13 KPA 2: BASIC SERVICE DELIVERY – ACTUAL ANNUAL OUTCOMES .................................. 110 7.14 KPA 3: LOCAL ECONOMIC DEVELOPMENT - ACTUAL ANNUAL OUTCOME .................... 114 7.15 KPA 4: GOOD GOVERNANCE AND PUBLIC PARTICIPATION – ACTUAL ANNUAL
OUTCOME ..................................................................................................................................................... 117 7.16 KPA 5: ENVIRONMENTAL AND SPATIAL MANAGEMENT – ACTUAL ANNUAL OUTCOMES .......................................................................................................................................................................... 128 7.17 KPA 6: MUNICIPAL FINANCIAL VIABILITY AND MANAGEMENT ....................................... 130
COMMENTS, RECOMMENDATIONS FOR IMPROVEMENT AND CONCLUSION SDBIP ................ 134
7.18 OVERALL COMMENT........................................................................................................................ 134 7.19 RECOMMENDATIONS FOR IMPROVEMENT ............................................................................. 134 7.20 CONCLUSION ...................................................................................................................................... 134 LIST OF REFERENCES ................................................................................................................................ 136
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 7
LIST OF TABLES Table.1 Annual Report Process……………….............................................................................................................15 Table.2 Multiple Deprivation Index……………………………………………………………………………………….………………………...20 Table.3 Household Income…………………………………………………………………………………………………………………………..….21 Table.4 Economic Sector Contribution……………………………………………...................................................................21 Table.5 Electricity Usage Households 2016/2017…………………………………………………………………………………………….23 Table.6 Schedule of Waste Collection…................................................................................................................25 Table.7 Solid Waste Collection……………………………...…………………………………………………………………………………………26 Table.8 Expenditure Schedule Rural & Urban Roads………………………………………………………………………………………..26 Table.9 Community Halls……………………………………………………………………………………………………………………………..….27 Table.10 Health Facilities………………………………………………………………………………………………………………………….……..27 Table.11 Councillors After Local Government Elections August 2016 ……………………………………………………………..30 Table.12 Councillors Prior Local Government Elections August 2016……………………………………………………………….30 Table.13 Council Committee Members Prior LGE August 2016 Planned Meetings…………………………………………..31 Table.14 Council Committee Members After LGE August 2016 Planned Meetings…………………………………………..32 Table.15 Status Quo IGR………………………………………………………………………………………………………………………………….34 Table.16 Audit & Performance Management Committee………………………………………………………………………………..35 Table.17 Municipal Policies………………………………..................................................................................................41 Table.18 Police Service Data………………………………………………………………………………………………………………………….…42 Table.19 Indigent Policy Criteria……………………………………………………………………………………………………………………...43 Table.20 PMS Assessment Methodology……………………………………………………………………......………………………………45 Table.21 Capital Spending 5 largest Projects……………………..................................................................................47 Table.22 Measures Undertaken to Improve PMS 2016/2017……………………………………….....……………………………..50 Table.23 WWTP Compliance Amajuba District………………....................................................................................52 Table.24 WWTP Turbidity Compliance…………………………………………………………………………………………………………….52 Table.25 Water Microbiological Compliance……………..........................................................................................53 Table.26 Planned Water Supply………………………………………………………………………………………………………………….……53 Table.27 Equipment Used for Solid Waste Management…………….......................................................................54 Table.28 Grass Cutting Schedule………………………..................................................................................................55 Table.29 No.of Times Grass Cutting Occurs Per Month.......................................................................................55 Table.30 Equipment Used For Grass Cutting……………………………………………………………………………………………………55 Table.31 LED – Catalytic Projects 2016/2017……………………………………………………………………………………………………62 Table.32 Employment By Economic Sector………………………………………………………………….…………………………………..62 Table.33 Economic Contribution by Sector………………………………………………………………………………………………………63 Table.34 Jobs Created by Municipality…………………………………………………………………………………………………………….63 Table.35 LED Objectives 2016/2017………………………………………………………………………………………………………..………63 Table.36 Solid Waste Delivery Levels to Households……………………………………………………………………………………….67
Table.37 Number of Cemeteries………………………………………………………………………………………………………………..……68
Table.38 Environmental & Business Health……………………………………………………………………………………………………..69
Table.39 Disaster Risk Profile 2016/2017………………………………………………………………………………………………..………70
Table.40 Disaster Risk Priorities 2016/2017…………………………………………………………………………………………………….70
Table.41 Disaster Management SWOT Analysis 2016/2017………………………………….………………………………………...72
Table.42 IT-Services Provided………………………………………………………………………………………………………………………….74 Table.43 IT-Initiatives……………………………………………………………………………………………………………………………………...74 Table.44 Section 54/56 Management………………………………………………………………………………………………………………76 Table.45 Staff Complement Per Department……………………………………………………………………………………………….….76 Table.46 Employment Equity Stats…………………………………………………………………………………………………………………..77 Table.47 Employment Equity 2016/2017…………………………………………………………………………………………………………77 Table.48 Vacant Positions 2016/2017……………………………………………………………………………………………………………..78 Table.49 Critical Positions 2016/2017……………………………………………………………………………………………………………..79 Table.50 Human Resources Policies………………………………………………………………………………………………………………...79 Table.51 S54/56 Management 2016/2017………………………………………………………………………………………………………81 Table.52 Municipal Indigent Expenditure………………………………………………………………………………………………………..82 Table.53 Municipal Debt Collection…………………………………………………………………………………………………………………83 Table.54 Grants/Subsidies & Expenditure………………………………………………………………………………………………………..83 Table.55 Municipal Revenue 2016/2017………………………………………………………………………………………………………….84
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 8
Table.56 Municipal Expenditure 2016/1027….………………………………………………………………………………………………...84 Table.57 Municipal Grant Receipts……………………………………………………………………………………………………...………….85 Table.58 Operating Income………………………………………………………………………………………….………………………………….85 Table.59 Municipal Operating & Capital Budget 2016/2017…………………………………………………………………………….86 Table.60 Operating & Capital Expenditure…………………………………………………………………….…………………………………87 Table.61 Municipal Bank Overdraft/External Loans/leases…….………………………………………………………………………..88 Table.62 Investment Analysis 2016/2017…………………………………………………………………………………………………………88 Table.63 Long-Term Contracts & PPPs……………………………………………………………………………………………………………..89 Table.64 Monthly Reports Long-Term Contracts Compliance…………………………………………………………......………….90 Table.65 Service Provider Performance ……………………………………………………………………………………………...………….91 Table.66 PMS Checklist……………………………………………………………………………………………………………………………………96 Table.67 Departmental Roles of Responsibilities……………………………………………………………………………………………..99 Table.68 IDP,PMS & Budget Alignment 2016/2017………………………………………………………………………………………..101 Table.69 KPAs & Weightings Per Department 2016/2017………………………………………………………………………………102 Table.70 National Assessment of KPAs 2016/2017………………………………………………………………………………………..103 Table.71 Overall Performance per Municipal KPA 2016/2017………………………………………………………………………..105 Table.72 Departmental Performance Against SDBIP KPIs 2016/2017………………………………………………......……….106 Table.73 Municipal Institutional Transformation & Development SDBIP KPIs 2016/17 Actual Annual…………..107 Table.74 Basic Service Delivery SDBIP KPIs 2016/17 Actual Annual………………………………………………………………..110 Table.75 Local Economic Development SDBIP KPIs 2016/17 Actual Annual……………………………………………………114 Table.76 Good Governance & Public Participation SDBIP KPIs 2016/17 Actual Annual…………………………………..117 Table.77 Environmental & Spatial Management SDBIP KPIs 2016/17 Actual Annual……………………………………..128 Table.78 Municipal Finance Viability & Management SDBIP KPIs 2016/17 Actual Annual………………………………130
LIST OF FIGURES
Figure.1 Population Distribution………………………………………………………………………….………..…………………………………18 Figure.2 Population Growth……………………………………….........................................................................................19 Figure.3 Education levels 2016/2017……………………………………………………………………………………………………………….19 Figure.4 Employment Stats..................................................................................................................................21 Figure.5 Number of households………………………………………………………………………………………………………………………22 Figure.6 Types of Dwellings……………………………………………………………………………………………………………………………..23 Figure.7 Energy for Cooking…………………………………………………………………………………………………………………………….24 Figure.8 Energy for Lighting……………………………………………………………………………………………………………………………..24 Figure.9 Energy for Heating……………………………………………………………………………………………………………………………..24 Figure.10 Water Access Households……………………………………………………………………………………………………………..…25 Figure.11 Household Sanitation……………………………………………………………………………………………………………………….25 Figure.12 Solid Waste Removal………………………………………………………………………………………………………......………….26 Figure.13 KPI 2015/16 vs 2016/17……………………………………………………………………………………………………………………45 Figure.14 Percentage KPI Representation 2016/17………………………………………………………………………………………….46 Figure.15 Total KPIs Per KPA 2016/17……………………………………………………………………………………………………………..46 Figure.16 Basic Service Delivery Capital Projects 2016/17……………………………………………………………………………….47 Figure.17 Capital Expenditure 5 Large Projects ……………………………………………………………………………………………….48 Figure.18 Operational Projects KPIs Achieved/Not Achieved/Almost Achieved 2016/17…………………………….…..49 Figure.19 Household Water Sources 2016/17……………………………………………………………………………………………….…51 Figure.20 Employee Total (Filled & Vacant Positions)………………………………………………………………………………………77 Figure.21 Actual Employment Equity 2016/17…………………………………………………………………………………………………78 Figure.22 Municipal Transformation & Institutional Development 2016/17 SWOT…………………………………….……81 Figure.23 Actual Income Earned 2016/17……………………………………………………………………………………………….……....86 Figure.24 Actual Expenditure 2016/17…………………………………………………………………………………………………………….87 Figure.25 Investment Bank Call Accounts 2016/17………………………………………………………………………………………….88
LIST OF MAPS
Map.1 Dannhauser Locality……………………………………………………………………………………………………………………………..17 Map.2 Ward Boundaries………………………………………………………………………………………………………………………………….18 Map.3 Location of Capital Projects…………………………………………………………………………………………………………………..48
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 9
LIST OF IMAGES
Image.1 Dannhauser LM Newly Elected Council August 2016………………………………………………………………………….29 Image.2 Dannhauser LM Newly Elected Executive Committee 2016………………………………………………………………..29 Image.3 Urban Tarred Residential Road…………………………………………………………………………………………………………..58
ANNEXURES ANNEXURE.1 – SERVICE DELIVERY BUDGET & IMPLEMENTATION PLAN 2016/17 ANNEXURE.2 - ANNUAL FINANCIAL STATEMENTS 2016/2017 ANNEXURE.3 - REPORT ON THE MUNICIPAL INFRASTRUCTURE GRANT (MIG), FIVE LARGEST CAPITAL PROJECTS PER WARD, TOP FOUR SERVICE DELIVERY PRIORITIES PER WARD 2016/2017 FINANCIAL YEAR ANNEXURE.4 - REPORT OF THE AUDITOR GENERAL 2016/2017 ANNEXURE.5 - RESPONSE TO THE REPORT OF THE AUDITOR GENERAL 2016/2017 ANNEXURE.6 - REPORT OF THE AUDIT COMMITTEE & RECOMMENDATIONS OF THE AUDIT COMMITTEE 2016/2017 ANNEXURE.7 - FINANCIAL DECLARATIONS OF COUNCILLORS AND MUNICIPAL STAFF 2016/2017 ANNEXURE.8 - INTEGRATED DEVELOPMENT PLAN 2016/2017
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 10
LIST OF ACRONYMS
AC Audit Committee
ADM Amajuba District Municipality
A&PMC Audit and Performance Management Committee
AFLED Agricultural Forum for Local Economic Development
AG Auditor General
AR Annual Report
AO Accounting Officer
CFO Chief Financial Officer
COGTA Co-operative Governance and Traditional Affairs
COMMS Community Services
CORPS Corporate Services
DTAC District Technical Advisory Committee
EPWP Extended Public Works Programme
EXCO Executive Committee
FINS Financial Services
IA Internal Audit
IDP Integrated Development Plan
IGR Inter-Governmental Relations
IWMP Integrated Waste Management Plan
KPA Key Performance Area
KPI Key Performance Indicator
MFMA Municipal Finance Management Act (No. 56 of 2003)
MFMG Municipal Finance Management Grant
MIG Municipal Infrastructure Grant
MM Municipal Manager
MPAC Municipal Public Accounts Committee
MPPR Municipal Planning and Performance Management Regulations (No. R796 of 2001)
MSA Municipal Systems Act (No. 32 of 2000)
MSA Municipal Structure Act (No. 117 of 1997)
MSIG Municipal Support Improvement Grant
MPAC Municipal Public Accounts Committee
NDHLM Dannhauser Local Municipality
NDP National Development Plan
NKPI National Key Performance Indicator
PA Performance Agreement
PGDS Provincial Growth and Development Strategy
PMS Performance Management System
PoE Portfolio of Evidence
PR Party Representative
SDBIP Service Delivery and Budget Implementation Plan
SLA Service Level Agreement
TECHS Technical Services
WC Ward Councilors
WC Ward Committee
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 11
CHAPTER 1: INTRODUCTION
MAYOR FOREWORD
The Municipality in compliance with chapter 12 (section 121) of the Municipal Finance Management Act 56 of 2003 is required to prepare annual report and table such a report to
council within nine months after the end of the financial year, in this case the 2016/17 financial year. It is in this context that this report is prepared. The 2016/17 was a tough year for local government in general as this was the last year of the previous term of Council and the local government election were looming in August 2016 during the financial year. One can only reflect on the accomplishment of the outgoing and incoming council and also commit to make improvements where they are needed. The current council that took over in August 2016 adopted in the 2016/17 IDP municipal vision of “creating a financially viable municipality and providing integrated quality services hereby with creating a better life for all”. The audit outcome of the 2016/17 financial year is unqualified and a number of positives that occurred during the 2016/17 financial year do indicate that the Municipality is indeed moving in the right direction. During the course of the financial year, the municipality’s wards were increased by two, thus changing complement from eleven to thirteen. The two addition wards were from splitting some existing wards and amalgamating them, this is due to high population levels and households, and would enable the municipality to render services effectively to all thirteen wards. The municipality also continued with the Implementation of a number of projects such as the upgrading of community halls, electrification in-fills to additional households, maintenance of street lights, delivery of water jojo tanks to households, development of crèches, road construction and maintenance, extension of waste collection services, implementation of the Agri-Park at Renier Farm with DRDLR, empowering of locally owned Co-operatives & SMME’s building of houses through integration with the Department of Human Settlements, Development of the Industrial Park funded by Cogta-KZN, just to mention a few. It is important to note that, Amajuba District Municipality is the Water Services Authority and implements projects related to water and liquid sanitation, the municipality does integrate with the District and indicates water & sanitation requirements and infrastructure requirements within its wards. The Municipality continued to align its operations to the Sustainable Development Goals, National Development Plan 2030, Provincial Growth and Development Strategy, National Infrastructure Plan, National Government Outcomes, Provincial Priorities, District Growth & Development Strategy and other strategies guiding municipal development socially and economically. In line with PGDS Goal 1 of Job creation the Municipality Implemented the EPWP project and created numerous job opportunities through all its capital projects, the municipality appointed the youth from different wards both male and females thus ensuring they have access to jobs. The Municipality aligns to all the seven goals of the PGDS and this is thoroughly articulated in our Integrated Development Plan. As part of the preparations for the fourth generation Integrated Development Plan (IDP) which caters for the 2017/18 to 2021/22 Financial years, the municipality has ensured that the objectives of the municipality are aligned to all the relevant national, provincial and local strategies. During the 2016/17 financial year, in order to provide progress on performance as well as to get input towards the 2017/18 budget and IDP, public participation meetings took place in November 2016 and again in March and April 2017. Stakeholders included, amongst others, Councillors, ward committee members, business, NGOs’, provincial sector departments and members of the community. These were very well attended indicating the commitment our people have towards the development of the city. The Municipality has already prepared an action plan to address the concerns raised by the Auditor General. There is a performance management system in place to ensure that people deliver on the set strategic objectives and targets. The Management reports against planned targets on a monthly basis and these are audited every quarter by our Internal Audit Unit. THANK YOU FOR ALL THE SUPPORT
-------------------------------------------
Honourable Executive Mayor
Cllr: Phakathi JP
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 12
MUNICIPAL MANAGER FORWORD
Dannhauser Local Municipality has had a successful fiscal year 2016/2017. A high quality of service and high delivery of services has occurred compared to the 2015/2016 financial year.
In adding to the words of the Mayor, the Legislative Requirements for the Preparation of the Annual Report: The preparation and publication of the Annual Report is a legislative requirement as per Section 46 of the Municipal Systems Act (MSA) 32 of 2000 and Section 121 of the Municipal Finance Management Act (MFMA) 56 of 2003. The main accountabilities of the Accounting Officer are the six Key Legislative Mandate and Key Performance Areas which include: 1. Basic Service Delivery and Infrastructure; 2. Local Economic Development; 3. Municipal Financial Viability and Management; 4. Good Governance and Public Participation; 5. Municipal Transformation and Organisational Development; and 6. Environmental and Spatial Management. Section 46 (1) of the MSA states that: A municipality must prepare for each financial year a performance report reflecting – (a) The performance of the municipality and of each external service provider during the financial year; (b) A comparison of the performances referred to in paragraph (a) with targets set for and performances
in the previous financial year; and (c) Measure taken to improve performance. (2) An annual performance report must form part of the municipality’s annual report in terms of Chapter
12 of the Municipal Finance Management Act (MFMA) 56 of 2003. Section 121 of the MFMA states that: (1) Every municipality and every municipal entity must for each financial year prepare an annual report in
accordance with this chapter. The council of a municipality must, within nine months after the end of a financial year, deal with the annual report of the municipality and of any municipal entity under the municipality’s sole or shared control in accordance with section 129.
(2) The purpose of an annual report is: (a) To provide a record of the activities of the municipality or municipal entity during the financial year to
which the report relates; (b) To provide a report on performance against the budget of the municipality or municipal entity for that
financial year; and (c) To promote accountability to the local community for the decisions made throughout the year by the
municipality or municipal entity. Subsections (3) and (4) continue to prescribe the contents of the annual reports for both the municipality and municipal entities. During the oversight process, to which the draft Annual Report will be subjected, compliance with these legislative requirements will be analysed.
SERVICE DELIVERY HIGHLIGHTS: Basic Service Delivery & Infrastructure Services: This component includes: Housing development, Electrification In-Fills, Gravel Roads, Water Jojo tanks, Sports & Recreation, Community Halls, Industrial Park and Waste Management – Landfill site. 10 houses built in Buhlebomzinyathi Housing Project Phase.1 15 houses built as part of infrastructure replacement due to a natural disaster 3 Mobile Child care facilities in wards 5 and 10;
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 13
1 Community Hall built in ward 2 4 km of rural gravel roads constructed wards 10 and 11; 632 houses electrification In-Fills; 967 Street lights maintained; 1 Industrial Park completed; 1 Sportsfield Upgraded; 11 Jojo Tanks and Stands Erected; 1 Waste Management – Landfill Site – Licensed; 1704 household refuse removal per week; 456 business refuse removal per week; and 12 136 small holdings outside Dannhauser urban area refuse removal per week; Economic Development: Economic development and physical planning at Dannhauser Local Municipality contributes to:- (a) Creation of jobs and protection of the livelihood of the people. (b) Protection of the environment and cultural heritage of the residents. (c) In general, contribute in encouraging Sustainable Development. 143 jobs created through EPWP all the municipal capital projects; 1100 jobs created through CWP in municipal capital and socio-economic up-keep projects; 15 Co-operatives and SMMEs’ received support through programmes and mentorships; 1 Municipal owned farm (Renier Farm) being utilized for agricultural projects by the local community
members owning Co-operatives, they are being supported by DRDLR through the Agri-Parks programme; Adoption of Urban Precinct Plan by Council; LED Strategy Reviewed; and Tourism Strategy being developed.
Municipal Transformation & Institutional Development Municipal Transformation & Institutional Development of Dannhauser contributes to the effective delivery of services and socio-economic development within the jurisdiction. The following were achieved; 12 Management Committee meetings; 2 Strategic Planning meetings; Work Skills Plan and Employment Equity Plan approved; Council Adopted Organisational Structure; and Council, Portfolio and Executive Committee meetings. Good Governance and Public Participation The municipality upheld its compliance levels with regards to guiding legislations and further incorporated the priority views of its community in all wards as required by the Municipal Systems Act, 32 of 2000, the following were achieved; 4 Meetings attended based on the Mayor’s and Municipal Managers Forums held at Amajuba District in
accordance to IGR requirements; 4 DTAC meetings attended as per Cogta – KZN invitations; Internal Audit Plan by Audit Committee approved and adopted by Council on 31 July 2017; 4 Audit Committee Meetings held; 4 Risk Management Committee meetings held and 2 Risk Assessment Workshops; Risk Management policies approved and adopted by Council on 30 October 2016; Draft Annual Report public comments submitted to Corporate Services for MPAC to prepare Oversight
Report 7 days after due date of draft AR advert; Annual Report 2015/2016 adopted by 31 January 2017; SDBIP 2016/17 submitted to Mayor 14 days after budget approval and approved by Council 28 days after
budget approval;
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 14
2016 / 2017 - PMS review and adoption by 31 July 2016; 52 ( 4 per ward) Constituency meetings held ; 4 Finance Forum meetings attended 2 IDP & Budget Roadshows 2016/17 conducted; IDP and Budget Process plan 2016/17 adopted by Council by 28 August 2017; 5 Performance Agreements Signed 30 Days after beginning of new financial year (30 July 2017) and made
public via the municipal website; Mid-year Section 72 performance report prepared and adopted by Council by 25 January 2017; and Youth development programmes implemented.
Environmental and Spatial Management The municipality complied with Land Use Management legislations and guiding strategies and enhanced environmental management upkeep through the application of promulgated legislations and within the district, the following were achieved; Review and adopting of the Spatial Development Framework (SDF) 2016/2017 by 31 May 2017; Enforcement and alignment of the SDF and Land Use Management System (LUMS) 2016/2017; Reporting and attending to disaster and fire incidents within the jurisdiction; Approved Cemetery Plan by 31 March 2017 and maintenance of urban and rural cemeteries; and Compliant waste management – landfill site that is fully licensed. Municipal Financial Management and Viability Regular reporting on actual expenditure versus budget, reports submitted quarterly to Exco, Council and
relevant stakeholders, submitted by the 10th
day after each quarter end; Monthly reconciliation of creditors, debtors and bank balances for the 2016/17 financial year; Developed procurement plan submitted to Municipal Manager and Council including status quo reports; The number of days for converting purchase requisition to order, to finalise specification of Bid/Tender, to
finalise evaluation of Bid/Tender, to adjudicate the Bid/Tender process all reduced to target days as per KPIs’;
(Revenue Collection)Billing of all municipal debtors undertaken within 30 days and 80 % debt collection achieved on a monthly basis;
Departmental budget actual expenditure reported on a quarterly basis; and Annual Financial statements submitted to Auditor General as prescribed by the Municipal Finance
Management Act and Public Finance Management Act.
Measures to Improve Performance: The approved Service Delivery and Budget Implementation (SDBIP) and Operational Plan (OP) included a total of 181 projects reduced into KPIs’. This includes 166 operating projects and 15 capital projects. On both the operating and capital projects, the Municipality achieved at least 85% of the targets (within the 85%; 94 % being fully achieved and 6 % being almost met) that were set at the beginning of the financial year. The report on both the SDBIP and OP (attached as Annexure ‘1’ and ‘2’) includes corrective measures as well as the timeframe/s for each individual Key Performance Indicator/ project. However, at a strategic level, in order to improve performance for the 2017/ 2018 financial year, the following measures have been put in place: Weekly monitoring of capital expenditure, both Council and grant-funded capital projects; Enhancing of procurement processes to ensure projects are undertaken; Intensifying the sourcing of grants to implement various projects; Continued use of Expanded Public Works Programme (EPWP) and Community Work Programme (CWP)
workers per ward to improve and accelerate project implementation and job creation; Embark on an aggressive debt collection programme; Increase revenue generating projects and activities; and Drawing in of investors. Without a doubt, the municipality continues to make progress towards achieving its mandate of providing developmental service delivery to its citizens. The municipality will implement an audit action plan to deal with
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 15
matters raised in the AG audit. This will allow the municipality to work towards a clean audit, which will ensure that we continue to build a capable and well developed municipality.
THE ANNUAL REPORT PROCESS The process followed for developing the annual report by the municipality is indicated in table.1 below; Table.1
No. Description TimeFrame
1. Preparation and finalization of annual performance report 2016/2017 and annual financial statements 2016/17
01 July 2017 – August 2017
2. Submission of Annual Performance Report 2016/2017 & Annual Financial Statements 2016/2017 to Auditor General for auditing.
On or before 31 August 2017
3. Finalise the 1st
draft of the Annual Report 2016/2017 to Municipal Manager with all data of relevant departments and Auditor General Comments.
20 November 2017
4. Draft Annual Report 2016/2017 completed and submitted to Auditor General for comments and changes if required.
22 November 2017
5. 2nd
draft of Annual Report completed and submitted to the Municipal Manager for comment incorporating Auditor General comments & if any changes.
30 November 2017
6. Engagement with author of Annual Report for finalization 1st
week of December 2017
7. Finalized, published and printed annual report by municipality or service provider appointed.
1st
week of January 2018
8. Annual Report tabled by the Mayor at Full Council. On or before the 31st
of January 2018
9. Tabled annual report 2016/2017 to be made accessible to the public. Within 14 days from the date of tabling the annual report
10. A copy of the report to be submitted to the MEC for local government in KZN, the Auditor General, Provincial Legislature and National Treasury.
Within 14 days from the date of tabling the annual report
11. Oversight report on Annual report 2016/2017 to commence once Annual Report has been tabled at Full Council, and Oversight report to be completed within two months of the Tabling of the Annual Report to Full Council
1st
of February to on or before 30
th March 2018
12. Oversight report made available to the public within seven (7) days of being tabled in Council
On or before the 6th
of April 2018
The mayor of a municipality must, within seven months after the end of the financial year, table in the municipal council the annual report of the municipality and of any municipal entity under the municipality’s sole control. The council of a municipality must consider the annual report of the municipality of municipal entity, and by no later than two months from the date on which the annual report was tabled in council, adopt an oversight report containing councils comments on the annual report which must include a statement whether the council- 1. has approved the annual report without reservations; 2. has rejected the annual report; or 3. has referred the annual report back for the revision of those components that can be revised. THE MUNICIPAL FINANCE MANAGEMENT ACT, NO 56 OF 2003: SECTION 121: (ANNUAL
REPORT OUTLINES) Preparation and adoption of annual reports (1) Every municipality and every municipal entity must for each financial year prepare an annual report in accordance with this Chapter. The council of a municipality must within nine months after the end of a
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 16
financial year deal with the annual report of the municipality and of any municipal entity under the municipality's sole or shared control in accordance with section 129. (2) The purpose of an annual report is—
(a) to provide a record of the activities of the municipality or municipal entity during the financial year to which the report relates;
(b) to provide a report on performance against the budget of the municipality or municipal entity for that financial year; and
(c) to promote accountability to the local community for the decisions made throughout the year by the municipality or municipal entity.
(3) The annual report of a municipality must include—
(a) the annual financial statements of the municipality, and in addition, if section 122(2) applies, consolidated annual financial statements, as submitted to the Auditor-General for audit in terms of section 126(1);
(b) the Auditor-General's audit report in terms of section 126(3) on those financial statements; (c) the annual performance report of the municipality prepared by the municipality in terms of section 46
of the Municipal Systems Act; (d) the Auditor-General's audit report in terms of section 45(b) of the Municipal Systems Act; (e) an assessment by the municipality's accounting officer of any arrears on municipal taxes and service
charges; (f) an assessment by the municipality's accounting officer of the municipality's performance against the
measurable performance objectives referred to in section 17(3)(b) for revenue collection from each revenue source and for each vote in the municipality's approved budget for the relevant financial year;
(g) particulars of any corrective action taken or to be taken in response to issues raised in the audit reports referred to in paragraphs (b) and (d);
(h) any explanations that may be necessary to clarify issues in connection with the financial statements; (i) any information as determined by the municipality; (j) any recommendations of the municipality's audit committee; and (k) any other information as may be prescribed.
(4) The annual report of a municipal entity must include—
(ii) the annual financial statements of the entity, as submitted to the Auditor-General for audit in terms of section 126(2);
(iii) the Auditor-General's audit report in terms of section 126(3) on those financial statements; (iv) an assessment by the entity's accounting officer of any arrears on municipal taxes and service
charges; (v) an assessment by the entity's accounting officer of the entity's performance against any measurable
performance objectives set in terms the service delivery agreement or other agreement between the entity and its parent municipality;
(vi) particulars of any corrective action taken or to be taken in response to issues raised in the audit report referred to in paragraph (b);
(vii) any information as determined by the entity or its parent municipality; (viii) any recommendations of the audit committee of the entity or of its parent municipality; and (ix) any other information as may be prescribed.
……………………………………….. Municipal Manager Nkosi WB
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 17
MUNICIPAL FUNCTIONS, POPULATION AND ENVIRONMENTAL OVERVIEW
1.1 VISION
To create a financially viable municipality and providing integrated quality services hereby with creating a better life for all.
1.2 MISSION Dannhauser municipality will utilize its available resources to achieve a sustainable economy by creating job opportunities through agrarian reform, mining and industrial development. This will be enhanced and supported by its transformed staff.
1.3 OVERVIEW OF DANNHAUSER MUNICIPALITY Dannhauser Local Municipality (LM) (KZN 254) is located north in the Kwa-Zulu Natal Province in Amajuba District with Newcastle Local Municipality and eMadlangeni Local Municipality as part of its family. It is the smallest of three local municipalities within the District; with area coverage of approximately 1516 square kilometers. Dannhauser LM is a predominantly rural municipality, and classified as a “Class B” municipality by national government. Mining towns with some residential areas were established within the jurisdiction prior to the 1980’s as a result of the numerous mines situated within and around the municipal area. These include Dannhauser Town, Hattingspruit, and other main towns such as Inverness, Kilegethe, Klipbank, Milford, Normandien, Nyanyadu, Rutland, Tendeka, Witteklip. The municipality in 2016/2017 had eleven (11) wards but it was subsequently increased to thirteen (13) wards with a combined total of 58 settlement areas. Dannhauser Town is the main node within the municipal area and currently is currently surrounded by some of the largest coal producing mines in KwaZulu-Natal. The municipality is strategically positioned in a midway point along a main railway line that provides linkage between Durban and Johannesburg and is located approximately eight (8) kilometres off a national road (N11). The landscape of the local municipality is characterized by numerous rivers that flow through the municipal area, the Ngagane and uMzinyathi Rivers are amongst the largest of these rivers. The western portion of the municipality is endowed with scenic landscapes. Map.1
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 18
1.4 WARDS AND TRADITIONAL AUTHORITY The north-eastern portion of the Dannhauser municipal area is largely land under the administration of traditional councils. It includes a portion of Ubuhlebomzinyathi Community Authority (that falls within Dannhauser Municipality), covering an area of approximately 13, 395 km2 in extent and Nyanyadu Traditional Council area which accounts for about 1, 1190 km2 of the total municipal area, the other Council Authorities are Ingwe, Emalangeni and Gule. Municipal Wards and Tribal Authority Boundaries Map.2 Ward Boundaries
Google Maps 2016
1.5 DEMOGRAPHIC PROFILE The population of the Dannhauser Municipality was recorded at 105 341 people in 2016 compared to a total of 102 161 in 2011. This is evident of an increase of 3 180 people between 2011 and 2016. The population is distributed unevenly among the 13 municipal wards.
Figure.1: Population Distribution
Stats SA: Census 2016
Ward1
Ward2
Ward3
Ward4
Ward5
Ward6
Ward7
Ward8
Ward9
Ward10
Ward11
Ward12
Ward13
2011 9749 8095 9101 9213 7424 9538 8094 9446 9787 11484 10232
2016 7291 8623 7864 6337 6295 8686 8820 8438 8987 8821 7651 7690 7434
0
2000
4000
6000
8000
10000
12000
14000
Po
pu
lati
on
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 19
1.6 POPULATION GROWTH / DECLINE Population densities are highest in the Traditional Council areas in the north-eastern portion of the municipal area and in Dannhauser Town. The town functions as a primary node (providing commercial service facilities, agricultural industries, industrial park, public social infrastructure, economic infrastructure and government services). The local economy is largely defined by the mining and agricultural sectors, these currently contribute to minimal employment within the jurisdiction. Local residents rely on the larger urban centres of Dundee and Newcastle for employment opportunities and higher order goods and services. The population growth within the jurisdiction can be attributed to a number of issues, including: receiving quality government services, immigration by residents moving from neighboring areas such as Newcastle, Emadlangeni and other municipalities, increased housing development by Human Settlements, availability of land for agricultural activities, etc. If the positive growth rate persists, it is likely to encourage development in the area. The situation therefore warrants interventional measures that could encourage people to remain within the municipality to the municipality. Figure.2: Population Growth
Stats SA: Census 2016 Education plays an important role in economic development. It provides skilled labour that is key in producing goods and services in an economy. In 2016, of the total population of 105 341, only 1.9% had obtained tertiary educational attainments and only 16.4% had matriculated. People with no schooling increased to 14.7% 2011. This can be attributed to a lower level of primary school enrolment that was experienced in the municipal area in 2014-2015. Only a handful of those who finish matric pursue further studies. It is important to address this challenge. There is a need to develop a program that will monitor or ensure that pupils that enroll in primary education are encouraged to complete secondary education and further their studies. Addressing this challenge is fundamental to creating a strong base that the municipality can use to stimulate economic growth and development.
Education Level Figure.3: Dannhauser Education Level
Stats SA: Census 2016
20012011
2016
102 779 102 161
105 341
Population growth/decline
NoSchooling
PrimarySome
Secondary MatricTertiary
15,507
38,226 32,020
17,297
2,003
Highest Level of Education
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 20
1.7 MULTIPLE DEPRIVATIONS INDEX The KwaZulu-Natal Provincial Index of Multiple Deprivation (PIMD) (2001) identifies poverty levels per municipality at a ward level. In terms of how it was determined, the PIMD (2001) was constructed by combining the five transformed domain scores with equal weights. The five domain indices are as follows: Income and Material Deprivation; Employment Deprivation; Health Deprivation; Education Deprivation; and Living Environment Deprivation.
Table.2: Multiple Deprivations Index (Census 2016)
WARDS LEVEL OF DEPRIVATION
Ward 1 High
Ward 2 Low
Ward 3 Most
Ward 4 Most
Ward 5 Most
Ward 6 Most
Ward 7 High
Ward 8 Most
Ward 9 High
Ward 10 Most
Ward 11 Low
Ward 12 Most
Ward 13 Most
1.8 EMPLOYMENT / UNEMPLOYMENT RATE The municipality experienced a slight increase in the number of people employed from 2011 to 2016, this is however offset by the large numbers of people who are eligible for employment but are not employed. This can be attributed to low education levels which compromise the employability of residents within the municipality and a lack of employment opportunities due to a lack of economic activities in the municipal area. High unemployment levels pose a number of challenges and are associated with a number of social ills, particularly for the youth. They make them prone to engage in activities such as drug abuse, crime, alcohol abuse, etc. Efforts should be made to address these challenges. The figure below indicates the employment status of the municipality; The marked slight improvement of employment has been contributed by the local economic development programmes that the municipality is engaging in with sector departments and private stakeholders. This has witnessed SMME’s and Co-operatives being empowered through government programmes whether through being awarded with contracts through the municipal supply chain management empowerment programme or other sector departmental programmes such as EPWP, CPWP and other initiatives.
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 21
Figure.4: Employment Status
Stats SA: Census 2016
1.9 HOUSEHOLD INCOME Table.3
HOUSEHOLD INCOME INCOME BRACKET NUMBER OF HOUSEHOLD No Income 3 544 R1 – R 4 800 1 124 R 4 801 – R 9 600 2 142 R 9 601 – R 19 200 4 979 R 19 201 – R 38 400 4 852 R 38 401 – R 76 800 2 427 R 76 801 – R 153 600 1 022 R 153 601 – R 307 200 458 R 307 201 – R 614 400 226 R 614 401 – R 1 228 800 32 R 1 228 801 – R 2 457 600 13 R 2 457 601 or More 18 Unspecified 1 Not Applicable 5 GRAND TOTAL 20 844
(Census 2016) It is clear from the above data that there are more households living in poverty, this impacts negatively on the revenue generating stream of the municipality. It also serves as an indicator that more employment opportunities (job creating activities) must be implemented to reduce the poverty margins.
1.10 GENERAL PERFORMANCE OF ECONOMIC SECTOR CONTRIBUTION - DANNHAUSER Table.4
TYPE OF SECTOR 1997 2003 2013
Primary Sector 55.9% 26.7% 36.0%
Agriculture 6.6% 10.8% 6.3%
Mining 49.3% 15.9% 29.7%
Secondary Sector 17.0% 21.1% 11.7%
Manufacturing 13.6% 18.3% 9.2%
Electricity 2.0% 1.0% 1.0%
Construction 1.4% 1.8% 1.5%
Tertiary Sector 27.1% 52.2% 52.3%
Trade 4.7% 7.6% 7.8%
Transport 4.3% 6.5% 5.6%
Finance 3.6% 7.7% 6.2%
Community Services 14.4% 30.5% 32.6%
Treasury – 2013 / Global Insight 2014
0
20000
40000
60000
Employed Unemployed Eligible To WorkBut Discourage
Not Legible toWork
10 852 9 843
31 471 44 214
11 100 9 872
38 069 46 300
2011 2016
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 22
As per Global Insight 2014, 2013 economic analysis publishing adopted by Provincial Treasury KZN in the Social-Economic Profile of Amajuba District in 2014; Dannhauser’s Gross Domestic Product performance and contribution per economic sector to Kwazulu-Natal province was; Agriculture decreased from 10.8% in 2003 to 6.3% in 2013; Mining increased from 15.9 % in 2003 to 29.7% in 2013; Manufacturing decreased from 18.3% in 2003 to 9.2% in 2013; Electricity remained constant at 1% from 2003 to 2013; Construction decreased from 1.8% to 1.5% from 2003 to 2013; Trade increased from 7.6 % to 7.8 % from 2003 to 2013; Transport decreased from 6.5 % to 5.6 % from 2003 to 2013; Finance decreased from 7.3 % to 6.2% from 2003 to 2013; and Community Services increased from 30.5% to 32.6 %. The mining sector has greatly contributed to employment within the jurisdiction with a total upward movement of 13.8 % from 2003 to 2013. According to Census 2011 data from Stats SA, the population of Dannhauser is 19 % are employed, 17 % are unemployed but economically active while 64 % are unemployed but are not economically active.
1.11 CURRENT HOSUEHOLD STATUS The number of households in the municipal area slightly increased from 20 439 in 2011 to 20 844 in 2016. These households are mostly located in rural settlements and are scattered in space in an inefficient manner. These scattered households pose a great challenge in terms of providing basic services such as water, roads, electricity. Figure.5: No of Households
Stats SA: Census 2016 1.11.1 FORMAL DWELLINGS Dannhauser municipality due to its rural setting has more traditional dwellings compared to formal residential ones. A handful of formal dwellings are situated around Dannhauser Town, in Durnacoal and Hattingspruit, while the traditional dwellings are situated on tribal council authority land in the north-eastern portion of the jurisdiction. The municipality through its internal operating units has integrated successfully with sector departments such as the Department of Human Settlements to ensure that there is an increase in the number of households from the previous financial year 2015/2016. This shows a marked improvement on the basic service delivery component by the municipality.
No. Houses-2001No. Houses-2011
No. Houses-2016
19 320 20 439 20 844
No. of Households
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 23
Figure.6: Types Of Dwellings
Stats SA: Census 2016
1.11.2 HOUSEHOLD ACCESS TO ELECTRICTY Dannhauser Municipality is not licensed to provide electricity, thus ESKOM is the sole service provider. The Municipality has managed to achieve 100% universal access to electricity; this confirms that the Dannhauser area has enough electrical capacity and infrastructure. The municipality is however experiencing challenges; a high of influx of people, particularly on privately owned land whereby the land owners allocate sites without considering the municipality’s plans. This has resulted in a burgeoning backlog of electricity infills, currently the backlog is at 1125. The backlog number was determined after an assessment that was undertaken by the municipality, in consultation with ward councilors and ward committee members. In the 2014/2015 financial year, the municipality received funding of R8 000 000 from KZN COGTA to eradicate this backlog. The municipality had also availed R11 000 000. For the 2015/2016 financial year, COGTA allocated a grant funding of R 5 000 000 and the Department of Energy set aside R32 000 000 which was directly allocated to ESKOM.
Table.5: Electricity Usage of Households In Dannhauser
COOKING HEATING LIGHTING
Electricity from mains 10 711 51.8%
Electricity from mains 7 762 37.6%
Electricity from mains 16 585 80.3%
Other source of electricity 36 0.2%
Other source of electricity 22 0.1%
Other source of electricity 0 0%
Gas 482 2.3% Gas 262 1.27% Gas 125 0.6%
Paraffin 1 392 6.7% Paraffin 695 3.36% Paraffin 167 0.8%
Wood 1406 6.4% Wood 1 987 9.6% Candles 3 615 17.5%
Coal 5 893 29.2% Coal 7 463 36.1% Solar 115 0.6%
Animal dung 489 2.14% Animal Dung 667 3.2% Unspecified 55 0.2%
Other 156 0.76% Other 92 0.4% None 0 0%
None 97 0.5% None 1 712 8.3%
Total 20 662 100% Total 20 662 100% Total 20 662 100%
Stats SA: Census 2016
1.11.3 ELECTRICITY FOR COOKING, HEATING AND LIGHTING Dannhauser Municipality became the first municipality in the country to electrify all households within its area of jurisdiction. About 80.7% of the population within the municipal area uses electricity for lighting, cooking and heating purposes. Coal is still used substantially for cooking and heating purposes. A shift away from this resource is needed due to its unsustainable nature. The various forms of energy used by the community reflect as follows;
2 579 106
17 103
973
Formal Residential Informal Residential Traditional Residential Farms
Types Of Dwellings
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 24
Figure.7: Energy for Cooking
Stats SA: Census 2016
Figure.8: Energy for Lighting
Stats SA: Census 2016
Figure.9: Energy for Heating
Stats SA: Census 2016
1.11.4 HOUSEHOLD ACCESS TO WATER
The municipal jurisdiction has varying sources of water used by the community, these are depicted in the figure below;
10 711
482 1 392 1 406
5 893
489 36 156 97
Energy For Cooking
16 584
125 167
3 615
0 0 115 55 0
Energy for Lighting
7 762
262 695 1 927
7 463
667 22 92 1 771
Energy For Heating
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 25
Figure.10: Water Access
Stats SA: Census 2016
1.11.5 HOUSEHOLD ACCESS TO SANITATION Per Census 2016 data, about 2 666 flush toilets are connected to a sewerage system and septic tank. This is negligible adjustment upwards from 2 341 in 2011. The greater population utilizes Pit Latrine toilets without ventilation, this is highly evident in the rural cluster settlements. Figure.11: Sanitation Facilities
Stats SA: Census 2016
1.11.6 HOUSEHOLD ACCESS TO REFUSE REMOVAL
The municipality is responsible for its solid waste removal; the following figure.13 represents the areas of service delivery;
Table.6: Schedule of Waste Collection
AREA OF SOLID WASTE COLLECTION NO. OF HOUSEHOLDS NO. OF BUSINESSES
Dannhauser Town 553 80
Hattingspruit 51 13
Durnacoal 576 6
Emafusini 510 8
Ramaphosa 100 -
Koppie Aleen 543 -
KwaMdakane 560 -
Grand Total 2 893 107
Stats SA: Census 2016
14 769
3 091
313 165 106 179 145 1 575
501
Water Sources
FlushToilets
(ConnectedSewage)
FlushToilets
Septic Tank
ChemicalToilet
Pit Latrine(VIP)
Pit Latrine(No VIP)
BucketLatrine
Other None
2362 304
2 141 1942
12 849
33 348 683
Sanitation
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 26
Figure.12: Waste Removal Weekly
Stats SA: Census 2016 Approximately 11.5% of the population in Dannhauser has access to weekly refuse removal services. This is possibly because majority of the households are located in the rural areas which are predominantly occupied by sparsely distributed households, hence making it difficult to offer refuse removal services. However, refuse removal services have been extended to rural areas through the provision of Skip Bins which are collected on a weekly basis.
1.11.7 SOLID WASTE COLLECTION SCHEDULE Table.7 REFUSE REMOVAL DAYS ACTIVITY AREA
MONDAY BUSINESS REFUSE REMOVAL
DANNHAUSER
TUESDAY HOUSEHOLD AND BUSINESS
HATTINGSPRUIT & KOPPIE ALLEN
WEDNESDAY HOUSEHOLD DURNACOL & KWAMDAKANE
THURSDAY HOUSEHOLD DANNHAUSER
FRIDAY HOUSEHOLD AND BUSINESS
DANNHAUSER & EMAFUSINI
Dannhauser: Municipal Data Register
1.12 EXPENDITURE FOR RURAL & TARRED ROADS Table.8
YEAR TOTAL RURAL ROADS
( R )
TOTAL URBAN ROADS
( R )
GRAND TOTAL SPEND PER FINANCIAL YEAR
( R ) 2014/15 10 844 741 - 10 844 741
2015/16 2 240 000 7 000 000 9 240 000
2016/17 7 000 000 - 7 000 000
Dannhauser: MIG Expendture
Removed ByLM Once A
Week
Removed ByLM Less ThanOnce A Week
CommunalRefuse Dump
Own RefuseDump
Other No RubbishDisposal
2 377 59 217
16 264
71 1 674
Solid Waste Removal
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 27
1.13 COMMUNITY FACILITIES Table.9
COMMUNITY FACILITY ACTUAL NUMBER OF FACILITIES BACKLOG
Community Halls Kwamdakane Community Hall (Ward7), Koppie Alleen Community Hall (Ward1), Emafusini Community Hall (Ward2),
Dorothy Nyembe Community Hall (Ward9),
Verdriet Community Hall (Ward3), Dannhauser Community Hall (Ward2), and Community Hall (Ward 13)
Ward 5 x 1,
Ward 12 x 1,
Ward 4 x 1,
Ward 6 x 1,and
Ward 8 x 1
Sports Fields Emafusini Sportsfield,
Durnacol Sportsfield, and
Dannhauser Cricket Ground
Taxi Ranks Kwamdakane Taxi Rank, and
Dannhauser Taxi Rank
Recreational Parks NONE RECREATIONAL FACILITIES
REQUIRED
1.14 HEALTH FACILITIES
Table.10
Type Of Facility Community Health Center Mobile Clinics
Dannhauser LM (Servicing 13 Wards) 1 36
Dannhauser Municipality has ten clinics that are administered by the Department of Health and one Community Health Centre (CHC) in Dannhauser, which is operational. The CHC is to ensure that health services of a higher degree are accessible and closer to the people. The Department of Health further supports thirty-six mobile clinics in areas where health services are not available. An application of planning standards for health services in the area (one clinic for every 6 000 households or one clinic within a 5km radius) indicates that the Dannhauser municipality area is well provided with clinics and primary health facilities, except for a concern that some of these facilities are mobile. Some of the challenges experienced by the local communities are; The mobile clinics do not have all the necessary medical equipment and medications to treat people who
are seriously ill; The ambulances are few to attend to all emergencies; Some people pass away in their houses due to the late arrival of medical assistance; Not all areas are readily accessible due to a lack of roads and a non-conducive terrain; The mobile clinics have difficulties in reaching various settlements when it is raining due to the muddy
roads as they mainly grave and not in good condition; and Some of the farmers who on farmlands with dwellings on them, prevent the mobile clinics from entering
into their properties to attend the farm dwellers are ill.
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 28
CHAPTER 2: GOVERNANCE
2.1 INTRODUCTION TO GOVERNANCE Governance at the Municipality is made up of political and administrative governance, inter-governmental relations, public participation and corporate governance. Political governance comprises of elected Councillors, Council, Executive Council Committees, and Management Committees. The oversight of governance administration is undertaken through various administrative structure and functionaries under the guidance of the Accounting Officer (Municipal Manager) to enhance effective and efficient service delivery. Dannhauser Municipality is not a Water Services Authority (WSA), this is the function of Amajuba District Municipality, which implements water and liquid sanitation service delivery. The municipality through Intergovernmental relations meets on a regular basis with Amajuba District, provincial and national government departments together with other municipalities through structured meetings guided by the Intergovernmental Relations Act, No.13 of 2005 to enhance coordinated service delivery. Public participation refers involves the Municipality engaging the communities within its area of jurisdiction in the running of its affairs. This takes place through community meetings, izimbizo’s, as well as ward committee and ward meetings. Corporate governance entails transparency, compliance with the rule of law, accountability and upholding of the Batho Pele Principles and undertaking the objects of local government endorsed in section 152 of the Constitution 108 of 1996.
2.2 COMPONENT A: POLITICAL AND ADMINISTRATIVE GOVERNANCE Political & administrative governance at the Municipality comprises of the elected Councillors, Municipal Manager and Senior Managers, respectively; they work together on a day-to-day basis in order to achieve identified service delivery goals and targets.
2.2.1 POLITICAL GOVERNANCE INTRODUCTION TO POLITICAL GOVERNANCE Dannhauser municipality has several political structures which include Full Council, Executive Committee, other Council committees and Committees established to support the Executive Committee. The Municipal Public Accounts Committee (MPAC) which is one of the Council Committees oversees the expenditure of public funds on behalf of Council and thereby ensures accountability of both the Executive Committee and administration. It further considers the Annual Report and provides Council with oversight report and its comments on the Annual Report. To ensure effective oversight the Council has further appointed the Audit Committee, which is a Committee that is made up of private individuals with expertise in the areas of finance, performance management and law to advise Council on the performance of the Executive Committee and administration with regard to financial management, risk management, performance management and legislative compliance. The Political Administrator and Municipal Manager are as depicted below;
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 29
DANNHAUSER LM COUNCILLORS Image.1
DANNHAUSER LM EXECUTIVE COMMITTEE
Image.2
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 30
2.3 COMPONENT B: GOVERNANCE OVERVIEW & COMMITTEES 2.3.1 COUNCIL COMPOSITION
Dannhauser Municipality comprises of 25 councilors (13 ward councilors and 12 Party Representatives
councilors) from various political parties. There are 14 African National Congress (ANC), 8 Inkatha Freedom
Party (IFP), 1 Economic Freedom Fighters (EFF), 1 Royal Loyal Party (RLP) and 1 Democratic Alliance (DA)
councilors.
Table.11: Councilors After August 2016 – Local Government Elections
COUNCILLOR NAME POLITICAL PARTY
1. Cllr Ngubane ZS (Honourable Speaker) ANC
2. Cllr Phakathi JP (Honourable Mayor) ANC
3. Cllr Msibi SD (ExCo) ANC
4. Cllr Ndlovu SN (ExCo) IFP
5. Cllr Nene PP (ExCo) IFP
6. Cllr Sithole SG (Exco) ANC
7. Cllr Dlamini SD ANC
8. Cllr Buthelezi MA IFP
9. Cllr Dubazana XM ANC
10. Cllr Dube NS DA
11. Cllr Nair PG IFP
12. Cllr Hlathswayo NS ANC
13. Cllr Hlathswayo VR IFP
14. Cllr Kumalo NP ANC
15. Cllr Kunene M ANC
16. Cllr Manyati NGR IFP
17. Cllr Mtlaba MN ANC
18. Cllr Mazibuko RN RLP
19. Cllr Mfusi ES ANC
20. Cllr Mkhize MS EFF
21. Cllr Mkhumane MS ANC
22. Cllr Ndaba VM ANC
23. Cllr Ngidi MA ANC
24. Cllr Radebe AN IFP
25. Cllr Sibisi SS IFP
Table.12: Councilors Until August 2016 – Local Government Elections
COUNCILLOR NAME POLITICAL PARTY
1. Cllr Ngubeni ZS (Honourable Speaker) ANC
2. Cllr Phakathi JP (Honourable Mayor) ANC
3. Cllr Ndaba VM (ExCo) ANC
4. Cllr Sibeko MA (ExCo) IFP
5. Cllr Mabanga TV (ExCo) NFP
6. Cllr Nyembe MR ANC
7. Cllr Hlongwane NS ANC
8. Cllr Buthelezi AH ANC
9. Cllr Ndlovu SN IFP
10. Cllr Mhlungu NJ AZAPO
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 31
11. Cllr Mabaso LL ANC
12. Cllr Sithole MP ANC
13. Cllr Buthelezi MA IFP
14. Cllr Radebe AN IFP
15. Cllr Shabalala MB NFP
16. Cllr Majola NM ANC
17. Cllr Ngidi MA ANC
18. Cllr Mdakane HV ANC
19. Cllr Manyathi NGJ IFP
20. Cllr Kunene ES DA
21. Cllr Nene PP IFP
During the year under review, 10 Council meetings were planned of which 8 (ordinary and special) meetings
were held.
2.3.2 GOVERNANCE COMMITTEES
The municipality had established different committees, which assists on the functioning of the Council at
different levels. Status Quo of Governance Committees
Table.13: (Council Committee Members Until Local Government Elections in August 2016)
Committee Name
Member Name Number of
Planned Meetings Number of Meetings
Held
Reason for Deviation
Executive Committee
Cllr Phakathi JP (Mayor)
8 5
Meeting did not quorate due to quorum, and also the other factor was the election which affected
the initially schedule
Cllr Ndaba VM
Cllr Sibeko MA
Cllr Mabanga TV
Corporate Services Portfolio
Committee
Mabanga TV (Chairperson)
8 7
New Council Elected
Nyembe MR
Hlongwane NS
Buthelezi AH
Ndlovu SN
Mhlungu NJ
Technical Services Portfolio
Committee
Ndaba VM (Chairperson)
8 7
New Council Elected
Maboso LL
Sithole MP
Buthelezi MA
Radebe AN
Shabalala MB
Phakathi JP (Ex Officio)
Ngubeni ZS (Ex Officio)
Community Services Portfolio
Committee
Sibeko MA (Chairperson)
8 7
New Council Elected
Majola NM
Ngidi MA
Mdakane HV
Manyathi NGJ
Kunene ES
Nene PP
Phakathi JP (Ex Officio)
Ngubeni ZS (Ex Officio)
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 32
Budget Steering
Committee
Phakathi JP (Chairperson)
2 2
New Council Elected
Ndaba VM
Mabanga TV
Sibeko MA
Nyembe MR
Ngubeni ZS (Ex Officio)
Local economic Development
and Land Resource
Committee
Nyembe MR (Chairperson)
8 5
New Council Elected Sithole MP
Majola NM
Shabalala MB
Kunene ES
Municipal Public
Accounts Committee
Nene PP (Chairperson)
8 8
New Council Elected
Nyembe MR
Shabalala MB
Kunene ES
Mhlungu NJ
Phakathi JP (Ex Officio)
Ngubeni ZS (Ex Officion)
Committee Name
Member Name Number of
Planned Meetings Number of Meetings
Held Date of Appointment
Audit and Performance Management
Committee (made up of independent individuals)
Mr B Mbange (Chairperson) 4 4 2012-2018
Mr S Ngwenya 4 2 2012-2015
Mr TC Ndlela 4 2 2013-2015
Mr SES Ngwenya 4 2 2013-2015
Mr B Dladla 4 2 2013-2015
Mr C Nciki 3 3 2015-2018
Mr M Ishmail 3 3 2015-2018
Miss Z Khanyile 3 3 2015-2018
Miss NR Sikhakhane 3 1 2015-2018
Table.14: (Council Committee Members Appointed Since August 2016 After Local Government Elections)
COMMITTEE
NAME
MEMBERS OF COMMITTEE Number of
Planned
Meetings
Number of
Meetings Held
Reason for Deviation
Executive Committee
Phakathi JP (Chairperson) Msibi SD SG Sithole Nene PP Ndlovu SN
8
3
Other meetings held by the previous Council prior to August 2016 Local Government Elections
Corporative Services Portfolio Committee
Nene PP (Chairperson) Kunene M Radebe AN Buthelezi MA Dlamini SD
8
1
Other meetings held by the previous Council prior to August 2016 Local Government Elections
Engineering Services Portfolio Committee
Msibi SD (Chairperson) Ndaba VM Dubazana XM Mkhize MS Hlathswayo VR Sibisi SS
8
1
Other meetings held by the previous Council prior to August 2016 Local Government Elections
Community Services
Portfolio
Ndlovu NS (Chairperson) Hlatshwayo NS Ngidi MA Dube NS
8
1
Other meetings held by the previous Council prior to August 2016
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 33
Committee Manyathi NGJ Mathlaba MN
Local Government Elections
Municipal Public
Accounts Committee
Ndaba VM (Chairperson) Mkhumane MS Kumalo NP
8
0
Other meetings held by the previous Council prior to August 2016 Local Government Elections
Local Economic Development Resource Committee
Sithole SG (Chairperson) Mfusi ES Mazibuko RN Nair PG Nkhumane MS
8
3
Other meetings held by the previous Council prior to August 2016 Local Government Elections
Performance & Audit Committee
Mbange B (Chairperson) Skhakane N Ncika MC Mohamed I Khanyile ZP
4
2
Other meetings held by the previous Council prior to August 2016 Local Government Elections
Risk Management Committee
Ngwenya SES (Chairperson Nkosi WB (MM) Mohapi DM (CFO) Ndlovu PJ (IDP Manager) Narothum S (Manager Corporate
Services) Naidoo S (Manager Community Services) Luckan A (Internal Audit Executive) Moodely K (Manager Internal Audit)
2.3.3 COMMITTEES TO ASSIST THE EXECUTIVE COMMITTEE The following Committees have been established in terms of section 80 of the Structures Act to assist the Executive Committee:
2.3.3.1 The Corporate Services Portfolio Committee
This Portfolio Committee is charged with the responsibility for efficient and effective Council and Committee support services, efficient and effective human resources management, information and communication technology management and legal services.
2.3.3.2 The Financial Services Portfolio Committee
This Portfolio Committee is responsible for the matters relating to the transparent, efficient and effective management of municipal finances which includes in the main treasury and budget management, supply chain management, revenue and expenditure management, as well as financial control and cash management.
2.3.3.3 The Engineering Services Portfolio Committee
This Portfolio Committee is responsible for municipal infrastructure planning, financing, development and maintenance landfill site management as well as water, sanitation, electricity, roads and storm water provisioning and management.
2.3.3.4 The Community Services Portfolio Committee
This Portfolio Committee is responsible for waste management, libraries, cemeteries and crematoria services, public safety and disaster management as well as traffic law enforcement services.
2.3.3.5 The Planning & Local Economic Development Portfolio Committee
This Portfolio Committee deals with integrated development planning matters, municipal markets, forestry and tourism, local economic development, environmental health as well as human settlements development and management.
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 34
Table.15: Status Quo of Intergovernmental Relations Structures
Committee
Name Purpose Planned Output Actual Performance
1. Mayors Forum To discuss governance issues in the district
Active participation in the District Mayors Forum, and attending all planned and schedule quarterly meetings
One (1) meeting materialized. Some meetings did not quorate due to poor attendance from other family municipalities
2. Municipal Managers Forum
To discuss Administrative issues in the district
Active participation in the District MMs Forum, and attending all planned and schedule quarterly meetings
One (1) meeting materialized. Some meetings did not quorate due to poor attendance from other family municipalities
3. Local Labour Forum
To discuss employee issues
Ten (10) LLF planned for the financial year. (3 in q1; 2 in q2; 2 in q4 and 3 in q4).
Four (4) meetings held.
4. Chief Financial Officers Forum
To discuss the financial matters in the district
Active participation in the District CFOs Forum, and attending all planned and schedule quarterly meetings
One (1) meeting materialized. Some meetings did not quorate due to poor attendance from other family municipalities
5. Corporate Services Forum
To discuss the IGR, Governance and other administrative strategic issues
Active participation in the District CORPS Forum, and attending all planned and schedule quarterly meetings
All quarterly meetings held and attended (4 meetings). Forum fully functional.
6. Community Services Forum
To discuss the matters concerning the Community Services related in the district, for cooperative and alignment
Active participation in the District COMMS Forum, and attending all planned and schedule quarterly meetings
All quarterly meetings held and attended (4 meetings). Forum fully functional.
7. Technical Services Forum
To discuss all Technical Services related issues, Service Delivery, Planning for support and alignment
Active participation in the District TECHS Forum, and attending all planned and schedule quarterly meetings
All quarterly meetings held and attended (4 meetings). Forum fully functional.
8. Planners Forum For coordination of the Planning matters as per
Active participation in the District Planners Forum, and attending all planned and schedule quarterly meetings
All quarterly meetings held and attended (4 meetings). Forum fully functional.
9. IDP District Forum
For planning and alignment on issues concerning the municipalities in the district
Active participation in the District IDP Forum, and attending all planned and schedule quarterly meetings
All quarterly meetings held and attended (4 meetings). Forum fully functional.
10. Agricultural Forum for Local Economic Development (AFLED)
Forum for coordination and alignment on LED
Active participation in the AFLED, and attending all planned and schedule quarterly meetings
Not all quarterly meetings held and attended. Only two (2) meetings materialized. Forum not fully functional.
11. District Technical Advisory Committee (DTAC)
Forum PMS, which is coordinated by the District Municipality and COGTA KZN, PMS Section
Active participation in the DTAC, and attending all planned and schedule quarterly meetings
All quarterly meetings held and attended (4 meetings). Forum fully functional.
12. Internal and Audit Committee Forum
Forum for Internal Audit and Audit Committee coordinated by the District Municipality
Active participation in the District IA and AC Forum, and attending all planned and schedule quarterly meetings
Not all quarterly meetings held and attended. Only two (2) meetings materialized. Forum not fully functional.
13. Disaster Management Advisory Forum
For coordination and management on the Disaster Management issues and alignment
Active participation in the District Disaster Management Advisory Forum, and attending all planned and schedule quarterly meetings
All quarterly meetings held and attended (4 meetings). Forum fully functional.
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 35
2.4 PERFORMANCE & FINANCE AUDIT COMMITTEE
Dannhauser Municipality had in place a joint audit committee, a committee that deals with both financial and
performance management matters. This Committee was shared with the family District Municipality. The
Committee consisted of five (5) independent members as per table below.
Table.16: Audit and Performance Management Committee Membership 2016 (Date of Appointmeny)
Name of Member Position Number of
Meetings Held
Number of Meetings
Each Member Attended Date of Appointment
Mr. B Mbange Chairperson 3 3 2015-2018
Mr C Nciki Member 3 3 2015-2018
Miss Z Khanyile Member 3 3 2015-2018
Mr M Ishmail Member 3 3 2015-2018
Miss NR Sikhakhane Member 3 1 2015-2018
As in the tables above, four (4) audit committee meetings were held in the year under review. It must be noted
that the Municipality was initially in the shared service arrangement on Performance and Financial
Management Audit Committee with the Amajuba District Municipality from 2008 to 2015, and the
Municipality then resolved to terminate the arrangement and establish its own Committee as from 2015
financial year onwards. The new Committee comprises of five members which was appointed for a period of 3
years.
2.5 POLITICAL DECISION-MAKING The municipality has been and is still compliant with the Rules and Procedures of Council and its Committees together with the powers and functions that the Council may delegate and those it may not delegate, and the manner in which the votes that are required when certain matters are to be decided on. All other questions before the Council are decided by a majority of the votes cast and in the case of an equality of votes, the Councillor presiding (the Speaker) exercises a casting vote in addition to a vote he or she has as a Councillor. In making decisions on the following matters, majority votes are required from the number of Councillors, the matters relate to:-
(a) the passing of by-laws; (b) the approval of budgets; (c) the imposition of rates and taxes, levies and duties; (d) the raising of loans; and (e) the rescission of a council resolution; and any other matter prescribed by legislation.
Before the Council takes a decision on any of the following matters it first has to obtain the recommendations of the Executive Committee:-
(a) the passing of by-laws; (b) the approval of budgets; (c) the imposition of rates; (d) the raising of loans; (e) the approval of an integrated development plan for the Municipality and any amendment to that
plan; (f) the approval of a performance management system; and (g) the appointment and conditions of service of the Municipal Manager and a head of department of the
Council.”
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 36
2.6 ADMINISTRATIVE GOVERNANCE INTRODUCTION TO ADMINISTRATIVE GOVERNANCE The roles and responsibilities of the Municipal Manager are comprehensively set out in Section 55 of the Municipal Systems Act and responsibilities of the Municipal Manager as Accounting Officer is set out in Chapter 8 of the Municipal Finance Management Act, 56 of 2003. The Municipal Manager’s office has assumed direct responsibility for Communications and Corporate Strategy as well as the drafting, management and implementation of Council’s Integrated Development Plan [IDP]. The Internal Audit unit is also located in the Municipal Manager’s office and ensures compliance with municipal legislation. In addition there are four Departmental Units that mirror the committee portfolios that also report to the Municipal Manager. These Business Units, each headed by a Senior Manager, ensure that services are delivered to the people within the municipal jurisdiction in fulfillment of the Integrated Development priorities of the Municipality. They are: Municipal Manager Finance & Budget Services; Corporate Services; Planning & Local Economic Development; Technical Services; and Community Services. The municipal manager and his team of executive managers hold weekly Management meetings to discuss key strategic service deliverable matters, and to offer guidance on the achievement of IDP goals.
2.7 COMPONENT C: PUBLIC ACCOUNTABILITY AND PARTICIPATION
2.7.1 OVERVIEW
During the 2016/2017 financial year, the municipality had increased in the number of wards it has, from 11 to 13 wards. The additional two wards was a result of splitting larger existing wards and forming two (2) from the splits. After Local Government Elections in August 2016 and the inauguration of the new council, all ward committee meetings were fully functional by the end of February 2017. The municipality complies with the Municipal Systems Act, 32 of 2000; Sections (5), (16), (17) (18), (19), (20), (21), (22) and (42); and further adheres to Chapter’s (6) & (7) of the MSA. These sections give directives to the municipality to engage with the community within the municipal jurisdiction to participate in the development, implementation and review of the municipality’s performance management system and in setting key performance indicators and performance targets. The municipality takes into consideration the concerns of its local community through each elected ward councilor. Each ward councilor engages with their ward community through “Ward Committee” meetings held on a regular basis. The Municipality aligns is public participation activities in line with the Municipal Structures Act, 117 of 1998, as amended; Sections 73 & 74 have been extracted to shed light on Ward Committees;
Section.73 Establishment of Ward committees (1) If a metro or local council decides to have ward committees, it must establish a ward committee for each
ward in the municipality. (2) A ward committee consists of-
(a) the councillor representing that ward in the council, who must also be the chairperson of the committee; and (b) not more than 10 other persons.
(3) A metro or local council must make rules regulating-
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 37
(a) the procedure to elect the subsection (2) (b) members of a ward committee, taking into account the need- (i) for women to be equitably represented in a ward committee; and (ii) for a diversity of interests in the ward to be represented. (b) the circumstances under which those members must vacate office; and (c) the frequency of meetings of ward committees.
(4) A metro or local council may make administrative arrangements to enable ward committees to perform their functions and exercise their powers effectively. Section.74 (Functions and Powers of Ward Committees) A ward committee-
(a) may make recommendations on any matter affecting its ward- (i) to the ward councillor; or (ii) through the ward councillor, to the metro or local council, the executive committee, the executive mayor or the relevant metropolitan subcouncil; and (b) has such duties and powers as the metro or local council may delegate to it in terms of section 32.
2.8 PROMOTION OF PUBLIC PARTICIPATION MECHANISMS In the promotion of public accountability and participation members of the public are invited to attend all meetings of the Council and its committees and participate through the Mayoral Budget and Integrated Development Plan (IDP) Izimbizo’s. The development of the draft budget is publicized through the Izimbizo’s in order to provide feedback to the community with regards to the implementation of projects in the current financial year and to further seek a clear understanding of the needs of the community in order to provide input for the new financial year. A second Izimbizo is held once the draft budget has been developed in order to inform the public of key elements in the proposed budget and responses to their needs.
2.8.1 PUBLIC MEETINGS 2.8.1.1 COMMUNICATION, PARTICIPATION AND FORUMS The Draft Process Plan was approved by Full Council and published for public comment during the month of July 2016. The Process Plan is a guideline that indicates the different activities and key milestones which are reflected in terms of the IDP review and PMS and Budget implementation, monitoring and evaluation. The municipality has a structured program of public participation. This program is outlined by the Process Plan and forms the basis of the municipal public participation process. The following are forms of citizenry participation that are utilized by the Municipality to ensure the citizen and stakeholders voice are accommodated in the planning, execution and review of the IDP, Budget and PMS processes: Executive Committee Meetings; Full Council Meetings; Intergovernmental Forum Meetings (Sector Departments); Ward Committee Meetings; Management Meetings; Integrated Development Planning Forum Meetings; Local Economic Development Meetings; Various Municipal Support Committee Meetings (Headed by Chairpersons); Izimbizo Public Meetings; Complaints Register; Operation Sukuma Sakhe (War Rooms) Meetings; Youth Forums Meetings; and Elderly Citizens Forums.
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 38
The above various forms of public participation engagements are conducted throughout the year specifically at an operational level and then some of them are organized on a fortnightly, monthly, quarterly and annually as reflected in our Process Plan.
2.9 COMPONENT D: CORPORATE GOVERNANCE 2.9.1 OVERVIEW OF CORPORATE GOVERNANCE The municipality is very strict with regards to Corporate Governance, by ensuring that governance is upheld the municipality thus ensures the proper use of public funds in all its dealings. Compliance in operational activities is applied as follows;
2.9.2 FRAUD AND ANTI-CORRUPTION STRATEGY LEGISLATIVE PROVISIONS Chapter 2 of Section 195 of the Constitution of the Republic of South Africa, Act 108 of 1996 [as amended] which deals with the Bill of Rights. The Constitution describes one of the values of founding provisions as Human Dignity, the improvement of the quality of life of all citizens. Section 195 of the Constitution of the Republic of South Africa, Act 108 of 1996 [as amended] which provides normative basic value principles for public administration including a high standard of professional ethics must be promoted and maintained. In terms of Section 62 of the Municipal Finance Management Act, Act No. 56 of 2003 (MFMA) the Accounting Officer of a municipality is responsible for managing the financial administration of the municipality and must for this purpose take all reasonable steps to ensure that unauthorized, irregular or fruitless and wasteful expenditure and other losses are prevented. The Internal Audit Unit reviews the implementation of the Action plans/ Activities on a quarterly basis and report to the Risk Management Committee and Audit Committee.
2.9.3 RISK MANAGEMENT COMMITTEE - MUNICIPALITY COMPLIANCE
Risk management forms an important part of the upkeep of governance and compliance; this minimizes the levels of financial and asset losses in the municipality’s custodian. All economic and financial transactions must be undertaken in relation to the legislations governing the activities of the municipality. The Accounting Officer and Heads of Departmental Units are responsible for ensuring that operational activities are undertaken legally. The Risk Management Committee is governed by a Risk Management Committee Charter. The Risk Management Committee is a sub-committee of the Audit Committee. Risk Management is a standing item in the Audit Committee Agenda meetings, and the Audit Committee report to Exco on quarterly basis include Risk Management. All reports on Risk Management are also presented to all Portfolio Committees & MPAC. Legislative Provisions In terms of Section 62 (1) (a) to (d) of the Municipal Finance Management Act, Act No. 56 of 2003 (MFMA) the Accounting Officer of a municipality is responsible for managing, the accounting officer of a municipality is responsible for managing the financial administration of the municipality, and must for this purpose take all reasonable steps to ensure—
(a) that the resources of the municipality are used effectively, efficiently and economically; (b) that full and proper records of the financial affairs of the municipality are kept in accordance with any
prescribed norms and standards; (c) that the municipality has and maintains effective, efficient and transparent systems—
(i) of financial and risk management and internal control; and (ii) of internal audit operating in accordance with any prescribed norms and standards;
(d) that unauthorised, irregular or fruitless and wasteful expenditure and other losses are prevented;
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 39
Section 165 of the MFMA requires the internal audit unit to advise the Accounting Officer and to report to the Audit Committee on matters relating to among other things, risk and risk management.
2.9.4 INTERNAL AUDIT UNIT – MUNICIPALITY COMPLIANCE Dannhauser Local Municipality complies with the MFMA Section (165) with regards to governance compliance, the following have been adhered to; (1) Each municipality and each municipal entity must have an internal audit unit, subject to subsection (3). (2) The internal audit unit of a municipality or municipal entity must—
(a) prepare a risk-based audit plan and an internal audit program for each financial year; (b) advise the accounting officer and report to the audit committee on the implementation of the
internal audit plan and matters relating to—
(i) internal audit; (ii) internal controls; (iii) accounting procedures and practices;
(iv) risk and risk management; (v) performance management; (vi) loss control; and (vii) compliance with this Act, the annual Division of Revenue Act and any other applicable legislation; and
(c) perform such other duties as may be assigned to it by the accounting officer.
(3) The internal audit function referred to in subsection (2) may be outsourced if the municipality or
municipal entity requires assistance to develop its internal capacity and the council of the municipality or the board of directors of the entity has determined that this is feasible or cost-effective.
2.9.5 AUDIT COMMITTEE – MUNICIPALITY COMPLIANCE The municipality has an External Audit Committee that ensures governance compliance, this is as per MFMA Section (166). (1) Each municipality and each municipal entity must have an audit committee, subject to subsection (6). (2) An audit committee is an independent advisory body which must—
(a) advise the municipal council, the political office-bearers, the accounting officer and the management staff of the municipality, or the board of directors, the accounting officer and the management staff of the municipal entity, on matters relating to—
(i) internal financial control and internal audits; (ii) risk management; (iii) accounting policies; (iv) the adequacy, reliability and accuracy of financial reporting and information; (v) performance management; (vi) effective governance; (vii) compliance with this Act, the annual Division of Revenue Act and any other applicable legislation; (viii) performance evaluation; and (ix) any other issues referred to it by the municipality or municipal entity; (b) review the annual financial statements to provide the council of the municipality or, in the case of a
municipal entity, the council of the parent municipality and the board of directors of the entity, with an authoritative and credible view of the financial position of the municipality or municipal entity, its efficiency and effectiveness and its overall level of compliance with this Act, the annual Division of Revenue Act and any other applicable legislation;
(c) respond to the council on any issues raised by the Auditor-General in the audit report;
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 40
(d) carry out such investigations into the financial affairs of the municipality or municipal entity as the council of the municipality, or in the case of a municipal entity, the council of the parent municipality or the board of directors of the entity, may request; and
(e) perform such other functions as may be prescribed. Section 78 of the MFMA outlines the general responsibilities of Senior Management and other officials of the Municipality. The responsibilities of these officials have a direct bearing in financial and risk management, governance and systems of internal controls. The MFMA has established the legal framework for risk management in the local government sphere that enforces risk management practice. Risk Management is about managing a potential inability by the municipality to fulfill the requirements of the Constitution. It is for this reason that the Constitution of the Republic of South Africa is the fundamental foundation for risk management.
2.10 SUPPLY CHAIN MANAGEMENT 2.10.1 OVERVIEW OF SUPPLY CHAIN MANAGEMENT (SCM) 1.1 The Municipality’s Supply Chain Management unit is the interdepartmental support unit that ensures that
internal departments procure what is required for use on a monthly basis in order to fulfill service delivery.
1.2 The supply chain management policy for the year 2016/2017 has been in place and is in compliance to SCM Regulation 3 (1) (a). All procurement processes and procedures are adhered to in line with the MFMA and PFMA.
1.3 An SCM Procurement plan was developed and implemented throughout the year and quarterly reports on implementation were submitted to MANCO, Exco and Council.
1.4 The SCM regulations prescribed are complied with through a system of demand, acquisition, logistics, disposal, risk and performance management.
2.11 RISK MANAGEMENT 2.11.1 Risk Management & Performance Management A SCM policy and procedures database that ensures compliance and monitoring of compliance with the SCM regulations and processes has been developed and implemented.
2.11.2 Monitoring and Contract Administration The municipality has some Service Level Agreements (SLA’s) in place with various service provider stakeholders that commenced in 2015/2016. The SLA’s are developed by the Corporate Services Unit and then given to the departmental heads which the service provider will be contracted to. Once the HOD is comfortable with the SLA, the Accounting Officer reviews the SLA based on the “Terms of Reference” agreed with the Service Provider and that would have been adopted by Council prior to appointment. The proper management of ensuring implementation by the service provider is monitored and evaluated by the relevant HOD and then reported to the Accounting Officer. The MSA, 32 of 2000, Section (84) (1), further guides and empowers the municipality on matters of SLA agreements, and reads as follows; “ After a prospective service provider has been selected, the municipality must on the basis of the bidding documents, and any addenda, amendments or variations thereto that were provided to all the bidders, negotiate the final terms and conditions of the service delivery agreement with the preferred service provider and, if successful, enter into such an agreement with the selected service provider on the terms and conditions specified in the bidding documents, as modified or supplemented in the negotiations, if such modifications do not materially affect the bid in a manner which compromises the integrity of the bidding process”.
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 41
The municipality monitors the performance of the contracted service provider in relation to the “Terms of Reference” deliverables. This is done through weekly updates undertaken in MANCO meetings. A written progress report is submitted by the service provider based on the agreed time frames in their respective SLA’s. Each contracted service provider is benchmarked in terms of performance and is reported in the SDBIP and Annual Performance Report. In terms of section 116 (2) & (3) of the MFMA (Contracts and Contracts Management) the accounting officer of a municipality must – The accounting officer of a municipality or municipal entity must—
(a) take all reasonable steps to ensure that a contract or agreement procured through the supply chain management policy of the municipality or municipal entity is properly enforced
(b) monitor on a monthly basis the performance of the contractor under the contract or agreement; (c) establish capacity in the administration of the municipality or municipal entity—
(i) to assist the accounting officer in carrying out the duties set out in paragraphs (a) and (b); and (ii) to oversee the day-to-day management of the contract or agreement; and
(d) regularly report to the council of the municipality or the board of directors of the entity, as may be appropriate, on the management of the contract or agreement and the performance of the contractor.
To enhance contract management, the municipality reports and undertakes the following; Stakeholder Management Engaging with all relevant stakeholders contracted to the municipality during and closure of their contractual obligations. Compliance Monitoring & Reporting Continuous review and reporting on contracted service provider deliverables against set benchmarks by the municipality and compliance with local government legislations and municipal policies; Supplier Performance Regular site visits and attending progress meetings which allows for systematic management of supplier performance, together with transfer of skills from the service provider to the municipal departmental units the service provider is assisting.
2.12 BRIEF OVERVIEW OF THE DEVELOPMENT OF POLICIES DURING THE 2016/2017 FINANCIAL YEAR
The municipality adopted and implemented the following policies; Table.17: Municipal Policies
POLICY DATE OF ADOPTION STATUS
Code of Conduct 2015 Implemented
HIV/AIDS Policy 2015 Implemented
HIV/AIDS Strategy 2007 Implemented
Sexual Harassment Policy 2010 Implemented
Smoking Policy 2013 Implemented
Recruitment Policy 2013 Implemented
Subsistence and Travelling Allowance Policy 2015 Implemented
Overtime Policy 2015 Implemented
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 42
POLICY DATE OF ADOPTION STATUS
Skills Development Policy 2010 Implemented
Mayoral Vehicle Policy 2013 Implemented
Supply Chain Management Policy 2015 Implemented
Employment Equity Policy 2007 Implemented
Property Rates Policy 2009/2010 Implemented
Indigent Policy 2015 Implemented
Subsistence & Travel Policy 2017 (May) Implemented
Value Added Tax Policy 2017 (May) Implemented
Petty Cash Policy 2017 (May) Implemented
Overtime & Standby Policy 2017 (May) Implemented
Expenditure Management Policy 2017 (May) Implemented
Unauthorised, Irregular & fruitless Wasteful Expenditure Policy
2017 (May) Implemented
Commitment Policy 2017 (May) Implemented
Supply Chain Management Policy 2017 (May) Implemented
Appointment of Consultants Policy 2017 (May) Implemented
Rates Policy 2017 (May) Implementation 2017/18
Draft Tariffs Policy 2017 (May) Implementation 2017/18
2.13 MUNICIPAL BY-LAW(S) The municipality currently has one adopted and published by-law, this is the “Animal Pound By-Law”, it is also currently working on other by-laws.
2.14 PUBLIC SAFETY – LAW ENFORCEMENT
The following table highlights polices services data.
Table.18: Police Service Data
Indicator 2016/2017 2015/2016
Number of road traffic accidents 241 241
Number of by-law infringements 1 390 1 391
Number of police officers in the field daily on average 3 3
Number of police officers on duty daily on average 5 4
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 43
CHAPTER 3 SERVICE DELIVERY PERFORMANCE
FUNCTIONAL AREA sdbip PER DELIVERY COMPONENTs
3.1 SERVICE DELIVERY The Local Municipality’s basic services as contained in the Municipal Indigent Policy is intended to provide norms and standards for a program to improve the lives of indigents and to improve access to FREE BASIC SERVICES. The municipality ensures that co-operation along the internal and inter-governmental structures including engagement of the community is center to address the needs of indigent households. The policy in place, thus addresses the delivery of the free basic services. The indigent policy seeks to address the problems and challenges faced by the poor within the jurisdiction. To enhance a better life for affordable basic services, the implementation of the indigent policy as the basis of providing Free Basic Services, the following has been taken into consideration; The high levels of unemployment; High numbers of low income earners below R 2 500 per month; High number of households headed by unemployed females; High number of grant dependents; and Elderly persons headed households. The Municipality’s indigent policy applies specifically to the Free Basic Services programme and incorporates i.e. free basic electricity, free basic refuse removal, while the free basic sanitation and water are implemented by Amajuba District Municipality on behalf of Dannhauser’s Indigent Register.
3.1.1 INDIGENT POLICY/SUPPORT (INCLUDING FREE BASIC SERVICES) The municipality has the an Indigent Policy and register, table below, indicates in summary how it is implemented; Table.19
CATEGORY DESCRIPTION
Property Rates Refuse Electricity
Indigents qualify, like all domestic consumers, for a reduction in the market value of the property as approved from time to time by Council, and as reflected in the applicable tariff register.
Income per household must not be more than R 3 200 per month;
Pensioners qualify for 100 % rebate;
Retired pensioners receiving a monthly income from GEPF, and other sources of above R 3 200 per month only receive 25 % discount; and
Electricity is applicable to whether one fully owns the property or the occupiers of the property who are tenants but receiving income below R 3 200 per month.
The additional submissions by applicants to be considered for registration on the indigent register apart from the above include; Owner and or occupiers of residential property; The applicant must be a South African citizen; The applicant must not be the registered owner of more than one property; The householder must be a resident of and have a registered account with the municipality
The municipality has an indigent policy in place, and has developed an indigent register therefor implementing the policy. The policy is reviewed twice per financial year, it further enables the municipality to provide free basic services to the needy. The municipality collected date on Indigent families as per the municipality’s Indigent Policy; currently the municipality is in the process of reviewing this data to ensure that the correct
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 44
information is captured and the data is updated. The municipality provides free basic services such as electricity, water, refuse and sanitation, however water and sanitation are provided by the Amajuba District Municipality. Electricity is provided by ESKOM, the municipality pays the due allocation to ESKOM as per registered indigent data that is approved by the Municipality. The indigent register allows the municipality to determine the financial needs of basic service delivery service resulting in it being able to develop a Financial Plan and Budget. The constant updating of the register will further allow for reliable cost updating for the free basic services delivery.
3.2 INTRODUCTION ANNUAL PERFORMANCE REPORT The Annual Performance Report (APR) is a legislative requirement which prescribes that the report must be submitted to the Auditor General by the 31st August annually. The Annual Performance Report, amongst other documents, will form part of the consolidated Annual Report of the Municipality which must be submitted to Council by the end of January on an annual basis. The Annual Performance Report 2016/2017 of the Municipality is divided into two (2) broad categories as follows: SECTION ONE: FUNCTIONAL AREA SERVICE DELIVERY REPORTING PER BUSINESS UNIT. SECTION TWO: ANNUAL REPORT OF THE SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN
2016/2017 & ANNUAL REPORT OF THE OPERATIONAL PLAN 2016/2017 During the 2016/2017 financial year, the Municipality developed as part of the reporting process on the SDBIP, a process for reporting against pre-determined objectives and Key Performance Indicators (KPI’s) that are contained in the approved Service Delivery and Budget Implementation Plan (SDBIP). The process is based on predetermined KPIs’ adopted by Council during the 2015/2016 financial year for the 2016/2017 IDP/ Budget/ PMS and SDBIP financial year. These reports and Council resolutions are available for inspection on request. During the 2016/2017 financial year, the Municipality had a S54 Municipal Manager and S56 Managers (HOD – Finance & Budget; HOD – Corporate Services; HOD – Technical Department and HOD – Community Services). The S54 & S56 managers all signed performance agreements as required by local government legislation. The Performance Management System (PMS) is a top layer Score Card which only assesses the performance of the S54 & S56 managers. The Evaluation assessment panels as prescribed by legislation to assess the Municipal Manager and Manager’s reporting directly to the Municipal Manager were constituted and were present during the assessment processes. The Service Delivery & Budget Implementation Plan (SDBIP) 2016/2017 served as a scorecard for performance management, the indicators in the SDBIP were formulated from the municipal strategic objectives and in line with the community’s inputs. In this regard for the 2016/2017 financial year the SDBIP focused on the service delivery indicators and the Operational Plan (OP) 2016/2017 focusing on operational, support and auxiliary services. The SDBIP 2016/2017 incorporated matters of Public Participation (Office of the Speaker, Office of the Mayor & Office of the Municipal Manager), and the following; Finance & Budget Department: (Financial Management, Budgeting (Planning, Implementation & Control),
Cashflow Management, Asset Management, Risk Management, Supply Chain Management, etc) Corporate Services Department: (General Administration, Fleet Management, Ward Committees, Council
Support, Policies & Procedures, Human Resources, etc)
Community Services Department: (Traffic & Parking, Cemeteries, Child Care, Area Based Management, Health and Social Services, Community Development (Parks, Waste Management, Halls, Libraries and Art Gallery) and Public Safety Enforcement and Disaster Management, etc),
Technical Services Department: (Water and Sanitation, Roads and Stormwater, Electricity, Fleet
Management and the Landfill Site) and
Planning & Local Economic Development Department: (Local Economic Development, Town Planning and Environmental Management & Human Settlements).
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 45
It also included are the Legislated Performance Indicators as regulated by the National and Provincial Departments of Cooperative Governance and Traditional Affairs (CoGTA). As prescribed by legislation, the Municipality must set and monitor key performance indicators of all municipal entities.
3.3 HIGH LEVEL PERFORMANCE OF THE MUNICIPALITY FOR THE 2016/2017 FINANCIAL
YEAR 3.3.1 ASSESSMENT METHODOLOGY
The municipality has an overall assessment of actual performance against targets set for the key performance
indicators as documented in the SDBIP is illustrated in terms of the following assessment methodology.
Table.20: Assessment Methodology
Colour Category Explanation
KPI not yet measured KPI's with no targets or actual results for the selected period
KPI not met Actual vs. target less than 75%
KPI almost met Actual vs. target between 75% and 100%
KPI met Actual vs. target 100% achieved
KPI well met Actual vs. target more than 100% and less than 150% achieved
KPI extremely well met Actual vs. target more than 150% achieved
3.3.2 KEY PERFORMANCE INDICATORS COMPARISON 2015/2016 VS 2016/2017 Figure.13
Total KPI’s: In 2015/2016 was 163, while in 2016/2017 they total 181, as per the six (6) National KPA’s.
The Increase is attributed to a greater demand by the communities to receive service delivery in various economic and social arenas.
KPI’s Achieved: In 2016/2017 the total achieved KPI’s are 146 up from the 2015/2016 KPI’s of 104 achieved, which was an upward trend of 42 KPI’s successfully achieved.
KPI’s Almost Met: In 2016/2017 a total of 7 KPI’s were Almost Met, while in 2015/2016, 28 KPI’s were Almost Met, the drop in KPI’s almost met by 20, is due to a high number of achieved KPI’s;
KPI’s Well Met & Extremely Met: In 2015/2016, Well Met and Extremely Met KPI’s were 9 and 3 respectively, totaling 12, however none were recorded in 2016/2017, management had a high number of KPI’s to address in 2016/2017 and was ensuring that all KPI’s receive equal attention. This is opposed to the lower number of KPI’s in 2015/2016.
104
28
9 3 19
146
7 0 0
28
0
20
40
60
80
100
120
140
160
Achieved Almost Met Well Met Extremely Well Met Not Met
2015/2016 2016/2017
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 46
KPI’s Not Met: In 2016/2017, KPI’s not met were 28 in total compared to the 19 in 2015/2016. The upward trend was mainly due to KPI’s that involved Sector Department Projects and others negatively affected by relocation of Community Members who were spearheading social welfare projects in wards.
Figure.14: 2016 / 2017 - KPI % (Met/Not Met/Almost Met)
3.4 BASIC SERVICE DELIVERY KEY PERFORMANCE INDICATORS – DANNHAUSER As indicated in the figure below, the municipality recorded twenty-two (22) basic service delivery KPIs’, within the 22 KPIs’, there are fifteen (15) capital project KPIs’ for 2016/2017 financial year.
Figure.15: Dannhauser - Total KPI’s Per Key Performance Area – 2016/2017
Basic Service Delivery KPI’s are mainly concentrated in the Technical Department and some with the Community Department of the municipality. In general these include the development of infrastructure, removal of solid waste, provision of electricity, provision of water & sanitation and ensuring of the up-keep of the public areas (cemeteries, parks, bus & taxi ranks, public road side clean ups, etc).
3.5 CAPITAL PROJECTS 2016/2017 – DANNHAUSER LOCAL MUNICIPALITY Dannhauser has a small municipal jurisdiction hence there are fifteen (15) capital projects, some are directly implemented through the municipality’s “Municipal Infrastructure Grant – MIG” funding, through external funding sourced from other government stakeholders through comprehensive business plans and some being implemented by sector departments based on the mandates of the sector departments. The capital projects that have been undertaken during the 2016/2017 financial year are as follows; Building of new municipal offices; - Design Plans approved; Phase.1 Buhlebomzinyathi Housing Project; - 90 houses planned for development, only 10 built;
81%
15% 4%
Key Performance %
KPIs Met KPIs Not Met KPIs Almost Met
0
20
40
60
80
100
MunicipalInstitutional
Transformation& Management
Basic ServiceDelivery
Local EconomicDevelopment
GoodGovernance &
PublicParticipation
Environmental& Spatial
Management
MunicipalFinance
Viability &Management
19 22 17
93
8 22
Total KPI's Per KPA
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 47
Phase.2 & 3 Buhlebomzinyathi Housing Project; - Stage 2 development approved as planned; Dannhauser Housing Project; - Stage 2 development approved as planned; Stein Drive Inn Housing Project; - No development due to delays by Human Settlements; Strijbank Rectification Housing Project; - No development due to delays by Human Settlements; Housing Development – Disaster relief; - 15 houses built as planned; Construction of Community Hall; - 1 Community Hall built in Ward.2 full constructed as planned; Construction of New Taxi Rank; - No development occurred due to the late appointment of a qualified
service provider; Rural Road Construction; - 8 km constructed and yet 4 km was planned for; Urban Road Construction; - 2 km constructed as planned; Electrification of Household In-Fills; - 623 households electrified and yet 1 052 houses had been planned
for, the failure to meet the target was due to a shortage of meters from Eskom; Upgrading & Maintenance of Street Lights; - 967 Street lights maintained as planned; Jojo Tanks Implementation to households; - 11 Jojo tanks and stands delivered and erected to
households without sources of water; and Provision of Mobile Child Care Facilities; - 3 Mobile Child Care facilities delivered.
3.6 GRAPHICAL REPRESENTATION OF ACHIEVEMENT, ALMOST ACHIEVED AND NON-ACHIEVEMENT – CAPITAL PROJECTS
Figure.16
It is clear from the above that the municipality is making strides with regards to achieving targets it had set; 67 % Capital Projects Achieved; 27 % Capital Projects Not Achieved; and 6 % Capital Projects Almost Achieved. Table.21: Capital Spending on 5 Largest Projects
Description
2016/2017 2015/2016
Budget (R)
Expenditure (R) % Budget
(R) Expenditure
(R) %
1. Electrification – Infills 0 0 % 18 151 904 18 047 199 99%
2. Municipal Infrastructure Grant
20 697 960 21 488 884 100% 20 422 000 20 422 000 100%
3. Small Town Rehabilitation Grant
4 834 960 4 834 960 100% 25 000 000 5 233 264 21%
4. Roads – Rural & Urban 16 374 642 13 374 692 82% 8 552 000 7 329 341 86%
5. Building of New Offices 3 000 000 3 000 000 100% 2 000 000 973 003 49%
Total R 44 907 562 R 42 698 536 95% R 74 125 904 R 52 004 807 70%
The funds listed in table.21 above were provided for through the MIG budget in the 2016/17 financial year.
Achieved 67% Almost Achieved
6%
Not Achieved 27%
BSD CAPITAL PROJECTS 2016/2017
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 48
Figure.17
Map.3: Location Of Capital Projects
3.7 OPEFRATIONAL PROJECTS 2016/2017 – DANNHAUSER LOCAL MUNICIPALITY The municipality’s operational projects differ from the capital projects, these incorporate the projects undertaken on a day to day basis in fulfillment of set annual KPIs’. Most of the operational projects are encompassed with the Technical and Community Departments. The projects impact on service delivery aspects to the various communities within the jurisdiction. The seventeen (17) operational projects indicated are those that directly and indirectly affect the community within the jurisdiction and these are as follows; Number of Households serviced with weekly refuse removal; - 1704 planned, all achieved; Number of Businesses serviced with weekly refuse removal; - 456 planned, all achieved; Number of small holdings in the outlying areas of Dannhauser CBD serviced with weekly refuse removal;
- 12 136 planned and achieved; Number of households with access to free basic services refuse removal; - 452 planned, all achieved; Number of roadblocks; - 15 planned per week, all achieved;
20 422
5 233
7 329
973
18 047
20 698
4 835
13 375
3 000
0 0
5000
10000
15000
20000
25000
Municipal InfrastructureGrant
Small Town Rehabilitation Roads (Rura & Urban) Building New MunicipalOffices
Electrification In-Fills
2015/16 2016/17
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 49
Number of jobs created through EPWP; - 143 planned, all achieved; Number of jobs created through CWP; - 1 100 planned, all achieved; Number of students sponsored through bursaries; - 13 planned, all achieved; Number of graduates placed in different companies; - 11 planned, all achieved; Number of meetings held for senior citizens; - 4 planned, none achieved; Number of events held for senior citizens; - 1 planned, and achieved; Number of meetings held for children, women & disabled persons; - 4 planned, none achieved; HIV / AIDS community meetings and programs; - 4 planned, none achieved; Umkhosi woMhlanga meetings; - 1 planned and achieved; AFLED meetings attended; - 4 planned and achieved; Ward Committee meetings held; - 52 planned and achieved; and Animal Pound By-Law Gazetting; - Planned for gazetting by 30 November 2016, and achieved. Out of the seventeen (17) projects, 14 were achieved and 3 were not achieved. The projects not achieved was as a result of either community members who were part of the committees having relocated thus causing no quorum for any decisions to be undertaken. The municipality has thus undertaken to aid the community members to form new committees so that programs can be rolled out. GRAPHICAL REPRESENTATION OF ACHIEVEMENT, ALMOST ACHIEVED AND NON-ACHIEVEMENT – OPERATIONAL PROJECTS Figure.18
3.8 MEASURES UNDERTAKEN AS PER S46 OF THE MUNICIPAL SYSTEMS ACT TO IMPROVE PERFORMANCE
During the 2016/2017 financial year a number of measures were undertaken as per S46 of the Municipal Systems Act to improve the overall performance of the Municipality in order to ensure that the municipality strives to obtain a clean or unqualified audit. The municipality adopted the “SMART” principle in developing its Service Delivery Budget and Implementation Plan 2016/2017 KPIs, and in so doing, the number of KPIs’ increased from 163 in 2015/2016 financial year to 181 in 2016/2017 financial year. The increase was due to additional service delivery requirements by the community, and this led management to strategically breaking down each delivery requirement so that implementation can be monitored and evaluated per KPI. It is important to note that, as much as the overall achievement of KPIs’ was high in 2016/2017 financial year, management and staff worked relentlessly as there is a shortage of staff within the structures of the municipality. The Portfolio’s of Evidence to substantiate the achievement of KPIs’ are available per quarter per departmental unit as per the SDBIP quarterly objectives. To increase the level of performance by the municipality, the following actions were undertaken;
82%
16%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
Achieved Not Achieved
OPERATIONAL PROJECTS 2016/2017
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 50
MEASURES UNDERTAKEN TO IMPROVE PERFORMANCE IN THE 2016/2017 FINANCIAL YEAR Table.22
NUMBER DEPARTMENT RESPONSIBLE
PERSON RESPONSIBLE
ACTION TAKEN STATUS REASON FOR DEVIATION
CORRECTIVE MEASURE
1 Office of the Municipal Manager
Mr W.B Nkosi (MM)
Upon the completion of the 2015/16 Audit by the Auditor General (A.G), the Office of the MM conducted a review of the SDBIP & OPMS and rectified the findings presented. In the 2016/17 financial year, the KPA’s were aligned to the IDP Municipal Strategic Objectives and the KPI’s were drawn from the identified Objectives, ensuring that there were deemed SMART (Specific, Measurable, Attainable, Realistic and Time Specific. The report review by Internal Audit noted areas to be addressed and these have been addressed.
Completed N/A N/A
2 Office of the Municipal Manager
Mr W.B Nkosi (MM)
The MM has set up controls to ensure that the monthly and quarterly reporting are in line with the SDBIP. The MM has instituted an Action Plan for financial and non-financial activity reporting in line with Performance Management KPI’s and through Steering Committees.
Completed N/A N/A
3 Office of the Municipal Manager
Mr W.B Nkosi The Municipality is complying with the Municipal Systems Act, the Act provides that quarterly reports based on the SDBIP must be produced to bench mark performance in achieving the targets. In ensuring that this legislative prescriptive is attained, the municipality through its MANCO and EXCO meetings review each department’s performance, recommendations for corrective measures are made were targets are not being met. The meetings have made it possible for the SDBIP & Operational Performance (OP) to be attained. The MM and all respective Heads of Departments (HOD’s) are involved in the process and meetings.
Completed N/A N/A
4 Internal Audit Once the SDBIP, OP, performance assessments and reports have been completed, they are forwarded to the Internal Audit unit for auditing. The findings are then presented in the Internal Audit findings and the submitted to Management for comments.
In Progress N/A N/A
5 IDP Manager & PMS
Mr P.Ndlovu The IDP Manager who is responsible for the PMS due to short staffing in the organization, ensures that there is continuous improvement on compliance of the SDBIP and OP, and that all legislative prescripts are abided to.
In Progress N/A N/A
6 Office of the Municipal Manager
Mr W.B Nkosi The MM is continuously providing a strategic oversight of compliance, and has recommended that training on how to develop KPI’s using the SMART Principle, how POE files are correctly updated with supporting documentation as per the SDBIP is undertaken.
In Progress N/A N/A
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 51
SECTION 1: FUNCTIONAL AREA SDBIP REPORTING PER BUSINESS UNIT 3.9 COMPONENT A: INFRASTRUCTURE SERVICES INTRODUCTION TO WATER SERVICES Amajuba District Municipality is the Water services Authority over Dannhauser Local Municipality, whereby this Water Services Authority was empowered to perform the functions and exercise the powers referred to in Section 84(1) (b) & (d) of the Municipal Structures Act (117 of 1998) which provides for the provision of potable water supply and domestic waste-water & sewage disposal systems sanitation systems. In terms of Section 11 of the Water Services Act (108 of 1997), every Water Services Authority is obligated to ensure the adequate sustainable access to water and sanitation to all consumers within their area of jurisdiction. The authority of the District Municipality is further enshrined in the Constitution 108 of 1996, Section 156 & 229, and read in line with the Municipal Structures Act (117 of 1998) section (83) (3). Dannhauser Local Municipality integrates with the District Municipality through the Intergovernmental Relations Act, through the obligations to be fulfilled by the District in the Structures Act, Section (83)(3) (a) to (d), but Dannhauser has no authority to undertake any implementation of water & liquid sanitation services to households, businesses, and the rest of the community. All licensing of water and liquid sanitation related activities for Dannhauser are undertaken by the District.
3.9.1 ACHIEVEMENTS WATER Piped Water Inside Dwelling: By 2016, 14 769 out of 20 844 households in Dannhauser municipality had
piped water inside their dwelling units, this was a significant jump from the approximately 11 100 households in 2011; and
Standpipes: Amajuba District Municipality, through the drought relief programme, has implemented some standpipe projects in the areas of Steildrift (Annievale, Kiel Keel and Nelly valley), Emfundweni, Fairbreeze, Eastbourne Farm Extension and Ubuhlebomzinyathi
Figure.19: Household Water Sources
Stats SA: Census 2016
14 769
3 091
313 165 106 179 145 1 575
501
Water Sources
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 52
3.9.2 WATER QUALITY & COMPLIANCE DANNHAUSER – 2016/2017
3.9.2.1 WATER QUALITY PERFORMANCE – WWTP – 2016/2017 Table.23
3.9.2.2 POTABLE WATER QUALITY – 2016/2017
Table.24
3.9.2.3 SANS 241:2011 PERFORMANCE INDICATORS (AMAJUBA WSA) – DANNHAUSER LOCAL MUNICIPALITY
A total of 68 samples were submitted to the lab for analysis, all of the samples were for compliance purpose. The results in table.25 indicate that no microbiological failures have been experienced in the potable water supplied within the three areas indicated;
Amajuba WWTP Non-Compliant variables to DWAF General Effluent Standards
Sample /
Sample Point
COD Suspended
Solids Ammonia Nitrate Phosphate E. Coli
Durnacol 4/4 Compliant 4/4 Compliant 4/4 Compliant 2/4 Compliant 3/4 Compliant
2/4 Compliant
AMAJUBA WSA – DANNHAUSER LOCAL MUNICIPALITY
Water Purification
Works
Compliance with
SANS 241:2011
Constituent
Variable for
Meeting
Standard
No of
samples
tested
No. of samples
failed Reasons for failure Action Taken
Waterval Prison Reservoir / Alcockspruit / Header Tanks
√
x
√
Turbidity >1
NTU
12
1
All the failures were turbidity
failures at various points.
Chlorine dosage at
the storage reservoir
should be increased.
Dannhauser √ x (Op) √ Turbidity >1
NTU 20 14
The samples failed on operational
limit turbidity of 1 NTU but
complied with the aesthetic turbidity
of 5 NTU.
Durnacol √ x (Op) √ Turbidity >1 12 6 The samples failed on operational
turbidity of 1 NTU.
Communication with
the reticulation points
should be made to
curb the failures.
Hattingspruit Reservoir / Reticulation
√
x
√
Turbidity
>1NTU
8
3
1turbidity failure which compiled
with the aesthetic compliance of 5.
Investigate if there is
a water storage before water gets to
the tap.
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 53
Table.25
WTP & Supply
Areas
Risk defined
health (Acute or
Chronic)
Risk defined
Operational (Final to
Distribution)
Acute Health - 1
Microbiological
(E. coli)
Acute Health
Chemical
Chronic Health
Chemical
Aesthetic
Hattingspruit 100%
63% 100%
100%
100%
100%
Dannhauser 100% 25% 100%
100%
100%
100%
Durnacol 100% 33% 100%
100%
100%
100%
3.9.2.4 Planned Water Supply Activities To Dannhauser Households – Amajuba District Water Supply Master Plan Implementation – 2016/2017
Table.26
Water Uses By Sector Water Loss due to leaks Water Infrastructure Repairs & Maintenance
Town / Area Name Raw Water Source
Water Treatment
Works
Present Demand Ml/day (includes Buffalo Flats
Water Scheme Completed 2014, allowed for 150l/d
household standpipes and house connections, 30% for
losses & commercial)
Future Demand Ml/day (includes Buffalo Flats Water Scheme Completed, allowed
for 360l/d, household standpipes and house
connections, 30% for losses & commercial)
Dannhauser including Emadlangeni
Ntshingwayo Dam
Dannhauser WTW
1000 1151
Durnacoal Ntshingwayo Dam
Durnacoal WTW 0,852 0,852
Hattingspruit Tom Worthington Dam
Biggarsberg 0,174 0,174
Alcockspruit/ Koppie Alleen
Ntshingwayo Dam
Ngagane WTW 0,111 0,267
Buffalo Flats Ntshingwayo Dam
Ngagane WTW 1,415
3,397
Ngagane (part of Buffalo Flats)
Ntshingwayo Dam
Ngagane WTW 1,800 4,321
Total 5,353 10,161
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 54
3.9.2.5 PROPOSED WATER INFRASTRUCTURE DEVELOPMENT IMPLEMENTED – DANNHAUSER LOCAL MUNICIPALITY (AMAJUBA DISTRICT WATER SERVICE PLAN)
The proposed regional scheme will require:
The upgrading of Ngagane WTW by 5 Ml/day plus growth for Dannhauser Municipality;
A new pump station to pump water from Ngagane WTW to a new reservoir near Dannhauser;
A 27 km long rising main from Ngagane WTW to the new Reservoir near Dannhauser;
A new 7,5 Ml reservoir near Dannhauser;
A new 6 km long gravity main between the new reservoir near Dannhauser and the existing Dannhauser
and Durnacol Reservoirs; A new 14 km long gravity main from the new Reservoir near Dannhauser to the Annieville Reservoir in
Buffalo Flats; and A new 8 km long gravity main to Hattingspruit (this main will continue for a further 16 kms on to Dundee).
3.9.2.6 SANITATION SERVICES Liquid sanitation is undertaken by Amajuba District Municipality, and the funding portion which is used for maintenance and infrastructure development is transferred from Treasury to the District on behalf of Dannhauser. The key initiative is to provide basic sanitation to formal and informal areas and the appropriate sanitation services to low, middle and high income communities. Not all communities can have water borne sewerage because of geographic setting. Dannhauser has informal households in deep rural areas and these rely on ventilated pit-latrines and not reticulation systems. The dispersion of the households makes it impossible to connect reticulation systems, and hence standalone pit latrines are cost-effective. As Per Census 2016 data, about 2 666 flush toilets are connected to a sewerage system and septic tank. This is negligible adjustment upwards from 2 341 in 2011. The greater population utilizes Pit Latrine toilets without ventilation, this is highly evident in the rural cluster settlements.
3.9.2.7 SOLID WASTE MANAGEMENT This is the responsibility of the municipality. Solid waste management is funded through the Equitable Share Allocation grant by Treasury through the Division of Revenue Act. A challenge however still remains, as the allocation for solid waste management did not meet the current levels of demand in 2016/17 financial year.
3.9.2.7.1 ACHIEVEMENTS 2016/2017 – SOLID WASTE MANAGEMENT 1 704 Households serviced weekly; 456 Businesses serviced weekly; 12 136 Small holdings outlying Dannhasuer CBD / Urban Areas serviced weekly; and 452 Indigent Households serviced weekly.
3.9.2.7.2 Solid Waste Management Equipment
Table.27: Equipment Used For Solid Waste Management
RESOURCE QUANTITY ACTIVITIES WORK SCHEDULE
Refuse truck- NDH 1377 1 Refuse collection in Wards According to work schedule
Massey Fergusson Tractor- NDH 2006
1 Cut grass (connected with slasher) Daily
Fiat tractor- NDH 1282 1 Transports skip bins Daily
Front end loader- NDH 1158 1 Compacts waste at the landfill site Daily
Isuzu bakkie- NDH 2479 1 Supervision Daily
Skip Bins 60 Waste collection Daily
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 55
3.9.3 GRASS CUTTING Dannhauser as part of its solid waste program through the use of EPWP and CWP participants, undertakes grass cutting in public areas and disposes of the grass. In the financial 2016/2017, a total of 143 jobs were created through EPWP and 1 100 through CWP. The following was achieved in 2016/17;
3.9.3.1 GRASS CUTTING SCHEDULE
Table.28
GRASS CUTTING DAYS ACTIVITY AREA
MONDAY Grass Cutting Newtown/White City
TUESDAY Grass Cutting Southpark/Emafusini Area
WEDNESDAY Grass Cutting Durnacol (No.7, No.3, Jacaranda, Targo Village, Tawain And Skomplaas)
THURSDAY Grass Cutting Hattingspruit (Ramaphosa Area And Central)
FRIDAY
Grass Cutting Dannhauser (Cbd, Cemeteries And Sportsfield)
TUESDAY Household And Business Hattingspruit & Koppie Allen
WEDNESDAY Household Durnacol & Kwamdakane
THURSDAY Household Dannhauser
FRIDAY Household And Business Dannhauser & Emafusini
3.9.3.2 NUMBER OF TIMES GRASS CUTTING OCCURS IN A MONTH
Table.29
AREAS HOUSEHOLD BUSINESS Dannhauser Town 553x4 =2212 80x8 = 640
Hattingspruit 51x4 = 204 13x4 = 52
Durnacoal 576x4 = 2304 6x4 = 24
Emafusini 510x4 = 2040 8x4 = 32
Total= 6760 Total= 748
GRAND TOTAL= 8256
3.9.3.3 EQUIPMENT USED FOR GRASS CUTTING
Table.30 RESOURCE QUANTITY ACTIVITIES WORK SCHEDULE
Massey Fergusson Tractor- NDH 2006
1 Cut grass( Connected with slasher) Daily
Foton tractor 1 Cut grass ( Connected with slasher) Daily
UD truck- NDH 2539 1 Transports workers (Grass cutting) Daily
Isuzu bakkie- NDH 2479 1 Supervision Daily
Brush cutters (STHL) 29 Grass cutting Daily
Self-Propelled Mowers (Kudu)
4 Grass cutting (Pavements and flat area) Daily (Seasonal)
Ride-on Mower 1 Grass cutting (Sport-fields and flat areas Daily ( Seasonal)
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 56
3.9.4 ELECTRICITY
INTRODUCTION TO ELECTRICITY Dannhauser Municipality is not a licensed electricity generator, transmitter or distributor. It does not own electrical infrastructure nor does it generate any income from the sale of electricity. Eskom is the sole service provider which undertakes these functions on behalf of the municipality. No customer accounts are held by the municipality on behalf of Eskom apart from the account that the municipality buys its own electricity for its own usage. Eskom has mandate to provide electricity and electrical infrastructure based on the recent legislation which includes the Electricity Amendment Acts 1989; 1994; 1995; and the Electricity Regulation Act 2006. As the municipality does not purchase and sale electricity on behalf of Eskom, Eskom has electricity sales outlets through various shop outlets within the Dannhauser CBD and also through small spazza shops / tuck shops within rural areas outside of the CBD but within the municipal jurisdiction. The Eskom Electricity Unit substation supplies electricity to the CBD, Industrial Area and households. In the 2014/2015 financial year, the municipality received funding of R8 000 000 from KZN COGTA to eradicate this backlog. The municipality had also availed R11 000 000. For the 2015/2016 financial year, COGTA allocated a grant funding of R 5 000 000 and the Department of Energy set aside R32 000 000 which was directly allocated to ESKOM and is utilized on a phased out yearly basis. The municipality through its Technical Department undertakes the implementation of electrification in-fills with regards to households as agreed with Eskom, it then transfers the in-fills to Eskom.
3.9.4.1 CHALLENGES
There is a high backlog on maintenance, refurbishment and upgrade of the Primary network, Secondary substations, Overhead lines and Cables, thus contributing to unplanned outages and more funding is required to address these challenges. Overloaded networks and illegal connections are contributing to the high number of replacement of equipment that has blown up; this is further exacerbated by weather elements such as heavy rainfalls with high lightning strikes. Durnacoal urban residential a once owned mining residential area, has had a high number of cable thefts in the past due to buildings left unoccupied, however since the electrical infrastructure is owned by Eskom, replacements of the cables have occurred and an improved reduction in theft has occurred, as the residents have been sensitized on the importance of ensuring proper infrastructure security as it affects their daily lives. Not all residential areas have access to electricity; this is attributed to their geographical setting. The areas in deep rural heavily depend on other forms of energy such as coal, paraffin, wood, candles, etc, apart from electricity. The main constraint is the high capital costs that will be incurred by Eskom if it was to erect bulk electrical reticulation infrastructure to rural households that are highly scattered in areas that are less accessible are that are a considerable distance from their substations. Another major challenge that exits within the jurisdiction is customer affordability of the electricity. Eskom has mitigated this challenge by replacing customer monthly usage accounts with prepaid meter systems. In some instances Eskom has had a challenge in implementing housing meters as there has been a tremendous shortage of the meters from Eskom itself. In 2016/17 the municipality had to electrify 1 052 households but only ended up electrifying 623 households and this resulted from a shortage of meters that had to be supplied by Eskom.
3.9.4.2 PRIMARY NETWORK
Eskom is however undertaking connections of households to primary networks (132kv towers, etc). It is important to note that there are areas within the urban cluster that have new housing developments which have to be connected to the main primary network. The municipality through its MIG funding does enable the newly developed houses to be connected to the primary network. These are termed electrical in-fills. In 2016/17 a total of 623 households new and existing that were in urban areas were connected to the primary
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 57
network. This was funded by the municipality and approved by Eskom. Eskom will further oversee the maintenance on an on-going basis as the electrification in-fills infrastructure has been handed over to Eskom.
3.9.4.3 SECONDARY MAINTENANCE
In 2016/17 maintenance has been done by Eskom on the Secondary substations, but due to the limited number of contractors on existing contract for maintenance, there is huge backlog that still needs to be addressed.
11kV OVERHEAD LINE MAINTENANCE The number of wooden poles supporting electrical cables that are posing a risk and they need urgent attention. Eskom has a maintenance plan that will be implemented to ensure that they are replaced.
132 kV OVERHEAD LINE MAINTENANCE Eskom is undertaking the use of traditional visual and advanced technology inspections with the use of a Helicopter to take photos of the towers and undertake repairs where necessary.
CABLES Many of the cables are old and overloaded. Currently the network is undergoing refurbishment and modifications with installation of new 630mm² single core cables and the establishment of distributor substations.
STREET LIGHTING The municipality in 2016/2017 has undertaken the maintenance of 967 streetlights.
3.9.4.4 ELECTRICITY FOR COOKING, HEATING AND LIGHTING – 2016/2017
Dannhauser Municipality became the first municipality in the country to electrify all households within its area of jurisdiction. About 80.7% of the population within the municipal area uses electricity for lighting, cooking and heating purposes. Coal is still used substantially for cooking and heating purposes. A shift away from this resource is needed due to its unsustainable nature. The various forms of energy used by the community other than electricity reflect as follows; Gas; Paraffin; Wood; Coal; Animal Dung; and Solar.
3.9.5 ROADS
3.9.5.1 INTRODUCTION TO ROAD TRANSPORT
This component of the report falls under the Technical & Engineering Infrastructure Services Department. It deals with the following: • Planning, Development and Maintenance of Municipal roads and stormwater infrastructure; • Transportation Planning, Traffic Engineering issues, Road Safety and Public Transport issues; • Planning, Development and Maintenance of Municipal Buildings; and • Planning, Development and Maintenance of pedestrian and vehicle bridges
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 58
3.9.5.2 INTRODUCTION TO ROADS
The Roads section continues to address the backlog of gravel roads. An attempt is made every year to upgrade 10 to 20 km of gravel roads, primarily funded by the Municipal Infrastructure Grant transferred from Cogta-Kzn. This is due to a larger population density situated in the rural areas of the municipality and thus enabling ease of access to and from these areas. Although there are tarred roads within the urban areas (CBD and some residential areas), the municipality tries to address a minimum of 2 km per financial year, but the low revenue generating activities and low equitable share allocation grant component pose a huge major challenge. Department of Transport does have its own roads within the jurisdiction and does rehabilitate them on a year basis, and while district owned roads do exist, the District has not upgraded or maintained any roads. In 2016/2017, the municipality undertook the following; Patching of potholes and resealing of cracked tarred roads by Department of Transport R621; No District roads maintenance by Amajuba District Municipality; No urban roads upgrades in 2016/17, but cleaning of stormwater systems by the municipality,
rehabilitation of 2km urban road CBD deferred to 2017/18; and 8 km of Rural Roads upgraded in Wards 10 & 11 by the municipality, R 13 374 642.00 was utilised. The Roads (urban and gravel) are maintained and upgraded through a five (5) years plan that is in place, and in 2016/2017, the municipality reviewed its Operations & Infrastructure Assets Management Plan (incorporating Roads & Stormwater Systems) for the next 5 years and has started implementing the plan. This is in a bid to enhance the economic life span of all its infrastructure assets utilizing a proactive and preventative program.
3.9.5.3 CHALLENGES ROADS - 2016/2017
A lack of funding to upgrade urban residential tarred roads; A lack of sidewalks in residential areas; A lack of sidewalks in CBD; Intersections where informal trading is taking place; and A lack of sidewalk maintenance
3.9.5.4 COUNTERMEASURES TO ADDRESS CHALLENGES
Municipality developed business plan and submitted for funding to rehabilitate tarred roads in 2016/17.
IMAGE OF TARRED ROAD IN URBAN RESIDENTIAL AREAS Image.3
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 59
3.9.6 TRANSPORTATION PLANNING
3.9.6.1 INTRODUCTION TO TRANSPORTATION PLANNING
Transportation Planning is crucial in planning sustainable developments and ensuring accessibility for all. The Transportation Planning Section is responsible for meeting the directives set out at all spheres of Government. The key principles that we address as a Section are: i. Type of Mobility & Land use; ii. Urban traffic Congestion; iii. Urban & Rural Road Efficiency iv. Road Safety; v. Storm water systems management & efficiency; and vi. Accessibility due to road network systems
3.9.6.2 ROAD TRANSPORTATION PLANNING OBJECTIVES
i. Evaluation and assessment of transport facilities; ii. Planning, co-ordination, facilitation, provision, monitoring and regulation of efficient, effective public
transport services and facilities within a balanced market demand and supply framework for all private and public transport users; and
iii. Provides effective traffic management, control and safety through co-ordinated planning and maintenance programmes.
3.9.6.3 STAKEHOLDERS
i. Municipality; ii. Department of Transport; iii. Amajuba District Municipality; and iv. Community.
3.9.6.4 STORM WATER
This component falls under the Roads & Transportation functionality, it is part of the technical department’s responsibilities to ensure that there is no flooding on roads due to efficient and effective storm water systems that allow for an ease in high volumetric flow of water. The municipality through the use of its EPWP and CWP participants cleaned 15 km of storm water drainage systems within the urban area in 2016/2017. Although this was just a cleanup, there is a need to increase the capacity of the systems. The cleaning was done to avoid further deterioration of the tarred roads that are already requiring major upgrades. The over-flooding of the drainage systems had also caused the roads to be slippery and become a hazard to vehicles, cyclers and pedestrians.
3.9.6.5 FLEET MANAGEMENT
3.9.6.5.1 INTRODUCTION TO FLEET MANAGEMENT
Fleet Management is the Corporate Services Department and its core function is to purchase manage, maintain and dispose the Council’s fleet, while the Technical Department is responsible for fleet utilized towards engineering activities and heavy plant.
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 60
3.9.6.5.2 FLEET MANAGEMENT STRATEGIC OBJECTIVES:
Fleet Administration: with regards to the municipality is associated with budgeting, requesting for
purchasing of parts and services, vehicle licencing, service plans, certificate of roadworthiness, job cards, CAMIS (vehicle history information) and auditing of keys and log books;
Fleet Maintenance: enables preventative maintenance, breakdowns and repairing of defects; Fleet Control: involves the Internal and external hiring, purchasing, disposal of vehicles, monitor vehicle
tracking system, fleet tenderers, implementation and compliance of fleet policy and branding of vehicles; Service plan: the vehicles and plant were serviced properly and this resulted in a low maintenance cost
and it was in line with management’s objective of and principle of optimizing and providing high level of vehicle availability, proper preventative maintenance plan developed in 2016/2017 of Operations & Infrastructure Assets Maintenance Plan;
Purchase of new vehicles: the municipality tenders for suppliers of various operational vehicles used by the municipality to enhance service delivery. During the budgeting phase, each department places specifications and reasons why a vehicle or vehicles are required;
Mayoral Vehicle Policy: a mayoral vehicle policy is in place and was implemented in 2013, it aids in usage of the Mayor’s vehicle and how it should be maintained and when it should be used and when it should be replaced.
3.9.6.6 WASTE MANAGEMENT - LANDFILL SITE
3.9.6.6.1 WASTE MANAGEMENT (DANNHAUSER LANDFILL SITE)
Solid waste collection is undertaken within the urban areas of the municipality, which are Dannhauser Town, Durnacoal, Hattingspruit and in 2016/2017 the municipality has extended its waste collection to the KwaMdakane, Koppjie Alleen and in rural residential areas situated in Tribal Councils of Ubuhlebmzinyathi, Nyanyandu, Ingwe, Emalangeni and Gule. To enhance collection, the municipality commenced supplying kwaMdakane and Koppjie Alleen with skip bins for disposal to the landfill site in town. The existing landfill site in Dannhauser was fully licensed by 30 March 2017 as required by the Environmental and Waste Management Regulations of South Africa. The landfill site services, households, businesses, schools, and areas of public use. Each of the thirteen wards have been provided with 50 recycle bins and the Community Work Programme (CWP) Coordinators together with youth in waste management programme who spearhead the recycling of waste under monitoring by the Department of Environmental Affairs. In 2016/2017 the municipality undertook the following; Upgrade of landfill site – R 800 000.00; Purchase of a Hydraulic Refuse Truck – R 1 500 000.00; Purchase of Troller Bins – R 50 000.00; and Purchase of Skip Bins – R 75 000.00. An Integrated and Waste Management Plan had been initially planned for development in 2016/2017, but had to be deferred to 2017/18 due to the magnitude of the work involved and ensuring that all stakeholders are incorporated into the whole process of development. This will enable compliance with relevant environmental legislations and allow for strategic objectives and mechanisms to be put in place to allow for proper monitoring of gas emissions, groundwater and surface water pollution and or contaminations and methods of prevention or rectifying any environmental irregularities.
3.10 COMPONENT B: ECONOMIC DEVELOPMENT This component includes: Planning, Local Economic Development, Building Control & Signage, Market and Housing.
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 61
3.10.1 PLANNING
3.10.1.1 INTRODUCTION TO PLANNING AND DEVELOPMENT
Economic development and physical planning at the Municipality contributes to:- (a) Creation of jobs and protection of the livelihood of the people; (b) Upliftment of the social status of individuals; (c) Protection of the environment for residents and other stakeholders; and (d) Contribution to Sustainable Development. The planning department enables the creation of sustainable development within the jurisdiction, it allows for zoning of areas for business and social activities and the integration to regional, provincial and national economic trade areas. In its planning activities, the municipality strategises to integrate with government sector departments and various economic sector stakeholders and further identifies which infrastructures must be built and or refurbished to enhance socio-economic development. The Spatial Development Framework and Local Area Sector Plans are also a task that the department undertakes, and these are meant to further integrate stakeholders with the municipality’s strategic objectives of development. The area sector plans also depict and implement the plans of sector departments which have mandates to undertake development within the jurisdiction. Strategies that are currently undertaken by Town Planning Department at the Municipality are as follows:- (a) Finalised the review of the Local Economic Development Strategy for the jurisdiction; (b) Has appointed a service provider to develop the Tourism Strategy; (c) Has commenced the development of the Informal Sector Policy; (d) Has signed M.O.U’s with stakeholders in the mining sector for the implementation of sustainable projects
that will employ local people; and (e) Implemented the Town Planning Scheme.
3.10.2 LOCAL ECONOMIC DEVELOPMENT
3.10.2.1 INTRODUCTION TO LOCAL ECONOMIC DEVELOPMENT
The Reviewed Local Economic Development Strategy identifies the need to develop and empower the local economy through the supporting of SMME’s and Co-operatives and through the forging of partnerships with well-established economic sector stakeholders. It has further highlighted the importance of developing new infrastructures and upgrading of existing infrastructures to stimulate economic investment. It capitalizes on the close proximity of the municipal jurisdiction CBD with the N11/N3 corridor, the corridor being currently developed as a Logistics Corridor by Provincial and National Government. Dannhauser is strategically located in a centralized position between Johannesburg and Durban making it easier to industrialize and take advantage of its centrality with regards to cost saving initiatives for investors.
3.10.2.2 KEY CHALLENGES 2016/17
Low economic activities;
High rate of unemployment;
No investment framework; and
Poor infrastructure to attract investors
3.10.2.3 KEY INTERVENTIONS 2016/17
Creation of an investment profile to draw and retain investors;
Effective LED forums and
Sourcing of funds to develop and upgrade existing economic and public infrastructures
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 62
3.10.2.4 CATALYTIC PROJECTS IMPLEMENTED
Table.31
1. COGTA – KZN
PORJECT NAME WARD NATURE OF PROJECT BUDGET ALLOCATED
Industrialisation CBD Dannhauser Industrial Park R 60 million (Still to implement finale phase of industrial park extension)
2. MINING COMPANIES
PROJECT NAME WARD NATURE OF PROJECT BUDGET
Shanduka Coal Mine 3 Hattingspruit Community Hall
Awaiting Final Cost Assessment
Buffalo (Zinoju) Coal Mine 7 3 x Crèches Total Of All Buffalo Projects contribution is: R 9 million
Buffalo (Zinoju) Coal Mine 7 Sports Complex
Buffalo (Zinoju) Coal Mine 1 Piggery production
3. DEPARTMENT OF RURAL DEVELOPMENT PROJECTS
PROJECT NAME WARD COMMODITY NO.OF HA BUDGET ALLOCATED
Feziphupho Coop 2 Maize and Veg Production 200 HA R 450 000.00
Sobathola Agric. Coop 1 Maize & Beans 50 HA R 600 000.00
Amajuba Rural Livelihood Project( 1 h/h 1ha
1(Renier Farm)
Vegetables and crop production
17 HA -
Dannhauser Coating 3 Paint mixing N/A R 900 000.00
Historymakers Leather Processing Project
1 Leather Processing N/A R 750 000.00
Zamokwakhe Coop 12 Toilet and Sanitary towel manufacturing
N/A R 600 000.00
Fit ‘n Proper 1 Maize & Bean Production 54 HA -
uMnothowesizwe Piggery Project
10 Piggery N/A Was supported in 2016/17 finacial year
Agri-Hub 1(Renier Farm)
Mechsnisation & Storage Facilities
To be allocated upon finalization of technical analysis by Urban Econ
3.10.2.5 EMPLOYMENT / UNEMPLOYMENT RATE The municipality experienced a slight increase in the number of people employed from 2011 to 2016, this is however offset by the large numbers of people who are eligible for employment but are not employed. This can be attributed to low education levels which compromise the employability of residents within the municipality and a lack of employment opportunities due to a lack of economic activities in the municipal area. High unemployment levels pose a number of challenges and are associated with a number of social ills, particularly for the youth. They make them prone to engage in activities such as drug abuse, crime, alcohol abuse, etc. Efforts should be made to address these challenges.
3.10.2.5.1 EMPLOYENT BY SECTOR – DANNHAUSER 2016/17
Table.32
EMPLOYMENT BY SECTOR – JOBS
SECTOR 2014/15 2015/16 2016/17
Agric, forestry and fishing
Mining and quarrying
Manufacturing
Wholesale and retail trade
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 63
Finance, property, etc
Govt, community and social services
Infrastructure services
3.10.2.6 ECONOMIC CONTRIBUTION BY SECTOR – DANNHAUSER 2016/17
Table.33
ECONOMIC ACTIVITY BY SECTOR - R ‘ 000
SECTOR 2014/15 2015/16 2016/17
Agriculture
Mining and quarrying
Manufacturing
Electricity
Construction
Wholesale and retail trade
Transport
Finance, property, etc
Govt, community and social services
3.10.2.7 JOBS CREATED THROUGH MUNICIPALITY
Table.34
JOB CREATING PROGRAMME
EPWP CWP TOTAL JOBS CREATED
2016/2017 1 100 143 1 243
2016/2015 900 N/A 900
2015/2014
3.10.2.8 LOCAL ECONOMIC DEVELOPMENT OBJECTIVES – 2016/17
Table.35
SERVICE OBJECTIVES
SERVICE TARGETS
2015/2016 TARGET
2015/2016 ACTUAL
2016/2017 TARGET
2016/2017 ACTUAL
Reduce unemployment
Job Creation (EPWP) & (CWP)
EPWP – 900 EPWP – 900 EPWP – 1 100 CWP - 143
(EPWP & CWP) - 1 243
Review of LED Strategy
Completion by 30 June 2017
N/A N/A Completion of draft reviewed LED Strategy
Draft Reviewed LED Strategy completed December 2016.
LED Forum Setting up forum by 30 June 2017
N/A N/A LED Forum Separation from MANCO Committee by 30 June 2017
Separation of LED Forum completed by 30 June 2017.
Development of Tourism Strategy
Completion of Draft Tourism Strategy by 30 June 2017
N/A N/A Completion of Draft Tourism Strategy by 30 June 2017
Draft Tourism Strategy still in progress of being developed. Not completed by 30 June 2017.
Informal Traders Draft formulation of Informal Traders Policy by 30 June 2017
N/A N/A Completion of Draft Informal Traders Policy
Informal Traders Policy still being developed.
Agri-Park Renier Farm
Commencement of crop farming by Local Co-op’s
N/a N/A Implementation by DRDLR of 1 ha, 1 household Crop
1 ha, 1 household crop farming
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 64
through the aid of DRDLR before 30 June 2017
farming at Renier Farm for local households by 30 June 2017.
programme commenced by DRDLR at Renier Farm before 30 June 2017
Completion of Industrial Pak
Completion of Infrastructure by Municipality Small Town rehabilitation Funding – Cogta by 30 June 2017
N/A N/A Industrial park infrastructure to be completed by 30 June 2017
Industrial park completed by 30 June 2017.
3.10.2.9 BUILDING CONTROL & SIGNAGE The Building Control and Signage Section controls building construction and outdoor advertising signage in the municipal jurisdiction. This is done through compliance with the National Building Regulations and Building Standards Act, 1977, the SANS 10400. The technical and community departments work together to inspect buildings while building plans are solely vetted by the technical department. A Town Planner was appointed in 2016/17 as the position had been vacant for quite some time. This had posed a huge challenge in the speedy addressing of various building and infrastructure projects within the jurisdiction. The municipality is however still negatively impacted as the following two critical positions still remain vacant; Housing Officer and Building Inspector. No provision has been made for a Signage Inspector as yet, and this is a function undertaken by the head of Technical Department in liaison with the Head of Community Department. The Head of the Technical Department integrates with Amajuba District Municipality as the buildings require bulk infrastructure connections in relation to water and liquid sanitation and further liaises with Eskom for electricity connections. Environmental Impact Assessments are undertaken by a service provider appointed by the municipality as and when required to ensure that an impact assessment is undertaken prior to the development or construction of any building. Already existing buildings within the CBD area are inspected two officials from the municipality, one from the Technical and the other from the Community Department. This is to ensure that the structures are still viable for use and are not hazardous for human and business occupations. In 2016/2017 some business owners where issued with notices of building closures if they did not properly refurbish their operating buildings. All the owners notified did refurbish their operating buildings while some were undertaken by their landlords they were leasing from. During the year the filing of Building Plans is undertaken in a two-fold state, (i) the plans are scanned and digitilised and backed onto a computer database, and (ii) the retention of the physical copy of all Building Plan files and documents, thus creating a legitimate Archival System. This system is currently being applied as the official proposed records filing system is still awaiting the approval of the Department of Arts and Culture.
3.10.3 MARKET
3.10.3.1 MARKET SERVICES
The municipality manly utilizes its CBD as its main market for various traders, however the newly constructed Ingogo Fresh Produce Market situated in Newcastle Municipality through the funding provided by Cogta – Kzn, is anticipated to service farmers within Amajuba District, including those in Dannhauser. The Fresh Market Produce has only been completed in the 2016/2017 financial year, and will be a trading place for buyers and sellers, whether directly or through market agencies acting as link between buyers and sellers. Currently Renier Farm agriculture participants have been earmarked through the DRDLR initiative to be suppliers to the Ingogo Fresh Market Produce. The main products traded are potatoes, onions, tomatoes, vegetables and fruit. The crucial variable determining the economic viability of the market is the volume of business, or the tonnage throughput. Renier Farm participants are the initial pilot project to the Agri-Hub being developed in Dannhauser as part of creating jobs through sustainable agricultural activities for the local community.
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 65
3.10.4 HUMAN SETTLEMENTS
3.10.4.1 INTRODUCTION
The Housing Sector Plan sets out housing delivery goals and targets for the municipality and provides and approach to housing delivery and spatial transformation. The Housing Sector Plan is reviewed annually together with the Integrated Development Plan of the Municipality. The Municipality had its first Housing Sector Plan in 2007. The Human Settlements Sub-Unit reviewed it 2011 and the municipality then reviewed it during the 2014/15 financial year and was approved by Council in 2015, and further reviewed it in the financial year 2016/17 but still to be adopted by Council. Like other secondary cities in South Africa, the Municipal spatial character depicts the legacy of apartheid planning and high levels of urbanisation. There are currently seventy identified informal settlements located in different parts of the city with limited basic services.
3.10.4.2 SOME KEY OBJECTIVES OF THE HOUSING SECTOR PLAN
To develop adequate and affordable housing for none and low-income earners; To develop housing that is safe for human habitat; To develop various forms of optional housing for the community; To ensure access to basic services for households and enable water and sanitation infrastructure to be
connected to the households; Upgrade the existing well located informal settlements to improve land tenure and access to basic
services; Accelerate development and consolidate human settlements development in line with the National Policy
directives and the IDP of the Municipality; and Contribute towards spatial transformation and creation of an efficient settlements and spatial pattern. The department of Human Settlements is currently acting as a developer and has delivered several housing projects which it has funded from its own budget. The land for the housing development is provided by the municipality either through integration agreements with Tribal Authority Council, Land purchased from private land owners, Trusts, Companies or NGO’s. Any land that would have been earmarked for development is first subjected to an Environmental Impact Assessment (EIA), and once the land has been deemed appropriate for development, that planning commences and Amajuba District Municipality is included in the whole process as the Water Services Authority. By 2016/17 financial year, a total of 20 844 households (hhs) had been developed, they had following categories achieved; 2 579 – Formal; 106 – Informal; 17 186 – Traditional and 973 – Farms; 14 769 hhs with piped water inside dwellings; 2 666 hhs with flushing toilets; 2 141 hhs – chemical toilets; 1 942 hhs – Pit Latrine VIP; 12 849 hhs – Pit
Latrine No VIP & 1 064 hhs – using other forms of sanitation; 10 711 hhs with electricity for cooking; 7 762 hhs – electricity for heating & 16 585 hhs – electricity for
lighting; and 1 704 hhs refuse removal weekly in Urban areas and 12 136 hhs refuse removal weekly in Tribal Authority
Council areas.
3.10.4.3 INFORMAL SETTLEMENT
This section facilitates the National Upgrading Support Programme which seeks to identify and incrementally upgrade informal settlements. The programme involves the identification, categorisation and prioritisation of informal settlements for upgrading initiatives. The assistance of the Department of Human Settlements aided in the eradication of a slum into the development of an informal settlement named “Ramaphosa”. The occupants of “Ramaphosa” initially resided on land previously owned by a mining company which had ceased operations, the mining company and the municipality entered into an agreement to develop proper housing facilities for those living in the shacks. The municipality then incorporated and integrated with the Department of Human Settlements, Amajuba District Municipality and Eskom to be a part of the development process.
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 66
A total of 100 housing units were constructed at a total cost of R 13 496 507.00 (Funded by Department of Human Settlements & Shanduka Coal was the contributor of the land. An Environmental Impact Assessment (EIA) was undertaken to determine the suitability of the land for construction, this was completed and approved by Human Settlements. The municipality aided in developing internal gravel roads and is currently waiting for an intervention by Department of Transport, Amajuba District has not implemented any bulk water and sanitation infrastructure, this compelled the municipality to supply the residents with Jojo water tanks inclusive of stands and to further undertake electrification of the households in liaison with Eskom. The municipality has commenced an application process to upgrade the Ramaphosa settlement into a township. The application will be submitted in 2017/18 financial year to the relevant government department for consideration and approval. The settlement is approximately 3 km away from Hattingspruit urban area.
3.10.5 PLANNING This Section identifies and facilitates the acquisition of well-located land to implement the relevant national housing subsidy programmes. Ensure the alignment between the Human Settlements Sector Plan, Spatial Development Framework Plan and Infrastructure Development Sector Plan. Prepare and package human settlements projects business plans to secure funding from relevant sources. Develop strategic policies to enhance the development of integrated human settlement within the Municipal area. There are currently six housing projects that are in various phases of the planning stage and are awaiting approval from Department of Human Settlements. These projects are expected to deliver a combined yield of 7 847 units in different financial years, with an additional 2 300 units being proposed to be built on different pockets of land of which Department of Human Settlements is currently undertaking EIA’s. During the 2016/2017 financial year, the Municipality acquired two large parcels of private land for human settlements development. The land is situated at the intersection of the R 621 and the main CBD road towards Hattingspruit.
3.10.6 PROJECT IMPLEMENTATION This Section is responsible for the provision of infrastructural services that are in-line with the municipal acceptable standards and top structures that comply with the National Housing Code, National Building Regulations, the NHBRC standards as well as Municipal requirements. As the municipality is still relatively small in size and is not well capacitated, most of the functions are undertaken by Department of Human Settlements and Amajuba District. The municipality does play an active role in inspecting the housing units that would have been developed prior to completion certificates being signed by the HOD of the Technical department. The municipality further sources funds which relate to the construction of internal roads where the housing units have been constructed and in certain instances for electrification of the households.
3.10.7 HOUSING ADMINISTRATION The Section administers all property management activities for Council’s Housing Rental Stock, Odd and freestanding properties. The Municipality currently owns ……….. rental flats and ……….. state funded properties and 58 odd / freestanding properties (houses) that are being leased out to tenants. Some of the major challenges that the section currently faces under the administration of the Housing Rental stock, has been a long history of poor payment of rentals and services, the lack of information on the status of the current tenants occupying the units as there has been many cases of sub-letting by previous tenants, deceased tenants (lease holder) which have passed away, leaving family members who can’t afford the rentals etc. but are still on the billing system. The other challenges is lack of qualified data that both Housing Administration and Finance work from in terms of rental collection and also the systems being used by the sections to perform property management activities. There has also been minimal maintenance of the rental stock due to lack of funding resulting from non-payment of rentals. One of the successes has been the completion of tenant audit and verification for all Council Housing rental stock and Odd / freestanding properties. This process has assisted in addressing the current challenges within all the tenancy discrepancies. The other achievement has been the formulating and
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 67
approving of a turnaround strategy and action plans to arrest the escalating arrears within all rental housing stock.
3.11 COMPONENT C: COMMUNITY SERVICES This component includes: Waste Management, Community Halls, Cemeteries & Crematoria, Environmental Health, Traffic & Public Safety, Disaster Management, Sport & Recreation and Library.
3.11.1 WASTE MANAGEMENT
3.11.1.1 INTRODUCTION TO WASTE MANAGEMENT The domestic refuse collection services cover a total of approximately 14 292 households out of a total of 20 844 households weekly. The business refuse collection service of 456 business units weekly has met its targets but faces problems with dumping of litter on the road, sidewalks and storm water drainage systems by the community. It is envisaged that there will be improvements as the community department becomes more efficient with tracking customers and reducing littering in the central business district. The community department is short staffed and cannot follow its mandate fully and is currently relying on contract and EPWP staff. Street sweeping is being conducted in ever increasing areas per ward. The cutting of grass alongside roads and in public areas is improving the image of the municipality and improving waste management initiatives. A challenge however exists; this is in relation to the minimum funding allocated to the municipality through the “Equitable Share Grant” allocation. It inhibits the successful delivery of waste collection from all targeted households within the jurisdiction.
Table.36
SOLID WASTE SERVICE DELIVERY LEVELS Households
Description 2015/2016 Actual Number
2016/2017 Actual Number
Solid Waste Removal (above min level)
Removed at least once a week 4 851 4 851
Minimum Service Level and Above sub-total 4 851 4 851
Minimum Service Level and Above Percentage 23.3% 23.3 %
Solid Waste Removal (below min level)
Removed less frequently than once a week 59 59
Using communal refuse dump 14 189 14 189
Using own refuse dump 0 0
Own Rubbish Disposal 71 71
No Rubbish Disposal 1 674 1 674
TOTAL NUMBER OF HOUSEHOLDS 20 844 20 844
The collection of solid waste on a weekly basis is 23.3% below the 50 % benchmark; this is attributed to the minimal Equitable Share Grant Allocation from Treasury and the low revenue collection margins from property rates, levies, etc. The municipality is thus limited in funds to undertake waste collection from a higher number of households.
3.11.2 COMMUNITY HALLS This unit is responsible for the management, maintenance and identification of wards requiring Community Hall facilities. Hall facilities maintained to an acceptable standard for use by hirers.
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 68
3.11.2.1 Actual Community Halls – 2016/2017
Koppie Alleen Community Hall - (Ward.1), Emafusini Community Hall - (Ward.2), Dannhauser Community Hall - (Ward.2); Verdriet Community Hall - (Ward.3); Millford Hall Community Hall – (Ward.4) Kwamgidiz A Community Hall – (Ward.5) Fairbreeze/Poona – (Ward.5) Kwamdakane Community Hall - (Ward.7); Mafahlawane Community Hall – Ward.9 Dorothy Nyembe Community Hall - (Ward.9); Eastbourne Community Hall – Ward.10; and Moyi Community Hall - (Ward.13)
3.11.2.1.1 Halls Constructed in 2016/17
Community Hall constructed - Ward.2
3.11.2.1.2 Backlog of Halls by 2016/17
Wards’: 4, 5, 6, 8 and 12: one each.
3.11.3 CEMETERIES & CREMATORIA This unit is responsible for the Management, maintenance and development of Cemeteries and Crematoria.
3.11.3.1 Number of Cemeteries In Dannhauser 2016/2017 Table.37
AREA OF CEMETERY NUMBER OF CEMETERIES
Ward.1
Ward.2
Ward.3
Ward.4
Ward.5
Ward.6
Ward.7
Ward.8
Ward.9
Ward.10
Ward.11
Ward.12
Ward.13
TOTAL
3.11.3.1.2 Cemeteries Achievements in 2016/2017 Cemeteries Upgrading & Maintenance Plan (Urban & Rural) developed in 2016/2017, approved and
adopted by Council, 31 March 2017; Cemeteries maintenance monthly reporting; 2016/2017; and Cemeteries maintenance and clean-up by CWP & EPWP participants on a monthly basis in urban and rural
areas;
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 69
3.11.4 ENVIRONMENTAL HEALTH Environmental Health encompasses those aspects of human health, including quality of life that is determined by physical, chemical, biological, social and psychosocial factors in the environment. It also refers to the theory and practice of assessing, correcting, controlling and preventing those factors in the environment that can potentially affect adversely the health of present and future generations. Environmental Health Services includes: Water quality monitoring, Food control, Waste management, Surveillance of premises, Communicable diseases control, Vector control, Environmental pollution control, Disposal of the dead, chemical safety and noise control. Although these functions are imbedded within the municipality’s Community Department, the vacant position of Environmental Officer complicates the implementation of the functions. Some of the functions are thus undertaken by Amajuba District, Department of Environmental Affairs, Department of Water Affairs and as the jurisdiction has mining activities, Department of minerals also plays a strategic role in the regulatory of environmental impacts due to mining activities. Table.38
DESCRIPTION TARGET ACHIEVED
No. of Complaints investigated 60 70
No. of Trade Licence application processed
No. of Dairies registered in terms of the Dairy Bylaws N/A N/A
No. of Beef Cattle & other Livestock Commercial Farming Operations 2 1
No. of Animal Pounds 1 1
Animal Pound By-Law 1 1
No. of Chicken Commercial Farms 1
No. of Mining Companies 3 3
No. of Commercial, industrial and residential premises inspected 2 4
No. of Water samples from reservoirs and consumer points (Amajuba) 10 12
Percentage compliance with SANS 241:2011 NB: SANS are national standards that replaced SABS(South African Bureau of Standards) 241: relates to drinking water (Amajuba)
70 68
No. of Food premises inspected in terms of R962 (Food Regulations): Formal: Informal:
2 2
No. of Communicable Diseases notifications investigated: N/A N/A
No. of Premises inspected for compliance with Tobacco Legislation 5 5
No. of Places of care inspected 1 1
No. of Controlled burning applications processed N/A N/A
No. of Notices issued
No. of Prosecutions instituted N/A N/A
Fines received businesses N/A N/A
3.11.5 TRAFFIC & PUBLIC SAFETY The department of Public Safety helps ensure a safe environment and improve the quality of life through effective Traffic policing combined with efficient use of security officers. Traffic services include: Control and regulate all forms of Traffic, promote education and training on the road and traffic safety. Attend scenes of motor vehicle collisions and assist with traffic control, removal of injured persons and removal of vehicles so that traffic may glow freely again. Eliminate points of congestion, obstruction, hindrance, interference or danger to vehicles and pedestrians.
3.11.6 DISASTER MANAGEMENT Disaster management (DM) promotes a culture of risk avoidance among communities through education and public awareness. The Disaster Management Sector Plan implemented in 2015 and reviewed in 2016/17 establishes the arrangements for disaster risk management within the requirements of the Disaster Management Act, 57 of 2002 and section 26(g) of the Municipal Systems Act, 2000. Planning for disasters leads to organisational preparedness and readiness in anticipation of an emergency or disasters. The Act requires an integrated and effective response to disasters.
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 70
Disaster Management as a whole is overseen by Amajuba District Municipality that has a fully-fledged Disaster Management Center. The municipality is actively participating in the District Advisory Forum, and meetings are coordinated by the District Municipality.
3.11.6.1 DISASTER RISK PROFILE – 2016/17
Table.39: Risk Profile Type of Disaster Low Risk Medium Risk High Risk
Flooding X
House Fires X
Severe Storms X
Transport Accidents X
Landslides X
Environmental Pollution X
Hazmat X
Animal & Plant Diseases X
Human Epidemic Disease X
Drought X
Lighting X
Thunderstorms X
Hail X
Veld Fires X
Disasters Caused By Mining X
3.11.6.2 PRIORITY RISKS REQUIRING PREPAREDNESS – 2016/17
Table.40: Priority Risks
Type of Disaster Low Risk Medium Risk High Risk
Flooding X
House Fires X
Severe Storms X
Transport Accidents X
Lighting X
Thunderstorms X
3.11.6.3 FUNDING PROVISION – 2016/17
Municipality had set aside a disaster budget of R 500 000.00 for immediate provision of relief, but in reviewed the amounts to R 4 million with regards to infrastructure housing development when mud houses are destroyed due to disasters and R 200 000.00 for various relief aid to families affected by disasters.
3.11.6.4 RISK REDUCTION & PREVENTION – 2016/17 Good risk reduction and prevention includes proper planning and integrating with Amajuba District Municipality which is the custodian of Disaster Management within the District. The municipality has planning groups, committees, joint response teams and recovery project teams, this is however undertaken in conjunction with the District. To enhance the prevention mechanism, the municipality has identified the construction of floods levees, relocation of housing and essential services away from flood plains, use of better building standards and introducing hazardous waste regulations. Coordination with Tribal Authority Council Administrators where there is a high density of housing and school infrastructures has been implemented. The municipality has identified the following prevention and mitigation strategies; The development of an early warning system for natural disasters such as floods, hailstorms, and
droughts; Prevent forest fires by having fire breaks; Upgrade and maintenance of infrastructure;
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 71
Develop protocols for specific risks; Road and sidewalk maintenance; Upgrade and maintenance of landfill sites; Public awareness campaigns; Replacement of old vehicles and machinery; Develop poverty alleviation strategies; and Develop job creation programmes (ie. Cleaning campaigns).
3.11.6.5 DISASTER MANAGEMENT AS A SHARED FUNCTION The management of disasters within Dannhauser municipality is a shared function between Dannhauser municipality and Amajuba District Municipality. As part of the shared function, the Dannhauser Disaster Management Plan is integrated with that of Amajuba District, to enhance cross-organisational and functional activities.
3.11.6.6 ROLE OF DANNHAUSER MUNICIPALITY
The municipal policy highlights the following: As a local municipality, Dannhauser hereby takes responsibility for all local disaster incidents, which can be managed within its resources; Council has set aside R 4 million towards rebuilding houses in the event of mud houses being destroyed
and R 200 000.00 annually for others forms of relief for victims of any disaster within the jurisdiction, from an initial amount of R 500 000.00;
The municipality shall within its broader statutory disaster management obligations, focus its disaster management efforts on disaster mitigations;
The municipality shall, in executing its responsibility, closely liaise with the other government spheres in particular the District Municipality;
The municipality shall establish a disaster co-ordination committee comprising of all its departments to ensure that all its available resources needed for disaster are properly mobilized and applied;
Any re-usable material assistance dispatched during and to address a disaster shall be closely monitored and any material remaining unused must be returned to the municipality;
In order to facilitate proper reporting of disasters, the affected community members shall be required or assisted to specifically declare their need/apply for the relief; and
The Mayor and Municipality Manager shall be the central stakeholders responsible for the implementation of this policy.
3.11.6.7 PREPARATION The municipality has a preparedness plan in place, the plan will be executed in line with the specific disaster. Through good preparation, the effects of disasters and significant incidents can often be reduced. Good preparation should include information and education of the public about hazards. Management of the municipality will be in the forefront. All relevant stakeholders and joint project teams will be notified where they are deemed necessary to intervene, this is to ensure that each disaster is managed appropriately with the correct resources.
3.11.6.8 RESPONSE AND RECOVERY
3.11.6.8.1 RESPONSE In major emergencies, it is critical that an efficient and effective disaster response is mobilized. Response is a collective responsibility. In a major emergency or disaster, people need to know, what to do, who will do it and how it will be done. The municipality highly relies on Amajuba District to aid with fire-fighting equipment, however it seeks to purchase equipment that will be readily available as the need may arise while Amajuba is attending to other disasters. An official who is a part of management is on standby for any emergency calls.
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 72
3.11.6.8.2 RECOVERY Recovery from major disaster can be a long and costly process. Essential services such as water and power may need to be restored; addition medical services may be required or temporary housing and family support may be needed. Although the yearly allocation may be deemed not to be sufficient, the municipality will have to make appropriate additional allocations if the disaster is severe.
3.11.6.8.3 TRAINING AND AWARENESS The training needs that are generally suggested for emergency responses include the following:
Community Awareness;
Workplace Emergency;
Professional Fire Fighting skills;
Victim Management Skills;
Disaster risk assessment;
Various Disaster Plans; (Fire & thunderstorms)
Radio Communication;
Contingency Plan development;
Safety planning at Live Events; and
Disaster Operation Centre Management Skills and Procedures. (ADM)
3.11.6.8.4 DISASTER MANAGEMENT SWOT ANALYSIS Table.41: Disaster Management SWOT Analysis
STRENGTHS WEAKNESSES
The human capital in Dannhauser is available but limited, however it is leveraged by the technical teams in AD.
Dannhauser is not prone to dreadful natural disasters such as tornadoes, earth quakes or hurricanes.
Credible Disaster Management Plan is not yet in place. Limited human capital allocation at a local municipal
level. Limited disaster management equipment; The spatial configuration and isolation of some of the
areas may increase the turnaround time to arrive during emergencies.
OPPORTUNITIES THREATS
The opportunity still exists to allocate human capital for implementation, monitoring & evaluation of the disaster management plan;
The structures used during IDP processes can be utilized to identify and mobilize volunteers.
Inability to respond to emergencies within prescribed response time would undermine the role of the municipality in terms of meeting its constitutional obligation;
Lack of sufficient budgeting implies a non-effective implementation of plan.
3.11.6.8.5 SERVICE STATISTICS FOR DISASTER MANAGEMENT During financial 2016/2017, a total of ….. Incidents were responded to. Disaster Management was
involved in the safety of …….. events; Disaster Management plan was approved in March 2015 by the full council and reviewed in 2016/17
financial year & fully implemented; and
In 2016/17, 15 houses built by the municipality to replace the low-income/RDP houses damaged due to
heavy winds and rains; and
24 Hours turnaround time to respond to disaster related incidents reported according to the Approved
DM plan/ strategy by 30th June 2017
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 73
3.11.7 SPORT & RECREATION Manage maintenance and development of all municipal sports facilities including the promotion and development of sports and recreation. Master plan for the maintenance of sports facilities approved.
3.11.7.1 SERVICE STATISTICS FOR SPORT AND RECREATION Total number of Sports Facilities – 3 Emafusini Sportsfield; Durnacol Sportsfield; and Dannhauser Cricket Ground Refurbishment of two of the sports fields (Emafusini & Durnacoal) has been deferred to the 2017/18 financial year.
3.11.7.2 LIBRARY SERVICES There is one main library within the Municipal Library Services; it is situated at the main municipal offices in a standalone building. The Library has a wide range of resources including books, large-print books, newspapers and periodicals, audio-books, and a public computers workstation. The library is highly maintained and has security systems that minimize the loss of its contents due to theft. It has a bulk printer, for those who seek copies to be made for them, and a fee is charged for this service depending on the nature of the copy, print and or its size. It operates from 8 am in the morning till 4pm, Mondays to Fridays, and is closed during public holidays if it is during the week.
3.12 INFORMATION & COMMUNICATION TECHNOLOGY SERVICES The municipality has a fully functional IT system, which is managed internally, with the following systems in place, Office 365 Midsize business, Mun-soft and VIP Payroll. The municipality has developed the IT Strategic Plan, IT Policies, IT Disaster Recovery Plan and ICT Governance Framework. Some of these IT Policies were approved during the 2012/2013 financial year and have been reviewed annually. The IT Disaster Recovery Plan, ICT Framework and IT Strategic Plan were developed and they are due for approval before the end of the financial year. The IT function is under Corporate Services department and the municipality has appointed an IT Officer for the day to day management of the IT section. The municipality has a fully functional Website Page which is managed internally by the IT Officer. The website allows the municipality to the public to access, inter alia, municipal policies and plans such as the IDP, Budget and PMS. In addition, the municipality established an SMS system, with the number 4409. The system allows communities to report on a myriad of issues and a Facebook page was also established for similar purposes. The services provided by the IT section are reflected on As required by the CGICT (Corporate Governance of ICT) Policy, IT must be aligned with the Municipality goals. In order to enable the Municipality to meet its goals as set out in this IDP, the ICT section of the Municipality provides the following services, either by the in-house provision, outsourcing or a combination.
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 74
3.13 IT-SERVICES PROVIDED
Table.42 SERVICE DESCRIPTION
Active Directory The Active Directory Service provides authentication and ensures that all actions that are performed on the system is properly authorized.
Personal Computers All users need a desktop or laptop computer to access all services.
Networked Storage This service allows users to store documents, and other important files, on a network server which is regularly backed up.
Exchange Amajuba District Municipality uses Microsoft Exchange Server 2010 together with the Outlook client on workstations in order to access email and shared calendars. Each user has a unique email address.
WWW This service allows users to access information published on the world wide web.
Munsoft FMS Financial Management System
GIS Geographical Information System
Antivirus Users need antivirus software to protect them from malware.
Server A shared workspace for working on projects.
Website Hosting Dannhauser.gov.za
Helpdesk Provides a single point of contact for users when requesting assistance with IT services.
Access Control System Controls and records access to the building.
Video Surveillance Provides security video recording of the building.
Data Projectors and Screens Provides services relating to data projectors and screens
Local Area Network Provides access to all network related services.
Updates Ensures that all software on servers and workstations are kept up to date in line with known vulnerabilities.
WAN Provides access to the internet and network connectivity to remote sites.
Printing and Scanning Allows users to print and scan documents.
Fax to Email Allows users to receive faxes via email.
Backup Makes backup copies of important data in order to recover from possible disasters.
Audio recording Record audio for important meetings for transcription and legal compliance purposes.
3.14 IT-INITIATIVES
In addition to the IT services currently being provided, the following initiatives are being undertaken to improve the value of IT as an enabler of the business and IDP communications tool. Table.43 INTIATIVE DESCRIPTION
Paperless council
Management has decided to obtain IPads for all councillors, IPads will be used as a communication tool and to distribute agendas and minutes without using paper. It may be possible to realise significant cost savings in this way, reducing the usage of paper and delivery costs. This could also have a significant positive impact on the carbon footprint of the organization.
Voice over IP
Voice over IP, also known as VoIP is now a mature technology. VoIP refers to the carrying of voice telephone conversations over data networks. Significant costs savings can be realized with the proper implementation of Voice over IP.
Cloud computing
A new trend has emerged in recent years, where IT are no longer hosted on a user’s premises. This is called “Cloud Computing”. Benefits of cloud computing include reduced capital costs, simplified management and possibly improved legal compliance.
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 75
3.15 LEGAL SERVICES Legal Services play an important role for aiding to maintain good governance on behalf of the municipality and various stakeholders whether social or of economic impact. The interpretation of by-laws, policies, bills and legislations are undertaken through this service. The developing of Service Level Agreements that are legally binding to parties and are not harmful to parties are also undertaken. This functionality with regards to the municipality, is undertaken by an appointed legal company ………………………….and it has various experts of law. Its contractual obligation will end on ………………….. In addition to the activities outlined above, the following items are formally placed on the SDBIP for Legal Services: Provision of legal comments on all reports whenever required; Regularly attending various Council committees and sub-committees, working groups of the Municipality,
including portfolio committees, the Executive Committee, the Bid Evaluation and Bid Adjudication Committees. In addition we regularly attend impromptu meetings requested by customer units;
Coordinating the activities of multidisciplinary municipal teams in relation to a particular legal issue, problem or objective;
Considering and evaluating new insurance claims against the municipality every month, and new prosecutions a month;
Acting, where required, as Prosecutors or Chairpersons of Disciplinary hearings. In essence, Legal Services provides legal advice on both a proactive and reactive basis to the municipality.
3.15.1 DELICTUAL COURT CLAIMS AND COURT INTERDICTS
Work on these matters involves daily management of court pleadings and extensive legal processes, including but not limited to correspondences with opposition attorneys, pre-trial procedures and court attendances. These procedures are extensively regulated by; inter alia, the Rules of Practice in the High and Magistrate’s Courts.
3.15.2 CRIMINAL PROSECUTIONS
Work in these matters involves processes of prosecuting persons in the criminal courts, including the consideration of evidence presented by Peace Officers, drafting of charge sheets where necessary, liaising with the Courts and lawyers representing the accused. Ultimately, Legal Services represent the municipality in all court matters and procedures are extensively regulated by the Criminal Procedure Act, 51 of 1977.
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 76
CHAPTER 4 ORGANISATIONAL DEVELOPMENT PERFORMANCE
4.1 INTRODUCTION TO ORGANIZATIONAL DEVELOPMENT PERFORMANCE During the 16/17 financial year the HR Unit - identified certain priorities that must be met in order to unlock the organization’s human capacity potential towards the achievement of the Municipality’s strategic priorities and outcomes. During the year under review, the Municipality’s departments indicated facing challenges of low staff morale and a poor state of employee wellbeing (threat of disease). During the HR Customer Satisfaction Survey the causes of this state of affairs were found to include multiple factors, inter alia: Lack of Municipal Office space for staff, this makes the working environment too cramped up and not
conducive for effective service delivery; Lack of proper staff complement within the departments; Lack of staff to enhance the achievement of Key Performance Indicators; and Current staff overworked and causing a low moral thus reducing work efficiency.
4.2 ALLOCATION/PLACEMENT PROCESS In 2016/2017 the Organisation went through the allocation/placement process, and the process is guided by its “Recruitment Policy”. The approved 2016/2017 Structure was adopted and reported on. The municipality has a staff compliment of five (5) Section 56 Managers, including the Municipal Manager. A total staff compliment of 122 people is within the structures of the municipality. These include subordinate managers, officers, administrative assistants and general workers. The municipality has made remarkable strides to fill vacant positions; especially at top management since all section 54 and 56 Managers are filled. Table.44: SECTION 54/56 MANAGEMENT
Directorate Name
Gender Type of Appointment
Male / Female
Date Status Signed Performance
Agreement (Yes / no)
Municipal Manager WB Nkosi Male 01 July 2008 5-year contract Yes
Chief Financial Officer DM Mohapi Female 15 April 2013 Permanent Yes
Manager Corporate Services
S Narothum Female 01 July 2002 Permanent Yes
Manager Technical Services
MR Nene Male 12 February 2013 Permanent Yes
Manager Community Services
S Naidoo Male 01 November 2013 Permanent Yes
It is notable in table.44 above that 40% of the Section 54/56 Managers are women. The table below outlines
the total staff complement (including the Section 54/56 Manager indicated in table above).
Table.45: STAFF COMPLEMENT PER DEPARTMENT
Department 2016/2017 2015/2016
Filled Vacant Total Filled Vacant Total
Office of the Municipal Manager 8 1 9 8 1 9
Corporate Services 18 1 19 14 5 19
Financial Services 23 4 27 17 4 21
Technical Services 33 10 43 23 10 33
Community Services 40 2 42 35 5 40
Total 122 18 140 96 27 122
During the year under review:
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 77
Town Planner and Machine Operator appointed in Technical Department
Finance consists of five (5) interns who are included in the table above.
4.2.1 EMPLOYEE TOTALS, FILLED & VACANCIES The filled and vacant positions within the municipality for 2015/16 and 2016/17 are as provided below; Figure.20
4.3 EMPLOYMENT EQUITY
In accordance with the Employment Equity Act No. 55 of 1998, the Dannhauser Municipality developed and
implemented the Employment Equity Plan; and as required by the said Act, the Plan was submitted to the
Department of Labour. The purpose of the plan is to state the broad principles of employment equity to which
the Dannhauser Municipality is committed and to describe in general how the Municipality seeks to realize
these principles. The Plan reflects the significant progress the municipality has made with regards to
addressing challenges relating to: enhanced demographic representation, skills development, succession
planning, fast tracking, mentorship, diversity management and organizational culture assessment.
Table.46: Employment Equity Statistics
Occupational Levels Male Female
Total African Colored Indian White African Colored Indian White
Top management (Section 54/56) 2 0 1 0 1 0 1 0 5
Senior management 1 0 0 0 0 0 0 0 1
Professionally qualified and mid-management
7 0 1 1 6 0 0 0 15
Skilled technical and academically qualified workers, junior management, supervisors, foremen, and superintendents
17 0 4 0 10 2 2 1 36
Other staff 39 0 4 2 15 2 2 1 65
Total 66 0 10 3 32 4 5 2 122
The employment equity profile illustrates progress made towards transformation. In terms of women empowerment, effective initiatives need to be introduced to bring women to the fore. The employment equity statistics are presented in the table below: Table.47
Employment Equity Implementation
Designated Group
Non-Designated Group
Women
Senior Management 60% 40% 40%
Middle Management 66% 33,34% 14%
Professional Staff 77,78% 22,23% 33,34%
96 122
25 20
2015/2016 2016/2017
MUNICIPAL FILLED & VACANT POSTS
Filled Vacant
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 78
Figure.21 (Employment Equity) 2016/17
Figure.21 above indicates that Dannhauser Municipality’s governance committees are effective with an
exception of two committees namely Local Economic Development and Land Resource Committee and
Municipal Public Accounts Committee where there are some challenges.
4.4 WORK PLACE SKILLS PLAN The municipality developed and adopted the Work Place Skills Plan (WPSP), it identified the gaps and how they must be addressed. The WPSP is currently being implemented and positions that require to be filled are being attended to. There is also training and development of political leaders and management including their subordinates. This will enhance the transformation of the municipality and its efficiency in delivering basic services to the community. Corporate governance will be upheld and proper financial management and use of municipal resources will be undertaken.
4.5 VACANCY RATE A vacancy rate of 15 % exists within the municipality, and only a few positions require to be filled. The ones that are still vacant are as follows; Table.48
DEPARTMENT VACANT POSITIONS
Office of the Municipal Manager PMS Officer
Budget & Treasury Asset and Fleet Officer, Debtors Clerk, Manager Budget and Treasury, Payroll Clerk, SCM Clerk, Secretary CFO
Department of Community & Social Services
Environmental Officer, Chief Protection Officer
Department of Corporate Services Committee Officer
Technical Services Head Civil Services, Housing Officer, PMU Officer, Building Inspector, Foreman Engineering Services, Bricklayer, 4 General Workers
4.6 CRITICAL POSTS The municipality has a staff compliment of five (5) Section 56 Managers, including the Municipal Manager. A total staff compliment of 122 people is within the structures of the municipality. These include subordinate managers, officers, administrative assistants and general workers. The municipality has made remarkable strides to fill vacant positions; especially at top management since all section 54 and 56 Managers are filled. The status on the filling of the critical positions is as follows:
0
20
40
60
80
African Coloureds Indians Whites
66
0 10 3
32
4 5 2
Male Females
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 79
Table.49
POSITIONS STATUS QUO REASONS AND
INTERVENTION FOR NOT
FILLING THE POSITIONS
ANTICIPATED TIME
FRAME FOR FILLING
THE OUTSTANDING
POSITIONS
Chief Protection Officer
Re-advertised Shortlisting and Interview process will be held
before end of September 2017 30 September 2017
PMS Officer Re-advertised Shortlisting and Interview process will be held before end of August 2017
30 August 2017
Asset and Fleet Officer Advertised and Shortlisted
Awaiting for appointment before the end of July 2017
31 July 2017
Financial Manager Not filled Awaiting SALGA information on Salary levels
January 2018 January 2018
LUMS and Building Inspector Officer
Advertised Interviews to be held in January 2018
January 2018
Environmental
Officer
Not filled Awaiting SALGA information on Salary
levels January 2018
Secretary: CFO Advertised Shortlisting and Interview process will be held
before end of June 2017 30 June 2017
Secretary: Community Services
Not filled To be advertised June 2017
The process of filling these positions is in progress. However, the municipality is struggling to attract appropriate candidates to fill some strategic positions due to the level or grading of the municipality.
4.7 HUMAN RESOURCES POLICIES Dannhauser Municipality adopted various human resource related policies. Dannhauser Municipality adopted various human resource related policies. These are detailed in below; Table.50: Human Resource Policies
Policy Date of Adoption
Status
Code of Conduct 2010 Implemented
HIV/AIDS Policy 2010 In process for compilation
HIV/AIDS Strategy 2007 Implemented
Sexual Harassment Policy 2010 Implemented
Smoking Policy 2010 Implemented
Recruitment Policy 2009 Implemented
Subsistence and Travelling Allowance Policy 2014 New Policy Adopted on Feb 2014
Overtime Policy 2010 Implemented
Skills Development Policy 2010 Implemented
Mayoral Vehicle Policy 2010 Implemented
Supply Chain Management Policy 2011 Implemented
Employment Equity Policy 2007 Implemented
Property Rates Policy 2009/2010 Implemented
Indigent Policy 2011 Implemented
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 80
4.8 HUMAN RESOURCES SERVICES The top service delivery priorities for human resources in 2016/17 were ensuring the adequate skills capacitation of the current employees and the adoption of the new organogram for 2017/18 financial year.
4.9 FINALISATION OF NEW ORGANISATIONAL STRUCTURE: IN PREPARATION FOR MIGRATION TO 2017/18 STRUCTURE
The process of developing the new for 2017/18 Structure was completed just before December 2017 in the 2016/17 Financial Year (FY). Subsequent to that all measures to have all jobs evaluated were put in place.
4.10 STAFF ALLOCATION/PLACEMENT PROCESS ON 2016/17 STRUCTURE In the 2016/2017 FY the Organization went through the staff allocation/placement based on the new 2017/18 Structure. The approved Structure although adopted in 2016/17 FY, will be implemented, guided by the approved Staff Allocation/Placement Policy. There was no need to engage Labour as this process primarily focused on the creation of new positions and levels of the positions inclusive of the duties allocated in the new positions. No TASK Grading system was applied nor were there any Staff Allocation Disputes.
4.11 HUMAN RESOURCES - ORGANIZATIONAL DEVELOPMENT PERFORMANCE During the 16/17 financial year the HR Unit - identified certain priorities that must be met in order to unlock the organization’s human capacity potential towards the achievement of the Municipality’s strategic priorities and outcomes. During the year under review, the Municipality’s departments indicated facing challenges of low staff morale. A number of findings were obtained and included multiple factors, inter alia: Shortage of staff in critical and crucial positions; Shortage of office work space, as employees are cramped in small offices; Lack of training and development; Managers and supervisors highly over worked as they are limited to delegating duties to their
subordinates due to staff shortages; and Service Delivery affected due to a shortage in staff.
4.12 ADDRESSING ORGANISATIONAL DEVELOPMENT The counter measures put in place to address gaps identified were as follows: New positions identified to aid in capacitation of critical and crucial areas; Job Adverts designed for the new positions to be recruited for in 2017/18; Building on new municipal offices funded through a Loan applied for from DBSA in 2017/18; and Deploying of staff members to accredited skills training and development for their relevant positions;
4.13 INSTITUTIONAL ARRANGEMENTS Dannhauser Municipality has a staff component of 122 of which some are permanently employed, and five (5) of which are on contracts. The Municipality currently employs five (5) financial interns and this in line with a National Government Programme, viz. the Municipal Financial Management Programme. The table below outlines the different Municipal Directorates and the relevant responsible managers:
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 81
Table.51
DIRECTORATE MANAGER RESPONSIBLE
EXECUTIVE COUNCILLOR
Municipal Manager WB Nkosi Councilor JP Phakathi
Budget & Treasury DM MOHAPI Councilor JP Phakathi
Corporate Services S Narothum Councilor PP Nene
Community Services S Naidoo Councilor SN Ndlovu
Engineering Services MR Nene Councilor SD Msibi
Portfolio Committee and Land Resources
WB Nkosi Councilor SG Sithole
MPAC DM Mohapi Cllr VM Ndaba
SWOT ANALYSIS – MUNICIPAL TRANSFORMATION AND INSTITUTIONAL DEVELOPMENT
Figure.22
STRENGTHS OPPORTUNITIES
Council support in all areas of operation; Sound labour relations Sound management and administrative
practices; All Section 56 / 54 positions filled; Human Resources policies in place; and Employment Equity practices in place
Implementation of policies timeously; Filling in vacant positions; Extended the working space environment; and Training staff members regularly Development of a strong cohesive
organizational structure; and Ensuring a performance driven results
outcomes;
WEAKNESSES THREATS
Working space is limited, making it a non-conducive environment;
Lack of timeous Implementation of policies; Some positions still vacant; A senior & well-experienced IT person is
required; and Skills development and training not undertaken
regularly.
High staff turnover; Lack of skills retention; Fraud & Corruption; Low morale of staff due to lack of office space;
and Salary disparities in comparison with other
surrounding municipalities.
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 82
Chapter 5 FINANCIAL PERFORMANCE
5.1 COMPONENT D: FINANCIAL SERVICES
This component includes: Indigents (Free Basic Services), Financial Services and Supply Chain Management.
5.1.1 INDIGENTS (FREE BASIC SERVICES) Council receives Equitable Share to subsidise those who cannot afford to pay for the minimum needs in life. The objective in calculating the amount to be subsidised, must be to prevent an increasing balance on the account of an indigent as it will be difficult to recover the debt in a humanly way. According to the Municipal Systems Act 2000, Section 74(3) and 75(2) stipulates, “A tariff policy may differentiate between different categories of users/debtors.” Criteria for Approval: 1. That the gross household income for qualification as a registered Indigent be determined each year by
Council in terms of the tariff register. Currently the threshold income is R3200.00, and pensioners 100% rebate; and
2. That the prescribed application forms be completed annually The municipality has an indigent policy in place, and has developed an indigent register therefor implementing the policy. The policy is reviewed twice per financial year, it further enables the municipality to provide free basic services to the needy. The municipality collected date on Indigent families as per the municipality’s Indigent Policy; currently the municipality is in the process of reviewing this data to ensure that the correct information is captured and the data is updated. The municipality provides free basic services such as electricity, water, refuse and sanitation, however water and sanitation are provided by the Amajuba District Municipality. Electricity is provided by ESKOM, then the municipality pays the due allocation to ESKOM as per registered indigent data that is approved by the Municipality. The indigent register allows the municipality to determine the financial needs of basic service delivery service resulting in it being able to develop a Financial Plan and Budget. The constant updating of the register will further allow for reliable cost updating for the free basic services delivery.
5.2.1 FREE BASIC SERVICES DELIVERED – 2016/17 (INDIGENT REGISTER) Table.52 Description of Indigent Service 2015/16
Budget 2015/16 Actual
2016/17 Budget
2016/17 Actual
Water
Waste Water (Sanitation
Electricity
Waste Management (Solid Waste
Total:
5.2.2 FINANCIAL SERVICES The National Key Performance Area for this business unit is Financial Viability & Management. Programmes pertaining to the sections are as follows: Budget & Treasury-Compliance and Annual Financial Statements. Expenditure-Trade and Sundry Payments, Payment of all invoices within 30 days, management of general
insurance fund, remuneration management. Revenue Management-Credit Control and billing, policies. Supply Chain &Supply Chain management, and Asset Management
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 83
5.2.2 DEBT COLLECTION The debt collection rate has improved, however is not ideal at this stage. The debt collection task team put together is addressing collection challenges. Table.53
Details of
the types of account raised and recovered
2015/2016 2016/2017
Billed in Year
Actual Collection
for accounts billed in year
Proportion of accounts
value billed that were collected
in the year %
Billed in year
Actual Collection
for accounts billed in year
Proportion of accounts
value billed that were collected
in the year %
Property Rates
Refuse
Other
The debt collection has improved from 2015/16 to 2016/17 due to the appointment of a debt collection officer. Internal control systems have been strengthened on how debtors must be invoiced, communicating with debtors and debt collected. The management of revenue is governed by policies that are directly aligned to revenue management and debt collection such as billing systems and indigent policies.
5.2.3 GRANT PERFORMANCE 5.2.3.1 GRANTS AND SUBSIDIES
The Municipality had a grant register in place which was updated on a regular basis. The following
grants/subsidies were received during the year under review.
Table.54: Grants/Subsidies Received & Expenditure
Grant/Subsidy 2016/2017 2015/2016
Received (R)
Expenditure (R)
% Received
(R) Expenditure
(R) %
Electrification 5 000 000 5 000 000 100%
Municipal Infrastructure Grant
21 488 885 21 488 885 100% 21 074 000 21 074 000 100%
Municipal Support Improvement Grant
0 0 100% 934 000 934 000 100%
Equitable Share 76 488
880 76 488 880 100% 74 181 000 74 181 000 100%
Municipal Finance Management Grant
1 825 000 1 825 000 100% 1 800 000 1 800 000 100%
Extended Public Works Programme
1 139 307 1 139 307 100% 1 000 000 1 000 000 100%
Library Provincialitions 559 000 559 000 100% 553 000 553 000 100%
Cyber Cadet Grant 179 000 179 000 100% 170 000 170 000 100%
Small Town Rehabilitation 4 834 960 4 834 960 100% 15 048 985 15 048 985 100%
TOTAL R 106 515 032 R 106 515 032 100% R 119 760 985 R 119 760 985 100%
The municipality did not receive an electrification grant in the 2016/17 financial year as indicated in table.54,
the grant was fully utilised in 2015/2016.
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 84
5.3 FINANCIAL HEALTH OVERVIEW
5.3.1 REVENUE Table.55 Revenue
SOURCE AMOUNT
National Grants &
Subsidies
R 100,405,000.00
Provincial Grants &
Subsidies R 738, 000.00
Rates General R 17,617,487.00
Other Income R 20,846,677.00
Refuse Removal R 1,048,075.00
Interest: R 3,000,000.00
TOTAL R 143,655,239.00
The municipality has a budget which constitutes of National and Provincial Grants, Rates and Taxes, Refuse Removal Services, Traffic Fines and Learners and Licences, and other services.
5.3.2 EXPENDITURE Table.56: Expenditure
EXPENDITURE AMOUNT %
Salaries R 34,075,078.00 24%
Councillor Allowances R 7,924,525.00 5%
General Expenses R 36,270,239.00 25%
Repairs & Maintenance R 5,779,552 .00 4%
Contribution to Capital Budget R 51,499,390 36%
Grant Expenditure and Provisions R 8,100,000 6%
TOTAL R 134 512 336
100%
The budgeted expenditure amounts to R 134 512 336 which exceeds the projected revenue. This indicates that the financial needs of the municipality exceed the available financial resources.
5.3.3 GRANTS AND SUBSIDIES The total budget of the municipality is made up of grants and subsidies which comprises of the following categories:
National Grants & Subsidies,
100,405,000
Provincial Grants & Subsidies,
738,000
Rates General, 17,617,487
Other Income, 20,846,677
Refuse Removal, 1,048,075
Interest: , 3,000,000
Income Source 2016/2017
Salaries 24%
Councillor Allowances
5%
General Expenses
25%
Repairs and Maintenace
4%
Contr. To Capital Budget
36%
Grant Expenditure
and Provisions
6%
Expenditure 2016/2017
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 85
Equitable Share, Municipal Infrastructure Grant, Financial Management Grant and Special Programmes Grants.
Table.57: Grants
GRANTS 2015/16 2016/17 2017/18
EQUITABLE SHARE R 70 358 000.00 R 70 144 000.00 R 67 748 000.00
FINANCIAL MANAGEMENT R 1 800 000.00 R 1 825 000.00 R 1 900 000.00
MUNICIPAL SYSTEM IMPROVEMENT
R 930 000.00 R 957 000.00 R 1 033 000.00
MUNICIPAL INFRASTRUCTURE R 21 074 000.00 R 21 767 000.00 R 22 807 000.00
ELECTRIFICATION GRANT R 5 000 000.00 R00 R00
SMALL TOWN REHABILITATION R 00 R 00 R 00
MWIG ALLOCATED DISTRICTS R 6 293 000.00 R 11 779 000.00 R 8 502 000.00
NATIONAL RURAL HOUSEHOLD INFRASTRUCTURE
R 4 500 000.00 Indirect Grant
R 5 000 000.00 Indirect Grant
R 00, 00
EXPANDED PUBLIC WORKS PROGRAMME
R 1 000 000.00 R 00, 00 R 00, 00
COUNCILLORS ALLOWANCES R 3 823 000.00 R 3 997 000.00 R 4 173 000.00
5.3.4 EMPLOYEE RELATED COSTS (INCLUDING COUNCILLOR ALLOWANCES)
The municipality spends approximately 23% (R 28 220 926) of its annual budget on salaries. This is in line with the stipulated requirement from Treasury (33%).
5.3.5 OPERATING INCOME
Table.58: Operating Income
Income 2016/2017 2015/2016
Projected Actual Projected Actual
Refuse Removal – Service Charges 1 048 075 1 033 703 981 000 144 196.63
Traffic Fines 351 446 850 990 169 000 87 805
Motor Licensing 800 000 2 318 403 604 031 1 660 216
Drivers Licensing 204 412 195 808 388 453 135 091
Permits 0 0 0 0
Leaners Licensing 199 580 196 920 189 355 192 800
Rates 16 954 475 17 644 629 16 325 127 16 395 134.95
Grants & Subsidies 101 024 000 106 279 386 104 712 000 104 712 000
Other Income 4 643 815 8 719 856 18 791 000 1 758 130
Total R125 225 803 R 137 239 695 R 142 159 966 R 125 085 373.58
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 86
5.3.5.1 Actual Income 2016/2017 vs 2015/2016
Figure.23
2016/17 MANAGEMENT COMMENTS
Grants and subsidies received was higher than any other income generated by the municipality; and
Rates collected followed grants and subsidies received;
5.3.6 MUNICIPAL EXPENDITURE, LOANS, LEASES AND INVESTMENTS
5.3.6.1 EXPENDITURE
DANNHAUSER LOCAL MUNICIPALITY – OPERATING & CAPITAL BUDGETS Table.59
DRAFT TOTAL OPERATING AND CAPITAL BUDGET 2013
-2016 PER DEPARTMENT
INCOME Original Budget
2015/16
Adjusted Budget
2015/16
Projected Budget
2016/17
Projected Budget
2017/18
Projected Budget
2018/19
COUNCIL (3 823 000) (3 823 000) (5 478 000) (3 997 000) (4 173 000)
FINANCE (98 885 242) (99 342 344) (11 227 059) (100 648 482) (100 019 572)
CORPORATE SERVICES (98 885 242) (100 329) 0 (105 847) (105 847)
TECHNICAL SERVICES (26 359 000) (26 298 928) (22 047 000) (27 004 299) (23 058 300)
COMMUNITY SERVICES (2 742 388) (2 742 002) (3 246 313) (1 809 362) (1 912 443)
PROTECTION SERVICES (1 617 282) (1 498 737) (1 656 867) (1 581 168 ) (1 674 456)
IDP (930 000) (934000) 0 (957 000 ) (1 033 000)
MUNICIPAL MANAGER 0 0 0 0 0
TOTAL INCOME (134 564 003) (134 739 339) (43 655 239) (136 103 158) (41 959 003)
EXPENDITURE Original Budget
2015/2016
Adjusted Budget
2015/16
Projected Budget
2016/17
Projected Budget
2017/18
Projected Budget
2018/19
COUNCIL 18 784 009 19 123 868 18 790 688 20 236 584 21 350 948
FINANCE 19 706 660 19 759 386 22 752 644 20 846 152 22 076 075
CORPORATE SERVICES 14 410 203 10 786 399 13 749 644 11 379 651 12 051 050
TECHNICAL SERVICES 57 999 313 60 209 252 53 163 023 62 273 823 65 926 596
144 88 1660 135 0 193 16395
104712
1758 1034 851 2318 196 0 197
17644
106297
8719
Actual Income Earned - '000
2015/16 2016/17
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 87
COMMUNITY SERVICES 13 327 265 12 721 010 189 51413 13 420 666 14 212 485
PROTECTION SERVICES 4 067 645 3 786 858 4 650 579 3 995 135 4 230 848
IDP 4 811 498 4 503 776 5 665 497 4 751 484 5 031 821
MUNICIPAL MANAGER 3 406 561 3 643 116 11 687 770 3 843 487 4 070 253
TOTAL EXPENDITURE 134 513 153 134 533 666 143 648 784 140 746 982 148 950 076
SURPLUS / DEFFICIT (50 8500) (205 673) 99 993 545 4 643 824 106 991 073
The major expenditure categories for the Dannhauser Municipality are set out in the table below.
Table.60: Operating and Capital Expenditure
Expenditure Item 2016/2017 2015/2016
Projected Actual Projected Actual
Salaries, wages and allowances 36 998 396 33 720 884 29 339 221 29 229 515
General expenditure 36 270 000 60 225 581 35 895 485 60 694 548
Repair and maintenance expenditure
7 518 041 4 573 949 5 126 997 6 163 643
Capital expenditure 51 158 000 68 204 621 78 561 955 60 346 162
Grant expenditure 101 143 000 106 279 386 117 789 000 104 181 893
Total: Gross/Net expenditure R 233 087 437 R 273 004 421 R 266 712 658 R 260 615 761
7.4.3.2 Actual Expenditure Comparison – 2015/16 Vs 2016/17 (‘000 000)
Figure.24
2016/17 MANAGEMENT COMMENTS
Grant and subsidies were fully utilised;
Capital expenditure was higher than general expenditure;
General expenditure was in line with the adjustment budget; and
Salaries, wages & allowances was in line with adjustment budget.
29
61
6
60
104
34
60
5
68
106
0
20
40
60
80
100
120
Salaries, Wages & Allowances General Expenditure Repair & Maintenance Capital Expenditure Grant Expenditure
2015/16 2016/17
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 88
5.3.7 LOANS, LEASES AND INVESTMENTS
As indicated in table.61 below, Dannhauser Municipality had neither bank overdrafts nor loans nor finance
leases for the year under review and the previous year.
Table.61: Bank Overdraft, External Loans and Leases
Loan Type Interest
Rate Balance 30/06/2016 Balance 30/06/2017
Bank overdraft Overdraft - 0 0
External Loans Short/Long Term - 0 0
Finance Leases Lease - 0 0
Total 0 R 0
Table.62: Investment Analysis 2016/17 Investment Description Balance (R) 2016/2017 Balance (R) 2015/2016
Standard Bank - Call Account 7 634 756 8 583 669
Nedbank - Call Account 6 994 104 4 132 507
First National Bank - Call Account 5 459 290 4 623 136
ABSA - Call Account 8 912 186 7 670 116
Stanlib - Call Account 0 6 586
Investec 15 160 816 10 189 256
Total R 44 161 152 R 35 205 324
Investment Call Accounts Comparison (30 June – 2016/2017 vs 2015/2016)
Figure.25
5.3.8 SUPPLY CHAIN MANAGEMENT The Municipality’s Supply Chain Management unit is a support function for all business units within the council to ensure provision of efficient, transparent, fair, equitable and cost effective procurement services hence assisting the business units to implement their service delivery priorities.
5.3.8.1 KEY FOCUS AREAS FOR 2016/2017 FINANCIAL YEAR
2016/17
2015/16
44 161
35 205
Investment - Call Accounts Grand Totals R '000
Investment - Call Accounts Grand Totals
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 89
5.3.8.1.1 Monitoring and Contract Management
In terms of section 116 (2) of the MFMA the accounting officer of a municipality must - “Take all reasonable steps to ensure that a contract or agreement procured through the supply chain management policy of the municipality or municipal entity is properly enforced; monitor on a monthly basis the performance of the contractor under the contract or agreement; establish capacity in the administration of the municipality to assist the accounting officer in carrying out the duties and to oversee the day-to-day management of the contractor under the contract or agreement;” therefore we have established a Contract management Office(monitoring) within the Supply chain management unit in order to adhere to the above act. These are activities of the contract management Monitoring Section: All contracts are monitored, by having regular sites visits and attending monthly site progress meetings. Monitoring of expenditure on supplies and services contract. Monitoring and rotating of contracts with panel of contractors to ensure equal distribution amongst the prospective suppliers. Verifying variation Orders on projects by Project managers and recommend to the Bid Evolution committee. There are challenges in Integrating of project management and Contract management
5.3.8.2 SERVICE STATISTICS FOR SUPPLY CHAIN MANAGEMENT 12 Monthly reports on tenders awarded were submitted during the year 2016/2017 financial year. There were …………….. contracts awarded in 2016/17 and others that commenced prior to 2016/17 and
are still in progress. The following are in place;
5.3.8.2.1 LONG TERM CONTRACTS AND PUBLIC PRIVATE PARTNERSHIPS Table.63 LONG TERM CONTRACTS (LARGEST CONTRACTS ENTERED INTO PRIOR TO 2016/17 AND CONTINUING INTO OR BEYOND
2016/2017) R’ 000
Name of Service Provider (Contract Number)
Description of Services Rendered by the Service Provider
Start Date of
Contract
Expiry date of Contract
Project Manager
Contract Value
5.3.8.2.2 PERFORMANCE MANAGEMENT OF CONTRACTS FOR THE PERIOD 1 JULY 2016 - 30 JUNE 2017
In terms of section 116 (2) of the MFMA the accounting officer of a municipality must - “Take all reasonable steps to ensure that a contract or agreement procured through the supply chain management policy of the municipality or municipal entity is properly enforced; monitor on a monthly basis the performance of the contractor under the contract or agreement; establish capacity in the administration of the municipality to assist the accounting officer in carrying out the duties and to oversee the day-to-day management of the contractor under the contract or agreement;”
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 90
In order to fulfill the requirements of the legislation quoted above the Supply chain Management unit prepares a monthly report on the Performance of all suppliers. This report is tabled at the Strategic Management Committee on a monthly basis thereafter it is forwarded to the other portfolio committees before it is tabled at Council. The table indicates a schedule summarizing the performance of all long-term contracts on a monthly basis that the municipality entered into.
5.3.8.2.2 MONTHLY REPORTS FOR THE PERIOD 1 JULY 2016 - 30 JUNE 2017 Table.64 Name of Service
Provider (Contract Number)
DESCRIPTION OF SERVICES RENDERED BY THE SERVICE
PROVIDER
CONTRACT AMOUNT
LEVEL OF PERFROMANCE & CURRENT WORK STATUS
5.3.8.2.3 SERVICE PROVIDER PERFORMANCE ASSESSMENT
The municipality can provide a municipal service by entering into a service delivery agreement (service level
agreement) in terms of Section 76 (b) of the Municipal System Act with an external service provider. The
municipality is responsible for monitoring and assessing the implementation of the agreement, including the
performance of the service provider in accordance with section 41 of the Municipal Systems Act.
Section 46 (1) (a) (b) states that “(1) A municipality must prepare for each financial year a performance report
reflecting –
a) the performance of the municipality and of each external service provider during that financial
year;
b) a comparison of the performance referred to in paragraph (a) with targets set for and
performance in the previous financial year, and
c) Measures taken to improve performance.
The municipality have taken strides to ensure compliance with the above quoted legislation however in terms
of services provider performance comparison are sometimes not possible due to the fact that projects are
completed within the particular financial year. The table below illustrates the list of services provided by
external service providers.
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 91
Table.65: Service Providers Performance Service
provided in
terms of the
Service
Level
Agreement
(SLA)
Value of Project
2015/16
Performance Information Assessment of
Service
Providers
Performance
2015/2016 2016/2017
Target Actual Target Actual G S P
Small Town
Project
R 25 000 000 Completion of 6 km
of tarred road,
sidewalk, drainage
system and curbing
for the extended
Industrial Park,
Small Town project.
Constructed 6
km tarred road,
erection of
drainage system
and construction
of sidewalks and
curbing.
Secure a bulk
water use
license, and
develop an
Investment
Framework that
invites
prospecting
investors to set
up operations.
This will be from
2016/17
financial year to
the 2017/18
financial year.
Engagement
with Amajuba
District
Municipality
(Water Services
Authority)
commenced.
Proposed
Investment
Framework
budget
presented
through
committees for
approval and
recommendation
to Council.
✔
Rural Road R 13 374 642 Construction of
5km Rural road in
Ward 2 and 5
5km of Rural
road constructed
inward 2 and 5
Construction of
4 Km of Rural
road in Ward 10
& 11
4 Km of Rural
road in Ward 10
& 11 completed.
✔
Urban Road R 3 000 000 Completion of 4.7
kms in urban road
1.7 km of road
constructed in
Urban road (Tar)
Construction of
2 Km tarred
Urban Road in
Wards 2 & 3.
No construction
of 2 Km tarred
urban road.
✔
Traffic Centre R 9 000 000 Traffic Center
offices, ablution
blocks, Testing
Ground, Concrete
fence and
Electrification of the
facility
Constructed of
Traffic Center
with ablution
block, Testing
Ground,
concrete fence
and
electrification of
the facility
N/a N/a ✔
Municipal
Office Building
R 21 000 000 Building Municipal
Office (planning
and Designs
approval)
Designs and
plans developed
and approved
Development of
Business plan
and Submission
for funding with
DBSA for
construction of
Municipal
Offices
Business plan
developed and
submitted for
funding. DBSA,
approved
funding for the
construction of
the Municipal
Offices.
✔
Ward 2
Community
Hall
R 3 000 000 Construction of
Ward 2 Hall
SCM processes,
planning phase
and
commencement
of the project
Monitor and
report the
construction
activity, inspect
building and
close off project.
Construction
completed,
building
inspected and
waiting for
closure
certificates.
✔
Mast Lights R 359 100 Erection of Mass
light for Ward 6,8
and 11
Mass light for
Ward 6,8 and 11
constructed
Maintain street
lights that are
dysfunctional.
Maintained and
upgraded 652
street lights in all
wards.
✔
Electrification
(Infill)
R 11 000 000 Electrification in-fills
projects for 979
households
979 households
electrified in all
Wards
Electrify
additional
household in-
fills.
All electrical
household in-fills
completed.
✔
Sports field
Upgrade
R 400 000 Construction of
sports fields in all
Wards (Grand
stands installation)
10 Grand stands
purchased and
allocated in
different sports
fields
✔
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 92
LED Farm R 1 500 000 Appointment of the
Technical Support
Consultant for
implementation of
the LED Projects
Technical
Support
Consultant
appointed
different
business plans
developed and
engage
investors for
investing in
Dannhauser,
Implementation
of the Agri-Park
project.
Undertake the
Implementation
of the Agri-park
Farmer
Producer
Support Unit
with Department
of Rural
Development
and Land
Reform
(DRDLR).
Renier Farm
purchased by
municipality for
the Agri-Park
projects.
DRDLR
commenced the
supporting of
Co-operatives
on Renier Farm
and has
delivered seeds
to the farmers at
Renier Farm.
Municipality has
fenced the farm
and has
reopened the
borehole
situated at the
farm to provide
water for
farming
activities.
✔
Compilation of
AFS 2016/17
R 380 000 Review of the
2015/2016 AFS
2015/2016
Annual Financial
Statements
were reviewed
as per GRAP
requirements
Review of the
2016/2017 AFS
Review of the
2016/2017 AFS
finalized before
the end of
August 2017
Good
Review of
Asset Register
2016/17
R 493 467 Review and
Verification of the
2015/2016 Asset
Register
2015/2016
Asset Register
was reviewed
and verified as
per GRAP
requires
Review and
Verification of
the Asset
Register
Review and
Verification of
the 2016/2017
Asset Register
finalized by the
end of August
2017
Good
Urban Precinct
Plan
R 446 994 Compilation and
Extension of the
Urban Precinct
Plan
The process for
the Compilation
and Extension of
the Urban
Precinct Plan
Approval of the
Urban Precinct
Plan extension.
The Precinct
Plan has been
approved by
MANCO and
Exco.
✔
References: G = Good = the service has been provided at acceptable standards and within the timeframe stipulated in the Service Level Agreement S = Satisfactory = the service has been provided at acceptable standards of the timeframe stipulated in the Service Level Agreement P = Poor = the service has been provided below acceptable standard
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 93
CHAPTER 6 AUDITOR GENERAL FINDINGS
6.1 AUDITOR GENERAL – PREVIOUS FINANCIAL YEARS
The figure below indicates the findings of the Auditor General’s reports on Dannhauser municipality.
6.1.1 AUDITOR GENERAL REPORT 2014 / 2015 FINANCIAL YEAR The Auditor-General performed an audit and issued a report on the following for 2014/15: Fair presentation and absence of material misstatements in the financial statements (i.e. all transactions or event have been dealt with in accordance with accounting and financial reporting disciplines); Reliable, usefulness and credible performance information for purposes of reporting on predetermined performance objectives; and Compliance with key legislation governing financial and performance matters. The Auditor-General had expressed an unqualified opinion on the Annual Financial Statements for year ending 30 June 2015 and Performance Information with no findings (“clean audit”).
6.1.2 AUDITOR GENERAL REPORT 2015 / 2016 FINANCIAL YEAR In the 2015/2016 financial year the Auditor General expressed an UNQUALIFIED OPINION for the Municipality. The basis for the Unqualified Opinion is as follows: The financial statements submitted for auditing were not prepared in all material respect in accordance
with the requirements of section 122 of the MFMA. Material misstatements of non-current assets, current assets and disclosure items identified by the auditors in the submitted financial statement were subsequently corrected and the supporting records were provided, resulting in the financial statements receiving an unqualified audit opinion.
Matters Raised that required attention and improvement were as follows: 1. Leadership The accounting officer to adequately exercise oversight responsibility over financial reporting, as well as
compliance with legislation. 2. Financial management Management to implement proper record keeping in a timely manner to ensure that the financial
statements are supported by complete and accurate information. Management to adequately review and monitor compliance with legislation to minimise material
misstatements were identified.
3. Governance The risk management activities performed to be adequate to ensure that key financial, and compliance
risks are identified and addressed timeously. Predetermined Objectives: The Auditor General performed procedures to obtain evidence about the usefulness and reliability of the reported performance information for the basic service delivery and local economic development objectives presented in the annual performance report of the municipality for the year ended 30 June 2016. The
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 94
following were undertaken;
An evaluation on reported performance information against the overall criteria of usefulness and reliability.
Evaluation of usefulness of the reported performance information to determine whether it was consistent with the planned objectives.
Performance of tests to determine whether indicators and targets were well defined, verifiable, specific, measurable, time bound and relevant, as required by the National Treasury’s Framework for managing programme performance information (FMPPI).
An assessment of the reliability of the reported performance information to determine whether it was valid, accurate and complete.
Findings No material findings in respect of the selected objectives were identified.
6.1.3 AUDITOR GENERAL REPORT 2016 / 2017 FINANCIAL YEAR
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 95
CONCLUSION
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 96
CHAPTER 7 (ANNEXURE 1) ORGANISATIONAL DEVELOPMENT PMS / SDBIP 2016/17
7.1 PERFORMANCE MANAGEMENT OVERVIEW AND PROCESS The performance management process is implemented to enhance and improve performance planning, implementation, reporting and measurement; Dannhauser has ensured the following actions; Reduction of KPI’s reported on, this enables a greater focus on addressing the municipal strategic
objectives identified in the IDP while applying an outcomes based approach; The SDBIP has a column of the Strategic Objectives cross-linked with rows of KPI’s for each municipal
operational unit, and interlinked with a column which represents the Portfolio of Evidence (P.O.E); The IDP Manager undertakes the functionality of the Performance Management System as there is a
shortage of staff within the municipal structures; The municipality currently uses a “Top Layer” system, this only monitor and evaluates the performance of
Section 56 & 54 managers; a “Middle Layer” which evaluates staff members below Section 56 & 54 appointments is planned for implementation. The SDBIP developed takes into account the “SMART” principle in the setting of indicators and objectives;
In 2016/2017 financial year, the municipality did not have a “Standard Operating Procedure” to evaluate performance, but this has been drafted for consideration in the 2017/18 financial year; and
A Performance Management Policy is currently in place, and it is reviewed on a yearly basis.
7.2 THE SERVICE DELIVERY AND BUDGET IMPLEMENTATION PLAN
The performance management at the municipality is evaluated by the “Top Layer SDBIP” both at the organizational level and the entire SDBIP at departmental level. The SDBIP, Budget and IDP are interlinked through Municipal Strategic Objectives and financial allocations, thus allowing for measurable business operations denoted in the form of KPI’s in the SDBIP. MFMA Circular No.13 gives direction to the following; Alignment of the IDP and Budget; Strategic priorities in the IDP to be addressed by the budget; The SDBIP to indicate and give direction to what the municipality will do in a financial year; and The SDBIP to form the basis of performance against goals set during the budget / IDP processes.
7.3 DANNHAUSER PERFORMANCE MANAGEMENT COMPLIANCE & CHECKLIST
For performance compliance, the following are in place; Table.66
DESCRIPTION YES / (NO)
1 Draft Performance Management Framework / Policy Yes
2 All MSA s57/56 Performance Contracts Signed Yes
3 Audit Committee Yes
4 Municipal Public Accounts Committee Yes
5 Quarterly Performance Reporting To Council Yes
6 Annual Reporting To Council Yes
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 97
7.4 DEVELOPMENT STRATEGY The development strategy for the Municipality is designed to fit-in and give effect to the intention of both the national and provincial development strategies. This includes at a National Development Plan (Vision 2030) and various government programs. The Municipal IDP also fits within the provincial development framework as set out in the PGDS. The Municipality’s strategy covers the following: Strategic fit (alignment with national and provincial development strategies). DLM long-term strategic direction and organizational culture. DLM short-to-medium term strategies and action plans.
7.5 ALIGNMENT WITH NATIONAL AND PROVINCIAL STRATEGIES
To enhance the performance of the municipality and delivery of services, the municipality is measuring all its
performance targets / outcomes based on national goals. The Service Delivery Budget and Implementation
Plan (SDBIP) 2016/2017 is aligned to the national goals of the six ( 6 ) KPA’s, integrated with the Strategic
Objectives in the IDP 2016/2017 in line with the six ( 6 ) KPA’s and then into measurable Key Performance
Indicators (KPI’s) per department. The strategic approach which is the SDBIP 2016/2017 is meant to highlight
the impact that the municipality seeks to create in the short to long-term period. As indicated in the IDP, in
addition to Outcome 9, the Municipality will contribute to the attainment of outcomes 2, 4, 6, 8, 10 and 12
with the 6 KPAs as the strategic areas for intervention. As such, the development strategy for the Municipality
is designed to address issues that are specific to the Municipality whilst also contributing to the attainment of
the National and Provincial Priorities.
7.6 LEGISLATIVE FRAMEWORK ON ANNUAL PERFORMANCE REPORT
Section 46 of the Municipal Systems Act requires a municipality to prepare for each financial year a
performance report reflecting-
The performance of the municipality and of each external services provider during that financial year;
A comparison of the performances referred to in paragraph (a) with targets set for and performances in
the previous financial year; and
Measures taken to improve performance.
An annual performance report must form part of the municipality’s annual report in terms of chapter 12 of the
Municipal Finance Management Act. Section 121 (1) (3) c) of the Municipal Finance Management Act (MFMA)
56 of 2003, requires that:
(1) Every municipality and every entity must for each financial year prepare an annual report. The Council of a
municipality must within nine months after the end of a financial year deal with the annual report of the
municipality and of any municipal entity under the municipality’s sole or shared control in accordance with
section 129.
3) The annual Report of a municipality must include the annual performance report of the municipality
prepared by the municipality in terms of section 46 of the Municipal Systems Act.
Section 129 (1) a) – c) of the Municipal Finance Management Act (MFMA) 56 of 2003, requires that:
(1) The Council of a municipality must consider the annual report of the municipality and of any municipal
entity under the municipality’s sole or share control, and by no later than two months from the date on
which the annual report was tabled in the council in terms of section 127, adopt an oversight report
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 98
containing the council’s comments on the annual report, which must include a statement whether the
council:
a) Has approved the annual report with or without reservations;
b) Has rejected the annual report; or
c) Has referred the annual report back for revision of those components that can be revised.
Every attempt has been made to align the submission of this Annual Performance Report with the submission
of the Annual Financial Statement for the Office of the Auditor General.
7.7 BASIS FOR COMPILATION OF THIS PERFORMANCE REPORT
The purpose of this report is to reflect the actual performance of the Dannhauser Municipality as measured
against the performance indicators and targets in its Integrated Development Plan (IDP) and Service Delivery
and Budget Implementation Plan (SDBIP) 2016/2017. Good performance information helps identify what
policies and processes work and why they work. Performance information is essential for effective
management, including organizational planning, monitoring and evaluation. Externally, performance
information allows effective accountability with appropriate information; members of the public and other
stakeholders are able to exert pressure for improvements and can better understand the issues involved.
Note: Not all indicators can be compared to previous years as a result of the ever-changing work environment
in local government. Some of the KPI’s of 2015/2016 have been phased out in the 2016/2017 financial year as
they have been fully accomplished, while others are new within the 2016/2017 financial year.
7.8 OVERVIEW OF ORGANISATIONAL DEVELOPMENT PERFORMANCE
7.8.1 PERFORMANCE MANAGEMENT SYSTEM FRAMEWORK
In the year under review, Dannhauser Municipality had developed and adopted its Performance Management System (PMS) Framework as guided by legislation. Council adopted this Framework on 27 July 2016. Municipality’s PMS is utilized in order to detect under performance early in the financial year under review; as such in order to improve on performance planning, implementation, reporting and measurement, the institution implemented the following actions: The Municipality’s SDBIP focused on strategic issues, which were well defined, output based and not
operational in nature and these were reported on quarterly. This afforded the institution the opportunity to focus of key service delivery matters;
Departmental operational plans were developed for monitoring and reporting operational programmes;
There is a column in the SDBIP for each KPI to ensure that the portfolio of evidence was populated correctly;
the Municipality endeavored during the development of the departmental SDBIPs that the “SMART” principle was adhered to in the setting of indicators and objectives; and
Emphasis was placed on ensuring that targets were specific and time bound, thus making it measurable; the Municipality also supported the Local Government Outcome 9 and its specific 7 outputs, and these included in both the organizational scorecard/SDBIP.
Dannhauser Municipality has a performance evaluation system in place only for Section 54/56 employees. The Municipality is looking at ways to cascade its PMS down to lower post levels. In the interim the PMS policy is implemented only to Section 54/56 Managers.
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 99
7.8.2 DEPARTMENTAL ROLES OF RESPONSIBILITIES
Dannhauser Municipality consists of five (5) departments. Departmental roles and responsibilities are outlined
in table.67 below.
Table.67: Departmental Roles and Responsibilities
DEPARTMENT FUNCTIONS
OFFICE OF
MUNICIPAL
MANAGER
Leadership
Overall responsibility for the organization; Form and develop efficient and effective administration; Advise
political structures and political office bearers; Ensure implementation of decisions of political structures;
Ensure implementation of national and provincial legislation/ laws; Accountability for financial and other
resources in the municipality; and IDP Alignment and Institutional Support
Performance Management System (PMS)
Organizational and Individual (high level) PMS; and Annual Report
Strategic Planning and Monitoring
Integrated Development Planning in terms of the MSA and the MFMA; and Performance Management
Systems in terms of the MSA and the MFMA.
Public Relations and Communication
Promote access to information; Provide ad hoc assistance to the Mayor’s office; Media liaison; and
Coordinate & organize official functions.
Internal audit and audit committee
Internal Audit, Performance & Risk Management
Internal Departmental Relations
Social Cohesion
Youth and Gender Matters; Plan and coordinate matters relating to youth and gender; HIV/AIDS; and
Culture & Gender
Local Economic Development
Local Tourism, Agriculture and Commerce and Industry; SMME Support and Poverty Alleviation; and
AFLED sub-committee administration
Financial & Project Management
Information Technology
Network administration
Departmental Policy Development
CORPORATE
SERVICES General administration
Fleet Administration
Office Facilities / Property Management
Ward Committees
Security Services
Cleaning/Gardening Services
Secretariat
Council Support
Legal Services
Human Resources and Labour Relations (Excluding Payroll)
Policies and Procedures
Capacity Building and Training
Governance
Registry/ Records Management
Human Resources; Skills Development ; Employee Wellness Programme; and Occupational Health & Safety
Departmental Policy Development
TECHNICAL
ENGINEERING
SERVICES
Water Service Authority
Governance, Planning & Regulation
Storm Water Management
Building Regulations
Electricity Maintenance (outsourced)
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 100
Integrated Waste Management
Municipal Roads
Public Works and Asset Maintenance; Land Reform; and Infrastructure Development
Municipal Infrastructure Grant Programme (MIG) and other allocations
Basic residential infrastructure; Public municipal services infrastructure; and Social institutions
infrastructure.
Fleet and Engineering Maintenance
Engineering Health and Safety
Development Planning Spatial Development Frameworks (SDF); Land Use Management Systems (LUMS); Geographic Information
Systems (GIS); Relevant IDP Sector Plans; and Housing and Land Reform Coordination
PMU Unit
Departmental Policy Development
FINANCIAL
SERVICES Management of Grants, Taxes, Levies, etc.
Income and Expenditure
Debt Management
Budgets (Planning, Implementation & Control)
Assets Management
Payroll
Risk Management
Loans and Investments
Financial Reporting
Supply Chain Management
Audit Administration
Departmental Policy Development COMMUNITY
SERVICES Regulate Passenger Transport
Traffic and Parking
Cemeteries and Crematoria
Cleansing
Disaster Management
Fire Fighting Services
Refuse removal, refuse dumps & solid waste
Child Care Facilities
Care and Burial of Animals
Pounds
Trade Regulations Licensing and control of undertaking that sell food to the Public; Control of undertaking that sell liquor to
the public; and Street trading
Facilities for Accommodation
Public places
Environmental Management
Pollution
Local Sport facilities
Municipal Parks and recreation
Departmental Policy Development
7.8.3 DISTRICT INTER-GOVERNMENTAL RELATIONS
Dannhauser Municipality has IGR structures in place and they are functionality though they are dependent on
the District Municipality as it is obligated to coordinate meetings.
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 101
7.9 INTEGRATED DEVELOPMENT PLAN, PERFORMANCE MANAGEMENT SYSTEMS AND BUDGET ALIGNMENT The MFMA Circular No.13 prescribes that: The IDP and budget must be aligned; The budget must address the strategic priorities; The SDBIP should indicate what the municipality is going to do during next 12 months; The SDBIP should form the basis for measuring the performance against goals set during the budget /IDP processes. Table.68: IDP, PMS and Budget Alignment 2016/2017
CRITERIA ESTABLISHED (YES/NO)
Is there a Council adopted PMS Framework? Yes, 29 July 2016
Is there a Council adopted Budget? Yes, 27 May 2017
Is there a Council adopted IDP? Yes, 27 May 2017
Were the above documents communicated with the community members? Yes
Does the municipality have measurable indicators as per National Treasury Framework for Managing Programme Performance Information? Yes
Does the IDP have priorities, strategic objectives, KPIs? Yes
Does the IDP have multi-year targets? Yes
Is there a Council adopted SDBIP? Yes, 29 July 2017
Does the budget align directly to the indicators? Yes
Are all Section 54/56 Managers in possession of signed performance agreements? Yes
Are the IDP indicators aligned to the Section 54/56 Managers performance plans? Yes
Were all quarterly performance reports developed and submitted to Council? Yes
Is the municipality with PMS audited by an Internal Auditor for functionality and legal compliance? Yes
Were all quarterly individual performance assessments conducted? No
Has the municipality cascaded PMS to levels below Senior Management? No
Is the municipality with appointed Audit Committee? Yes
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 102
Council adopts IDP/Budget Process Plan in July of each year. Council adopted the IDP Review and the Budget
for 2016/17 on 27 May 2016; the 2016/2017 IDP Review and Budget was adopted by Council timeously on 27
May 2016. Council adopted the PMS Framework Review 2016/2017 on 27 July 2016. Once IDP and Budget
were adopted, the SDBIP 2015/16 was finalized as prescribed by the MSA, MFMA and MFMA Circular 13.
Council approved this SDBIP on 29 July 2015. Assessments of the SDBIP were conducted on a quarterly basis;
reports of which were submitted to Council for consideration.
The mid-year performance assessment report (Section 72 Report of the MFMA) was prepared and adopted by
Council on 27 January 2017. Thereafter the adjustment budget process was initiated, resulting in an
Adjustment Budget 2016/17 being considered and approved by Council on 24 February 2017. There was a
need to revise the SDBIP in terms of Section 54(c) of the MFMA; Council adopted the revised SDBIP on 24
February 2017. Adoption/approval of all the aforementioned documents was publicized as prescribed by
Section 21(a)(1) of the MSA.
As indicated earlier, this report highlights 2016/2017 successes and areas that require improvement in an
endeavor to achieve the six (6) municipal strategic key performance areas. Table.69 below outlines these
strategic KPAs and weighting per department.
Table.69: Key Performance Areas and Weightings per Department
Key Performance Area (KPA) KPA
Acronym
Departmental KPA Weightings (%)
OMM FINS CORPS TECHS COMMS
Municipal Institutional Transformation and
Development MIT&D 10 10 40 10 10
Basic Service Delivery BSD 5 0 0 50 30
Local Economic Development LED 20 10 10 10 10
Good Governance and Public Participation GG&PP 40 40 40 10 10
Environmental and Spatial Management ESM 10 0 0 10 20
Municipal Financial Viability and Management MFV&M 15 40 10 10 20
TOTAL 100 100 100 100 100
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 103
7.10 PERFORMANCE AGAINST THE NATIONAL KEY PERFORMANCE INDICATORS
Table.70 below highlight performance of legislated key performance indicators (KPI) as set out in Section 10 of the Municipal Planning and Performance
Management Regulations of 2001.
Table.70: Assessment of National Key Performance Indicators
National Key Performance Indicator (NKPI)
Performance Information
2015/2016 2016/2017
Target Achieved Target Achieved
Basic Service Delivery
The percentage of households with access to basic level of water services Not Applicable (function of the District Municipality)
The percentage of households with access to basic level of sanitation services Not Applicable (function of the District Municipality)
The percentage of households with access to basic level of electricity services 20 439 hh 831hh/20 439hh = 4.1% 20 439 hh 831hh/20 439
The percentage of households with access to basic level of solid waste removal 3 000 hh 3000/3000 = 100% 3000hh 3000/3000 = 100%
National Key Performance Indicator (NKPI)
Performance Information
2015/2016 2016/2017
Target Achieved Target Achieved
Financial Viability and Management
The percentage of a municipality’s capital budget actually spent on capital projects identified
for a particular financial year in terms of the municipality’s IDP
100% MIG - 100% -Electrification
100%
100% MIG – 100%
Local Economic Development
The number of jobs created through the municipality’s local economic development initiatives
including capital projects
Not Available 279 jobs = 200 LED
opportunities (Zibambele
project) plus 79 EPWP
opportunities
143 jobs (Zibambele
project)
143 jobs created =100%
Institutional Development and Transformation
The number of people from employment equity target groups employed in the three highest
levels of management in compliance with a municipality’s approved employment equity plan
Not Available 20 (10 African Males, 2 Indian
Males, 7 African Females and
1 Indian Female) 20/86 = 23%
Not Available 20 (10 African Males, 2
Indian Males, 7 African
Females and I Indian
Female) 20/86 = 23%
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 104
The percentage of a municipality’s budget actually spent on implementing its workplace skills
plan
R1 968 000-00
R2 061 447-58
R2 788 000-00
R2 659 689-00
104%
National Key Performance Indicator (NKPI)
Performance Information
2015/2016 2016/2017
Target Achieved Target Achieved
Financial viability as expressed by ratios:
Debt coverage
A = B – C
D
Where –
“A” represents debt coverage
“B” represents total operating revenue
“C” represents operating grants
“D” represents debt service payments (interest and redemption) due within the financial year
1:1 (141 454 982.48 minus 81
743 277.59) divided by 25
720 827.22
= 1:8.68
1:1 (124 050 234 minus 104
514 687) divided by 23
262 721
= 1: 0.84
Outstanding service debtors to revenue
A = B
C
Where -
“A” represents outstanding service debtors to revenue
“B” total outstanding service debtors “C” represents annual revenue actually received for
services.
1:1 12 975 297.22 divided by 12
518 924
= 1:1.04
1:1 11 274 140 divided by 14
275 520.65
= 0.79 : 1
Cost coverage
A = B + C
D
Where –
“A” represents cost coverage
“B” represents all available cash at a particular time
“C” represents investment
“D” represents monthly fixed operating expenditure.
1:1 (12 518 924 plus 30 985
267.27) divided by (5 898
968.50 plus 19 821 858.72)
= 1:1.69
1:1 47 467 268 divided by
113 574 464/12
= 5 : 1
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 105
7.11 PERFORMANCE AGAINST SIX (6) MUNICIPAL STRATEGIC KEY PERFORMANCE AREAS
7.11.1 Overall Performance per Municipal KPA
Overall performance per each of the six (6) KPAs is as per table.71 below.
Table.71: Overall Performance per Municipal KPA
Category Explanation MIT&D BSD LED GG&PP ESM MFV&M Total #
KPIs Total % KPIs
KPI not yet measured
KPI's with no targets or actual results for the selected period
0 0 0 0 0 0 0 0
KPI not met Actual vs. target less than 75% 5 4 3 16 0 0 28 15%
KPI almost met
Actual vs. target between 75% and 100%
1 1 1 3 0 1 7 4%
KPI met Actual vs. target 100% achieved 13 17 13 74 8 21 146 81%
KPI well met
Actual vs. target more than 100% and less than 150% achieved
0 0 0 0 0 0 0 0%
KPI extremely well met
Actual vs. target more than 150% achieved
0 0 0 0 0 0 0 0%
Total # KPI 19 22 17 93 8 22 181 100%
Indications: MIT&D = Municipal Institutional Transformation and Development BSD = Basic Service Delivery LED = Local Economic Development GG&PP = Good Governance and Public Participation SDS = Social Development Services MFV&M = Municipal Financial Viability and Management
The table above indicates that of the 181 KPIs:
146 KPIs were achieved (KPI met + KPI well met + KPI extremely well met) which is 81% of the indicators;
7 KPIs were almost achieved (KPI almost met), which is 4% of the indicators; and
28 KPIs were not achieved, which is 15% of the indicators.
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 106
Table.72: Departmental Performance Against SDBPI KPIs
Department
2016/2017 2015/2016
No. of Indicators / Targets
(KPI Met / KPI Well Met / KPI
Extremely Well Met) + KPI Almost
Met
KPI Not Met
% (KPI Met / KPI Well Met
/ KPI Extremely
Well Met) + KPI Almost
Met
No. of Indicators /
Targets
(KPI Met / KPI Well Met /
KPI Extremely Well Met) + KPI Almost
Met
KPI Not Met
% (KPI Met / KPI Well Met / KPI Extremely Well Met) + KPI Almost
Met
Office of the MM 70 49 + 7 = 56 14 80% 69 35 + 4 = 39 6 87%
Financial Services 29 27 + 1 = 28 1 97% 24 25 + 1 = 26 1 96%
Corporate Services 32 28 4 88% 24 15 + 0 = 15 3 84%
Technical Services 24 19 + 1 = 20 4 88% 25 11 + 1 = 12 1 92%
Community Services 26 20 + 1 = 21 5 81% 21 10 + 3 = 13 2 87%
Total 181 143 + 10 = 153 28 85% 163 97 + 9 = 106 18 89%
Table.72 indicates percentage of target achieved and partially achieved as 85%; which represents 94% of target met, well met and extremely well met and 6%
of almost met. Table.72 is in line with table.71
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 107
7.12 KPA 1: MUNICIPAL INSTITUTIONAL TRANSFORMATION AND DEVELOPMENT – ACTUAL ANNUAL OUTCOMES Table.73: Municipal Institutional Transformation and Development SDBIP KPIs
SDBIP Ref
IDP Ref Strategic Objective
Measurable Outputs
Unit of Performance
Measurement
Frequency / Timeline
Institutional / Ward
2015/2016 2016/2017 Performance Information
Annual
Annual Target Annual Actual
KPI Not Met / KPI
Almost Met / KPI Met / KPI Well Met
/ KPI Extremely
Met
Performance Comments / Reasons for Deviation
Corrective Action
Demand Baseline Backlog
KPA 1: Municipal Transformation and Institutional Development
Outcome 9 Indicator : Output6 - Improving Municipal Financial and Administrative Capacity & Output 1: Implement a differentiated approach to municipal financing, planning and support
OMM1 3.3.2.1 To keep the Municipal Workforce
well informed
Management committee meetings
conducted
No. of meetings
Quarterly Institutional 12 12 0 12 12 KPI Met
OMM2 3.3.2.1 Staff Meetings
conducted No. of
meetings Quarterly Institutional 4 4 0 4 4 KPI Met
OMM3 - To transform the
Dannhauser into a
performance driven
Municipality
Strategic Planning Meetings
conducted
No. of meetings
Quarter 3 & 4
Institutional 2 2 0 2 2 KPI Met
OMM4 3.5.4.5
Social Development Activities Plan developed and
adopted by ExCo
Date adopted Quarter 1 Institutional Yes New No by 31 June 2017
Social Development Plan not yet
approved nor adopted by June 2017
KPI Not Met
Social development
Plan developed but
not yet approved
To be approved in
2017/18 financial year
FIN1 7
To transform the
Dannhauser into a
performance driven
Municipality
Outsourced services
effectively managed
Monitoring and
evaluation of Service Level Agreement as per appointed
Contractors and Service providers
Quarterly Institutional New New 0 Annual Report
Annual Report is available
June 2017
KPI Met
CORP1 7
To transform the
Dannhauser into a
performance driven
Municipality
Outsourced services
effectively managed
Develop and signing of
Service Level Agreement as per appointed
Contractors and Service
Quarterly Institutional New New 0 Annual Report
Annual Report is available
June 2017
KPI Met
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 108
providers
CORP2 3.3.1.1
To provide skills
development programmes
for Staff, Councillors
Workplace Skills Plan (WSP) in line with the Employment Equity Plan
(EEP) approved
Date of approval of WSP in line
with EEP
Quarter 4 Institutional Yes No 30-Apr-17
WSP & EEP Approved
KPI Met
CORP3 3.3.2.1
Municipality's Budget actually
spent on Workplace Skills
Plan
% Spent = (actual
amount spent on WSP / budgeted
amount for WSP)*100
Annually Institutional 100% 0% 0% 100% 100%
KPI Met
CORP4 3.3.3.2
Human Resource
Development Strategy
compliance
Date of approval of the Human Resource
Development Strategy
Quarter1 Institutional Yes Draft
Strategy No 30-Sep-16
Draft Strategy Developed as at 30 September 2017
KPI Not Met
Draft document not submitted to Council as it was still being verified
To be submitted to Council in 2017/2018
CORP5 3.3.2.1
Skilled workforce
(Employees & Councillors)
Number of Employees
and Councillors
Trained
Quarterly Institutional Yes 26
employees & 18 Cllrs
No
Annual Progress report on the
Staff and Councillors
trained
100% KPI Met
CORP6 3.3.1.1
To ensure that
employment equity targets
are met
Updated EE Plan
Date submitted
Quarter 2 Institutional 10/1/2014 10/1/2014 0 by 31 Oct 2016 31 Oct 2016 KPI Met
CORP7 3.3.2
To implement a refined
organisational structure
Council Adopted
Organisational Structure
Date of adoption
Quarter 1 Institutional Yes Yes, 30 May
2016 No by 30 June 2017
30 June 2017
KPI Met
CORP8 3.3.4
To implement a refined
organisational structure
Recruitment for critical posts completed
No. of critical posts filled
Quarterly Institutional 22 5 0 22 posts filled 5 Posts Filled
KPI Not met
Posts were advertised but no suitable applicants for 17 posts. Vacant posts also affected by shortage of municipal office space.
Re-advertising of posts within the new financial year 2017/2018.
CORP9 3.3
To ensure effective record
management
Develop and implementation
of Records Management
Progress reports
Quarterly Institutional Yes None Yes since
2014
Approved Record
Management System and
4 Progress Reports In place but
record
KPI Almost
Met
Waiting for responses for department of Arts & Culture
To ensure Department of Arts & Culture
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 109
System System Implementation Reports
system not approved
responds in 2017/2018
CORP10 3.3
Finalising approval of the
Record Management
Policy by Council
Date adopted Quarter 2 Institutional Yes Draft Policy Yes 30-Nov-16 KPI Not
Met Waiting for Department of Arts & Culture
To ensure the Department of Arts & Cultiure finalizes in 2017/2018
CORP11 3.6 To transform
the Dannhauser
into a performance
driven Municipality
Monitoring and excecution of
Council, Portfolio and
EXCO resolutions
No. of Status quo Reports
Quarterly Institutional 4 New none 4 4 Reports KPI Met
CORP12 3.3.3.2 Implementation
of job evaluations
No. of progress reports
Quarterly Institutional - New - 4 4 Reports KPI Met
TECH1 7
To transform the
Dannhauser into a
performance driven
Municipality
Outsourced services
effectively managed
Monitoring and
evaluation of Service Level Agreement as per appointed
Contractors and Service providers
Quarterly Institutional New New 0 Annual Report Annual
Report In Place
KPI Met
COM1 7
To transform the
Dannhauser into a
performance driven
Municipality
Outsourced services
effectively managed
Monitoring and
evaluation of Service Level Agreement as per appointed
Contractors and Service providers
Quarterly Institutional New New 0 Annual Report - KPI Not
Met
No SLA’s required with service providers
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 110
7.13 KPA 2: BASIC SERVICE DELIVERY – ACTUAL ANNUAL OUTCOMES
Table.74: Basic Service Delivery SDBIP KPIs
SDBIP Ref IDP Ref Strategic Objective
Measurable Outputs
Unit of Performance
Measurement
Frequency / Timeline
Institutional / Ward
2015/2016 2016/2017 Financial Performance
Annual
Annual Target Annual Actual
KPI Not Met / KPI
Almost Met / KPI Met /
KPI Well Met / KPI Extremely
Met
Performance Comments / Reasons for Deviation
Corrective Action
Demand Baseline Backlog
KPA 2: Basic Service Delivery
Outcome 9 Indicator : Output 2 - Improving Access to Basic Services
OMM5 5.2.5 To improve expenditure
control
Grant projects' performance
monitoring and evaluation reports
submitted to relevant
stakeholders
Turnaround time (M&E reports signed 7 days
after each month-end and
submitted accordingly)
Monthly Institutional Yes New No
signed within 7 days
monthly and submitted
accordingly
Grant funded projects
monitoring and evaluation
reports signed within 7 days after month-
end on a monthly basis and submitted
to grant stakeholders
KPI Met -
TECH2 3.4.5 To facilitate the construction of
new offices
Building of New Offices
implementation of project = (work
performed/total scope of work as
per business plan)*100
Quarterly 2 - New -
The project commenced
based on Design Plans
Design Plans approved,
funding obtained from
DBSA in 2016/2017
KPI Met
TECH3 3.4.7 &
4.7
To facilitate the provision
housing in line with the
national and provincial norms and standards
Phase 1 of Buhlebomzinyathi Housing Project: Implementation
No. of the houses built
Quarter 4 9, 10 90 New 0 90 houses
built 10 houses built
KPI Not Met
10 Certficates of Completion submitted by 30 June 2017, Construction
near completion
and verification of
completed structures still
to be undertaken
To follow-up with
Department of Human
Settlements for
certificates of completion
TECH4 3.4.7 & To facilitate the Phase 2 & 3 of implementation of Ongoing 9, 10 Approval of Stage 1 - Approval of Approval of KPI Not Application To ensure
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 111
4.7 provision housing in line
with the national and
provincial norms and standards
Buhlebomzinyathi Housing Project: Planning & Data
Collected
project = (work performed/total scope of work as
per business plan)*100
Stage 2 by 30 June 2017
completed Stage 2 by 30 30 June 2017
Stage 2 by 30 30 June 2017
Met Pack for the project has
been submitted to
Department of Human
Settlements for approval of
stage 2 & 3, BUT rejected
due to outstanding documents -
that programme calendar of
Human settlements is obtained by
the municipality
and to further make
constant follow-ups for
stage 2 & 3 approvals in
2017/18
TECH5 3.4.7
To facilitate the provision
housing in line with the
national and provincial norms and standards
Dannhauser Housing Project
Submission of stage 2 application for
approval
implementation of project = (work
performed/total scope of work as
per business plan)*100
Quarterly 2 Approval of
Stage 2 by 30 June 2017
Stage 1 completed
- Approval of
Stage 2 by 30 June 2017
Approval of Stage 2 by 30
June 2017
KPI Not Met
Application pack
submitted to Human
Settlements for approval
but was rejected due
to Stage 1 still being
incomplete
To ensure that
programme calendar of
Human settlements is obtained by
the municipality
and to further make
constant follow-ups for
stage 2
TECH6 4.7
To facilitate the provision
housing in line with the
national and provincial norms and standards
Implementation of Stand Drive Inn
Project
Implementation of project = (work performed/total scope of work as per business plan)*100
Quarter 4 2
Approval of Stage 1
applicationand land aquisation by 30 June 2017
New -
Approval of Stage 1
application and land
aquisation by 30 June 2017
No reports received from
Human Settlements
KPI Not Met
Process is external and handled by
Human Settlements
To Follow-Up with Human Settlements
TECH7 3.4.7 &
4.7
Implementation of Strijbank
Rectification Project
Implementation of project = (work
performed/total scope of work as
per business plan)*100
Quarter 4 3
Approval of Business plan
and construction of 180 houses by
30 June 2017
New
Approval of Business plan
and construction
of 180 houses by 30 June
2017
No reports received from
Human Settlements
KPI Not Met
Process is external and handled by
Human Settlements
To Follow-Up with Human Settlements
TECH8 3.1.14 Implementation of
Disaster relief program
Number of houses build
Quarterly All 15 15 15 15 Housing
unit constructed
15 Houses Constructed
KPI Met
TECH9 3.4.1 & 3.4.3
To facilitate the provision
housing in line with the
national and provincial norms and
Water mitigation project: Deep rural
households provided with water
through water tankers
Implementation of project = (work
performed/total scope of work as
per business plan)*100
Monthly All New Not
Available Not
Available
Jojo Tank acquired and
installed; Provision Reports
Jojo Tanks Installed
KPI Met
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 112
standards
TECH10
To Provide Public
Amenities
Provision Mobile Child Care Facilities
No. of Facilities provided
Quarter 3 5 and 10 3 2 8
Erection of mobile child
care facility in Ward 5 and
10
3. Mobile Child care facilities
provided KPI Met .
TECH11 3.5.4.4 Construction of Community Hall
100 % implementation of
project = (work performed/total scope of work as
per business plan)*100
Annually 2 1 3 -
Ward 2 Constructed community
Hall
Community Hall Ward 2 Construction Completed
100 %
KPI Met
TECH12 3.5.4.4 Construction of Taxi
Rank
implementation of project = (work
performed/total scope of work as
per business plan)*100
Annually 2 New - - Dannhauser
taxi rank completed
Appointment of Service provider
occurred in February 2017, planning and designing also commenced
and completed
KPI Not Met
The magnitude of the project is large and
required proper
planning and processing to
appoint a suitabily qualified Service
Provider
Constructin to commence in
2017/2018 financial period
TECH13 3.4.6.1
To ensure safe Rural road
infrastructure networks
Road Network Constructed
No. of KM's Ongoing 10 & 11 4 Km 6km - 4 km
constructed 4 Km
constructed KPI Met
TECH14 3.4.6.1
To ensure safe Urban road
infrastructure networks
Urban road infrastructure
networks Installed No. of KM's Quarter 2 2&3 2km 4.7km 11.3km
2km constructed
Appointment of Service provider
KPI Not Met Budget
Limitation
Road constructed in
2017/2018
TECH15 3.4.5
To ensure safe environment
through installation of
Mast Lights
Electrification of the household-infills
No. of the household
electrified- In-fills Quarter 4 All 3 700 800 3 700
100% completion
(1 052 Electrified In-
fills)
100% Completion
( 623) Electrified In-
fills)
KPI Almost Met
Shortage of meters and
Eskom Process
Purchasing of meters and
engaging Eskom to catalyze process
TECH16 3.4.5
To ensure safe environment
through installation of Street Lights
Upgrade and maintenance of the
street lights
% of street lights maintained = (street lights
maintained / total no. of street lights)*100
Quarterly 1, 2 527 0 967 all street
lights maintained
All street lights maintained
KPI Met
COM2 3.4.4
To regularly provide effective
services to the
Provide Refuse Removal to the
municipal area on a weekly basis
No. of households serviced with
refuse removal Weekly 1.2 1704 1704 0 1704
1704 refuse removal’s per
week KPI Met
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 113
COM3 3.4.4
Community in order to create clean and safe environment
No of business units serviced
with refuse removal
Weekly 1, 2, 114 114 0 456 456 refuse removals per week
KPI Met
COM4 3.4.4
No of small holdings in the
outlying areas of Dannhauser
receiving refuse removal services
Weekly 1, 3, 7, 11 3034 3034 0 12136 12136 refuse removal weekly
KPI Met
COM5 3.4.4
No of indigent household with access to free basic services
(Refuse removal)
Quarterly 1,2,11 113 113 113 452 452 indigent
refuse removal KPI Met
COM6 3.5.3.4
To provide educational
and recreational
services to the community
Monitor the number of registered library
users on monthly basis
No. of Statistical Reports
Monthly All 12 12 0 12 12 KPI Met -
COM7 3.5.4.13
To direct law enforcement to improve safety
and security
Road block conducted
No. of Road Blocks Conducted
Quarterly Institutional 15 15 0 15 15 KPI Met -
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 114
7.14 KPA 3: LOCAL ECONOMIC DEVELOPMENT - ACTUAL ANNUAL OUTCOME
Table.75: Local Economic Development SDBIP KPIs
SDBIP Ref IDP Ref Strategic Objective
Measurable Outputs
Unit of Performance
Measurement
Frequency / Timeline
Institutional / Ward
2015/2016 2016 / 2017 Financial Performance
Annual
Annual Target Annual Actual
KPI Not Met / KPI
Almost Met / KPI Met / KPI
Well Met / KPI
Extremely Met
Performance Comments / Reasons for Deviation
Corrective Action
Demand Baseline Backlog
KPA 3: Local Economic Development
Outcome 9 Indicator : Output 3 - Implementation of the Community Work Programme
OMM6 3.5.3.1
To Create a climate
conducive for
sustainable economic
Growth and job creation
Reviewed LED Strategy adopted
by Council Date adopted Quarterly Institutional Yes New No
Adopted and Implemented LED Strategy
Draft LED Strategy under
review
KPI Almost Met
Currently stakeholder engagement
processes
LED Strategy to be adopted
with all comments from stakeholders in
2017/18 (29 November
2017)
OMM7 3.5.3.2
Develop and approved Tourism
Strategy and establishment of
Community Tourism
Organisation
Date adopted Annually Institutional Yes None No
Adopted Tourism
Strategy and Establishment
of CTO's
Tourism Strategy still
being developed and formalization
of CTO underway
KPI Not Met
Tourism Strategy
developed and CTO
establishment still in progress
Tourism Strategy
Developed and to be adopted
in 2017/18, CTO establishment to be finalized
in 2017/18
OMM8 3.5.3
Establishment and functional
Investment Committee
No. of meetings held
Quarterly Institutional 8 0 New 4 Meetings held No Meetings
held KPI Not Yet
Met
Two meetings held, initially
under MANCO but Investment Forum has been separated from
MANCO and palced under LED Forum to
enhance Stakeholder Participation
Investment Forum
established and meetings now
being convened under LED
Forumas from 2017/18
financial yae
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 115
OMM9 3.5.3.1
To Create a climate
conducive for
sustainable economic
Growth and job creation
Implement of Rural
Development initiative
Progress Report on the
Implementation of Rural
Development Initiative
Quarterly Institutional 4 New 0 Annual
Progress Report
4 Reports and Annual Report
In place KPI met
OMM10 3.5.3 Implementation of LED project
No. of jobs created through
LED Quarterly All 112 96 112 112 112 KPI Met -
OMM11 3.5.3.5 Promotion and Support of local
SMMEs
SMME's supported and
capacitated Quarterly Institutional Yes New No
Annual progress Report
Progress Report in
place KPI Met
OMM12 3.5.2.6
Promotion and Support of Local
Information Economy
Informal traders Supported and
Capacitated Quarterly Institutional Yes New No
Number of Supported and
Capacitated informal Economy
Informal Economy
Policy
KPI Not Met
Process of developing
Informal Economy Policy commenced as community was
still being consulted
Policy to be finalized in
2017/18
OMM13 3.5.3.1
Implementation of municipal Zibambele
program and implementation
of CWP
No. of participants
employed for municipal Zibambele
(EPWP)
Quarterly All 143 121 22 143 143 Jobs Created
KPI Met
OMM14 3.5.3.10 Implementation
of municipal CWP
No. of participants
employed for CWP
Quarterly All 1010 1100 90 1100 1100 Jobs Created
KPI Met
OMM15 3.1.4.1
To eradicate poverty and
improve socio
economic condition
Finalisation of the Urban Precinct
plan Approval by Council
Date adopted Quarter 2 4 Yes None Yes since
2014
Finalisation of the Urban
Precinct plan and approval by
council
Precinct plan adopted
KPI Met -
FIN2 3.5.3.1 To Create a
climate conducive
for sustainable economic
Growth and job creation
Co-ordinate and Implementation
of LED
To provide support for LED Project as and when required
Quarterly All New New 0 4 4 KPI Met
FIN 3 3.5.3.1
Implementation of municipal Zibambele
program and implementation
of CWP
No. of participants
employed for municipal Zibambele
(EPWP)
Quarterly All 143 121 22 143 143 KPI Met
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 116
CORP13 3.5.3.1 To Create a
climate conducive
for sustainable economic
Growth and job creation
Co ordinate and Implementation
of LED
To provide support for LED Project as and when required
Quarterly All New New 0 4 4 KPI Met
CORP 14 3.5.3.1
Implementation of municipal Zibambele
program and implementation
of CWP
No. of participants
employed for municipal Zibambele
(EPWP)
Quarterly All 143 121 22 143 143 KPI Met
TECH17 3.5.3.1
To Create a climate
conducive for
sustainable economic
Growth and job creation
Co ordinate and Implementation
of LED
To provide support for LED Project as and when required
Quarterly All New New 0 4 4 KPI Met
TECH18 2.1.3
To eradicate poverty and
improve socio
economic condition
Implementation of municipal Zibambele program
No. of participants
employed for municipal Zibambele
(EPWP)
Quarterly All 143 121 22 143 4 KPI Met
COM8 3.5.3.1
To Create a climate
conducive for
sustainable economic
Growth and job creation
Co ordinate and Implementation
of LED
To provide support for LED Project as and when required
Quarterly All New New 0 4 4 KPI Met
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 117
7.15 KPA 4: GOOD GOVERNANCE AND PUBLIC PARTICIPATION – ACTUAL ANNUAL OUTCOME
Table.76: Good Governance and Public Participation SDBIP KPIs
SDBIP Ref IDP Ref Strategic Objective
Measurable Outputs
Unit of Performance
Measurement
Frequency / Timeline
Institutional / Ward
2015/2016 2016 / 2017 Financial Performance
Annual
Annual Target Annual Actual
KPI Not Met / KPI
Almost Met / KPI Met / KPI
Well Met / KPI
Extremely Met
Performance Comments / Reasons for Deviation
Corrective Action
Demand Baseline Backlog
KPA 4: Good Governance and Public Participation
Outcome 9: Output 7- Single Window of Coordination & Output 5: Deepen democracy through a refined Ward Committee model
OMM16 2.2
To ensure progressive compliance
with institutional
and governance
requirements
Institutional compliance
checklist developed and
updated quarterly
Date developed; No.
of updates Quarterly Institutional Yes, 4 New No 4
KPI Not Met
Capcity Constraints
To fill in positions to aid in achieving
compliance, positions to be advertisied in
2017/18
OMM17 3.7.2
To ensure that IGR
structures function
effectively within the
District
Mayor's Forum attended as per District
Municipality invitation
No. of meetings attended
Quarterly Institutional
(District) 4 0 0 4 4 KPI Met -
OMM18 3.7.2
MM Forum attended as per District
Municipality invitation
No. of meetings attended
Quarterly Institutional
(District) 4 0 0 4 4 KPI Met -
OMM19 3.7.2
DTAC meetings attended as per
CoGTA invitation
No. of meetings Quarterly Institutional 4 4 0 4 4 KPI Met -
OMM20 7 To transform
the Dannhauser
into a performance
driven Municipality
Reviewed PMS and adopted by
Council Date adopted Quarter 1 Institutional
Adopted by 31 Jul
PMS Framework
in place None 7/31/2016
Adopted 7/31/2016
KPI Met -
OMM21 7
Organisational PMS
implemented and reports
submitted to Council
No. of Municipal
Performance Reports
submitted to Council
Quarterly Institutional 4 4 4 4 4 KPI Met -
OMM22 7 All Heads of No. of Quarter 1 - Institutional 5 0 5 5 signed by 30 5 Signed by 30 KPI Met -
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 118
Department in possession of
signed Performance Agreements
Performance agreements signed and
uploaded on website
30 days after beginning of financial year
July 2017 July 2017
OMM23 7 To transform the
Dannhauser into a
performance driven
Municipality
Individual Performance Assessments conducted
No. of performance assessments
held
Quarterly as per 2006
Regulations Institutional 4 0 4
4 (2 informal & 2 formal)
4 KPI Met -
OMM24 1.7
Mid-year performance
report prepared as part of Sect
72 and adopted by Council
Date adopted Quarter 3 Institutional 1/25/2015 1/23/2015 n/a by 25 Jan 2017 Adopted by 25
Jan 2017 KPI Met -
OMM25 35.4.5
To promote sports and recreation throughout the District
Effective Sports and Recreation
Council
No. of meetings held
Quarterly All 4 4 0 4 0 KPI Not
Met
Members of sports Council
Resigned
New members to be elected in 2017/18
OMM26 3.5.4.5
Sport and recreation activities organised
No. of reports of Ward inter-games hosted
Quarterly All 4 4 O 4 0 KPI Not
Met
Rearranging of programmes to
be hosted in wards
New programmes to be developed in 2017/18 with new councillors
OMM27 3.5.4.5
Participation in SALGA Games coordinated by
District
No. of reports of participation
Quarter 2 All 1 1 0 2 0 KPI Not
Met
Capacity Constraints within municipality
Games will be attended in 2017/2018 when there is capacity
OMM28 3.5.4.5
To promote youth
development within the
Municipality
Functional Youth Council
No. of meetings held
Quarterly Institutional 4 4 0 4 0 KPI Not
Met Members relocated
New members to be appointed in
2017/18
OMM29 3.5.4.5
Implementation of Youth
Programmes
No. of programmes
held Bi-annually Institutional 2 2 0 2 2 KPI Met
OMM30 3.5.4.5
Empowering youth
matriculants and post matric
Bi-annually Institutional Yes New No
Adopted Policy and progress
report and close-out report
100% KPI Met
OMM31 3.5.4.5
Awarding Busaries to the thirteen best
perfoming Matric student
within Dannhauser
Area as per 1st thirteen tertiary
aid program
No. of students sponsored
Quarter 3 All 13 9 0 13 13 KPI Met
OMM32 3.5.4.5
Implementation of the
placement programme
No. of graduates placed in different
companies
Quarter 2 All 13 15 11
Appointment of 11 students; Monitoring
Reports
11 KPI Met
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 119
OMM33 3.5.4.9 To promote Gender
equality and protect the
human rights of Senior Citizens, Women,
People with Disabilities
and Children
Coordinate Senior Citizens
Activities
No. of meeting held
Quarterly All 4 4 0 4 0 KPI Not Met
Members relocated
New members to be appointed in 2017/18
OMM34 3.5.4.9 No. of events
held Quarter 2 &
4 All 1 1 0 2 1
KPI Almost Met
Additional event not done due to members relocating
New members to be appointed in 2017/18
OMM35 3.5.4.9
Coordinate Children,
Women and Disabled People
Activities
No. of meetings held
Quarterly All 4 4 0 4 0 KPI Not
Met Members relocating
New members to be appointed in
2017/18
OMM36 3.5.4.9 & 3.5.4.14
To effectively manage and Coordinate HIV/AIDS Activities
Functional HIV/AIDS Structures
No. of LAC Meeting
Coordinated Quarterly Institutional 4 4 0 4 0
KPI Not Met
Members relocating
New members to be appointed in
2017/18
OMM37 3.5.4.9 & 3.5.4.14
Functional HIV/AIDS Structures
No. of DAC Meeting
Attended as per District invite
Quarterly Institutional
(District) 4 4 0 4 0
KPI Not Met
Municipality capacity
constraints
Positions to be advertised in
2017/18 financial year
OMM38 3.5.4.9 & 3.5.4.14
To effectively manage and Coordinate HIV/AIDS Activities
Functional HIV/AIDS Structures
Date AIDS day held
Quarter 2 Institutional Yes 12/1/2015 No by mid-Dec
2017 0
KPI Not Met
Municipal Capcity Constraints
Positions to be advertised in
2017/18 financial year
OMM39 3.1.12.5.7 To Promote Arts and Culture
Activities
Coordinate Cultural Event
No. of events held
Quarter 1 All 1 1 0 1 0 KPI Not Met
Municipal Capacity Constraints
Positions to be advertised in
2017/18 financial year
OMM40 3.5.3.4 Coordinate
Umkhosi woMhlanga
Date held Quarter 1 All 1 1 0 by end-Sept
2017 1 KPI met
OMM41 3.7.2
To ensure that IGR
structures function
effectively within the
District
Internal Audit Forum attended as per District Municipality
invitation
No. of meetings attended
Quarterly Institutional
(District) 4 0 4 4 0
KPI Not Met
No meetings convened by the
District
Can only attend if District calls for the
meeting
OMM42
3.7.6.1 & 3.7.6.2
To provide reasonable
assurance on the adequacy
and effectiveness
of internal control systems
Approval of Internal Audit Plan by Audit Committee
Date approved Quarter 1 Institutional 7/31/2014 7/31/2014 None by 31 July 2017 Approved and
adopted KPI Met
OMM43
Effective implementation of the Annual
Plan
%age implementation
= (performed audits/ planned
audits as per approved IA plan)*100
Quarterly Institutional 100% 100% None 100% of plan performed
100% KPI Met
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 120
OMM44
To Ensure Functional
Audit Committee
Coordinate Audit
Committee Meetings
No. of meetings held
Quarterly Institutional 4 4 0 4 4 KPI Met
OMM45 3.7.5
To implement
and maintain effective
enterprise-wide risk
management system
Functional Risk Management Committee
(RMC)
No. of meetings held
Quarterly Institutional 2 New 0 4 4 KPI Met
OMM46 3.7.5 Conduct Risk Assessment Workshop
No. of workshops held
Quarter 4 Institutional 2 2 0 2 2 KPI Met -
OMM47 3.7.5 To implement
and maintain effective
enterprise-wide risk
management system
Reviewed and Council
approved Risk Management policies and
strategies for 2016/2017
Date adopted Quarter 4 Institutional Yes Yes, 2015 No by 30 October
2016
Adoption of approved risk management
policy
KPI Met -
OMM48 3.7.8
Implementation of Enterprise-
Wide Risk Management Action Plan
(consolidationof dept reports)
No. of EWRM reports
Quarterly Institutional 4 New 0 4 4 KPI Met -
OMM49 6 To transform
the Dannhauser
into a performance
driven Municipality
Service Delivery and
Budget Implementation Plan (SDBIP) for
2016/2017 submitted and adopted as per
legislation
Date submitted to Mayor
Q4: 14 days after budget
approval Institutional Yes
14 days after budget
approval No
14 days after budget approval
SDBIP Submitted 14
days after approval of
budget
KPI Met -
OMM50 6 Date of Council
approved
Q4: 28 days after budget
approval Institutional Yes
28 days after budget
approval No
28 days after budget approval
SDBIP approval by Council 28
days after budget
approval
KPI Met -
OMM51 7.2 To transform
the Dannhauser
into a performance
driven Municipality
2015/2016 Annual Report (AR) developed and adopted by Council as per
legislation
Date of Council adoption of
draft AR Quarter 3 Institutional 1 1 0
by 31 January 2017
Draft AR adopted 31
January 2017 KPI Met -
OMM52 7.2 Draft AR
advertised Quarter 3 Institutional Yes
21 days after draft
adoption No
advertised for 21 days after
adoption
Draft Revision AR 21 days
after adoption KPI Met -
OMM53 7.2 Date Council
approved final AR
Quarter 3 Institutional Yes 3/24/2017 No by 31 March
2017
Approved final AR 31 March
2017 KPI Met -
OMM54 7.2
To transform the
Dannhauser into a
performance
Public Comments on
Draft AR (if any) consolidated
and submitted
Date of submission
Quarter 4 Institutional Yes New No 7 days after due date of Draft AR
advert
Public Comments on Draft AR if any submitted to
Corporate
KPI Met -
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 121
driven Municipality
to Corporate Services for
MPAC to prepare
Oversight Report
Services & MPAC 7 days after draft AR
advert
OMM55 4
To transform the
Dannhauser into a
performance driven
Municipality
A credible IDP developed 2016/2017
No. of IDP Representative
Forums meetings facilitated
Quarterly Institutional 4 4 0 4 4 KPI Met -
OMM56 3.7.1
Council adoption of the
IDP/Budget Process Plan
Quarter 1 Institutional Yes 6/26/2016 No by 28 August
2017
Council Adoption of
IDP/ Budget & Process Plan
KPI Met -
OMM57 4 Date Council adoption of
Draft IDP Quarter 3 All 3/31/2016 3/24/2017 0
by 31 March 2017
Date of Council Adoption of Draft IDP 31 March 2017
KPI Met -
OMM58 3.7.8.1
No. of IDP/Budget Roadshows Conducted
Bi-annually All 2 2 0 2 2 KPI Met
OMM59 4 Date of
approval of final IDP
Quarter 4 All 5/31/2016 5/30/2017 0 by 31 May 2017 Approval of final IDP 31 May 2017
KPI Met -
OMM60 3.7.2 To ensure that IGR
structures function
effectively within the
District
Planners Forum attended as per District
Municipality invitation
No. of meetings attended
Quarterly Institutional
(District) 4 0 4 4 4 KPI Met
OMM61 3.7.2
IDP District Forum attended as per District Municipality
invitation
No. of meetings attended
Quarterly Institutional
(District) 4 0 4 4 3
KPI Almost Met
Municipal Capacity Constraint caused the none attendance of final meeting
Positions to be advertised in
2017/18
OMM62 3.7.2
To ensure that IGR
structures function
effectively within the
District
AFLED Forum attended as per District
Municipality invitation
No. of meetings attended
Quarterly Institutional
(District) 4 0 4 4 4 KPI Met -
OMM63 3.7.2
Communication Forum attended as per District Municipality
invitation
No. of meetings attended
Quarterly Institutional
(District) 4 0 4 4 0
KPI Not Met
Municipal Capacity
constraints
Positions to be advertised in
2017/18 financial year
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 122
OMM64 - To improve
the image of the
Municipality
External Newsletter
through Media produced and disseminated
No. of Press Statement
Issued Quarterly All 4 2 2 4 3
KPI Almost Met
Not all Press Statements
released due to capacity
constraints
Positions to be advertised in
2017/18 financial year
OMM65 -
No. of newsletter
publications produced
Quarterly Institutional 10,000 5,000 0 10,000 0 KPI Not
Met
No Newslaters printed due to
budget constraints
Newslaters to be printed by 2017/18
financial year
OMM66 1.3; 1.6;
3.7.1 To ensure
continuous engagement
with ward constituency
Hold ward committee meetings
No. of meetings held
Quarterly All 44 44 0 44 (4 meetings
per ward) 44 KPI Met
OMM67 3.7.7.3; 3.7.8.1;
3.7.1
Hold constituency
meetings
No. of meetings held
Bi-annually All 44 44 0 52 (4 meetings
per ward) 52 KPI Met
FIN4 3.7.2
To ensure that IGR
structures function
effectively within the
District
Finance Forum attended as per District
Municipality invitation
No. of meetings attended
Quarterly Institutional
(District) 4 0 4 4
4
KPI Met -
FIN5 3.6 To transform
the Dannhauser
into a performance
driven Municipality
2016/2017 Adjustment
Budget adopted by Council
Date adopted Quarter 3 Institutional Yes 2/25/2016 0 by 28 Feb 2017
Adoption of adjustment
budget 28 Feb 2017
KPI Met -
FIN6 4.4
2016/2017 Sect 72 Report
adopted by Council
Date adopted Quarter 3 Institutional 4 1/23/2016 0 by 25 Jan 2017
Sect 72 Report Adoption by
Council 25 Jan 2017
KPI Met -
FIN7 3.6.2
To ensure progressive compliance
with institutional
and governance
requirements
Updated and review indigent Policy Adopted
by Council
Date Adopted Annually Institutional Yes Indigent
Policy No
by end May 2017
Review of Indigent Register & Policy adopted by Council
KPI Met -
FIN8 3.6.2 To ensure
progressive compliance
with institutional
and governance
requirements
Updated, Review and
finalise indigent register in line
with the budget
Date Adopted Quarterly Institutional Yes Indigent Register
No
Updated, Review and
finalise indigent register
Review and updating of Indigent Register
KPI Met -
FIN9 3.6 2017/2018
Budget adopted by Council
Date adopted Quarter 4 Institutional Yes 5/26/2017 No by 31 May 2017 Budget
Adoption 31 May 2017
KPI Met -
FIN10 3.6.5 To improve expenditure
control
Monthly Section 71
reports No. of Sec 71 Monthly Institutional 12 12 0 12 12 KPI Met -
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 123
adopted by Council
FIN11 3.6.6
To provide reasonable
assurance on the adequacy
and effectiveness
of internal control systems
Asset Verification Register for 2016/2017 developed
Date developed Quarterly Institutional Yes New No by end-June
2017
Asset Register Verification by
June 2017 KPI Met -
FIN12 3.6
Preparation and submission AG of 2016/2017
annual financial statements
Date submitted Quarter 1 Institutional Yes Aug-2017 No by 31 Aug 2017 Submission to
AG by 31 August 2017
KPI Met -
FIN13 3.6
Preparation and submission to
Council of 2016/2017
interim financial
statements
Date submitted Quarter 3 Institutional Yes New No by 31 Jan 2017
Submission of Interim
Financial Statements
2016/2017 to Council by 31
Jan 2017
KPI Met -
FIN14 3.6.10
To ensure progressive compliance
with institutional
and governance
requirements
SCM Policy Implementation
Reports submitted to
ExCo
No. of reports submitted
Monthly Institutional 12 12 0 12 12 KPI Met -
FIN15 3.7.8
To implement
and maintain effective
enterprise-wide risk
management system
Implementation of Risk
Management Action Plan (Finance)
No. of progress reports
Quarterly Institutional 4 New 0 4 4 KPI Met -
CORP15 3.7.2
To ensure that IGR
structures function
effectively within the
District
Corporate Forum attended as per District Municipality
invitation
No. of meetings attended
Quarterly Institutional
(District) 4 0 4 4 4 KPI Met -
CORP16 2.1.1
To ensure that the Animal
Pound By-Law is
developed, and enforced
within the
Animal Pound By-Law
Gazetting Fastracked
Date Gazzeted Quarter 2 All 1 0 Yes since
2014
by 30 November 2016/gazetted animal pound-
by-law
Gazetting of Animal Pound
By-Law 2016/2017
KPI Met -
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 124
prescribed jurisdiction
CORP17 3.7.3 To transform the
Dannhauser into a
performance driven
Municipality
Council and Committee
minutes produced
Time taken to produce minutes
No of days Institutional 7 days 14 days 7 days
minutes produced within
7 days after meeting
Council & Committee
Minutes produced
within 7 days after meetings
KPI Met -
CORP18 3.7.3
2016 Municipal Council
Meetings Calendar adopted
Date adopted Annually Institutional Yes 30-Sep-16 No 30 Sep 016 Calendar Adopted
KPI Met -
CORP19 3.7.3
To transform the
Dannhauser into a
performance driven
Municipality
Effective and Functional
Council
Number of Council
Meeting Held Monthly Institutional 12 12 0 12 12 KPI Met -
CORP20 3.7.3 No. of reports
on Council meetings
Quarterly Institutional 2 2 0 4 4 KPI Met -
CORP21 3.7.3 Effective and Functional Executive
Committee
Number of EXCo Meetings
Held Monthly Institutional 10 10 0 10 10 KPI Met -
CORP22 3.7.3 No. of reports
on ExCo meetings
Every 6 months
Institutional 2 2 0 4 4 KPI Met -
CORP23 7
All Heads of Department in possession of
signed Performance Agreements
No. of Performance agreements signed and
uploaded on website
Quarter 1 - 30 days after beginning of financial year
Institutional 5 0 5 5 signed by 30
July 5 signed by 30
July 2017 KPI Met -
CORP24 3.3
Effective and Functional Municipal
Public Accounts Committee
(MPAC)
Number of MPAC Meetings
Held Monthly Institutional 10 10 0 10
KPI Not
Met
Although municipality
provided Terms of Reference to
the representatives of the MPAC to
the new Councillors, the Councillors not
appointed are in dispute stating
that they seek to be represented
The Speaker and Municipal Manager
are engaging the Councillors and will resolve the dispute
in 2017/2018 financial year
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 125
CORP25 3.3
Effective and Corporate Services Portfolio
Committee
Number of Corporate Services Portfolio
Meetings Held
Monthly Institutional 10 10 0 10 10 KPI Met -
CORP26 3.3
Effective and Functional Technical Services Portfolio
Committee
Number of Technical Portfolio
Meetings Held
Monthly Institutional 10 10 0 10 10 KPI Met -
CORP27 3.3
Effective and Functional
Community Services Portfolio
Committee
Number of Community
Services Portfolio Held
Monthly Institutional 10 10 0 10 10 KPI Met -
CORP28 3.3
Effective and Functional
Ward Committee Structures
Number of Ward
Committee Meetings Held
Monthly All Wards 122 122 0 103 (9 meetings
per ward) 103 KPI Met -
CORP29 3.3
Effective and Functional Land
Resource Management Committee
Number of Land Resource
Committee Meetings Held
Quarterly All Wards 10 10 0 10 10 KPI Met -
CORP30 3.3 Effective and
Functional Local Labour Forum
Number of Local Labour
Forum Meetings Held
Monthly Institutional 10 10 0 10 10 KPI Met -
CORP31 3.7.8
To implement
and maintain effective
enterprise-wide risk
management system
Implementation of Risk
Management Action Plan (Corporate)
No. of progress reports
Quarterly Institutional 4 New 0 4 4 KPI Met -
TECH19 3.7.2 To ensure that IGR
structures function
effectively within the
District
Technical Forum attended as per District Municipality
invitation
No. of meetings attended
Quarterly Institutional
(District) 4 0 4 4 4 KPI Met -
TECH20 3.7.2
Planners Forum attended as per District
Municipality invitation
No. of meetings attended
Quarterly Institutional
(District) 4 0 4 4 4 KPI Met -
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 126
TECH21 3.7.2 Housing Forum meeting held
No of meetings seated
Quarterly Institutional 4 0 4 4 4
KPI Met
TECH22 3.7.8
To implement
and maintain effective
enterprise-wide risk
management system
Implementation of Risk
Management Action Plan (Technical)
No. of progress reports
Quarterly Institutional 4 New 0 4 4 KPI Met -
COM9 3.7.2
To ensure that IGR
structures function
effectively within the
District
Community Services Forum
attended as per District
Municipality invitation
No. of meetings attended
Quarterly Institutional
(District) 4 4 0 4 4 KPI Met -
COM10 3.7.2
To ensure that IGR
structures function
effectively within the
District
Disaster Forum attended as per District
Municipality invitation
No. of meetings attended
Quarterly Institutional
(District) 4 4 0 4 4 KPI Met -
COM11 3.7.7.1 Functional
Sukuma Sakhe Programmes
No. of meeting held
Quarterly All 4 4 0 4 4 KPI Met -
COM12 3.4.4
To ensure safe and healthy
Environment
Develop and Approval of the
Waste Management
Plan
Date Approved Quarter 3 ALL Yes None Yes since
2014
by 31 March 2017 (Approval
by Council)
Approved and Adopted by 31
March 2017
KPI Not Met
Developed but not yet approved and adopted by
Council
To ensure that it is approved and
adopted by Council
COM13 3.1.14
To re-inforce and maintain
proactive Disaster
Management strategies
Review of Disaster
Management Plan
Date Approved Quarter 3 All Yes None No by 31 March
2017
Disaster Management Plan reviewed and adopted
KPI Met
COM14 2.1.1
To ensure that the
animal By-law is
developed and enforced
within the prescribed jurisdiction
Animal Pound By-Law
Gazetting Fast-tracked
Date of Gazette Quarterly All 1 0 Yes since
2014
by 30 November 2016/gazetted animal pound-
by-law
Animal Pound By-Law
Gazetted KPI Met
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 127
COM15 2.1.1
To ensure that the animal pound
structure is develop and functional In
the municipal
area
Facilitation for the completion of the Animal
Pound infrastructure
Progress reports
Quarterly 2 1 0 Yes since
2014 by 30 June 2017
Facilitation for the completion of the Animal
Pound Infrastructure
KPI Met
COM16 3.7.8
To implement
and maintain effective
enterprise-wide risk
management system
Implementation of Risk
Management Action Plan
(Community)
No. of progress reports
Quarterly Institutional 4 4 0 4 4 KPI Met -
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 128
7.16 KPA 5: ENVIRONMENTAL AND SPATIAL MANAGEMENT – ACTUAL ANNUAL OUTCOMES Table.77: Environmental and Spatial Management SDBIP KPIs
SDBIP Ref IDP Ref Strategic Objective
Measurable Outputs
Unit of Performance
Measurement
Frequency / Timeline
Institutional / Ward
2015/2016 2016 / 2017 Financial Performance
Annual
Annual Target Annual Actual
KPI Not Met / KPI
Almost Met / KPI Met / KPI
Well Met / KPI
Extremely Met
Performance Comments / Reasons for Deviation
Corrective Action
Demand Baseline Backlog
KPA 5: Environmental and Spatial Management
Outcome 9: Output 3: Implementation of the Community Work Programme
OMM68 4.5.1.3 To ensure that the Spatial
Development Framework is prepared and aligned with
LUMS
Review and Adopted SDF
Date adopted Quarter 4 All Yes 26-May-16 No by 31 May
2017
SDF reviewed & adopted by 31 May 2017
KPI Met -
OMM69 3.5.4.5
Enforcement of alignment between SDF
and LUMS through By-
law
Approval of Land use
Applications Quarterly Institutional New - New Annual Reports
Enforcement & Approval of
LUMS in 2016/2017 in line with the
SDF
KPI Met
COM17 3.1.14.4
To ensure functional Disaster
Management
Reported and attended
fire and other
disaster incidences managed
effectively
Number of incidents
reported and attended timeously
Quarterly Institutional Yes New No
Number of Incidents
attended to and Reports produced for
the year
Reports in place
KPI Met
COM18 3.1.14.4
To ensure functional Disaster
Management
Reported and attended
fire and other
disaster incidences managed
effectively
Number of incidents
attended to and
immediate relief
provided
Quarterly Institutional Yes New No
Number of incidents Short
term relief provided for
the year
All incidents reported and
immediate relief provided
KPI Met
COM19 3.5
To provide services to
the community
Adoption of the
Cemetery Plan
Date Approved
Quarter 3 All Yes None Yes since
2007
by 31 March 2017
(Approved Cemetery plan)
Cemetery Plan Approved by
31 March 2017 KPI Met
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 129
COM20 3.5
in developing a Cemetery
plan and maintaining
cemeteries in the Urban and Rural
Areas
Development and
Maintenance of Rural and
Urban Cemeteries on monthly
basis
No. of reports Quarterly All 13 11 0
Progress report on the
maintenance of Urban and
Rural Cemeteries for the preceding
year
11 Reports in place
KPI Met
COM21 3.4.4
To regular provide effective
services to the
Community in order to
create clean and safe
environment
Compliant landfill site (disposal
site) maintained
monthly
No. of progress reports
Quarterly 1 4 4 0 4 4 KPI Met
COM22 3.4.4 Registered landfill site
Annually 2 Yes None Yes since
2000 by 31 March
2017
Registered fully in
2016/17 financial year
KPI Met
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 130
7.17 KPA 6: MUNICIPAL FINANCIAL VIABILITY AND MANAGEMENT
Table.78: Municipal Financial Viability and Management SDBIP KPIs
SDBIP Ref IDP Ref Strategic Objective
Measurable Outputs
Unit of Performance
Measurement
Frequency / Timeline
Institutional / Ward
2015/2016 Financial Performance
Annual
Annual Target Annual Actual
KPI Not Met / KPI
Almost Met / KPI Met / KPI
Well Met / KPI
Extremely Met
Performance Comments / Reasons for Deviation
Corrective Action
Demand Baseline Backlog
KPA 6: Municipal Financial Viability and Management
Outcome 9: Output 3: Implementation of the Community Work Programme
OMM70 3.6 To improve expenditure
control
Municipal Budget actual
spent No. of reports Quarterly Institutional 4 New None 4 4 KPI Met
FIN16 3.6
To ensure progressive compliance
with institutional
and governance
requirements
Regular producing
and submitting quarterly returns to
EXCO, Council and different Stakeholders
Date submitted
Quarterly Institutional Yes 30 June No
submitted by the 10 day
after quarter end
Quarterly returns
submitted 10 days after
quarter end
KPI Met -
FIN17 3.6
To improve expenditure
control
Monthly reconciliation of creditors
No. of reconciliations
Monthly Institutional 12 12 0 12 12 KPI Met -
FIN18 3.6 Payment of
creditors Creditors Age
Analysis Within 30
Days Institutional
Within 30 Days
90 days 60 days 30 days Creditors being paid within 30
days KPI Met -
FIN19 3.6
Monthly reconciliation
of bank balances
No. of reconciliations
Monthly Institutional 12 12 0 12 12 KPI Met -
FIN20 3.6.10
To improve the
procurement system
Develop and submit
procurement plan to MM and Council
Date submitted to
MM Quarter 1 Institutional Yes New No
Procurement Plan & 3
Status Quo Reports
Procurement plan submitted to MM and Council
KPI Met -
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 131
FIN21 3.6.10
To improve the
procurement system
No. of days to place an
order reduced
No. of days for requisition
to be converted to a purchase
order outstanding
Daily Institutional 10 days 10 days 0 10 days Orders being
processed within 10 days
KPI Met -
FIN22 3.6.10
To improve the
procurement system
No. of days to finalise
specification of Bid / Tender
reduced
No. of days Quarterly Institutional 5 days 8 days 3 days 10 days per
tender
Bid specifications
being completed in
10 days
KPI Met -
FIN23 3.6.10
To improve the
procurement system
No. of days to finalise
evaluation of Bid / Tender
reduced
No. of days from close of
tender Daily Institutional 20 days 15 days 20 days 20 days
Evaluation of Bid undertaken
with 20 days KPI met -
FIN24 3.6.10
To improve the
procurement system
No. of days between the evaluation
process and the
adjudication process reduced
No. of days Daily Institutional 5 days 5 25 days 10 days
Number of days between evaluation and adjudication is
10 days
KPI Met -
FIN25 3.6.3
To Improve Municipal Revenue
Base
Total No. customers -
database
% of customers billed/Total
No, of Customers-
database
Monthly Institutional 100% 100% 0% 100% 100% KPI Met -
FIN26 3.6.3 Debt
Collection
% of collection:
Amount collected
Monthly Institutional 100% 80% 40% 100% 80% KPI Almost
Met Indigent Debtors to be written off
Indigent Debtors to be written off in 2017/2018
FIN27 3.6.4 Debt
coverage ratio
Ratio [(Total
operating revenue
received) - (operating
grants received) /
debt service payments
due, including interest and
capital]
Quarterly Institutional 1:1 1:1 Yes 1:1 Ratio analysis
kept as 1:1 KPI met -
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 132
FIN28 3.6.4
Outstanding service
debtors to revenue
No. of days debtors are outstanding
(Total outstanding
debtors / Actual
revenue received for services) x
100
Daily Institutional 90 days 120 days 240 days 250 Days 600 days KPI Met
FIN29 3.6.4 Cost
coverage ratio
Ratio [All available
cash at a particular
time) + (Investments)-
Conditional grants)]/
Monthly fixed operating
expenditure)
Quarterly Institutional 1:1 1:1 None 1:1 1:1 KPI Met -
CORP32 3.6 To improve expenditure
control
Departmental budget
actually spent within dept
budget
No. of reports Quarterly Institutional 4 new None 4 4 KPI Met -
TECH25 3.6
To improve expenditure
control
Capital budget
actually spent on capital projects
identified in 2016/2017
IDP
% Spent = (total
spending on capital
projects / total capital budget)*100
Quarterly Institutional 100% 100% 100% 100% 100% KPI Met -
TECH26 3.6
Departmental budget
actually spent within dept
budget
No. of reports Quarterly Institutional 4 new None 4 4 KPI Met -
COM23 3.6 To improve expenditure
control
Departmental budget
actually spent within dept
budget
No. of reports Quarterly Institutional 4 new none 4 4 KPI Met -
COM24 3.6
To Invest in the
Development of the
Municipality
Revenue Generated
Through Learner
Licensing
Revenue Generated
Through Learner
Licensing
Quarterly Institutional - 120000 - R180,000 R196 920 KPI Met -
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 133
COM25 3.6
through Revenue
Enhancement
Revenue Generated
Through Drivers
Licensing
Revenue Generated
Through Drivers
Licensing (No testing since
Sept 2014 due to Road
Construction as such
projections may be
inaccurate)
Quarterly Institutional - R150 000
(2014) - R166,500 R195 808 KPI Met -
COM26 3.6.3
Revenue Generated
Through Motor
Licensing
Revenue Generated
Through Motor
Licensing (Commission /
Payment to Council)
Quarterly Institutional - 800000 - R1 125,000 KPI Met (Awaiting Final Actual figure)
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 134
COMMENTS, RECOMMENDATIONS FOR IMPROVEMENT AND CONCLUSION SDBIP
7.18 OVERALL COMMENT The progress and performance made in respect of meeting organizational and operational targets is
commended.
7.19 RECOMMENDATIONS FOR IMPROVEMENT
That additional performance monitoring and evaluation at a departmental level on at least a monthly basis be
made compulsory to encourage adherence to planned programmes particularly the capital projects. The head of
each department and responsible managers are to conduct monthly meetings to monitor compliance with all
targets and reporting requirements.
That internal co-ordination systems and processes be reviewed to ensure improved co-ordination.
That alignment of the financial system to the PMS is further enhanced.
That quarterly performance reviews must be conducted timeously as indicated in the PMS Policy review of
2015/2016; and the head of each department ensure that the performance information and the portfolio of
evidence are submitted timeously. This will in turn ensure support of internal auditing processes so that they
are value adding to the performance management process.
That evidence submitted is signed off in order to ensure accountability, validity, reliability and accuracy of
performance submitted information.
That where applicable, the department communicates with the responsible department to merge certain Key
Performance Indicators and provide information corresponding to each other for alignment purposes.
That performance management capacity be increased organization-wide to improve accountability.
That performance management be cascaded below managers in signing performance agreements.
That project task teams be established for all projects where co-ordination and integration is required. This
project task team is to develop a project management system for monitoring and evaluation of projects and this
system will in turn ensure performance monitoring and evaluation of each service provider.
That a baseline study be conducted on basic services to ensure alignment with internal statistics, Stats-SA and
other sources.
7.20 CONCLUSION
The Dannhauser Municipality served the community with distinction during the year that ended 30 June 2017. This
report clearly demonstrates the commitment of Dannhauser Municipality to ensure that its community members
have access to basic services. This report to Council and the local community demonstrates the ability of the
Dannhauser Municipality to adapt to the ever changing social needs of the local community. The budget of the top
five (5) capital projects as stated in the table 4.9 clearly demonstrates Dannhauser Municipality’s focus on improving
the socio-economic status of its community members. Due to various challenges, only 28 (15%) targets of the
planned targets could not be met while 85 % (81% met and 4 % almost met) out of 181 targets. As a Municipality, we
will respond to these outstanding targets and will duly report on the progress made to address those targets.
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 135
I wish to extend my gratitude to the Municipal Council, Executive Committee, the Management Committee as well
as to all the Employees of the Dannhauser Municipality who willingly and competently assisted to ensure that
Dannhauser Municipality continues to deliver quality services to its community members in the spirit of Batho Pele.
____________________
W.B. NKOSI MUNICIPAL MANAGER
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 136
LIST OF REFERENCES
ANNEXURES
ANNEXURE.1 – SERVICE DELIVERY BUDGET & IMPLEMENTATION PLAN ANNEXURE.2 - ANNUAL FINANCIAL STATEMENTS ANNEXURE.3 - REPORT ON THE MUNICIPAL INFRASTRUCTURE GRANT (MIG), FIVE LARGEST CAPITAL PROJECTS PER WARD, TOP FOUR SERVICE DELIVERY PRIORITIES PER WARD 2016/2017 FINANCIAL YEAR ANNEXURE.4 - REPORT OF THE AUDITOR GENERAL 2016/2017 ANNEXURE.5 - RESPONSE TO THE REPORT OF THE AUDITOR GENERAL 2016/2017 ANNEXURE.6 - REPORT OF THE AUDIT COMMITTEE & RECOMMENDATIONS OF THE AUDIT COMMITTEE 2016/2017 ANNEXURE.7 - FINANCIAL DECLARATIONS OF COUNCILLORS AND MUNICIPAL STAFF 2016/2017
ANNEXURE.8 - INTEGRATED DEVELOPMENT PLAN 2016/2017
LEGISLATIVE REFERENCES
Municipal Performance Regulations for Municipal Managers and Managers directly accountable to
Municipal Managers (2006)
Municipal Planning and Performance Regulation (2001)
Public Finance Management Act (1999)
Municipal Finance Management Act (2003)
MFMA Circular 63 (2012)
Performance Management System Framework (2016/2017)
Municipal Structures Act (1998)
Municipal Systems Act (2000)
Municipal Systems Amendment Act (2011)
Intergovernmental Relations Framework Act (2005)
Spatial Planning and Land Use Management (2013)
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 137
DANNHAUSER PROJECTS
1. DURNACOL SPORT CENTRE
EMAFUSINI HALL
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 138
TRAFFIC CENTRE TESTING GROUND – PHASE 1
MOURNE CRECHE
ANNUAL REPORT 2016/2017
DANNHAUSER LOCAL MUNICIPALITY Page | 139
DANNHAUSER MUNICIPALITY ANNUAL REPORT
Dannhauser Local Municipality
8 Church Street,
Private Bag X1011,
Dannhauser
3080
Website Address: [email protected]