Page 1: Annino Brochure

Alfredo Annino Construction, Inc. of Nevada

1 2 6 1 6 V E N T U R A B O U L E V A R D | S E C O N D L E V E L | S T U D I O C I T Y | C A 9 1 6 0 4

Quality • On Time • In Budget

California License No. 727577

W W W . A N N I N O . C O M | P 8 1 8 . 5 0 9 . 0 3 4 5 | F 8 1 8 . 5 0 9 . 1 8 2 0

Page 2: Annino Brochure

Alfredo Annino Construction was established in 1982. The founder and president, Alfredo

Annino, has been a licensed general building contractor in California since 1972.

TYPE OF FIRM:• AACI is a commercial construction firm.

• Restaurants, museums, lounges, medical construction and tenant improvements since 1982.

• AACI performs the following tasks: concrete, framing, drywall, and finish carpentry.

OUR APPROACH:• Generations of experience have shown us how to build a solid foundation for the

success of every project. We do it by delivering high quality construction at competitive

prices, using proven methods, including value engineering and computer based

scheduling. We do it with a firm commitment to finish your job on time, because at

Annino Construction, we know that time means money.

• On time completions – We do whatever it takes when we see extraordinary measures are

needed to stay on schedule, and if that means working nights, weekends, and holidays,

we do it.

• Informed clients – We keep the lines of communication open. Regular progress reports

are e-mailed. The company president, project manager as well as the job superintendent

are available for consultations at any time.

• Relationships that work – The architect is considered a part of the construction team.

This way we work together to take advantage of significant cost saving opportunities

that may occur during construction. Long standing relationships with city officials have

been built on mutual respect. The result is prompt response when needed, saving

valuable time and money.

• Skilled subcontractors – We rely on those whose competence and professionalism

have been proven to us. Their work is closely & continually monitored to maintain our

high standards.

Alfredo Annino Construction, Inc. of Nevada

INTR

ODUCTI

ON

Quality • On Time • In Budget

Page 3: Annino Brochure

OUR EMPLOYEES:• Committed employee/supervisors – Our supervisors are full time employees, not

temporary hired guns. They are trained to do things our way, so all phases of

construction run smoothly.

• Superintendents – Superintendents provide hands on, day to day construction

management. They are responsible for all on-site trades, scheduling, and

communication with city and governmental agencies.

• Projects Managers – Project managers are responsible for overseeing projects along

with the field superintendents and job foremen. Their responsibilities include

mitigating on-site job problems, reviewing job schedules, ensuring on-time delivery

and monitoring quality control.

ADMINISTRATION: Management Services available through AACMS.

LICENSES: AACI is licensed in the states of Arizona, California, and Nevada.

MINORITY BUSINESS: AACI qualifies as a Minority Business by the Southern California

Regional Purchasing Council Inc. (Certification No. 1611) by the Inland Empire Purchasing

Council, and by the Orange County Purchasing Council.

LEED: AACI has a Leed Accredited Professional on full time staff. Annino Construction’s

knowledge of Green Building Practice required for successful implementation of the

leadership in energy and environmental design.

INTR

ODUCTIO

N

Page 4: Annino Brochure

OUR COMMITMENTS:

To fulfill or exceed the requirements of the project.

To provide a safe and healthy work environment.

To work in partnership with the owners and the design team to provide the highest quality at competitive prices and to deliver the project on time.

To eliminate waste and delays in the construction process through planning, coordination, and detailing.

To reduce costs, while increasing control by the use of AACI employees andsubcontractors for all phases of the project.

To provide value analysis during the design and detailing process.

To work as a team player with owner, architects, engineers, and city officials to create a

successful project.

To guarantee the price.

To guarantee performance.

To provide solutions.

AACI’S A

PPRO

ACH

Page 5: Annino Brochure

PROJECT MANAGEMENT

The project Manager is the single person responsible forthe project from start to finish - and beyond. It is his job to evaluate each step of the

design and installation process from every angle: performance, constructability,

final quality, and cost.

AACI’S

APPRO

ACH

AACI’s Project Management provides the leadership to:

Prepare a construction schedule that meets the owner’s requirements.

Initiate the submittal and approval processes.

Initiate field mobilization and installation of work.

Mitigate and resolve design, logistical, and field issues.

Supervise project commissioning.

Resolve any operational or warranty problems.

Provide all close-out documents to the owner.

Provide Solutions.

Page 6: Annino Brochure

SAFETY

AACI is committed to the safety and health of all employees, team members and

subcontractors and maintaining strict compliance with regulations governing accident

prevention and employee safety. A good safety record is clear evidence of good management,

and it is our policy to do everything reasonable to prevent injury to employees, damage to

property and to protect our employees, our clients, and the public from the result of accidents.

AACI’S A

PPRO

ACH

The primary objectives of the Loss Prevention Program are to:

Provide a safe and healthy working environment for all employees.

Reduce the human and financial losses resulting from accidents and illnesses occurring in

the course of employment or arising out of employment with AACI.

Establish safety policies, committees, and training.

Initiate a uniform safety program for all AACI’s employees and subcontractors.

Page 7: Annino Brochure

BONDING (Available for all projects)

LEGALAACI has their own in-house counsel to handle any legal issues that may arise with any

subcontractors, so to ensure a smooth running project.

PURCHASINGAACI established its purchasing department to assure that:

• All suppliers meet the requirements of the project’s plan, specifications, insurances,

warranty, governing agencies, and standards of quality.

• Submittals, manufacturing, and delivery to the job are done in a timely manner.

Purchase orders are linked to our accounting system.

ACCOUNTINGThe accounting department assists in tracking and controlling costs on a project. Accounting will

provide timely and accurate billing and insurance release documents. Accounting ensures that

the subcontractor’s paperwork is complete and all supplier releases are provided. AACI provides:

• Job costs that are updated on a daily and weekly basis

• Job cost reports.

• Committed cost.

• AIA billings.

RES

OURCES

INSURANCE

Comprehensive General Liability

$2,000,000 – General Aggregate per project$2,000,000 – Products & Complete Operations Aggregate Limit$1,000,000 – Limits of Liability per Occurrence$100,000 – Fire Legal Liability Excess Liability$10,000,000 – Excess Umbrella Policy

Commercial Automobile

$1,000,000 – Liability$1,000,000 – Uninsured Motorists

Workman’s Compensation

Statutory Limit

$1,000,000 – Each Accident

Waiver of Subrogation, if applicable

Excess Liability

$10,000,000 – Excess Umbrella Policy

Page 8: Annino Brochure

1 2 6 1 6 V E N T U R A B L V D | S E C O N D L E V E LS T U D I O C I T Y | C A 9 1 6 0 4

P 8 1 8 . 5 0 9 . 0 3 4 5 | F 8 1 8 . 5 0 9 . 1 8 2 0W W W . A N N I N O . C O M