Engineering Geology 55 (2000) 133147www.elsevier.nl/locate/enggeo
A critical review of landslide monitoring experiences
Maceo-Giovanni Angeli a, Alessandro Pasuto b,*, Sandro Silvano b
aNational Research Council I.R.P.I. Institute, via Madonna Alta, 126-06128 Perugia, Italy
bNational Research Council I.R.P.I. Institute, C.so Stati Uniti, 4-35127 Padova, Italy
Abstract
Over the past few years, the monitoring of natural phenomena has acquired great importance for the scientific
community. It aims to understand the mechanisms of disruptive processes, define adequate prevention measures for
the mitigation of their effects and reduce the loss of human lives and assets. In order to detect the stability conditions
of slopes belonging to different geological and environmental contexts, geotechnical investigations have been carried
out since 1982. The various types of landslides to be investigated, and the diverse socio-economic contexts involved,
have shown the need for constant surveillance, using the most up-to-date technology available. For this purpose,
automatic recording systems connected to different sensors have been installed, (and also serve civil defence purposes).
During this research activity, several problems arose, and several solutions had to be found. In this paper, some of
the main problems concerning the installation and management of monitoring equipment used for the study of three
landslides will be discussed. 2000 Elsevier Science B.V. All rights reserved.
Keywords: Instrumentation; Italy; Landslides; Warning system
1. Introduction This is achieved by means of monitoring kine-
matic, hydrological and climatic parameters in
order to:Hydrogeological disarrangement is one of the$ identify movements before important morpho-most destructive natural events striking civilian
logical changes at the surface have taken place;populations, urban settlements and infrastructures$ define the geometry of the moving mass withworld-wide every year, causing thousands of casu-
precision;alties and serious damage.$
quantify the principal kinematic parametersThe monitoring of natural phenomena has (velocity, acceleration, etc.) and their possibleacquired great importance for the scientific com-correlation with hydrological and climaticmunity since the use of adequate monitoring sys-characteristics;tems is a powerful tool for understanding
$ carry out constant surveillance for events thatkinematic aspects of mass movements and permitsput inhabited areas at risk; andtheir correct analysis and interpretation; in addi-
$ propose reasonable plans to help people intion, it is an essential aid in identifying and check-risk areas.ing alarm situations.Landslides show a great variability not only
from the typological but also from the kinematic* Corresponding author. Tel.: +39-49-829-5800;
and geometrical standpoints. Each landslide isfax: +39-49-829-5827.E-mail address: [email protected] (A.Pasuto) therefore characterised by the way it has devel-
0013-7952/00/$ - see front matter 2000 Elsevier Science B.V. All rights reserved.
PII: S 0 0 1 3 - 7 9 5 2 ( 9 9 ) 0 0 1 2 2 - 2
-
7/24/2019 Angel i 2000
2/15
134 M.-G. Angeli et al./Engineering Geology 55 (2000) 133147
oped, and this necessarily determines the kind of These events caused the filling of the Tessina
valley with material ranging from 30 to 50 m insensors that should be set up, as well as the number
and location of measurement points, the sampling thickness, seriously endangering the village ofFunes, which is situated on a steep ridge originallyfrequency of parameters, etc. As a consequence,
the standardisation of intervention methods and quite high above the river bed, but now almost
level with the mudflow.of the sensors that should be used is a rather
difficult task. In April 1992, after periods of rather heavy
rainfall and snowmelt, a collapse on the left-handIn order to obtain relevant results, a monitoring
system should be chosen not as a product of slope of the torrent Tessina occurred, involving
approximately one million cubic metres ofvarious technologies but after the preliminary
analysis of a phenomenon by means of adequate material.
The toe of the flow reached the village of Funesconsideration of the data. Similarly, a set of sensors
placed haphazardly inside and around a landslide in just 5 days, moving at an approximate velocity
of 10 m/h (the mass was about 5 m wide and 1 mbody will produce a series of measurements that
are neither easy to interpret nor easy to compare. thick), whereas the main slide, more than 100 mwide, moved at a velocity of about 15 m/day.This may also be due to problems arising in the
sensors installment and functioning and also in Flow movement continued with varying inten-
sity until July 1992, when it almost reached thedata collection.
In this paper, some of the problems involved in outskirts of Lamosano after having overrun the
earlier flows; then, the houses of Funes andthe installation and running of different monitoring
systems employed in the study of three landslides, Lamosano were evacuated.
Up to now, the landslide has developed betweenwith different aims in view (civil defence, research,
remedial measures), will be discussed. the altitudes of 1220 and 625 m a.s.l., with a total
longitudinal extension of almost 3 km and a maxi-
mum width of about 500 m (Fig. 1).
From a geological standpoint, the event has2. Tessina landslideaffected a flysch formation (Middle Eocene), made
up of rhythmic alternations of low-permeabilityIn the autumn of 1960, after a period of intense
precipitation, a landslide, characterised by a source marly-clayey and calcarenite strata with a thickness
of 10001200 m. In some parts, this formation isarea in constant expansion affected by a complex
(rotational slideearth flow) slide movement with covered with Quaternary deposits mainly con-
sisting of vast scree slopes and Wurm morainica slip surface approximately 2030 m deep, was
activated in the province of Belluno (northeast- deposits from the glaciers of the River Piave valley
and from other small local glaciers.ern Italy).
The material from this area, which is intensely From a morphological point of view, it was
possible to distinguish a flat upper accumulationfractured and dismembered, was channelised along
the Tessina valley, where it was progressively area, and a lower accumulation area consisting of
the main flow over two kilometres long, with aremoulded with an increase of water content. Thus,
it underwent increasing fluidification, giving rise steep narrow discharge channel connecting these
two areas.to small earth flows that converged into the main
flow body. In the upper landslide sector, the main morpho-
logical element is a large perimetral scarp, overThe mass movement involved about two million
cubic metres of material, and was responsible for 20 m high, bordering the most active area. The
mobilised material is collected in an almost flatendangering the villages of Funes and Lamosano
(Angeli et al., 1994; Pasuto and Silvano, 1995). area, located at the scarps base, where its primary
characteristics are progressively lost as it turns intoFurther landslides occurred at the site in 1962,
1963, 1973, 1987, 1988, and 1989 after long-term a rather viscous mud, owing to water absorption.
Once transformed, the material flows through arainfall.
-
7/24/2019 Angel i 2000
3/15
135M.-G. Angeli et al./Engineering Geology 55 (2000) 133147
Fig. 1. Index map, location of the instrumentation and schematic cross-section of the Tessina landslide. Legend: (1) main flow body;
(2) roto-translational slide; (3) scree slope; (4) highly folded and fractured flysch; (5) flysch formation; (6) calcareous and marly-
calcareous formations.
narrow and steep discharge channel where the The lowest landslide sector corresponds to the
main accumulation area, which stretches from thethick sandstone layers making up the flysch forma-
tion crop out; these rocks form a sort of retaining toe of the discharge channel as far as Lamosano,
passing by the hamlet of Funes.structure for the overlying material.
-
7/24/2019 Angel i 2000
4/15
136 M.-G. Angeli et al./Engineering Geology 55 (2000) 133147
Several geotechnical tests have been carried out On the upper section of the slide, an automatic
topographic system for measuring surface move-on both the original material cropping out on the
main scarp and the remoulded material making ment was installed. This consists of a motorisedWild TM3000V theodolite with EDM Wildup the main landslide flow. All the materials tested
fall within the field of medium-high plasticity Distomat Di2002. More than 30 targets, made by
retroreflectors (reflecting prisms), are placed eitherinorganic clays. The liquid limit (wl) ranges
between 38.5 and 52.5%, whereas the plasticity within or outside the landslide body.
The telescope body has an integrating focusingindex (PI) is 16.224.7%. Direct shear tests have
provided values of the drained residual friction drive, a CCD camera, an eccentrically placed wide-
angle lens, and a coaxial target light. The targetangle, wr, ranging between 19.9 and 26.1.
By means of field observations and investiga- light generates an invisible infra-red beam of light.
This can be pointed to a retroreflecting target thattions and by analysing the data acquired over the
past few years, it was possible to develop a fairly reflects incident light back to its source, i.e. it acts
as if it was an active luminous target. The CCDreliable landslide evolution model. In practice, the
material involved in the slides affecting the main camera receives the optical beam and projects thevisual field to a video monitor. Image processingscarp or the margin of the upper accumulation
area gives rise to new flows that overlap those allows the theodolite system to identify targets
automatically and measure the angle and distancealready stabilised. Owing to an undrained loading
effect, the latter are partially remobilised over to each target. For target recognition, the CCD
camera is controlled to indicate either the measur-thicknesses of 12 m. This is facilitated during
periods of intense precipitations or snowmelt, ing or the wide-angle field of view to the target.
The theodolite transmits the video signal via thewhen the piezometric rise inside the earth flow
body comes close to the topographic surface. In cameras mains-supply unit to the computer, which
processes the data and calculates the targets dis-these conditions, a sudden overload noticeably
reduces the factor of safety. placements. The monitoring of each benchmark
position is carried out at 13 h intervals duringConsidering this high-risk situation, an alarmand monitoring system has been planned with the emergency periods, whereas in normal times, the
measurement interval is 6 h.main purpose of alerting the population in case of
imminent danger and, secondarily, in order to In order to detect the passage of flow fronts of
a certain thickness that are potentially hazardousacquire useful data for understanding the dynamic
pattern of the phenomenon and for the definition for the hamlets of Funes and Lamosano, two
control units, one consisting of three directionalof possible evolution scenarios.
bars and an ultrasonic echometer, the other of two
directional bars and an echometer, were installed2.1. Instrumentation
on the mudflow some 100 m uphill of the villages.
Three videocameras were also installed toFollowing the 1992 events, a programme of
remedial interventions was started, i.e. building of record and monitor the slide movement in the
most critical areas. Two of these cameras wereretaining walls and installation of a monitoring
and alarm system to guarantee the safety of the connected to two SVHS videorecorders, recording
for 2 s every 3 min, positioned by the hamlets ofpopulation (Fig. 1) (Angeli et al., 1996b).
In particular, two multiple-base wire-extensom- Funes and Lamosano. The third camera, in prox-
imity to the main scarp, sent images directly to aeter units, measuring 280 and 390 m, were installed
in the slide upper section in order to provide a monitor installed at the Lamosano Town Hall,
where personnel with surveillance duties constantlyconstant check of the movement occurring on the
landslide surface. These units consisted of a series checked the evolution of the phenomenon.
Three peripheral stations, fed by photovoltaicof 12 measuring pulleys fitted with an appropriate
scaler system capable of detecting movements as panels and buffer batteries, acquired and pre-
elaborated the data coming from all sensors, check-small as a centimetre.
-
7/24/2019 Angel i 2000
5/15
137M.-G. Angeli et al./Engineering Geology 55 (2000) 133147
Fig. 2. Extensometric devices installed on the Tessina landslide.
2.1.1. Wire extensometers
As regards wire extensometers in the Tessina
landslide, the need to carry out the measurement
of separate, but interrelated, movements and their
arrangement required the planning of a highlyindividual system composed of two anchor points.
One of these was installed in the central part of
the moving zone, and the other in the stable zone,
with the function of keeping cable tension con-
stant. Then, 12 measuring apparatuses (Figs. 2
and 3), consisting of a pulley fitted with an appro-
priate scaler system capable of detecting move-
ments as small as a centimetre, were positioned
along the cable and connected by wire to a peri-
pheral station able to transmit the data via radio
to the central monitoring station at Lamosano.Fig. 3. Layout of the extensometric device. Legend: ( 1) fineThe anchorage points were composed of a cageangular-displacement transducer; (2 ) main angular-displace-
of about 212 m, containing a series of springsment transducer; (3 ) 10-to-1 movement scaler; (4 ) wire; ( 5)pulley. together with a delay mechanism permitting a
cable lengthening of some 10 m, with constant
cable tension (Fig. 4).ing their proper functioning at the same time. DataBearing in mind the high level of risk for theacquisition by the sensors took place every 10 min,
local population and the dimension of the areaand the data were immediately downloaded, viabeing checked, this deformation measurementradio signals, onto a central monitoring station,system was connected to a topographic measure-located inside the Town Hall of Lamosano in order
to define possible danger situations. ment system with automatic surveying to check
-
7/24/2019 Angel i 2000
6/15
138 M.-G. Angeli et al./Engineering Geology 55 (2000) 133147
Fig. 4. Device used to keep the wire in constant tension.
and verify the movements of some benchmarks snow, during which topographic measurement
cannot be carried out.and all the extensometric measurement equipment.
This linkage between the two systems has demon- However, the intensity of the movement under
study has created notable difficulties for the man-strated the advantage of continuous surveillance
of the evolution of the source area, even in adverse agement of the entire measuring apparatus.Maintaining the steel wire in constant tension byclimatic conditions, e.g. intense rainfall, fog and
Fig. 5. Example of correlation between rainfall and displacement recorded by an extensometric device during the 1993 critical phase.
-
7/24/2019 Angel i 2000
7/15
139M.-G. Angeli et al./Engineering Geology 55 (2000) 133147
means of the apparatus shown in Fig. 4 was practi-
cable up to a stretch limit of some tens of metres,
beyond which complete resetting of the extensome-ter devices was necessary.
Moreover, considering that each extensometric
apparatus placed within the body of the slide was
connected to a data logger with an electric cable
for data transmission, intense movements have
often broken the cable, thus necessitating the
reconnection of the cables, sometimes under
difficult conditions.
Other problems arose from the tilting of meas-
uring equipment in the course of slide movements,
leading to misalignment between it and the wire.
Also, in these cases, the original equipment posi-tion needed to be reset to ensure its correct
functioning.
Despite all this, the system has allowed contin-
ual checking of the movements and the forecast
of several critical situations that have led to the
collapse of substantial sections of the slope
(Fig. 5).
2.1.2. Directional bar
This is a simple instrument consisting of a bar
that, when suspended from a cable runningthrough a channel, records the passing of
mud/debris flows and avalanches (Fig. 6). TheFig. 6. Directional bar suspended from a cable running throughworking principle is based upon the tractional andthe Tessina Valley.
rising effect of the moving mass on the bars.
Groups of two and three bars were installed
upstream of Lamosano and Funes, respectively,
working as alarm systems (Fig. 1). They were meter was added to each group of bars, which
constantly measured the altitude of the flow sur-calibrated so as to set offan alarm signal by the
closure of a mercury switch only if they were tilted face, to confirm and back-up the alarm signal from
the directional bars.more than 20 from the vertical position for more
than 20 s. This threshold was introduced as a way Thanks to the simplicity of the apparatus con-
struction, no particular operational problemof reducing false alarms usually due to the effects
of frequent gusts of wind for which this valley is occurred. In addition, the possibility of false alarm
was further reduced due to checks by means ofrenowned.
The entire system was connected to specifically developed software, set up to record
only the passage of mud flow deeper than 34 mmeasuring/checking stations, which sent the vari-
ous alarm signals to an operative centre. and with a velocity of at least several metres per
minute, such as the present situation of danger forIn fact, the installation of several directional
bars, placed at reasonable intervals from one the inhabited areas.
Notwithstanding this, false alarms took placeanother, allowed registration of both the mud flow
and its velocity so that the varying risk levels of on two occasions, due, on one occasion, to excep-
tionally intense and persistent winds that kept athe area could be detected. An ultrasonic echo-
-
7/24/2019 Angel i 2000
8/15
140 M.-G. Angeli et al./Engineering Geology 55 (2000) 133147
Fig. 7. Giau Pass landslide: location of boreholes and evolution scheme of the slope (reference to cross-section CC).
bar tilted for more than 20 s, and, on another dAmpezzo) has been monitored since the early
1980s.occasion, to the passage of a fallen tree carried by
the flow, whose branches reached and displaced a On 25 April 1988, the landslide suddenly col-
lapsed, and its evolution was automaticallybar. However, in both cases, the remote control
of data produced by the echometer permitted recorded (Fig. 7).
From a geological viewpoint, the layers crop-immediate rectification.
Maintenance and checking of the bars function- ping out in the area surrounding the landslide
belong to the Werfen Formation (Scythian). Thising caused considerable difficulties because they
were hanging from a cable some hundred metres formation is composed of a well-bedded, reddish,
marly limestone, alternated with marls and sand-in length, positioned transversally over a valley.
Retrieval and repositioning of the instrumentation stones. These beds dip upstream with an average
slope angle of about 30. The overlying morainerequired delicate and laborious manoeuvres owing
to the inaccessibility of the slope. deposits, which form the landslide body, are com-
posed of a fine silty-sandy matrix, including gravel,
pebbles and blocks of dolomitic limestone from
the uphill dolomite peaks. Sandy and clay lenses3. Giau Pass landslide
are also present.
Since the first investigation, the landslide hasA landslide of some 500 000 m3 made up of
morainic material and located in the Dolomites appeared to be a complex slide (Skempton and
Hutchinson, 1969), characterised by a large graben(near the Giau Pass, about 30 km from Cortina
-
7/24/2019 Angel i 2000
9/15
141M.-G. Angeli et al./Engineering Geology 55 (2000) 133147
area in the upper part of the slope and by a
translation of the main mass occurring on an
almost sub-horizontal slip surface. Late in 1981,the main scarp, located at the back of the graben,
had already reached a greater extent: 6 m in height
and 250300 m in length. Further enlargements of
the main scarp occurred in subsequent years, until
the complete slope collapsed, during which the
scarp reached a height of 20 m, and the landslide
body underwent a translative displacement of the
same intensity, before stopping against the oppo-
site slope.
The maximum thickness of the landslide body
was about 50 m, whereas its maximum length was
150200 m. The slip surface was identified as beinglocated at the contact surface between the moraine
deposits and the Werfen marl bedrock, at least as
regards its rectilinear extent. Its curvilinear extent
is completely contained within the moraine depos-
its (Fig. 7).
Hydrogeological and geotechnical investiga-
tions have been carried out since 1982.
Laboratory tests were carried out on the finer
matrix of soil samples collected either from bore-
holes or directly along some parts of the slip
surface, which was formed after the 1988 collapse.The matrix of most of the soil samples (mainly
constituted by coarse-grained moraine materials)
taken from the slip surface was classified as a clay
of intermediate plasticity (with a PI of 15.3 Fig. 8. Correlation between rainfall, groundwater level andinclinometric displacements over 7 years of recording. The land-17.4%). Residual shear strength tests carried outslide collapsed on 24 April 1988.on the finer matrix material (passing through the
B40 sieve) gave wr values ranging between 15
and 17.
tions and inclinometric displacements are quite
evident.
The automatic instrumentation installed in the3.1. Instrumentation and data obtained
landslide body, in particular the electric pressure
transducer and a steel wire extensometerFollowing the first investigations, the slope was
gradually equipped with standard and automatic (Corominas et al., 1999), with a sample interval
of 2 h, allowed a detailed recording of two criticalinstrumentation: three Casagrande piezometric
cells, two electric pressure transducers, two deep- events concerning stability (Angeli et al., 1990a).
Movements of a few centimetres were measuredseated steel wire extensometers, four inclinometric
tubes, a rainfall gauge, a snow gauge and an air in April 1987, along with piezometric variations
of about 1.5 m, whilst in the same month of thethermometer. A summary of standard hydrological
and kinematic data collected over 7 years on the following year, the slope collapsed, with a displace-
ment of more than 20 m but with a rise in piezo-slope examined is shown in Fig. 8. The correlations
between precipitation depth, piezometric eleva- metric level of only 0.5 m (Fig. 9).
-
7/24/2019 Angel i 2000
10/15
142 M.-G. Angeli et al./Engineering Geology 55 (2000) 133147
Fig. 9. Comparison of data recorded during two critical hydrological events in 1987 and 1988.
In both cases, the data established that the reprocessing of piezometric data was therefore
taken into account. Considering the solution ofbeginning of movement happened before the
recorded piezometric peak and in particular that the differential equations of water flow (Hvorslev,
1951) inside the piezometric apparatuses, a recal-it coincided with the flexure point of the piezomet-
ric rise curve, rather than with its maximum value. culation of piezometric data was obtained.
The fundamental input data considered were:This behaviour was attributed to the large
volume that piezometric apparatuses used (open diameter and length of the filter, diameter of the
piezometer and permeability of the ground.standpipe piezometers). The electric pressure trans-
ducers were placed inside a 80 mm diameter pipe, The application of a computer routine has thus
permitted recalculation of the new curves relativeand this fact meant that a significant time-lag
occurred between the levels of the GWT inside to the piezometric level variations. These new
piezometric elevation values show an oppositeand outside the tube.
trend to those recorded (Fig. 10).
The April 1988 situation (measured peak value:3.1.1. Piezometers
In order to correct the observed time-lag and a 27.82 m; calculated value: 19.7 m) was
assessed as being much more severe than thepossible cut-off of the maximum peaks, a
-
7/24/2019 Angel i 2000
11/15
143M.-G. Angeli et al./Engineering Geology 55 (2000) 133147
quence, there has been a significant reduction in
the number of buildings in the old part of the
village.The stratigraphic sequence of the cliff is com-
posed of thick or massive layers of marls and
calcareous marls. In some places, thin layers of
clay are present.
Structurally, the area is characterised by a
monocline dipping SE from 20 to 30, which is
affected by several systems of faults and joints,
generally subvertical. Steep escarpments partly sur-
round the monocline above.
Under these conditions, large blocks of rock,
set free by the systems of joints and by the presence
of the above escarpments, tend to slide on the
bedding planes (Figs. 11 and 12).
Since 1990, a number of horizontal and vertical
boreholes have been drilled and equipped with
geotechnical instrumentation. In particular, BHH2
and BHH3 boreholes were drilled horizontally, at
a slightly different elevation, in order to install
several fibre-glass extensometric bars of different
lengths (20, 40, 60, 80 m). The direction of the
boreholes and the different lengths of the extenso-
metric bars were established in order to check theFig. 10. Measured and calculated piezometric head during two extent to which the differential movements in thecritical events (1987 and 1988).
jointed rock mass could take place. They reached
a stable zone well below the inhabited area.
This type of extensometer is generally used inprevious situation occurring in 1987 (measured civil engineering for monitoring retaining struc-peak value: 26.94 m; calculated value: 22.3 m) tures such as bulkheads, large supporting walls or(Fig. 9). The new calculated piezometric curves,
inner tunnels for controlling the stability of rockshowing peaks preceding movement and much
walls. It has been successfully used for the firsthigher than the values measured, fully explained
time for monitoring a landslide using considerablythe occurrence and the collapse mechanism.
long bars.
In the case of Sirolo, rectangular-section
(35 mm) bars were installed and anchored atdifferent depths in order to identify the precise4. Sirolo landslidelocation of the slip surface. The bars are protected
by rigid sheaths, with their upper extremity pro-The village of Sirolo, located on top of a steeptruding from the ground surface, on which amarly cliffalong the Adriatic sea, several kilome-manual centesimal comparator is placed. Thetres south of the harbour of Ancona (Centralmanual comparator may be substituted by a linearItaly), is widely affected by instability phenomenadisplacement transducer, which, when connected(rock falls, toppling of rock pillars, slides) (Angelito a suitable logger, allows continuous movementet al., 1990b, 1991, 1996a; Angeli and Pontoni,recording.1995). The area is highly tectonised and subject to
recurrent high-intensity earthquakes. As a conse- Concomitant with the installation of extensome-
-
7/24/2019 Angel i 2000
12/15
144 M.-G. Angeli et al./Engineering Geology 55 (2000) 133147
Fig. 11. Map of the Sirolo landslide area showing the location of the equipped boreholes and the control works.
tric bars, a rain gauge and several electric transduc- Each head of the anchor is connected to the
others by steel-reinforced beams, running horizon-ers of pressure and displacement were connected
to automatic data loggers. High-precision geodetic tally along different contour lines in the slope.
Moreover, horizontal tubular drains weresurveys were also carried out.
Observation of all the data collected has permit- drilled at different locations along the slope
(Figs. 11 and 12). Sometimes, they reached ated a first hypothesis on the main landslide mecha-
nism. In particular, a huge block-type slide length of 150 m. Often, they allowed the rapid
outlet of large quantities of water coming fromoccurring on a subhorizontal plane was identified.
Fluctuation of the groundwater table above a fixed the opened cracks existing at the back of the
landslide body.threshold was identified as being responsible for
periodic landslide reactivations. A sufficient number of critical hydrological situ-
ations recorded before and after the remedialRemedial measures consisted of a series of very
long pre-stressed steel anchors and subhorizontal measures have revealed a significant reduction in
the piezometric peaks in the landslide body,tubular drains.
-
7/24/2019 Angel i 2000
13/15
145M.-G. Angeli et al./Engineering Geology 55 (2000) 133147
Fig. 12. Schematic cross-section of the Sirolo landslide body: bedding planes dip 20 to 30 toward the observer.
accompanied by a cessation of movement 5. Final remarks(Fig. 13).
A particularly innovative feature of this experi- From the three cases briefly illustrated, the wide
spectrum of situations in which even simple moni-ence was the use of extensometric bars made of
fibre-glass, which proved especially useful for the toring systems can be employed advantageously is
evident. Usually, the best possible results can onlydetection of very small movements. This equip-
ment is, in fact, able to detect movements of the be obtained if the position of the sensors is mean-
ingful, and this can result only from a previousorder of hundredths of a millimetre and is thus
particularly useful for rock-slide applications. The in-depth understanding of the phenomena,
obtained through collection and analysis of all theeffectiveness of these apparatuses was also con-
firmed both by the long activity period (about previous documentation. Geological conditions
must also be accurately investigated.10 years) and by the accuracy of the measurements
obtained, thus guaranteeing the continuity and Another very important aspect is the choice of
parameters and frequency of sample data collec-reliability of the observations, which would not
have been possible with the equipment normally tion. It is indeed important to optimise data collec-
tion so that large amounts of poorly significantused (inclinometers, wire extensometers).
Precision is required in its installation, and the data can be discarded.
In the case of alarm systems, it is very importantmeasurements themselves should be taken by
expert personnel. At present, checking is carried to avoid false alarms, to choose appropriately the
critical thresholds for the various parameters takenout manually. The choice of a sufficiently accurate
automatic data logger for continuous data collec- into consideration, and possibly to use alternative
measures if such thresholds are exceeded.tion that also permits manual checking at the same
time is currently being examined. Finally, it should be pointed out that the instru-
-
7/24/2019 Angel i 2000
14/15
146 M.-G. Angeli et al./Engineering Geology 55 (2000) 133147
Fig. 13. Relationships between monthly rainfall, piezometric rise and landslide movement; piezometer BH1 is representative of the
landslide body, whereas piezometers BH8 and BH11 represent the piezometric behaviour of the stable area; BHH2 and BHH3 indicate
horizontal extensometric bars; A1, A2 and A3 refer to the three systems of anchors installed, and D1, D2 and D3 refer to the three
sets of tubular drains.
mentation used in the study of landslides is a Acknowledgementspowerful tool of investigation, but in no case
This paper is part of the CEC Environmentshould it be the aim of research. In this case, theProgramme Project NEWTECH (ENV-main objective (i.e. the knowledge, study, observa-CT96-0248) New Technologies for Landslidetion and management of landslides) would be
lost. Hazard Assessment and Management in Europe.
-
7/24/2019 Angel i 2000
15/15
147M.-G. Angeli et al./Engineering Geology 55 (2000) 133147
Angeli, M.G., Gasparetto, P., Pontoni, F., 1996a. Long termReferencesmonitoring and remedial measures in a coastal landslide
(Italy). In: Senneset, K. (Ed.), Landslides. Proc. 7th ISL
Angeli, M.G., Gasparetto, P., Pasuto, A., Silvano, S., 1990a. Trondheim, Norway. Balkema, Rotterdam, pp. 14971502.Analisi di un caso di frana in materiali morenici (Val Fioren- Angeli, M.G., Pasuto, A., Silvano, S., 1996b. Landslide hazardtina, Belluno). Mem. Sci. Geol. 42, 129154. in high mountain areas: some case histories (Italy). J. Geol.
Angeli, M.G., Barbarella, M., Dramis, F., Garzonio, C.A., Pon- Soc. China 39, 401422.toni, F., 1990b. A monitoring project for the definition of Corominas, J., Moya, J., Lloret, A., Gili, J.A., Angeli, M.G.,the geostructural model of Sirolo landslide (Italy). Proc. 6th Pasuto, A., Silvano, S., 1999. Measurement of landslide dis-ICFL, 12 September 1990, Milan, Italy, 175186. placements using a wire extensometer. Eng. Geol. 55,
Angeli, M.G., Barbarella, M., Pontoni, F., 1991. Instability of 149166 (this issue).a sea cliff: Sirolo landslide, Italy. In: Bell, D.H. (Ed.), Land- Hvorslev, M.J., 1951. Time lag and soil permeability in ground-slides. Proc. 6th ISL, Christchurch (NZ). Balkema, Rotter- water observations, US Army Corps of Engineers Water-dam, pp. 10931100. ways, Experiment Station, Vicksburg, MS, Bull., 36.
Angeli, M.G., Gasparetto, P., Menotti, R.M., Pasuto, A., Pasuto, A., Silvano, S., 1995. The Tessina landslide. In: Horlick-Silvano, S., 1994. A system of monitoring and warning in a Jones, T., Amendola, A., Casale, R. ( Eds.), Natural Riskcomplex landslide in northeastern Italy. Landslide News 8, and Civil Protection. Chapman & Hall, London,
1215. pp. 283290.Angeli, M.G., Pontoni, F., 1995. Il monitoraggio e gli interventi Skempton, A.W., Hutchinson, J.N., 1969. Stability of natural
di stabilizzazione in una falesia di roccia fratturata, Atti slope and embankment foundation, State-of-the-Art
Report. Proc. 7th ICSMFE, Mexico City, 291340.XIX Convegno Nazionale di Geotecnica, Pavia, Italy, 16.