      CHAPTER ONE

     

    INTRODUCTION ❖ Wastewater  is the used water generated by the community

    arious actiities!

     ❖ It contains im"urities or "o##utants in the $orm o$ so#ids%#i&u

    or their combination in such concentration that is harm$u# i$

    the enironment!

     ❖ The contaminants inc#ude sus"ended so#ids%biodegradab#e

    organic com"ounds%inorganic so#ids%nutrients%meta#s and "

    microorganisms!

  • 8/16/2019 ANEMUTE ALEMU

    3/39

     ❖ The suspended solids are primarily organic particles composed

    wastes(faeces),food waste and toilet paper.

     ❖ Inorganic solids include surface sediments and soil as well as sa

    metals.

     ❖ The removal of suspended solids is essential prior to discharge

    avoid settlement in the receiving water course.

     ❖ The design of wastewater treatment plant units,in general,means

    determination of the determination of capacity(volume)and dimetreatment tanks.

     ❖ Wastewater treatment plants are designed on a unit operation co

    which one operation is optimized to accomplish one task.the cho

    treatment operations depends on the uality and variability of wa

    treatment ob!ectives.

  • 8/16/2019 ANEMUTE ALEMU

    4/39

     ❖ Wastewaters are normally treated by the combination of physicand biological operations.

     ❖ physical methods of treatment include the use of tanks and othe

    designed to control the flow of wastewater and and to promote thcontaminants.

     ❖ The action of bacteria and other microorganisms are biological m

    treatment,which play a vital role in the removal of pollutants whic

    effectively achieved by other means.

     ❖ "hemical treatment methods enhance the efficiency of other pro

    operations and provide specialized treatment as a result of their

    various treatment stages.

  • 8/16/2019 ANEMUTE ALEMU

    5/39

      'OURCE' O( WA'TEWATER

     ❖ Wastewater can originate from the combination of domestic,indu

    commercial activities.

     ❖ The source of wastewater will determine its its characteristics an

    be treated.

     ❖

    #omestic wastewater is the wastewater generated from homes,band institutions and contains pollutants such as,faecal and vege

    matter,grease and scum,detergents,rags and sediments.$n the

    wastewater from industrial processes may include to%ic chemica

    strong organic wastes,radioactive wastes,large amounts of sedim

    temperature wastes or acidic wastes.

  • 8/16/2019 ANEMUTE ALEMU

    6/39

      O)*ECTI+E' O( THE PRO*ECT

     ❖  The main ob!ective of this pro!ect is to maintain a healthy enviro

    treating properly the wastewater before they find their way into wor agricultural lands and other possible reuse.

     ❖ To reduce the strength of wastewater,so that it may not pollute th

    water.

     ❖ To reduce its volume in general.

     ❖ To destroy the pathogens

     ❖ To enable its safe and satisfactory disposal

     ❖

    To produce methane gas

  • 8/16/2019 ANEMUTE ALEMU

    7/39

      ,OCATION O( TREAT-ENT P,A

  • 8/16/2019 ANEMUTE ALEMU

    8/39

      DE'I.N PERIOD

    &enerally, the design period of wastewater treatment plant is determ

    considering the following facts'

     ❖ unds available for the construction of the treatment plant

     ❖ seful lifespan of materials that are used in the construction of wa

    treatment plant

     ❖ *ate of interest on the loans taken to complete the pro!ect

     ❖ $peration and maintenance cost

     ❖

     +nticipated e%pansion of the population

  • 8/16/2019 ANEMUTE ALEMU

    9/39

     ❖ The consideration of the above factors in the se

    design period serves two purposes.

    (irst#y% it wi## not "ut on e/cessie $inancia# burden on the const

    the wastewater treatment "#ant as it can be carried out in "hase

    design "eriod is ery #ong% it wi## unnecessari#y increase the cosconstruction and the ca"acity o$ the treatment "#ant wi## remain

    #onger "eriod o$ time! On the other hand% i$ the design "eriod is

    ca"acity o$ the "#ant sha## be consumed $aster and wi## create a

    e/"ansion!Thus% by considering the aboe cases% a design "erio

    years inc#uding its construction "eriod is ado"ted $or this "ro3e

  • 8/16/2019 ANEMUTE ALEMU

    10/39

      POPU,ATION PRO*ECTION ❖ A$ter the design "eriod has been $i/ed% the "o"u#ation o$ the

    area at the end o$ the design "eriod has to be determined! I

    designing a wastewater treatment "#ant $or a new town4city%

    dai#y wastewater $#ow is norma##y com"uted on the basis o$

    dai#y water demand o$ the town 4city! This demand is usua##

    on the basis o$ the "ro3ected "o"u#ation oer the end o$ the

    "eriod!

     ❖ The estimation o$ $uture "o"u#ation de"ends on the conside

    $actors that wi## goern the $uture growth and dee#o"ments

    town4city in the s"heres o$ trade and

    commerce%industries%education%socioeconomics%etc!

  • 8/16/2019 ANEMUTE ALEMU

    11/39

     ❖ Thus $rom the data obtained $rom Communication Cor"orat

    Directorate )ureau o$ Debre -ar5os Uniersity%the statisticastudents and sta$$ wor5ers are as $o##ows6

      Tab#e 76 'tudents 'tatistica# data in 8229 E!C

    irst

    degree

    econ

    ddegree

    Total

    *egular

    -/-0 112 -3/2

    4%tension

    5525 6/ 317

    umm 206 670 251

  • 8/16/2019 ANEMUTE ALEMU

    12/39

    Table 8workers statistical data in 007 4."

     

    9ale emale

    Total

     +cademicstaff

    222 -62 --67

     +dministrative staff 

    533 651 -/0

    Technicalassistant

    56 -3 7

    "afeteria

    -5

  • 8/16/2019 ANEMUTE ALEMU

    13/39

  • 8/16/2019 ANEMUTE ALEMU

    14/39

  • 8/16/2019 ANEMUTE ALEMU

    15/39

  • 8/16/2019 ANEMUTE ALEMU

    16/39

  • 8/16/2019 ANEMUTE ALEMU

    17/39

  • 8/16/2019 ANEMUTE ALEMU

    18/39

  • 8/16/2019 ANEMUTE ALEMU

    19/39

  • 8/16/2019 ANEMUTE ALEMU

    20/39

  • 8/16/2019 ANEMUTE ALEMU

    21/39

  • 8/16/2019 ANEMUTE ALEMU

    22/39

  • 8/16/2019 ANEMUTE ALEMU

    23/39

  • 8/16/2019 ANEMUTE ALEMU

    24/39

  • 8/16/2019 ANEMUTE ALEMU

    25/39

  • 8/16/2019 ANEMUTE ALEMU

    26/39

  • 8/16/2019 ANEMUTE ALEMU

    27/39

  • 8/16/2019 ANEMUTE ALEMU

    28/39

  • 8/16/2019 ANEMUTE ALEMU

    29/39

  • 8/16/2019 ANEMUTE ALEMU

    30/39

  • 8/16/2019 ANEMUTE ALEMU

    31/39

  • 8/16/2019 ANEMUTE ALEMU

    32/39

  • 8/16/2019 ANEMUTE ALEMU

    33/39

  • 8/16/2019 ANEMUTE ALEMU

    34/39

  • 8/16/2019 ANEMUTE ALEMU

    35/39

  • 8/16/2019 ANEMUTE ALEMU

    36/39

  • 8/16/2019 ANEMUTE ALEMU

    37/39

  • 8/16/2019 ANEMUTE ALEMU

    38/39

  • 8/16/2019 ANEMUTE ALEMU

    39/39