  • 8/12/2019 Analisis Dewatering Sumpits

    1/10

    Syarat Sistem Dewatering

    Kedalaman Galian dari MAT(m)

    1 16 Sump & Pits

    3 16 Deep Well

    No. Sistem Dewatering

  • 8/12/2019 Analisis Dewatering Sumpits

    2/10

    DATA

    Luas dasar galian A = 9,316.99 m2

    Kedalaman muka air tanah h1 = 1.5 m

    Kedalaman galian tanah h2 = 4 m

    Curah hujan 5 tahunan

    Curah hujan R1 = 50 mm/jam

    Durasi t1 = 60 mnt

    Curah hujan run off R2 = 120 mm/jamKoefisien run off C = 0.9 data teknik sipil

    Jumlah sump = Jumlah pump n = 4 buah

    PERHITUNGAN

    Kondisi I

    R1 = 50 mm/jam

    Q1 = C*I*A

    = 0.1164624 m3/dtk

    = 116.46238 Lt/dtk

    Kondisi II

    R2 = 120

    Q2 = C*I*A

    = 0.2795097 m3/dtk

    = 279.5097 Lt/dtk

    Volume air akibat muka air tanah V1 = A*(h2 - h1)

    = 23,292.48 m3 ada pengaruh air tanah

    Volume air akibat hujan 5 tahunan V2 = Q1*t1

    = 419.26 m3

    Volume air total Vtot = V1 + V2

    = 23,711.74 m3

    A. Menentukan Dimensi Pit (Parit)

    PERHITUNGAN DEWATERING SISTEM SUMPS & PITS

  • 8/12/2019 Analisis Dewatering Sumpits

    3/10

    Q2 = 279.5097 Lt/dtk

    Jumlah sump n = 4 buah

    Debit dalam pit Qpit = Q2/n

    = 69.88 Lt/dtk

    Lebar dasar saluran b = 0.3 mTinggi bebas saluran h1 = 0.2 m

    Kedalaman air h2 = 0.3 m

    Kemiringan saluran = 60

    Panjang saluran L = 102 m

    Kondisi saluran

    Koefisien kekasaran K = 43.5

    a1 = 0.17 m

    a2 = 0.35 m

    Luas penampang basah F = 0.14 m2

    Keliling basah O = 0.99 mJari-jari hidrolis R = 0.14 m

    Kemiringan dasar saluran i = 2.9E-03

    Kecepatan aliran v = 0.65 m/dtk

    Debit aliran Qaliran = F*v

    = 0.09 m3/dtk

    = 91.63 Lt/dtk

    Qaliran > Qpit ok!

    B. Menentukan Dimensi Sump (Lubang) dan Pompa

    4. Saluran drainase, tanpa tanggul

    b

    h1

    h2 L

    h2

  • 8/12/2019 Analisis Dewatering Sumpits

    4/10

    Panjang p = 0.5 m

    Lebar l = 0.5 m

    Tinggi t = 0.5 m

    Volume sump (lubang) Vsump = 0.125 m3

    Jumlah sump (lubang) n = 4 buah

    Volume total sump (lubang) Vtot = 0.50 m3

    C. Menentukan Kapasitas Pompa

    Jumlah pompa n = 4 buah

    Kapasitas pompa Qpump = 0.4 m3/mnt

    = 400 Lt/mnt

    Volume air yang dapat dibuang oleh pompa Vbuang = (n*Qpump*t1)+Vtotsump

    = 96.5 m3

    Volume air yang tidak dapat dipompa Vsisa = Vair - Vbuang

    = 23,615.24 m3

    Waktu membuang volume sisa ts = 14759.52 mnt

    = 10.2 hari

    p

    l

    t

  • 8/12/2019 Analisis Dewatering Sumpits

    5/10

  • 8/12/2019 Analisis Dewatering Sumpits

    6/10

  • 8/12/2019 Analisis Dewatering Sumpits

    7/10

    88092.4379

    36781.8827

    4133.4516

    18880.3713

    36659.3231

    13075.1903

    7675.3875

    40650.7533

    15486.063

    64209.36574506.0018

    4506.0018

    2000.5793

    6448.3776

    6685.2471

    58598.1979

    408388.6319 mm

    KLL 408.3886319 m

  • 8/12/2019 Analisis Dewatering Sumpits

    8/10

    DATA

    Luas dasar galian A = 9,316.99 m2

    Kedalaman muka air tanah h1 = 1.50 m

    Kedalaman galian tanah h2 = 4.00 m

    Curah hujan 5 tahunan

    Curah hujan R1 = 50 mm/jam

    Durasi t1 = 60 mnt

    Curah hujan run off R2 = 120 mm/jam

    Koefisien run off C = 0.9 data teknik sipil

    Jumlah sump = Jumlah pump n = 4 buah

    PERHITUNGAN

    Kondisi I

    R1 = 50 mm/jam

    Q1 = C*I*A

    = 0.1164624 m3/dtk mm/jam m2 m3/det

    = 116.46238 Lt/dtk

    Kondisi II

    R2 = 120

    Q2 = C*I*A

    = 0.2795097 m3/dtk

    = 279.5097 Lt/dtk

    Volume air akibat muka air tanah V1 = A*(h2 - h1)

    = 23,292.48 m3 ada pengaruh air tanah

    Volume air akibat hujan 5 tahunan V2 = Q1*t1

    = 419.26455 m3

    Volume air total Vtot = V1 + V2

    = 23,711.74 m3

    A. Menentukan Dimensi Pit (Parit)

    PERHITUNGAN DEWATERING SISTEM SUMPS & PITS

  • 8/12/2019 Analisis Dewatering Sumpits

    9/10

    Q2 = 279.5097 Lt/dtk

    Jumlah sump n = 4 buah

    Debit dalam pit Qpit = Q2/n

    = 69.88 Lt/dtk

    Diameter saluran D = 0.7 mJari-jari saluran r = 0.35 m

    Tinggi bebas saluran h1 = 0.2 m 3.8

    Kedalaman air h2 = 0.3 m

    Panjang saluran L = 102 m

    Kondisi saluran

    Koefisien kekasaran K = 43.5

    Luas penampang basah F = 0.19 m2

    Keliling basah O = 1.10 m

    Jari-jari hidrolis R = F/O

    = 0.18 mKemiringan dasar saluran i = h2/L

    = 2.9E-03

    Kecepatan aliran v = K*R^(2/3)*i^0.5

    = 0.74 m/dtk

    Debit aliran Qaliran = F*v

    = 0.14 m3/dtk

    = 141.95 Lt/dtk

    Qaliran > Qpit ok!

    B. Menentukan Dimensi Sump (Lubang) dan Pompa

    4. Saluran drainase, tanpa tanggul

    L

    h2

    D

    h1

    h2

  • 8/12/2019 Analisis Dewatering Sumpits

    10/10

    Panjang p = 0.5 m

    Lebar l = 0.5 m

    Tinggi t = 0.5 m

    Volume sump (lubang) Vsump = 0.125 m3

    Jumlah sump (lubang) n = 4 buah

    Volume total sump (lubang) Vtot = 0.50 m3

    C. Menentukan Kapasitas Pompa

    Jumlah pompa n = 4 buah

    Kapasitas pompa Qpump = 0.4 m3/mnt

    = 400 Lt/mnt

    Volume air yang dapat dibuang oleh pompa Vbuang = (n*Qpump*t1)+Vtotsump

    = 96.5 m3

    Volume air yang tidak dapat dipompa Vsisa = Vair - Vbuang

    = 23,615.24 m3Waktu membuang volume sisa ts = 14759.52 mnt

    = 10.2 hari