ContextA feasibility study for a large PPP real-estate

development in centre of Brussels

Usually, the deliverables are

• historical & contextual analysis • gross estimate of maximum and minimum amount of m2 • a list of possible functions that can be implemented • rough financial feasibility • volumetric studies based on zoning regulations • etc.

± 30 A4 pages.

Nevertheless,

this approach was not really going to work out

StakeholdersReal-estate developers The Vlaamse Overheid

The Architects/Urbanists

Financial Feasibility Social Impact Political Relevance Architectural & Urban Constraints

Parameters

GOV

DEV ARCH

GOV

politicians

policymakers

architects

real estatedept.

banks

investors

CSR

DEV ARCH

us

GOV

politicians

policymakers

architects

real estatedept.

banks

investors

CSR

DEV ARCH

SHORT TERM

PROFIT

COOLNESS

SOCIAL

IMPACT

QUALITY

RESIDUAL GROUND

VALUE

LONG TERM GAINS

GIN&TONIC BARS

GET

RE-E

LECT

ED

Gre

en e

nerg

y?

Too expensive.

The stakeholders did not speak the same language &

did not share the same interests

GOV

politicians

policymakers

architects

real estatedept.

banks

investors

CSR

DEV ARCH

?

A “dj mixer” that will allow intuitive control of relevant parameters, provide users with direct feedback regarding choices and be relevant to all stakeholder groups, regardless of their background.

Interactive Negotiation Tool

step#1

intuitive parametric control

friendly feedback

so much numbers

step#2

• categorise & visualise parameters • hide inner-mechanics • emphasise end results • emphasise the flow of information

Strategies

First UX Sketches

kosten

inkomsten126.309.089

saldo42.429.429

42.429

42.429

42.429.429

42.429.429

6.309.089

kosten

inkomsten126.309.089

saldo42.429.429

6.309.089

IRR: 5% IRR EV: 12%

#codefaster

#codeEvenfaster

• financial development decisions • functional variety (offices, housing, hotel, leisure, etc.)

Categorise & Visualise Parameters

• more than 70% of information taken up by secondary calculations that only 10% of users understand

• makes it look complex&reliable

Hide inner mechanics

• you can not see the important numbers!!1!1 • #frigginobvious

Emphasise end results

Emphasise the flow of information

off the chartdatabase

Parameters

m2 calculations

Netto Present Value

Profit

Residual ground value

• users gain a global understanding of the process • they become aware of the trade-offs involved • they appropriate the other stakeolders; point of view

Emphasise the flow of information

so much coolso happy

Thank you for your time.Dimitrie A. Stefanescu