an insitu-model-aircraft cross validation strategy for...

21
An insitu-model-aircraft cross validation strategy for SMOS Jeffrey Walker 1 , Christoph Rüdiger 1 , Jean-Christophe Calvet 2 and Yann Kerr 3 (1) Department of Civil and Environmental Engineering, University of Melbourne, Melbourne, Australia (2)CNRM (Météo-France, CNRS), Toulouse, France (3)CESBIO (UPS, IRD, CNRS, CNES), Toulouse, France

Upload: donhi

Post on 11-May-2018

220 views

Category:

Documents


2 download

TRANSCRIPT

An insitu-model-aircraft cross validation strategy for SMOS

Jeffrey Walker1, Christoph Rüdiger1, Jean-Christophe Calvet2 and Yann Kerr3

(1)Department of Civil and Environmental Engineering, University of Melbourne, Melbourne, Australia

(2)CNRM (Météo-France, CNRS), Toulouse, France(3)CESBIO (UPS, IRD, CNRS, CNES), Toulouse, France

Microwave satellites: near-future

SMOS (Soil Moisture and Ocean Salinity) launch 9 Sept. 2009 40km 3days; synthetic aperture radiometer

AQUARIUS (Ocean Salinity and soil moisture)launch May 2010 ~100km 7days; “traditional” active passive

SMAP (Soil Moisture Active Passive) launch ~2013 40-10km 3days; high resolution active

Microwave satellites: current

ASCAT (Advanced Scatterometer) launched 2006 50km 1-3days; c-band microwave scatterometer

AMSR-E (Advanced Microwave Scanning Radiometer for the Earth observing system) launched 2002 25km 1-3days; “traditional” c-band radiometer

WindSAT (Wind Satellite)launched 2003 Same as AMSR-E but 6:30am/pm overpass time rather than 1:30am/pm

ASAR (Advanced Synthetic Aperture Radar)launched 2004 1km ~10days; c-band microwave scatterometer

The cross-validation strategy

A SMOS cross-validation strategy using in-situ measurements, airborne measurements, model predictions and satellite observations

The Murrumbidgee: A demonstration test-bed

0 500km

Murrumbidgee Catchment characteristics

Murrumbidgee Catchment monitoring

OzNet monitoring network

www.oznet.unimelb.edu.au

MoistureMap: An overview …

Data Assimilation

SMO

S Si

mul

ator

1km LanduseLandcover Data

Project 4Multi-angle Retrieval

Rainfall and ET Data

BoM

Rea

l-ti

me

Obs

ervi

ng

Net

wor

k

BoM

7-da

y N

WP

Fore

cast

BoM

Sea

sona

l Cli

mat

e Fo

reca

st

50km

SM

OS

Dat

a

1km

MO

DIS

Dat

aMoistureMap

A soil moisture monitoring, prediction and reporting system for land management

1km

Soi

l Moi

stur

e P

redi

ctio

n M

odel

Walker et al. (2003), MODSIM

SMMR Assimilation

CABLE: CSIRO Atm. Bio. Land Exchange

Canopy radiation;sunlit & shaded visible &near infra-red,albedo stomata transp.

& photosynthesis

Carbon fluxes;GPP, NPP,NEP

SEB & fluxes;for soil-vegetationsystem:λEf , Hf , λEg , Hg;

evapotranspiration

soil moisture snow

carbon pools; allocation & flow

CASA-CNP

vegetation dynamics/disturbance

soil temp. soil respiration

Developed at present

Future development

Airborne sensing instruments

L-band Radiometer6 x Everest TIR’s

Thermal Imager 6 x Skye VIS/NIR/SWIR Spectrometers

Full Waveform Laser Scanner

R/G/B/NIRVideo Hyperspectral

(400 to 2500nm)

21MPixel Camera

L-band Radar (InSAR)

Hyperspectral (400 to 900nm)

1km

Multi-spectral data: example

Merlin, Walker et al., 2009. Adv. Water Resour.

AACES campaigns

To be conducted in Nov 2009 and Feb 2010 + 2 more timesFull pixel coverage at 1km resolution

20 SMOS pixels + transect flight

AACES campaigns

To be conducted in Nov 2009 and Feb 2010 + 2 more timesFull pixel coverage at 1km resolution

20 SMOS pixels + transect flight

AACES campaigns

To be conducted in Nov 2009 and Feb 2010 + 2 more timesFull pixel coverage at 1km resolution

20 SMOS pixels + transect flight

AACES campaigns

Vegetation

water contentbiomasstypeLAIspectral

Soil moistureVeg type/heightRock fraction

DewRoughnessGrav. Moisture

The cross-validation strategy

A SMOS cross-validation strategy using in-situ measurements, airborne measurements, model predictions and satellite observations

CABLE validation: Kyeamba

0-7cm

0-30cm

30-60cm

60-90cm

ModelStn Obs

AMSR-E validation: Adelong

Draper, Walker et al. (2009) RSE

+ AMSR-E

- Stn Obs

ASAR validation

PLMR SM Nov21

PLMR SM Nov07ASAR SM Nov06

ASAR SM Nov20

Mladenova, Walker et al. (In Review) TGARS

“Make no little plans; they have no magic to stir the blood and probably will themselves not be realized. Make big plans; aim high in hope and work, remembering that a noble, logical diagram once recorded will not die.” Daniel Burnham

Raphael The School of Athens

Fin