what the future looks like for the aec industry

Post on 10-May-2015

909 Views

Category:

Business

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

The crisis today in the AEC industry is the result of converging forces for over 60 years. What are those underlying forces and what will the future look like.For the audio version send me an email.

TRANSCRIPT

A new way of looking at an old problem.

Thursday, February 4, 2010

Thursday, February 4, 2010

The Medium is the Message

Thursday, February 4, 2010

!

What is the Real Crisis?

Thursday, February 4, 2010

Thursday, February 4, 2010

Thursday, February 4, 2010

Thursday, February 4, 2010

Thursday, February 4, 2010

Thursday, February 4, 2010

Symbolic

Realistic

Conceptual

Contextual

(Hack/Mod)

Thursday, February 4, 2010

Thursday, February 4, 2010

Oral

Holistic, Circular, Symbolic, Interdependent

Print

Linear, Sequential, Rational, Autonomous

Broadcast

Fluid, Fragmented, Emotional, Isolated

Digital/Interactive

Holistic, Non-linear, Whole-Brain Systems Thinkers, Interconnected

Thursday, February 4, 2010

Digital Immigrants Digital Natives

Thursday, February 4, 2010

Thursday, February 4, 2010

Over 656%

Boomer50%

GenX38%

Millennials6%

2008

Thursday, February 4, 2010

Thursday, February 4, 2010

Boomers24%

GenX33%

Millennials43%

2018

Thursday, February 4, 2010

Different Seas

Different ShipsThursday, February 4, 2010

The Vertigo of Disruptive Change

•Acceleration•Interconnection•Complexity•Intangibility•Convergence•Immediacy•Unpredictability•Scale

Thursday, February 4, 2010

Thursday, February 4, 2010

Thursday, February 4, 2010

Thursday, February 4, 2010

•$300-$500 billion annual WASTE(buildingSmartAlliance)

•50%+ Waste in the System(buildingSmartAlliance and Lean Construction Institute)

•70% Over Budget and Late(Egan report)

•48% of Green House Gases (Energy Info Admin Statistics and Pew Climate report)

Results of an Old Hammer

Thursday, February 4, 2010

•Labor = 50% @ 30% efficiency = 35% waste

•Materials = 40% @ 70% efficiency = 12% waste

•QTO = up to10% of the cost

•Bidding = 5%+ of the cost of a project

•Change orders between 2-10% of the cost

•Contingencies up to 7%

•Team Learning Curve = 1-2%

•3-7% is lost in project cost reduction by not maximizing Construction Tax Planning

Uncovering the Hidden Waste

Thursday, February 4, 2010

Thursday, February 4, 2010

Thursday, February 4, 2010

2 Camps

Finding the New Normal

or

Hoping for the Old Normal

Thursday, February 4, 2010

Integration

Expanded Horizons

•Value

•Care

•Time

•Relationship

•Thought

New Operating Principles (imperatives)

Thursday, February 4, 2010

ParadigmsGoalsTeamsRulesMeta-ToolsProcessesToolsFeedback LoopsBottlenecksPeople

Magnitudes of Change/Impact

System

Parts

Thursday, February 4, 2010

Thursday, February 4, 2010

Thursday, February 4, 2010

Thursday, February 4, 2010

15 Words for SnowSnowflake

FrostFine particle

Drifting particleClinging particle

Snow on the groundSoft deep snow

Crust on fallen snowFresh fallen snow

Snow floating on waterSnow bankSnow block

Snow corniceBlizzard

Severe BlizzardThursday, February 4, 2010

GreenIPDBIM

Relational ContractingLean

Outcome Based Incentives

Emerging Terms with Few Words

Thursday, February 4, 2010

Thursday, February 4, 2010

Financial Alignment: Outcome Based

Thursday, February 4, 2010

Thursday, February 4, 2010

•Trust-based turnkey teams

•Early collaboration

•Built-in sustainability (quality)

•Transformational leadership

•Big BIM (Building Information Modeling)

•Integrated Project Delivery

•Shared risk/Shared reward

•Leverage Offsite Fabrication

•Improve Workplace Performance!

Nine Keys (4 Principles, 4 Tools, 1 Hidden Opportunity)

Thursday, February 4, 2010

Thursday, February 4, 2010

The ROI of Trust•LogicaCMG study of 1200 contracts: 20% to

40% difference on service, quality & cost

•Profitable Partnering for Lean Construction: strategic partnering delivers up to 30% in cost savings of construction

•Speed of Trust: distrust creates a 50% tax on work

•Edelman Trust Barometer: 20% higher ROI over a 10 year period

•Warren Buffet: Handshake deal for McLean

Thursday, February 4, 2010

Trust Tax -80% -60%-60% -40%-40% -20%Environment Hated ToxicToxic StressfulStressful WorryFocus Conflict EscalationEscalation Pre-emptionPre-emption ProcessRelationships Anger HostileHostile DisrespectDisrespect IndifferentProcess Open defeat SabotageSabotage Hidden agendasHidden agendas Chain of commandBehavior Punish MicromanageMicromanage CYACYA Do my jobOutcomes Grievance or Law-suit GotchaGotcha PoliticsPolitics SlowSystems Disintegrated DysfunctionalDysfunctional DistractingDistracting HassleEthics Your ruin Your harmYour harm Self-interestSelf-interest Compliance

Trust Dividends NeutralNeutral 20%20% 40%40%Environment No worriesNo worries PositivePositive UpliftingUpliftingFocus ScopeScope OutcomeOutcome Mutual successMutual successRelationships CordialCordial CooperativeCooperative CollaborativeCollaborativeProcess Task at handTask at hand Keeping promisesKeeping promises Making it easier for othersMaking it easier for othersBehavior RespectRespect PartneringPartnering TransparencyTransparencyOutcomes EfficientEfficient Learn from mistakesLearn from mistakes ImproveImproveSystems Does not get in the wayDoes not get in the way SupportiveSupportive AdaptiveAdaptiveEthics What is expectedWhat is expected What is rightWhat is right What is goodWhat is good

Trust: From Deficit to Dividend

Thursday, February 4, 2010

Select Teams not Players

2004 2008

Thursday, February 4, 2010

Novartis - Memorandum of Understanding

Thursday, February 4, 2010

Guaranteed Price

Guaranteed Move-in Date

No Change Orders

2-Year Warranty

1 Page Contract

The Value of

a Promise

Thursday, February 4, 2010

Freemium - free BIM work for gain sharing

Free green retrofit for performance compensation

Cutting original move-in timeline by 70%, with guarantee = big bonus

Achieve under 5 year payback for high performing green retrofits

Guarantee on-time, on budget, no change orders, 2-year warranty and one page contract

Equity stake as part of the compensation

Guarantee 10% less than open bid results

Tie design model through to CAFM and create new role as BIM integrator

Partner with steel fabricator to design a pre-fab rebar frame for shotcreet walls. Cuts 16 weeks and $750k in general conditions

Ideas for Expanding the Value Horizon

Thursday, February 4, 2010

What does Better Together look like under the new operating imperatives of integration and extended horizons?

Thursday, February 4, 2010

•What is a next step for teaming?

•How do we explore different models for taking on risk and creating value?

•Where can we find and partner with Fed Up or Early Adopter owners for proof of concept?

•How do we engage Millennials to accelerate our learning curve?

•How do we move our organizations out of a 500 old year mindset?

•What do ships look like that can sail digital waters?

•What does the next hammer look like? (hint: ask)

Call To Action

Thursday, February 4, 2010

•Speaking

•Training

•IPD Strategies and Implementation

•Designing New Value Propositions

•Market Repositioning

•Creating Integrated Alliances

•Business Development

•Educating Owners

•Change Management

rex@rexmiller.net

214-498-3055

Thursday, February 4, 2010

top related