East Delta WTP

page 1/12

WTP Water Hammer - Damage Sphere

Checking the water hammer vessel water rise andnot go down so that mean sphere damaged and to Checked

East Delta WTP

page 2/12

WTP Water Hammer - Damage Sphere

Sphere Welding Carck and fll with water

East Delta WTP

page 3/12

WTP Water Hammer - Damage Sphere

Sphere Welding Carck and fll with water

East Delta WTP

page 4/12

Spare Parts

No new for Spare parts

East Delta WTP

page 5/12

Flash Mixer Dry Run damage

Dry Run damage because of twisted a round the mixer

East Delta WTP

page 6/12

Flash Mixer Dry Run damage

They assembly the switch but not connected yet

East Delta WTP

page 7/12

Filter 03,04 Refill with New Filter Media

The empty 03 and refill 04

East Delta WTP

page 8/12

Filter 03,04 Refill with New Filter Media

The empty 03 and refill 04

East Delta WTP

page 9/12

Chlorine

Sherkia CO take Drum valve to mainten , till now not installed

East Delta WTP

page 10/12

Thickener

Thickener empty or full and pipe blocked and pumps stopped

Regular CheckNo Unit Activates

1Intake 1- Checking Raw Water Pump pressure,temprature,power and gland packing leakage.

2- Checking water hammer system working or not.2 Distribution Shift Checking flow, pressure, chlorine dosing and float fix or not.

3 Chlarifier Checking sludge pumping units, cleaning and greasing of knife,air pressure, bridge and mixers.

4 Thickener Checking pump pressure, pipeline blocking and thickener level.

5Filters 1- Checking backwash , backwash waste ,boosters and dewatering.

2- Air system ,compressors,dryer,pressure,…,etc. 3- Checking filters flow , levels , backwash tank level.

6 Under Ground Reservoir Checking rediusal chlorine smaple plan and tanks levels

7

1- Checking pump priming system. 2- Checking Treated Water Pump pressure,temprature,power and mechanical seal leakage.

3- Checking water hammer system working or not. 4- Checking measurement devices.

8Chlorine 1- Checking drums, vacuum units , changeover unit and piping.

2- Checking dosing cabient, dosing , feeding pressure. 3- checking Caustic Soda Pump.

9 Chemical 1- Checking dosing pumps, strianers, pressure , flow and piping. 2- Checking Tanks levels and cleaning.

10 Evaporation ponds 1- Checking air pressure , cleaning and greasing of knife.

Activites and Remarks for week

No Unit Remaks1 Intake

2 Distribution Shaft

3 Clarifier1- Fixing of the flash mixer dry run was bad and cause damage to it.

3 Thickener 1- Thickener empty or full and piping blocked and pumps stopped

4 Filters 1- Filter 03,04 Refill with New Filter Media2- Backwash pumps was stopped because someone played by button.3- Backwash pump 42 coupling extension handed over to AC till install new H-Shape rubber

5 Chlorine1- Sherkia CO take Drum valve to mainten , till now not installed2- General cleaning of drum store

7 Chemical 1- Plastic fall in tanks during filling.

8

9 Evaporation ponds 1-opened valve closed and operation shloud from panel.

Treated Water Pump Station

Central dewatering Station

10 Under Ground Reservoir Rediusal Chlorine sample pump not working.

11 Water hammer maintenance

12 Insturctions .lenieregyp