wat is het c2c project? walter tempst, ovam

Post on 14-Nov-2014

773 Views

Category:

Business

1 Downloads

Preview:

Click to see full reader

DESCRIPTION

 

TRANSCRIPT

C2C{Network project

3

What’s INTERREG IVC ?

Priority 2 > Environment and Risk prevention Sub-theme > Waste prevention and management Capitalisation Project ‘Regions for Economic Change Initiative’

> Moving to a recycling society

C2CN selected as INTERREG IVC project

4

C2CN selected as Fast Track Network

What’s a Fast Track Network and why C2CN was selected?

5

C2CN selected as Fast Track Network

European Commission as 11th partner bringing in expertise and assistance from

European CommissionDG Regional Policy

European CommissionDG Enterprise and Industry

European CommissionDG Environment

involving and mobilising Management Authorities of mainstream EU Operational Funds programmes

6

C2CN general goals

Create European platform for gathering and disseminating knowledge on C2C

(…) how C2C can be formulated and implementedDraw up 'action plans' in which we demonstrate

regionally to produce sustainable solutions

Establish links with regional policy objectives (...)

Promote regional stakeholder involvement

7

C2CN target areas

Product (…) design

Built environment design/development

Area specific design/development

Governance for C2C

8

C2CN target areas

Product (…) design

Built environment design/development

Area specific design/development

Governance for C2C

Governance for C2C

Framew

ork for C2C

9

C2CN expected outputs

1 long term European Partnership / C2C Network 14 good practices succesfully transfered (minimal) 4 general perspective studies (1 for each target area) 10 regional Action Plans 1 Good Practice Handbook (describing good practices) 1 Guide on Waste Management and C2C 1 set of policy recommendations 10 regional waste management policies addressed / improved 10 functional regional networks on C2C and waste management 6 mio EUR of mainstream funds dedicated to the

implementation of good practices (from this project)

Regional Action Plans

Guide on Waste Management and C2C

Good Practices Handbook

Perspectivestudies

10

C2CN expected outputs

1 long term European Partnership / C2C Network 14 good practices succesfully transfered (minimal) 4 general perspective studies (1 for each target area) 10 regional Action Plans 1 Good Practice Handbook (describing good practices) 1 Guide on Waste Management and C2C 1 set of policy recommendations 10 regional waste management policies addressed / improved 10 functional regional networks on C2C and waste management 6 mio EUR of mainstream funds dedicated to the

implementation of good practices (from this project)

Regional Action plans

Guide on Waste Management and C2CGood Practices

Handbook

6 mio EUR of EU mainstream funds dedicated

to action

Policy recommendations

Policy recommendations

11

C2CN expected outputs

1 long term European Partnership / C2C Network 14 good practices succesfully transfered (minimal) 4 general perspective studies (1 for each target area) 10 regional Action Plans 1 Good Practice Handbook (describing good practices) 1 Guide on Waste Management and C2C 1 set of policy recommendations 10 regional waste management policies addressed / improved 10 functional regional networks on C2C and waste management 6 mio EUR of mainstream funds dedicated to the

implementation of good practices (from this project)

Regional Action plans

Guide on Waste Management and C2CGood Practices

Handbook

Long term European C2C partnership / network

6 mio EUR EU of mainstream

funds dedicated to action

Policy recommendationsLong term Regional C2C

partnership / network

12

C2CN work breakdown 2010

Thematic Seminar

Perspective Study A

Perspective Study B

Good Practices Handbook

Perspective studies

C2C Cases

C2CFramework

{

C2CFramework

13

Work in progress > thematic seminars

Area specific development - Launch event (Maastricht NL, July 8-9th 2010)

Governance for C2C (Leuven BE, July 12-13th 2010)

Product / process design (Milan IT, Sep 9-10th 2010)

Building design / built environment (Ipswich UK, Sep 15-16th 2010)

14

C2CN work breakdown 2011

Guide on Waste Management and C2C

Regional Action PlansPolicy recommendations

Adoption of good practices

Perspective studies

Study/site visits

6 mio EUR of EU mainstream funds

dedicated to action

15

C2CN budget breakdown

Total budget 2,48 mio EUR Cofinancing 25 % Management 20 % Communication 15 % Exchange 65 % Budget OVAM 257.000 EUR

16

C2CN partner regions

17

C2CN management on overall project level International

Executive Board

International Steering

Committee

External Endorsement

Committee

Regional stakeholder involvement

18

Regional stakeholder involvement

Based on functional networks

Other networks invited ...

19

C2CN links to Flemish policy / initiatives

20

C2CN links to EU and international policy

EU policy and EC involvement via Fast Track Network Other INTERREG projects PRE-WASTE (4C), SufalNet4EU (4C), FRESH (4C) and C2C

Islands (4B) > exchange info, practices, outputs, speakers (events)

Informal Council on Environment Global Forum Sustainable Material Management

(Mechelen, October 25-27th)

21

Work in progress > collecting cases

Cases / good practices not necessarily 100 % C2C not necessarily implemented potential for learning, transfer

and implementation Collecting and sending

top related