Change Management: One University’s Evolution from Chaos to Calm John Borwick, Director of IT Portfolio Management Rita Mewing, Manager of IT Change and Metrics Management Wake Forest University Thursday, October 18th at 11am (Eastern) Wake Forest University implemented department-wide IT service change management in 2008. The process has persisted and flourished during a CIO transition and a major service management tool upgrade. Now in 2012, the process appears to be anchored in our culture. This presentation summarizes the lessons learned with the implementation and subsequent improvements, for example: the major obstacles we created in our initial roll-out and how we addressed them, how we controlled the process during our tool upgrade, how CAB has evolved to include change reviews for pending work, how we changed the perception of emergency changes, and how we have built on our change management process to solve pressing IT management issues such as allocating resources for major initiatives. Additionally, we will review our key metrics for change management and illustrate how process improvements affected these metrics. Finally, before answering questions we will summarize what we think you should do if you are implementing or managing a change management process.

TRANSCRIPT

Change Management: One University's evolution from chaos to calm

John Borwick, Director IS Portfolio ManagementRita Mewing, Change Manager, Sr.

kWake Forest University

About ITSM AcademyAbout ITSM Academy Accredited Education

Certified Process Design Engineer (CPDE) Since 2003 - Tens of Thousands

Trained and Certifiedg g ( )

ITIL® Foundation

ITIL Capability (OSA|PPO|RCV|SOA)

ITIL Lifecycle (SS|SD|ST|SO|CSI)

Trained and Certified

ITSM Professional Diplomas Change/Support/SLM

Public Classes throughout U S ITIL Managing Across the Lifecycle (MALC)

ISO/IEC 20000 Foundation & Bridge

MOF Foundation

P i l V l Add W k h

Public Classes throughout U.S.

Corporate On-Site Classes

Virtual Classes Practical, Value-Add Workshops

Building Blocks, Roles, Service Catalog, etc.

ITIL, MOF, ISO 20K Overviews

Apollo 13 Visible Ops The Class

Courseware Licensing Corporate & Partner (GEM)

Alumni Program Apollo 13, Visible Ops: The Class

And more!

g

PMI Global Education Provider

Certified Woman-Owned

Welcome!ITIL® is a Registered Trade Mark of the Cabinet Office.

Wake Forest UniversityWake Forest University

Information Systems at WFU

• Central IT: Academic & AdministrativeAdministrative

• Grew in the mid-1990s due to laptop programp p p g

• Over 100 staff, with low turnover

Agenda

• Scope, assumptions, and vocabulary• Change management implementation and change • Change management implementation, and change

management v2• Timeline, 2008-PresentTimeline, 2008 Present

• 2008-March 2010• Tool Upgrade• March 2010-Now

• What You Should Do to Reduce the Chaos•• Q&A

Timeline

Scope, assumptions, and vocabularyy

What is a “change” in this context?

IN SCOPE:• Production changes• Production changes• Department process changes• “Service modifications”Service modifications• Project deliverables

OUT OF SCOPE:• ProjectsProjects• Low-risk service provisioning• Low-risk maintenanceLow risk maintenance

Assumptions

• This is not the first time you've heard of "change management"management

• Our implementation isn't a blueprint, but some of our ideas will help youp y

• Our pain is your gain

VocabularyVocabulary RFC: Request For Change EC: Emergency Change EC: Emergency Change CAB: Change Advisory Board ISMB (or MB): Information Systems Management Board ISMB (or MB): Information Systems Management Board Governing document: a controlled description of our

processp

Change management implementation, and change

t 2management v2

Gaining Buy-In

Gaining Buy-In

"I want change control."-Mike Spano, Interim CIO(December 2007)

Our first Change Advisory Board(January 2008)(January 2008)I. Attendees2 1 Business Concept Document2.1 Business Concept Document2.2 CAB Schedule2 3 Remedy Change Management Module2.3 Remedy Change Management Module2.4 Change Management Procedure2 5 CAB Infrastructure2.5 CAB Infrastructure

ITIL’s “4 P’s”ITIL s 4 P s People Process Process Products (Technology) Partners Partners

Our first Change Advisory Board(January 2008)(January 2008)I. Attendees2 1 Business Concept Document2.1 Business Concept Document2.2 CAB Schedule2 3 Remedy Change Management Module2.3 Remedy Change Management Module2.4 Change Management Procedure2 5 CAB Infrastructure2.5 CAB Infrastructure

Our first Change Advisory Board(January 2008)(January 2008)I. Attendees2 1 Business Concept Document

People2.1 Business Concept Document2.2 CAB Schedule2 3 Remedy Change Management Module

Process

2.3 Remedy Change Management Module2.4 Change Management Procedure2 5 CAB Infrastructure

Products

2.5 CAB InfrastructurePartners

The People

• Chair: Assistant CIO• Standing members: Directors• Standing members: Directors• Change managers: Continual Service Improvement

TeamTeam• Presenters: People requesting the change

CAB met 4 times a week

The Process

The Process

- Linear- Designed by one person- Same process for all

changes

The Products

• Remedy 5.5 change management module• MS Office• MS Office• Email and Calendar• Blackboard (Learning management tool)Blackboard (Learning management tool)

Note: Tool did not reinforce the processNote: Tool did not reinforce the process

The PartnersThe Partners Consultants attending the interim CIO John B eventually attended ITIL v2 Release & Control John B eventually attended ITIL v2 Release & Control

Opportunities for Improvement

• Approvals too slow• Rubber stamp approvals• Rubber-stamp approvals• Lots of emergency changes• One size fits allOne size fits all

Then the Interim CIO Left

Change Management v2

In change management v1, changes were approved after they had been built and tested.approved after they had been built and tested.

Identify a change

Change built Change tested

Change submitted …wait…

CAB approval Change implementedimplemented

In change management v2, changes were approved before they have been built.approved before they have been built.

Identify a change Approve change

Change built Change tested

Change scheduled

Change implementedimplemented

In change management v1, all changes were approved by the CAB.approved by the CAB.

Turn on a new serviceservice

Minor application CABMinor application upgrade

CAB

Add record for HR

In change management v2, there were three levels of “approval authority.”levels of approval authority.

Turn on a new service ISMBservice

Minor application CABMinor application upgrade CAB

Add record for HR Local Authority

In change management v1, we spent a lot of time figuring out who should handle a change.time figuring out who should handle a change.

Service request submitted

Team A? Team B?submitted B?

T C? T Help Desk ticket submitted

Team C? Team D?

Internal request b itt d

Who knows??submitted

In change management v2, all changes are sent to “change intake” to be classified.sent to change intake to be classified.

Service request submittedsubmitted

Help Desk ticket submitted Change intake

Internal request b itt dsubmitted

Other improvements included…Other improvements included… Holding additional training Creating notification listserves Creating notification listserves Reviewing and minimizing data collected Id tif i i h Identifying on-going change managers

Timeline, 2008-March 2010

Overall Timeline

Let’s focus on the first half,2008-March 20102008-March 2010

Here are the events John talked about

Metric tracking

Rita and Angie take on change managementmanagement

Rita and Angie take on change managementmanagement

Emergency Change (EC)Emergency Change (EC)• Paper form• Requestor and the

change manager seek signaturesDi t • Director sponsor signature

• CIO office approval signature

Change management v2

Changes by approval type

Pre-approved changes, andseparating CAB from MBseparating CAB from MB

Tool upgrade

How to make everyone mad at you(again)( g )

new tool stirred up some chaos

Teams culled the clutter Teams culled the clutter Closed tickets became archived/read only T i i id d t l Training provided too early Tool enforced approvals

new tool started to calm the chaos

Timing – easier to track different change typesTiming – easier to track different change typesFields with workflowApproval proxiesApproval proxiesPerformance ratings

March 2010-Now

March 2010-Now

Tracking and auditing with new fields

More CAB meeting improvements

Meetings and meeting deadlines

CAB/MB deadline:Friday at noonFriday at noon

CAB & MB agendas sent CAB & MB agendas sent out by Friday at 4 PM

CAB:Monday at 10:15 AM

ISMB:Tuesday at 2:00 PM

Why are emergency changes happening?happening?

Why are emergency changes happening?happening?

Emergency Change (EC)• Paper form• Requestor and the

change manager seek signaturess g atu es

• Director sponsor signature

• CIO office approval signature

Putting out fires...

Monthly Operational Report

“Work Units”

Remedy/Google Calendar integration

What does the CAB agenda look like today?y

The CAB Agenda Today

1. Attendees2. On-call pages3. Post-Implementation Review, Emergency Changes4 P t I l t ti R i N l Ch4. Post-Implementation Review, Normal Changes5. Post-Implementation Review, No Impact Changes6. Old Business7. Regular Changes8. Briefings

O h A i I9. Other Action Items10. Open CRQ tickets11. IS Change Schedule Calendar g

What You Should Do to Reduce the Chaos

Do these things

Stand firm on deadlines, processStand firm on deadlines for RFCs to go on the CAB and MB agendasStand firm on deadlines for RFCs to go on the CAB and MB agendas.

Put up with grief now to save a lot of grief later.

Make others feel the pain so you don’t have to—you are enforcing the process.

Do these things

Buy-in and support from upper managementYou can only stand firm on process when management wants the process to You can only stand firm on process when management wants the process to

work.

Do these things

Create standard templates for the agendaHave a placeholder for “parking lot” itemsHave a placeholder for parking lot items.

Change these templates to anticipate problems you’ve seen in the past.

CAB/MB questions that we have added in our template:

Communication plan needed?

Security review needed?

Training impact?

Reporting impact?

Do these things

Send the agenda with time to review before the meetingmeeting

We have a CAB listserv and email the agenda

Anyone can subscribe

We also send calendar invitations for each agenda item

Do these things

Have written rules, processGoverning documents that are updated regularlyGoverning documents that are updated regularly

We are on version 13

We review twice annually

Do these things

Assign the roles and have people dedicated to change managementmanagement

Our roles:

Change coordinators

Approvers

Change Schedulers

We have ~1 FTE dedicated to change management.

Do these things

Delegate approval authority

Deputy CIO

Directors

Managers Managers, …

Do these things

Watch Your Process TriggersOnly trigger change management for “real” changes—things that require Only trigger change management for real changes things that require review.

Summary

Q&AQ

Change Management:

One University’s evolution from chaos to calm One University s evolution from chaos to calm

(THE FOLLOWING ARE OPTIONAL SLIDES)

Connections to Other Processes

Connections to other processesConnections to other processes Project management Scrum/Agile software development Scrum/Agile software development

Projects & ProductsE

CT

ROLLINITIATE

PR

OJE PLAN ROLL

OUT CLOSING

S s)D

UC

TSve

rabl

es

PRODUCT #1

PRODUCT #2

PRODUCT #3

PR

O(D

eliv #1 #2 #3

Projects & ProductsE

CT

ROLLINITIATE

PR

OJE PLAN ROLL

OUT CLOSING

S s)D

UC

TSve

rabl

es

PRODUCT #1

PRODUCT #2

PRODUCT #3

PR

O(D

eliv #1 #2 #3

THE KIND OF CHANGE MANAGEMENT WE’RE TALKING ABOUT GOES HERE

Projects & ProductsE

CT

ROLLINITIATE

PR

OJE PLAN ROLL

OUT CLOSING

PROJECT SCOPE CHANGE MANAGEMENT

S s)

IS CONFUSING TO PEOPLE

DU

CTS

vera

bles

PRODUCT #1

PRODUCT #2

PRODUCT #3

PR

O(D

eliv #1 #2 #3

Scrum/Development &Change RequestsChange Requests

pp D

evro

cess Add to

BacklogReady to

WorkDevelopment and Testing

Verified in Production

Ap P

g g

nge

emen

t

Change Request Approve Scheduled and

Cha

Man

ag

Request created

ppCRQ Implemented