view from the bridge wing in the drydock of open cargo holds forward

Post on 18-Dec-2015

218 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

TRANSCRIPT

View from the bridge wing in the drydock of open cargo holds forward

Looking down into a cargo hold from the bridge wing

Mounting the propeller, preparing for installation of the rudder

The bulbous bow grand block in the paint shop

The bulbous bow is remover

from the paint shop

Moving the bow section into position for turning it

The bow section is lifted by the Goliath crane for righting.

The sequence of righting the bow section

The sequence of righting the bow section

The bow is landed right ride up

A view from the crane

A view from the crane as the bow is placed in the dock

MAUNAWILI in the drydock

View in drydock before erection of bow sections

View of stern section.

Assembly of grand block after erection, during weldout

Intermediate deck grand block awaiting erection

Stern view in drydock

View from a top Goliath.

Upper bow section maneuvered into the paint shop for final coating

Maunawili upper bow grand block after painting

A tight squeeze out of the paint shop

The Kirow machines maneuver a 525-ton unit from the paint shop

An imposing move of the final grand block

Upper bow section being maneuvered out to yard for transport and installation.

Upper bow section being maneuvered out to yard for transport and installation.

Upper bow section being maneuvered out to yard for transport and installation

Upper bow section being maneuvered out to yard for transport and installation.

Upper bow section being maneuvered out to yard for transport and installation.

top related