BNL Meeting July 00
U.S. ATLAS Physics and Computing Project Status
John Huth
Harvard University
PCAP Review 26 Oct, 2000
Outline
Project Management Plan Organization Scope
Facilities Software
Milestones Budget
PCAP Review 26 Oct, 2000
William WillisProject Manager
William WillisProject Manager
John HuthAssociate Project Manager,
Computing and Physics WBS 2
James ShankDeputy
External Advisory Group
Ian HinchliffeManager, Physics
WBS 2.1
Torre WenausManager, Software
WBS 2.2
Bruce GibbardManager, Facilities
WBS 2.3
C. TullControl/Framework
2.2.1.1,2.2.1.2
David MalonData Management
2.2.1.3
S. RajagopalanEvent Model
2.2.1.4
J. ShankDetector Specific
2.2.2, 2.2.2.1
F. MerrittTraining
2.2.5L. Vacavant
Inner Tracker2.2.2.2
F. LuehringTRT
2.2.2.3
S. RajagopalanLiquid Argon Calorimeter
2.2.2.4
T. LeCompteTilecal2.2.2.5
B. ZhouMuons2.2.2.6
A. LankfordTrigger/DAQ
2.2.2.7
Subsystems
Core Software
TBNFacility Software
M. AskinaziHardware/systems
R. GardnerDistributed ITInfrastructure
Facilities
TBNCollaborative
Tools2.2.3
R. BakerDeputy
T. WenausSoftware Support
Coordinator2.2.4
A. UndrusSoftware Librarian
2.2.4.1
Computing CoordinationBoard
Physics Manager, IB Convener, co-chairs
U.S. ATLAS Organization
PCAP Review 26 Oct, 2000
Projectization
Access/MS Project Database Reporting/tracking function
Reporting Scheme Formal reports quarterly Written reports monthly PCWS, PCWP, ACWP tracking (same as
construction project)
Inputs from all Level 2 managers
PCAP Review 26 Oct, 2000
PMP Overview
Description of ATLAS CSG etc
Description of U.S. Organization Job descriptions Policies
Reporting and oversight Working appendices
Budget WBS Deliverable list Major Milestones
PCAP Review 26 Oct, 2000
Escalation
Procedure
MS Project 98Baseline
(Resource LoadedSchedules)
Cost Reporting(WBS Level 5)
Report Generator
Update Procedure
ACCESS Database
CSSR Procedure
Functional OverviewCost/Schedule Control System
• WBS• WBS Dictionary• Estimate - Labor - Material - Travel• Rates• Contingency• Cost Books• MOUs• Project/NSF/Base/ Infrastructure• Funding Source
CSSR atWBS Level 3WBS Level 5
Institutions
BCWS/BCWP
Cumulative CostMonthly CostReports
Escalation RatesDOE
Reports
Schedules
Terminal
S/S Mgr. Status Data
Baseline
MS Project 98Statused
(Resource LoadedSchedules)
ProjectionsProcedure
FY Fundingby Institution
Status Sheets
1 2 3
4 5
6 7
8 9
10
11
12 13 14
15 16 17
18
PCAP Review 26 Oct, 2000
Cost Categories
Advanced Information Technology Professional
Information Technology Professional I
Information Technology Professional II
Information Technology Technician
Student Travel
Stores Space Power Low value materials High value materials Licenses Maintenance Consulting Technical services Administrative
service
PCAP Review 26 Oct, 2000
Change Control
SubsystemManager
Defines Need forBaseline Change
Proposal(BCP)
Associate ProjectManager Review
Change ControlBoard Review
ATLASCERN
DOE/NSF
Change ControlOffice
Prepares BCP
Updates ControlDocuments
BCP LogContingency Log
Milestone LogCost Baseline Log
U.S. ATLAS Change Control Process
Distribution
Approved
Rejected
Approved/Rejected
10/9/97
Revisions
CCProcess.vsd
ATLAS CERN
PCAP Review 26 Oct, 2000
Project Office
Information in ACCESS DB Tracking functions automated Use of project office for procurements
Major procurements: 10% Mock Data Challenge (’03) 40% Facilities ramp (end of 04) 100% Facilities ramp (05)
PCAP Review 26 Oct, 2000
Coordination with Intl. ATLAS
Common WBS, schedule Working to same milestones Trying to ramp up presence at CERN Multiple Tutorials given on
control/framework Software Agreements in progress
(control/framework is prototype agreement)
PCAP Review 26 Oct, 2000
Contingency
Major issue: Funding profiles very tight Uncertainties large for a fixed set of
deliverables Factors of 2 or more in some cases
Adopt this model: “Build to cost” – drop requirements as
needed to meet deliverables Add 10% project reserve to help put deal
with crises – year by year allocation Agreement with CMS
PCAP Review 26 Oct, 2000
Major U.S. Project Components
Regional Center at Brookhaven User support facility
Software “Core” software
Control/framework Data management
Detector Specific reconstruction Support, training
Physics Event generators, physics objects
Computational grids Tier 2 facilities
PCAP Review 26 Oct, 2000
Regional Center
Goals: Support U.S. Physicists in analysis Support ATLAS Collaboration Hub of U.S. ATLAS Grid
Status: Support hires Center running, providing support Planning for ATLAS, Grid activities Acquisition of more Linux boxes
Support for CPU intensive jobs– Shielding calculations
– Trigger studies
PCAP Review 26 Oct, 2000
Muon Level 2 Trigger
Radius of curvature map for muons.
PCAP Review 26 Oct, 2000
Neutron Background Studies
Total neutron flux KHz/cm2
PCAP Review 26 Oct, 2000
E450(NFS Server)
Dual Intel
Dual Intel
USATLASSwitch
SANHub
BackupServer
HPSSArchiveServer
Ÿ XXX.USATLAS.BNL.GOVŸ E450 front line with SSHŸ Objectivity Lock Server
200 GBytesRAID Disk
US ATLAS Tier 1 Facility
62 Intel/LinuxDual 700/450 MHz256/512 MBytes
9/18 GBytes100 Mbit Ethernet(3,200 SPECint95)
9840TapesAFS
Servers
AFS
~10 GBytesRAID DiskUS ATLAS
AFS
Ÿ LSFŸ AFSŸ ObjectivityŸ Gnu etc.
US ATLAS Equipment
RCF Infrastructure
~50 GBytesJBOD Disk
Intel/LinuxWeb Server
August 2000 Configuration
128 MBytes18 GBytes
.
.
.
RCFLAN
PCAP Review 26 Oct, 2000
Software
U.S. Responsibilities Control/framework Data management Major detector reconstruction
Liquid Argon Calorimeter Tile Calorimeter Muons
Status Major milestones passed in creation of
control/framework 7 FTE software professionals working Preparation for software agreements with ATLAS
PCAP Review 26 Oct, 2000
Grid Computing
Petabyte scale virtual data grid Hierarchy of centers (Tier 0 = CERN, Tier 1=
BNL, Tier 2 = Universities) Grid middleware linkages
Resource allocation and discovery Security Automation
Status U.S. ATLAS testbed planning Participation in GriPhyN, PPDG projects
PCAP Review 26 Oct, 2000
Calren Esnet, Abilene, Nton
Abilene
Esnet, Mren
UC BerkeleyLBNL-NERSC
Esnet
NPACI, Abilene
BrookhavenNationalLaboratory
Indiana University
Boston University
ArgonneNationalLaboratory
U.S. ATLAS Testbed
HPSS sites
PCAP Review 26 Oct, 2000
GriPhyN
NSF Meeting (May 31, 2000) Carl Kesselman 6
GriPhyn Architecture
Virtual Data ToolsRequest Planning and
Scheduling ToolsRequest ExecutionManagement Tools
Transforms
Distributed resources(code, storage,
computers, and network)
Resource Management
Services
Resource Management
Services
Security and Policy
Services
Security andPolicy
Services
Other Grid Services
Other GridServices
Interactive User Tools
Production Team
Individual Investigator Other Users
Raw datasource
PCAP Review 26 Oct, 2000
Challenges in Project Planning
“Projectizing” Accounting and tracking systems (DONE) Revision to Project Management Plan (DONE) Preparations for “Lehman” review (NOW)
Integration with International ATLAS Need more support functions at CERN (In
Progress) LHC Computing review (in progress)
Concerns about CERN IT division
Coping with funding profiles ($5M short integral) Poor match particularly in software Seeking relief in FY 02-04
PCAP Review 26 Oct, 2000
Major Milestones
00/5/9 pre Alpha Release of Athena00//10/30 Geant 3 Digi's available00/12/29 Athena Beta release00/12/31 Reconstruction in Athena
1/1/02 First definition of regional centers1/1/15 ARC Report completed1/3/01 G4 interefaced to framework1/3/30 Core Software Agreements Complete1/4/30 Athena Release1/6/29 Database product decision1/9/30 Athena Release
1/12/21 Athena Production Release1/12/21 G4 Physics validated
PCAP Review 26 Oct, 2000
Milestones
2/7/30 MDC 1 completed2/11/29 Comp. TDR completed2/12/02 10% processor farm in place2/12/31 100 Tbyte database prototype complete3/9/30 MDC 2 completed4/6/30 Second cycle of OO4/7/30 Full test chain in real environment
4/12/31 Full DB infrastructure4/12/31 40% Processing farm prototype5/6/30 100% processing farm prototype
5/11/01 LHC Startup
PCAP Review 26 Oct, 2000
PCAP Review 26 Oct, 2000
PCAP Review 26 Oct, 2000
Request
Profile Comparison
0.00
5.00
10.00
15.00
20.00
0 1 2 3 4 5 6
Fiscal Year
00 M
Dol
lars
Request - Now
PMP Request
Agency Guidance
PCAP Review 26 Oct, 2000
Software
Software
0.00
1.00
2.00
3.00
4.00
5.00
6.00
0 1 2 3 4 5 6
Fiscal Year
This request
Original PMP Request
Agency Profile
PCAP Review 26 Oct, 2000
Facility Profile
Facilities
0
2
4
6
8
10
12
0 1 2 3 4 5 6
Fiscal Year
This Request
Agency Guidance
PCAP Review 26 Oct, 2000
Guidance - Request
Guidance - Request
-2.00
-1.00
0.00
1.00
2.00
3.00
4.00
0 1 2 3 4 5 6
Fiscal Year
R eques t- gui danc e
PCAP Review 26 Oct, 2000
Profile Effects
Substantial delay in services at Regional Center Mass Storage System support delayed until
FY 04. Impacts ability to perform ’03 Mock data
challenge
Software development can’t work with this profile Need flatter profile (FY 02-04) Still, integral eliminates all detector
specific tasks (mainly impacts universities)
PCAP Review 26 Oct, 2000
Fallbacks
Overall: scale back on requirements Software:
Degree of grid automation Overall requirements
– (e.g. carrying two vs. one DB product) Shifting personnel
– (e.g. CERN location of SW pros)
Hardware Reduction of scope of RC… Delay of purchases – Moore’s law Alternative data-analysis strategies
Comment: user part of facilities is conservative
PCAP Review 26 Oct, 2000
Overall Budget
Breakout by Category
0.00
2.00
4.00
6.00
8.00
10.00
12.00
14.00
0 1 2 3 4 5 6
Fiscal Year
Mgmt. Reserve
Project
Physics
Facilities
Software
PCAP Review 26 Oct, 2000
Budget Breakout
2% Physics
1% Project Office
9% Mgmt Reserve
46% Facilities
42% Software
PCAP Review 26 Oct, 2000
Summary
Functional Organization Software effort backbone of Intl. ATLAS
International ATLAS starting to coalesce
Grid tasks beginning Funding profile must be addressed PMP (minus WBS, budget) available for
comment Steps to projectization