u.s. atlas physics and computing project status

34
BNL Meeting July 00 U.S. ATLAS Physics and Computing Project Status John Huth Harvard University

Upload: asha

Post on 12-Jan-2016

23 views

Category:

Documents


0 download

DESCRIPTION

U.S. ATLAS Physics and Computing Project Status. John Huth Harvard University. Outline. Project Management Plan Organization Scope Facilities Software Milestones Budget. U.S. ATLAS Organization. Projectization. Access/MS Project Database Reporting/tracking function - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: U.S. ATLAS Physics and Computing Project Status

BNL Meeting July 00

U.S. ATLAS Physics and Computing Project Status

John Huth

Harvard University

Page 2: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Outline

Project Management Plan Organization Scope

Facilities Software

Milestones Budget

Page 3: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

William WillisProject Manager

William WillisProject Manager

John HuthAssociate Project Manager,

Computing and Physics WBS 2

James ShankDeputy

External Advisory Group

Ian HinchliffeManager, Physics

WBS 2.1

Torre WenausManager, Software

WBS 2.2

Bruce GibbardManager, Facilities

WBS 2.3

C. TullControl/Framework

2.2.1.1,2.2.1.2

David MalonData Management

2.2.1.3

S. RajagopalanEvent Model

2.2.1.4

J. ShankDetector Specific

2.2.2, 2.2.2.1

F. MerrittTraining

2.2.5L. Vacavant

Inner Tracker2.2.2.2

F. LuehringTRT

2.2.2.3

S. RajagopalanLiquid Argon Calorimeter

2.2.2.4

T. LeCompteTilecal2.2.2.5

B. ZhouMuons2.2.2.6

A. LankfordTrigger/DAQ

2.2.2.7

Subsystems

Core Software

TBNFacility Software

M. AskinaziHardware/systems

R. GardnerDistributed ITInfrastructure

Facilities

TBNCollaborative

Tools2.2.3

R. BakerDeputy

T. WenausSoftware Support

Coordinator2.2.4

A. UndrusSoftware Librarian

2.2.4.1

Computing CoordinationBoard

Physics Manager, IB Convener, co-chairs

U.S. ATLAS Organization

Page 4: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Projectization

Access/MS Project Database Reporting/tracking function

Reporting Scheme Formal reports quarterly Written reports monthly PCWS, PCWP, ACWP tracking (same as

construction project)

Inputs from all Level 2 managers

Page 5: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

PMP Overview

Description of ATLAS CSG etc

Description of U.S. Organization Job descriptions Policies

Reporting and oversight Working appendices

Budget WBS Deliverable list Major Milestones

Page 6: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Escalation

Procedure

MS Project 98Baseline

(Resource LoadedSchedules)

Cost Reporting(WBS Level 5)

Report Generator

Update Procedure

ACCESS Database

CSSR Procedure

Functional OverviewCost/Schedule Control System

• WBS• WBS Dictionary• Estimate - Labor - Material - Travel• Rates• Contingency• Cost Books• MOUs• Project/NSF/Base/ Infrastructure• Funding Source

CSSR atWBS Level 3WBS Level 5

Institutions

BCWS/BCWP

Cumulative CostMonthly CostReports

Escalation RatesDOE

Reports

Schedules

Terminal

S/S Mgr. Status Data

Baseline

MS Project 98Statused

(Resource LoadedSchedules)

ProjectionsProcedure

FY Fundingby Institution

Status Sheets

1 2 3

4 5

6 7

8 9

10

11

12 13 14

15 16 17

18

Page 7: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Cost Categories

Advanced Information Technology Professional

Information Technology Professional I

Information Technology Professional II

Information Technology Technician

Student Travel

Stores Space Power Low value materials High value materials Licenses Maintenance Consulting Technical services Administrative

service

Page 8: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Change Control

SubsystemManager

Defines Need forBaseline Change

Proposal(BCP)

Associate ProjectManager Review

Change ControlBoard Review

ATLASCERN

DOE/NSF

Change ControlOffice

Prepares BCP

Updates ControlDocuments

BCP LogContingency Log

Milestone LogCost Baseline Log

U.S. ATLAS Change Control Process

Distribution

Approved

Rejected

Approved/Rejected

10/9/97

Revisions

CCProcess.vsd

ATLAS CERN

Page 9: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Project Office

Information in ACCESS DB Tracking functions automated Use of project office for procurements

Major procurements: 10% Mock Data Challenge (’03) 40% Facilities ramp (end of 04) 100% Facilities ramp (05)

Page 10: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Coordination with Intl. ATLAS

Common WBS, schedule Working to same milestones Trying to ramp up presence at CERN Multiple Tutorials given on

control/framework Software Agreements in progress

(control/framework is prototype agreement)

Page 11: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Contingency

Major issue: Funding profiles very tight Uncertainties large for a fixed set of

deliverables Factors of 2 or more in some cases

Adopt this model: “Build to cost” – drop requirements as

needed to meet deliverables Add 10% project reserve to help put deal

with crises – year by year allocation Agreement with CMS

Page 12: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Major U.S. Project Components

Regional Center at Brookhaven User support facility

Software “Core” software

Control/framework Data management

Detector Specific reconstruction Support, training

Physics Event generators, physics objects

Computational grids Tier 2 facilities

Page 13: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Regional Center

Goals: Support U.S. Physicists in analysis Support ATLAS Collaboration Hub of U.S. ATLAS Grid

Status: Support hires Center running, providing support Planning for ATLAS, Grid activities Acquisition of more Linux boxes

Support for CPU intensive jobs– Shielding calculations

– Trigger studies

Page 14: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Muon Level 2 Trigger

Radius of curvature map for muons.

Page 15: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Neutron Background Studies

Total neutron flux KHz/cm2

Page 16: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

E450(NFS Server)

Dual Intel

Dual Intel

USATLASSwitch

SANHub

BackupServer

HPSSArchiveServer

Ÿ XXX.USATLAS.BNL.GOVŸ E450 front line with SSHŸ Objectivity Lock Server

200 GBytesRAID Disk

US ATLAS Tier 1 Facility

62 Intel/LinuxDual 700/450 MHz256/512 MBytes

9/18 GBytes100 Mbit Ethernet(3,200 SPECint95)

9840TapesAFS

Servers

AFS

~10 GBytesRAID DiskUS ATLAS

AFS

Ÿ LSFŸ AFSŸ ObjectivityŸ Gnu etc.

US ATLAS Equipment

RCF Infrastructure

~50 GBytesJBOD Disk

Intel/LinuxWeb Server

August 2000 Configuration

128 MBytes18 GBytes

.

.

.

RCFLAN

Page 17: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Software

U.S. Responsibilities Control/framework Data management Major detector reconstruction

Liquid Argon Calorimeter Tile Calorimeter Muons

Status Major milestones passed in creation of

control/framework 7 FTE software professionals working Preparation for software agreements with ATLAS

Page 18: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Grid Computing

Petabyte scale virtual data grid Hierarchy of centers (Tier 0 = CERN, Tier 1=

BNL, Tier 2 = Universities) Grid middleware linkages

Resource allocation and discovery Security Automation

Status U.S. ATLAS testbed planning Participation in GriPhyN, PPDG projects

Page 19: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Calren Esnet, Abilene, Nton

Abilene

Esnet, Mren

UC BerkeleyLBNL-NERSC

Esnet

NPACI, Abilene

BrookhavenNationalLaboratory

Indiana University

Boston University

ArgonneNationalLaboratory

U.S. ATLAS Testbed

HPSS sites

Page 20: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

GriPhyN

NSF Meeting (May 31, 2000) Carl Kesselman 6

GriPhyn Architecture

Virtual Data ToolsRequest Planning and

Scheduling ToolsRequest ExecutionManagement Tools

Transforms

Distributed resources(code, storage,

computers, and network)

Resource Management

Services

Resource Management

Services

Security and Policy

Services

Security andPolicy

Services

Other Grid Services

Other GridServices

Interactive User Tools

Production Team

Individual Investigator Other Users

Raw datasource

Page 21: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Challenges in Project Planning

“Projectizing” Accounting and tracking systems (DONE) Revision to Project Management Plan (DONE) Preparations for “Lehman” review (NOW)

Integration with International ATLAS Need more support functions at CERN (In

Progress) LHC Computing review (in progress)

Concerns about CERN IT division

Coping with funding profiles ($5M short integral) Poor match particularly in software Seeking relief in FY 02-04

Page 22: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Major Milestones

00/5/9 pre Alpha Release of Athena00//10/30 Geant 3 Digi's available00/12/29 Athena Beta release00/12/31 Reconstruction in Athena

1/1/02 First definition of regional centers1/1/15 ARC Report completed1/3/01 G4 interefaced to framework1/3/30 Core Software Agreements Complete1/4/30 Athena Release1/6/29 Database product decision1/9/30 Athena Release

1/12/21 Athena Production Release1/12/21 G4 Physics validated

Page 23: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Milestones

2/7/30 MDC 1 completed2/11/29 Comp. TDR completed2/12/02 10% processor farm in place2/12/31 100 Tbyte database prototype complete3/9/30 MDC 2 completed4/6/30 Second cycle of OO4/7/30 Full test chain in real environment

4/12/31 Full DB infrastructure4/12/31 40% Processing farm prototype5/6/30 100% processing farm prototype

5/11/01 LHC Startup

Page 24: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Page 25: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Page 26: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Request

Profile Comparison

0.00

5.00

10.00

15.00

20.00

0 1 2 3 4 5 6

Fiscal Year

00 M

Dol

lars

Request - Now

PMP Request

Agency Guidance

Page 27: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Software

Software

0.00

1.00

2.00

3.00

4.00

5.00

6.00

0 1 2 3 4 5 6

Fiscal Year

This request

Original PMP Request

Agency Profile

Page 28: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Facility Profile

Facilities

0

2

4

6

8

10

12

0 1 2 3 4 5 6

Fiscal Year

This Request

Agency Guidance

Page 29: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Guidance - Request

Guidance - Request

-2.00

-1.00

0.00

1.00

2.00

3.00

4.00

0 1 2 3 4 5 6

Fiscal Year

R eques t- gui danc e

Page 30: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Profile Effects

Substantial delay in services at Regional Center Mass Storage System support delayed until

FY 04. Impacts ability to perform ’03 Mock data

challenge

Software development can’t work with this profile Need flatter profile (FY 02-04) Still, integral eliminates all detector

specific tasks (mainly impacts universities)

Page 31: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Fallbacks

Overall: scale back on requirements Software:

Degree of grid automation Overall requirements

– (e.g. carrying two vs. one DB product) Shifting personnel

– (e.g. CERN location of SW pros)

Hardware Reduction of scope of RC… Delay of purchases – Moore’s law Alternative data-analysis strategies

Comment: user part of facilities is conservative

Page 32: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Overall Budget

Breakout by Category

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

0 1 2 3 4 5 6

Fiscal Year

Mgmt. Reserve

Project

Physics

Facilities

Software

Page 33: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Budget Breakout

2% Physics

1% Project Office

9% Mgmt Reserve

46% Facilities

42% Software

Page 34: U.S. ATLAS Physics and Computing Project Status

PCAP Review 26 Oct, 2000

Summary

Functional Organization Software effort backbone of Intl. ATLAS

International ATLAS starting to coalesce

Grid tasks beginning Funding profile must be addressed PMP (minus WBS, budget) available for

comment Steps to projectization