• 21 years of construction industry experience
• 19 years experience with Primavera Software
• 11 years Certified Primavera Trainer and
Implementation Consultant
• 16 years experience as CPM Scheduler
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
2
• 16 years experience as CPM Scheduler
• AACE member for 6 years
• Member of PMI and AGC
• Hobbies Include: Ice Hockey, Cross Country
Skiing, Surfing, Bowling, Fishing, Camping and
being outdoors with my Chocolate Lab
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
NYSDOT Capital Improvement Program
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
3
The NYSDOT 2010-2015 Capital Program describes the future needs and
challenges facing the State’s transportation system, the objectives and
performance measures recommended to be used to determine the State’s
investments and outlines a proposed $25.8 billion multimodal infrastructure investment program to achieve those objectives.
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
NYSDOT Requires P6 Software
B. Scheduling Software:
The State will provide Primavera P6 software, or newer release, and
computer system for use by the Engineer to review the schedules submitted
by the Contractor. The Department has installed Primavera P6 software, or
ITEM 639.1022 20 – CPM (CRITICAL PATH METHOD) PROGRESS SCHEDULE
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
by the Contractor. The Department has installed Primavera P6 software, or
newer release, on internet accessible servers for use by the Department’s
construction inspection staff. Appropriate Department personnel,
Consultants, and Contractors will also have access to these schedules on the
Department’s Enterprise Project Management Database (EPMD). The
Department will determine the location to store the project schedule files on
the EPMD, and will provide the Contractor the naming convention for all
progress schedule submissions.
• CONTRACTOR DOES NOT HAVE TO PURCHASE ANY SOFTWARE!
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
Contractor Access to EPMD
• The Contractor shall submit Request for Access Forms to the Regional
Construction Engineer (EIC) for each proposed Primavera user to obtain the
User ID’s and Passwords for access to the P6 software and data on the
Department’s network servers after being awarded the contract.
• The form can be downloaded from the following web page
https://www.nysdot.gov/main/business-center/contractors/construction-
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
https://www.nysdot.gov/main/business-center/contractors/construction-
division/primavera, or can be provided by the Department’s Construction
Supervisor.
• These forms may submitted any time following the contract letting date and
announcement by the Department that the Contractor is the apparent low
bidder.
• Access forms can be sent to CPMSCHEDULINGSECTION@dot.state.ny.us
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
Contractor Request for Access Form
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
CITRIX Web Interface
• Login to the CITRIX Web Interface to access the NYSDOT P6 EPMD with
User Name and Password provided by the NYSDOT
https://www4.dot.state.ny.us/Citrix/MetaFrame/auth/login.aspx
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
P6 CITRIX Web Interface
• Click on the Primavera P6 Icon to login to the software
https://www4.dot.state.ny.us/Citrix/MetaFrame/site/default.aspx
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
Click the P6 Icon Link
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
Contractor Work Area in NYSDOT P6
• The Contractor Work Area gives access only to the projects that the
contractor has been assigned rights too
• Multiple projects can be assigned under one contractor account
• Up to two user accounts per Contractor can be assigned to each project
• Contractors can request more users to be added by the NYSDOT
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
NYSDOT Project Templates
• The Department or its agents will make available to the apparent low bidder
on network servers the Suggested Preliminary Construction CPM Schedule in
Primavera P6 format within seven (7) calendar days of the letting date as a
template to assist the Contractor in developing the Baseline CPM Progress
Schedule in a timely manner. The template will have the “CON” designation.
– WBS Structure to be modified by the Contractor
– Standard/global calendars to be used by the Contractor
– Standard/global activities required by the NYSDOT
– Standard activity codes required by the NYSDOT
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
– Standard activity codes required by the NYSDOT
• The Contractor will then modify the WBS and input the contractor activities,
durations, logic, project calendars, and project codes
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
DRMcNatty & Associates, Inc. Overview of Consulting Services for Contractors on NYSDOT Projects
• Certified Consulting, Training, and Mentoring for P6 Project Manager Software
for Contractors awarded NYSDOT Projects
• Mentoring of the NYSDOT CPM Schedule Specifications
• Create the Initial Project Baseline Progress Schedule for the Preconstruction
Meeting and WBS project structure
• Create the At Award Baseline Progress Schedule @ Award for submission and
approval to the NYSDOT to establish the approved baseline schedule before
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
approval to the NYSDOT to establish the approved baseline schedule before
construction
• Create the Monthly Progress Schedule Updates recording actual progress of
work including changes /delays to the schedule
• Create Baseline and monthly progress update schedule narratives
• Generate Appendix Reports required by the NYSDOT CPM Schedule
Specifications
• Attend project schedule meetings
• Online training & consulting support via the internet
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
Creating the Baseline Schedule
• Create the Contractor WBS Structure
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
Import Contractor Activities with Excel
• Export from P6 into an XLS (Microsoft Excel) File from the project in P6
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
Import Contractor Activities with Excel cont.
• Contractor can update the XLS (Microsoft Excel) document with all activities
• Import includes the Activity ID, Activity Name, and Original Duration
• Do not change the Column Headings
• NO IMPORTING FROM SURETRAK, PRIMAVERA P3 or MS PROJECT!
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
Activity ID’s
can be created
using Excel
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
Import Contractor Activities with Excel cont.
• Contractor does not have rights to Import the Excel file
• Contractor emails the Excel file to the NYSDOT for verification and import
• Activities can then be assigned to the WBS by drag and drop and filters
• NYSDOT Global data is not effected or replaced by importing with Excel
Group & Sort by WBS
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
Use P6 Drag & Drop feature to
move activities under the
correct WBS name
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
Submit Final Baseline Schedule• Contractor makes a copy of the “CON” file per the NYSDOT Schedule
Filename Convention when Final Baseline Schedule is approved
• The CON file is the main “editing” file for all future updates
• All submitted files are marked “Inactive” so they cannot be edited after
submission to the NYSDOT
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
Submit Final Baseline Schedule cont.
• Contractor submits the Baseline Schedule to the NYSDOT via email
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
Monthly Progress Schedule Submissions
• First Monthly Progress Schedule Submission – Within three State Business Days following acceptance of the Final Baseline Progress Schedule @ Award or the closing date for the first months contract payment period whichever is later, the Contractor shall perform a Progress Schedule Update to reflect the status of all activities where work was performed in the time period between the start of work and acceptance of the Final Baseline Progress Schedule @ Award.
• Data Date - the “Data Date” shall be the date the Project Scheduler last edits
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
• Data Date - the “Data Date” shall be the date the Project Scheduler last edits the schedule prior to submission to the Engineer (generally the last working day of the contract payment period).
• The Engineer will review the Monthly Progress Schedule submissions and will prepare a written response (Progress Schedule Review Report) to the Contractor’s submission within five (5) State Business Days following receipt of the Contractor’s complete schedule submission. The Engineer will either “accept” the schedule, “accept as noted”, or “reject” the schedule for re-submittal by the Contractor
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
Monthly Progress Schedule
• Access the main “editing” file with the CON designation for Contractor
• This is the main file for all updates each month
• The CON file is the only “Active” file all other schedule submissions are
“Inactive” so they can not be edited after being submitted and approved
by the NYSDOT
• Once the monthly update is complete and ready for submission a copy is
made per the NYSDOT naming convention and submitted via email for
review and approval
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
Updating a Monthly Progress Schedule
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
How Data is Collected
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
The Data Date
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
The Data Date cont.
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
Progress SpotlightA
AC
E I
nte
rnati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
Setting the New Data Date
Click on the Data
Date & Drag to the
New Data Date
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
New Data Date
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
Setting the New Data Date cont.
New Data Date for
All Activities that fall into
the status period will be
highlighted in Yellow
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
New Data Date for
the Current Update
Status Period for
Current Update
highlighted in Yellow
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
Entering Actuals
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
Statusing Activities in Progress
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
Using Layouts to Collect Update Data
• Use customized “Layouts” to send as an Adobe PDF document via email to
field personal to mark up with update information
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
Using Excel to Collect Update Data
• Copy activities from P6 and paste into an Excel file and customize columns
• Send via email to field personal to provide update information
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
Use GoToMeeting for Online Updates
• Collaborate online for Monthly Updates & Review sessions
• Email participants that need to attend the online meeting
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
Submit Monthly Update to NYSDOT
• Contractor makes a copy of the “CON” file per the NYSDOT Schedule
Filename Convention when Monthly Update Schedule is ready for review
• The NYSDOT copies the submitted file and pastes into the NYSDOT
schedule review area in P6 to perform their review and approval
• All submitted files are marked “Inactive” so they cannot be edited after
submission to the NYSDOT
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
Submit Monthly Update to NYSDOT• Contractor submits the all Monthly Update Progress Schedules to the
NYSDOT via email
• Contractor provides specific Monthly Submission documents to the NYSDOT
per the CPM Specifications
• Monthly Update Narrative / Schedule Log Report / Size D 24x36 Plot
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
Why the NYSODT CPM Spec Works
• Cost included as a bid item in the contract
• No software to purchase
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
• Access from any location via the internet
• Importing and overriding of Global P6 Date not an issue
• No importing from Microsoft Project, SureTrak, P3
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
Why the NYSODT CPM Spec Works cont.
• Do not need to create lots of reports, NYSDOT has
standard/global reports, layouts and filters
• All schedule submission and review is done electronically
thru email and Adobe PDF attachments
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
thru email and Adobe PDF attachments
• The CPM Specifications were written with a combined
effort from NYSDOT, AGC, CPM Consultants, and NY
State Contractors
• NYSDOT commitment from the top down
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
Questions?
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
Questions?
-
An
nu
al
Weste
rn W
inte
r W
ork
sh
op
Contact Information
Jonathan McNatty4955 Chestnut Ridge Road, Suite 201
Orchard Park, NY 14127P. (716) 417-7094 F. (716) 299-2034
Email: jmcnatty@drmcnatty.comWeb: www.drmcnatty.com
AA
CE
In
tern
ati
on
al’s 50
thA
nn
ual
Weste
rn W
inte
r W
ork
sh
op
Offices in California and New York
top related