the t while each corro specia coa n which the p defor errabella® ve incorpora n panel is mad sion...
Post on 14-Mar-2020
1 Views
Preview:
TRANSCRIPT
www.terrabellaroof.com
TerrabActual Actual CoveraCovera VeronaActual Actual Covera VeronaTerrab
VeronaActual Covera VeronaActual Covera VeronaLengthWidth Valley LengthWidth Roof-toLengthWidth Z-Bar FLengthWidth=
Self-t1/2”)
bella Verona®length = 44.6Width = 18”
age length = 3age width = 1
a Ridge Cap®Length = 15.9Width = 15.2
age Length = 4
a End cap ella Verona, C
a Bird-Stop ELength = 49.2
age Length = 4
a Bird-Stop RLength = 49.2
age Length = 4
a Valley: h = 8’
= 18”
Cap: h = 8’
= 2”
o-Wall Channh = 8’
= 6”
Flashing h=50” =3”
apping screw
® 67”
39.75” 5.74”
94”
25” 49.375”
Classic
ave: 2” 48”
Ridge: 2” 48”
nel:
w#9 Hex (1/4”
” diameter) xx 1.5” (or lenggth sufficient to penetratee roof deck
Terrabella® Verona Installation Guide | Ver. 2.0 www.terrabellaroof.com
Terrabella® Verona Installation Guide | Ver. 2.0 www.terrabellaroof.com
Overview
Terrabella Verona® Comparative Bene�tsProtection and
Bene�ts Terrabella® Clay Tile Fiber Cement Shingle
Weight Light 1.11 Lbs./Ft2 5.99-15 Lbs./Ft2 5.99 Lbs./Ft2 2.5-3.99 Lbs./Ft2
Fire Class A Material Class A Material Class A Material Class A Material
Wind Resistanceis for Terrabella
is higher
121 mph not cover winddamage
up to 75 mph up to 111 mph
Earthquake Added shear strength Prome to collapse No added shearstrength
No added shearstrength
Environmetal Recyclable Limited Recycling Limited Recycling Limited Recycling
Impact ResistantUL 2218
Class 4 - you canwalk on it, quali�es
for discount on insurance
High mailtenance Class 3 Class 3
Maintenance/life cycle cost
Low, retains itsappearance
without damage
High maintenance High maintenance High maintenance
Base structureoptions
Wood, steel andconcrete solid surface
or support
Wood, steel andconcrete solid surface
or support
Wood, steel andconcrete solid surface
or support
Wood, steel andconcrete solid surface
Options forre-roo�ng
Excellent, you may keepexisting roof
TEAR OFF requiredfor re-roo�ng
TEAR OFF requiredfor re-roo�ng
TEAR OFF requiredfor re-roo�ng
The Twhile Each corrospeciacoa nwhich The pdefor
Terrabella® Ve incorpora n
panel is madsion resistanally patentedng (ceramic sh assures a lo
pre-punched rming the pan
Side Overlap
erona le pang the benefit
de with a gauce in many t
d resin that cstone chips). ng las ng fin
tabs allow nel due to the
nels are specits and durabil
uge 26 alumintypes of envireates a stroFinally the p
ish.
panels to beir uneven e
Pre-fast
-punched tening tabs
TERRA
ially manufaclity of metal r
num-zinc coaronments. Th
ong bond betpanel is coate
be screwed e shape.
ABELLA VE
ctured to emuroofing.
ated steel corhe steel coretween the steed with a pr
onto de str
RONA TILE
ulate Italian c
re that offerse is then coateel core and otec ve acry
ucture below
SYSTEM
classic es
s ted with a the stone
ylic glazing
w without
Side Overlap
Terrabella® Verona Installation Guide | Ver. 2.0 www.terrabellaroof.com
Terrabella® Verona Installation Guide | Ver. 2.0 www.terrabellaroof.com
Terra
AccesA.TerraB.TerraC. Terr
E. TerrF. TerrG. TerrH. TerrI. TerrTerrab
InstalTin SniTape MHand BTable sOther
bella Veronaa e (24ea peer 100sq. .) aadd 10%-15%% waste
ACCESORRY LOCATIOON AND DISTRIBUTIOON
Figure
e 1. Accessory dd
ssories abella Veronaabella Verona
a Hip and Ridg
rabella Bird-stD. Terrabella Roof-to-wall Channel (8ft), step flashing and both sides of hips
abella Z-Bar fabellaVeronarabella Veronrabella Flat Shabella Bird-stella Verona H
Toolps
Measure Benders saw Char required i
a Hip and Ridgge (1.1 v
top Eave(4 )
flashing (4 ),a Valley (8 ) a Valley Cap(
heet 14"x50" top Ridge (4ftHip and Ridge
ls
alk Line tems
ge (1.1 covverage each) verage each)
step and heaad wall ( ) t)
e end cap (To
CirculScrewHamm
close the end
lar Saw w Gun mer
ds of hips andd ridges)
Terrabella® Verona Installation Guide | Ver. 2.0 www.terrabellaroof.com
Roofing underlayment (one layer required) Spray Paint High Grade Roofing Sealant Galvanized Pipe Flashings 2x2 and 1x2 as needed for hipsand ridges Care and Recomme
Guidelines: Products should be installed in accordance with the following guidelinesestablished by Terrabella®: • Do not use accessories that contain copper or lead with the steel roof system, as they are incompa metals. • A slope of 4/12 or more is required to install this product. • When handling the product, be careful not to deform panels. • Always wear gloves when working with metallic products. • When installing Terrabella® roofing panels, care should be taken to avoid excessive on between panels. This could damage the durability of the stone coa g. • Immediately after and/or during insta remove any steel that may remain on the panelsdue to drilling and cu ng. These will rust and might damage and stain the panels. • It is recommended that those working on the roof use rubber soled shoes to avoid damaging the product. Terrabella® Maintenance: • Terrabella® is designed to withstand a most environment, but the product life can be extended with proper maintenance. • Upon comp ng the i check that the roof surface is clean and free of objects that could damage the (metal burrs, screws, wire, sheet metal clippings, etc...) • Avoid foot traffic on the roof whenever possible. • It is recommended to clean the roof surface every six months when installed in a highly corrosive environment (use water and a so brush, or have a professional do the job). • Always carry out any work on the roof deck using all safety measures and wooden planksfor weight distri
Terrabella® Verona Installation Guide | Ver. 2.0 www.terrabellaroof.com
It is important to carefully read each of the recommenda in this manual before the in process.
Terrabella® is not responsible for improper installa on ormisinter of this manual. For the most current and up-to-date installa instru go to www.terrabellaroof.com General recommenda for transpor handling, and storage: Storage Recommenda : • Always store the product indoors. • Store the product in a dry and ven ated area. • Avoid stocking the product in direct contact with the floor over large periods of me. • If stored outside: Locate product on a firm surface and protect from damage. Allow for water to drain off of the panels and protect it from being blown by wind. • Packs of 5 panels can be stored on top of each other to a maximum height of 1 meter. Always make sure there is enough air circ on between packs. •If using tarpaulins, leave enough space at the ends of the canvasto allow for air • Do not use polyethylene or to cover the packages. •Do not store detergents, solvents, acidic materials, or alkali such as concrete or plaster with Terrabella® products. • It is recommended to store products near the place where they will be installed to avoid damage from handling. General recommenda for
Structure: The roof structure should be inspected thoroughly. Any structural problems should be corrected prior to the installa of the roofing panels.
Decking:15/32”minimum thickness; Grade B-C APA rate plywood or equal should be used.
must be 2"x2" or 1”x2” standard grade Douglas fir or nominal thickness 1.5" x 1.5" and .75” x 1.5”.
Underlayment:A minimum underlayment of #30 felt or synthe underlayment is required on all new constr and tear-offs. Always check local building codes prior to i
Roof Saddles: Roof saddles are required behind any roof protrusion 48" in width and above. Panel diverters are easy to make and are a good way of water from the back of the protrusion and should be used where necessary.
Sealants:A one-part polyurethane type sealant is recommended.
Terrabella® Verona Installation Guide | Ver. 2.0 www.terrabellaroof.com
ROOFING PREPARATION New roof: The Terrabella Verona system does not require b ns to be installed on the deck. Prepare the wooden deck to be level and secure. Cut out decking in areas where you plan to install ridge vents and install #30 felt or equivalent synthe underlayment on the decking. Always check local building codes for addi al requirements. Reroofing:Terrabella® roofing system may be installed over an exis ng asphalt shingle roof (maximum of 1 layer). Follow the steps below before installing Terrabella® panels and accessories on top of shingles:
Step 1: Remove all the old hips, ridges, gable material and any drip edge installed on eaves. Step 2:Cut any overhang flush with the exis ng fascia. If necessary, build up the fascia at the eave using 1”x4”s and 2”x2”s un l the fascia is flush with the rest of the roof. Step 3: Install a new layer of underlayment over the roof area. #30 felt or equivalent synthe c underlayment is recommended. Always check local building codes, materials such as ice and water shield might be required for your area.
Step 4:Install Terrabella® roofing system following the installa procedure described in this manual. Be sure to use screws that are long enough to correctly fasten the panels and accessories on the deck or
Tear-offs: If a complete tear-off is required, make sure to completely remove the en re old product in order to work on a leveled surface. Clean the deck thoroughly and install a layer of underlayment before installing the new product. ACCESSORY AND BATTEN INSTALATION
installing the correct underlayment you must install all roof-to-wall channels, Valley Channels and b ens on the roof structure. Avoid fastening any Verona panels prior to installing these materials first. BATTENS AT GABLE TRIM When installing at a gable nail down two 2”x2” at the edge of the roof. this is done install a roof-to-wall channel on the inner face of the as shown in the figure below: This is done so there is a surface to screw the ridge piece onto at gables. Always use a 6” (15cm) overlap when joining two pieces of roof-to-wall channels together. Be sure to pre-paint the exposed sec of the channels so they match the color of the roof. Roof-to-wall channels at gables must have a minimum 1”(2.54cm) overhang past the eaves so as to allow water the water collected through the channels to exit the roof without dripping on the walls.
Terrabella® Verona Installation Guide | Ver. 2.0 www.terrabellaroof.com
BATTENS AT HIPS & RIDGES When installing over hips you must place two stacked 2”x2” stacked up the center of the hips (An addi might be necessary depending on the roof pitch). A nailing down the
proceed to install a roof-to-wall channel at each side of the hip as shown in the figure below: When fastening roof-to-wall channels, always place screws on as far away from the center of the hip as possible. This will allow water to flow through the channel without leakage at screw
Be sure to pre-paint all exposed areas of channels.
must beinstalled at ridges in the same manner without any roof-to-wall channel beside them. If there is need for ridge ven place two sets of stacked 2”x2” b ens spaced approximately 4” (10cm) on center at ridge. The figure below illustrates both scenarios:
Valley Channel on The Terrabella® valley channel is installed on each one of the roof’s valleys and is designed to capture and evacuate the large amounts of water that focus on these areas. The Valley channel must be installed along the center line of each valley. As with the roof-to-wall channels at gables, install so that a minimum 1” (2.54cm)hangs past the edge of the eave. A minimum of 6” (15cm) overlap is required when joining two valley pieces together. Install over previously notched starter clips at eaves. This will reduce any possibility of leakage through the screw holes. Finally, snap or slide the stone-coated valley cap into place the valley is complete.
screws may be used, but not required, to fix the valley caps in place.The exposed area of the valley should be painted to match the roof color. Installa onRoof-To-Wall Channel at Ver cal Structures Whenever the roof meets a structure such as a wall or a chimney, a roof-to-wall channel must also be installed in order to avoid leakage at these joints. Always start installing channels from the lowest point up towards the ridge. Remove any wall panels before installing the roof-to-wall channel so it can be installed over it later on. When a surface such as stucco is to be applied, do it the channel to cover it up. Screw the channel every 8” (20cm) and apply a roofing grade sealant on the joint between the channel and the structure that meets the roof. The installa on of a flashing is also recommended wherever it might be necessary the roof-to-wall channel is successfully installed. Stone-coated z-bars may be used over the channels to generate a consistent look on the roof. The Terrabella® roof-to-wall channel must have a 6” (15cm) minimum overlap. Paint any exposed areas of the channel to match the rest of the roof.
Terrabella® Verona Installation Guide | Ver. 2.0 www.terrabellaroof.com
TERRAABELLA®VEERONAPANEL INSTALLLATION Once abegin mwith tguideli
all b ns, Vm g thehe recommenes set forth
Valley Channee first course ended under
by this docum
els and roof-of Terrabella
rlayment andment.
-to-wall chana® panels. Mad all of the
nnels are sucake sure the raccessories
cessfully instroof is complare installed
talled, you metely protect
d following t
may ted the
The Iniin the o
First C
evalley panels Leave overlapfasten panels Never straigh
Secondstart ththe cou
i al point forordershown o
r panel instalon the diagra
n will alwms below:
ways be fromm the eave annd advance tooward the riddge
ourse: Begine the course fchannel. Oncand fastenin
the screw clp with a newdown the n
; this will help
angle the scrht line.
d Course: If ahe second courses does no
ning at the efrom one endce you have ang them ontolosest to the
w panel.A er ose of the Vp avoid water
rews when fa
a full panel wurse; con nu
ot match, red
Figure 2.In
eave, place ad of the roof aligned the po the deck by overlap betfully installin
Verona panelsr leakage.
astening pane
nstalla dia
Figure
was used on tue with a full ucing any cha
full panel o it meetsn of the
y the pre-putween panelsng the first cs. Avoid insta
els as this ma
agram
n posi on 1(s and overlape first coursenched areas
s for last; insourse of panalling screws
3.Panel Overla
he first courspanel. This mance of water
ay deform th
ap
Figure X).Be psa roof-to-we of panels be
on the backstall it a r nels at the eas on the valle
sure to alwawall channel oegin placing t of each pancomple ng t
ave, proceed ey areas of t
ays r a
the nel. the
to the
em and makke you lose yoour
se, a half-panmust be done r leakage.
nel or piece mso that the o
must be used overlap on all
to of
1511 12 13 14
4 5 6 7
16
8 9 10
1 2 3
Roof Deck
Terrabella® Verona Installation Guide | Ver. 2.0 www.terrabellaroof.com
ConWhen the areinstalli
ue installing fastening pa
eas where wang a screw in
It is stlines.Tfit flush Panelsalong tnecess A er tand th2” (5cm2 inche
Keep m
tly ridge. Panelsridge pthe firs
This is througoverflochanne Panelsthat ggables,top of Panelsinstalle
rongly recomhere should bh with a mini
s at ridge: Befthe ridge. Thesary.Draw a ch
he b ns are ba ens at t
m) to the meaes up so that
measuring, cuwith the pan
s at gable: Papiece must best course of p
done as an gh the roof-towing and leel and always
s at hips and vghtly fit on th, notch the bthe roof-to-w
s at Head Waed to the wal
the next counels over at ater will flow these areas,
rses making svalley chann
w. If there is n use a roofing
sure the overels and roof-
no other wayg grade seala
rlaps do not a-to-wall chany to securely nt around the
align with thennels, avoid u
fasten the pae installed scr
e course belousing screws anel other threw.
ow. on
han
mmended to dbe no space gmum gap.
fore placing tese b ns mhalk line to in
re nailed dowthe ridge. Maasurement. Cit can be scre
u ng and benel below and
anels installee fastened ovpanels must b
addi onal pto-wall channeaking water s use caulk on
valleys: Whehe valley chaird-stop eave
wall channels
all:As with thl. Add 1” (2.5
draw a chalkgreater than 1
k line every 31/8” (3.2mm)
3rdcourse to m) between Ve
maintain strarona panels a
ight, horizonand they shou
ntal uld
he last line ofmust be nailednstall the batt
f panels at thd down at thetens in a strai
e ridge, instae center of thght line, befo
all two stackehe ridge, use aore nailing do
d 2”x2” ea third n
own.
ens n if
wn, measure tark a panel w
Cut the panel ewed into the
the length bewith the meas
using this nee ens whe
etween the tosurement obtw measurem
en installed. S
op of the lasttained and ad
ment and bendSee figure4:
t panel installdd an ond the n
led nal nal
Figure
4.Panels at riddge
nding panelsd a correct ov
s at the ridgeverlap is main
. Make sure tntained with
the modifiedthe rest of th
piece is lockhe panels at t
ked the
ed at gables ver them on te notched as
must be plache previously shown in the
ced over the y s. Thee figure below
roof-to-wall e bird-stop eaw:
channel andave installed
d a on
rotec on aganel to exit oto the deck
n the screws if
ainst leakageoff of the rok below. Avof you do so.
e as it permitoof. Preventi
oid installing
ts the water ing the chanscrews on t
that is drainnnel from evhe roof-to-w
ned ver
wall
ere panels mennels and ro
e a full semi-cand valley ch
eet hips and vof-to-wall chcircle at valleyhannels.
valleys, cut thannels at hipys and hips. T
he panels in aps. As with thTry to avoid u
a size and shahe panels at tusing screws
ape the on
the ridge, mmeasuremen
he panels at 54cm) to the
easure the dnt and cut the
distance frome panel. Bend
m the last pand the add n
nel nal
Terrabella® Verona Installation Guide | Ver. 2.0 www.terrabellaroof.com
inch soroofingon theTerrab
o it is paralleg grade sealae wall. If theella® panels.
el with the wnt and a flash
ere are wall
wall. Fasten thing as needepanels or si
he panel to ed. Install a bidings, reinst
the head wabird stop ridgetall them ove
all and seal te over the paer the bent
the joint withanel fastening
n of t
h a g it the
RIDGEOnce tand en Ridge direc othe pre
Fastendo notthat reend ca
If a rid
othe ridridge p
E AND HIP the panels at nd caps may b
Installa on:Mon of the winesence of strs as shown in
the ridge pie plan to stone
emain exposep on all ends
dge vent is ton as shown i
ge pieces as ypieces and en
INSTALLAThips and ridg
be installed. A
Make sure tnd.This will carong winds. Bn the figure b
eces on the be coat each oed. Once all p.
o be installein the figure you normallyd cap.
Figure 5. Panels at head
ION ges are instalAll panels and
to begin instause the overBefore installelow:
ba at eveone with the tpieces are fa
Figure 6.Rid
d, roll it outbelow. r
y would. Be su
led as instrucd accessories
t n fromrlap betweening the ridge
ery overlap. Mtouch-up kit. stened, cut-o
d wall
cted above, tshould be ins
dge piece insta
on top of tr the ridge veure to cover t
m the end on each ridge pe piece fasten
Make sure toThese are th
off the excess
he Terrabellastalled at this
a
he ens aent has been the re rid
f the roof opiece to reman the bird-sto
o use pre-paine only screwss ridge piece
a® Verona ridpoint.
dge
opposite to tain unalteredop ridge on t
the d in the
nt screws if ys in the syste and install t
you ms the
at the ridge aset over the ge vent with
and adjust inb ns, instthe Terrabell
nto tall la®
ROOFING GRADESCALANT
Hip Installa on: When installing ridge pieces on hips, always start from the eave upwards. Fasten on the ens installed on the hip using 2 screws for each piece. Use pre-painted screws or stone coat each one installa on with the touch-up kit. placing the final hip piece, install the end caps where needed. Use sealant if there is a gap between the end cap and the hip piece. At the inters of the hip and ridge, modify the ridge pieces to connect them. Use n snips to do this process with ease. Cut the Ridge trim to fit the contour of the hip pieces and install sealant at the overlap of the cut hip trims. INSTALLATION AROUND PIPES Whenever a pipe vent is present in a roof, the panels around it must be cut in the shape of the pipe. Install a pipe flashing around the pipe vent. Cut the skirt on the top pipe flashing to fit height of the course, and fit it over the vent pipe. Mold the skirt of the flashing to fit the of the panel. Using a width of panel, that is wide enough to cover the en re pipe flashing skirt, carefully cut a hole to fit around the cone of the flashing. Install the “cover panel” and fasten. Be sure to seal and chip around the cone using the Terrabella Touch-up kit.
Figure 17.Pipe flashing layout Figure 18.Installed pipe flashing
Chimneys, Skylights & Dormers There will be mes where panels must be installed around a chimney, skylight or dormers.Install full panels where possible and use cut panels to cover the remaining areas.Start by measuring from the full panel belowthe chimney. Use the same procedure as with the in of panels on a head wall. Use roof-to-wall channels on the le and right faces of these structures. Install a z bar over the channel installing panel pieces over it.The roof-to-wall channel should extend a minimum of 4” (20cm) past the chimney’s edges. For the front of the structure install as you would at a ridge bending the top of the panel up and installing a bird-stop ridge. Follow with a Z- bar. A chimney saddle may be used to cover the area above the chimney or dome. Avoid using lead or copper materials for this purpose as they must not be in prolonged contact with the rest of the system. r the flashings are installed, proceed to install the rest of the panels above the channels. Follow the diagrams below for a successful
Terrabella® Verona Installation Guide | Ver. 2.0 www.terrabellaroof.com
Pipe
Pi pe Flashing
Pi pe Flashing
Roofing Grade Sealent
Z Bar
Roofing Grade Sealent
Roof to wallChannel
Terrabella® Verona Installation Guide | Ver. 2.0 www.terrabellaroof.com
USINGTheTerany supanels
Apply tfor 24 stains w
Keep Use
Figure 19.(1)Inat the back of as you would awith roofing gchimney.
nstall roof-to-wf the chimney; bat a ridge. (2)Srade sealant. (
wall channel onbend the front Seal all around (3) Install Z bar
n both sides anpanel upwardthe chimney
r around
nd ds
G THE TERRrrabella® toucrface. A er cas well as an
RABELLA®TO
the resin on thours before
will not come
p the resin aw
safety glasse
ch up kit is tocomple thny visible scre
OUCH-UP Ko be used to rhe insta nws.
KIT repair damagn on the roof,
ged areas, hid, begin identi
ding screws, oifying damage
or stone-coatied or scratch
ing hed
the required ae walking ovee off.
area and comer these spot
mpletely covets. Be careful
r it with the s not to spill a
stone granuleany resin on
es. Let it hardthe roof, the
den ese
way from thee eyes and mouth.
es when handdling the stonne granules.
top related