the nemo project: a status report
Post on 15-Jan-2016
53 Views
Preview:
DESCRIPTION
TRANSCRIPT
2000
3000
3600
NEMO
The NEMO Project: A The NEMO Project: A Status ReportStatus Report
M.TaiutiM.Taiution behalf of the NEMO Collaborationon behalf of the NEMO Collaboration
Athens, GreeceAthens, Greece
VLVNT09 WorkshopVLVNT09 Workshop
October 13 - 15, 2009October 13 - 15, 2009
2000
3000
3600
NEMO
OutlineOutline
► IntroductionIntroduction The NEMO CollaborationThe NEMO Collaboration Physics MotivationsPhysics Motivations
► The NEMO Activities:The NEMO Activities: The Site CharacterizationThe Site Characterization The NEMO Phase-1The NEMO Phase-1 The NEMO Phase-2The NEMO Phase-2
► Conclusions and PerspectivesConclusions and Perspectives
2000
3000
3600
NEMO
The NEMO CollaborationThe NEMO CollaborationINFNINFN Bari, Bologna, Catania, Genova, LNF, LNS, Napoli, Pisa, RomaBari, Bologna, Catania, Genova, LNF, LNS, Napoli, Pisa, Roma
► UniversitiesUniversities Bari, Bologna, Catania, Genova, Napoli, Pisa, Roma “La Sapienza”Bari, Bologna, Catania, Genova, Napoli, Pisa, Roma “La Sapienza”
CNRCNR Istituto di Oceanografia Fisica, La SpeziaIstituto di Oceanografia Fisica, La Spezia Istituto di Biologia del Mare, VeneziaIstituto di Biologia del Mare, Venezia Istituto Sperimentale Talassografico, MessinaIstituto Sperimentale Talassografico, Messina
Istituto Nazionale di Geofisica e Vulcanologia (INGV)Istituto Nazionale di Geofisica e Vulcanologia (INGV)
Istituto Nazionale di Oceanografia e Geofisica Sperimentale (OGS)Istituto Nazionale di Oceanografia e Geofisica Sperimentale (OGS)
Istituto Superiore delle Comunicazioni e delle Tecnologie Istituto Superiore delle Comunicazioni e delle Tecnologie dell’Informazione (ISCTI)dell’Informazione (ISCTI)
The NEMO physicists actively participates to the ANTARES and The NEMO physicists actively participates to the ANTARES and KM3NeT programsKM3NeT programs
Introduction – The NEMO Collaboration
2000
3000
3600
NEMO
A Northern Telescope for High Energy A Northern Telescope for High Energy NeutrinosNeutrinos
► The telescope will be complementary to ICECUBEThe telescope will be complementary to ICECUBE► The small cross section and the expected low The small cross section and the expected low
neutrino flux require neutrino flux require large volume telescope large volume telescope ~~ 1 km 1 km33
long observation time long observation time ~~ yrs yrs
► The atmospheric muon background requiresThe atmospheric muon background requires a shielding a shielding >> 2000 m water equivalent 2000 m water equivalent
► The Mediterranean Sea provides convenient sites The Mediterranean Sea provides convenient sites
NEMOCapo Passero 3400 m
NESTORPylos 4000 m
ANTARESToulon 2400 m
Introduction – Physics Motivations
2000
3000
3600
NEMO
Sky View of a Mediterranean Sea Sky View of a Mediterranean Sea TelescopeTelescope
2 downward sensitivity assumed
Located inMediterranean visibilityof givensource canbe limitedto less than 24h per day
> 75%> 25%
Introduction – Physics Motivations
NOT seenby ICECUBE
2000
3000
3600
NEMO
The NEMO R&D ActivityThe NEMO R&D Activity
► Site locationSite location More than 25 sea campaigns since More than 25 sea campaigns since
19981998
► The NEMO SiteThe NEMO Site 80 km off-shore80 km off-shore 3500 m depth3500 m depth
80 km NEMO Site
CataniaINFN-LNS
Test Site North (TSN)
Test Site South (TSS)
The NEMO Activities: The Site Characterization
2000
3000
3600
NEMO
The NEMO Site PropertiesThe NEMO Site Properties
Base line rate (Threshold 1)
15
20
25
30
35
0 7 14 21 28 35 42 49
Date (days since the 31 st of March)
Cou
nti
ng
rate
s (k
Hz)
0.0%
0.5%
1.0%
1.5%
2.0%
Tim
e ab
ove
200
kH
z
The NEMO Activities: The Site Characterization
► High water transparencyHigh water transparency Data compatible with pure salt Data compatible with pure salt
water propertieswater properties No seasonal variationsNo seasonal variations
► Reduced background, mostly Reduced background, mostly from from 4040K decayK decay 10” PMT thres. 0.5 p.e. 10” PMT thres. 0.5 p.e.
noise rate noise rate ~~ 30 kHz 30 kHz Bioluminescence almost absentBioluminescence almost absent
► Geologically stableGeologically stable
Base line rate
ANTARES 1850-2250 m
NEMO Site 2850-3250 m
NEMO Site Test 3
ANTARES Test 3
2000
3000
3600
NEMO
The NEMO Phase-1 ActivityThe NEMO Phase-1 Activity
► The NEMO Phase-1 aimed at The NEMO Phase-1 aimed at characterizing and validating characterizing and validating technologies for a deep water technologies for a deep water neutrino detectorneutrino detector
MechanicsMechanics►Fibre-glass containers pressure-Fibre-glass containers pressure-
compensatedcompensated►A Detection Unit based on a Tower structure A Detection Unit based on a Tower structure
that is deployed packed and unfolds after that is deployed packed and unfolds after the deploymentthe deployment
Data readout and transmissionData readout and transmission►Pulse shape analysisPulse shape analysis
The NEMO Activities: The NEMO Phase-1
2000
3000
3600
NEMO
South branchSouth branch5.000 km5.000 km
North branchNorth branch5.220 km5.220 km
The NEMO Phase-1 ActivityThe NEMO Phase-1 Activity
OnDE acoustic stationOnDE acoustic station
Operating from Operating from Jan 2005 till Dec 2006Jan 2005 till Dec 2006
Junction BoxJunction BoxStill operating Still operating
in situin situTower
FrameFrame
Single armored Single armored cablecable
20.595 km20.595 km
Double armored Double armored cablecable2.330 km2.330 km
BUBU
NEMONEMOPhase-1Phase-1
Jumpers 300mJumpers 300m Jumper Jumper 300m300m
Geoseismic Geoseismic stationstationSN-1 station SN-1 station (INGV)(INGV)
Operating since Operating since Jan 2005Jan 2005
The NEMO Activities: The NEMO Phase-1
Mini-TowerMini-Tower
Fully operating starting Fully operating starting from 16 Dec 2006 for 4 from 16 Dec 2006 for 4 monthsmonths
During that period the Mini-Tower suffered a loss of buoyancy and an attenuation in signal transmission
2000
3000
3600
NEMO
The NEMO Phase-1 Mini-TowerThe NEMO Phase-1 Mini-Tower► 4 floors4 floors
Length 15 mLength 15 m Vertical spacing 40 mVertical spacing 40 m
► 16 Optical Modules with 10” 16 Optical Modules with 10” PMTPMT
► Acoustic PositioningAcoustic Positioning 2 hydrophones per floor2 hydrophones per floor 1 beacon on the tower base1 beacon on the tower base
► Environmental instrumentationEnvironmental instrumentation 1 compass + tiltmeter in each 1 compass + tiltmeter in each
Floor Control ModuleFloor Control Module CTD (Conductivity-Temperature-CTD (Conductivity-Temperature-
Depth) probe on floor 1Depth) probe on floor 1 C* (attenuation length meter) on C* (attenuation length meter) on
floor 2floor 2 ADCP (Acoustic Doppler Profiler ADCP (Acoustic Doppler Profiler
(including compass) on floor 4(including compass) on floor 4
The NEMO Activities: The NEMO Phase-1
TBM
FPM
FPM
FCM
FCM FPM
FCM
FCM FPM
br
br
br
br
HH
OM OMC T D
A BC *
ADCP
Tower Base
Floor 1
Floor 2
Floor 3
Floor 4
Buoy
HC
2000
3000
3600
NEMO
NEMO Phase-1 ResultsNEMO Phase-1 Results► Systematics over one month Systematics over one month
shows acceptable water shows acceptable water properties already at 2000 m properties already at 2000 m depth:depth: baseline ratebaseline rate burst fraction evaluated as burst fraction evaluated as
time above 1.2xbaselinetime above 1.2xbaseline burst fraction evaluated as burst fraction evaluated as
time above 200 kHztime above 200 kHz
► The Mini-Tower can reconstruct The Mini-Tower can reconstruct atmospheric muon tracks!atmospheric muon tracks!
► The OM configuration with The OM configuration with PMTs looking horizontally PMTs looking horizontally increases the atmospheric increases the atmospheric muon reconstruction efficiencymuon reconstruction efficiency
The NEMO Activities: The NEMO Phase-1
January 24 2007 Run R17 file 1 Event # 36605913 PMT hit
2000
3000
3600
NEMO
Atmospheric Muon Angular Atmospheric Muon Angular DistributionDistribution
23-24 January, 2007:23-24 January, 2007:
LiveTime: 11.31 hoursLiveTime: 11.31 hoursOnLine Trigger: ~610OnLine Trigger: ~61077
OffLine Trigger (7 seeds): 184709OffLine Trigger (7 seeds): 184709Reconstructed tracks: 2260Reconstructed tracks: 2260Selected tracks: 965Selected tracks: 965
Azimuth
Likelihood
Distribution
Zenith
The NEMO Activities: The NEMO Phase-1
2000
3000
3600
NEMO
Vertical Muon IntensityVertical Muon Intensity
Vertical muon intensity as a function of depth from data recorded on 23-24 Jan, 2007Compared with the relation fromBugaev et al, Phys. Rev. D58, 05401 (1998) The NEMO Activities: The NEMO Phase-1
NEMO Phase-1
Paper submitted to Astr.Phys.
2000
3000
3600
NEMO
The NEMO Phase-2The NEMO Phase-2
80 km NEMO Site
to NEMO Site
► Infrastructures for the -3500 m Infrastructures for the -3500 m underwater NEMO siteunderwater NEMO site Electro-optical cable (50 kW – 20 fibres)Electro-optical cable (50 kW – 20 fibres)
► Deployed in July 2007 Deployed in July 2007 ► DC/DC power converter (Medium Voltage DC/DC power converter (Medium Voltage
Converter) (10kV to 400 V)Converter) (10kV to 400 V) built by Alcatelbuilt by Alcatel tested and workingtested and working At LNS for final integrationAt LNS for final integration installation by end 2009installation by end 2009
Shore station in PortoPalo di Capo Passero Shore station in PortoPalo di Capo Passero ► 1000 m1000 m22 building inside the harbour area building inside the harbour area
of Portopalo of Portopalo► Renovation of first part of the laboratory Renovation of first part of the laboratory
completedcompleted Test and validation of new Test and validation of new
technologiestechnologies
The NEMO Activities: The NEMO Phase-2
2000
3000
3600
NEMO
The Medium Voltage Converter by The Medium Voltage Converter by AlcatelAlcatel
Single BoardSingle Board2 2
subconverterssubconverters
StackStack8 8
subconverterssubconverters1 Control Board1 Control Board
Assembled Assembled ConverterConverter
Internal UnitInternal UnitHoused UnitHoused Unit
The NEMO Activities: The NEMO Phase-2
2000
3000
3600
NEMO
Test of the Medium Voltage Test of the Medium Voltage ConverterConverter► August 2008August 2008 -- Test of MVC prototype at full load in “realistic” -- Test of MVC prototype at full load in “realistic”
conditions conditions 100 km artificial line100 km artificial line 1 NEMO tower (16 power modules and backbone)1 NEMO tower (16 power modules and backbone) 18 equivalent towers18 equivalent towers Interconnecting cablesInterconnecting cables
► August 2008 - July 2009August 2008 - July 2009 -- Development of further prototypes -- Development of further prototypes and production and FAT of the final 2 NEMO MVCsand production and FAT of the final 2 NEMO MVCs
► July 2009July 2009 -- Test of final MVC after FAT at full load in “realistic” -- Test of final MVC after FAT at full load in “realistic” conditionsconditions 100 km artificial line100 km artificial line 1 NEMO tower (16 power modules and backbone)1 NEMO tower (16 power modules and backbone) 18 equivalent towers (18 equivalent towers (input filter, 600W DC/DC and resistive load)input filter, 600W DC/DC and resistive load) 1 ANTARES mini-line (4 power modules)1 ANTARES mini-line (4 power modules) Long interconnecting cablesLong interconnecting cables
The NEMO Activities: The NEMO Phase-2
2000
3000
3600
NEMO
The July 2009 TestThe July 2009 Test
► Factory Acceptance Test of NEMO MVC n°1 Factory Acceptance Test of NEMO MVC n°1 and 2 (test performed prior shipping)and 2 (test performed prior shipping)
►Operational Test of final NEMO MVC with:Operational Test of final NEMO MVC with: 100 km artificial line100 km artificial line 1 NEMO tower (16 power modules and backbone)1 NEMO tower (16 power modules and backbone) 18 equivalent towers (input filter, 600W DC/DC 18 equivalent towers (input filter, 600W DC/DC
and resistive load)and resistive load) 1 ANTARES mini-line (4 power modules)1 ANTARES mini-line (4 power modules) Long interconnecting cablesLong interconnecting cables
► The system works properly without The system works properly without oscillationsoscillations
The NEMO Activities: The NEMO Phase-2
See R.Cocimano talk
2000
3000
3600
NEMO
The July 2009 Test LayoutThe July 2009 Test Layout
ANTARESSTRING
SW3
The NEMO Activities: The NEMO Phase-2
2000
3000
3600
NEMO
375 V
0 V
The NEMO Activities: The NEMO Phase-2
Vout MVC
Iout MVC
Vin Tower
Vin Line
2000
3000
3600
NEMO
Summary of Summary of the MVC Activitythe MVC Activity
► Tests have been successfully Tests have been successfully completedcompleted
► The deployment procedure has The deployment procedure has been testedbeen tested
► The MVC has been assembled The MVC has been assembled in the frame in the frame
► The deployment is scheduled The deployment is scheduled by end of 2009 by end of 2009
The NEMO Activities: The NEMO Phase-2
2000
3000
3600
NEMO
The Shore StationThe Shore Station
The NEMO Activities: The NEMO Phase-2
2000
3000
3600
NEMO
Test and Validation of New Test and Validation of New TechnologiesTechnologies► A ROV (PEGASO) dedicated to A ROV (PEGASO) dedicated to
marine operation in the NEMO Sitemarine operation in the NEMO Site► A mechanical test of a realistic A mechanical test of a realistic
tower (12 floors)tower (12 floors)
► A test of functionality of the A test of functionality of the ANTARES Mini-line in deep waterANTARES Mini-line in deep water
The NEMO Activities: The NEMO Phase-2
2000
3000
3600
NEMO
The ROV PEGASOThe ROV PEGASO
► TheThe wrong assembling of an o- wrong assembling of an o-ring ring caused a leakage of the caused a leakage of the oil used in the compensation oil used in the compensation system and the implosion of a system and the implosion of a hose hosting the 3kV power hose hosting the 3kV power supply wires during the first supply wires during the first immersionimmersion
► PEGASO has been repaired by PEGASO has been repaired by the SeaEye company and the SeaEye company and shipped back to Cataniashipped back to Catania
► It will be available for the next It will be available for the next deploymentdeployment
The NEMO Activities: The NEMO Phase-2
2000
3000
3600
NEMO
The TowerThe Tower
The NEMO Activities: The NEMO Phase-2
2000
3000
3600
NEMO
The TowerThe Tower
► A failure of the tower A failure of the tower boom release system, boom release system, prevented the prevented the deployment of the deployment of the tower on the seabed tower on the seabed and the successive and the successive planned operations of tower unfurlingplanned operations of tower unfurling
► The tower has been rescued and the The tower has been rescued and the problem investigated and solved on-shoreproblem investigated and solved on-shore
► The tower is presently ready for a new The tower is presently ready for a new deploymentdeployment
The NEMO Activities: The NEMO Phase-2
2000
3000
3600
NEMO
The ANTARES Mini-lineThe ANTARES Mini-line
► This is a joint activity of the ANTARES and NEMO This is a joint activity of the ANTARES and NEMO CollaborationsCollaborations
► Comparison in the same environmental conditions Comparison in the same environmental conditions of the two presently available detector designs with of the two presently available detector designs with respect to:respect to: response to the external solicitations (sea current)response to the external solicitations (sea current) sea operations and ROV connectionssea operations and ROV connections
bioluminescence stimulated by the structurebioluminescence stimulated by the structure
► Continuous monitoring of the NEMO Site (~1 year) Continuous monitoring of the NEMO Site (~1 year) with a similar apparatus used in ANTARESwith a similar apparatus used in ANTARES
The NEMO Activities: The NEMO Phase-2
2000
3000
3600
NEMO
The ANTARES Mini-lineThe ANTARES Mini-line
► ConfigurationConfiguration:: 3 storeys with 2 PMTs3 storeys with 2 PMTs spaced 100m spaced 100m Anchor (BSS)Anchor (BSS) top buoytop buoy
► New R&D to adapt the line to 3500m depthNew R&D to adapt the line to 3500m depth New electro optical water tight penetrator from New electro optical water tight penetrator from
Seaproof Seaproof New design of the connection of the line (from 2 short New design of the connection of the line (from 2 short
jumpers + 1 interlink to 1 long jumper)jumpers + 1 interlink to 1 long jumper) Fuse box in the long jumper to protect DC/DC against Fuse box in the long jumper to protect DC/DC against
shorts in the lineshorts in the line
► Assembled in CCPM and presently in Catania ready Assembled in CCPM and presently in Catania ready for deployment by end 2009for deployment by end 2009
The NEMO Activities: The NEMO Phase-2
2000
3000
3600
NEMO
Conclusions and PerspectivesConclusions and Perspectives► The NEMO Collaboration is working on a long-term R&D program The NEMO Collaboration is working on a long-term R&D program
toward a kmtoward a km33 -telescope in the Mediterranean Sea-telescope in the Mediterranean Sea
An optimal candidate site has been found: the NEMO SiteAn optimal candidate site has been found: the NEMO Site
The NEMO Phase-1, aiming to validate the proposed technologies, The NEMO Phase-1, aiming to validate the proposed technologies, has been successfully conducted at the Catania Test Sitehas been successfully conducted at the Catania Test Site► Since Jan. 2005 the geoseismic and acoustic stations are fully operativeSince Jan. 2005 the geoseismic and acoustic stations are fully operative► The Junction Box and the mini-Tower has been deployed at the end of The Junction Box and the mini-Tower has been deployed at the end of
20062006► The Junction Box is still operatingThe Junction Box is still operating► Atmospheric muons have been successfully reconstructed and the Atmospheric muons have been successfully reconstructed and the
measured flux agrees with previous measurements and modelsmeasured flux agrees with previous measurements and models
The NEMO Phase-2, aiming to realize the deep sea station at the The NEMO Phase-2, aiming to realize the deep sea station at the NEMO Site, is in progressNEMO Site, is in progress► The deployment of the electro-optical cable has been done in 2007The deployment of the electro-optical cable has been done in 2007► The set-up of the onshore station is almost completedThe set-up of the onshore station is almost completed► The deployment of the DC/DC converter is scheduled by end of 2009The deployment of the DC/DC converter is scheduled by end of 2009► The test of new technologies is in progress The test of new technologies is in progress
Conclusions and Perspectives
AND…AND…
2000
3000
3600
NEMO
Toward the Toward the -Telescope-Telescope
► EU funded the joint activity for a European-scale EU funded the joint activity for a European-scale Design Study for a kmDesign Study for a km33 -telescope in the -telescope in the Mediterranean SeaMediterranean Sea
KM3NeT: ANTARES-NEMO-NESTOR consortiumKM3NeT: ANTARES-NEMO-NESTOR consortium
http://www.km3net.org/http://www.km3net.org/
► KM3NeT identified three possible Detection Unit KM3NeT identified three possible Detection Unit configurations (NuONE, Seawiet and MEDUSA)configurations (NuONE, Seawiet and MEDUSA)
► A prototype of NuONE will be built and tested at the A prototype of NuONE will be built and tested at the NEMO SiteNEMO Site
Conclusions and Perspectives
2000
3000
3600
NEMO
NuONENuONE
►NuONE design:NuONE design: towers towers Bar-storey 6 m length Bar-storey 6 m length
(6PMT/floor 8 inch 35% QE)(6PMT/floor 8 inch 35% QE) 20 bars/tower 20 bars/tower Proposed number of towers 127Proposed number of towers 127 Hexagonal lay-outHexagonal lay-out
Conclusions and Perspectives
PJBPJB
SJBSJB
MEOMEOCC
► The NuONE tower is lighter The NuONE tower is lighter than present NEMO tower than present NEMO tower with a drag 3 times smallerwith a drag 3 times smaller
2000
3000
3600
NEMO
Sea Operation with NuONE and Sea Operation with NuONE and PEGASOPEGASO
PEGASO in lifter configurationcontrolling the Tower unfolding procedure
PEGASO with DSS in supporting configuration
for the ROV
Conclusions and Perspectives