The Management and Administra�on of FIDIC Contracts – 1999 Edi�ons

WHO SHOULD ATTEND

The course will benefit all built environment prac��oners (engineers, quan�ty surveyors, lawyers,

project managers, etc.) Funding agents, such as Development Banks will also benefit enormously

from the workshop.

COURSE OVERVIEW

This Live Stream workshop is based on the FIDIC Approved Module 4 workshop.

The Mul�-Lateral Development Banks, including the World Bank, Islamic Bank for Development

and the Asian Development Bank have adopted the FIDIC Condi�ons of Contract for Construc�on

with modifica�on. The purpose of the course is to ensure that FIDIC contracts are managed and

administered correctly by understanding the full contract cycle from contract award, condi�ons of

contract, start-up, the pre-commencement mee�ngs, performance security, daily diaries, the

programme, financial control, ongoing supervision, taking-over the works, suspension and

termina�on and dispute resolu�on.

This prac�cal training course, explains and illustrates the use of the FIDIC Condi�ons of Contract

for Construc�on and the FIDIC Condi�ons of Contract for Plant and Design-Build. The course is

designed to help par�cipants have confidence in working with the FIDIC Red and Yellow Contract

Documents whether represen�ng Employers, Consultants or Contractors

two-day VIRTUAL WORKSHOP

An outstandingINTERACTIVE

on the administration of FIDIC Contracts

INTERACTIVE WORKSHOP facilitated by Kevin Spence

Pr Eng, BSc Eng (Civil)(Wits), MSAICE, FAArB, FIQReg. Professional Engineer, Mediator,

Adjudicator & ArbitratorAccredited FIDIC Trainer

REVIEWSKevin shows passion for his work especially on DABs, would be great to have Mr Spence as a mentor. ~ MD Contracts ConsultantKevin was a true professional, an expert in the industry. ~ RaubexKevin Spence has been such an excellent facilitator and gives construc�ve trainings. ~ World Food Programme

Kevin is a registered Professional Engineer, Mediator, Adjudicator and Arbitrator with over 40 years'

experience in the Construc�on Industry. His experience spans across Freeway Construc�on, Airport Runway

Rehabilita�on, Dams and Water Retaining Structures, Pipelines, Civil and Building Construc�on, Concrete

Structures, Asphalt and Concrete Road Surfacing and most recently Claims Prepara�on and Defence.

Throughout Kevin's professional career he has managed various business units of one of the largest

construc�on companies in South Africa, owned a Road Surfacing Company which was later sold to a listed

company before moving into dispute resolu�on and claims consul�ng.

Kevin completed the Fellowship of Arbitrators Qualifica�on and currently specialises in large scale

Construc�on Claims and Dispute Resolu�on. Over the last 10 years Kevin has been involved as Mediator,

Adjudicator, Arbitrator and expert witness on numerous ma�ers. He is presently appointed on Dispute

Boards (DB’s) in South, Central and West Africa. Kevin is an admi�ed member of the FIDIC President's List of

Adjudicators.

He is considered an expert on the FIDIC suite of contract documenta�on. He is the only FIDIC Accredited

Trainer in South Africa.

8:30am - 16:30pm

Session 1Ÿ Introduc�on and overviewŸ Contract formsŸ The FIDIC Golden PrinciplesŸ General formsŸ RiskŸ General Provisions

Session 2Contract Documents & Award Ÿ Contract Award ProceduresŸ Contract DocumentsŸ Role and authority of the EngineerŸ Performance Security

Session 3Contract Start Up Ÿ Commencement DateŸ AppointmentsŸ The ProgrammeŸ InsurancesŸ DrawingsŸ Kick off Mee�ngs

Session 4Post Commencement Date Administra�onŸ Access & possession of SiteŸ Site SecurityŸ Contractors Mobilisa�onŸ Nominated Sub-ContractorŸ RecordsŸ Progress ReportsŸ Local lawsŸ Design & ER Scru�nyŸ Contractor's DocumentsŸ Plant, Materials, & Workmanship

Session 5Financial ProceduresŸ MeasurementŸ Varia�on OrdersŸ Value EngineeringŸ Interim Payment Cer�ficateŸ Final Payment Cer�ficate

Session 6Claims, Suspension and Termina�onŸ Contractors ClaimsŸ Engineers ResponseŸ Employers ClaimsŸ Determina�onsŸ Suspension by Employer/Engineer and

ContractorŸ Instruc�ons by Employer directly to

Contractor

Session 7Disputes; Amicable Se�lement and Arbitra�on

Ÿ Establishment of the DAB Ÿ Procedure of the DAB Ÿ Amicable Se�lement Procedures Ÿ Arbitra�on Procedures

Session 8Taking over the Works and Defects Ÿ Taking Over Cer�ficateŸ Defects in the DNPŸ Performance Cer�ficateŸ Contract Comple�on issues

The Management and Administra�on of FIDIC Contracts – 1999 Edi�ons

9-10 November 2020