the installing instruction for concealed tank g¡?u ¤/ … · and our company shall not be...

Post on 24-Aug-2020

7 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

563307 14-1.0

NO.

1 4

1

1

22

2

1

1

1

1

1

1

1

2

3

4

5

6

7.1

7.2

8.1

8.28.3

9

10

Expansion bolt components

Clamp

Drainage pipe

Flush pipe

Drainage straight pipe components

Flush straight pipe components

Long bolt

Transparent long bolt shield

Long bolt components

Plug

To fix frame

To fix drainage pipe

To drain

To supply water to flush

To connect the bended pipes to toilet bowl

To fix toilet bowl

To shield long bolt To fix toilet bowl

To reserve space for straight pipes when laying bricks

NAME QTY FUNCTION

On-off For Filling WaterAngle valve

THE INSTALLING INSTRUCTION FOR CONCEALED TANK

FFL

Important remind:Please read through this Instructions carefully prior to installation, and our company shall not be responsible for any loss caused by not installating accrding with this Instructions. There are lubricantsin production for toilet bowl installation.Please confirm the FFL according to the overall indoor fitment method. Line out the FFL on the wall and always regard FFL as datum line of 0 height.

Note:1.Please install the frame before paving the tiles. The dimensional unit is millimeter. 2.Please subject to the object as right if it is not in conformity with the components in picture.

FFL of finish face, all dimension is millimeter Accessories List:

1.

2.

Protection frame For space reservation of push button plate when building the wall

To prevent sundries falling into the tank when fitmentProtection cover

Straight flush pipe of some products are offered with two kinds of seal gaskets A.B which can be selected according to toiletbowl type during installation.

A.B

7

B

A7.2

7.1

9

1

88.1

8.2

8.3

3.Please confirm the thickness of the floor exceed 80mm and it can bear more than 300kgf strength when the strength act on the front of toilet bowl.

300kgf

FFL 0

1. Dimensions and Supply Pipe-laying

Top inlet

Back inlet

G1/2

500

FFL 0

1000

230180

1140

40(4

0~24

0)

0~200

G1/2

400-100

320

100

500

FFL 0

1000

1052

.540

0~200

400-100

360 185

235

35

46

46

1095

°

12

12

2.Drainage Pipe Installation

If necessary, adjust the clamp and drainage pipe location according to the bowl dimension. (Keep this clamp tightened to professionals!)

Remind: The function of drainage would be worse when the installation angle of drainage pipe exceed 45°

Install drainage pipe clamp.

1Position1 W=140~1602Position2 W=160~180

When excretory tube lean 45° it can only be fixed in Position 2(W=160~180).

45 2(W=160~180)

W 160~180

1. 10X 502.3.4.5.

1.

50m

m

As shown on picture:1.Drill 10*50 2. Insert expansion bolt 3. Tighten nut to strain bolt; 4. Unscrew nut;5.Hold screw and washer for later use.

10X 503.Drill on the floor. 10XDrill50

4. Adjust floor-fixing bracket :

Floor-fixing bracket.

10X50mm

1120

360

185

360185

10mm

2. 3.

4. 5. 6.

B

A

B

A

5. Adjust horizontally and vertically, and tighten bolt:

Please pre-tighten bolt, and tighten after bracket adjustment.

A

B

2

11

A

B

C

D

E

“Click” “Click”

F

1

19

2

Install angle valve, connect it to inlet valve with hose.

Angle valve

Supply pipe

Flexible hose connecting inlet valve

3

20~60mm

6.Install Plug:

Sketch of installed frame

7.The thickness of fixed wall is 20~60mm(measured from the front of frame to the finished tile surface)

20~60

“Click”

Important remind: When the concealed tank fixed completely, it is important to test leaking with water upon 12 hours before fixing wall.

For the fixing of the long screw, there are two groups of screw holes on the bracket which are of different distance. Please choose the right position according to the size of the toilet bowl.

180230

8.Install toilet bowl:

d

L2L1

L1+6mm

L2+3mm

Set Straight Pipes into Flush Bend and Drain Bend properly, and marks lines.

Add lubricant onto the Rubber Gaskets of two Straight Pipes and set them into Bowl. Flush Pipe seal Gasket assembly see 3.1, 3.2 and 3.3 .

Mark lines as shows. L1 is the distance of two marks on Flush Straight Pipe, and L2 is that of two marks on Drainpipe Straight Pipe. Cut Straight Pipe just as shows.

Chamfer and trim the cutting edges on the shortened Straight pipes (as shows). Adjusting length for Bolt is d+25mm as shows.

First install Drain Straight Pipe into Drain Bend, and second install Flush Straight Pipe into Hole on Bowl. Install Bowl. Station Bowl properly.

1. 2. 3.

4. 5. 6.

7. 8. 9.

10. 11. 12.

Take out the sponge with silicon oil and smear it on connecting edges of Straight Pipe and Bends.

All data contained is based upon the last product information available at the time of publication. We reservesthe right to implement changes of product characteristics, packaging and availability at any time without further notice.

TOTO (CHINA) CO., LTD.After Service Free Tel: 800-820-9787Mobile telephone:400-820-9787

9.Installation of tank fittings:

The tank fittings have been installed before leaving factory. The above sketches are only for reference.

A

B

1

2

3

4

A

1

2 B

5

1

2

21

3.1 3.2 3.3

5. Adjust horizontally and vertically, and tighten bolt:

Please pre-tighten bolt, and tighten after bracket adjustment.

A

B

2

11

A

B

C

D

E

“Click” “Click”

F

1

19

2

Install angle valve, connect it to inlet valve with hose.

Angle valve

Supply pipe

Flexible hose connecting inlet valve

3

20~60mm

6.Install Plug:

Sketch of installed frame

7.The thickness of fixed wall is 20~60mm(measured from the front of frame to the finished tile surface)

20~60

“Click”

Important remind: When the concealed tank fixed completely, it is important to test leaking with water upon 12 hours before fixing wall.

For the fixing of the long screw, there are two groups of screw holes on the bracket which are of different distance. Please choose the right position according to the size of the toilet bowl.

180230

8.Install toilet bowl:

d

L2L1

L1+6mm

L2+3mm

Set Straight Pipes into Flush Bend and Drain Bend properly, and marks lines.

Add lubricant onto the Rubber Gaskets of two Straight Pipes and set them into Bowl. Flush Pipe seal Gasket assembly see 3.1, 3.2 and 3.3 .

Mark lines as shows. L1 is the distance of two marks on Flush Straight Pipe, and L2 is that of two marks on Drainpipe Straight Pipe. Cut Straight Pipe just as shows.

Chamfer and trim the cutting edges on the shortened Straight pipes (as shows). Adjusting length for Bolt is d+25mm as shows.

First install Drain Straight Pipe into Drain Bend, and second install Flush Straight Pipe into Hole on Bowl. Install Bowl. Station Bowl properly.

1. 2. 3.

4. 5. 6.

7. 8. 9.

10. 11. 12.

Take out the sponge with silicon oil and smear it on connecting edges of Straight Pipe and Bends.

All data contained is based upon the last product information available at the time of publication. We reservesthe right to implement changes of product characteristics, packaging and availability at any time without further notice.

TOTO (CHINA) CO., LTD.After Service Free Tel: 800-820-9787Mobile telephone:400-820-9787

9.Installation of tank fittings:

The tank fittings have been installed before leaving factory. The above sketches are only for reference.

A

B

1

2

3

4

A

1

2 B

5

1

2

21

3.1 3.2 3.3

top related