In this presentation, see how the AVEVA Data-Centric Digital Asset enables efficiency through all phases of the project, driving potential savings of 10% of Total Project Cost through:
✓ improved collaboration; ✓ alignment of accountability; ✓ faster decision/actions cycles; ✓ reduction handover to operations costs; and✓ reductions in overhead and indirect costs.
Also, through enhanced accessibility to all asset information, annual OpEx costs can be reduced 20-30% by reducing time spent finding and validating engineering information; enabling data analytics that can increase plant reliability; reducing maintenance and turnaround costs; and improving operations and
maintenance training and planning.
One Core philosophy…
For everyPhysical Asset…
There must exist a Digital Asset
Both assets need to be managed and sustained to ensure mechanical
integrity and safe operations. Each is an exact replica of the other!
What is a Digital Asset?
Engineering Information Asset
10% TIC Savings is on the table
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
••••••
•
•
•
•
•
•
•
•
•
•
•
•
Engineering Information Asset
••
•
•
•
•
••
•
•
•
•
Insulation needs to be added
Insulation clashes
Equipment Datasheets need to be updated
and re-issued
Pipe stress calcs need to
be re-assessed
Pipe has now become safety
cricital
P&IDs need to be updated
and re-issued
Spec Change
Wrong piping/equip-ment specs to
suppliers
Planning is no
longer valid
Rework
DelaysCost
Overrun
Company reputation
Wasted materials
Re-ordering
Change of one single
Temperature value
Different Instrument
arrangement needed
Lists and Datasheets are all aligned with 3D models and schematics,
ensuring quality deliverables
Avoiding procurement errors
and delays
Avoiding rework in construction
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
10% TIC Saving Through a Digital Asset Approach to EngineeringPatrick Reilly, Managing Partner, Vista Projects
June 21, 2017
Overview
Vista – Starting 3rd major project with a fully integrated and data centric approach
“Start Early” Strategy
Incremental improvements to business processes each project
Continual Improvement from a new Digital Base
Benefits in Conceptual / FEED Engineering
P&IDs Integrated with Line List - Auto Line List Generation
P&IDs Integrated with Instrument Index - Auto Instrument Index Generation
P&ID Integrated with 3D Model – Auto Validation
3D Modelling Efficiency
Plot Plan Integrated with 3D Model
Reduced Piping Stress Cycles
Electrical Cable Schedule Integrated with 3D Model
Ease of Access to Information / Data
Work from the latest information – not the last issued
A common misconception is that a digital asset approach is too rigorous for early engineering.
Experience shows that it will save 15% and produce better results
Benefits in Detailed Engineering
Elimination of unnecessary 2D deliverables
Integration with Fabrication
Integration with Commissioning
Integration with Material Control
Integration of FIWP creation
Ease of Access to Information
Reduced Project Tracking Burden on Technical Staff
Elimination of unnecessary deliverables and streamlining between systems can provide significant savings in detailed engineering.
Challenging the Status Quo
Can you propagate engineering and design changes quickly and reliably across all disciplines?
Can you incorporate late changes to design with minimal impact to execution?
Can you quickly and reliably recalculate TIC as the design changes?
Can you incorporate additional cost reduction cycles without impacting schedule?
Do your projects pass over from good ideas that are too late?
Can you reliably and automatically produce engineering and construction deliverables from your source tools?
Do you resort to offshore “value” centers to produce deliverables?
Barriers to Adoption
About AVEVA
AVEVA software and services enables our customers to solve the world’s most
complex engineering and design challenges. Discover how we can help you
redefine engineering possibilities to successfully create and manage world-class
capital-intensive assets. Headquartered in Cambridge, England, AVEVA employs
more than 1,600 staff in 50 offices around the world.
www.aveva.com
@avevagroup
Linkedin.com/company/aveva
top related