step 2 - compiere pro manufacture walkthrough - define and source components

Post on 05-Jul-2015

474 Views

Category:

Technology

2 Downloads

Preview:

Click to see full reader

DESCRIPTION

Step 2 in the compiere manufacture process. Source components, create purchase order , receive against purchase order . SolTech is a Compiere partner in Atlanta

TRANSCRIPT

Acme Decal Factory

2. Order Components

Manufacture with Compiere

SolTech. Inc http://www.soltech.net (404) 601-6000

Setup Vendors

In compiere, business partners can be vendors, customers and employees.

SolTech. Inc http://www.soltech.net (404) 601-6000

Define products

› Top layer, product header

SolTech. Inc http://www.soltech.net (404) 601-6000

Product Tabs

SolTech. Inc http://www.soltech.net (404) 601-6000

Product Tabs

SolTech. Inc http://www.soltech.net (404) 601-6000

BOM definition

Each product can be a component or a bom.

Boms can be made up of other boms

SolTech. Inc http://www.soltech.net (404) 601-6000

Place the PO

SolTech. Inc http://www.soltech.net (404) 601-6000

Receive Components

Create receipt lines from initial PO….(or manually)

SolTech. Inc http://www.soltech.net (404) 601-6000

Define Customer

SolTech. Inc http://www.soltech.net (404) 601-6000

Sell Product - quote

Inventory shortage tells us we need to manufacture.

SolTech. Inc http://www.soltech.net (404) 601-6000

Quote to Sales Order

SolTech. Inc http://www.soltech.net (404) 601-6000

Check Inventory

SolTech. Inc http://www.soltech.net (404) 601-6000

Work Order from Sales Order

Work orders can be driven directly from the sales order

Work order operations driven from routing

SolTech. Inc http://www.soltech.net (404) 601-6000

Generate Work order Operation Reqts

SolTech. Inc http://www.soltech.net (404) 601-6000

Generate Resource Charges

SolTech. Inc http://www.soltech.net (404) 601-6000

Reporting

SolTech. Inc http://www.soltech.net (404) 601-6000

Reporting

SolTech. Inc http://www.soltech.net (404) 601-6000

Reporting

top related