© 2013 Eaton, All Rights Reserved.

Spotlight on quality and manufacturing: Power Xpert™ 9395 UPS

Learn more at Eaton.com/9395

© 2013 Eaton, All Rights Reserved.

Eaton is flexible and equipped to build your pre-configured and custom UPS systems.

Learn more at www.powerquality.eaton.com

© 2013 Eaton, All Rights Reserved.

Title

Raleigh Plant Operations (RPO) in Raleigh, NC, currently has over 150 manufacturing employees.

© 2013 Eaton, All Rights Reserved.

One 9395 universal power module (UPM) comes off the line every 45 minutes.

© 2013 Eaton, All Rights Reserved.

We use a continuous flow manufacturing process, with sub-assemblies feeding the center assembly line.

© 2013 Eaton, All Rights Reserved.

Each UPM goes through comprehensive testing on the assembly line.

© 2013 Eaton, All Rights Reserved.

The base of the integrated system bypass module (ISBM) is built and wired.

© 2013 Eaton, All Rights Reserved.

Title

First pass yield is shown in real time providing instant feedback on the day’s assembly. It also shows day, month and YTD performance.

© 2013 Eaton, All Rights Reserved.

An 825 kVA 9395 UPS takes about 12 ½ hours of assembly while a 550 kVA UPS takes about 10 hours.

© 2013 Eaton, All Rights Reserved.

Wireless mobile stations can move as needed during assembly. The instructions are also accessible to service teams in the field.

© 2013 Eaton, All Rights Reserved.

Title

The conveyor is adjusted to prepare the ISBM for loading of the UPM.

© 2013 Eaton, All Rights Reserved.

One UPM comes off the line every two hours

Title

The ISBM is populated with the required number of UPMs to create the final UPS.

© 2013 Eaton, All Rights Reserved.

One UPM comes off the line every two hoursRoughly two days of work for the 550 kVA and three days for the 825 kVA.

© 2013 Eaton, All Rights Reserved.

Title

Each unit spends between five and nine hours in test, depending on kVA rating.

© 2013 Eaton, All Rights Reserved.

Units are double checked in button up before proceeding to final wrap.

© 2013 Eaton, All Rights Reserved.

• 9395 UPSs are shipped dedicated truck. This extra measure reduces risk of shipping damage in transit.

• Warranty is 12 months from date of installation or 18 months from date of shipment, whichever comes first. Extended warranty options are available.

Shipping and Warranty

© 2013 Eaton, All Rights Reserved.

Typical lead times range from 2-6 weeks for standard 9395 orders. For specific information or to order contact InsideSalesEngineerUPS@Eaton.com

© 2013 Eaton, All Rights Reserved.

Eaton Raleigh Plant Operations (RPO)

© 2013 Eaton, All Rights Reserved.

Eaton would be proud to be a part of your data center solutions.

To learn more go to Eaton.com/9395

top related