SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 1
Secondary Raw Materials for Concrete precast products
Introducing new products, applying the circular economy
Prof. Dr.-Ing. Christian Glock
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 2
Gliederung
1. Interreg NWE (Länder, Ziele, Prioritäten)
2. SeRaMCo-Projekt
3. Antragsphase
4. Erfahrungen Antragphase
5. Projektumsetzung
6. Erfahrungen Umsetzungsphase
7. Fazit
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 3
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
IrelandUK
France
Belgium
The Netherlands
Germany
Luxembourg
Switzerland
8 teilnehmende Länder
Fläche 845 000 km²
Bevölkerung 180 Mio. Menschen
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 4
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
Projekt…
… sollte Partner aus mindestens drei Ländernzusammenbringen, von denen zwei aus dem NWE-Raum stammen müssen …
… sollte die Veränderungen und Ergebnisse, die sie erreichen wollen, so weit wie möglich identifizieren und quantifizieren und sicherstellen, dass diese zu den Ambitionen des Programms passen …
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 5
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
Allgemeine Zielsetzung
„Um ein wichtiger wirtschaftlicher Akteur auf der Welt zu werden und einen attraktiven Ort zum Arbeiten und Leben mit hohem Innovationsgrad, Nachhaltigkeit und Zusammenhalt zu schaffen“
Um dieses Ziel zu erreichen:
Unterschiede in der wirtschaftlichen, ökologischen und sozialen Leistung der Regionen von NWE verringern
Steigerung der Gesamtleistung im gesamten NWE-Raum
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 6
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
Innovation
SO1: To enhance innovation performance of enterprises
Low Carbon
SO2: To facilitate the implementation of low-carbon, energy and climate protection strategies
SO3: To facilitate the uptake of low carbon technologies, products, processes and services in sectors with high energy saving potential
SO4: To facilitate the implementation of transnational low-carbon solutions in transport systems
Resource and materials efficiency
SO5: To optimise (re)use of material and natural resources in NWE
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 7
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
Gesamtziel
Erhöhung der Verwendung von Bauabfällen (CBTC: concrete, briks, tiles and ceramics) als Sekundärrohstoff für Zement und Betonfertigteile
Basis Verwendung von rezyklierten Gesteinskörnungen ca. 3 Mil. Tonnen in NWE
Geschätzte Nettoveränderung
- kurzfristig (Projektende) … + 50.000 t/a
- mittelfristig (nach 5 a) … + 1 Million t/a
- langfristig (nach 10 a) … + 13 Millionen t/a
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 8
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
Unterziele (Sub-objectives):
1. Voraussetzungen für hochwertiges Recycling von Beton, Ziegeln, Fliesen und Keramik entwickeln, um deren Verwendung als Sekundärrohstoff für Zement und Betonfertigteile zu ermöglichen
2. Entwicklung und Charakterisierung neuer Zement-und Betonmischungen, die die Verwendung der hochwertigen recycelten Abfälle ermöglichen
3. Entwicklung und Herstellung innovativer Zement-und Fertigprodukte aus recycelten Zuschlagstoffen und deren Vorbereitung auf die Vermarktung und Marktdurchdringung
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 9
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
11 Partners3 Sub-Partners3 Associated Partners
17 Partner aus5 EU-Ländern(Deutschland, Frankreich, Niederlande, Belgien, Luxemburg)
Partnerschaft
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 10
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
Projektpartner
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 11
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
CDW-unknown origin
CDW-known origin
developed treatment
AggregateSandcement mixes
concrete mixes
Str. Elements
Non-str. Elements
cement3 pilot projects
Projektidee
WP T1
WP T2
WP T3
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 12
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
LONG TERM EFFECTS COMMUNICATION PROJECT MANAGEMENT
WPT1: Best process of materials treatment
WPT2: Developing new cement and new concrete mixes for use of recycled materials
WPT3: Generating and implementing innovative cement and concrete products based on recycled aggregates
Pilot 1: test, implement and promote precast products in the city of Seraing (Belgium)
Pilot 2: test, implement and promote precast products in Saarlouis (Germany)
Pilot 3: test, implement and promote precast products in Moselle region DC57 (France)
UNIKLS&P UNIKL
Ulg
UL
ULux
Ulg
UNIKL
Cerema
Arbeitspakete
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 13
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
Mar 2017 Oct 2017Mar2019
Sep 2019
Jun 2020 Sep 2020
LONG TERM EFFECTS
COMMUNICATION
PROJECT MANAGEMENT
WP T1
WP T2
WP T3
WP T3
WP T3
WP T3
38 Monate - Zeitplan
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 14
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
Market Analysis Roll-out plan
Business Model
LONG TERM EFFECTS
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 15
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
COMMUNICATION
Activities & Deliverables
1. Start-up activities including communication strategy Detailed Communication strategy communication workshop with all PP, incl. goals, target groups Key messages & tactics Promotional material package (leaflet & poster)
2. Public Event(s) High-level conferences Presentation of findings at key multipliers Public openings of investments
3. Publication(s) (non- and scientific articles & Documentary videos)
4. Digital activities ( Website, social media, newsletter)
To inform the actors of the supply chain about the methods and products developed in the project and to engage them for replacing the raw materials in pre-cast concrete products with secondary raw materials
Communication Strategy
Public Events
Publication & Digital Activities
COMMUNICATION
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 16
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
Project Management Team (PMT)
Project ManagerCommunication Manager
Financial Manager
Advisory Board(AB)
13 Members
Thematik Working Groups (WGs)WG-1: Best process for materials treatment
WG-2: Developing
new cement mixes
WG-4: Generating and implementing
innovative cement and concrete products
WG-3: Developing new concrete mixes
Steering Committee
(SC)12 Members
PROJECT MANAGEMENT
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 17
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
Activities &Deliverables
1. Day-to-day management and coordination project manual - for PPs steering committee (7 meetings) activity reporting (to programme)
2. Financial management Financial management tool Financial monitoring reports Financial reporting (to programme
3. Risk management Risk management plan Updating the RMP Mid-term evaluation
4. First level controlling Set-up controlling and audit trails Audits
Project manual
Steering Committee
Activity reporting
1- Day-to-day management and coordination
PM – Activities & Deliverables
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 18
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
Tools Monitoring reports
Activity reporting
2-Financial management
PM – Activities & Deliverables
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 19
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
Plan Plan updating7 updates
Mid-term evaluation
3-Risk management
PM – Activities & Deliverables
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 20
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
4- First Level Controlling
Set-up controlling and audit trails
Audits
PM – Activities & Deliverables
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 21
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
Die Erfahrungen der Antragsphase lassen sich nach folgenden Kriterien kategorisieren:
1. Projektidee
2. Partnerschaft
3. Projektorganisation
4. Antrag & EMS
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 22
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
Fokussiert, konkret und realistisch
Messbare Ergebnisse, die marktorientiert sind und Programmzielen dienen
Basiert auf vorhandener Forschung und Erfahrung aus andern nationalen und internationalen Projekten (besonders EU Projekte)
Kann gut zu einer Prioritätsachse zugeordnet werden
1. Projektidee
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 23
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
2. Partnerschaft
Nicht zu viele Partner
Unterschiede der Länder im Stand der Technik bezüglich Projektthema beachten
Keine zwei Partner für ähnliche / gleiche Aufgabe zuordnen
Diversität der Fachkompetenzen der Partner soll Austausch fördern
Budget angemessen zur Aktivitäten und zum Personalbedarf
Arbeitsumfang in Arbeitspaket „Project Management“ nicht unterschätzen
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 24
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
3. Projektorganisation
Projektidee klar definieren und frühzeitig abstimmen
2-3 Partnertreffen in Antragphase (physisch)
Aufgaben, Beiträge und Verantwortungen zur Antragskizze beim ersten Partnertreffen präzise verteilen
Lead-Partner (LP) definiert feste Termine für Abgaben
Excel-Tabellen für gesamtes Budget sowie für das Budget jeder Partner erstellen(EMS-Vorgaben beachten wegen Übertragung )
Ausreichendes Budget für FLC-Kosten einplanen
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 25
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
4. Antrag & EMS
Antrag muss Projektidee, Objectives, Sub-objectives, Aktivitäten und Deliverables klar und verständlich darstellen
„Baseline“und „Changes (results)“ müssen in Zahlen angegeben werden
Begriffe „joint development, joint evaluation, joint …“ und „Erfahrungsaustausch“ müssen gelebt werden
Übertragungsaufwand der Antragstexte und Budget aus Word-und Excel-Datei in EMS nicht unterschätzen (ca. 20 Arbeitsstunden) - Störungen in EMS einrechnen
In EMS soll nach jedem Text „ Speicher“ betätigt werden
1 Tag vor der Abgabe alles in EMS übertragen
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 26
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
Umsetzungsphase
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 27
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
Status-quo
17/46 Deliverables
Communication und Long-term gemäß Plan
Best Practice bei Materialaufbereitungs- und Recyclingmethoden
Best Practice bei der Herstellung von Beton und Zement aus rezyklierten Gesteinskörnungen
Erste Ergebnisse der Entwicklung neuer Zement-und Betonmischungen
Industrielle Produktion von Zement aus recyceltem Sand hat bei VICAT begonnen
Entwicklung neuer Konzepte für Fertigprodukte von TU Delft
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 28
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
Aufgaben müssen zu Projektstart eindeutig auf Projektpartner verteilt werden
Aktivitäten in den verschiedenen Arbeitspaketen sollen streng nach Takt entsprechend Antrag durchgeführt werden
Aktivitäten wie Pilotprojekte erfordern frühzeitige Abstimmung mit zuständigen Behörden und/oder Verantwortlichen
Enge und frühzeitige Abstimmung jedes Projektpartners mit ihrem jeweiligen FLC
Lead Partner (LP) soll Fristen für Erstellung der Partnerreporte setzen um Abgabeverspätungen zu vermeiden
Erfahrungen
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 29
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
Besuch Schulung für Finanzmanager und First Level Controller (FLC) um sich Organisation und Abrechnungsarten anzueignen
Förderfähigkeitsregeln sind verständlich und in der Programmbeschreibung ordnungsgemäß erläutert
Schnelle Beantwortung bei Abrechnungsfragen seitens OFD
Projekt ist in Antragsphase soweit detailliert, das Implementation erleichtert
Definierte Deliverables aus Antragphase können in der Implementation gesteuert werden
Erfahrener Projektpartner für Kommunikation im Projekt
Erfahrungen
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 30
Interreg NWE
Länder
Ziele
Prioritäten
SeRaMCo
Kurzvorstellung
Antragsphase
Erfahrungen – A.
Umsetzungsphase
Erfahrungen – U.
Fazit
Fazit:
Ein Interreg-Projekt …
…ermöglicht guten Austausch und Zusammenarbeit mit Partnern aus derselben Branche in NWE
… öffnet Türen für weitere grenzüberschreitende Projekte
… erfordert viel organisatorischen und verwaltungstechnischen Aufwand
… lohnt die Mühe
SeRaMCo - Secondary Raw Materials for Concrete Precast Products | Nationaler Interreg Infotag, Mainz, 12.02.2019 | Prof. Dr. -Ing Christian Glock 31
Vielen Dank für Ihre Aufmerksamkeit!
Ich freue mich auf Ihre Fragen.
Prof. Dr.-Ing. Christian Glock