scheduling note title: strategic programmatic …• strategic direction for the business line •...

Post on 10-Oct-2020

3 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

SCHEDULING NOTE

Title: STRATEGIC PROGRAMMATIC OVERVIEW OF THE NEW REACTORS BUSINESS LINE (Public Meeting)

Purpose: Provide the Commission with a discussion of strategic considerations associated with the New Reactors Business Line.

Scheduled: January 24, 2019 10:00 a.m.

Duration: 2 hours

Location: Commissioners' Conference Room, 1st Floor OWFN

Participants:

NRC Staff

Margaret Doane, Executive Director for Operations

Fred Brown, Director, Office of New Reactors (NRO) Topic: • Strategic Direction for the Business Line • Key Focus Areas and Challenges

Robert Taylor, Director, Division of Licensing, Siting and Environmental Analysis (DLSE), NRO

Topic: • Light Water Reactor (LWR) Licensing Activities

Anna Bradford, Deputy Director, DLSE, NRO Topic: , • Initiatives to Modernize LWR Reviews

William Jones, Director, Division of Construction Oversight, Region II Topic: • Vogtle Construction Oversight

Presentation

60 mins.*

1

John Monninger, Director, Division of Safety Systems, Risk

Assessment, and Advanced Reactors, NRO Topic: • Advanced Reactor (non-LWR) Preparations

Commission Q & A

Discussion - Wrap-Up

*For presentation only and does not include time for Commission Q & A's

50 mins.

5 mins.

2

7 U.S.NRC United States Nuclear Regulatory Commission

Protecting People and the Environment

Strategic Programmatic Overview of the New Reactors Business Line

January 24, 2019

.Agenda

• Introduction - Margaret Doane

• Strategic Direction for the New Reactors Business Line - Fred Brown

• Large Light Water and Small Modular Reactor Licensing Activities - Rob Taylor

• Initiatives to Modernize Reviews - Anna Bradford

Agenda ( continued) • Vogtle 3 & 4 Construction Oversight -

Bill Jones

• .Advanced Reactor Readiness - John Monninger

·~u.S.NRC United Scares Nuclear Regulatory Commission

Protecting People and the Environment

Strategic Direction for the New Reactors Business Line (N RBL)

Frederick Brown Director

Office of New Reactors

Summary of NRBL strategic direction · • Complete work before us with an

appropriate focus on "reasonable assurance of adequate protection"

• Be agile in responding to workload changes

• Develop enduring guidance and direction to facilitate both clarity and reliability for future applicants

Effectively Executing Our Current Workload

• "Whole Team" effort with our agency partner offices

• Reliable in our approach to licensing and inspection

• Efficient in the timeliness of our decisions

• Open in our communications and engagement

Scaling the Office of New Reactors for Current and

Future Workload

• Combining internal work units • "Pre-merging" work units with the

Office of Nuclear Reactor Regulation • Maintaining staff continuity and

minimizing disruption where possible

Planning and Preparing for the Future

• Improving internal processes

• Preparing for the transition to operations at Vogtle

• Focusing guidance documents and pursuing approved rulemaking

• Executing the vision for advanced reactor licensing

7 U.S.NRC United Stares Nuclear Regulatory Commission

Protecting People and the Environment

Large Light Water and Small Modular Reactor Licensing

Activities

Robert M. Taylor Director

Division of Licensing, Siting, and Environmental Analysis

Effective and Timely (1/4)

• Completed APR1400 DC Review on 42 month schedule

• Pursuing direct final rulemaking for certification

Photo of NRC and KHNP staffs during the signing of the APR1400 Standard Design Approval issued on September 28, 2018.

Effective and Timely (2/4) • Completed 50

licensing actions supporting construction schedule

• lmpr?ved licensing& . eff1c1ency ,-.. -RAI

enhancements - Clear review

standards

___ __ _I,

Installation of Ring 3 on Vogtle Unit 3 Source: Southern Nuclear Company

Effective and Timely (3/4)

• Clinch River ESP - Leveraged audits - Reduced RAls

significantly - Completed SER with

no open items -Assessed

emergency planning zone size creatively

1•A 1. ;'191'- .... -

Photo of NRC staff examining core borings at Clinch River

Effective and Timely (4/4) • NuScale SMR Design Certification

- Phase 1 complete

- Phase 2 progressing - Resolving challenging issues

- Focus on safety and risk significance

New Reactors, Region II and Technical Training Center staff in NuScale Simulator Source: NuScale Power

Preparing for Licensing Work in FY 2019 and Beyond

• Continuing licensing support of Vogtle construction

• No new light water reactor DC or ESP applications expected

• Completing current applications under • review

• Preparing for new combined license application

·-~fU.S.NRC Unircd Srarcs Nuclear Rcgularory Commission

Protecting People and the Environment

Initiatives to Modernize Reviews

Anna Bradford Deputy Director

Division of Licensing, Siting, and Environmental Analysis

Improved Processes

• Improving the use of Requests for Additional Information (RAI)

- Ensuring an RAI is necessary to reach a regulatory finding

- Linking each RAI to the applicable requirement

- Resulting in better use of resources

Improved Processes (cont'd)

• Refining the use of Audits -Applying lessons learned from a

successful review

- Keeping audits focused, short, and well documented

- Benefiting staff and applicants

Transformation of Framework

• Initiated Part 50/ 52 Rulemaking - Ensuring consistency between the two

regulations

-Addressing lessons learned from the initial uses of Part 52 for certification, permitting, licensing, and construction

- Goal to provide appropriate flexibility for applicants and licensees, and improved opportunity for staff to focus on safety

Transformation of Framework (cont'd) • Refocusing of Standard Review Plan

- Current content results in an in-depth review across all topic areas

- Revise the SRP to focus on the regulatory requirement and necessary finding, not on historical information and prescriptive language

- Provide a structure for staff reviews to be innovative and flexible, better tailored to specific applications

Original Approaches for Issues

• Departing from past practice while achieving desired safety and security outcomes

- Tier 2* license amendment request for Vogtle - General Design Criterion 27 exemption for NuScale design certification

- Demand to capacity ratio for structural analysis in APR- 1400 design certification

~U.S.NRC United States Nuclear Regulatory Commission

Protecting People and the Environment

Vogtle 3&4 Construction Oversight

William Jones Director

Division of Construction Oversight Region II

Resources Aligned with Construction and Operational Inspection Challenges

1 , ~ irl:·~ r~~~

• Effectively implementing inspections through well qualified staff

• Previous organizational changes established foundation for transition to operations

NRC inspector observing

Unit 4 accumulator

lift

NRC -- inspector

with French

regulator

Effectively Meeting the Construction and Operational Inspection Challenges

Vogtle Unit 3: NRC ITAAC Inspection Completion Status vs.

ICNs Submitted & Verified Dated November 5 2018

• Construction status 1:1 2 0 1 0

1

• ITAAC and operational programs inspection status

• Effectively executing inspections associated with IT AAC closures

70

60

so

40

30

20

10

4/2018 •nd May-18 Jun-18 Jul-18 Au~-18 S<p-18 18-0ct P,lor

l!!!I NRC lTAAC ln$pedion Incomplete for ICNs Submitted

GmNRC rTAAC lnspa,:tion Compl<>te (Accumulating Total) ~ l T.S.NR C _._ICNs Submitted and Verified [Accumulating Total) ,.,._. ·-· ..... , .... 111"',i.-·•• ~n ......

f\Ml'tM1t\\y,!ltD#/1l~P.#~11-

Vogtle U3: NRC ITAAC Inspection Plan Status

• Compleood rTAAC ln,paction P~ns.

• rTAAC lmpc,ction Plons Not Complcrtc,

tiOTE: ' Ill\!£ lnspeaion P. u~t\ul.Co-n:, ch:· rnd.d.: lont lc· 1t

h 'UPCl",ns i-. :l'og'M"i

ant.I a.NDt· Jd..·on und tot aicf vif es not ·~'ldv r01 if\5QE"Cft'1.

To date, 34 ICNs or 16% for Unit 3 have been submitted and verified by the NRC.

'j l •.

'~ US.NRC 1. ....... ,cw, • .. <"'. ltoi. ·~ • , ..........

l"NMi"'Jfh9,l,'-"'""'ht,,,-

* Unit 4 Metrics Similar to Unit 3

Innovative Project Oversight

• Vogtle Readiness Group • Effective oversight through cognizant

offices throughout agency • Independence from organizational

changes • Ensures integration of guidance and

resources for the transition to operations

• Provides agency and licensee continuity in licensing and oversight activities

Transformational Initiative • Integrated Project Plan supports agency

readiness • Informed by licensee milestones

• Supports Vogtle Readiness Group decision making

• Aligns agency staff on program activities through plant operations

Supportive Infrastructure • Well established programs and

processes

• Maintains a forward inspection focus and ITAAC review

• Independent of agency organizational changes in structure or leadership

• Joint NRO./NRR Office instruction developed for 1 OCFR52. l 03(g) ·

Leveraging International Experience

• Enhanced NRC staff transition to operations readiness

• Gained AP-1000 startup program

• experience

• Eff~ctive knowledge transfer

NRC Staff at top of

the Sanmen

Unit 2 steam

igenerator

TTC APl 000 Simulator

5J U.S.NRC United States Nuclear Regulatory Commission

Protecting People and the Environment

Advanced Reactor Readiness

John Monninger Director

Division of Safety Systems, Risk Assessment, and Advanced Reactors

Broad Landscape Micro Liguid Metal Cooled High-TemQerature Molten Salt

Reactors Fast Reactors Gas-Cooled Reactors Reactors (LMFR) (HTGR) (MSR)

,---------Okla ·11 I [ GE-H ) ~ [ - X-ener

~ [ General Atomics ) [ Westinghouse l 11 l Terra Power ) .--ARC l 11 ) [ Framatome I

Sodium-Cooled J ~ [ StarCore ) I

TR/SO Fuel _ ~-f ( I- ~-- . Terrestrial ---------------------[ Westinghouse f 1 I ,- - Terra Power

[ Columbia Basin ) [ Elysium

[ Hydromine ) ( Thorcon

Lead-Cooled J I ( Muons

( Flibe

( Alpha Tech

Liquid Salt Fueled

Working the Action Plan

Strategy 1 J I strategy 2 Strategy 3 Strategy 4 11 Strategy 5 11 St t 6 Knowledge, ~~ills Computer Codes Flexible Review

. ra egy Consensus Codes Polley and Key C . t'

and Capabrhty & Review Tools Processes . ommunrca ron

and Standards Technical Issues

ONRL Molten Salt I 1

Identification & Regulatory

ASME BPVC I I Siting near

l NRC DOE Reactor Training

Assessment of Roadmap

Section Ill densely populated Workshops

Available Codes Division 5 areas

Knowledge I I Prototype I 1 ANS Standards I I Insurance and

Periodic 20.1, 20.2 Stakeholder

Management Guidance 30.2, 54.1

Liability Meetings

Competency Non-LWR Design Non-LWR Consequence

NRC DOE GAIN Based Security

Modeling Criteria PRA Standard (SECY-18-0076)

MOU

Updated HTGR Environmental EPforSMRs

I International and Fast Reactor Reviews and ONTs I Coordination

Training (SECY-18-0103)

Licensing

j I Functional

Modernization Containment Project (SECY-18-0096)

Potential First Movers

Micro-Reactors

Integrated Evaluation of the Licensing Framework

• Removing unnecessary barriers to incentivize holistic approach to safety

• Systematic use of risk assessment tools

• Balancing accident prevention and consequence mitigation

• Inter-relationship and linkage of initiatives being pursued

Developing a Risk-Informed and Performance-Based Framework

• Evaluating N El 18-04, "Risk Informed Performance-Based Guidance for Non­Light Water Reactor Licensing Basis Development" for NRC endorsement

- Systematic process

- Identification of licensing-basis events

- Classification of structures, systems, and components

- Consideration of Defense-in-Depth

Developing a Risk-Informed and Performance-Based Framework

( continued)

• Significant stakeholder interactions including coordination with Department of Energy and Department of Defense

• Engagement with the Advisory Committee on Reactor Safeguards and international community

Improving the Focus of the Content of Applications

.. I u4{p !i \ ...,.J cr_,, , ! ,-. U-02 :--:---- ... - - Arrdton ;! ,.4' ) . ---

"''" at ~ - 1.14' .. -- - -- - -------- · - ..

~ ~ lf-4$

1£41 1 -

10C111tSO.l4 lloM lilnll

',,,, I

' I ', I ',,

1£-07 .._ _______________________ _

1 (.01 t .(,02 U...Ot 1.(.00 t E•OI U•OZ U.ol

MEAN TOTAL EFFECTIVE DOSE EOUIVALENT (REM) AT fXCLUSION AREA BOUNDARY (EABI

Non-Light Water

Safety-Related SSCs

Non-Safety-Related SSCs Risk Significant

Non-Safety-Related SSCs

Non-Risk Significant

Application

~

Addressing Challenges

• Planning for the broad range of designs under development

• Expanding N RC staff organizational capacity

• Ensuring coherence of new licensing approaches

Acronyms • DC - design certification

• ESP - early site permit

• FY - fiscal year

• IPP - Integrated Project Plan

• IT AAC - Inspections, tests, and acceptance criteria

• NEI - Nuclear Energy Institute

• RAI - request for additional information

• SER - safety evaluation report

Acronyms • SMR - small modular reactor

• TVA - Tennessee Valley Authority

top related