2© 2006 PRICE Systems, L.C.C. All Rights Reserved.
45-Minute Online Webcast / September 26, 2006
Headlines!
“Of the 250 projects analyzed, about 25 were deemed successful in that they achieved their schedule, cost, and quality objectives. About 50 had delays or overruns below 35 percent, while about 175 experienced major delays and overruns, or were terminated without completion.”
Capers Jones,Software Project Management Practices: Failure Versus Success,Crosstalk Vol. 17 No. 10,October 2004
Inadequate Project Management at DOEResults in Frequent Cost Overruns, Delays
- National Academy of Sciences
FBI's Trilogy Program Draws Senate Ire
FBI Case Management System Marked for Termination Modern case-management capabilities remain atop the FBI's IT Most Wanted List as the bureau's $170 million Virtual Case File (VCF) project faces imminent termination.
- INTERNET NewsUNITED STATES COAST GUARDImprovements Needed in Management andOversight of Rescue System Acquisition
- GAO Report
3© 2006 PRICE Systems, L.C.C. All Rights Reserved.
45-Minute Online Webcast / September 26, 2006
The Affordability ChallengeAffordability is the biggest issue facing agencies, organizations and contractors today. Clear evidence is seen in high profile failures (inaccurate estimates, cost overruns, major project delays, project cancellations)
Why?Although there are clear program management guidelines, programs do not focus on the cost engineering discipline and cost engineering processes and technologies stove-piped
The ConsequencesGovernment oversight has increased.
Credibility, competence, and funding are challenged.
The Solution Program Affordability Management
How do you get the funding you need, manage risks and eliminate surprise cost overruns?
There are six key steps to successful Program Affordability Management
4© 2006 PRICE Systems, L.C.C. All Rights Reserved.
45-Minute Online Webcast / September 26, 2006
Anthony A. DeMarco
• President, Managing Member andco-Founder of PRICE Systems, L.L.C.
• 25 years experience in project cost engineering and program managementanalysis
• Award winning creator of cost andschedule models and management methods
• Patent author of cost estimating techniques
• Member of the NASA International Space Station Management and Cost Estimating task force (Young task force)
• Board of Director of the National Defense Industrial AssociationDelaware Valley Chapter
5© 2006 PRICE Systems, L.C.C. All Rights Reserved.
45-Minute Online Webcast / September 26, 2006
DefinitionsProgram
A system of services, opportunities, or projects, usually designed to meet a social need
Affordabilityability to be able to bear the cost of
Managementthe conducting or supervising of something
Program Affordability ManagementThe set of supervised and coordinated activities that determine whether or not an organization will be able to bear the cost of a program over the course of its life
6© 2006 PRICE Systems, L.C.C. All Rights Reserved.
45-Minute Online Webcast / September 26, 2006
Total Program Life Cycle
7© 2006 PRICE Systems, L.C.C. All Rights Reserved.
45-Minute Online Webcast / September 26, 2006
Program Affordability Management
There are key steps to Program Affordability Management, fortifying the practice with the expertise, tools and best practices and discipline to meet specific oversight requirements and build credibility, competence and success.
Program Affordability Management integratesProgram Affordability Management integratestraditionally traditionally ““stovestove--pipedpiped”” activities, such as :activities, such as :
Engineering/DesignEngineering/DesignEstimating/Cost ManagementEstimating/Cost ManagementEarned Value Management Earned Value Management Knowledge ManagementKnowledge Management
into a cohesive, iterative, lifespan viewinto a cohesive, iterative, lifespan view.
8© 2006 PRICE Systems, L.C.C. All Rights Reserved.
45-Minute Online Webcast / September 26, 2006
Assemble the right team
Percent of effort spent onAffordability Management8.0%7.0%6.0%5.0%4.0%3.0%
Complexity
Priority
Complex Program$100M/year30 people
Technical
FinancialStatistical
Leadership
You must size the affordability management effort commensurate with program size, complexity, and priority
Simple Program$5M/year1 person
You must ensure that you have the right skill mix for the program
9© 2006 PRICE Systems, L.C.C. All Rights Reserved.
45-Minute Online Webcast / September 26, 2006
Use a credible life cycle cost model
Understanding – common language among the team from Management throughout the supply chain
Focus – common performance criteria helps guide management actions –Performance Based Contracts
Speed – rapidly evaluate, negotiate and agree on changes
Confidence – relieve fear of mistrust and inaccuracy
Decision Criterion = Effectiveness / LCC
Simple cost model (< 10,000 function points)
LCC = Design + Build + Support= ($200 x FP) + ($400 x FP) + ($50 x FP x Yrs)where LCC = life cycle cost, and
FP = function point count
“People operate with beliefs and biases. To the extent that you can eliminate both and replace them with data, you gain a clear advantage”.
- John Henry (Florida Marlins Owner 1999)Moneyball is the best business book Lewis has written. It may be the best business book anyone has written.
- Mark Gerson, The Weekly Standard
10© 2006 PRICE Systems, L.C.C. All Rights Reserved.
45-Minute Online Webcast / September 26, 2006
Use a credible life cycle cost model
Understanding – common language among the team from Management throughout the supply chain
Focus – common performance criteria helps guide management actions –Performance Based Contracts
Speed – rapidly evaluate, negotiate and agree on changes
Confidence – relieve fear of mistrust and inaccuracy
Decision Criterion = Effectiveness / LCC
Robust Cost Models (>10,000 function points)
Project Cost by Resource
…there are commercially available models for ERP and COTS implementations, Data Center Operations, custom hardware and software development and more.
Project cost/ effort over time
Credible: offering reasonable grounds for being believed
11© 2006 PRICE Systems, L.C.C. All Rights Reserved.
45-Minute Online Webcast / September 26, 2006
Get the estimate right the first time
1
1 2x’s
UNDERESTIMATESLEAD TO DISASTER- insufficient resources- panicked decisions- unrealistic
expectations
REALISTIC ESTIMATES MINIMIZE FINAL COST
OVERESTIMATES LEAD TO DISASTER- under-utilized resources- excess capacity- un-competitive pricing
THE FREIMAN CURVE
FINAL PROGRAM
COST
ESTIMATED COST
2x’s
12© 2006 PRICE Systems, L.C.C. All Rights Reserved.
45-Minute Online Webcast / September 26, 2006
Size, Productivity, Complexity
Get the estimate right the first time
Design Cost = SIZE x Productivity x Complexity = SIZE x (Hours/SIZE x K)
where K is determined by benchmark comparison with other projects and/or operations research on project characteristics, for example…
Design Cost = (FP x $/FP x K) = 5,000FPs x $200 x 1.4= $1,400,000
where FP = function point count SIZE, and$200 = average normalized cost per FP for a web-based user interface, and1.4 = empirical factor derived from OR on non co-located teams
13© 2006 PRICE Systems, L.C.C. All Rights Reserved.
45-Minute Online Webcast / September 26, 2006
OMB OEGIT Directive
14© 2006 PRICE Systems, L.C.C. All Rights Reserved.
45-Minute Online Webcast / September 26, 2006
Create, document, train, and reuse knowledge, metrics and processes
1. Program AffordabilityManagement Manual
2. Cost Estimating Guide
3. Earned Value ManagementSystem Guide
4. Risk Management Guide
5. Design to Cost Guide Life Cycle Cost Estimating Process Flow
Identify program requirements and establish timeline
2
1
Establish a common Work Breakdown Structure (WBS)
Collect applicable and necessary technical,
programmatic, and cost data
Determine appropriate estimating tools &
techniques to employ.
• RDT&E• Procurement• Operations & Support• Disposal
• COTS Models & Databases such as Price H, Price S, ACEIT, Excel.
• Custom Built Applications
4
3
5
Documentation
Present findings and defend cost estimate
9
7 Identify cost drivers and
determine risk/uncertainty.
• Use Data from Analogous programs for cross checks.
• OMB Circular A76 or A94• DAD 5000• etc. • ACEIT, PRICE H, PRICE S
• SEER-SEM• COCOMO• MS Excel, etc.
Understand the customer needs and capture the program mission and goals.
Develop a cost estimate
6
8 Validate/Verify cost estimate
and assumptions
• Aircraft, Ship, Missile• Software, electronics• etc.
• Current Year $• Then-Year $• Discounted $
• What If Analysis • Cost, Schedule, Tech. Parameters
• Sensitivity Analysis • Monte Carlo Simulation • Analysis of Variance (ANOVA)
15© 2006 PRICE Systems, L.C.C. All Rights Reserved.
45-Minute Online Webcast / September 26, 2006
Cost Estimating
Program Control (Earned Value Management)
CostEstimating
Cost Estimating &
Program Control (Earned Value Management)
Integrate cost, project control and knowledge management and ensure program is incentivized on forward looking measures
CostEstimating
CostEstimating
CostEstimating
Knowledge Management
Asis
Shouldbe
16© 2006 PRICE Systems, L.C.C. All Rights Reserved.
45-Minute Online Webcast / September 26, 2006
Integrate cost, project control and knowledge management and ensure program is incentivized on forward looking measures
TOTAL PROGRAMPRE-SYSTEM ACQUISITION
Concept Refinement & Technology DevelopmentSYSTEM ACQUISITION
SDD & ProductionSUSTAINMENT
Operation & Support
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
O&SAcqPre-Acq
Today
Budget Targets
Level 1: Visitor Recognition and ID System
Program Affordability DashboardYou cannot manage by only looking into the rearview mirror
Integrating estimating models with program control enables “forward-looking”performance based measures of cost, schedule and effectiveness.
17© 2006 PRICE Systems, L.C.C. All Rights Reserved.
45-Minute Online Webcast / September 26, 2006
Persist! Repeat steps 1 through 5 throughout the program life cycle
1. Assemble the right team
2. Use a credible life cycle cost model
3. Get the estimate right the first time
4. Create, train, document and reuse knowledge: metrics and processes
5. Integrate Cost, Project Control, and Knowledge Management and ensure that the team is incentivized on forward looking measures
People, Processes, Tools
18© 2006 PRICE Systems, L.C.C. All Rights Reserved.
45-Minute Online Webcast / September 26, 2006
Federal Program Office Case StudyLarge Government Program OfficeProgram Office Improves Business Modernization Management
Controls and Capabilities Through Independent Validation of Cost and Performance
• The Challenge: Controls and capabilities related to configuration management, human capital management, cost and schedule estimating, contract management, and post-implementation reviews have not yet been fully implemented or institutionalized. Weaknesses in these controls and capabilities have contributed, at least in part, to Business Systems Modernization (BSM) project cost and schedule shortfalls.
• Solution: Partner with an expert who could produce accurate, independent cost estimates and analyses quickly and reliably, improving the credibility and reliability of program cost and budgeting.
• Results: The initial effort was focused on one project in the form of an independent cost estimate and assessment for the next increment. The results were successfully received by the program office and the oversight agencies. Additional projects of various sizes have been taken on with similar results. The program office is currently evaluating proposals for a five year effort to continue this type of support.
Highlights: 1. Program Office gained credibility with oversight committee.
2. Initial findings valuable enough to warrant a long-term contract.
19© 2006 PRICE Systems, L.C.C. All Rights Reserved.
45-Minute Online Webcast / September 26, 2006
Defense Program Office Case Study
• The Challenge: Overcome SPS software integration failures andfunctionality shortcomings and eliminate the ineffective resulting“work-arounds” that triggered a “strategic pause” in the projectand a lack of confidence by end users and oversight boards.
• Solution: Partner with an expert who could produce accurate, independent cost estimates and analyses quickly and reliably, maximizing efficiency of existing DoD tools and processes.
• Results: A process of knowledge transfer and set of reusable best practices for project control that enabled SPS to interface with 32 systems across DoD and ended the “strategic pause” by regaining the confidence their customers, users, and the oversight agencies. More than 23,000 DoD professionals use SPS to purchase over $48 billion in goods and services; currently it’s deployed in 800 sites worldwide.
Department of Defense (DoD)Standard Procurement System Gains Balanced Scorecard through AccurateCost Estimating and Knowledge Transfer
Highlights: SPS achieved Upper-Management’s Recognition as well as gained credibility with their oversight committee
20© 2006 PRICE Systems, L.C.C. All Rights Reserved.
45-Minute Online Webcast / September 26, 2006
Federal Program Office Case StudyNational Oceanic & Atmospheric Administration’s, National Weather Service (NWS)NWS Improves Ability to Define, Analyze, and Defend Budget and Performance Requirements with Program Affordability Management Approach
• The Challenge: NWS determined the need to modernize our nation's ability to monitor weather and climate with greater resolution and frequency, including the modernization of their COOP program, which actually supports more remote and densely populated stations throughout the United States. Determining the process for modernization was a challenge that had never been undertaken at this level.
• Solution: Working with PRICE Systems TrueMethods best practices and TruePlanningtools, NWS was able to adopt an Affordability Management to planning and control, to improve their ability to manage costs in their multiple-program portfolio environment.
• Results: By integrating the budget process, the cost estimating efforts, and the earned value activities all into one framework, NWS is able to measure performance essential for oversight organizations such as Office of Management and Budget.
Highlights: President Bush asked NWS to take the lead in an international Tsunami Detection system, NWS was ready and implemented the framework immediately.
21© 2006 PRICE Systems, L.C.C. All Rights Reserved.
45-Minute Online Webcast / September 26, 2006
Defense Contractor Case Study
• The Challenge: Develop a cost-modeling tool that will immediately establish credibility with new customers by quickly producing “data-defensible” proposals and cost estimates. This new tool needs to respond fast to complex “what if” scenarios and make proposal and project adjustments seamlessly. Over time, a high “level of confidence” must be maintained through ongoing accuracy of quotes in the prototype, test and production phases, ultimately enabling BAE to effortlessly execute contracts on time and within budget at all times.
• Solution: Establish a disciplined cost methodology based on a robust knowledge base of cost management throughout the life cycle of a program. BAE’s knowledge base is built on an internal history and industry-wide cost data using PRICE tools and consulting best practices.
• Results: Achieved a measurable competitive edge, proven by repeat contracts and an increased “win rate.” With cost-modeling from PRICE Systems, United Defense has established credibility with its customers and contractors. Profitability is now sustained, allowing its systems to sell at competitive costs. Overall, BAE is in a stronger negotiating position with suppliers,has improved workflow and reduced risk.
BAE Systems (formerly United Defense)Armament Systems Division Achieves Measurable Competitive Edge, Proven by Repeat Contracts and an Increased “Win Rate”
Highlights: “. “We have to be profitable in order to develop new product lines, go after new business and execute DoD contracts. Our work using PRICE gives us the confidence we need to invest in new areas, deliver our projects at a fair price and move forward profitably. Customers keep coming back as a result.” - Jim Unterseher Director of Army Programs at ASD
22© 2006 PRICE Systems, L.C.C. All Rights Reserved.
45-Minute Online Webcast / September 26, 2006
Systems Integrator Case StudyComputer Science CorporationCSC Wins New Business by Employing PRICE Tools and Services
Highlights: With the completion of ERP blueprinting by May 2008, this selection will enable the first ECSS capability to be implemented soon thereafter, with deployment of full operational capabilities by January 2013.
• The Challenge: The AirForce’s Expeditionary Combat Support System (ECSS) program is an Oracle-based ERP commercial off-the-shelf logistics support system, part of the Air Force’s eLog21 long-term overhaul of its logistics system. ECSS is intended to integrate financials, order management, purchasing, inventory management, distribution and other business functions onto one platform. In order to receive award, Computer Science Corporation (CSC) would need to provide a response that addressed costs and time required for ERP implementation.
• Solution: Working with PRICE Systems TrueMethods best practices and TruePlanningtools, CSC was able to accurately provide a credible cost estimate that supported the proposed COTS software and addressed the AirForce’s requirements.
• Results: The Air Force Materiel Command’s 554th Electronic Systems Group awarded a firm fixed-price task order worth $627.8 million to CSC for systems integration support to configure, deploy, and conduct training and change management activities for the Expeditionary Combat Support System (ECSS).
23© 2006 PRICE Systems, L.C.C. All Rights Reserved.
45-Minute Online Webcast / September 26, 2006
Banking Industry Case Study
• The Challenge: Every IT project, with associated operational justification and cost estimation, are reviewed as part of the elaboration of the IT multi-year Budgetary Plan. With projects at very different stages, there was a need to prioritize projects to make the decision of which projects will be launched and when.
• Solution: Partner with an expert who could produce accurate, independent cost estimates and analyses quickly and reliably, improving the credibility and reliability of program cost and budgeting.
• Results: Crédit Agricole received a Proof of Concept which covers the whole process of budgetary planning enabling them to better manage their Information Systems by providing a flexible cost estimation framework for all their IT projects and a means to rationalize and improve consistency of the data requested from the projects.
Highlights: Crédit Agricole achieved a roadmap to make credible decisions regarding their IT multi-year Budgetary Plan
Credit Agricole SAThe Company's principal activity is the operation of the largest commercial bank in France and one of the largest in Europe.
24© 2006 PRICE Systems, L.C.C. All Rights Reserved.
45-Minute Online Webcast / September 26, 2006
Banking Industry Case StudyINGThe organization's corporate governance and transparency have been improving continuously since ING was created in 1991. ING's governance moves away from a typically Dutch governance structure toward a structure that is better adapted to the needs of an international company. ING has an annual IT spend of about €2.5 billion—about 25 percent of total operating expenditure and about 40 percent of net operating income. It employs about 15,000 IT staff, and invests around €1 billion on IT-enabled capital programs.
• The Challenge: ING is totally dependent on information technology, not just to support and enhance its business, but increasingly to enable it. ING realized the need for excellent governance structures and processes to determine the right investments were made and the organization's resources were properly employed resulting in a return on investment.
• Solution: ING adopted a dashboard and benchmarking process to provide information necessary to enable ING, over time, to develop and compare the most appropriate metrics on IT spend, performance and value.
• Results: ING use of the knowledge and tools improved the IT investment process and help to better manage IT expenditure and providing a far clearer and more complete picture of where its major areas of project risk are.
Highlights: The ING case study indicates the co-variance between ING’s superior business performance and the robustness of the IT governance structure supported by innovative IT portfolio analysis (investment fund management approach of enterprise IT) combined with strong execution capabilities.
25© 2006 PRICE Systems, L.C.C. All Rights Reserved.
45-Minute Online Webcast / September 26, 2006
Summary• Affordability is the biggest
barrier to program mission success
• Government oversight is demanding more affordability discipline
• Program Affordability Management is a practice that satisfies government oversight and helps ensure program success
• There are Six key steps to successful Program Affordability Management
• Program Affordability Management is practiced by successful programs today
“Among the most important software development practices leading to success are those of planning and estimating before the project starts, absorbing changing requirements during the project, and successfully minimizing bugs or defects. Successful projects always excel in these critical activities: planning, estimating, change control, and quality control. By contrast, projects that run late or fail typically had flawed or optimistic plans, had estimates that did not anticipate changes or handle change well, and failed to control quality.”
Capers Jones,Software Project Management Practices: Failure Versus Success,Crosstalk Vol. 17 No. 10,October 2004
26© 2006 PRICE Systems, L.C.C. All Rights Reserved.
45-Minute Online Webcast / September 26, 2006
Upcoming Webinars
Project SizingIndependent Government Cost
EstimatesThursday, October 26, 2006 Thursday, November 30, 2006
11:00 AM 11:00 AM
To learn more and register: www.pricesystems.com
Size of the project is a critical elementHow to determine the “size” of your projectCommon mistakes in determining sizeMethods for “sizing”
Why is an Independent Estimate needed?Does an Independent baseline really gain
you anything?What is the industry best practice?
White paper available soonWe will offer a free workshop and
30 day trial of software sizing tools for all who attend
White paper available soonAlso presented will be the results
of an independent Market Survey of government leaders
27© 2006 PRICE Systems, L.C.C. All Rights Reserved.
45-Minute Online Webcast / September 26, 2006
If you would like to discuss further or find out more…
Anthony A. DeMarcoPresident, PRICE Systems, L.L.C.1700 N. Moore Street – Suite 1100 17000 Commerce Parkway – Suite AArlington, VA 22209 Mt. Laurel, NJ 08054
856.608.7214 (Office)Anthony.DeMarco@PRICESystems.com (eMail)www.pricesystems.com (Website)
Thank you for your time – QUESTIONS?